Loading...
COD IFB 7213 Lake Ray Roberts VFD Replacement 11x17 PlansCITY OF DENTON LAKE RAY ROBERTSWATER TREATMENT PLANHIGH SERVICE PUMP STATION VFD REPLACEMENTPROJECT NO. 190616INDEX OF DRAWINGS100% SUBMITTALISSUED FOR BIDELECTRICAL00E06ELECTRICAL ROOM DEMOLITION00E0700E09MCC-1 PARTIAL ONE-LINE DIAGRAM MODIFICATIONELECTRICAL ROOM MODIFICATION00E08PUMP STATION FLOOR PLAN00E01LEGEND AND SYMBOLS - I00E02LEGEND AND SYMBOLS - II00E05MCC-1 ONE-LINE DIAGRAM DEMOLITION00E03GENERAL NOTES00E04EXISTING MV SWITCHGEAR ONE-LINE DIAGRAMGENERALCOVER SHEET00E10VFD CONTROL SCHEMATIC - I00E11VFD CONTROL SCHEMATIC - II00E12PLC INTERFACE DIAGRAM AND SCHEMATIC00E13NETWORK DIAGRAM - DEMOLITION00E14NETWORK DIAGRAM - MODIFICATION00E15VFD-PLC ANALOG INTERFACE - I13717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.comGAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-259300E16VFD-PLC ANALOG INTERFACE - II00E17VFD-PLC DIGITAL INTERFACE - I00E1800E1900E2000E2100E22VFD-PLC DIGITAL INTERFACE - IIVFD-PLC DIGITAL INTERFACE - IIIVFD-PLC DIGITAL INTERFACE - IVVFD-PLC DIGITAL INTERFACE - VCONTROL VALVE CONTROL PANEL VFD INTERFACEOCTOBER 2019DENTONWATER TREATMENT PLANT16525 LAKE RAY ROBERTS DAM RD,AUBREY, TX 76227DENTONLAKE RAY ROBERTSWATER TREATMENT PLANTSEQUENCE NO.67981253410111213141516171819202122EZ01STANDARD DETAILS2310/25/19IFB PROJECT NO. 7213 DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E01100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:08 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E01.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANTNS100AATS-1(OOX)BC000OXO(XOO)AXOOTBDMVERTDTG30APOWER JUNCTION BOX4-20mA SIGNAL JUNCTION BOXCONTROL JUNCTION BOXINDICATES LIMITS OF EQUIPMENT ORWIRING ENCLOSUREETM(E.O.)PV-SVA:5REMOTE DEVICESMISFRAMETRIP30KVA480V-120/208YK-*5KW5KWVMAM*#*STOPSTARTSTOPSTARTBACOFFONM#CR#TDHTRORORORORIMEDIUM VOLTAGE DRAWOUT TYPE POWER CIRCUITBREAKERCS-CONTROL SWITCHLOW VOLTAGE CIRCUIT BREAKER, 3 POLEUNLESS OTHERWISE NOTED.LSIG IF NOTEDMCP IF NOTEDERMS IF NOTEDCOMBINATION MOTOR CIRCUIT PROTECTOR ANDMAGNETIC MOTOR STARTER, FULL VOLTAGENON-REVERSING UNLESS OTHERWISE NOTED:FVR-FULL VOLTAGE REVERSINGRVNR-REDUCED VOLTAGE NON-REVERSING2S1W-TWO SPEED, ONE WINDING2S2W-TWO SPEED, TWO WINDINGNON-FUSIBLE DISCONNECT SWITCH, 600 VOLT, 3POLEAMPERE RATING NOTED IF OTHER THAN 30ASYMBOLSDESCRIPTIONVOLTMETER (WITH SWITCH IF 3-PHASE)FUSIBLE DISCONNECT SWITCH, 600 VOLT, 3 POLE, AMPERERATING AND FUSE SIZE AS NOTED:AMPERE RATING NOTED IF OTHER THAN 30AFUSE RATINGMOTOR ISOLATION SWITCH, HORSEPOWER RATEDDRAWOUT TYPE EQUIPMENT OR DEVICEMEDIUM VOLTAGE CABLE TERMINATIONMEDIUM VOLTAGE AIR INTERRUPTER SWITCHMEDIUM VOLTAGE FUSED AIR INTERRUPTER SWITCHMEDIUM VOLTAGE FUSED MOTOR CONTROLLERTRANSFORMER, RATINGS AND CONNECTIONS AS NOTED.UNLESS OTHERWISE NOTED ON THE SINGLE LINE DIAGRAMSALL DRY TYPE TRANSFORMERS SERVICINGADMINISTRATIVE AND LABORATORY SPACES SHALL HAVE AK FACTOR OF 13. ALL OTHER DRY TYPE TRANSFORMERSSHALL HAVE A K-4 RATING. ISOLATION TRANSFORMERSSHALL HAVE A K-20 RATINGCURRENT TRANSFORMER:QUANTITYA= PRIMARY AMPERESPOTENTIAL TRANSFORMER:QUANTITYPV= PRIMARY VOLTAGESV= SECONDARY VOLTAGEGENERATOR, RATINGS AND CONNECTIONS ASNOTEDTRANSFER SWITCHAUTOMATIC TRANSFER SWITCH (EG ATS-1)MANUAL TRANSFER SWITCH (EG MTS-1)"N" INDICATES NORMAL SOURCE"S" INDICATES STANDBY SOURCE100A INDICATES CONTINUOUS CURRENT RATINGVARIABLE SPEED DRIVE CONTROLLERD.C.= D.C. DRIVE CONTROLLERSCR= SILICON CONTROLLED RECTIFIERVFD= VARIABLE FREQUENCY DRIVEAFD= ADJUSTABLE FREQUENCY DRIVEVACUUM FAULT INTERRUPTERUNIT HEATER - ELECTRIC HEATING COIL AND FANUNIT HEATER - STEAM OR WATER HEATING COIL ANDFANMOTOR, NUMERAL INDICATES HORSEPOWERAMMETER (WITH SWITCH IF 3-PHASE)METERWM- WATTMETERWHM- WATTHOUR METERWHDM- WATTHOUR DEMAND METERWHDR- WATTHOUR DEMAND RECORDERPF- POWER FACTOR METERRT- RUNNING TIME METERTRANSDUCERAX- CURRENT TRANSDUCERWX- WATT TRANSDUCERRELAY, NO. AS INDICATED25- SYNCHRONISM CHECK RELAY27- UNDER VOLTAGE RELAY38- BEARING PROTECTIVE DEVICE40- LOSS OF EXCITATION RELAY42- RUNNING CONTACTOR/PILOT RELAY46- REVERSE PHASE/PHASE BALANCE/CURRENT RELAY47- PHASE SEQUENCE VOLTAGE RELAY49- MACHINE OR TRANSFORMER THERMAL RELAY50- INSTANTANEOUS OVERCURRENT RELAY50G- INSTANTANEOUS GROUND51- TIME OVER CURRENT RELAY51G- TIME OVERCURRENT RELAY,GROUNDING RESISTOR TYPE51N- TIME OVERCURRENT RELAY, RESIDUAL TYPE51V- TIME OVERCURRENT RELAY WITH VOLTAGE RESTRAINT60- NEGATIVE SEQUENCE VOLTAGE RELAY62- TIME DELAY RELAY63- OVER PRESSURE RELAY67- AC DIRECTIONAL OVERCURRENT RELAY83- AUTOMATIC SELECTIVE CONTROL OR TRANSFER RELAY86- LOCKING-OUT RELAY87- DIFFERENTIAL PROTECTIVE RELAYB- SUFFIX INDICATES "BUS"G- SUFFIX INDICATES "GENERATOR"GF- GROUND FAULTST- SHUNT TRIPT- SUFFIX INDICATES "TRANSFORMER"X- SUFFIX INDICATES "AUXILIARY"SPECIAL CAPACITORSC- SURGE CAPACITORPF- POWER FACTOR CORRECTION CAPACITORINCLUDING INDUCTIVE LINK AS NEEDEDPUSH BUTTON, MOMENTARY CONTACT, SPRING RETURN,NORMALLY CLOSEDPUSH BUTTON, MOMENTARY CONTACT, SPRING RETURN,NORMALLY OPENEMERGENCY STOP PUSH BUTTON WITH RED MUSHROOMHEAD OPERATOR (MAINTAINED CONTACT)START-STOP PUSH BUTTON CONTROL STATION(MOMENTARY CONTACT) "L" DENOTES LOCKOUT TYPESTART-STOP PUSH BUTTON CONTROL STATION,MAINTAINED CONTACT WITH LOCKOUT DEVICE ON STOPOFF/ON SELECTOR SWITCHPOSITIONTOPCONTACTMIDDLECONTACTBOTTOMCONTACT3 POSITION SELECTOR SWITCH, MAINTAINED CONTACTO-OPEN X-CLOSEDNAMEPLATE (A/B/C)HOA- HAND/OFF/AUTOHOR- HAND/OFF/REMOTELOR- LOCAL/OFF/REMOTERSL- RAISE/STOP/LOWERTOA- TEST/OFF/AUTONOTE: 2 POSITION MULTI-CONTACT SWITCHFOLLOWS SAME CONVENTIONMOTOR STARTER COIL, NUMBER AS INDICATEDCONTROL RELAY COIL, NUMBER AS INDICATEDPILOT LIGHT, COLOR AS NOTEDR- REDG- GREENB- BLUEW- WHITEA- AMBERPILOT LIGHT, PUSH-TO-TEST TYPE, COLOR AS NOTEDABOVE.SYMBOLSDESCRIPTIONDESCRIPTIONDESCRIPTIONTIME DELAY RELAYRANGE AS NOTEDSET POINT AS NOTEDTDD-TIME DELAY AFTER DE-ENERGIZATION-OFF DELAYTDE-TIME DELAY AFTER ENERGIZATION-ON DELAYNOTC-NORMALLY OPEN, TIMED CLOSING WHEN ENERGIZEDNCTO-NORMALLY CLOSED, TIMED OPENING WHEN ENERGIZEDNOTO-NORMALLY OPEN, TIMED OPENING WHEN DE-ENERGIZEDNCTC-NORMALLY CLOSED, TIMED CLOSING WHEN DE-ENERGIZEDFIELD INSTRUMENT, TAG NO. OR LOOP # AS INDICATED - INDICATES INSTRUMENT TYPE DEFINED ON LOOP SHEETS## - INDICATES LOOP NO.LIQUID LEVEL (FLOAT) SWITCHNORMALLY OPEN, CLOSES ON RISING LEVELNORMALLY CLOSED, OPENS ON RISING LEVELNORMALLY OPEN, CLOSES ON DROPPING LEVELNORMALLY CLOSED, OPENS ON DROPPING LEVELPRESSURE OR VACUUM SWITCHNORMALLY OPEN, CLOSES ON RISING