Loading...
Attachment 1_Test LocationsM. OKAZ M. OKAZ GENERAL ARRANGEMENT OVERALL SITE PLAN 94619 GA102 MULTIPLE 201612/7/2016 10:16:49 AM PRELIMINARY09/23/16 CJMMO 10/14/16 MO CJM ISSUED FOR REVIEW A B C 11/21/16 MO CJM ISSUED FOR INFORMATION D MO12/06/16 CJM ISSUED FOR INFORMATION D DENTON, TEXAS FIRM LICENSE NO. F-845 816-333-9400 KANSAS CITY, MO 64114 9400 WARD PARKWAYScale For MicrofilmingInchesMillimeters1 1615141312111098765432 17 M L K J I H G F E D C B A no.date descriptionby ofsheet sheets project rev.drawing fileckd detaileddesigned no.date descriptionbyckd contract COPYRIGHT ©BURNS & McDONNELL ENGINEERING COMPANY, INC.18 19 DENTON ENERGY CENTERScale For MicrofilmingInchesMillimeters1 1615141312111098765432 17 M L K J I H G F E D C B A no.date descriptionby ofsheet sheets project rev.drawing fileckd detaileddesigned no.date descriptionbyckd contract COPYRIGHT ©BURNS & McDONNELL ENGINEERING COMPANY, INC.18 19 Scale For MicrofilmingInchesMillimeters1 1615141312111098765432 17 M L K J I H G F E D C B A no.date descriptionby ofsheet sheets project rev.drawing fileckd detaileddesigned no.date descriptionbyckd contract COPYRIGHT ©BURNS & McDONNELL ENGINEERING COMPANY, INC.18 19 THIS DOCUMENT AND ANY ATTACHMENTS THERETO MAY CONTAIN INFORMATION THAT IS CONFIDENTIAL, COMMERCIALLY-SENSITIVE, PROPRIETARY, AND/OR PUBLIC POWER UTILITY COMPETITIVE AND FINANCIAL INFORMATION IN ACCORDANCE WITH THE PROVISIONS OF TEXAS GOVERNMENT CODE, SECTION 552.101, 552.104, 552.110 AND/OR 552.133, AND MAY BE PROTECTED FROM REQUIRED PUBLIC DISCLOSURE. SITE KEY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 RECIPROCATING ENGINE HALLS MV SWITCHGEAR ENLOSURE MECHANICAL ROOM MAINTENANCE ROOM WARTSILA ENGINES SILENCERS / STACKS RADIATORS CONTROL ROOM NEW LUBE OIL TANK SERVICE LUBE OIL TANK USED LUBE OIL TANK AMMONIA TANK AMMONIA CONTAINMENT HVAC UNITS GENERATOR STEP-UP TRANSFORMER SELECTIVE CATALYTIC REDUCERS CHARGE AIR FILTERS GAS YARD LUBE OIL CONTAINMENT OIL/AMMONIA UNLOADING STATION AUX GENERATOR GAS CONDITIONING SUBSTATION (BY OTHERS) STATION TRANSFORMERS 5 1 18 17 6 7 13 12 21 14 22 20 10 11 9 8 3 1 7 5 16 16 4 2 15 15 15 2 19 23 24 (TYP OF 12)(TYP OF 6) (TYP OF 30)(TYP OF 6) (TYP OF 30) 18 17 6 (TYP OF 12)(TYP OF 6) (TYP OF 6) 14 (TYP OF 6) 14 (TYP OF 6) 25 26 27 NORTH ELECTRICAL ROOM SOUTH ELECTRICAL ROOM ESSENTIAL POWER TRANSFORMER FUTURE 25 26 27 PRELIMINARY - NOT FOR CONSTRUCTION 1 GA111 2 GA112 4 GA114 3 GA113 5 GA115 28 28 FUTURE GAS YARD