7013 - Lake Lewisville Water Treatment Plant Phase II Improvements, Tabulation SheetArcher Western
Construction
Oscar Renda
contracting, Inc.
Irving, Texas Roanoke, TX
ITEM Quantity UOM Unit Price Total Cost
1 LS EA
$12,323,000.00 $10,715,000.00
2 LS EA
$3,797,000.00 $9,775,000.00
3 LS EA
$1,537,000.00 $1,525,000.00
4 LS EA
$130,000.00 $250,000.00
5 7 EA $5,600.00 $1,750.00
6 120 LF $360.00 $600.00
7 2700 SF $67,500.00 $27,000.00
$100,000.00 $100,000.00
$17,960,460.00 $22,394,350.00
$538,813.80 $671,830.50
$18,499,273.80 $23,066,180.50
Type of Service Requested
For construction of improvements at or near the site of the Lake Ray Roberts Raw Water
Pump Station, including raw water piping improvements and potable water piping to the
site from the Lake Ray Roberts Water Treatment Plant, as shown on the Plans or as
otherwise required by these Contract Documents
IFB 7013 Bid Tabulation for LLWTP Phase II Improvements
For construction of intruder detection and related security improvements at the site of the Lake
Lewisville Water Treatment Plant, but not shown or described by these Contract Documents, an
allowance of
Total Bid Amount with Contingency Allowance
For construction of improvements at or near the Lake Lewisville Water Treatment Plant and
all Work not included in other Bid Items, as shown on the Plans or as otherwise required by
these Contract Documents
For construction of improvements at or near the site of the Lake Lewisville Raw Water
Pump Station, including intake improvements in Lake Lewisville and potable water piping to
the site, as shown on the Plans or as otherwise required by these Contract Documents
For furnishing the Medium Voltage Pad-Mounted Switch to the project site, ready for
installation, independent of other labor and materials, as specified in Section 26 12 01
"Medium Voltage Pad-Mounted Switch"
Shade Tree (3" Cal) installed
Tree Protection Fencing Installed
Filter Building Ceiling Repair
Allowance A
Total Cost
Contingency Allowance (3%)