Exhibit 2 - Bid TabulationItem #Spec. Section #Description of Work UOM QTY Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price 100 203.1 R.O.W PREPARATION (CLEARING AND GRUBBING)STA 16 $750.00 $12,000.00 $4,246.66 $67,946.56 $22,000.00 $352,000.00 101 203.2 UNCLASSIFIED EXCAVATION CY 8,066 $24.50 $197,617.00 $18.95 $152,850.70 $19.00 $153,254.0010201 70 00 MOBILIZATION LS 1 $300,000.00 $300,000.00 $218,075.06 $218,075.06 $243,000.00 $243,000.00103801.1 TRAFFIC CONTROL LS 1 $55,000.00 $55,000.00 $86,770.05 $86,770.05 $250,000.00 $250,000.00 104 01 58 13 CAPITAL IMPROVEMENT SIGNS EA 2 $394.76 $789.52 $481.28 $962.56 $600.00 $1,200.00105TX-512 FURNISH & INSTALL TRAFFIC BARRIER LF 892 $40.00 $35,680.00 $40.64 $36,250.88 $26.00 $23,192.00 106 TX-512 MOVE TRAFFIC BARRIER LF 892 $8.42 $7,510.64 $8.56 $7,635.52 $2.00 $1,784.00107TX-512 REMOVE TRAFFIC BARRIER LF 892 $16.84 $15,021.28 $17.11 $15,262.12 $8.00 $7,136.00108203.2 REMOVE ASPHALT PAVEMENT SY 7,817 $5.95 $46,511.15 $10.43 $81,531.31 $6.00 $46,902.00109203.2 REMOVE CONCRETE PAVEMENT SY 323 $9.81 $3,168.63 $16.04 $5,180.92 $23.00 $7,429.00110203.2 REMOVE CONCRETE SIDEWALK SF 9,172 $0.98 $8,988.56 $1.34 $12,290.48 $2.50 $22,930.00111203.2 REMOVE CONCRETE MEDIAN SY 164 $24.72 $4,054.08 $16.04 $2,630.56 $18.50 $3,034.00112305.1 REMOVE CONCRETE CURB & GUTTER LF 655 $5.82 $3,812.10 $8.56 $5,606.80 $6.50 $4,257.50 113 203.2 REMOVE GRAVEL DRIVEWAY SY 266 $3.97 $1,056.02 $5.35 $1,423.10 $5.00 $1,330.00114TX-560 REMOVE & RESET MAILBOX EA 3 $355.82 $1,067.46 $310.44 $931.32 $515.00 $1,545.00 115 305.4 REINFORCED CONCRETE UNDERCUT STREET HEADER LF 136 $44.78 $6,090.08 $20.79 $2,827.44 $36.00 $4,896.00 116 303.5.4 LONGITUDINAL BUTT JOINT LF 825 $7.30 $6,022.50 $8.82 $7,276.50 $12.00 $9,900.00 117 305.3 4" THICK COLORED CONCRETE MEDIAN PAVEMENT SF 1,298 $16.66 $21,624.68 $21.08 $27,361.84 $70.00 $90,860.00118305.3 MONOLITHIC MEDIAN NOSE EA 2 $2,781.70 $5,563.40 $1,058.29 $2,116.58 $290.00 $580.00119305.2 4" REINFORCED CONCRETE SIDEWALK SF 6,765 $4.92 $33,283.80 $4.40 $29,766.00 $8.00 $54,120.00120305.2 5" REINFORCED CONCRETE SIDEWALK SF 1,153 $7.29 $8,405.37 $6.38 $7,356.14 $9.00 $10,377.00121305.2 6" REINFORCED CONCRETE SIDEWALK SF 12,622 $7.16 $90,373.52 $6.36 $80,275.92 $7.50 $94,665.00122305.2 BARRIER FREE RAMP EA 5 $1,675.00 $8,375.00 $2,930.94 $14,654.70 $1,560.00 $7,800.00 123 TX-360 12" 4000 PSI CONTINUOUSLY REINF. CONC. PVMT.SY 3,190 $87.00 $277,530.00 $125.74 $401,110.60 $94.00 $299,860.00 124 305.2 8" 4000 PSI REINFORCED CONCRETE DRIVEWAY SY 888 $85.00 $75,480.00 $76.84 $68,233.92 $69.00 $61,272.00125302.8 2" HOT MIX ASPHALT CONCRETE TYPE D TON 351 $95.00 $33,345.00 $137.18 $48,150.18 $115.00 $40,365.00126302.9 3" ASPHALT SURFACE COURSE TYPE C TON 1,278 $73.50 $93,933.00 $94.90 $121,282.20 $115.00 $146,970.00 127 302.8 9" ASPHALT BASE COURSE TYPE B TON 3,918 $70.00 $274,260.00 $83.88 $328,641.84 $115.00 $450,570.00128305.1 6" INTEGRAL CONCRETE CURB LF 991 $3.64 $3,607.24 $3.00 $2,973.00 $11.50 $11,396.50 129 305.1 SEPARATE CONCRETE CURB & GUTTER LF 1,446 $16.74 $24,206.04 $29.12 $42,107.52 $24.00 $34,704.00 130 301.5/302.8 TEMPORARY ASPHALT PAVEMENT-3" TY B HMA W/6" FLEX BASE & COMPACTED SUBGRADE SY 629 $70.59 $44,401.11 $88.75 $55,823.75 $53.00 $33,337.00 131 301.2 6" LIME STABILIZED SUBGRADE (48 LB/SY)SY 3,333 $7.95 $26,497.35 $3.64 $12,132.12 $4.25 $14,165.25 132 301.2 12" LIME STABILIZED SUBGRADE (2 LIFTS, 36 LB/SY EACH)*SY 16,001 $4.02 $64,324.02 $3.64 $58,243.64 $9.10 $145,609.10 133 301.2 HYDRATED LIME*TON 370 $190.19 $70,370.30 $179.90 $66,563.00 $150.00 $55,500.00 134 301.3 12" CEMENT STABILIZED SUBGRADE (2 LIFTS, 24 LB/SY EACH)*SY 16,001 $2.20 $35,202.20 $3.26 $52,163.26 $6.30 $100,806.30 135 301.3 CEMENT FOR SUBGRADE STABILIZATION*TON 193 $572.61 $110,513.73 $227.43 $43,893.99 $125.00 $24,125.00136301.5 FLEX BASE TY-D GR 1-2*SY 7,896 $26.76 $211,296.96 $25.85 $204,111.60 $12.50 $98,700.00137TX-618 6" PVC SCHEDULE 40 IRRIGATION SLEEVE LF 1,559 $12.71 $19,814.89 $44.92 $70,030.28 $28.00 $43,652.00138204.5 FURNISH & INSTALL BERMUDA BLOCK SOD SY 6,400 $6.81 $43,584.00 $5.23 $33,472.00 $4.10 $26,240.00 139 204.6 HYDROMULCH SEEDING SY 438 $4.96 $2,172.48 $24.41 $10,691.58 $4.50 $1,971.00 200 804.2 4" WHITE THERMOPLASTIC STRIPE LF 620 $1.21 $750.20 $1.12 $694.40 $1.20 $744.00201804.2 6" WHITE THERMOPLASTIC STRIPE LF 1,703 $1.84 $3,133.52 $1.60 $2,724.80 $1.80 $3,065.40 202 804.2 4" YELLOW THERMOPLASTIC STRIPE LF 1,911 $1.21 $2,312.31 $1.12 $2,140.32 $1.20 $2,293.20203804.2 4" DOUBLE YELLOW THERMOPLASTIC STRIPE LF 749 $2.42 $1,812.58 $2.25 $1,685.25 $2.30 $1,722.70204804.2 24" WHITE THERMOPLASTIC STRIPE LF 938 $15.00 $14,070.00 $8.07 $7,569.66 $8.40 $7,879.20205804.2 WHITE THERMOPLASTIC WORD EA 3 $263.17 $789.51 $139.04 $417.12 $170.00 $510.00206804.2 WHITE THERMOPLASTIC ARROW EA 9 $226.33 $2,036.97 $139.04 $1,251.36 $160.00 $1,440.00 207 TX-672 REFLECTIVE TRAFFIC BUTTON (TYPE II W-C/R)EA 62 $4.58 $283.96 $4.28 $265.36 $4.40 $272.80208TX-672 REFLECTIVE TRAFFIC BUTTON (TYPE II A-A)EA 33 $4.58 $151.14 $4.28 $141.24 $4.40 $145.20 209 TX-644 SMALL ROADWAY SIGN EA 13 $394.76 $5,131.88 $497.33 $6,465.29 $400.00 $5,200.00 300 501.6 FURNISH AND INSTALL 18" CLASS III REINF. CONC. PIPE LF 360 $68.42 $24,631.20 $78.07 $28,105.20 $66.00 $23,760.00 301 501.6 FURNISH AND INSTALL 24" CLASS III REINF. CONC. PIPE LF 449 $89.48 $40,176.52 $95.78 $43,005.22 $86.00 $38,614.00 302 501.6 FURNISH AND INSTALL 36" CLASS III REINF. CONC. PIPE LF 197 $157.90 $31,106.30 $148.34 $29,222.98 $144.00 $28,368.00 303 501.6 FURNISH AND INSTALL 3'X2' REINFORCED CONC. BOX LF 108 $189.48 $20,463.84 $196.63 $21,236.04 $212.00 $22,896.00 304 501.6 FURNISH AND INSTALL 4'X4' REINFORCED CONC. BOX LF 138 $252.64 $34,864.32 $293.69 $40,529.22 $305.00 $42,090.00 IFB 7381 - Bid Tabulation for the McKinney Street - Mayhill Intersection Exhibit 2 $30,472.07 $23,354.80 $23,272.50 $2,282,553.11 $2,486,607.54 $2,981,434.65 *SUBGRADE STABILIZATION PAY ITEMS TO BE DETERMINED BASED ON FIELD CONDITIONS TOTAL FOR SCHEDULE B: PAVEMENT MARKINGS TOTAL FOR SCHEDULE A: PAVING IMPROVEMENTS Respondent's Business Name: Principal Place of Business (City and State):Denton, TX Grand Prairie, TX Grapevine, TX SEMA Construction, Inc. SCHEDULE B: PAVEMENT MARKINGS SCHEDULE C: DRAINAGE IMPROVEMENTS Jagoe-Public Company Pavecon Public Works, LP SCHEDULE A: PAVING IMPROVEMENTS Item #Spec. Section #Description of Work UOM QTY Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price IFB 7381 - Bid Tabulation for the McKinney Street - Mayhill Intersection Exhibit 2 Respondent's Business Name: Principal Place of Business (City and State):Denton, TX Grand Prairie, TX Grapevine, TX SEMA Construction, Inc.Jagoe-Public Company Pavecon Public Works, LP SCHEDULE A: PAVING IMPROVEMENTS 305 501.6 FURNISH AND INSTALL 5'x2' REINFORCED CONC. BOX LF 216 $289.49 $62,529.84 $296.63 $64,072.08 $310.00 $66,960.00306501.6 FURNISH AND INSTALL 5'x4' REINFORCED CONC. BOX LF 113 $326.33 $36,875.29 $344.01 $38,873.13 $335.00 $37,855.00 307 501.6 