7013 - Lake Lewisville Water Treatment Plant Phase II Improvements, Tabulation SheetArcher Western Construction Oscar Renda contracting, Inc. Irving, Texas Roanoke, TX ITEM Quantity UOM Unit Price Total Cost 1 LS EA $12,323,000.00 $10,715,000.00 2 LS EA $3,797,000.00 $9,775,000.00 3 LS EA $1,537,000.00 $1,525,000.00 4 LS EA $130,000.00 $250,000.00 5 7 EA $5,600.00 $1,750.00 6 120 LF $360.00 $600.00 7 2700 SF $67,500.00 $27,000.00 $100,000.00 $100,000.00 $17,960,460.00 $22,394,350.00 $538,813.80 $671,830.50 $18,499,273.80 $23,066,180.50 Type of Service Requested For construction of improvements at or near the site of the Lake Ray Roberts Raw Water Pump Station, including raw water piping improvements and potable water piping to the site from the Lake Ray Roberts Water Treatment Plant, as shown on the Plans or as otherwise required by these Contract Documents IFB 7013 Bid Tabulation for LLWTP Phase II Improvements For construction of intruder detection and related security improvements at the site of the Lake Lewisville Water Treatment Plant, but not shown or described by these Contract Documents, an allowance of Total Bid Amount with Contingency Allowance For construction of improvements at or near the Lake Lewisville Water Treatment Plant and all Work not included in other Bid Items, as shown on the Plans or as otherwise required by these Contract Documents For construction of improvements at or near the site of the Lake Lewisville Raw Water Pump Station, including intake improvements in Lake Lewisville and potable water piping to the site, as shown on the Plans or as otherwise required by these Contract Documents For furnishing the Medium Voltage Pad-Mounted Switch to the project site, ready for installation, independent of other labor and materials, as specified in Section 26 12 01 "Medium Voltage Pad-Mounted Switch" Shade Tree (3" Cal) installed Tree Protection Fencing Installed Filter Building Ceiling Repair Allowance A Total Cost Contingency Allowance (3%)