Loading...
7483 - APPENDIX I - Project LocationsDenton North Interchange Arco Substation Spencer Interchange Woodrow Substation Hickory SubstationR.D. Wells Interchange 69kV North Lakes Substation Pockrus Substation Corinth Substation (Oncor) Teasley Substation Argyle Switch (Oncor) Fort Worth Substation Denton West Interchange Krum Tap Switch (Oncor) Bonnie Brae Substation Cooper Creek McKinney Substation 138kV North Lakes Substation New Jim Christal Substation Locust 138kV Substation Industrial Masch Branch Substation Underwood Substation Brinker Nw e s Transmission Line Project Locations Denton Municipal Electric Appendix I Rebuild Denton West to RD Wells 138kV, 4.47 Miles Rebuild RD Wells to Hickory 138kV, 1.73 Miles Rebuild Hickory to Locust 138kV, 2.58 Miles Rebuild Spencer to Locust 138kV, 1.68 Miles New, Hickory Tie-In 138kV, 0.5 Miles New, Underwood Tie-In 138kV, 0.5 Miles Rebuild Cooper Creek to Brinker 138kV, 1.96 Miles 1.Rebuild Brinker to Woodrow 138kV, 0.41 Miles 2.Rebuild Industrial to Spencer 138kV, 0.33 Miles Replace Two 138kV Transmission Poles New, Pockrus to Brinker 138kV, 3.1 Miles Replace One 138kV Transmission Pole