FURNISH AND INSTALL 6'x4' REINFORCED CONC. BOX LF 180 $368.44 $66,319.20 $423.85 $76,293.00 $450.00 $81,000.00308501.6 FURNISH AND INSTALL 7'x2' REINFORCED CONC. BOX LF 207 $394.76 $81,715.32 $412.25 $85,335.75 $460.00 $95,220.00309501.6 FURNISH AND INSTALL 7'x4' REINFORCED CONC. BOX LF 371 $457.92 $169,888.32 $505.03 $187,366.13 $500.00 $185,500.00310501.6 FURNISH AND INSTALL 8'x4' REINFORCED CONC. BOX LF 119 $542.13 $64,513.47 $550.43 $65,501.17 $635.00 $75,565.00311803.3 FURNISH AND INSTALL GROUTED RIP-RAP SY 191 $84.21 $16,084.11 $128.34 $24,512.94 $72.00 $13,752.00 312 TX-466 CONSTRUCT TxDOT PW EA 2 $18,422.03 $36,844.06 $16,042.78 $32,085.56 $7,800.00 $15,600.00313TX-450 TxDOT RAIL (TY PR11)LF 124 $157.90 $19,579.60 $171.12 $21,218.88 $90.00 $11,160.00 314 TX-169 TxDOT CLASS 2 TYPE E SOIL RETENTION BLANKET SY 210 $10.53 $2,211.30 $2.14 $449.40 $12.00 $2,520.00315107.2 FURNISH & INSTALL TRENCH SAFETY LF 2,454 $1.05 $2,576.70 $1.34 $3,288.36 $6.50 $15,951.00316TX-465 CONSTRUCT 5' STANDARD CURB INLET EA 1 $6,586.13 $6,586.13 $3,208.56 $3,208.56 $6,200.00 $6,200.00317TX-466 CONSTRUCT 10' STANDARD CURB INLET EA 2 $8,165.80 $16,331.60 $3,850.27 $7,700.54 $6,850.00 $13,700.00318TX-465 CONSTRUCT 10' RECESSED CURB INLET EA 4 $8,165.48 $32,661.92 $5,909.09 $23,636.36 $7,075.00 $28,300.00319TX-465 CONSTRUCT 15' RECESSED CURB INLET EA 3 $9,744.62 $29,233.86 $8,395.72 $25,187.16 $7,100.00 $21,300.00320TX-465 CONSTRUCT 20' RECESSED CURB INLET EA 1 $10,796.88 $10,796.88 $10,267.38 $10,267.38 $8,050.00 $8,050.00 321 TX-465 CONSTRUCT 4'x4' SQUARE DROP INLET EA 1 $5,263.44 $5,263.44 $4,278.07 $4,278.07 $10,700.00 $10,700.00322TX-465 CONSTRUCT 5'X5' SQUARE DROP INLET EA 1 $7,895.15 $7,895.15 $5,614.97 $5,614.97 $10,500.00 $10,500.00 323 TX-465 CONSTRUCT 6'x6' SQUARE DROP INLET EA 1 $9,474.19 $9,474.19 $6,951.87 $6,951.87 $11,225.00 $11,225.00324TX-465 CONSTRUCT 6-GRATE INLET EA 1 $8,421.50 $8,421.50 $10,695.19 $10,695.19 $10,500.00 $10,500.00325502.1 CONSTRUCT 4'x4' SQUARE SDMH EA 1 $4,737.09 $4,737.09 $3,850.27 $3,850.27 $8,200.00 $8,200.00 326 TX-465 CONSTRUCT 8'8' TxDOT JUNCTION BOX (PJB)EA 1 $13,158.59 $13,158.59 $9,090.91 $9,090.91 $13,700.00 $13,700.00 327 502.1 CONSTRUCT MANHOLE ON TOP OF 7'X2' REINFORCED CONC. BOX EA 1 $3,158.06 $3,158.06 $3,743.32 $3,743.32 $6,050.00 $6,050.00 328 502.1 CONSTRUCT MANHOLE ON