7483 - Informal Amendment 2 Executed
Procurement & Compliance
901 B Texas St., Denton, TX 76209 (940) 349-7100
OUR CORE VALUES
Integrity Fiscal Responsibility Inclusion Transparency Outstanding Customer Service
March 23, 2022
Maslonka Powerline Services, LLC
Attn: Dustin Maslonka
10103 N. Division St., Suite 106
Spokane, WA 99218
dustym@maslonkapowerline.com
Re: Letter Agreement to Amend (this “Amendment”) Contract 7483 – Transmission Line
Construction between the City of Denton (“COD”) and Maslonka Powerline Services, LLC.,
dated February 23, 2021 (the “Contract”) – Amendment #2
Dear Mr. Maslonka,
Thank you for being such a valued partner. By signing this Amendment below, COD and
Maslonka Powerline Services, LLC. agree that the Contract is hereby deemed amended to
the updated Schedule of Charges, as shown in Attachment A. Additionally, we agree to the request
for Maslonka to review rates yearly.
Except as amended by this Amendment, the Contract is not otherwise amended and all other terms
and conditions of the Contract remain in full force and effect, as amended hereby. This Amendment
may be executed in any number of counterparts, each of which shall be deemed an original and all of
which together shall constitute one and the same instrument. Signatures transmitted electronically
shall have the same effect as the delivery of original signatures.
The City of Denton reserves the right to re-evaluate pricing as the market conditions change and can
ask your firm to provide updated proposed pricing, including, but not limited to, a decrease in
pricing, as a result of any such change.
We look forward to future business with your firm.
Regards,
____________________________ ___________________________
Christa Christian, CPPB Dustin Maslonka, VP
Procurement and Compliance or Authorized Representative
City of Denton Maslonka Powerline Services,
LLC
DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC
Proposer's Name:
NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB.
Item
#
4 Year
Estimated
Quantity
UOM Construction Unit Original
Unit Price
March 2022
price revision
Original
Extended Price
Notes
Section A
1 EA TPS-138DC - DC TANGENT BR POST 0-2 DEG (1-POLE) (EMBEDDED) ( <= 100' ) ( < 40K LBS ) $ 4,089.32 $ 4,498.25 $ - 10%
2 EA TPS-138DC - DC TANGENT BR POST 0-2 DEG (1-POLE) (EMBEDDED) ( > 100' ) ( < 40K LBS ) $ 4,224.65 $ 4,647.12 $ - 10%
3 EA TPS-138DCX - DC TANGENT BR POST 0-2 DEG W/ 2ND SW DE (1-POLE) (ON PIER) ( <= 100' ) ( < 40K LBS ) $ 4,295.25 $ 4,724.78 $ - 10%
4 EA TPS-138DCX - DC TANGENT BR POST 0-2 DEG W/ 2ND SW DE (1-POLE) (ON PIER) ( > 100' ) ( < 40K LBS ) $ 4,648.29 $ 5,113.12 $ - 10%
5 EA TUS-2DC - DC SMALL ANGLE BR POST 2-10 DEG (1-POLE) (ON PIER) ( <= 100' ) ( < 40K LBS ) $ 4,471.77 $ 4,918.95 $ - 10%
6 EA TUS-2DC - DC SMALL ANGLE BR POST 2-10 DEG (1-POLE) (ON PIER) ( > 100' ) ( < 40K LBS ) $ 4,589.45 $ 5,048.40 $ - 10%
7 EA TUS-7GA - DC DEADEND 20-40 DEG (1-POLE) (ON PIER) ( <= 100' ) ( < 40K LBS ) $ 5,413.20 $ 5,954.52 $ - 10%
8 EA TUS-7GA - DC DEADEND 20-40 DEG (1-POLE) (ON PIER) ( > 100' ) ( < 40K LBS ) $ 5,766.23 $ 6,342.85 $ - 10%
9 EA TUS-7GAX - DC DEADEND 20-40 DEG (1-POLE) (ON PIER) ( <= 100' ) ( < 40K LBS ) $ 5,766.23 $ 6,342.85 $ - 10%
10 EA TUS-7GX - DC DEADEND TANGENT (1-POLE) (ON PIER) ( <= 100' ) ( < 40K LBS ) $ 4,824.81 $ 5,307.29 $ - 10%
11 EA TUS-7A - DC DEADEND 90-100 DEG (2-POLE) (ON PIERS) ( <= 100' ) ( < 40K LBS EA ) $ 10,120.33 $ 11,132.36 $ - 10%
12 EA TUS-7A - DC DEADEND 90-100 DEG (2-POLE) (ON PIERS) ( > 100' ) ( < 40K LBS EA ) $ 10,708.72 $ 11,779.59 $ - 10%
13 EA TUS-7A - DC DEADEND 90-100 DEG (1-POLE) (ON PIER) ( <= 100' ) ( < 40K LBS EA ) $ 4,824.81 $ 5,307.29 $ - 10%
14 EA TUS-7A - DC DEADEND 90-100 DEG (1-POLE) (ON PIER) ( > 100' ) ( < 40K LBS EA ) $ 5,707.39 $ 6,278.13 $ - 10%
15 EA TUS-2AU - SC SMALL ANGLE BR POST 2-10 DEG (1-POLE) (EMBEDDED) ( <= 100' ) ( < 40K LBS ) $ 4,236.42 $ 4,660.06 $ - 10%
16 EA TPS-138U - SC TANGENT BR POST 0-2 DEG (1-POLE) (EMBEDDED) (W/UNDERBUILD) $ 4,942.49 $ 5,436.74 $ - 10%
17 EA TPS-138U-XS - SC TANGENT BR POST 0-2 DEG (1-POLE) (EMBEDDED) (W/UNDERBUILD) $ 6,714.31 $ 7,385.74 $ - 10%
18 EA TPS-138U-XT - SC TANGENT BR POST 0-2 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 5,177.84 $ 5,695.62 $ - 10%
19 EA TUS-3AU - SC MED ANGLE 10-20 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 5,177.84 $ 5,695.62 $ - 10%
