7237 IFB-- 2019 Street Reconstruction - PLANS lhREPORT COVER PAGE
Terracon Consultants, Inc. 8901 John W. Carpenter Freeway Dallas, Texas 75247 Registration No. F-3272
P (214) 630 1010 F (214) 630 7070 terracon.com
REPORT COVER LETTER TO SIGN
REPORT TOPICS
....................................................................................................... I
............................................................................................................. 1
..................................................... 1
...................................................................... 2
....................................................................................... 3
................................................................................................................ 4
.................................................................................................................. 6
................................................................................................. 9
REPORT SUMMARY
INTRODUCTION
INTRODUCTION
SITE CONDITIONS AND PROJECT DESCRIPTION
GEOTECHNICAL CHARACTERIZATION
Subsurface Profile
Groundwater Conditions
GEOTECHNICAL OVERVIEW
EARTHWORK
Existing Fill Materials
Site Preparation
Fill Material Types
Fill Compaction Requirements
1
1
PAVEMENTS
Pavement Subgrade Preparations
Microcracking of Cement Stabilized Subgrade
Pavement Design Parameters
Pavement Section Thicknesses
1
GENERAL COMMENTS
ATTACHMENTS
EXPLORATION AND TESTING PROCEDURES
Field Exploration
1
Laboratory Testing
SITE LOCATION AND EXPLORATION PLANS
STUART ROADREDSTONE ROADSTUART ROADBUCKINGHAM DR
BRADLEY STREETSTUART ROADMARIETTA STREET
BRADLEY STREET
STUART ROAD
T-1
T-2
T-3
T-4
T-5
••••
••••
EXPLORATION RESULTS
SUPPORTING INFORMATION
UNIFIED SOIL CLASSIFICATION SYSTEM
A B
C
E F
E F
C
F, G, H
F, G, H
D
E I
E I
D
G, H, I
G, H, I
K, L, M
J K, L, M
K, L, M, N
K, L, M, O
K, L, M
K, L, M
K, L, M, P
K, L, M, Q
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
Level A Test Holes
Pape Dawson Street
Reconstruction
Denton, Texas
March 14, 2019
Lamb-Star Engineering, LP
5700 W. Plano Parkway, Suite 1000
Plano, TX 75093
(214) 440-3600
TBPE Registration No. F-9073
LSE Project No.:B200505.10 Vacuum Truck No.:3625
TEST HOLE DATA FORM
TH 01
PROJECT NAME:2019 - Street Reconstruction
TEST HOLE DATA TEST HOLE SECTION (NTS)
Utility Type:E SUE Field Manager:Hendricks
Utility Owner DME Field Technicians:BL JK
5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/20/2019 Weather:SUNNY
Approximate Station: N/A Offset: N/A
A Depth to Top of Utility:3.5
B Surface Elevation:668.96
C Top of Utility Elevation:665.46
D Utility Material Type:PVC
TEST HOLE
E Outside Diameter of Utility (Inches):4
F Existing Pavement Thickness (Inches):6
SHOT POINT NORTHING EASTING SURFACE ELEV
PAINT
DESCRIPTION NUMBER (Y) (X) (Z) MARKER
01 81045 7143007.39 2387538.07 668.96
Checked By:DWSLSE Project Manager D. Smith Completed By: RFL
Lamb-Star Engineering, LP
TBPE Firm No.: F-9073
LSE Project No.:B200505.10 Vacuum Truck No.:3625
TEST HOLE DATA FORM
TH 02
PROJECT NAME:2019 - Street Reconstruction
TEST HOLE DATA TEST HOLE SECTION (NTS)
Utility Type:UNK SUE Field Manager:Hendricks
Utility Owner UNK Field Technicians:BL JK
5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/20/2019 Weather:SUNNY
Approximate Station: N/A Offset: N/A
A Depth to Top of Utility:3.33
B Surface Elevation:659.5
C Top of Utility Elevation:656.17
D Utility Material Type:STL
TEST HOLE
