Pricing Sheet for Fire Station #8 RFP 7140- Pricing Sheet for Construction of FIRE STATION #8 (Addendum 2)
The respondent shall complete the following sections (yellow boxes), which directly corresponds to the specifications. The respondent shall not change the contract calendar days shown
in Itgems 4-6A. The contractor shall not make changes to this format.
1
2
3
4
5
5A
Proposal Pricing:
7
8
9
10
Item #
10
11
12
13
14
15
16
17
OPTIONAL PRICING
Item #
18
19
Respondent's Name:
Principal Place of Business (City and State)
Respondent is a Corporation, Partnership, sole Proprietorship, Indvidual?
Total calendar days to start construction after Notice to Proceed is issued by City:
Total calendar days after Notice to Proceed for Phase 1 Substantial Completion:
Total calendar days after Phase 1 substantial completion to Phase 1 Final Completion:
Base Bid amount to construct project per Contract Documents:
Insurances, Payment and Performance Bonds
Total Base Bid amount to construct with Insurances and Bonds
Total Base Bid amount in typed words (in next line)
Quantity
1
1
1
1
1
1
1
1
Quantity
1
1
UOM
LS
LS
LS
LS
LS
LS
LS
LS
UOM
Linear Foot
Linear Foot
Product Description
Jobsite General Conditions
Earthwork, Site Utilities, Storm Drainage
Site Concrete, Landscaping, Irrigation
Structural Concrete, Masonry, Cast Stone
Structural Steel, Roofing
Finishes (Division 9)
Mechanical, Electrical, Plumbing, Fire Protection, Fire Alarm
All Other Work Not Listed Above
Product Description
Provide a unit price fpr adding or deleting one linear foot of drilled pier in soil including drilling, concrete, reinforcing and installation (for soil drilling) which differs from
elevations indicated on the drawings. Soil drilling indicated on details shall not be considered an extra.
(Deduct price shall not be less than 35% of add price.)
Provide a unit price fpr adding or deleting one linear foot of drilled pier in rock including drilling, concrete, reinforcing and installation which differs from elevations indicated
on the drawings. Rock drilling indicated on details shall not be considered an extra. (Deduct price shall not be less
than 35% of add price.)
14
330
45
$
$
$
$
Unit Price
0
0
0
0
0
0
0
0
Total Base Bid:
Pier
Diameter
18"
24"
18"
24"
Extended Price
0
0
0
0
0
0
0
0
0
ADD
Unit Price
DEDUCT
Unit Price