20 EA TUS-4AU - SC LARGE ANGLE 20-40 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 5,060.16 $ 5,566.18 $ - 10%
21 EA TUS-5AAU-2 - SC DEADEND 60-80 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 5,648.55 $ 6,213.41 $ - 10%
22 EA TUS-5AU - SC DEADEND 80-100 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 5,883.91 $ 6,472.30 $ - 10%
23 EA 1.5 TUS-5AU - SC DEADEND 90 DEG W/ TAP (1-POLE) (ON PIER) (W/UNDERBUILD) $ 6,001.59 $ 6,601.75 $ - 10%
24 EA TUS-SWT-1U - SC DEADEND INLINE 1-WAY SWITCH (1-POLE) (ON PIER) (W/UNDERBUILD) $ 6,825.34 $ 7,507.87 $ - 10%
25 EA TPS-138DCU - DC TANGENT BR POST 0-2 DEG (1-POLE) (EMBEDDED) (W/UNDERBUILD) $ 7,060.69 $ 7,766.76 $ - 10%
26 EA TUS-2DCU - DC SMALL ANGLE BR POST 2-10 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 5,295.52 $ 5,825.07 $ - 10%
27 EA TUS-7GAU - DC DEADEND 20-40 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 6,001.59 $ 6,601.75 $ - 10%
28 EA TUS-7GAU-2 - DC DEADEND 40-60 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 6,236.95 $ 6,860.65 $ - 10%
RFP 7483 - Attachment A - Addendum #2 cost increase
JRD, LLC dba Maslonka Powerline Services, LLC
DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC
Proposer's Name:
NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB.
Item
#
4 Year
Estimated
Quantity
UOM Construction Unit Original
Unit Price
March 2022
price revision
Original
Extended Price
Notes
JRD, LLC dba Maslonka Powerline Services, LLC
29 EA TUS-7GAU-3 - DC DEADEND 60-80 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 6,589.98 $ 7,248.98 $ - 10%
30 EA TUS-7GU - DC DEADEND 80-100 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 5,883.91 $ 6,472.30 $ - 10%
31 EA TUS-7GXU - DC DEADEND TANGENT (1-POLE) (ON PIER) (W/UNDERBUILD) $ 6,707.66 $ 7,378.43 $ - 10%
32 EA INSTALL WOOD POLE (EMBEDDED) (W/UNDERBUILD) $ 2,706.60 $ 2,977.26 $ - 10%
33 EA INSTALL WOOD POLE (EMBEDDED) (NO UNDERBUILD)) $ 1,867.52 $ 2,054.27 $ - 10%
34 EA INSTALL 138KV TRANSMISSION RISER STRUCTURE (OVERHEAD TO UNDERGROUND) (ON PIER) (HORIZONTAL
TERMINATIONS) (<125') $ 9,213.11 $ 10,134.42 $ - 10%
35 EA INSTALL 138KV TRANSMISSION RISER STRUCTURE (OVERHEAD TO UNDERGROUND) (ON PIER) (VERTICAL
TERMINATIONS) (< $ 10,707.13 $ 11,777.84 $ - 10%
Section A - Subtotal $ -
Section B - Foundation Construction Units
36 PER STR ASSEMBLING AND ERECTING STRUCTURE WEIGHING IN EXCESS OF 40,000 LBS (PER LB OVER 40,000 LBS) $ 10,651.32 $ 11,716.45 $ - 10%
37 LB ASSEMBLING AND ERECTING STRUCTURE WEIGHING IN EXCESS OF 40,000 LBS (PER LB OVER 40,000 LBS) $ 0.35 $ 0.39 $ - 10%
38 PER CY FOUNDATION - CONCRETE FOR ANCHOR BOLT CAGE $ 583.06 $ 641.37 $ - 10%
39 PER CY FOUNDATION - CONCRETE FOR DIRECT EMBEDDED POLE $ 449.92 $ 494.91 $ - 10%
40 PER 1K
LBS FOUNDATION - REINFORCING STEEL PER 1,000 LBS $ 1,235.29 $ 1,358.82 $ - 10%
41 PER CY SLURRY PROCESSING OF FOUNDATION HOLES $ 462.08 $ 508.29 $ - 10%
42 LINEAR
FOOT ROCK DRILLING, PER CUBIC YARD $ 945.30 $ 1,039.83 $ - 10%
43 PER FT CASING, 48" DIA, INSTALL AND REMOVE PER LINEAR FOOT $ 46.60 $ 51.26 $ - 10%
44 PER FT CASING, 60" DIA, INSTALL AND REMOVE PER LINEAR FOOT $ 113.17 $ 124.49 $ - 10%
45 PER FT CASING, 72" DIA, INSTALL AND REMOVE PER LINEAR FOOT $ 157.11 $ 172.82 $ - 10%
46 PER FT CASING, 84" DIA, INSTALL AND REMOVE PER LINEAR FOOT $ 213.03 $ 234.33 $ - 10%
47 PER FT CASING, 96" DIA, INSTALL AND REMOVE PER LINEAR FOOT $ 259.63 $ 285.59 $ - 10%
48 PER FT CASING, 108" DIA, INSTALL AND REMOVE PER LINEAR FOOT $ 292.91 $ 322.20 $ - 10%
49 PER FT CASING, 120" DIA, INSTALL AND REMOVE PER LINEAR FOOT $ 360.81 $ 396.89 $ - 10%
50 PER FT CASING, 48" DIA, INSTALL AND LEAVE IN PLACE PER LINEAR FOOT $ 146.46 $ 161.11 $ - 10%
51 PER FT CASING, 60" DIA, INSTALL AND LEAVE IN PLACE PER LINEAR FOOT $ 219.68 $ 241.65 $ - 10%
52 PER FT CASING, 72" DIA, INSTALL AND LEAVE IN PLACE PER LINEAR FOOT $ 312.88 $ 344.17 $ - 10%
53 PER FT CASING, 84" DIA, INSTALL AND LEAVE IN PLACE PER LINEAR FOOT $ 426.05 $ 468.66 $ - 10%
54 PER FT CASING, 96" DIA, INSTALL AND LEAVE IN PLACE PER LINEAR FOOT $ 512.59 $ 563.85 $ - 10%
55 PER FT CASING, 108" DIA, INSTALL AND LEAVE IN PLACE PER LINEAR FOOT $ 705.65 $ 776.22 $ - 10%
56 PER FT CASING, 120" DIA, INSTALL AND LEAVE IN PLACE PER LINEAR FOOT $ 865.42 $ 951.96 $ - 10%
DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC
Proposer's Name:
NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB.
Item
#
4 Year
Estimated
Quantity
UOM Construction Unit Original
Unit Price
March 2022
price revision
Original
Extended Price
Notes
JRD, LLC dba Maslonka Powerline Services, LLC
Section B - Subtotal $ -
Section C: Wire / Assembly Installation Units
57 PER 1K
FT SHIELD WIRE - 3/8'' EHS STEEL, 7-STRAND ( < 0.5 MI ) $ 922.05 $ 1,014.26 $ - 10%
58 PER 1K
FT SHIELD WIRE - 3/8'' EHS STEEL, 7-STRAND ( > 0.5 MI ) $ 1,044.99 $ 1,149.49 $ - 10%
59 PER 1K
FT SHIELD WIRE - OPGW AFL DNO-8168 (0.691") ( < 0.5 MI ) $ 1,475.29 $ 1,622.82 $ - 10%
60 PER 1K
FT SHIELD WIRE - OPGW AFL DNO-8168 (0.691") ( > 0.5 MI ) $ 1,598.23 $ 1,758.05 $ - 10%
61 PER 1K
FT CONDUCTOR - (1) 795 ACSR "DRAKE" ( < 0.5 MI ) $ 4,179.98 $ 4,597.98 $ - 10%
62 PER 1K
FT CONDUCTOR - (1) 795 ACSR "DRAKE" ( > 0.5 MI ) $ 4,487.33 $ 4,936.06 $ - 10%
63 PER 1K
FT CONDUCTOR - (1) 959.6 ACSS/TW/HS "SUWANEE" ( < 0.5 MI ) $ 4,671.74 $ 5,138.91 $ - 10%
64 PER 1K
FT CONDUCTOR - (1) 959.6 ACSS/TW/HS "SUWANEE" ( > 0.5 MI ) $ 4,794.68 $ 5,274.15 $ - 10%
65 PER 1K
FT CONDUCTOR - (2) 959.6 ACSS/TW/HS "SUWANEE" ( < 0.5 MI ) $ 7,991.13 $ 8,790.24 $ - 10%
66 PER 1K
FT CONDUCTOR - (2) 959.6 ACSS/TW/HS "SUWANEE" ( > 0.5 MI ) $ 8,114.07 $ 8,925.48 $ - 10%
66a PER 1K
FT CONDUCTOR - (1) 795 AAC "ARBUTUS" $ 3,934.10 $ 4,327.51 $ - 10%
66b PER 1K
FT CONDUCTOR - (1) 556 AAC "Mistletoe" $ 2,950.57 $ 3,245.63 $ - 10%
67 PER 1K
FT CONDUCTOR - (1) 795 ACSR "DRAKE" ( < 0.5 MI ) (STRINGING NEXT TO ENERGIZED CIRCUIT) $ 4,794.68 $ 5,274.15 $ - 10%
68 PER 1K
FT CONDUCTOR - (1) 795 ACSR "DRAKE" ( > 0.5 MI ) (STRINGING NEXT TO ENERGIZED CIRCUIT) $ 5,040.56 $ 5,544.62 $ - 10%
69 PER 1K
FT CONDUCTOR - (1) 959.6 ACSS/TW/HS "SUWANEE" ( < 0.5 MI ) (STRINGING NEXT TO ENERGIZED CIRCUIT) $ 5,040.56 $ 5,544.62 $ - 10%
70 PER 1K
FT CONDUCTOR - (1) 959.6 ACSS/TW/HS "SUWANEE" ( > 0.5 MI ) (STRINGING NEXT TO ENERGIZED CIRCUIT) $ 5,286.44 $ 5,815.08 $ - 10%
71 PER 1K
FT CONDUCTOR - (2) 959.6 ACSS/TW/HS "SUWANEE" ( < 0.5 MI ) (STRINGING NEXT TO ENERGIZED CIRCUIT) $ 8,155.40 $ 8,970.94 $ - 10%
72 PER 1K
FT CONDUCTOR - (2) 959.6 ACSS/TW/HS "SUWANEE" ( > 0.5 MI ) (STRINGING NEXT TO ENERGIZED CIRCUIT) $ 8,398.85 $ 9,238.74 $ - 10%
73 EA SHIELDWIRE SUSPENSION ASSEMBLY - 3/8'' EHS STEEL $ 60.86 $ 66.95 $ - 10%
74 EA SHIELDWIRE SINGLE COMPRESSION DEADEND ASSEMBLY - 3/8'' EHS STEEL $ 91.29 $ 100.42 $ - 10%
75 EA SHIELDWIRE DOUBLE COMPRESSION DEADENED ASSEMBLY - 3/8'' EHS STEEL $ 121.72 $ 133.89 $ - 10%
76 EA SHIELDWIRE SINGLE MECHANICAL DEADEND ASSEMBLY - 3/8'' EHS STEEL $ 91.29 $ 100.42 $ - 10%
77 EA SHIELDWIRE DOUBLE MECHANICAL DEADENED ASSEMBLY - 3/8'' EHS STEEL $ 152.15 $ 167.37 $ - 10%
78 EA CONDUCTOR BRACED POST ASSEMBLY - (2) 959.6 ACSS\TW\HS "SUWANEE" $ 237.36 $ 261.10 $ - 10%
79 EA CONDUCTOR BRACED POST ASSEMBLY - (1) 795 ACSR "DRAKE" OR (1) 959.6 ACSS\TW\HS "SUWANEE" $ 186.81 $ 205.49 $ - 10%
80 EA CONDUCTOR HORIZONTAL POST INSULATOR JUMPER ASSEMBLY - (2) 959.6 ACSS\TW\HS "SUWANEE" $ 213.49 $ 234.84 $ - 10%
81 EA CONDUCTOR HORIZONTAL POST INSULATOR JUMPER ASSEMBLY - (1) 795 ACSR "DRAKE" OR (1) 959.6
ACSS\TW\HS "SUWANEE" $ 208.16 $ 228.98 $ - 10%