E Outside Diameter of Utility (Inches):UNK
F Existing Pavement Thickness (Inches):6
SHOT POINT NORTHING EASTING SURFACE ELEV
PAINT
DESCRIPTION NUMBER (Y) (X) (Z) MARKER
02 81046 7142979.89 2389295.10 659.50
Checked By:DWSLSE Project Manager D. Smith Completed By: RFL
Lamb-Star Engineering, LP
TBPE Firm No.: F-9073
LSE Project No.:B200505.10 Vacuum Truck No.:3625
TEST HOLE DATA FORM
TH 04
PROJECT NAME:2019 - Street Reconstruction
TEST HOLE DATA TEST HOLE SECTION (NTS)
Utility Type:FOC SUE Field Manager:Hendricks
Utility Owner ATT Field Technicians:BL JP
5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/26/2019 Weather:SUNNY
Approximate Station: N/A Offset: N/A
A Depth to Top of Utility:5.05
B Surface Elevation:693.96
C Top of Utility Elevation:688.91
D Utility Material Type:PE
TEST HOLE
E Outside Diameter of Utility (Inches):UNK
F Existing Pavement Thickness (Inches):- -
SHOT POINT NORTHING EASTING SURFACE ELEV
5/8"IR W/ CAP
DESCRIPTION NUMBER (Y) (X) (Z) MARKER
04 81054 7130084.99 2380431.37 693.96
Checked By:DWSLSE Project Manager D. Smith Completed By: RFL
Lamb-Star Engineering, LP
TBPE Firm No.: F-9073
LSE Project No.:B200505.10 Vacuum Truck No.:9991
TEST HOLE DATA FORM
TH 06
PROJECT NAME:2019 - Street Reconstruction
TEST HOLE DATA TEST HOLE SECTION (NTS)
Utility Type:FOC SUE Field Manager:Hendricks
Utility Owner FRONTIER Field Technicians:JP AJ
5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/21/2019 Weather:CLOUDY
Approximate Station: N/A Offset: N/A
A Depth to Top of Utility:2.92
B Surface Elevation:734.97
C Top of Utility Elevation:732.05
D Utility Material Type:PE
TEST HOLE
E Outside Diameter of Utility (Inches):1.5
F Existing Pavement Thickness (Inches):5
SHOT POINT NORTHING EASTING SURFACE ELEV
PAINT
DESCRIPTION NUMBER (Y) (X) (Z) MARKER
06 81053 7130062.18 2379043.44 734.97
Checked By:DWSLSE Project Manager D. Smith Completed By: RFL
Lamb-Star Engineering, LP
TBPE Firm No.: F-9073
LSE Project No.:B200505.10 Vacuum Truck No.:9991
TEST HOLE DATA FORM
TH 07
PROJECT NAME:2019 - Street Reconstruction
TEST HOLE DATA TEST HOLE SECTION (NTS)
Utility Type:FOC SUE Field Manager:Hendricks
Utility Owner ATT Field Technicians:JP AJ
5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/21/2019 Weather:RAIN
Approximate Station: N/A Offset: N/A
A Depth to Top of Utility:3.28
B Surface Elevation:736.62
C Top of Utility Elevation:733.34
D Utility Material Type:PVC
TEST HOLE
E Outside Diameter of Utility (Inches):UNK
F Existing Pavement Thickness (Inches):7
SHOT POINT NORTHING EASTING SURFACE ELEV
PAINT
DESCRIPTION NUMBER (Y) (X) (Z) MARKER
07 81052 7130114.96 2379011.53 736.62
Checked By:DWSLSE Project Manager D. Smith Completed By: RFL
Lamb-Star Engineering, LP
TBPE Firm No.: F-9073
LSE Project No.:B200505.10 Vacuum Truck No.:3625
TEST HOLE DATA FORM
TH 08
PROJECT NAME:2019 - Street Reconstruction
TEST HOLE DATA TEST HOLE SECTION (NTS)
Utility Type:FOC SUE Field Manager:Hendricks
Utility Owner VERIZON Field Technicians:BL JK
5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/21/2019 Weather:CLOUDY
Approximate Station: N/A Offset: N/A
A Depth to Top of Utility:1.76
B Surface Elevation:641.88
C Top of Utility Elevation:640.12
D Utility Material Type:PE
TEST HOLE
E Outside Diameter of Utility (Inches):1.5
F Existing Pavement Thickness (Inches):12
SHOT POINT NORTHING EASTING SURFACE ELEV
PAINT
DESCRIPTION NUMBER (Y) (X) (Z) MARKER
08 81048 7139078.58 2391979.51 641.88
Checked By:DWSLSE Project Manager D. Smith Completed By: RFL
