7020 - Construction of Three (2019) Playgrounds, Addendum 1 Purchasing Department 901-B Texas St. Denton, TX 76209 (940) 349-7100 www.dentonpurchasing.com ADDENDUM #1 RFP # 7020 Construction of (2019) Three Playgrounds Issue Date: April 18, 2019 Response due Date and Time (Central Time): Tuesday, April 30, 2019, 11:00 A.M. C.S.T RFP # 7020 ADDENDUM # 1 The following are changes to the specification sheet:  Please see the attached Questions and Answers that came up on this project.  The opening date is still April 30, 2019 (Tuesday) 11:00 AM NO OTHER CHANGES AT THIS TIME. Please acknowledge addendum on Attachment F of the main solicitation document when submitting a proposal. RFP 7020 - Question and Answers: 1. To be considered, contractor must include an acceptable bid bond, cashier’s check, or certified check in an amount not less than 5% of the total submission or $15,000, whichever is less. All submissions received without the above will be rejected and considered non-responsive. ONLY HARD COPY BONDS WILL BE ACCEPTED AND MUST BE PROVIDED TO THE CITY BEFORE THE DUE DATE AND TIME ON THE COVER SHEET. There will not be a Bid bond, cashier’s check or certified check required. The only bond requirements will be with the vendor winning the RFP. 2. I noticed that the following was in the SOW’s: DELIVERY: Delivery should be approximately 4 to 6 weeks after notice to proceed. Does this mean once the contract is awarded, the equipment should be delivered in 4-6 weeks? Yes, this timeline is flexible, within reason. 4-6 weeks is the standard time of delivery but we realized that if it’s a busy season, like spring, it may take a few weeks longer. If your projected delivery time is more than the 4-6 weeks requested by the Scope of Work, please provide this information in the schedule/timeline submittal. Please Note: Within the scoring criteria of the evaluation process the “Project Schedule” is set at 10% of the overall scoring. Extended delays in delivery could result in a lower score in this section. Regarding MLK Playground, which is to be installed after September 1, we would not expect the equipment to be delivered within 4-6 weeks just sit outside for months. 3. I see the budget for two of the parks is $290,000 but the Ridglea does not list a budget. Ridglea playground we have $175,500.00 and a total of $465,500.00 for all three playground. 4. I have looked through the bid documents and I don’t see any drawings or details for each park with the layout? Yes, all playgrounds vendors submit deigns (2 maximum) for each playground. This is standard. 5. Are there any CAD files for the parks, or site map that show the layout and any trees or objects that might be in the area? Or will the vendors need to go and measure each site and take pictures? No CAD files. Vendors have to go to the site anyways, as outlined in the SOW, to determine # of existing play activities that they must match or exceed with their designs. RFP 7020 - Question and Answers: 6. Are there any CAD files for the parks, or site map that show the layout and any trees or objects that might be in the area? Or will the vendors need to go and measure each site and take pictures? No CAD files. Vendors have to go to the site anyways, as outlined in the SOW, to determine # of existing play activities that they must match or exceed with their designs. 7. The square footage of the three playgrounds are in the scope of work  Playground area: o Carl Young Sr. Park 2,225 sq. ft. – existing border o Nette Shultz Park 4,630 sq. ft. – existing border o Ridglea Court Park 3,500 sq. ft. – new playground, no existing border 8. As is the age group of each playground A. Carl Young Sr. Park 1. Playground Removal – City of Denton Parks and Recreation will remove existing playground equipment within the footprint of the playground which includes play components, concreted posts, fabric, drainage rock, drainage pipe, and wood fiber. 2. 5-12 Playground Installation – Includes material, delivery and installation of the playground. All application standards must follow the guidelines stated in specifications.  Must meet or exceed current number of elevated play activities  Must meet or exceed current number of ground level play activities o Pre-bid site inspection required to determine current number of activities 3. Swing: single bay swing set containing (2) two belt swings RFP 7020 - Question and Answers: B. Nette Shultz Park 1. Playground Removal - City of Denton Parks and Recreation will remove existing playground equipment within the footprint of the playground which includes play components, concreted posts, fabric, drainage rock, drainage pipe, and wood fiber. 2. 2-5 Playground Installation – This includes material, delivery and installation of the playground. All applications standards must follow the guidelines stated specifications.  Must meet or exceed current number of elevated play activities  Must meet or exceed current number of ground level play activities o Pre-bid site inspection required to determine current number of activities 3. Swing: a two (2) bay swing set containing two (2) belt swings and two (2) toddler swings 4. 5-12 Playground Installation – This includes material, delivery and installation of the playground. All application standards must follow the guidelines stated specifications.  