82 EA CONDUCTOR VERTICAL POST INSULATOR JUMPER ASSEMBLY - (2) 959.6 ACSS\TW\HS "SUWANEE" $ 234.84 $ 258.32 $ - 10%
DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC
Proposer's Name:
NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB.
Item
#
4 Year
Estimated
Quantity
UOM Construction Unit Original
Unit Price
March 2022
price revision
Original
Extended Price
Notes
JRD, LLC dba Maslonka Powerline Services, LLC
83 EA CONDUCTOR VERTICAL POST INSULATOR JUMPER ASSEMBLY - (1) 795 ACSR "DRAKE" OR (1) 959.6 ACSS\TW\HS
"SUWANEE" $ 229.51 $ 252.46 $ - 10%
84 EA CONDUCTOR COMPRESSION DEADEND ASSEMBLY - (2) 959.6 ACSS\TW\HS "SUWANEE" $ 640.48 $ 704.53 $ - 10%
85 EA CONDUCTOR COMPRESSION DEADEND ASSEMBLY - (1) 795 ACSR "DRAKE" OR (1) 959.6 ACSS\TW\HS "SUWANEE" $ 320.24 $ 352.26 $ - 10%
86 EA CONDUCTOR COMPRESSION ANGLE ASSEMBLY - (2) 959.6 ACSS\TW\HS "SUWANEE" $ 640.48 $ 704.53 $ - 10%
87 EA CONDUCTOR SUBSTATION JUMPER WITH COMPRESSION TERMINAL FOR (2) 959.6 ACSS/TW/HS "SUWANEE" $ 651.16 $ 716.28 $ - 10%
88 EA CONDUCTOR SUBSTATION JUMPER COMPRESSION TEE TAP FOR (2) 959.6 ACSS/TW/HS "SUWANEE" $ 693.86 $ 763.25 $ - 10%
89 EA CONDUCTOR MECHANICAL DEADEND ASSEMBLY - (1) 795 ACSR "DRAKE" OR (1) 959.6 ACSS\TW\HS "SUWANEE" $ 266.87 $ 293.56 $ - 10%
89a EA CONDUCTOR MECHANICAL DEADEND ASSEMBLY - (1) 795 AAC "ARBUTUS" $ 266.87 $ 293.56 $ - 10%
89b EA CONDUCTOR MECHANICAL DEADEND ASSEMBLY - (1) 556 AAC "MISTLETOE" $ 245.52 $ 270.07 $ - 10%
90 EA OPGW SUSPENSION ASSEMBLY - AFL DNO-8186 (0.691") $ 160.12 $ 176.13 $ - 10%
91 EA OPGW DOUBLE SUSPENSION ASSEMBLY - AFL DNO-8168 (0.691") $ 208.16 $ 228.98 $ - 10%
92 EA OPGW SINGLE DEADEND ASSEMBLY - AFL DNO-8168 (0.691") $ 213.49 $ 234.84 $ - 10%
93 EA OPGW DOUBLE DEADEND ASSEMBLY ASSEMBLY - AFL DNO-8168 (0.691") $ 279.13 $ 307.04 $ - 10%
94 EA OPGW FLOATING DEADEND ASSEMBLY - AFL DNO-8168 (0.691") $ 257.66 $ 283.43 $ - 10%
95 EA OPGW DOWNLEADS AND COIL BRACKET - AFL DNO-8168 (0.691") $ 644.14 $ 708.55 $ - 10%
96 EA OPGW COIL WIRE AND INSTALL SPLICE ENCLOSURE $ 1,073.57 $ 1,180.93 $ - 10%
97 EA SPLICE FIBER OPTIC CABLE - 72 FIBER COUNT $ 4,470.59 $ 4,917.65 $ - 10%
98 EA GROUNDING - CONCRETE DRILLED PIER FOUNDATION $ 375.75 $ 413.33 $ - 10%
99 EA GROUNDING - DIRECT EMBED FOUNDATION $ 322.07 $ 354.28 $ - 10%
100 EA GROUNDING - ADDITIONAL GROUNDING ASSEMBLY ON NEW STRUCTURE $ 214.71 $ 236.18 $ - 10%
101 EA GROUNDING - FIELD REPLACEMENT ON EXISTING STRUCTURE $ 213.49 $ 234.84 $ - 10%
102 EA MEGGAR EXISTING GROUNDS PER STRUCTURE $ 106.75 $ 117.43 $ - 10%
103 EA GUY WIRE AND MULTI-HELIX SCREW ANCHOR ASSEMBLY $ 320.24 $ 352.26 $ - 10%
104 EA GUY WIRE AND CONCRETE ANCHOR ASSEMBLY $ 426.99 $ 469.69 $ - 10%
105 EA BIRD DETERRENT PER CIRCUIT (ON STRUCTURE) $ 186.81 $ 205.49 $ - 10%
106 EA MARKER BALLS ON SHIELDWIRE OR CONDUCTOR (IN SPAN, FROM GROUND) $ 266.87 $ 293.56 $ - 10%
107 EA CONDUCTOR STOCKBRIDGE VIBRATION DAMPERS - 795 ACSR "DRAKE" OR 959.6 ACSS/TW/HS "SUWANEE" $ 80.06 $ 88.07 $ - 10%
108 EA SHIELDWIRE SPIRAL VIBRATION DAMPERS - 3/8" EHS OR OPGW $ 53.37 $ 58.71 $ - 10%
109 EA SHIELDWIRE STOCKBRIDGE VIBRATION DAMPERS - 3/8" EHS OR OPGW $ 53.37 $ 58.71 $ - 10%
Section C - Subtotal $ -
DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC
Proposer's Name:
NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB.
Item
#
4 Year
Estimated
Quantity
UOM Construction Unit Original
Unit Price
March 2022
price revision
Original
Extended Price
Notes
JRD, LLC dba Maslonka Powerline Services, LLC
Section D: Removal / Repair Units
110 EA REMOVE AND REPLACE EXISTING INSULATOR ASSEMBLY $ 290.46 $ 319.51 $ - 10%
111 EA REMOVE AND REPLACE CONDUCTOR OR STATIC ARMS $ 474.23 $ 521.65 $ - 10%
112 PER STR REMOVE - SHIELDWIRE AND/OR CONDUCTOR HARDWARE ASSEMBLY $ 219.33 $ 241.26 $ - 10%
113 PER 1K
FT REMOVE - SHIELDWIRE $ 592.78 $ 652.06 $ - 10%
114 PER 1K
FT REMOVE -CONDUCTOR $ 948.45 $ 1,043.30 $ - 10%
115 EA REMOVE - DIRECT EMBEDDED WOOD POLE $ 474.23 $ 521.65 $ - 10%
116 EA REMOVE - DIRECT EMBEDDED STEEL POLE $ 1,778.34 $ 1,956.17 $ - 10%
117 EA REMOVE - POLE ON CONCRETE FOUNDATION $ 2,371.13 $ 2,608.24 $ - 10%
118 EA REMOVE - GUY MULTI-HELIX ANCHOR $ 108.78 $ 119.66 $ - 10%
119 EA REMOVE - GUY CONCRETE ANCHOR $ 326.33 $ 358.96 $ - 10%
120 EA REMOVE - CONCRETE PIER FOUNDATION $ 4,351.03 $ 4,786.13 $ - 10%
Section D - Subtotal $ -
DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC
Proposer's Name:
NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB.
Item
#
4 Year
Estimated
Quantity
UOM Construction Unit Original
Unit Price
March 2022
price revision
Original
Extended Price
Notes
JRD, LLC dba Maslonka Powerline Services, LLC
Section E - Mobiliation Units
121 1-LOT MOBILIZATION / DEMOBILIZATION - PROJECTS ( < $50,000 ) $ 5,000.00 $ 5,500.00 $ - 10%
122 1-LOT MOBILIZATION / DEMOBILIZATION - PROJECTS ( $50,000 < $250,000 ) $ 20,000.00 $ 22,000.00 $ - 10%
123 1-LOT MOBILIZATION / DEMOBILIZATION - PROJECTS ( $250,000 < $1,000,000 ) $ 35,000.00 $ 38,500.00 $ - 10%
124 1-LOT MOBILIZATION / DEMOBILIZATION - PROJECTS ( > $1,000,000 ) $ 50,000.00 $ 55,000.00 $ - 10%
125 1-LOT MOVE OFF PROJECT AND RETURN AT A LATER DATE FOR LABOR AND EQUIPMENT $ 25,000.00 $ 27,500.00 $ - 10%
Section E - Subtotal $ -
Section F - Miscellaneous Unit
126 PER DAY EQUIPMENT - CRANE, 50 TON, 110 FT BOOM $ 515.00 $ 618.00 $ - 20%
127 PER DAY EQUIPMENT - CRANE, 100 TON, 160 FT BOOM $ 697.00 $ 836.40 $ - 20%
128 PER DAY HEAVY CRANE WITH OPERATOR AND RIGGER - SUBCONTRACTED (10 HOUR DAY) $ 8,625.00 $ - New item we will need for I-35 crossing project
129 LS MOB IN/OUT FOR HEAVY CRANE ABOVE - SUBCONTRACTED $ 12,000.00 $ - New item we will need for I-35 crossing project
130 PER DAY CREW AND EQUIPMENT TIME AND EXPENSES - NORMAL WEEKDAY $ 4,120.00 $ 4,532.00 $ - 10%
131 PER DAY CREW AND EQUIPMENT TIME AND EXPENSES - NIGHT $ 6,176.00 $ 6,793.60 $ - 10%
132 PER DAY CREW AND EQUIPMENT TIME AND EXPENSES - HOLIDAY $ 8,240.00 $ 9,064.00 $ - 10%
133 PER DAY HYDROVAC CREW $ 2,720.00 $ 2,992.00 $ - 10%
134 PER DAY TRAFFIC CONTROL - with NO traffic plan required $ 4,500.00 $ - No Change
135 % Add TRAFFIC CONTROL - REQUIRES A TRAFFIC PLAN estimated $6,500/event. billed at Cost +10% $ 10,000.00 $ - No Change
136 PER
ACRE ROW CLEARING - SCATTERED LIGHT CLEARING $ 1,600.00 $ 1,920.00 $ - 10%
137 PER
ACRE ROW CLEARING - HEAVY CLEARING $ 9,800.00 $ 11,760.00 $ - 10%
