7051-1 Pricing SheetExhibit 1 -RFP 7051 - Pricing Sheet for Fiber Optic Cable Installation Services
The respondent shall complete the following section, which directly corresponds to the specifications. The contractor shall not make changes to this format.
Services Proposal Pricing to include all costs including but not limited to labor, supervision and equipment:
ITEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
ESTIMATED TOTAL ANNUAL COST
*NOTE: PLEASE EMAIL THIS EXHIBIT 1 AS AN EXCEL FILE TO EBIDS@CITYOFDENTON.COM
Estimated Annual Quantity
50000
46700
1
1
1
1
1
1
1
1
1
1
1
1
1
33000
33000
33000
33
33
170
170
170
170
170
25000
4
4
1000
1000
170
170
4
7
16
UOM
FT
FT
Per Splice 36 Fibers
Per Splice 72 Fibers
Per Splice 144 Fibers
EA
EA
Reel
Reel
Per Splice 72 Fibers
Per Splice 144 Fibers
EA
EA
Reel
Reel
ft
ft
ft
hr
hr
hr
hr
hr
hr
hr
ft
ft
ft
ft
ft
hr
hr
hr
hr
hr
Type of Service Requested
Installation of ADSS fiber optic cable on utility poles as per instructions located in the Appendix section. All manufactures’ requirements for installation of fiber optic cable shall
be met.
Installation of ADSS fiber optic cable in existing conduit as per instructions located in the Appendix section. All manufactures’ requirements for installation of fiber optic cable
shall be met.
Fiber Splicing ADSS fiber ( DME supplying Enclosure and all supplies, not equipment ) per manufacturers recommendations -Exhibit 4
Fiber Splicing ADSS fiber ( DME supplying Enclosure and all supplies, not equipment ) per manufacturers recommendations -Exhibit 4
Fiber Splicing ADSS fiber ( DME supplying Enclosure and all supplies, not equipment ) per manufacturers recommendations -Exhibit 4
ADSS Fiber Cable Prep
ADSS Enclosure Prep.
ADSS 72 Fiber Reel Test and Verification . Documentation of every fiber
ADSS 144 Fiber Reel Test and Verification . Documentation of every fiber
Fiber Splicing OPGW ( DME supplying Enclosure and all supplies, not equipment)per manufacturers recommendations.
Fiber Splicing OPGW ( DME supplying Enclosure and all supplies, not equipment)per manufacturers recommendations.
OPGW Fiber Cable Prep
OPGW Enclosure Prep.
OPGW 72 Fiber Reel Test and Verification . Documentation of every fiber
OPGW 144 Fiber Reel Test and Verification . Documentation of every fiber
Installation of Pull Tape in existing conduit
Rodding existing conduit
Installation of Trace wire in existing conduit as DMEs requirements.
1 man crew to perform small maintinance jobs
1 man crew with Bucket to perform small maintinance jobs
2 man crew to perform small maintinance jobs
2 man crew with bucket to perform small maintinance jobs
3 man crew to perform small maintinance jobs
3 man crew with bucket to perform small maintinance jobs
3 man crew with backhoe to perform small maintinance jobs
Removal (retire) of old Fiber (ADSS)
Trenching 2 inch typical 48 inches
Installation of 2" PVC conuit in open trench
Trenching 4 inch typical 48 inches
Installation of 4" PVC conuit in open trench
Pulling Cat5e or Siamese or Multiple Cables thru conduits or buildings
Mounting cameras , housing, terminating Cat5e cable
Emergency Services (minimum 4 hours) 1 man crew
Emergency Services (minimum 4 hours) 2 man crew
Emergency Services (minimum 4 hours) 3 man crew
Respondent Company Name:
Principal Place of Business (City,ST)
City of Denton requested completion schedule
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1 Week Notification of work
1HR Response
2HR Response
3HR Response
City of Denton Recommended installation time
2000 ft per day/ straight pull
2000 ft per day/ straight pull
72 per day
1hr
2hr
1 day
72F per day
2hr
3hr
1 day
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
4000 ft per day
200 ft per day / straight run
200 ft per day / straight run
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Cost of Service
Estimated Annual Total Cost
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0