Must meet or exceed current number of elevated play activities  Must meet or exceed current number of ground level play activities o Pre-bid site inspection required to determine current number of activities C. Ridglea Court Park Site 1. New playground site: in addition to drainage rock, drainage piping, fabric, play structure and engineered wood fiber this site also requires excavation, concrete border, and concrete ADA ramp extending from border into play area. 2. 2-5 Playground Installation – Includes material, delivery and installation of the playground. All application standards must follow the guidelines stated specifications. 3. 5-12 Playground Installation – Includes material, delivery and installation of the playground. All application standards must follow the guidelines stated specifications. RFP 7020 - Question and Answers: As well as the surfacing  Surfacing – Subsurface shall consist of drainage rock and drainage piping overlaid with a geotextile fabric and covered with a minimum 12” Engineered Wood Fiber o Alternate surfacing may be proposed so long as it fits budget and complies with standards Carl Young Sr. Park https://www.google.com/maps/place/Carl+Young,+Sr.+Park/@33.2114878,- 97.1191124,82m/data=!3m1!1e3!4m5!3m4!1s0x864dcaeb5ae905b7:0x1e53fe914d a79439!8m2!3d33.2115227!4d-97.119282 Nette Shultz https://www.google.com/maps/place/Nette+Shultz+Park/@33.239381,- 97.1128525,97m/data=!3m1!1e3!4m5!3m4!1s0x864db55e482eb4b7:0x416bc36c7 80c8e40!8m2!3d33.2382348!4d-97.1133947 6500 Ridglea Court (No existing footprint) https://www.google.com/maps/place/Ridglea+court,+Denton,+TX+76226/@33.13 21595,- 97.2001558,142m/data=!3m1!1e3!4m5!3m4!1s0x864dceb7c7b98a01:0x67736795 41194245!8m2!3d33.1314923!4d-97.1997825 9. My question is when I read the specs it states that the contractor will in all materials Ewf, Drains, Geo fabric. But I am under the impression is the existing playground unit will not need all of this or is the city going to remove everything for the contractor to complete new drainage, Drainage base, fabric and new EWF with the two existing units Carl Young and Nette Shultz ? SCOPE OF WORK STATES: 1. Playground Removal – City of Denton Parks and Recreation will remove existing playground equipment within the footprint of the playground which includes play components, concreted posts, fabric, drainage rock, drainage pipe, and wood fiber. 10. Ridgelea Court - What happens to the spoils from the excavation? Contractor will haul it off. We can provide a dump location that is only 4 miles away. Dump location is a 200 acre tract located at 4300 S. Bonnie Brae St, Argyle, TX 76226 RFP 7020 - Question and Answers: 10. Ridgelea Court - There is no mention of swings. Will these be added to the bid? Yes, add swings to the design – 2 bay swing set containing 2 belt swings and 2 toddler swings Ridglea Court Rendering. NOTE: Actual playground shape does not have to be as shown in rendering. This is merely to show the approximate location of the playground. RFP 7020 - Question and Answers: 11. I was re reviewing the scope of work for RFP #7020. Are we responsible for installing the drainage and safety surfacing at Carl Young and Nette Schultz? Yes, please familiarize yourself with the scope of work as it is stated 3 times. SCOPE This project consists of the design, procurement and installation of three commercial public playgrounds including drainage system, impact attenuation surfacing material and play structure at Carl Young Sr. Park located at 327 South Wood Street, Nette Shultz Park located at 1517 Mistywood Lane in Denton, Texas Work is to include the design of a play system within the existing play area boundaries, as well as the installation of commercial grade playground equipment, equipment footings, drainage materials, landing mats, and fall zone material  Impact mats under swings and slide exits required  Surfacing – Subsurface shall consist of drainage rock and drainage piping overlaid with a geotextile fabric and covered with a minimum 12” Engineered Wood Fiber 12. You mentioned the timeline of 4-6 weeks for delivery of equipment after the bid has been awarded. Ours is typically 8-10 weeks, will this be o.k.? Please see #2 13. We have worked with many cities and my question is would they be able to receive the equipment and provide a storage place or a stage place to carry out your projects. This would cut shipping cost. Several cities have worked with us to expedite the project faster and save a few dollars? Regarding receiving, please refer to scope of work, see below:  DELIVERY: Delivery should be approximately 4 to 6 weeks after notice to proceed. Vendor is responsible for offloading the truck and be present to inventory delivered components. Regarding storage: Parks & Recreation has an area at the Municipal Service Center, located at 901 Texas St., where you may offload and store the equipment. Vendor will be responsible for hauling equipment from storage area to project location RFP 7020 - Question and Answers: NOTE: The Scope of Work states that an independent (3rd Party) playground audit must be performed on finished products prior to acceptance by City of Denton. This is a requirement and must happen. Audit documents to be provided to Parks & Recreation Staff once completed and corrections from audit are made.