PRESSURENORMALLY CLOSED, OPENS ON RISING PRESSURENORMALLY OPEN, CLOSES ON DROPPING PRESSURENORMALLY CLOSED, OPENS ON DROPPING PRESSURETEMPERATURE SWITCH OR THERMOSTATNORMALLY OPEN, CLOSES ON RISING TEMPERATURENORMALLY CLOSED, OPENS ON RISING TEMPERATURENORMALLY OPEN, CLOSES ON DROPPING TEMPERATURENORMALLY CLOSED, OPENS ON DROPPING TEMPERATUREFLOW SWITCH (AIR, WATER, ETC.)NORMALLY OPEN, CLOSES ON INCREASED FLOWNORMALLY OPEN, CLOSES ON DROPPING FLOWNORMALLY CLOSED, OPENS ON INCREASED FLOWNORMALLY CLOSED, OPENS ON DROPPING FLOWPOSITION (LIMIT) SWITCHNORMALLY OPENNORMALLY OPEN - HELD CLOSEDNORMALLY CLOSEDNORMALLY CLOSED - HELD OPENTORQUE SWITCHNORMALLY CLOSED, OPENS ON HIGH TORQUECONDUCTORS OR CONDUITS CROSSING PATHS BUT NOTCONNECTEDCONDUCTORS ELECTRICALLY CONNECTEDLIGHTNING ARRESTER/SURGE CAPACITORGROUND RODGROUND ROD WELLFUSE, AMPERE RATING AS NOTEDHEATERINDUCTORTACHOMETER GENERATORCONTACT, NORMALLY OPEN (NO)CONTACT, NORMALLY CLOSED (NC)OVERLOAD RELAY HEATERKEY INTERLOCKTERMINAL OR TEST BLOCKRESISTANCE TEMPERATURE DETECTORVIBRATION DETECTORDAMPER MOTORELAPSED TIME METERMOTOR OPERATED VALVEMOV WITHOUT INTEGRATED DISCONNECTMOV WITH INTEGRATED DISCONNECTORORORORORORORORORORORSYMBOLSSYMBOLSJUNCTION BOXPULL BOXTERMINATION CABINETSPDSURGE PROTECTION DEVICESCLAGENERAL NOTETHIS IS A STANDARD LEGEND.SOME SYMBOLS MAY NOTAPPEAR ON THE DRAWINGS.E-STOPSTOP PUSH BUTTON WITH RED HEAD OPERATOR(MAINTAINED CONTACT) WITH LOCKABLE OPTION : E-STOP : STOP00E011 OFLEGEND & SYMBOLS - IT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICAL DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E02100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:09 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E02.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANTDACONDUIT, EXPOSED/SURFACE MOUNTEDCONDUIT, EXPOSED/SURFACE MOUNTED, TURNING UPCONDUIT, EXPOSED/SURFACE MOUNTED, TURNING DOWNSVSOLENOID VALVENOT TO SCALENTSWPWEATHERPROOFXFMRXPEXPLOSION PROOFTRANSFORMERSSSTAINLESS STEELVOTCTELSWSWGRTYPTSTSWTOVFDUGWVTWISTED SHIELDED WIREVALVE OPERATORUNDERGROUNDVARIABLE FREQUENCY DRIVEWIRETYPICALVOLTSTEMPERATURE SWITCHTERMINATION CABINETTIME DELAY ON OPENINGTELEPHONESWITCHGEARSWITCHRCPPTPVCSCQTYSHSNSECOLPHPBPRPCCOLXRELAY CONTROL PANELSOLID NEUTRALSURGE CAPACITORSHIELDED OR SHEETPOLYVINYL CHLORIDESECONDS OR SECONDARYQUANTITYPUSH BUTTON OR PULL BOXPUMP CONTROL CONSOLEOVERLOAD CONTROL RELAYPOTENTIAL TRANSFORMERPHASEPAIROVERLOADEMEMERGENCYLPLAMFRMCCMCPINSTLGTSNONCMTSMTDMTGMHMANUFACTURERNORMALLY CLOSEDNORMALLY OPEN OR NUMBERMANUAL TRANSFER SWITCHMOUNTINGMOUNTEDMANHOLELIGHTING PANELMOTOR CIRCUIT PROTECTORMOTOR CONTROL CENTERLIGHTNING ARRESTERLIGHTSINSTRUMENTEMHFUFRPGCPGFIGENGRSHTHHHZFBOFOG, GRDGENERATOR CONTROL PANELGROUND FAULT INTERRUPTERGALVANIZED RIGID STEELHANDHOLEHERTZHEIGHTGROUNDGENERATORELECTRICAL MANHOLEFIBERGLASS REINFORCEDFURNISHED BY OTHERSPOLYESTERFUSEFIBER OPTICELECECELEVEMPTY CONDUITELEVATIONELECTRICALCONDUITCIRCUIT BREAKERAMPEREABOVE GRADEAMERICAN WIRE GAUGEAUTOMATIC TRANSFER SWITCHABOVE FINISHED FLOORALTERNATING CURRENTAUTOMATICAUXILIARYALUMINUMCBCAFFAUTOAUXAWGATSAMP/AAGALUMACCKTCLFCPTCRCSCTCUDCDIDNEHHCONTROL POWER TRANSFORMERDIRECT CURRENTELECTRICAL HANDHOLEDOOR INTERLOCKDOWNCURRENT TRANSFORMERCURRENT LIMITING FUSECONTROL SWITCHCONTROL RELAYCOPPERCIRCUIT SHEETSHTLIGHTNING CONTACTORLCIMHINSTRUMENT MAN HOLEDWGDRAWINGSCHSCHEMATICTVSSTRANSIENT VOLTAGEPFRPHASE FAILURE RELAYPUSH TO TEST TYPEPTTADJUSTABLE FREQUENCY DRIVEAFDCONTINUED ABOVE RIGHTCONTINUED BELOW LEFTEOELECTRICALLY OPERATEDHTPHEAT TRACE PANELMLOMAIN LUGS ONLYPPRPHASE PROTECTIVE RELAYRECPRECEPTACLESCONDUIT OR DUCTBANK, CONCEALEDCPCONTROL PANELGOGATE OPERATORSTSTARTERSCCRSHORT CIRCUIT CURRENT RATINGLOCAL CONTROL PANELLCPINCANDESCENT, COMPACT FLUORESCENT OR H.I.D. TYPELIGHTING FIXTURE:"A"- FIXTURE TYPE"b"- CONTROLLED BY SWITCH "b""LA-3"- CIRCUIT 3 FROM PANEL LAFLUORESCENT TYPE LIGHTING FIXTURE, NOTATIONSSAME AS ABOVEALA-3bLA-3bALA-3AORALA-3INDICATES LIGHT FIXTURES WHICH ARE UNSWITCHED,NOTATIONS SAME AS ABOVEALA-3bALA-3bALA-3WALL MOUNTED LIGHTING FIXTURE, NOTATIONSSAME AS ABOVEPOLE MOUNTED LIGHTING FIXTURE, NOTATIONSSAME AS ABOVEAALA-3LA-3EMERGENCY LIGHTING BATTERY UNIT WITH TWO LAMP HEADS,NOTATIONS SAME AS ABOVEREMOTE EMERGENCY ADJUSTABLE WALL LIGHTING FIXTUREWITH TWO LAMP HEADS, NOTATIONS SAME AS ABOVECEILING MOUNTED EXIT SIGN, NOTATIONS SAME AS ABOVEWALL OUTLET EXIT SIGN. ARROW INDICATES DIRECTION OFEGRESS, NOTATIONS SAME AS ABOVECONDUIT STUBBED OUT AND CAPPEDDENOTES A QUANTITY OF 2 SETS OF THREE (3) NO.3/0 AWGCONDUCTORS AND 1 NO.AWG GROUND CONDUCTOR EACHINSTALLED IN 3" CONDUIT.DENOTES A QUANTITY OF TWO INSTRUMENT CABLES. EACHCONSISTS OF TWO NO.16 AWG CONDUCTORS TWISTEDTOGETHER AND COVERED WITH A METALLIC SHIELD AND ANOVERALL PROTECTIVE JACKET. REFER TO THE SPECIFICATIONSFOR THE EXACT CABLE TO BE PROVIDED.2(2/C#16TS)3(4"C)DENOTES A QUANTITY OF THREE 4-INCH CONDUITS.FLEXIBLE METAL CONDUIT "WHIP" (2#12, #12G, 3/4"C UNLESSOTHERWISE NOTED) FOR RECESSED LIGHTING FIXTURES ANDLIQUID TIGHT MOTOR CONNECTIONSHOMERUN, CIRCUITS 1 AND 3 RUN TO PANEL LP-1SINGLE POLE SWITCH"b"- INDICATES SWITCH LEG SHALL CONTROL LIGHT FIXTURESWITH "b" DESIGNATIONMULTI POLE SWITCH"x"- INDICATES NUMBER OF POLE"b"- NOTATIONS SAME AS ABOVEMANUAL MOTOR STARTER /DISCONNECTSINGLE POLE SWITCH AND PILOT LIGHT,"b"- NOTATIONS SAME AS ABOVEDIMMER LIGHTING CONTROL SWITCH,"b"- NOTATIONS SAME AS ABOVETIME SWITCH,"b"-NOTATIONS SAME AS ABOVELIGHTING CONTACTOR WITH NUMBER OF POLES AS INDICATEDLIGHTING PANELBOARD (TYPICAL 120V/240V OR 120V/208V)DISTRIBUTION PANELBOARD (TYPICAL 277V/480V)DUPLEX RECEPTACLE, 20A, 120V, 2P, 3W :GFI- GROUND FAULT INTERRUPTER TYPEWP- WEATHERPROOF"LA-3"- CIRCUIT 3 FROM PANEL LALA-3LC-1L*-##ORH*-##ORRED FACE ISOLATED GROUND DUPLEX, 15A20A, 240V, 2P, 3W, RECEPTACLECLASS 1, DIVISION 1, RATED TWIST LOCK RECEPTACLE, VOLTAGEAND AMPERAGE RATING AS NOTEDSINGLE FACE, SINGLE GANG PEDESTAL WITH 20A, 120V, 2P, 3WDUPLEX RECEPTACLE, FURNISHED AND INSTALLED UNDERDIVISION 16 UNLESS OTHERWISE NOTED. * DENOTES FURNISHEDUNDER OTHER DIVISIONS OF THE SPECIFICATIONS BUTINSTALLED UNDER DIVISION 16DOUBLE FACE, SINGLE GANG PEDESTAL WITH 20A, 120V, 2P, 3WDUPLEX RECEPTACLE AND 20A, 240V, 2P, 3W SINGLERECEPTACLE, FURNISHED AND INSTALLED UNDER DIVISION 16UNLESS OTHERWISE NOTED. * DENOTES FURNISHED UNDEROTHER DIVISIONS OF THE SPECIFICATIONS BUT INSTALLEDUNDER DIVISION 16DOUBLE RECEPTACLE, 20A, 120V, 2P, 3W MOUNTED IN BOX CURBFURNISHED UNDER OTHER DIVISIONS OF THE SPECIFICATIONSBUT