TOP OF 8'X4' REINFORCED CONC. BOX EA 1 $4,210.75 $4,210.75 $2,139.04 $2,139.04 $6,100.00 $6,100.00 329 504.2 CONCRETE ENCASEMENT FOR WASTEWATER CROSSING CY 5 $263.17 $1,315.85 $187.17 $935.85 $300.00 $1,500.00330TX-421 CONNECT TO EXISTING PIPE/BOX EA 3 $3,158.06 $9,474.18 $2,673.80 $8,021.40 $775.00 $2,325.00 331 501.7 8" WATER LINE LOWERING EA 2 $5,789.78 $11,579.56 $4,278.07 $8,556.14 $7,500.00 $15,000.00332203.1 REMOVE & DISPOSE REINFORCED CONCRETE PIPE LF 535 $21.05 $11,261.75 $21.39 $11,443.65 $15.00 $8,025.00 333 203.1 REMOVE & DISPOSE CORRUGATED METAL PIPE LF 64 $15.79 $1,010.56 $10.70 $684.80 $20.00 $1,280.00334203.1 REMOVE & DISPOSE BOX CULVERT LF 278 $47.37 $13,168.86 $48.13 $13,380.14 $48.00 $13,344.00 335 203.1 REMOVE & DISPOSE HEADWALL EA 4 $1,052.69 $4,210.76 $1,283.42 $5,133.68 $1,700.00 $6,800.00336505.7 TV INSPECTION LF 4,908 $2.11 $10,355.88 $2.14 $10,503.12 $1.50 $7,362.00337202.14 FURNISH & INSTALL INLET PROTECTION EA 19 $143.42 $2,724.98 $99.04 $1,881.76 $23.00 $437.00338TX-506 FURNISH & INSTALL 12" DIA. EROSION CONTROL LOGS LF 1,262 $2.68 $3,382.16 $3.76 $4,745.12 $6.50 $8,203.00339201.9 FURNISH & INSTALL ROCK CHECK DAM LF 88 $49.98 $4,398.24 $31.82 $2,800.16 $65.00 $5,720.00 340 01 57 13 STORM WATER POLLUTION PREVENTION PLAN LS 1 $157.90 $157.90 $7,732.62 $7,732.62 $870.00 $870.00341TX-416 CONSTRUCT PR FOUNDATION EA 6 $526.34 $3,158.04 $1,016.04 $6,096.24 $1,300.00 $7,800.00 400 501.14 6" PVC WATER PIPE LF 121 $68.42 $8,278.82 $57.33 $6,936.93 $100.00 $12,100.00401501.14 12" PVC WATER PIPE LF 665 $78.95 $52,501.75 $74.39 $49,469.35 $89.00 $59,185.00 402 501.7 16" DUCTILE IRON WATER PIPE LF 562 $142.11 $79,865.82 $149.04 $83,760.48 $130.00 $73,060.00403501.7 20" DUCTILE IRON WATER PIPE LF 622 $173.69 $108,035.18 $183.37 $114,056.14 $142.00 $88,324.00 404 501.15 10" PVC PRESSURE RATED WASTEWATER PIPE LF 123 $105.27 $12,948.21 $96.84 $11,911.32 $96.00 $11,808.00405501.9 18", 1/2" SPLIT-STEEL ENCASEMENT PIPE LF 100 $210.54 $21,054.00 $173.37 $17,337.00 $180.00 $18,000.00406501.9 20", 1/2" STEEL ENCASEMENT PIPE LF 65 $263.17 $17,106.05 $192.25 $12,496.25 $200.00 $13,000.00407506.8 CUT & PLUG EXISTING WATER MAIN EA 3 $684.25 $2,052.75 $1,069.52 $3,208.56 $750.00 $2,250.00408506.8 CUT & PLUG EXISTING WATER MAIN FOR TEST EA 2 $842.15 $1,684.30 $802.14 $1,604.28 $750.00 $1,500.00 409 502.1 