Exhibit 2 - QuoteContract
No.:TR11-18 Date
Prepared:2/10/2022
Buying
Agency:Contractor:
Contact
Person:
Prepared
By:
Phone:Phone:
Fax:Fax:
Email:Email:
Product
Code:M056 Description:
98,250.00
Cost Cost
4,600.00
Subtotal B: 4600
Cost Cost
14200
Subtotal C: 14200
14%
D. Total Cost before any other applicable Charges, Trade-Ins, Allowances, Discounts, Etc. (A+B+C)
1 117050 =Subtotal D: 117050
Cost Cost
-1,965.00
Subtotal E: -1965
115085F. Total Purchase Price (D+E): Delivery Date: 180-230 DAYS ARO
Subtotal From Additional Sheet(s):
Quantity Ordered: X Subtotal of A + B + C:
E. Other Charges, Trade-Ins, Allowances, Discounts, Etc.
Description Description
JIM LEWIS
501-454-1007
B. Published Options - Itemize below - Attach additional sheet if necessary - Include Option Code in description if applicable
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description
jim.lewis@bandcbody.com
Description
FREIGHT
CONTRACT PRICING WORKSHEET
For Standard Equipment Purchases
J & J TRAILERS ALUMINUM LIVE FLOOR
A. Product Item Base Unit Price Per Contractor's H-GAC Contract:
903-212-3041
This Worksheet is prepared by Contractor and given to End User. If a PO is issued, both documents
MUST be faxed to H-GAC @ 713-993-4548. Therefore please type or print legibly.
CITY OF DENTON
1527 S. MAYHILL RD., DENTON, TX 76208
940-349-8422
brad.holland@cityofdento.com
EAST TEXAS MACK/ DBA/ B & C BODY CO.
Description Description
C. Unpublished Options - Itemize below - Attach additional sheet if necessary
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Subtotal From Additional Sheet(s):
STEEL SURCHARGE
HGAC CITY OF DENTON DISCOUNT 2%
For this transaction the percentage is: Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A+B).