INSTALLED UNDER DIVISION 16480V, 3P, 4W RECEPTACLEQUAD RECEPTACLEPCOSOCCUPANCY SENSOR CAPABLE OF VACANCYPHOTOCELLTELEPHONE OUTLETDATA OUTLETDATA INPUT/OUTPUT CABLE OUTLET. "P" DENOTES PROCESSCOMPUTER SYSTEMPVOICE/DATA OUTLETPAGING SPEAKER HORNPAGING SPEAKER BI-DIRECTIONALPAGING SPEAKER, CEILING MOUNTED TYPEPAGING SPEAKER, WALL MOUNTED TYPEDSKPCRWSMDGBFACPACPSAPSECURITY ALARM PANELSECURITY ALARM DOOR SWITCHSECURITY ALARM KEY PADSECURITY SYSTEM CARD ACCESS READERSECURITY ALARM WINDOW SWITCHSECURITY ALARM MOTION DETECTORSECURITY CAMERA :CCTV- CLOSED CIRCUIT TV CAMERAPTZ- PAN, TILT, ZOOM CAMERA LENS CONTROLSGLASS BREAK DETECTORFIRE ALARM CONTROL PANELACCESS CONTROL PANELSURGE SUPPRESSORSYMBOLSDESCRIPTIONSYMBOLSDESCRIPTIONSYMBOLSDESCRIPTIONABBREVIATIONSCOMMUNICATIONS SYSTEMSSECURITY SYSTEMSSWBDSWITCHBOARDSINGLE POLE SWITCH WITH OCCUPANCY SENSORGFCIGROUND FAULT CIRCUITINTERRUPTERLSIGLONG TIME/SHORT TIME/INSTANTANEOUS/GROUNDFAULT FEATURE INCLUDEDSINGLE POLE DIMMER SWITCHFIRE ALARM SYSTEMSSMOKE DETECTOR: D- DENOTES DUCT SMOKE DETECTORR- DENOTES FIXED TEMPERATURE RATE-OF-RISE TYPE.ALARM HORN, MOUNT AT 7'-6": F- DENOTES FIRE ALARMALARM STROBE, MOUNT AT 6'-8": F- DENOTES FIRE ALARMALARM HORN AND STROBE LIGHT COMBINATION,MOUNT AT 6'-8": F- DENOTES FIRE ALARMFFIRE ALARM MANUAL PULL STATION, MOUNT AT 4'-0"PNLBDPANELBOARDRVSSREDUCED VOLTAGE SOFT STARTERERMSENERGY-REDUCINGMAINTENANCE SWITCHGENERAL NOTETHIS IS A STANDARD LEGEND.SOME SYMBOLS MAY NOTAPPEAR ON THE DRAWINGS.MCC-1TAGGINGEQUIPMENTEQUIPMENT TAGMOTOR CONTROL CENTERCONDUIT TAGMC1-XXSWBD-1SWITCHBOARDSB1-XXSWGR-1SWITCHGEARSG1-XXPLC-1PROGRAMMABLE LOGIC CABINETPL1-XXVFD-1VARIABLE FREQUENCY DRIVEVF1-PLOW VOLTAGE TRANSFORMERGEN-1GENERATORGN1-XTX-LX OR TX-HXSERVICE TRANSFORMERTX-1TXLX-P OR TXHX-PTX1-PLP/PP-XXLIGHTING/POWER PANELBOARDXX-XXATS-1AUTOMATIC TRANSFER SWITCHAT1-XXEXAMPLE LEGEND:EQUIPMENTCONDUIT NO. ORBREAKER NO.INDICATES INSTRUMENTTYPE DEFINED ON LOOPSHEETSINDICATES LOOPNO.TYPICAL TAG FOR CONDUIT FROM THIS EQUIPMENT TO DOWNSTREAM LOAD FOR EXAMPLE.MC#-8FIT-101bxxxSWITCH ENCLOSURE"x"- NOTATIONS SAME AS ABOVE"b"- NOTATIONS SAME AS ABOVE"xx"- INDICATES ENCLOSURE TYPE00E022 OFLEGEND & SYMBOLS - IIT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICAL DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E03100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:09 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E03.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANT00E033 OFGENERAL NOTEST. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICALELECTRICAL GENERAL NOTES1.THE NOTES CONTAINED ON THIS SHEET ARE PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR WHENWORKING IN THE FIELD, AND CONTAIN EXCERPTS FROM THE SPECIFICATION SECTIONS. HOWEVER THECONTRACTOR IS HEREBY ADVISED THAT THE CONTRACT DOCUMENTS CONSIST OF BOTH THE DRAWINGS AND THESPECIFICATIONS, AND THAT THE CONTRACTOR MUST COMPLY FULLY WITH BOTH THE BOUND DRAWINGS AND THEBOUND SPECIFICATIONS.2.ALL EQUIPMENT WIRING, RACEWAYS, ETC. SHALL BE INSTALLED AND GROUNDED IN ACCORDANCE WITH THE LATESTEDITION OF THE NATIONAL ELECTRICAL CODE, LOCAL CODES, AND INDUSTRY STANDARDS (IE. UL, NEMA, IEEE, ANSI,ETC.) THE DRAWING NOTES AND DETAILS SHALL BE COMPLIED WITH IN ADDITION TO THE REQUIREMENTS IN THESPECIFICATIONS. REFER TO EACH SPECIFICATION SECTION FOR SPECIFIC REQUIREMENTS.3.ALL RACEWAY INSTALLATIONS SHALL BE INSTALLED IN A MANNER TO PREVENT CONFLICTS WITH EQUIPMENT ANDSTRUCTURAL CONDITIONS. ALL EXPOSED RACEWAY SHALL BE INSTALLED PARALLEL TO BEAMS, CEILINGS, FLOORSAND WALLS. SEE SPECIFICATION ON RACEWAYS FOR ADDITIONAL REQUIREMENTS.4.CONDUITS SHALL BE TERMINATED IN A NEAT MANNER AND STRICTLY IN ACCORDANCE WITH THE SPECIFICATIONSAND DRAWING DETAILS.5.CONDUITS TERMINATED INTO ENCLOSURES SHALL BE PERPENDICULAR TO THE WALLS OF THE ENCLOSURE. THEUSE OF SHORT SEALTIGHT ELBOW FITTINGS FOR SUCH TERMINATIONS WILL NOT BE PERMITTED.6.ALL RACEWAY INSTALLATIONS, CROSSING EXPANSION JOINTS OR TRANSITIONS FROM BELOW GRADE TO EXPOSEDABOVE GRADE, SHALL HAVE EXPANSION OR EXPANSION/DEFLECTION TYPE FITTINGS AS SPECIFIED FOR THEAPPLICATION. SEE THE DRAWINGS AND THE SPECIFICATION ON RACEWAYS FOR THE EXACT TYPE OF FITTING TO BEUSED.7.NO CONDUIT SMALLER THAN 3/4", NOR WIRE SMALLER THAN NO. 12 AWG, SHALL BE USED UNLESS SPECIFICALLYNOTED.8.ALL UNDERGROUND SINGLE CONDUITS, AND DUCTBANKS OF MULTIPLE CONDUITS, SHALL BE RIGID PVC CONDUIT,ENCASED IN REINFORCED RED CONCRETE, AND THE CONCRETE DYED RED BEFORE PLACEMENT, AS SPECIFIED.MINIMUM SIZE SHALL BE 2 INCH. THE CONTRACTOR SHALL FIELD VERIFY THE ROUTING OF ALL EXISTINGUNDERGROUND CONDUIT AND DUCTBANKS AND SHALL COORDINATE THE ROUTING OF NEW CONDUIT ANDDUCTBANKS TO AVOID INTERFERENCE WITH EXISTING CONDUIT AND DUCTBANKS AND OTHER UNDERGROUNDUTILITIES.9.ALL CHANGES OF DIRECTION GREATER THAN 20 DEGREES IN UNDERGROUND SINGLE, OR DUCTBANKS OF MULTIPLECONDUITS, SHALL BE ACCOMPLISHED USING PVC COATED RIGID ALUMINUM FACTORY ELBOWS WITH LONG RADIUSAS REQUIRED. BENDS OF PVC CONDUIT GREATER THAN 20 DEGREES, OR THE USE OF FLEXIBLE CONDUIT OF ANYTYPE, WILL NOT BE PERMITTED. SEE THE SPECIFICATIONS FOR MORE REQUIREMENTS.10.LIQUID TIGHT FLEXIBLE ALUMINUM CONDUIT SHALL BE USED FOR THE PRIMARY AND SECONDARY OFTRANSFORMERS, GENERATOR TERMINATIONS AND OTHER EQUIPMENT WHERE VIBRATION IS PRESENT. USE INOTHER LOCATIONS IS NOT PERMITTED, EXCEPT FOR CONNECTIONS TO INSTRUMENTATION TRANSMITTERS, WHEREMULTIPLE PENETRATIONS ARE REQUIRED. LIQUID TIGHT FLEXIBLE ALUMINUM CONDUIT SHALL HAVE A MAXIMUMLENGTH NOT GREATER THAN THAT OF A FACTORY MANUFACTURED LONG RADIUS ELBOW OF THE CONDUIT SIZEBEING USED. THE MAXIMUM BENDING RADIUS SHALL NOT BE LESS THAN THAT SHOWN IN THE NEC CHAPTER 9,TABLE 2, "OTHER BENDS". BX OR AC TYPE PREFABRICATED CABLES WILL NOT BE PERMITTED.11.THE WIRING DIAGRAMS, BLOCK DIAGRAMS, QUANTITY, SIZE OF WIRES, AND CONDUIT REPRESENT A SUGGESTEDARRANGEMENT BASED UPON SELECTED STANDARD COMPONENTS OF ELECTRICAL EQUIPMENT. MODIFICATIONSACCEPTABLE TO THE ENGINEER MAY BE MADE BY THE CONTRACTOR TO ACCOMMODATE EQUIPMENT ACTUALLYAPPROVED. ALL MODIFICATIONS SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL. THE BASIC SEQUENCEAND METHOD OF CONTROL MUST BE MAINTAINED AS INDICATED ON THE DRAWINGS AND/OR SPECIFIED.12.FOR ALL JUNCTION BOXES, PULL BOXES AND TERMINATION BOXES IN THE RACEWAY SYSTEM IN NEMA 12 AREAS,BOXES SHALL BE OF ALUMINUM. FOR NEMA 4X AREAS SEE SECTION 26 05 33 FOR BOX DETAILS ANDSPECIFICATIONS.13.WHERE RACEWAYS ENTER JUNCTION BOXES OR CONTROL