Loading...
Exhibit 2 - Pricing EvaluationLine #Description QTY UOM Unit Extended Lead Time Unit Extended Lead Time Unit Extended Lead Time Unit Extended Lead Time 1 2 3 65' overhead static mast pole with lightning mast (S23)17 EA $7,990.93 $135,845.81 12 weeks $8,522.00 $144,874.00 20 weeks $10,065.00 $171,105.00 4-6 wks + 12-16 weeks $13,280.912 $225,775.50 3-4 wks + 10-12 weeks 4 40' H-frame take-off structure 6kip with lightning masts (S25)4 EA $40,978.72 $163,914.88 12 weeks $34,181.00 $136,724.00 20 weeks $44,875.00 $179,500.00 4-6 wks + 12-16 weeks $69,291.375 $277,165.50 5 Light bracket for tapered tubular structures 50 EA $31.53 $1,576.50 12 weeks no bid $1,925.00 $38.50 $1,925.00 4-6 wks + 12-16 weeks $506.12 $25,306.00 Line # 1 2 3 4 Manufacturer: RFP 7401 - Pricing Evaluation for Tubular Steel Exhibit 2 15.0 7.0 67.8 21.5 18.8 15.0 7.0 62.2 Complicance with specifications (20%) Probable Performance (15%) Total Score: Description 40.0 15.0 15.0 7.0 77.0 Texas Electric Cooperatives Techline, Inc.Texas Electric Cooperatives Price/Total Cost (40%) Project Delivery (25%) 32.2 13.6 $283,523.00 $352,530.00 $528,247.00 Evaluation 25.0 16.0 13.0 91.6 $301,337.19 SAE Towers - BAFO Techline, Inc. CHM Alternate - Pelco Texas Electric Cooperatives Texas Electric Cooperatives Meyer Utility Structures Georgetown, TX Fort Worth, TX Georgetown, TX SAE Towers - BAFO SAE Towers SECTION I - Unit Pricing: Pricing shall be quoted to include all costs, with shipping F.O.B. Destination. Pricing Sheet for Galvanized Tapered Tubular Steel Structures for Brinker Substation The respondent shall complete the following section, which directly corresponds to the Scope of Services, Payment and Performance Requirements. Total Price: Respondent's Business Name: Principal Place of Business (City and State):Houston, TX 37.6