WATER SERVICE EA 9 $2,105.37 $18,948.33 $1,411.76 $12,705.84 $1,500.00 $13,500.00410502.3 INSTALL FIRE HYDRANT EA 7 $3,158.06 $22,106.42 $3,278.07 $22,946.49 $5,000.00 $35,000.00 411 203.1 REMOVE FIRE HYDRANT EA 3 $526.34 $1,579.02 $267.38 $802.14 $2,100.00 $6,300.00412203.1 DELIVER FIRE HYDRANT EA 3 $157.90 $473.70 $213.90 $641.70 $200.00 $600.00413502.6 6" GATE VALVE EA 7 $1,052.69 $7,368.83 $1,069.52 $7,486.64 $1,500.00 $10,500.00414502.6 12" GATE VALVE EA 6 $2,631.72 $15,790.32 $2,673.80 $16,042.80 $3,000.00 $18,000.00415502.6 16" GATE VALVE EA 2 $21,053.75 $42,107.50 $12,021.39 $24,042.78 $13,000.00 $26,000.00416502.6 20" GATE VALVE EA 2 $25,264.50 $50,529.00 $20,157.22 $40,314.44 $23,000.00 $46,000.00417502.1 48" DIAMETER WASTEWATER MANHOLE EA 2 $7,895.16 $15,790.32 $7,225.67 $14,451.34 $5,210.00 $10,420.00 418 502.1 VACUUM TEST MANHOLE EA 2 $263.17 $526.34 $187.17 $374.34 $180.00 $360.00419502.1 REMOVE EXISTING WASTEWATER MANHOLE EA 2 $526.35 $1,052.70 $748.66 $1,497.32 $950.00 $1,900.00 420 502.1 ADJUST EX. WASTEWATER MANHOLE EA 1 $368.44 $368.44 $962.57 $962.57 $1,400.00 $1,400.00421505.7 TV INSPECTION LF 246 $2.11 $519.06 $3.21 $789.66 $1.50 $369.00422107.2 FURNISH & INSTALL TRENCH SAFETY LF 2,093 $1.05 $2,197.65 $2.14 $4,479.02 $10.00 $20,930.00 $938,507.27 $959,373.38 $990,002.00 TOTAL FOR SCHEDULE C: DRAINAGE IMPROVEMENTS SCHEDULE D: WATER & WASTEWATER IMPROVEMENTS Item #Spec. Section #Description of Work UOM QTY Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price IFB 7381 - Bid Tabulation for the McKinney Street - Mayhill Intersection Exhibit 2 Respondent's Business Name: Principal Place of Business (City and State):Denton, TX Grand Prairie, TX Grapevine, TX SEMA Construction, Inc.Jagoe-Public Company Pavecon Public Works, LP SCHEDULE A: PAVING IMPROVEMENTS 423 504.2 FLOWABLE FILL CY 160 $157.90 $25,264.00 $176.47 $28,235.20 $190.00 $30,400.00 500 TX-416 DRILL SHAFT (24 IN)LF 30 $257.91 $7,737.30 $262.03 $7,860.90 $150.00 $4,500.00 501 TX-416 DRILL SHAFT (TRF SIG POLE) (48 IN)LF 88 $436.87 $38,444.56 $443.85 $39,058.80 $510.00 $44,880.00502TX-618 CONDUIT (PVC) (SCHD 40) (2 IN) (TRENCH)LF 201 $16.84 $3,384.84 $17.11 $3,439.11 $6.50 $1,306.50 503 TX-618 CONDUIT (PVC) (SCHD 40) (3 IN) (TRENCH)LF 255 $17.90 $4,564.50 $18.18 $4,635.90 $8.00 $2,040.00504TX-618 CONDUIT (PVC) (SCHD 40) (4 