PANELS CONTAINING ELECTRICAL OR INSTRUMENTATIONEQUIPMENT, ALL ENTRANCES SHALL BE SEALED WITH WATERTIGHT SEALANT. REFER TO THE SPECIFICATIONS FORDETAILS.14.ALL EQUIPMENT AND ELECTRICAL EQUIPMENT ENCLOSURE LOCATIONS, OR TERMINAL BOX LOCATIONS, AREAPPROXIMATE. THE EXACT LOCATIONS SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER/ENGINEER,DURING CONSTRUCTION, AT NO ADDITIONAL COST TO THE OWNER.15.ALL EQUIPMENT AND ELECTRICAL EQUIPMENT ENCLOSURES DIMENSIONS ARE APPROXIMATE. ALL EQUIPMENT ANDELECTRICAL EQUIPMENT ENCLOSURES OR TERMINAL BOX DIMENSIONS SHALL BE VERIFIED WITH THE EQUIPMENTSUPPLIER. ALLOW FOR LOCATION CHANGES AND INCLUDE IN THE CONTRACT PRICE. THE EXACT LOCATIONS OF ALLELECTRICAL EQUIPMENT AND ROUTING OF ALL CABLES AND CONDUITS SHALL BE COORDINATED WITH ANDAPPROVED BY THE OWNER ENGINEER DURING CONSTRUCTION.16.CORING OF AN EXISTING STRUCTURE SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER/ENGINEER.CORING THROUGH STRUCTURAL BEAMS IS STRICTLY PROHIBITED, WITHOUT PRIOR WRITTEN APPROVAL FROM THEOWNER/ENGINEER.17.THE LOCATION OF ALL ELECTRICAL EQUIPMENT AND ROUTING OF CABLES AND CONDUITS SHALL BE COORDINATEDAND APPROVED BY THE OWNER.18.THE DUCTBANK ROUTING AS SHOWN ON THE DRAWING IS APPROXIMATE. THE EXACT DUCTBANK ROUTING, CABLELENGTH AND CONDUIT LENGTH SHALL BE VERIFIED IN THE FIELD.19.PROVIDE CONDUIT SEALS FOR CONDUIT PENETRATIONS. SEE SECTION 26 05 33 FOR DETAILS.20.THIS IS AN OPERATING FACILITY. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE OWNER.21.THE CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE ALL UNDERGROUND UTILITIES BEFORE DIGGING.CONTRACTOR SHALL COORDINATE THE EFFORT WITH THE OWNER.22.ALL SLOTTED CHANNEL, SLOTTED CHANNEL SUPPORT MATERIAL, WASHERS, SCREWS, NUTS, CONDUIT CLAMPS, ALLTHREAD SPRING NUTS AND MISC. MOUNTING HARDWARE SHALL BE 316 STAINLESS STEEL.23.LIGHTING FIXTURES SHALL BE MOUNTED ACCORDING TO THE MOUNTING HEIGHT GIVEN ON THE DRAWINGS. THEMOUNTING HEIGHT SHALL BE MEASURED FROM THE BOTTOM OF THE LIGHTING FIXTURE TO THE FINISHED FLOOR.24.CONDUIT AND WIRE (NOT SHOWN) FOR THE HVAC CONTROL EQUIPMENT AND MISCELLANEOUS DEVICES SHALL BEFURNISHED AND INSTALLED UNDER THE HVAC SPECIFICATIONS AND SHALL BE:A.3/4" (MIN) RIGID ALUMINUM.B.NO.14 XHHW CU. WIRE XHHW (MIN.) NUMBER OF WIRES AS REQUIRED.C.IN ACCORDANCE WITH ALL DIVISION 26 REQUIREMENTS.25.ALL CONDUITS AND WIRES SHOWN ON THE INTERFACE DIAGRAM SHALL BE INSTALLED BY THE CONTRACTOR.GROUPING OF CONDUIT AND WIRE MAY BE CHANGED, IF APPROVED BY THE ENGINEER AND OWNER.26.ALL CONDULETS SHALL BE FORM 7 AND SHALL HAVE 316 SS CLAMP COVERS WITH 316 SS CLAMPS AND SCREWS.SCREW DOWN COVERS ARE UNACCEPTABLE. REFER TO THE SPECIFICATIONS FOR MORE INFORMATION.27.ALL BARE COPPER GROUNDING CONDUCTORS SHALL BE TINNED, ALL GROUND RODS SHALL BE COPPER CLADSTEEL, 3/4" BY 10' LONG. ALL EXPOSED COPPER GROUND CABLES SHALL BE GREEN INSULATED CONDUCTORS.PROVIDE XHHW INSULATION.28.WHERE NOTES ON THE DRAWING INDICATE THAT THE CONTRACTOR SHALL FIELD-VERIFY, THE INTENT IS FOR THECONTRACTOR TO INVESTIGATE TO THE EXTENT NECESSARY TO PROVIDE THE WORK AND MATERIALS PRIOR TOBIDDING AND INCLUDE ALL COSTS IN THE BID PRICE. THE CONTRACT PRICE SHALL NOT BE INCREASED WHEN THECONTRACTOR HAS NOT INVESTIGATED PER THE NOTES DIRECTING THAT BE DONE.DEMOLITION NOTES1.THE CONTRACTOR SHALL COORDINATE THE DEMOLITION OF THE ELECTRICAL CONDUIT, WIRE, EQUIPMENT ANDDEVICES WITH THE GENERAL DEMOLITION AND SCHEDULE. THE DRAWINGS ARE INTENDED TO CONVEY THEGENERAL NATURE AND SCOPE OF THE DEMOLITION WORK. EVERY ITEM TO BE DEMOLISHED MAY NOT BESHOWN. FIELD VERIFY WITH OWNER PRIOR TO BID, AND INCLUDE ALL DEMOLITION WORK IN THE CONTRACTPRICE.2.PROVIDE TEMPORARY WIRE AND CONDUIT FOR THE EQUIPMENT WHICH MAY BE AFFECTED BY THE DEMOLITIONBUT TO REMAIN IN SERVICE.3.RELOCATE AND RECONNECT POWER AND CONTROL RACEWAYS AND CONDUCTORS TO EQUIPMENT AFFECTEDBY DEMOLITION WORK.4.ALL CONDUCTORS BEING DEMOLISHED SHALL BE DISCONNECTED AND REMOVED FROM THE LOAD TO THESOURCE. SURFACE MOUNTED CONDUITS AND MOUNTING HARDWARE SHALL BE REMOVED. UNDERGROUNDCONDUITS WHICH ARE NOT BEING REMOVED OR OTHERWISE NOT BEING MADE UNUSABLE SHALL BE CAPPEDAND TAGGED AS SPARE, WITH INFORMATION CLEARLY INDICATING THE LOCATION OF THE OTHER END.5.ALL SURFACES WHERE DEMOLISHED EQUIPMENT OR CONDUIT IS REMOVED SHALL BE CLEANED, PATCHED ANDPAINTED TO MATCH THE SURROUNDING SURFACE.6.THE CONTRACTOR SHALL BE RESPONSIBLE TO CHECK THE FUNCTION OF EACH CONDUCTOR BEFOREREMOVING OR DISCONNECTING.7.IF A CONDUCTOR WHICH HAS TO STAY IN SERVICE (NOT BEING DEMOLISHED) IS INSTALLED IN A COMMONCONDUIT WITH CONDUCTORS WHICH ARE BEING DEMOLISHED, THE CONTRACTOR SHALL REMOVE ALLCONDUCTORS FROM THE CONDUIT, PROVIDE NEW CONDUCTORS WHICH ARE REPLACEMENTS FOR THECONDUCTORS THAT ARE TO REMAIN IN SERVICE AND RE-INSTALL THE NEW CONDUCTORS. AFTER THECONDUCTORS ARE PULLED, MEGGER OR HIPOT TEST EACH CONDUCTOR. CONNECT BOTH ENDS OF THE NEWCONDUCTORS AND TEST THE SYSTEM FOR PROPER FUNCTION. DO NOT RE-PULL USED CONDUCTORS.8.WHERE EQUIPMENT IS BEING RE-FED FROM A NEW SOURCE, EXISTING CONDUIT MAY BE REUSED ONLY IF THECONDUIT AND FITTINGS ARE OF THE TYPE SPECIFIED FOR NEW WORK ON THIS CONTRACT. IF NOT, THECONDUIT AND CONDUCTORS SHALL BE REPLACED WITH NEW MATERIAL MEETING THE SPECIFICATIONS, AT NOADDITIONAL COST TO THE OWNER.9.THE CONTRACTOR SHALL COORDINATE WITH THE OWNER/ENGINEER TO FLAG EXISTING UNDERGROUNDCONDUITS BEFORE DIGGING.10.THE OWNER HAS THE RIGHT OF FIRST REFUSAL TO THE EQUIPMENT BEING REMOVED. THE CONTRACTORSHALL DELIVER THE EQUIPMENT WHICH THE OWNER WISHES TO KEEP AT LOCATION DESIGNATED BY THEOWNER. SEE SPECIFICATIONS.11.THE CONTRACTOR SHALL NOT MAKE ANY MODIFICATIONS TO THE EXISTING ELECTRICAL EQUIPMENT UNTIL THEFOLLOWING HAS BEEN DONE:A.THE OWNER/CONTRACTOR SHALL WITNESS AND RECORD THE CONDITION OF THE EXISTING EQUIPMENT, THECONTRACTOR SHALL NOTE DOWN ANY DEFECTS OR DEFICIENCIES.B.THE OWNER SHALL OPERATE THE EQUIPMENT TO DEMONSTRATE THE CURRENT CONDITIONS. THECONTRACTOR SHALL NOTE DOWN ANY DEFECTS OR DEFICIENCIES.C.A WRITTEN AND PHOTOGRAPHIC RECORD OF THE OPERATION AND EXISTING CONDITION SHALL BE KEPT IN ATHREE RING BINDER AT THE OWNER/CONTRACTOR TRAILER, IN FORM OF PICTURES AND INFORMATION ON AFORM.D.A FORM SHALL BE GENERATED BY THE CONTRACTOR TO RECORD THE OBSERVATIONS. BOTH PARTIES SHALLSIGN ON THE FORM.E.THE CONTRACTOR SHALL BE RESPONSIBLE TO FURNISH AND INSTALL MATERIAL OR EQUIPMENT DAMAGEDDURING THE COURSE OF HIS WORK.F.AFTER THE CHANGES ARE MADE, THE EQUIPMENT SHALL BE INSPECTED AND RE-TESTED TO DEMONSTRATETHAT IT FUNCTIONS CORRECTLY.G.NO PORTION OF EXISTING CONDUCTORS SHALL BE SPLICED TO NEW CONDUCTORS FOR RE-USE WITHOUTSPECIFIC APPROVAL FROM THE OWNER/ENGINEER ON A CASE-BY-CASE BASIS. DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E04100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:09 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E04.