Loading...
RFP 7177 - SOW Exhibit D - Storm Water Pollution Prevention01 57 13 - 1 STORM WATER POLLUTION PREVENTION Page 1 of 3 CITY OF DENTON RFP# 7177 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised September 20, 2018 SECTION 01 57 13 1 STORM WATER POLLUTION PREVENTION 2 PART 1 - GENERAL 3 1.1 SUMMARY 4 A. Section Includes: 5 1. Procedures for Storm Water Pollution Prevention Plans 6 B. Deviations from this City of Denton Standard Specification 7 1. None. 8 C. Related Specification Sections include, but are not necessarily limited to: 9 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the 10 Contract 11 2. Division 1 – General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Storm Water Pollution Prevention Plan 15 a. Measurement for this Item shall be by lump sum. 16 b. Payment 17 1) The work performed and the materials furnished in accordance with this 18 Item shall be paid for at the lump sum price bid for “Storm Water Pollution 19 Prevention Plan”. 20 c. The price bid shall include: 21 1) Preparation of Storm Water Pollution Prevention Plan 22 2) Implementation 23 3) Permitting fees 24 4) Installation 25 5) Maintenance 26 6) Removal 27 1.3 REFERENCES 28 A. Abbreviations and Acronyms 29 1. Notice of Intent: NOI 30 2. Notice of Termination: NOT 31 3. Storm Water Pollution Prevention Plan: SWPPP 32 4. Texas Commission on Environmental Quality: TCEQ 33 5. Notice of Change: NOC 34 A. Reference Standards 35 1. Reference standards cited in this Specification refer to the current reference 36 standard published at the time of the latest revision date logged at the end of this 37 Specification, unless a date is specifically cited. 38 01 57 13 - 2 STORM WATER POLLUTION PREVENTION Page 2 of 3 CITY OF DENTON RFP# 7177 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised September 20, 2018 2. Integrated Storm Management (iSWM) Technical Manual for Construction 1 Controls 2 1.4 ADMINISTRATIVE REQUIREMENTS 3 A. General 4 1. Contractor is responsible for resolution and payment of any fines issued associated 5 with compliance to Stormwater Pollution Prevention Plan. 6 2. As a condition of approval, applicants conducting land disturbing activities will 7 complete the online construction site survey. This survey can be found at 8 https://www.surveymonkey.com/r/HT2BDHZ 9 B. Construction Activities resulting in: 10 1. Less than 1 acre of disturbance 11 a. Provide erosion and sediment control in accordance with Drawings. 12 2. 1 to less than 5 acres of disturbance 13 a. Texas Pollutant Discharge Elimination System (TPDES) General Construction 14 Permit is required 15 b. Complete SWPPP in accordance with TCEQ requirements 16 1) TCEQ Small Construction Site Notice Required under general permit 17 TXR150000 18 a) Sign and post at job site 19 b) Prior to Preconstruction Meeting, send 1 copy to City Watershed 20 Protection Department, Joetta Dailey (940) 349-7153 or David Hunter 21 (940) 349-7123. 22 2) Provide erosion and sediment control in accordance with: 23 a) Drawings 24 b) TXR150000 General Permit 25 c) SWPPP 26 d) TCEQ requirements 27 3. 5 acres or more of Disturbance 28 a. Texas Pollutant Discharge Elimination System (TPDES) General Construction 29 Permit is required 30 b. Complete SWPPP in accordance with TCEQ requirements 31 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee 32 a) Sign and post at job site 33 b) Send copy to City Watershed Protection Department, Joetta Dailey 34 (940) 349 7153 or David Hunter (940) 349 7123. 35 2) TCEQ Notice of Change required if making changes or updates to NOI 36 3) Provide erosion and sediment control in accordance with: 37 a) Drawings 38 b) TXR150000 General Permit 39 c) SWPPP 40 d) TCEQ requirements 41 4) Once the project has been completed and all the closeout requirements of 42 TCEQ have been met a TCEQ Notice of Termination can be submitted. 43 a) Send copy to City Watershed Protection Department, Joetta Dailey 44 (940) 349-7153 or David Hunter (940) 349-7123. 45 01 57 13 - 3 STORM WATER POLLUTION PREVENTION Page 3 of 3 CITY OF DENTON RFP# 7177 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised September 20, 2018 1.5 SUBMITTALS 1 A. SWPPP 2 1. Submit in accordance with Section 01 33 00, except as stated herein. 3 a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City 4 as follows: 5 1) 1 copy to the Project Manager 6 a) Project Manager will forward to the City Watershed Protection 7 Department, Joetta Dailey (940) 349-7153 or David Hunter (940) 349-8 7123 for review. 9 B. Modified SWPPP 10 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City 11 in accordance with Section 01 33 00. 12 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 13 1.7 CLOSEOUT SUBMITTALS [NOT USED] 14 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 15 1.9 QUALITY ASSURANCE [NOT USED] 16 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 17 1.11 FIELD [SITE] CONDITIONS [NOT USED] 18 1.12 WARRANTY [NOT USED] 19 PART 2 - PRODUCTS [NOT USED] 20 PART 3 - EXECUTION [NOT USED] 21 END OF SECTION 22 23 Revision Log DATE NAME SUMMARY OF CHANGE 24