Loading...
Pricing Sheet for Fire Station #8 RFP 7140- Pricing Sheet for Construction of FIRE STATION #8 (Addendum 2) The respondent shall complete the following sections (yellow boxes), which directly corresponds to the specifications. The respondent shall not change the contract calendar days shown in Itgems 4-6A. The contractor shall not make changes to this format. 1 2 3 4 5 5A Proposal Pricing: 7 8 9 10 Item # 10 11 12 13 14 15 16 17 OPTIONAL PRICING Item # 18 19 Respondent's Name: Principal Place of Business (City and State) Respondent is a Corporation, Partnership, sole Proprietorship, Indvidual? Total calendar days to start construction after Notice to Proceed is issued by City: Total calendar days after Notice to Proceed for Phase 1 Substantial Completion: Total calendar days after Phase 1 substantial completion to Phase 1 Final Completion: Base Bid amount to construct project per Contract Documents: Insurances, Payment and Performance Bonds Total Base Bid amount to construct with Insurances and Bonds Total Base Bid amount in typed words (in next line) Quantity 1 1 1 1 1 1 1 1 Quantity 1 1 UOM LS LS LS LS LS LS LS LS UOM Linear Foot Linear Foot Product Description Jobsite General Conditions Earthwork, Site Utilities, Storm Drainage Site Concrete, Landscaping, Irrigation Structural Concrete, Masonry, Cast Stone Structural Steel, Roofing Finishes (Division 9) Mechanical, Electrical, Plumbing, Fire Protection, Fire Alarm All Other Work Not Listed Above Product Description Provide a unit price fpr adding or deleting one linear foot of drilled pier in soil including drilling, concrete, reinforcing and installation (for soil drilling) which differs from elevations indicated on the drawings. Soil drilling indicated on details shall not be considered an extra. (Deduct price shall not be less than 35% of add price.) Provide a unit price fpr adding or deleting one linear foot of drilled pier in rock including drilling, concrete, reinforcing and installation which differs from elevations indicated on the drawings. Rock drilling indicated on details shall not be considered an extra. (Deduct price shall not be less than 35% of add price.) 14 330 45 $ $ $ $ Unit Price 0 0 0 0 0 0 0 0 Total Base Bid: Pier Diameter 18" 24" 18" 24" Extended Price 0 0 0 0 0 0 0 0 0 ADD Unit Price DEDUCT Unit Price