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANTB1B2ABA1A21500 KVA4160 TO480VXFMR-22000AAUTOTRANSFERSWITCHFROM ELECTRICAL BUILDINGMAIN SWITCHGEAR00E044 OFEXISTING MV SWITCHGEARONE-LINE DIAGRAMT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICAL4160V, 3Ø, 3W, 1200A, 350MVASWG-B21-3/C#4/0, #3G SOFTSTARTERSS-P1SWG-A2 1-3/C#4/0, #3G P2-CAPP2-P P1-CAP P1-PHIGHSERVICEPUMP P-2VIBRATIONSWITCHES1250HSP-2HSP-1HIGHSERVICEPUMP P-112501500 KVA4160 TO480VXFMR-1REFER TOSHEET 00E05FORCONTINUATIONRTDHTRHEATERVIBRATIONSWITCHESRTDHTRHEATERDIAGRAMHSPS MV-SWITCHGEARONE-LINE52525252525252SOFTSTARTERSS-P1KKKTIEMAINSWG-B13#4/0 (5KV),#4G (600V), 4"CXFM2-P5(5-750KCMIL,250KCMIL G, 5"C)XFM1-P5(5-750KCMIL,250KCMIL G, 5"C)MC1-P SWG-A1 3#4/0 (5KV), #4G (600V), 4"C DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E05100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:09 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E05.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANT1.REMOVE INCOMING FEEDER CABLE TO THE VFD'S.2.REMOVE EXISTING VFD'S.3.REMOVE EXISTING CABLE UP TO THE SPLICEPOINT SHOWN IN SHEET 00E-07.4.THE VENT FAN IS INTERLOCKED WITH THERESPECTIVE VFD.5.REMOVE THE CONTACT CONNECTION FROMEXISTING VFD AND RECONNECT TO NEW VFD.6.REFER TO SCHEMATIC ON SHEET 00E12.NOTES BY SYMBOL " ":#00E055 OFMCC-1 ONE-LINE DIAGRAM - DEMOLITIONT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICALLIGHTINGPANELLACONTROLPANELBRIDGECRANEHIGH SERVICEPUMP NO.3HSP-3500VFDHIGH SERVICEPUMP NO.4HSP-4500VFDEUH-121321EUH-2EUH-3EUH-4EUH-5MSIZE 1MMMMMMVF-1VF-2VF-3VF-4VF-5VF-6VF-71CONTROLPANELHYDRAULICPOWERUNITMCP3P234567891011121314151617SIZE 1SIZE 1SIZE 1SIZE 1SIZE 1SIZE 150A3P60A3P70A3P1000A3P1000A3P50A3P50A3P50A3P50A3P90A3P480V, MCC-1 3Ø, 3W, 2000A, 65KA SCCR, TIN PLATED COPPER BUS2000A3P45KVA480V-208/120V XFMRVENT FAN3#4, #8G, 1"C3#6, #10G, 1"C3#6, #10G, 1"C3#6, #10G, 1"C 3#6, #10G, 1"C 3#6, #10G, 1"C 3#6, #10G, 1"C 3#12, #12G, 1"C 3#12, #12G, 1"C 3#12, #12G, 1"C 3#12, #12G, 1"C 3#12, #12G, 1"C 3#12, #12G, 1"C 3#12, #12G, 1"C 3#12, #8G, 1"C CONTROLPANELLIGHTINGCONTACTOR1860A3PCONTROLPANELPS-A/C-119300AT3P400A3PMCONTINUATIONFROM SHEET 00E043#12, #8G, 1"C 3#12, #8G, 1"CM111213141516SPAREELEVATIONMCCNTS123491810195678202217VF-1-1THERMOSTATCONTROLMCP3PMCP3PMCP3PMCP3PMCP3PMCP3PDIAGRAMMCC-1 ONE-LINE456456456456VFD3-PVFD3-CVFD4-PVFD4-C333 MC1-1PMC1-2P MMDATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E06100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:09 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E06.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANTPHOTOGRAPHVFD-3A-A-PHOTOGRAPHVFD-4B-PLANELECTRICAL ROOM DEMOLITION01'2'6'4'SCALE: 1/2" = 1'-0"B-MCC-1BELOWCABINETEXISTINGPULL BOXFIBER OPTICENCLOSUREPLCEXISTINGPULL BOXAIR DUCT00E066 OFELECTRICAL ROOM - DEMOLITIONT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICAL1.REMOVE ONE VFD AT A TIME.2.EXISTING CONTROL WIRES IN VFD ENCLOSURESTO REMAIN. BUNDLE, TIE AND PROVIDEPROTECTION TO WIRE DURING THEREPLACEMENT PROCESS.3.EXISTING POWER WIRES FROM VFD TO MOTOR TOREMAIN. BUNDLE, TIE AND PROVIDE PROTECTIONTO WIRE DURING THE REPLACEMENT PROCESS.RECONNECT TO JUNCTION BOX SHOWN ON SHEET00E07.4.DEMOLISH EXISTING INCOMING WIRE.5.DEMOLISH EXISTING AIR DUCT.6.INSTALL NEW LOUVERS IN EXISTING ROOFPENETRATION.7.REFER TO ONE-LINE DIAGRAM ON SHEET 00E05.8.CONTROL WIRE NOT SHOWN FOR CLARITY.9.EXISTING EXHAUST FANS TO REMAIN. REMOVECONTROL AND POWER WIRES FROM VFD TOEXHAUST FAN.NOTES BY SYMBOL " ":#3VFD-35PHOTOGRAPHEXHAUST FANS ON ROOFC-12EXISTINGPANEL LAVFD-412MC1-1PMC1-2P44VFD4-PVFD3-P33PLANELECTRICAL ROOM DEMOLITION ROOF01'2'6'4'SCALE: 1/2" = 1'-0"C-6969PHOTOGRAPHAIR DUCTC-D- DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E07100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:09 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E07.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANT500VFD-311000A3P00E077 OFMCC-1 PARTIAL ONE-LINE DIAGRAM - MODIFICATIONT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICALMC1-1P2 (4/C 750KCMIL)VF3-P2(4/C 750KCMIL, 4"C)1.ALL EXISTING CONTROL WIRES TO BERECONNECTED FROM EXISTING FIELD DEVICE TONEW VFD SHOWN FOR INFORMATION ONLY.2.PROVIDE NEW TRAY RATED CABLE.3.PROVIDE A NEW ENCLOSURE WITH TERMINATIONSTRIPS TO TERMINATE NEW AND EXISTING WIRES.4.INTERFACE WITH EXISTING VENTS FAN STARTERLOCATED IN MCC-1.5.THE CONTRACTOR SHALL OBTAIN THE SERVICESOF THE MANUFACTURER IF ADJUSTMENT OF THECIRCUIT BREAKERS ARE NEEDED.6.INTERFACE WITH EXISTING LOW PRESSURERELAY PANEL.NOTES BY SYMBOL " ":#HTRVALVE CPRTDRTDBEARINGRTDMOTORRTDHSP-3HEATERVIBRATIONSWITCHFLOWSWITCHP3-MSH2#12, #12GVFDP3-01C26#14, #14G, 1"CVSH-2656#14, #14GFS-2654#14, #14GTE-2651-8TRI, #18, 1"C 11000A3PMC1-2P 2 (4/C 750KCMIL)FLA TABLE FOR EXISTING MOTORS4HSP3MOTOR HP500FLA500580A580A500VFD-4VF4-P 2(4/C 750KCMIL, 4"C)HTRVALVE CPRTDMOTORRTDHSP-4HEATERVIBRATIONSWITCHFLOWSWITCHP4-MSH 2#12, #12G VFDP4-01C 26#14, #14G, 1"C VSH-266 6#14, #14G FS-266 4#14, #14G TE-266 1-8TRI, #18, 1"C CONTI N U E D O N S H E E T 0 0 E 0 5 FROM SHEET 00E05 TCTC-43TCTC-3322DIAGRAMONE-LINE52521111111111VENT FANSTARTERVF-3VENT FANSTARTERVF-444PHOTOGRAPHEXISTING MOTOR NAME PLATEA-VF3-C2#14, 3/4"C VF4-C 2#14, 3/4"CCPRTDBEARINGRTD CP6LOWPRESSURERELAYPANEL6LOWPRESSURERELAYPANELREMOTEE-STOPREMOTEE-STOP11PSL-C 2#14, 3/4"C PSL-C 2#14, 3/4"C MMMMDATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E08100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:09 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E08.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANT1.RECONNECT EXISTING DEVICES TO NEW VFD'SUSING EXISTING CABLES.2.PROVIDE NEW WIRE FROM LOAD SIDE OF VFD UPTO JUNCTION BOX. CONNECT TO TERMINAL STRIPIN JUNCTION BOX.3.VENT FANS SHOWN FOR INFORMATION ONLY.RECONNECT STARTER IN MCC-1 TO NEW VFD.NOTES BY SYMBOL " ":#SCALE ACCORDINGLYIF NOT ONE INCH1"AT FULL SIZEONE INCHPLANGROUNDING10'04'16'2'SCALE: 3/16" = 1'-0"480V MCC-1LIGHTINGPANEL LA00E088 OFPUMP STATION FLOOR PLANT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICALMV SWITCHGEAREXISTING CONDUIT TRENCHPUMP NO.1 VALVECONTROL PANELPUMP NO.2 VALVECONTROL PANELPUMP NO.3 VALVECONTROL PANELPUMP NO.4 VALVECONTROL PANELHSP-1HSP-2HSP-3HSP-4CABLE TRENCHHYDRAULICPOWER UNITVP-1VP-2VP-3VP-4VALVEVALVEVALVEVALVETC-4TC-3EXISTING TRANSFORMERVF-1VF-2VF-3VF-433P3-MSH1P4-MSH1FS-265FS-26611VFD 4VFD 3P2-MSH1P1-MSH1SS-HSP-1SS-HSP-2REFER TO SHEET00E09 FOR WORKIN THIS AREA DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E09100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:09 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E09.