IN) (TRENCH)LF 72 $18.95 $1,364.40 $19.25 $1,386.00 $15.00 $1,080.00 505 TX-620 ELECTRICAL CONDUCTOR (NO. 4) INSULATED LF 276 $2.11 $582.36 $2.14 $590.64 $1.80 $496.80506TX-620 ELECTRICAL CONDUCTOR (NO. 6) BARE LF 1,334 $2.11 $2,814.74 $2.14 $2,854.76 $1.10 $1,467.40507TX-620 ELECTRICAL CONDUCTOR (NO. 6) INSULATED LF 167 $2.11 $352.37 $2.14 $357.38 $1.10 $183.70508TX-624 GROUND BOX TY D W/ APPRON EA 11 $1,315.86 $14,474.46 $1,336.90 $14,705.90 $1,200.00 $13,200.00509TX-628 REMOVE ELECTRICAL SERVICES EA 1 $1,052.69 $1,052.69 $1,069.52 $1,069.52 $365.00 $365.00 510 TX-628 ELC SRV TY D 120/240 100 (NS)AL (E) PS (U)EA 1 $6,842.47 $6,842.47 $6,951.87 $6,951.87 $5,200.00 $5,200.00511TX-680 *INSTALL HWY TRF SIG (ISOLATED)EA 1 $16,843.00 $16,843.00 $17,112.30 $17,112.30 $17,000.00 $17,000.00 512 TX-690 REMOVE TRAFFIC SIGNALS EA 1 $3,158.06 $3,158.06 $3,208.56 $3,208.56 $11,000.00 $11,000.00513TX-681 TEMP TRAF SIGNALS EA 1 $8,947.84 $8,947.84 $9,090.91 $9,090.91 $72,000.00 $72,000.00514TX-682 VEH SIG SEC (12 IN) LED (GRN)EA 8 $421.08 $3,368.64 $427.81 $3,422.48 $250.00 $2,000.00515TX-682 VEH SIG SEC (12 IN) LED (GRN ARW)EA 6 $421.08 $2,526.48 $427.81 $2,566.86 $250.00 $1,500.00516TX-682 VEH SIG SEC (12 IN) LED (YEL)EA 8 $421.08 $3,368.64 $427.81 $3,422.48 $250.00 $2,000.00 517 TX-682 VEH SIG SEC (12 IN) LED (YEL ARW)EA 6 $421.08 $2,526.48 $427.81 $2,566.86 $250.00 $1,500.00518TX-682 VEH SIG SEC (12 IN) LED (RED)EA 8 $421.08 $3,368.64 $427.81 $3,422.48 $250.00 $2,000.00 519 TX-682 VEH SIG SEC (12 IN) LED (RED ARW)EA 6 $421.08 $2,526.48 $427.81 $2,566.86 $250.00 $1,500.00520TX-682 BACK PLATE (12") (3 SEC) (VENTED) ALUM EA 11 $157.90 $1,736.90 $160.43 $1,764.73 $150.00 $1,650.00 521 TX-682 BACK PLATE (12") (4 SEC) (VENTED) ALUM EA 3 $168.43 $505.29 $171.12 $513.36 $150.00 $450.00522TX-684 TRF SIG CBL (TY A) (14 AWG) (3 CONDR)LF 3,850 $2.11 $8,123.50 $2.14 $8,239.00 $1.20 $4,620.00523TX-684 TRF SIG CBL (TY A) (14 AWG) (5 CONDR)LF 80 $2.11 $168.80 $2.14 $171.20 $1.20 $96.00524TX-684 TRF SIG CBL (TY A) (14 AWG) (7 CONDR)LF 647 $2.11 $1,365.17 $2.14 $1,384.58 $1.20 $776.40525TX-684 TRF SIG CBL (TY C) (12 AWG) (2 CONDR)LF 2,349 $2.11 $4,956.39 $2.14 $5,026.86 $1.20 $2,818.80 526 TX-684 TRF SIG CBL (TY A) (14 AWG) (12 CONDR)LF 1,852 $3.16 $5,852.32 $3.21 $5,944.92 $2.20 $4,074.40527TX-684 TRF SIG CBL (TY A) (14 AWG) (21 CONDR)LF 