Loading...
7013 - Lake Lewisville Water Treatment Plant Phase II Improvements, Addendum 1- Modification to the SpecsAddendum No. 1 00 05 15 - 1 DTN18104 – Lake Lewisville Water Treatment Plant Phase II Improvements CITY OF DENTON LAKE LEWISVILLE WATER TREATMENT PLANT PHASE II IMPROVEMENTS IFB 7013 ENGINEERING PROJECT NO. 6305 ADDENDUM NO. 1 May 6, 2019 BID DATE: Tuesday, May 21, 2019 at 11:00 A.M. 00 05 15 ADDENDUM NUMBER 1 The following additions, deletions, modifications, or clarifications shall be made to the appropriate sections of the Contract Documents. Bidders shall acknowledge receipt of this Addendum in the space provided on the Bid Form. TECHNICAL SPECIFICATIONS: A1-1. SECTION 09 91 00 PAINTING A. Reference: Par. 3.07 MISCELLANEOUS TANK REHABILITATION: 1. Deletion: Delete this paragraph in its entirety. B. Reference: Par. 3.08 DISINFECTION: 1. Deletion: Delete this paragraph in its entirety. A1-2. SECTION 32 90 00 LANDSCAPE PLANTING 1. Addition: Insert the new specification section attached. 5-6-2019 Addendum No. 1 00 05 15 - 2 DTN18104 – Lake Lewisville Water Treatment Plant Phase II Improvements DRAWINGS: A1-3. SHEET G-1, SEQ. 1 A. Reference: INDEX TO DRAWINGS: 1. Modification: Add the following new text to the INDEX TO DRAWINGS, following the CIVIL section: “LANDSCAPING 14A L-1 ADMIN BUILDING PLANTING PLAN 14B L-2 TREE PLANTING & PROTECTION DETAILS” A1-4. SHEET G-5, SEQ. 5 A. Reference: Potable Water Supply to Administration Building: 1. Clarification: Connection of new 8-PW-PVC to existing 8-PW northwest of Administration Building shall be made with new tee installed in existing pipeline. A1-5. SHEET C-1, SEQ. 7 1. Modification: Replace the sheet with the new sheet attached. A1-6. SHEET C-2, SEQ. 8 1. Modification: Replace the sheet with the new sheet attached. A1-7. SHEET C-3, SEQ. 9 1. Modification: Replace the sheet with the new sheet attached. A1-8. SHEET C-5, SEQ. 11 A. Reference: Paving and Grading Plan: 1. Clarification: Exterior Stairway west of existing Operations Building is “Clearwell Area Access Stairway” shown in plan and section on Sheet S-10. A1-9. SHEET C-7, SEQ. 13 1. Modification: Replace the sheet with the new sheet attached. A1-10. SHEET L-1, SEQ. 14A 1. Addition: Insert the new sheet attached. A1-11. SHEET L-2, SEQ. 14B 1. Addition: Insert the new sheet attached. A1-12. SHEET HS-1, SEQ. 15 A. Reference: WATER LINES FROM HEADER ROOM TO FLUORIDE INJECTION STATION AREA: 1. Modification: Change callout for two small lines from Symbol 4 to Symbol 3 to “(X2) 2- PW-PVC”. Addendum No. 1 00 05 15 - 3 DTN18104 – Lake Lewisville Water Treatment Plant Phase II Improvements B. Reference: NOTES BY SYMBOL: 1. Modification: Revise Note 4 to read as follows: “SEE SHEET HS-3 FOR CONTINUATION OF PW LINES. SAMPLE LINE TO CONTINUE THROUGH HEADER ROOM UPSTAIRS TO LABORATORY IN OPERATIONS BUILDING, FOLLOWING EXISTING SAMPLE ROUTE (NOT SHOWN).” A1-13. SHEET HS-3, SEQ. 17 A. Reference: SMALL WATER LINES FROM HEADER ROOM WEST: 1. Modification: Change destination designation in callout to “48-FW LINE NEAR FLUORIDE INJECTION STATION”. 2. Clarification: Valves at wall for 2” PW lines shall be PVC Ball Valves. A1-14. SHEET CF-1, SEQ. 25 A. Reference: POLYMER FEEDER PIPING: 1. Clarification: Replace header piping on floor as shown, including vertical tees at connections. 