Exhibit 4 - PresentationEffluent Filter, Aeration Diffuser, and Digester Improvements PCWRP DENTON CITY COUNCIL -22-520 –MARCH 22, 2022 1 Outline –Phase 1A •Age and Condition •Current Flows •Anticipated flows •Texas Commission on Environmental Quality (TCEQ)Requirements •Phase 1 Improvements: •Filter Rehabilitation •Aeration Defuses •Anaerobic Digester •Selection process 2DENTON CITY COUNCIL -22-520 –MARCH 22, 2022 City of Denton Pecan Creek Water Reclamation Plant Current Conditions •The existing wastewater treatment plant is an almost 60 yr old facility •Key components of the plant have reached the end of the useful life. •Processes are proposed to be upgraded for additional capacity using newer technologies. •Current effluent filtration process uses sand media, an inefficient process. •The existing Aeration Diffusers are 20 plus years old and have become inefficient and problematic. •The Anaerobic digester lid is over 40 yrs. old and has reached the end of its functional life. 3DENTON CITY COUNCIL -22-520 –MARCH 22, 2022 City of Denton Pecan Creek Water Reclamation Plant Current Conditions •Pecan Creek Water Reclamation Plant: •Permitted for 21 MGD Annual Average Flow and 46 MGD Peak Flow. •Flows are at 71% of permitted average daily flows. •The Texas Commission on Environmental Quality (TCEQ) require when 75% of the permitted flows are reached capacity upgrades must be in design. •When 90% of the permitted flows are reached, construction of the facility upgrades and or expansion must be initiated. 4DENTON CITY COUNCIL -22-520 –MARCH 22, 2022 5 Sand Filter Rehabilitation •Current filters rated capacity of 20 MGD •Sand Filters to be replaced with modern cloth filter, improving capacity, with no modifications to the existing footprint. •Upgrade will increase filtration capacity to 46 MGD with one filter out of service (for redundancy). DENTON CITY COUNCIL -22-520 –MARCH 22, 2022 Aeration Diffuser Installation •A new Membrane Diffuser system will be installed in the existing Aeration Basins. Replacing the 20 + yr old system. •These new diffusers resist fouling, they are less expensive to manufacture and install. •The membrane diffusers have a longer lifespan. •The operation and maintenance costs are greatly reduced. 6DENTON CITY COUNCIL -22-520 –MARCH 22, 2022 Anaerobic Digester Improvements •Existing anaerobic digesters will be cleaned. •A new primary gas holder digester lid will be constructed on site and installed. •The new gas holding type lid allows for storage and reclaims the methane. The reclaimed gas will be utilized to heat the digester. •Any excess methane gas will be piped over into a landfill project in collaboration with Atmos Gas. 7DENTON CITY COUNCIL -22-520 –MARCH 22, 2022 Competitive Sealed Proposal •Through the Procurement evaluation process for this Competitive Seal Proposal contract firm elected: •Archer Western Construction, LLC •$13,509,221 with a contract total •395 days for construction Staff recommends awarding Effluent Filter, Aeration Diffuser, and Digester Improvements PCWRP contract to Archer Western Construction, LLC 8DENTON CITY COUNCIL -22-520 –MARCH 22, 2022 Questions? 9DENTON CITY COUNCIL -22-520 –MARCH 22, 2022