1,090 $4.21 $4,588.90 $4.28 $4,665.20 $4.40 $4,796.00 528 TX-687 PED POLE ASSEMBLY EA 5 $1,684.30 $8,421.50 $1,711.23 $8,556.15 $900.00 $4,500.00529TX-682 PED SIG SEC (LED)(COUNTDOWN) EA 8 $842.15 $6,737.20 $855.61 $6,844.88 $550.00 $4,400.00530TX-688 PED DETECT PUSH BUTTON (APS) EA 8 $789.52 $6,316.16 $802.14 $6,417.12 $700.00 $5,600.00531TX-688 PED DETECTOR CONTROLLER UNIT EA 1 $4,210.75 $4,210.75 $4,278.07 $4,278.07 $2,400.00 $2,400.00532TX-686 INS TRF SIG PL AM(S)1 ARM(45')LUM&ILSN EA 1 $25,896.11 $25,896.11 $26,310.16 $26,310.16 $23,000.00 $23,000.00 533 TX-686 INS TRF SIG PL AM(S)1 ARM(50')LUM&ILSN EA 2 $26,369.82 $52,739.64 $26,791.44 $53,582.88 $34,000.00 $68,000.00 534 TX-686 INS TRF SIG PL AM(S)1 ARM(55')LUM&ILSN EA 1 $26,527.72 $26,527.72 $26,951.87 $26,951.87 $38,000.00 $38,000.00 535 TX-6090 *INSTALL ONLY-ILSN SIGNS WITH MOUNTING HARDWARE & CABLE EA 4 $684.25 $2,737.00 $695.19 $2,780.76 $700.00 $2,800.00 536 TX-8151 *INSTALL ONLY-PTZ CAMERA SYSTEM WITH CABLE EA 1 $473.71 $473.71 $481.28 $481.28 $1,100.00 $1,100.00 537 TX-6025 *INSTALL ONLY-ADVANCED RADAR DETECTION SYSTEM WITH CABLE EA 4 $947.42 $3,789.68 $962.57 $3,850.28 $525.00 $2,100.00 538 *INSTALL ONLY-VIDEO DETECTION SYSTEM WITH CABLE EA 1 $3,369.65 $3,369.65 $3,423.53 $3,423.53 $1,100.00 $1,100.00 539 TX-8590 *INSTALL ONLY-OPTICOM DETECTOR WITH CABLE & MOUNTING HARDWARE EA 4 $473.71 $1,894.84 $481.28 $1,925.12 $210.00 $840.00 540 TX-686 *INSTALL ONLY-LED LUMINAIRE FOR TRAFFIC SIGNAL POLES EA 4 $447.39 $1,789.56 $454.55 $1,818.20 $110.00 $440.00 600 TX-618 2 IN PVC STREET LIGHT CONDUIT LF 2,783 $21.05 $58,582.15 $21.39 $59,528.37 $8.50 $23,655.50 601 TX-610 INSTALLATION OF STREET LIGHT POLE AND FIXTURE PROVIDED BY DME EA 14 $2,842.26 $39,791.64 $2,887.70 $40,427.80 $1,700.00 $23,800.00 602 TX-610 INSTALLATION OF PEDESTRIAN LIGHT POLE AND FIXTURE PROVIDED BY DME EA 6 $4,000.21 $24,001.26 $4,064.17 $24,385.02 $1,600.00 $9,600.00 $124,341.19 $57,055.50 $4,182,505.75 $4,375,450.22 $4,911,451.65 $500,906.00 TOTAL FOR SCHEDULE D: WATER & WASTEWATER IMPROVEMENTS TOTAL FOR SCHEDULE E: TRAFFIC SIGNAL IMPROVEMENTS (* Supplied by the City of Denton) $300,449.74 $305,220.72 $358,781.00 SCHEDULE F: LIGHTING IMPROVEMENTS SCHEDULE E: TRAFFIC SIGNAL IMPROVEMENTS $508,148.51 $476,552.59 TOTAL FOR SCHEDULE F: LIGHTING IMPROVEMENTS $122,375.05 TOTAL: