7213 Addendum No.1 Purchasing Department 901-B Texas St. Denton, TX 76209 (940) 349-7100 www.dentonpurchasing.com ADDENDUM #1 RFP #7213 RFP Lake Ray Roberts WTP 500HP VFD Replacement Issue Date: November 11, 2019 Response due Date and Time (Central Time): Thursday, November 14, 2019, 11:00 A.M. C.S.T RFP # 7213 ADDENDUM #1 The following are answers to contractor questions: Q1: Question: Reference Drawing 00E06 – Note 6 – Install new louvers in existing roof penetration- Do we need to provide these louvers or have you already purchased them? If we need to provide them, is there a spec available for the louvers? Or some parameters that need to be followed when procuring them? Is the size for the new louvers known? What controls the new louvers? A1: The louvers are existing and to remain there is no control involved for the louvers. Q2: Question: What is going to done with old VFD equipment? A2: Contractor shall dispose of the old VFDs as required based on appropriate standards and procedures. Q3: Question: Estimated cost for bid bond? A3: See Opinion of Probable Construction Cost in attachement. Q4: Question: Louvers replaced? A4: Existing louvers above the VFDs are to remain. Contractor to cover up the louvers. Q5: Question: Cover up the louvers? A5: Contractor to cover up the louvers penetration. Q6: Question: Existing exhaust fans disconnected? A6: The existing exhaust fans to be disconnected, the power and control wires to be disconnected and coiled up in the junction box located next to them. Q7: Question: Low pressure relay panel located? A7: There is a valve/pressure control panel located next to each individual pump. Q8: Question: Cable tray above new VFD, size, aluminum? A8: Refer to the Cable Tray Specification section for size and materials. Q9: Question: How will the VFDs will be moved in to the electrical room? A9: City of Denton will provide a new egress door with a removable transom so the contractor can fit the VFD using a cart. Q10: Question: Section 00 41 00 3.1 (Time of Completion) states "The work will be complete for Final Acceptance within 365 days after the Contract time commences...". However, section 00 52 43 4.1 (Agreement:Contract Time) states "The work will be complete for Final Acceptance within 154 days after the Contract Times commences...". Please advise of the contract time and if the number of days are calendar days or working days. A10: The contract time will be 154 days Section 00 41 00 3.1 will be updated. Q11: Question: Can Danfoss be added to the approved manufacturer list? A9: The manufacturer list will not be modified. The following are changes to the specifications: Front End Specification Section 00 41 00 Bid Form MODIFY existing paragraph 3.1 to read: 3.1 The Work will be complete for Final Acceptance within 154 days after the date when the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. The following are changes to the plans: Sheet 00E06 Electrical Room – Demolition MODIFY existing note by symbol 6 to read: 6. Existing louvers to remain. Provide material to cover up louver penetration. Sheet 00E07 MCC-1 Partial One-Line Diagram – Modification ADD General Note 1 to read: 1. Field verify location of all devices and equipment shown on One-Line. Sheet 00E08 Pump Station Floor Plan REMOVE Note by symbol 1 on plan to the following equipment: 1. P1-MSH. 2. P2-MSH. Sheet 00E09 Electrical Room Modification MODIFY existing note by symbol 5 to read: 5. Provide cable tray if needed to route cables inside electrical room. Minimum width of tray to be 20” NO OTHER CHANGES AT THIS TIME. Please acknowledge addendum when submitting a proposal.