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANTCABINETPBFIBER OPTICENCLOSUREPLCPB00E099 OFELECTRICAL ROOMMODIFICATIONT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICAL1.COORDINATE WITH VFDMANUFACTURER TO PROVIDELEAVE OUTS IN THE SAMELOCATION AS EXISTING VFDS.2.VFD MANUFACTURER TO PROVIDEPULL SECTION AS NEEDED.3.EXISTING CABLE FROM MOTOR.4.EXACT LOCATION OFTERMINATION BOX SHALL BEADJUSTED IN FIELD.5.PROVIDE CABLE TRAY IF NEEDEDTO ROUTE CABLES INSIDEELECTRICAL ROOM.6.DO NOT ATTACH RAIL TOHANDRAIL.7.SPLICE NEW CABLE FROM VFD TOEXISTING CABLE FROM MOTORUSING A TERMINAL STRIP.8.PROVIDE A SAFETY BARRIERBETWEEN TERMINATION STRIPAND ENCLOSURE DOOR.9.PATCH AND SEAL CONDUITPENETRATIONS.NOTES BY SYMBOL " ":#TC-3TC-4TC-05CTC-07CLIGHTING PANEL1-EXISTINGCABLE TRAYSECTIONMCC-1100E09NTSPUMP NO.4TERMINATION BOXPUMP NO.3TERMINATION BOXTC-3TC-4VFD-3 FEEDERBREAKERVFD-4 FEEDERBREAKER1234SPARE91810111213141516195678172022TC-05AVF-11THERMOSTATCONTROLMC1-1P3CABLE TRAYNEMA-12ENCLOSURE(TYP. OF 2)6MC1-1P3MC1-2PTC-07AVF3-PMC1-1PMC1-2PVF4-PVFD-3VFD-4HANDRAIL44CABLE TRAY54EXISTING 4"PENETRATION(TYP.)SS-HSP-1SS-HSP-2PHOTOGRAPHCABLE TRAYA00E09NTSA-PLANELECTRICAL ROOM MODIFICATION01'2'6'4'SCALE: 1/2" = 1'-0"7FROM VFD-4FROM VFD-313EZ0120EZ0119EZ0118EZ0117EZ01989MC1-2P DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E10100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:09 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E10.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANTMOTOR MANAGEMENT RELAY00E1010 OFVFDCONTROL SCHEMATIC - IT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICALCONTROLPOWERTRANSFORMERCPTCABSIGNALISOLATORSPEEDCONTROLSIGNAL4-20mAFROM PLCSTARTSIGNALFROM00E11SPEEDOUTPUTSIGNAL4-20mATO PLCCR-8CR-YCR-XVARIABLEFREQUENCYDRIVE (VFD)MANUALSPEEDPOTVFD RUNNINGTO LINE 80SHT EB-37,SCH-1VFD FAILURETO LINE 26SHT EB-37,SCH-1NOTES FOR MP4 TRIP - FAIL-SAFE ALARM - NON-FAIL-SAFE AUX.1 - NON-FAIL-SAFE AUX.2 - FAIL-SAFEALL RTDs MUST BE OF THE SAME TYPEAND SHALL BE 3 WIRE LOOP RETURNEDBACK TO MULTILIN.USE ZERO SEQUENCE CONNECTION FORGROUND FAULT INPUT.USE TWISTED PAIR WHEN USING THE 5AMP INPUT-TERMINALS G9 & H9OUTPUT RELAY CONTACTS SHOWN:CONTROL POWER APPLIED, N.O. TRIPS,N.O. ALARMS & FACTORYCONFIGURATIONS IN EFFECT.2.4.3.1.MCR-XVFD FAILURELINE-22 SHT.EB-37 SCH-1SEE SCHEMATIC 2GF1GF2CT1GROUND FAULT CTC5C3C1H1NIGF1C1BED1A129A514G01FLEXITESTL23X10L22X2AL2L3L21L1JBX10ABCVBVCAVA11BB3B2GBH7G7G11G12B1H6G6G9H9MP4MOTOR MANAGEMENT RELAYA2A3G1H1H2A1G2D18D23H12DOOR MOUNTEDSHORTINGTYPETERMINALBLOCKS(TYP ON ALLCT CIRCUITS)CONTINUED ONSHEET EB-37, SCH-1HNVFD ENCLOSUREOLETHERNETCONNECTIONSPAREWINDINGMOTOR6WINDINGMOTORWINDINGWINDINGMOTORWINDINGMOTORMOTORWINDINGMOTOR54321GROUNDBUSTO PT'SSHORTING TERMINALSAUTOMATIC CTTO CT'SLAND ALL CT LEADSON SHORTING TYPETERMINAL BLOCKS(TYP)TO LINE 48SHEET EB-37,SCH-1TO LINE 46SHEET EB-37,SCH-1TERMINAL BLOCKS(TYP)G1E5G12E2F1E1F2E3F3G11H12H11G2H1H2R2 AUXILIARYR1 TRIPF4E4F5E6F6E8F7E7E9R4 ALARMR3 AUXILIARYSTARTR6 SERVICER5 BLOCKGROUNDCOMCURRENT INPUTSPHASE BH7COMPHASE AH6COMG61A/5AG71A/5APHASE CH8COMG81A/5AG91A/5ADIFFERENTIAL INPUTSPHASE BPHASE AG3H91A/5AG4H31A/5ACOMPHASE C1A/5AG5H4COMH5COMRTD #1A1A2A3RTD #2RTD #3A7A5A4A6A8A9A10RTD #4RTD #5RTD #6A14A12A11A13A15D1D2ANALOG OUTPUTSD23C2C1D18D16D22D21D20F9+REMOTE RESET-ASSIGNABLE INPUT 4ASSIGNABLE INPUT 3ASSIGNABLE INPUT 2ASSIGNABLE INPUT 1EMERGENCY RESTARTDIGITAL INPUTSD19B2COMMONCOMPUTERRS485AUXILIARYB4-+B31+4+A26A23RTD #7RTD #8D6D3D4D5D7D8D9RTD #9RTD #10D13D10D11D12D15D14B1A204+ANALOG I/O-+24A22A27COMSHIELDA21A16ANALOG INPUTSA181+2+A173+A19RTD #11RTD #12FRONT PANEL LOCALPROGRAMMING PORTRS232 H10G10COMGROUND50:.025STARTER STATUSD17HOTCOMPENSATIONRTD RETURNHOTHOTRTD RETURNRTD RETURNHOTRTD RETURNHOTRTD RETURNHOTRTD RETURNHOTRTD SHIELDHOTHOTHOTHOTHOTCOMPENSATIONCOMPENSATIONCOMPENSATIONCOMPENSATIONCOMPENSATIONCOMPENSATIONCOMPENSATIONCOMPENSATIONCOMPENSATIONCOMPENSATIONCOMPENSATION3+2+A25A24-+C4C3ACCESSTESTVdcCOMF8D24SWITCH +24VdcCOMGROUND GROUND FILTER SAFETY CONTROL-+POWERVaVbVcomVcVOLTAGE INPUTSPHASEE11TRIP COILF11SUPERVISIONF12E12INDICATORDRAWOUTMOTOR MANAGEMENT RELAYMP4C6C4C2CT2CT3480V120VAMBIENTPUMPBEARING2PUMPBEARING1MOTORBEARING2MOTORBEARING1PERMISSIVECR-E LINE-10SHT. EB-37,SCH-11.THE CONTRACTOR SHALL SIZE THE CONTROLPOWER TRANSFORMER (CPT) AS REQUIRED BYCONTROL LOGIC.NOTES BY SYMBOL " ":#TO PLC CONNECTION DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E11100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:09 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E11.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANT1.VFD CONTROL SHCEMATIC OBTAINED FROM RECORD DRAWING VFDMANUFACTURER TO REPLICATE EXISTING CONTROL SYSTEM.2.ALL RELAY CONTACTS SHALL HAVE A CONTINUOUS ANDINTERRUPTING RATING SIZED FOR THE LOAD.3.THE CONTROL SCHEMATIC SHOWN SHALL BE INCORPORATED INTOTHE VFD MOTOR CONTROLS.4.EQUIPMENT SHOWN WITH A DASHED BOX IS EXISTING AND NOTPROVIDED BY VFD SUPPLIER.5.ALL TIMING RELAYS, (TR1, TR2, TR3, TR4, TR5, AND TR7) SHALL BEFIELD ADJUSTABLE.6.PTT = PUSH-TO-TEST.GENERAL NOTES:LEGEND:DEVICE LOCATED IN THE FIELD.LOCATED AT PLC.DEVICE LOCATED AT THE LCP.TERMINAL IN MCC FOR FIELD WIRING.CONNECTION IN MCC.1.CONTROL RELAY "CR13" SHALL BE PROVIDED WITH A MINIMUM OF 4N.O. AND 4 N.C. SPARE CONTACTS.2.VENT FAN PS-VF-3 IS ASSOCIATED WITH HIGH SERVICE PUMP NO.3AND VENT FAN PS-VF-4 IS ASSOCIATED WITH HIGH SERVICE PUMPNO.4. REFER TO SHEET 00E12.3.FROM PRESSURE RELAY PANEL. REFER TO SCHEMATIC ON SHEET00E12.NOTES BY SYMBOL " ":#VFD CONTROLCVLS-1OVLS-2CVLS-3CVLS-4OVLS-5SWITCHNUMBERSVALVEOPENINTERMEDIATE5%VALVECLOSEFUNCTIONSTART PERMISSIVEPUMP CONTROL VALVE 5% OPENPUMP CONTROL VALVE 95% CLOSEDPUMP CONTROL VALVE (CLOSED)PUMP CONTROL VALVE (OPEN)VALVE POSITIONLIMIT SWITCH POSITIONSNOTES:1. INDICATES OPEN CONTACTS.2. INDICATES CLOSED CONTACTS.CR1CR3TR1CR4CR5CR6CR8IR4CR12TR3PTTPOWER