Loading...
Exhibit 4 - PresentationFile ID 21-2309 Location Field Type Equipment Age North Lakes Park Softball 1-4 27 years Softball 5-6 42 years Soccer 1-10 27 year Football 1-3 20 years Golf Driving Range Unknown Evers Park Baseball 1-2 20 years Baseball 3-9 24 years Baseball 10-11 27 years Mack Park Baseball 1-2 25 years Roberts Field 20 years Fred Moore Park Baseball 27 years Denia Park Softball 1-4 27 years File ID 21-2309 File ID 21-2309 File ID 21-2309 Usage Fees $147,696.42 Based on actual 18/19 usage Labor $18,584.29 Actual FY 18/19 Parts $9,930.00 Bulbs, wire, ballasts, etc. Bucket Truck Purchase $12,000.00 Annual cost over 15 years Bucket Truck Usage $7,500.00 Based on 300hrs usage 1 Ton Truck Usage $4,000.00 Based on 200hrs usage Total $199,710.71 Usage Fees $73,978.14 Based on actual 18/19 usage Labor $3,000.00 Inspections @ 60hrs Parts Eliminated 15-year warranty Bucket Truck Purchase 15-year warranty Bucket Truck Usage 15-year warranty 1 Ton Truck Usage $1,200.00 Based on 200hrs usage Total $78,178.14 File ID 21-2309 Project Location Estimated Expenditure North Lakes Softball –Fields 1-6 $545,000.00 North Lakes Soccer –Fields 1-10 $470,000.00 North Lakes Football –Fields 1-3 $231,000.00 North Lakes Golf Driving Range $55,000.00 Evers Baseball –Fields 1-11 $562,000.00 Fred Moore Baseball $88,000.00 Mack Baseball –Fields 1-2 $187,000.00 Mack Baseball –Roberts Field $132,000.00 Denia Softball –Fields 1-4 $285,000.00 Pole Inspections –166 light poles $20,750.00 Contingency –15%$386,362.50 Total $2,962,112.50 Light Pole Replacement (each)$13,000.00 File ID 21-2309 File ID 21-2309