Intent to AwardMabak Directional Drilling
Line #Description QTY UOM Estimated
1
2
3
4 16in. Bore in Dirt with Conduit/Lines installed in Steel Casing 400 FT 214,000.00$
5 16in. Bore in Rock with Conduit/Lines installed in Steel Casing 600 FT 420,000.00$
6 18in. Bore in Dirt with Conduit/Lines installed in Steel Casing 400 FT 216,000.00$
7 18in. Bore in Rock with Conduit/Lines installed in Steel Casing 100 FT 72,000.00$
8 20in. Bore in Dirt with Conduit/Lines installed in Steel Casing 1300 FT 717,600.00$
9 20in. Bore in Rock with Conduit/Lines installed in Steel Casing 800 FT 601,600.00$
10 24in. Bore in Dirt with Conduit/Lines installed in Steel Casing 500 FT 312,500.00$
11 24in. Grade Bore > 1% in Dirt with Conduit/Lines installed in Steel Casing 100 FT 67,500.00$
12 24in. Grade Bore < 1% in Dirt with Conduit/Lines installed in Steel Casing 100 FT 69,500.00$
13 24in. Bore in Rock with Conduit/Lines installed in Steel Casing 100 FT 81,100.00$
14 24in. Grade Bore > 1% in Rock with Conduit/Lines installed in Steel Casing 100 FT 85,700.00$
15 24in. Grade Bore < 1% in Rock with Conduit/Lines installed in Steel Casing 100 FT 88,000.00$
16 30in. Bore in Dirt with Conduit/Lines installed in Steel Casing 100 FT 71,200.00$
17 30in. Grade Bore <1% in Dirt with Conduit/Lines installed in Steel Casing 100 FT 78,700.00$
18 30in. Grade Bore > 1% in Dirt with Conduit/Lines installed in Steel Casing 400 FT 305,600.00$
19 30in. Bore in Rock with Conduit/Lines installed in Steel Casing 100 FT 84,900.00$
20 30in. Grade <1% Bore in Rock with Conduit/Lines installed in Steel Casing 100 FT 93,200.00$
21 30in. Grade >1% Bore in Rock with Conduit/Lines installed in Steel Casing 100 FT 90,500.00$
22 36in. Bore in Dirt with Conduit/Lines installed in Steel Casing 100 FT 77,500.00$
23 36in. Grade Bore <1% in Dirt with Conduit/Lines installed in Steel Casing 400 FT 331,200.00$
24 36in. Grade Bore >1% in Dirt with Conduit/Lines installed in Steel Casing 100 FT 80,500.00$
25 36in. Bore in Rock with Conduit/Lines installed in Steel Casing 100 FT 91,500.00$
26 36in. Grade Bore <1% in Rock with Conduit/Lines installed in Steel Casing 100 FT 104,300.00$
27 36in. Grade Bore >1% in Rock with Conduit/Lines installed in Steel Casing 100 FT 101,500.00$
28
29 16in. Diameter steel casing with 0.3125FT minimum thickness 700 FT 67,375.00$
30 20in. Diameter steel casing with 0.3750FT minimum thickness 1500 FT 178,500.00$
31 24in. Diameter steel casing with 0.4375in. minimum thickness 700 FT 134,750.00$
32
33 16in. Diameter steel casing with 0.500in. minimum thickness 300 FT 47,250.00$
34 18in. Diameter steel casing with 0.500in. minimum thickness 500 FT 109,375.00$
35 20in. Diameter steel casing with 0.500in. minimum thickness 600 FT 115,500.00$
36 24in. Diameter steel casing with 0.500in minimum thickness 500 FT 112,000.00$
37 30in. Diameter steel casing with 0.500in. minimum thickness 900 FT 204,750.00$
38 36in. Diameter steel casing with 0.625in. minimum thickness 900 FT 283,500.00$
39
40 Unit price for bores less than 50FT in length $_____ per bore job 1 FT 50,750.00$
41 Unit price $_____ per foot to excavate up to 12FT and weld additional 16in. steel casing onto existing steel casing.1 FT 14,250.00$
42 Unit price $_____ per foot to excavate up to 12FT and weld additional 20in. steel casing onto existing steel casing.1 FT 14,250.00$
43 Unit price $_____ per foot to excavate up to 12FT and weld additional 24in. steel casing onto existing steel casing.1 FT 14,259.00$
44 Per linear foot adder to cut concrete Price shall include restoration of concrete $_____ per square foot.1 FT 32.00$
45 Per linear foot adder to cut asphalt Price shall include restoration of asphalt $_____ per square foot.1 FT 42.00$
46 DIRT BORE: Adder per foot for bore pits depth to 20FT 1 FT 1,200.00$
47 ROCK BORE: Adder per foot for bore pits depth to 20FT 1 FT 2,000.00$
48
49 Performance Bond, 100% of $150,000 1 EA 4,225.00$
50 Payment Bond, 100% of $150,000 1 EA 4,225.00$
51 Estimated number of days to deploy once request is submitted:1 DAYS 15
5,814,333.00$
NOTE 1: Minimum wall thickness criteria for water/wastewate requirements may change if design criteria are updated. Contact designated City of Denton water/wastewater
NOTE 2: Minimum wall thickness criteria for water/wastewate requirements will be project specific for bore depths greater than 20FT. Contact designated City of Denton
SECTION I - DRY AUGER BORE ANNUAL PRICING - INCLUDES ALL COSTS, LABOR, AND SUPPLIES REQUIRED PER THE SPECIFICATIONS EXCEPT STEEL CASINGS, FOR BORES WITH PITS TO 12
SECTION III - ADDITIONAL PRICING
BONDING
SECTION IIA - STEEL CASING TO BE SUPPLIED BY CONTRACTOR FOR ELECTRIC FACILITIES
SECTION IIB - STEEL CASING TO BE SUPPLIED BY CONTRACTOR FOR WATER/WASTEWATER FACILITIES1,2