ON480V120V@PUMPCONTROLVALVETR6TR5TR4CR13CR7IR2IR1CR10CR9EMTTR7VBR2VBR1CR-7VBR2CRCR-5CR-4CR-6CR-8CR-3CR-8CR-6IR4IR4IR4CR-13CR-9TR3TR4TR5RLOSTARTTR1STOPOVLS-2CVLS-1CR-4CR-6CR-5PTTPTTPTTTR3TR3TR4TR4TR5TR7CR-8VBR2CR-8CVLS-4CR-1CR-12IR4MOTOR SPACE HEATERCR-10IR4IR4VBR1VBR2CR-7MPRMPRIR1IR2CR-8IR4TR3TR4TR5TR6TR5TO PLCTO PLCTO PVC CONTROL ENCLOSUREOXE-STOPREMOTEE-STOPVIBRATIONSENSOR(X-AXIS)VIBRATIONSENSOR(X-AXIS)OXOVALVECLOSEDOVLS-5VALVEOPENPUMPSTOPPUMPRUNNOPRESSUREVALVEFAILUREPUMP FAILURE/NO FLOWNO FLOWWARNINGVIBRATIONALARMVIBRATIONTRIPE-STOPREMOTEENABLEVALVEMAINTENANCEMODEMPRTRIPMPRALARMCVLS-3@ PUMPCONTROL VALVE@ PUMPCONTROL VALVE@ PUMPCONTROL VALVE@ FLOWSWITCHREMOTERESETMOMPUMP FAILURE/NO FLOW0-10 MIN.SET @3 MIN.0-10 MIN.SET @3 MIN.VALVE FAILURE0-10 MIN.SET @3 MIN.NO PRESSURE10-10 MIN.SET @1 MIN.RESETRESETRESETPLCSTOPMOMPLCSTARTMOM0-30 MIN.SET @15 MIN.NOFLOWPUMPCONTROLVALVEFAILURENOPRESSUREVFDTRIPMPRTRIPXOOOOXOXOSLOWCLOSEOPEN/CLOSELOCALSPEED POTVFDSTART/STOPPUMPRUNTO VFD SHEET 00E10(TYP. FOR HIGH SERVICE PUMP NO.3 AND NO.4TO VENT FAN STARTERVALVE MAINT.MODE@ PCVCONTROLENCLOSUREPTTVALVE MAINT.MODEPTTVALVE OPENPTTVALVE CLOSEDPTTPUMP STOPPTTPUMP RUN1-10 MIN.SET @3 MIN.VIBRATION TRIPRESETTR7@ PUMPCONTROLVALVESHUTDOWNALARMVIBRATION SENSORS @ MOTOR00E1111 OFVFDCONTROL SCHEMATIC - IIT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICAL224121416182022242628303420,24,2870,72,74,7664707266646258545248444240383614,16,4852,7610,12,1814627476START·PLC START CONTACT MOMENTARILY CLOSES SENDING VOLTAGE THRUTR-1 CONTACT AND CR-5 N.C. CONTACT TO CR-4 COIL.·CR-4 CONTACT CLOSES ENERGIZING CR-6 COIL (LATCHES IN).·CR-6 CONTACT CLOSES ENERGIZING CR-8 COIL.·CR-8 CONTACT CLOSES STARTING VFD (DIN 5) TB-2 TERM 2 AND 3.·VALVE OLS #2 CLOSES ENERGIZING CR-3. CR-3 CONTACT HELPS LATCHCR-8 COIL, HOLDING VFD ON.STOP·PLC STOP CONTACT CLOSES ENERGIZING CR-5 COIL.·CR-5 CONTACT OPENS BREAKING LATCH ON CR-6.·VALVE OLS #2 HOLDS CR-3 ON UNTIL VALVE IS CLOSED.·CR-3 CONTACT OPENS THEN AND BREAKS LATCH TO CR-8 STOPPINGVFD.·CF-6 AND PUMP PRSSURE SWITCH ENERGIZES CR-12, CR-12 ENERGIZESIR-2.·IR-2 RELAY OPENS/CLOSES VALVE.SEQUENCE OF OPERATION:36,84,10681032465056606822,2226,2630,3272282444,74727276764,74440,42 DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E12100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:09 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E12.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANT1.REFER TO SHEET 00E11 FOR SCHEMATIC.NOTES BY SYMBOL " ":#00E1212 OFPLC INTERFACE DIAGRAM AND SCHEMATICT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICALHSP PUMP NO.3PUMP STOPPEDEQUIPMENT NO.DESIGNATIONFIELD WIRINGPLCPUMP NO PRESSUREINTERFACE DIAGRAMREMOTE ENABLEVIBRATION ALARMVIBRATION TRIPPUMP RUNNINGMOTOR PROTECTION ALARMCONTROL VALVE MALFUNCTIONCONTROL VALVE CLOSEDSPEED CONTROLEXISTING PLC-4 MOTOR PROTECTION TRIPE-STOP PRESSEDHSP PUMP NO.4WIRE/CONDUIT SCHEDULECONTROL & INSTRUMENTATIONA3A1A2A6A5A4A9A8A7A10C3C1C2C6C5C4C9C8C7C30C11C1018#14, 1-1/4"C20#14, 1-1/4"C22#14, 1-1/2"C6#14, 1"C10#14, 1"C8#14, 1"C12#14, 1-1/4"C16#14, 1-1/4"C14#14, 1-1/4"C2#14, 3/4"C4#14, 3/4"CC37C#74#14, 4"CC = CONTROL60#14, 3-1/2"C9-1Pr#16 TSP, 2"C10-1Pr#16 TSP, 2"C3-1Pr#16 TSP, 3/4"C7-1Pr#16 TSP, 2"C8-1Pr#16 TSP, 2"C5-1Pr#16 TSP, 1"C4-1Pr#16 TSP, 1"C6-1Pr#16 TSP, 1-1/2"C1-1Pr#16 TSP, 3/4"C2-1Pr#16 TSP, 3/4"C# REPRESENTS PAIR OF WIRE EXAMPLE C10 = 20#14 WIRES EXAMPLE C20 = 40#14 WIRES1) NOT ALL POSSIBLE COMBINATIONS ARE LISTED.INCLUDE A SEPARATE GROUND WIRE IN EACH CONDUITRUN.A1111-1Pr#16 TSP, 2"C2) ANALOG CABLES ARE INTENDED TO BEINDIVIDUALLY INSULATED TWISTED SHIELDED PAIRSUNLESS OTHERWISE NOTED ON THE DRAWING.CONTROL & INSTRUMENTATIONWIRE/CONDUIT TABLE NOTES:M1M2M3M4C1224#14, 1-1/4"CC1428#14, 1-1/4"C1-CAT-5e, 1"C2-CAT-5e, 1-1/2"C3-CAT-5e, 2"C4-CAT-5e, 2"C41VDF-3C1C1C1C1C1C1C1C1C1C1C1C1C1A1A1TC-05CVFD-4CONTROL VALVE OPENCONTROL VALVE FAILURESPEED FEEDBACKSCHEMATICEXISTING VENTILATION FAN ANDDAMPER CONTROLANOT TO SCALE (TYPPS-VF-3, ANDPS-VF-4)TR1480V120V0-10 MIN.SET @2 MIN.AHOXOOOOX REMOTETHERMOSTAT@VFDIR4CR1M1RPTTFAN ONVENTILATION FANM2DAMPERCR1C13A2TC-05APUMP STOPPEDPUMP NO PRESSUREREMOTE ENABLEVIBRATION ALARMVIBRATION TRIPPUMP RUNNINGMOTOR PROTECTION ALARMCONTROL VALVE MALFUNCTIONCONTROL VALVE CLOSEDMOTOR PROTECTION TRIPE-STOP PRESSEDC1C1C1C1C1C1C1C1C1C1C1C1C1CONTROL VALVE OPENCONTROL VALVE FAILUREC13A1A1A2TC-07ASPEED CONTROLSPEED FEEDBACKTC-07CFROM VFDC1326#14, 1-1/4"C1CR1120V@"LOW PRESSURE"PRESSURE SWITCHCRIR4TO PUMP(P1)SOFT-STARTERIR4IR4IR4IR4IR4IR4SCHEMATICEXISTING "LOW PRESSURE" CUTOFFRELAY PANEL CONTROL SCHEMATICATO PUMP(P2)SOFT-STARTERTO PUMP(P3)VFDTO PUMP(P4)VFDFUTUREFUTUREFUTURE DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E13100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:10 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E13.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANT1.DRAWINGS OBTAINED FROM PLC SHOPDRAWINGS.2.REPLICATE THE EXISTINGCONNECTIONS SHOWN.3.COORDINATE ALL WORK WITH CITY OFDENTON.GENERAL NOTES:00E1313 OFNETWORK DIAGRAM - DEMOLITIONT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICAL1.REMOVE EXISTING MULTILINS 269NOTES BY SYMBOL " ":#11REPRODUCED FROMAS BUILT PLC SHOPDRAWING DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E14100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:10 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E14.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANT00E1414 OFNETWORK DIAGRAM - MODIFICATIONT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICAL1.DRAWINGS OBTAINED FROM PLC SHOPDRAWINGS.2.REPLICATE THE EXISTINGCONNECTIONS SHOWN.3.FROM E13.GENERAL NOTES:1.PROVIDE NEW 869 MULTILINS.2.FURNISH NEW CABLE TO CONNECT THENEW MULTILINS.NOTES BY SYMBOL " ":#1212REPRODUCED FROMAS BUILT PLC SHOPDRAWING DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E15100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:10 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E15.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANT00E1515 OFVFD-PLC ANALOG INTERFACE - IT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICAL1.DRAWINGS OBTAINED FROM PLC SHOPDRAWINGS.2.REPLICATE THE EXISTINGCONNECTIONS SHOWN.3.FROM E13.GENERAL NOTES:1.RECONNECT VFD SIGNALS FROM PLCTO VFD CONTROL PANEL.NOTES BY SYMBOL " ":#11REPRODUCED FROMAS BUILT PLC SHOPDRAWING DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E16100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:10 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E16.