138 TN INSTALL & REMOVE FLEX BASE MATERIAL FOR EQUIPMENT ACCESS (LABOR, MATERIAL, & EQUIPMENT) $ 35.00 $ 42.00 $ - 10%
139 PER FT TEMPORAY ACCESS ROAD (10’ wide access road using gravel; price should include removal of access road. ) $ 2,675.00 $ 3,210.00 $ - 10%
140 EA INSTALL AND REMOVE CULVERT 1'-2' DIA. BY 20' LENGTH $ 2,400.00 $ 2,880.00 $ - 10%
141 EA INSTALL AND REMOVE CULVERT 2'-4' DIA. BY 20' LENGTH $ 2,800.00 $ 3,360.00 $ - 10%
142 EA INSTALL AND REMOVE CULVERT 4'-6' DIA. BY 20' LENGTH $ 3,400.00 $ 4,080.00 $ - 10%
143 EA INSTALL AND REMOVE CULVERT >6' DIA. BY 20' LENGTH $ 3,800.00 $ 4,560.00 $ - 10%
144 MAT MAT RENTAL, PRICE PER MAT, PER DAY INCLUDING TRANSPORTATION, INSTALLATION AND REMOVAL $ 115.00 $ 80.50 $ - -30%
145 TN ROCK, COARSE AGGREGATE (3X5), DELIVERED, INSTALLED AND REMOVED $ 35.00 $ 42.00 $ - 10%
146 LF SILT FENCE, INSTALLED, MAINTAINED IN OPERABLE CONDITION, AND REMOVED AT CONCLUSION OF PROJECT $ 6.50 $ 7.80 $ - 10%
147 LF Chemical Spraying for ROW Clearing (75' ROW Width) $ 0.80 $ 0.96 $ - 10%
Section F - Subtotal $0.00
DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC
Proposer's Name:
NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB.
Item
#
4 Year
Estimated
Quantity
UOM Construction Unit Original
Unit Price
March 2022
price revision
Original
Extended Price
Notes
JRD, LLC dba Maslonka Powerline Services, LLC
Section G - Hourly Rates For Additional Services - Equipment - ADDENDUM # 1 (Required section; IT will not contribute to pricing score)
150 HOUR 1 TON FLATBED $ 31.26 $ 37.51 $0.00 20%
151 HOUR 1100 DIGGER $ 54.51 $ 65.41 $0.00 20%
152 HOUR 115 TON CRANE $ 95.21 $ 114.25 $0.00 20%
153 HOUR 130 TON CRANE $ 106.84 $ 128.21 $0.00 20%
154 HOUR 135 TON CRANE $ 106.84 $ 128.21 $0.00 20%
155 HOUR 15 TON CRANE $ 51.02 $ 61.22 $0.00 20%
156 HOUR 165 TON CRANE $ 112.65 $ 135.18 $0.00 20%
157 HOUR 1-DRUM PULLER $ 39.98 $ 47.98 $0.00 20%
158 HOUR 2 TON A-FRAME $ 34.16 $ 40.99 $0.00 20%
159 HOUR 2 TON FLATBED $ 31.26 $ 37.51 $0.00 20%
160 HOUR 20' FLATBED TRAILER $ 10.91 $ 13.09 $0.00 20%
161 HOUR 25 TON CRANE $ 48.70 $ 58.44 $0.00 20%
162 HOUR 270 DIGGER $ 37.07 $ 44.48 $0.00 20%
163 HOUR 30' GOOSENECK TRAILER $ 15.27 $ 18.32 $0.00 20%
164 HOUR 30 TON CRANE W/BASKET $ 54.51 $ 65.41 $0.00 20%
165 HOUR 50 TON CRANE W/BASKET $ 80.86 $0.00 NEW ITEM
166 HOUR 3100 DIGGER $ 106.84 $ 128.21 $0.00 20%
167 HOUR 330 DIGGER $ 37.07 $ 44.48 $0.00 20%
168 HOUR 3-DRUM PULLER $ 98.12 $ 117.74 $0.00 20%
169 HOUR 4-DRUM PULLER $ 72.14 $0.00 NEW ITEM
170 HOUR 20K PULLER $ 104.12 $0.00 NEW ITEM
171 HOUR 30K PULLER $ 153.53 $0.00 NEW ITEM
172 HOUR 50K PULLER $ 159.35 $0.00 NEW ITEM
173 HOUR 4-6 WHEEL ATV $ 13.81 $ 16.57 $0.00 20%
174 HOUR 50 TON CRANE $ 71.95 $ 86.34 $0.00 20%
175 HOUR 54" SMOOTH DRUM ROLLER $ 29.80 $ 35.76 $0.00 20%
176 HOUR 55 TON CRANE $ 74.86 $ 89.83 $0.00 20%
177 HOUR 600 DIGGER $ 37.07 $ 44.48 $0.00 20%
178 HOUR 65' BUCKET $ 29.80 $ 35.76 $0.00 20%
179 HOUR 70 TON CRANE $ 77.77 $ 93.32 $0.00 20%
DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC
Proposer's Name:
NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB.