Lamb-Star Engineering, LP
TBPE Firm No.: F-9073
LSE Project No.:B200505.10 Vacuum Truck No.:9991
TEST HOLE DATA FORM
TH 10
PROJECT NAME:2019 - Street Reconstruction
TEST HOLE DATA TEST HOLE SECTION (NTS)
Utility Type:FOC SUE Field Manager:Hendricks
Utility Owner DENTON FIBER Field Technicians:JK AJ
5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/21/2019 Weather:CLOUDY
Approximate Station: N/A Offset: N/A
A Depth to Top of Utility:3.56
B Surface Elevation:640.2
C Top of Utility Elevation:636.64
D Utility Material Type:PE
TEST HOLE
E Outside Diameter of Utility (Inches):1.5
F Existing Pavement Thickness (Inches):8
SHOT POINT NORTHING EASTING SURFACE ELEV
PAINT
DESCRIPTION NUMBER (Y) (X) (Z) MARKER
10 81047 7139568.64 2389955.09 640.20
Checked By:DWSLSE Project Manager D. Smith Completed By: RFL
Lamb-Star Engineering, LP
TBPE Firm No.: F-9073
LSE Project No.:B200505.10 Vacuum Truck No.:3625
TEST HOLE DATA FORM
TH 11
PROJECT NAME:2019 - Street Reconstruction
TEST HOLE DATA TEST HOLE SECTION (NTS)
Utility Type:FOC SUE Field Manager:Hendricks
Utility Owner VERIZON Field Technicians:BL JK
5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/21/2019 Weather:RAIN
Approximate Station: N/A Offset: N/A
A Depth to Top of Utility:1.43
B Surface Elevation:640.24
C Top of Utility Elevation:638.81
D Utility Material Type:PE
TEST HOLE
E Outside Diameter of Utility (Inches):1.5
F Existing Pavement Thickness (Inches):12
SHOT POINT NORTHING EASTING SURFACE ELEV
PAINT
DESCRIPTION NUMBER (Y) (X) (Z) MARKER
11 81049 7139119.32 2391998.28 640.24
Checked By:DWSLSE Project Manager D. Smith Completed By: RFL
Lamb-Star Engineering, LP
TBPE Firm No.: F-9073
LSE Project No.:B200505.10 Vacuum Truck No.:9991
TEST HOLE DATA FORM
TH 13
PROJECT NAME:2019 - Street Reconstruction
TEST HOLE DATA TEST HOLE SECTION (NTS)
Utility Type:FOC SUE Field Manager:Hendricks
Utility Owner VERIZON Field Technicians:JP AJ
5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/20/2019 Weather:SUNNY
Approximate Station: N/A Offset: N/A
A Depth to Top of Utility:2.04
B Surface Elevation:615.22
C Top of Utility Elevation:613.18
D Utility Material Type:PE
TEST HOLE
E Outside Diameter of Utility (Inches):1.5
F Existing Pavement Thickness (Inches):8
SHOT POINT NORTHING EASTING SURFACE ELEV
PAINT
DESCRIPTION NUMBER (Y) (X) (Z) MARKER
13 81050 7140250.34 2394946.87 615.22
Checked By:DWSLSE Project Manager D. Smith Completed By: RFL
Lamb-Star Engineering, LP
TBPE Firm No.: F-9073
LSE Project No.:B200505.10 Vacuum Truck No.:9991
TEST HOLE DATA FORM
TH 14
PROJECT NAME:2019 - Street Reconstruction
TEST HOLE DATA TEST HOLE SECTION (NTS)
Utility Type:E SUE Field Manager:Hendricks
Utility Owner DME Field Technicians:JP AJ
5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/20/2019 Weather:SUNNY
Approximate Station: N/A Offset: N/A
A Depth to Top of Utility:3.72
B Surface Elevation:613.27
C Top of Utility Elevation:609.55
D Utility Material Type:PVC
TEST HOLE
E Outside Diameter of Utility (Inches):2.5
F Existing Pavement Thickness (Inches):- -
SHOT POINT NORTHING EASTING SURFACE ELEV
5/8"IR W/ CAP
DESCRIPTION NUMBER (Y) (X) (Z) MARKER
14 81051 7140224.26 2395378.68 613.27
Checked By:DWSLSE Project Manager D. Smith Completed By: RFL
Lamb-Star Engineering, LP
TBPE Firm No.: F-9073
Level A Test Holes
Pape Dawson-Street Reconstruction
Denton, Texas
March 20, 2019
Lamb-Star Engineering, LP
5700 W. Plano Parkway, Suite 1000
Plano, TX 75093
(214) 440-3600
TBPE Registration No. F-9073