Loading...
Exhibit 2 - Map2019 ADA Sidewalk Design List Locations ROWS:1- 18, 23, 24. Sections 5, 6, 8, & 12 will be covered by the “Mews” plan. 1 1 2 5 4 3 6 7 8 9 10 11 12 14 15 13 16 1718 23 24 19 20 (fill in gaps) A lot of sidewalk is already in place on the south side of Emery starting from the east to almost Primrose (see blue) 21 22 Some sidewalk is already in place on the west side of Campbell heading north from Paisley ? 25 26 Some sidewalk is already in place between Bayfield and Brittany on Audra. 27