2. Clarification: Provide flexible tubing and valves sized to match equipment connections. A1-15. SHEET A-3, SEQ. 28 A. Reference: PLAN: 1. Clarification: Window blinds are required for all exterior windows in the Administration Building except for storefront in the Vestibule. A1-16. SHEET A-17, SEQ. 42 A. Reference: UPPER PLAN - NOTES: 1. Clarification: Notes 1, 2 and 3 only pertain to the area that is crosshatched. The fiberglass form board insulation is located on the ceiling. A1-17. SHEET A-19, SEQ. 44 A. Reference: PLAN: 1. Clarification: Walls requiring “Prep and Paint” are nominally 12’ high, field verify. A1-18. SHEET LRW-1, SEQ. 133: A. Reference: OVERALL SITE PLAN – 2-PW-PVC piping near the Chemical Building: 1. Clarification: The 2-PW-PVC piping near the Chemical Building shall be as shown on LRW-CF-11. A1-19. SHEET LRW-3, SEQ. 135: A. Reference: PUMP STATION AREA PLAN – 2-PW-PVC piping near the Chemical Building: 1. Clarification: The 2-PW-PVC piping near the Chemical Building shall be as shown on LRW-CF-11. Addendum No. 1 00 05 15 - 4 DTN18104 – Lake Lewisville Water Treatment Plant Phase II Improvements A1-20. SHEET LRW-5, SEQ. 137 A. Reference: OVERALL YARD PIPING PLAN: 1. Modification: Delete “1”=50’ “ below plan callout and replace with “1”=5’ “. B. Reference: SCALE BAR (LOWER RIGHT CORNER): 1. Modification: Replace “50’ ” with “5’” and replace “100’ “ with “10’ “. A1-21. SHEET LRW-9. SEQ. 141 A. Reference: GENERAL NOTES: 1. Modification: Delete Note 6 and replace with the following: “6. ONLY ONE INTAKE PIPE IS SHOWN IN THIS SECTION. THE SECOND INTAKE IS AT A CENTERLINE OF 505.0±.” 2. Modification: Add Note 10 as follows: “10. THE CONTRACTOR SHALL INSTALL THE TWO 2-DSP-SS CHEMICAL LINES INSIDE OF THE 36-RW-PCC AS SHOWN IN SECTION 3. THE 2-DSP-SS ASSOCIATED WITH THE UPPER INTAKE AT ELEVATION 505.0± SHALL CONTINUE TO WITHIN THE EDGE OF THE INTAKE SCREEN. THE 2-DSP-SS ASSOCIATED WITH THE LOWER INTAKE AT ELEVATION 480.0± SHALL CONTINUE TO THE LOWER INTAKE SCREEN AS SHOWN ON LRW-13 AND LRW-14.” 3. Modification: Add Note 11 as follows: “11. THE CONTRACTOR SHALL TAP THE TWO 36-RW-PCC PIPES BETWEEN THE GATE VALVE AND THE INTERIOR FACE OF THE WETWELL TO ACCOMMODATE THE 2-DSP-SS CHEMICAL FEED PIPES. THE CONTRACTOR MAY UTILIZE A TAPPING SADDLE WITH A THREADED NIPPLE. A FULLY THREADED 2-INCH STAINLESS STEEL (TYPE 316SS) NIPPLE WOULD BE USED TO PASS THROUGH THE TAPPING SADDLE SO THAT A THREADED TYPE 316SS FLANGE CAN BE INSTALLED ON EACH SIDE OF THE THREADED 316SS NIPPLE. THE 2-DSP-SS WILL THEN CONNECT TO THE NIPPLE THROUGH THE USE OF FLANGES. THE CONTRACTOR MAY UTILIZE PIPE COUPLING METHODS OTHER THAN FLANGE (E.G., SWAGELOK) PROVIDED THE COUPLING METHOD IS SUITABLE FOR THE INTENDED SERVICE.” B. Reference: Section 3: 1. Modification: Delete the pipe call out “36-RW-S” and replace with “36-RW-PCC”. 2. Modifications: Delete the callout “2-1/2” TAP WITH CORP. STOP TO ACCOMMODATE 2- DSP-SS FOR CHEMICAL FEED (TYP. 2 INTAKE LOCATIONS)” and replace with the following: “TAP TO ACCOMMODATE 2-DSP-SS FOR CHEMICAL FEED (REFER TO NOTE 11)”. 3. Modification: Add the text “(REFER TO NOTE 6)” at the end of the callout “36” FLG. X PE STEEL SPOOL (1’-0” LENGTH) W/ 2-1/2” WELD-O-LET”. 4. Modification: Add the text “(REFER TO NOTE 6)” at the end of the callout “36” DOUBLE DISK SLIM LINE GATE VALVE”. 5. Modification: Add the text “(REFER TO NOTE 9)” at the end of the callout “CHEMICAL INJECTION”. Addendum No. 1 00 05 15 - 5 DTN18104 – Lake Lewisville Water Treatment Plant Phase II Improvements A1-22. SHEET RRW-4 SEQ. 184: A. Reference: PLAN, STA 10+25: 1. Clarification: The label “AIR/VACUUM RELEASE VALVE & VAULT” refers to an existing facility on the 42” raw water line. A1-23. SHEET RRW-CF-5 SEQ. 190: A. Reference: CHEMICAL BUILDING LAYOUT – 2-CW-PVC/SS piping along north wall of the Chemical Building: 1. Modification: The 2” water piping along the north wall of the Chemical Building should be designated 2-PW-PVC or 2-PW-SS. A1-24. SHEET RRW-CF-6 SEQ. 191: A. Reference: SECTION 3 and SECTION 4: 1. Modification: The 2” water piping along the north wall and west wall of the Chemical Building should be designated 2-PW-PVC or 2-PW-SS. END OF ADDENDUM NO. 1