Loading...
Exhibit 1 - Agenda Information SheetCity of Denton _____________________________________________________________________________________ AGENDA INFORMATION SHEET DEPARTMENT: Procurement & Compliance CFO: Antonio Puente, Jr. DATE: January 28, 2020 SUBJECT Consider adoption of an ordinance of the City of Denton, a Texas home-rule municipal corporation, authorizing the City Manager to execute a Professional Services Agreement with Stearns, Conrad and Schmidt, Consulting Engineers, Inc. (dba SCS Engineers), for the installation of 12 vertical gas wells, 8” gas header piping and 6” gas lateral piping for the Solid Waste Landfill Division as set forth in the contract; providing for the expenditure of funds therefor; and providing an effective date (RFQ 7109-002 – Professional Services Agreement for the installation of 12 vertical gas wells, 8” gas header piping and 6” gas lateral piping for the Solid Waste Landfill Division awarded to Stearns, Conrad and Schmidt, Consulting Engineers, Inc. (dba SCS Engineers), in the not-to-exceed amount of $237,654). INFORMATION/BACKGROUND This item is for the turnkey installation of the Landfill Cell 4-5 Gas Extraction Well Expansion Project. SCS-FS will furnish all equipment, material, and labor to install the proposed 8” header with all 6” laterals that are referenced in the drawings provided by SCS Engineers. SCS-FS will install 8” header piping to the tie-in at the existing 18” perimeter header. 6” laterals off the 8” header will run to 12 new vertical gas extraction wells and 8 existing decommissioned leachate injection lines. Header and lateral lines will be placed above ground at a 3 percent grade to allow for gas condensate drainage. All piping is to be anchored by rebar straddling the pipe every 50’. Two (2) corrugated metal piping road crossings are to be installed at locations coordinated with site personnel. SCS-FS will drill and install 12 vertical gas extraction wells as per the attached drawings. Request for Qualifications for professional and engineering services was solicited using the City’s formal solicitation process. City Council approved a pre-qualified list of engineering firms on October 8, 2019 (Ordinance 19-2305). PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS) On October 8, 2019, Council approved RFQ 7109 for a prequalified list of professional and engineering firms for Solid Waste/Landfill (Ordinance 19-2305). On January 27, 2020, this item will be presented to the Public Utilities Board for recommendation to the City Council for consideration. City Hall 215 E. McKinney Street Denton, Texas www.cityofdenton.com RECOMMENDATION Award a contract with Stearns, Conrad and Schmidt, Consulting Engineers, Inc. (dba SCS Engineers), for the installation of 12 vertical gas wells, 8” gas header piping and 6” gas lateral piping for the Solid Waste Landfill Division in an amount not to exceed $237,654. PRINCIPAL PLACE OF BUSINESS Stearns, Conrad and Schmidt, Consulting Engineers, Inc. (dba SCS Engineers) Bedford, TX ESTIMATED SCHEDULE OF PROJECT This project will be started upon approval with a completion date by March 2020. FISCAL INFORMATION These items/services will be funded from Solid Waste account 660243585. Requisition #145024 has been entered in the Purchasing software system. The budgeted amount for this item is $237,654. EXHIBITS Exhibit 1: Agenda Information Sheet Exhibit 2: Ordinance and Contract Respectfully submitted: Lori Hewell, 349-7100 Purchasing Manager For information concerning this acquisition, contact: Randall Morris, 940-349-8049. Legal point of contact: Mack Reinwand at 940-349-8333.