Pricing - QuoteOshkosh Corporation Classification - Restricted#
Contract
No.:RH08-20 Date
Prepared:10/12/2021
Buying
Agency:Contractor:
Contact
Person:
Prepared
By:
Phone:Phone:
Fax:Fax:
Email:Email:
Product
Code:A56 Description:
116,608
Cost Cost
602
3859
1696
114
1746
1006
621
Subtotal B: 9644
Cost Cost
233 194
271 194
84 207
358
493
140 Subtotal C: 2174
2%
D. Total Cost before any other applicable Charges, Trade-Ins, Allowances, Discounts, Etc. (A+B+C)
1 128426 =Subtotal D: 128426
Cost Cost
2122
-8,099
10807
Subtotal E: 4830
133256
Cleanout Door Spill Tray: CS TG Side panel: 10 ga. AR450
Center Stop Light
Description
For this transaction the percentage is: Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A+B).
X Subtotal of A + B + C:
ANSI Roof Ladder Rearward
Container Dump Light: Canopy mtd. LED
E. Trade-Ins / Special Discounts / Other Allowances / Freight / Installation / Miscellaneous Charges
Description
CAMERA PRICING_SSV9-2
City of Denton
Terry Kader
940-349-7100
B. Published Options - Itemize below - Attach additional sheet if necessary - Include Option Code in description if applicable
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description Description
BODY FLOOR THICKNESS_STD4 3/16 AR400
HYDSERVICELIFT_YA
Mudflaps: Black w/ McN Logo
HOPPER FLOOR LINER 1/4-400
FIRE EXTINGUISHER ON BODY
SMART LIGHTS_TG 4" TG Round
C. Unpublished Options - Itemize below - Attach additional sheet if necessary
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Subtotal From Additional Sheet(s):
Safety Equipment, In Cab Monitor Mount Center Overhead
CONTRACT PRICING WORKSHEET
For Standard Equipment Purchases
McNeilus: Atlantic Series 4029: 28-yd. Heavy Duty Full Eject Front Loader
A. Product Item Base Unit Price Per Contractor's H-GAC Contract:
This Worksheet is prepared by Contractor and given to End User. If a PO is issued, both documents
MUST be faxed to H-GAC @ 713-993-4548. Therefore please type or print legibly.
John Plowman
(574) 229-8710
jplowman@mcneilusco.com
McNeilus Truck and Manufacturing
Description Description
F. Total Purchase Price (D+E): Delivery Date: 210 days
Surcharge @ 9%
Freight per truck - $2,122 x 1
Discount - $8,099
Hopper Floor Cleanouts: CS Cleanout Subtotal From Additional Sheet(s):
Quantity Ordered:
Hydraulic Pump Cover for Peterbilt 520