Loading...
7131 Scope of Work- The scope of work shall be finalized upon the selection of the Firm. The respondent’s submission shall have accurately described your understanding of the objectives and scope of the requested products and services and provided an outline of your process to implement the requirements of the Scope of Work and Services. It is anticipated that the scope of work will include, at a minimum, the following: The proposal shall include all of the following information. Failure to include all of the required information may result in disqualification of a vendor. A. PURPOSE: The intent of this document is to provide interested vendors with sufficient information to enable them to prepare and submit proposals for consideration by the City of Denton for Plumbing Services for various City buildings on an as needed basis to assist the City of Denton with renovations, remodels and maintenance of existing facilities. The scope of services is to include but not limited to the following: Plumbing Services: 1.) New installation and removal of equipment 2.) Repairs SCOPE OF SERVICES: A typical project may include the following phases: Phase 1: Field Investigation 1.) Review the existing materials, drawing reports, etc. prepared by City staff on the proposed project. 2.) Review the proposed scope. 3.) Review the existing infrastructure in the facility. 4.) Locate, quote product and labor costs. Phase 2: Review Material and Labor Options with City Staff 1.) This phase will consist of review of quotes and materials options. 2.) This phase may also include detailed specifications and implementation schedule.