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANT00E1616 OFVFD-PLC ANALOG INTERFACE - IIT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICAL111.DRAWINGS OBTAINED FROM PLC SHOPDRAWINGS.2.REPLICATE THE EXISTINGCONNECTIONS SHOWN.3.FROM E13.GENERAL NOTES:1.RECONNECT SPEED CONTROL SIGNALTO EXISTING PLC.NOTES BY SYMBOL " ":#REPRODUCED FROMAS BUILT PLC SHOPDRAWING DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E17100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:10 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E17.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANT00E1717 OFVFD-PLC DIGITAL INTERFACE - IT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICAL111111111.DRAWINGS OBTAINED FROM PLC SHOPDRAWINGS.2.REPLICATE THE EXISTINGCONNECTIONS SHOWN.3.FROM E13.GENERAL NOTES:1.REWIRE THE FIELD WIRES FROMVFD TO EXISTING PLC ATTERMINALS AS SHOWN.NOTES BY SYMBOL " ":#REPRODUCED FROMAS BUILT PLC SHOPDRAWING DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E18100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:10 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E18.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANT00E1818 OFVFD-PLC DIGITAL INTERFACE - IIT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICAL1.DRAWINGS OBTAINED FROM PLC SHOPDRAWINGS.2.REPLICATE THE EXISTINGCONNECTIONS SHOWN.3.FROM E13.GENERAL NOTES:11.REWIRE THE FIELD WIRES FROMVFD TO EXISTING PLC ATTERMINALS AS SHOWN.NOTES BY SYMBOL " ":#REPRODUCED FROMAS BUILT PLC SHOPDRAWING DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E19100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:10 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E19.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANT00E1919 OFVFD-PLC DIGITAL INTERFACE - IIIT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICAL1.DRAWINGS OBTAINED FROM PLC SHOPDRAWINGS.2.REPLICATE THE EXISTINGCONNECTIONS SHOWN.3.FROM E13.GENERAL NOTES:111111111.REWIRE THE FIELD WIRES FROMVFD TO EXISTING PLC ATTERMINALS AS SHOWN.NOTES BY SYMBOL " ":#REPRODUCED FROMAS BUILT PLC SHOPDRAWING DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E20100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:10 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E20.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANT00E2020 OFVFD-PLC DIGITAL INTERFACE - IVT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICAL1.DRAWINGS OBTAINED FROM PLC SHOPDRAWINGS.2.REPLICATE THE EXISTINGCONNECTIONS SHOWN.3.FROM E13.GENERAL NOTES:11.REWIRE THE FIELD WIRES FROMVFD TO EXISTING PLC ATTERMINALS AS SHOWN.NOTES BY SYMBOL " ":#REPRODUCED FROMAS BUILT PLC SHOPDRAWING DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E21100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:10 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E21.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANT00E2121 OFVFD-PLC DIGITAL INTERFACE - VT. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICAL1.DRAWINGS OBTAINED FROM PLC SHOPDRAWINGS.2.REPLICATE THE EXISTINGCONNECTIONS SHOWN.3.FROM E13.GENERAL NOTES:1.RECONNECT VFD SIGNALS FROM PLCTO VFD CONTROL PANEL.NOTES BY SYMBOL " ":#11111111REPRODUCED FROMAS BUILT PLC SHOPDRAWING DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_00E22100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:10 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_00E22.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANT00E2222 OFCONTROL VALVE CONTROL PANELVFD INTERFACET. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICAL1.DRAWINGS OBTAINED FROM EXISTINGVFD SHOP DRAWINGS.2.REPLICATE THE EXISTINGCONNECTIONS SHOWN.3.FROM E13.GENERAL NOTES:1.PROVIDE TERMINAL STRIPS INVFD ENCLOSURE TO MATCHTHE TERMINALS AS SHOWN.NOTES BY SYMBOL " ":#DIAGRAMVFD FIELD WIRINGTERMINATION1REPRODUCED FROMAS BUILT VFD SHOPDRAWING CONCRETE, CMU ORBRICK WALL(CONCRETE SHOWN)FIRE RETARDANT SEALINGCOMPOUND INDOORS ORNON-SHRINKING CEMENTGROUT OUTDOORSPROVIDE SQUARE ON ONROUND OPENING AS NEEDEDPVC COATEDALUMINUMDETAILEXISTING BLOCK OR CONCRETE WALL -INTERIOR CONDUIT PENETRATION E13-NTS1.LEAVE REBAR INTACT WHEN BREAKING OUTEXISTING WALLS.NOTES BY SYMBOL " ":#CORE DRILLED HOLECONDUIT ASSPECIFIEDPVC COATEDCOUPLING (TYP.)PVC COATEDALUMINUMELBOW (TYP.)CONCRETE CURB WITHCHAMFERED EDGES3" MINIMUM HOUSEKEEPING PADCONCRETEFLOOR OR SLABCONDUITS ASSPECIFIED OR ASPLANNED1DETAILINTERIOR OR EXTERIOR -CONCEALED CONDUIT INSTALLATION CONCRETE SLAB E17-NTS1.THE FIRST FITTING PAST ANY FINISH SURFACESHALL BE A MIN. OF 3" ABOVE THAT FINISHSURFACE.NOTES BY SYMBOL " ":#DRILL AND ADHESIVE#4 REBAR 6"x6"ANCHOR @24AROUND PERIMETEROF PAD MIN 3" INTOPAD AND INTO FLOOR15TYPICAL FREE STANDING EQUIP.PROVIDE MID-SUPPORT WHEREREQUIRED BY MANUFACTURER1/2" DIA. MIN.ADHESIVE TYPEANCHOR AND 316 SSANCHOR BOLTS3FINISHEDFLOORROUGHEN FLOORSLAB PRIORPOURING PADDETAILELECTRICAL EQUIPMENTFLOOR MOUNTING E18-NTS1.ALSO SEE STRUCTURAL DETAILS FOR FURTHERINFORMATION.2.PROVIDE FINAL INSTALLATION LEVEL.3.PROVIDE THE CORRECT SIZE ANCHOR BASED ONLOAD.4.COORDINATE CONDUIT PENETRATION THROUGHFLOOR AND EQUIPMENT PAD WITH STRUCTURALDESIGN.5.EQUIPMENT PAD SHALL BE 3" MORE IN LENGTHAND WIDTH THAN THE EQUIPMENT TO BE PLACED.IF EQUIPMENT IS PLACED UP AGAINST THE WALL,THERE SHALL NOT BE A 3" GAP BETWEEN THEEQUIPMENT AND WALL. REFER TO PLAN VIEWSFOR ADDITIONAL INFORMATION.NOTES BY SYMBOL " ":#ELECTRICALEQUIPMENTENCLOSURE ASSPECIFIED1-5/8" 316 SSSLOTTED CHANNEL.ALL CUT EDGES TOBE FILED SMOOTH5/16" DIA. MINADHESIVE TYPEAND 316 SSANCHOR BOLTS1DETAILELECTRICAL EQUIPMENTWALL MOUNTING E19-NTS1.PROVIDE THE CORRECT SIZE ANCHOR BOLTSBASED ON LOADNOTES BY SYMBOL " ":#1-5/8" 316 SS DOUBLESLOTTED CHANNEL316 SS NUTS,WASHERS (TYP.)3/8" (MIN.)316 SS ALLTHREAD RODALUMINUMCABLE TRAY(TYP.)316 SSFASTENINGHARDWARE316 SSANCHORBOLTS1DETAILTRAPEZE TRAY SUPPORT E20-NTS1.PROVIDE THE CORRECT SIZE ANCHOR BOLTSBASED ON LOAD.NOTES BY SYMBOL " ":#DATE:REMARKSDRWNDATENO.REV.DRAWN BY:SHEET CHK'D BY:APPROVED BY:DESIGNED BY:OCTOBER 2019190616FILE NAME:PROJECT NO.SHEET NO.4115_EZ01100% SUBMITTAL ISSUED FOR BID2313717 Neutron RoadDallas, Texas 75244Tel: 972-490-7661Fax: 972-490-7125email:gaiconsulting.com 10/25/2019 9:10 AM Z:\4115_Denton Lake Ray Roberts WTP HSPS VFD Replacement\5 Drawings\Electrical\!Working\4115_EZ01.dwg Matthew Goff 10/25/19GAIGupta & Associates, Inc.CONSULTING ENGINEERINGRegistration No. F-2593HIGH SERVICE PUMP STATIONVFD REPLACEMENTDENTON LAKE RAY ROBERTSWATER TREATMENT PLANTEZ0123 OFSTANDARD DETAILST. HERNANDEZM. GOFFG.B. LUKET. HERNANDEZELECTRICAL