Loading...
7565 Project Bid SheetPROJECT BID SHEET COMMUNITY DEVELOPMENT DIVISION - OPTIONAL RECONSTRUCTION PROGRAM (See Specifications and Floor Plans for Details on Bid Sheet) Name:Martin & Monica Delgadillo Address:1802 Westwood Dr., Denton, TX 76205 1.Saw Pole/Site Prep/Porta-John/Erosion Control $1. 2.Form Board Survey Fee $2. 3.Engineered Slab Fee $3. 4.Plumbing Rough-In $4. 5.Pre-Slab Termite Treatment $5. 6.Slab/Foundation $6. 7.Stud Const/Framing/Wall Sheathing / Decking & Cornice/Brick Ties $7. 8.$8. 9.Exterior Brick $9. 10.Electrical Rough-In $10. 11.Plumbing Stack-Out $11. 12.Exterior Doors / Locks / Windows $12. 13.Exterior Paint $13. 14.Ducts / Vents / HVAC 18 Seer Phase I: $_________ Phase II: $________ $14. 15.Energy Seal $15. 16.Interior Wall Insulation $16. 17.Sheetrock / Tape / Bed / Texture $17. 18.Interior Trim / Doors / Pull-down Attic Stairs $18. 19.Closets Rods & Shelves / Bath Accessories $19. 20.Interior Paint $20. 21.Electrical Final $21. 22.Cabinets: Kitch, Bath(s), Utility $22. 23.Countertops $23. 24.$24. 25. Attic Insulation $25. 26.$26. 27.Plumbing Fixtures $27. 28.Utility Services Hook-Up $28. 29.Energy Star Certification $29. 30.Flat Work: Drive Approach/Walkways 30. 31.Final Grade / Landscaping $31. 32.Floor Coverings Vinyl $$32. 33.Final Cleaning Move-in Prep $33. 34.Landfill/Dump Fees (Non-Demo)$34. 35.Gutters $35. 36.$36. $ 37.$37. GRAND TOTAL $ I, THE UNDERSIGNED CONTRACTOR, submit this bid in good faith to the Community Development Division for reconstruction and demolition of the above address. Bid amounts are based on all materials and work specifications as stated in the attached document entitled General Notes To Contractors, Floor Plans, Elevations and as required to meet City Building Codes. / Contractor Signature /Contractor Name Printed /( ) Address /( Area Code ) Phone # City State Zip Date Submitted Misc.___________________________________________________________ (describe) Contractor Name BID AMOUNT New Construction Total *Demo Permit / Demo Haul Off - see Demo specs for details Roof / Vents (Ridge vents on Gable Roofs are Mandatory Construction - No Exceptions) Electrical Fixtures (Owner to select light fxtrs - Fixture Budget Allowed is? $_____________) Project Systems X ES Microwave w/ Vent-a-Hood (vent thru roof) X Gas Range X ES 18 C.F. Frig w/Ice Maker X ES Dishwasher Install: owner-provided Disposal - ES=Energy Star APPLIANCES: (Bid Items with "X")