Item
#
4 Year
Estimated
Quantity
UOM Construction Unit Original
Unit Price
March 2022
price revision
Original
Extended Price
Notes
JRD, LLC dba Maslonka Powerline Services, LLC
180 HOUR 70 TON CRANE MANTIS $ 86.49 $ 103.79 $0.00 20%
181 HOUR 700 DIGGER $ 63.23 $ 75.88 $0.00 20%
182 HOUR 75’ BUCKET $ 28.35 $ 34.02 $0.00 20%
183 HOUR 800 DIGGER $ 63.23 $ 75.88 $0.00 20%
184 HOUR 85' BUCKET $ 28.35 $ 34.02 $0.00 20%
185 HOUR AIR COMPRESSOR $ 13.23 $ 15.88 $0.00 20%
186 HOUR ARCO CONC MIX 6 YD $ 16.72 $ 20.06 $0.00 20%
187 HOUR ARCO DOODLE BUG $ 14.98 $ 17.98 $0.00 20%
188 HOUR BACKHOE $ 22.53 $ 27.04 $0.00 20%
189 HOUR BUCKET TRUCK, 100' $ 57.42 $ 68.90 $0.00 20%
190 HOUR BUCKET TRUCK, 125' $ 69.05 $ 82.86 $0.00 20%
191 HOUR BUCKET TRUCK, 150' $ 74.86 $ 89.83 $0.00 20%
192 HOUR BUCKET TRUCK, 170' $ 80.67 $ 96.80 $0.00 20%
193 HOUR CAT CHALLENGER CRAWLER TRACTOR $ 63.42 $0.00 NEW ITEM
194 HOUR CHIPPER $ 14.98 $ 17.98 $0.00 20%
195 HOUR CONCRETE MIXER 10 YD $ 28.35 $ 34.02 $0.00 20%
196 HOUR CREW BOAT $ 16.72 $ 20.06 $0.00 20%
197 HOUR CREW CAB $ 31.26 $ 37.51 $0.00 20%
198 HOUR CREW TRUCK $ 32.42 $ 38.90 $0.00 20%
199 HOUR D-4 DOZER $ 34.16 $ 40.99 $0.00 20%
200 HOUR D-5 DOZER $ 37.07 $ 44.48 $0.00 20%
201 HOUR D-6 CAT OR EQUIV $ 45.79 $ 54.95 $0.00 20%
202 HOUR D-7 DOZER $ 48.70 $ 58.44 $0.00 20%
203 HOUR D-8 DOZER SAG CAT $ 80.86 $0.00 NEW ITEM
204 HOUR DUMP TRUCK 12 YD $ 31.26 $ 37.51 $0.00 20%
205 HOUR DUMP TRUCK 6 YD $ 19.63 $ 23.56 $0.00 20%
206 HOUR FIBER PULLER $ 29.80 $ 35.76 $0.00 20%
207 HOUR FIBER TENSIONER $ 29.80 $ 35.76 $0.00 20%
208 HOUR FIELD OFFICE $ 18.47 $ 22.16 $0.00 20%
209 HOUR FORKLIFT $ 25.44 $ 30.53 $0.00 20%
210 HOUR FOUNDATION DRILL EX130 $ 200.05 $0.00 NEW ITEM
DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC
Proposer's Name:
NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB.
Item
#
4 Year
Estimated
Quantity
UOM Construction Unit Original
Unit Price
March 2022
price revision
Original
Extended Price
Notes
JRD, LLC dba Maslonka Powerline Services, LLC
211 HOUR FOUNDATION DRILL 3110 $ 153.53 $0.00 NEW ITEM
212 HOUR GREASE TRUCK $ 22.53 $ 27.04 $0.00 20%
213 HOUR HAUL TRUCK & TRAILER $ 35.62 $ 42.74 $0.00 20%
214 HOUR HEAVY HAUL TRUCK AND TRAILER $ 89.04 $0.00
215 HOUR HD-19 DOZER $ 66.14 $ 79.37 $0.00 20%
216 HOUR HOT SHOT TRUCK $ 31.26 $ 37.51 $0.00 20%
217 HOUR IT-28 $ 57.42 $ 68.90 $0.00 20%
218 HOUR LARGE TRACK HOE $ 34.16 $ 40.99 $0.00 20%
219 HOUR LIGHT PLANT $ 10.91 $ 13.09 $0.00 20%
220 HOUR LINE TRUCK / DIGGER $ 63.42 $0.00 NEW ITEM
221 HOUR LOADER 1 CY $ 39.98 $ 47.98 $0.00 20%
222 HOUR LOADER 4CY $ 45.79 $ 54.95 $0.00 20%
223 HOUR LOG SKIDDER $ 39.98 $ 47.98 $0.00 20%
224 HOUR MANLIFT 45' $ 19.63 $ 23.56 $0.00 20%
225 HOUR MANLIFT 65' $ 21.08 $ 25.30 $0.00 20%
226 HOUR MINI EXCAVATOR $ 22.53 $ 27.04 $0.00 20%
227 HOUR MOTOR GRADER 12' $ 66.14 $ 79.37 $0.00 20%
228 HOUR MUD SLED $ 14.98 $ 17.98 $0.00 20%
229 HOUR PICKUP $ 13.52 $ 16.22 $0.00 20%
230 HOUR PONTOON BOAT $ 25.44 $ 30.53 $0.00 20%
231 HOUR ROPE RIG $ 35.62 $ 42.74 $0.00 20%
232 HOUR STATIC TENSIONER $ 29.80 $ 35.76 $0.00 20%
233 HOUR TENSIONER $ 41.43 $ 49.72 $0.00 20%
234 HOUR TENSIONER/BUNDLED $ 121.56 NEW ITEM
235 HOUR TOOL VAN $ 57.42 $ 68.90 $0.00 20%
236 HOUR TRACK CRANE $ 112.84 $0.00 NEW ITEM
237 HOUR TRAILER-WIRE REEL STDS $ 28.35 $ 34.02 $0.00 20%
238 HOUR TRENCHER 3500 DW $ 22.53 $ 27.04 $0.00 20%
239 HOUR VAC-TRON $ 31.26 $ 37.51 $0.00 20%
240 HOUR VAN TRAILER $ 18.17 $ 21.80 $0.00 20%
241 HOUR V-GROVE $ 57.42 $ 68.90 $0.00 20%
DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC
Proposer's Name:
NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB.
Item
#
4 Year
Estimated
Quantity
UOM Construction Unit Original
Unit Price
March 2022
price revision
Original
Extended Price
Notes
JRD, LLC dba Maslonka Powerline Services, LLC
242 HOUR VIBER HAMMER $ 22.53 $ 27.04 $0.00 20%
243 HOUR WACKER PACKER $ 13.52 $ 16.22 $0.00 20%
244 HOUR WATER TRUCK 2000 GAL. $ 31.26 $ 37.51 $0.00 20%
245 HOUR WIRE BOAT $ 43.07 $0.00 NEW ITEM
246 HOUR WELDER $ 12.65 $ 15.18 $0.00 20%
Section G - Subtotal $0.00
Section H - Hourly Rates For Additional Services - Labor - ADDENDUM # 1 (Required section; IT will not contribute to pricing score)
247 HOUR SUPERINTENDENT $ 59.29 $ 65.22 $0.00 10%
248 HOUR PROJECT MANAGER $ 95.00 $0.00 No Change
249 HOUR SAFETY MANAGER $ 50.00 $0.00 No Change
250 HOUR GENERAL FOREMAN $ 56.74 $ 62.42 $0.00 10%
251 HOUR FOREMAN $ 54.19 $ 59.61 $0.00 10%
252 HOUR LINEMAN $ 51.65 $ 56.81 $0.00 10%
253 HOUR SUBSTATION TECH $ 50.05 $ 55.05 $0.00 10%
254 HOUR OPERATOR $ 49.09 $ 54.00 $0.00 10%
255 HOUR TRUCK DRIVER $ 32.71 $ 35.98 $0.00 10%
256 HOUR IRONWORKER $ 32.71 $ 35.98 $0.00 10%
257 HOUR GROUNDMAN $ 32.52 $ 35.77 $0.00 10%
258 HOUR LABORER $ 27.42 $ 30.16 $0.00 10%
259 HOUR INSTRUMENT MAN $ 32.71 $ 35.98 $0.00 10%
260 HOUR MECHANIC $ 41.45 $ 45.59 $0.00 10%
261 HOUR FIELD CLERK $ 28.69 $ 31.56 $0.00 10%
262 HOUR WELDER $ 44.00 $ 48.40 $0.00 10%
263 HOUR CONCRETE FINISHER $ 27.42 $ 30.16 $0.00 10%
264 DAY PIER DIEM $ 100.00 $ 120.00 $0.00 20%
265 LS BOND COSTS $ -
Section H - Subtotal $0.00
Total (Section A - F)$0.00
DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC
Certificate Of Completion
Envelope Id: EEB8D90C0E324224B60D8F64240DD8BC Status: Completed
Subject: Please DocuSign: 7483 - Amendment 2
Source Envelope:
Document Pages: 11 Signatures: 2 Envelope Originator:
Certificate Pages: 5 Initials: 0 Christa Christian
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-06:00) Central Time (US & Canada)
901B Texas Street
Denton, TX 76209
Christa.Christian@cityofdenton.com
IP Address: 198.49.140.10
Record Tracking
Status: Original
3/23/2022 12:16:35 PM
Holder: Christa Christian
Christa.Christian@cityofdenton.com
Location: DocuSign
Signer Events Signature Timestamp
Christa Christian
christa.christian@cityofdenton.com
Senior Buyer
City of Denton
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 198.49.140.10
Sent: 3/23/2022 12:18:38 PM
Viewed: 3/23/2022 12:18:48 PM
Signed: 3/23/2022 12:18:53 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Dustin Maslonka
dustym@maslonkapowerline.com
VP
Security Level: Email, Account Authentication
(None)Signature Adoption: Drawn on Device
Using IP Address: 52.144.111.99
Signed using mobile
Sent: 3/23/2022 12:18:55 PM
Viewed: 3/23/2022 12:24:04 PM
Signed: 3/23/2022 12:29:07 PM
Electronic Record and Signature Disclosure:
Accepted: 3/23/2022 12:24:04 PM
ID: 5946d8ec-691b-4e22-a625-3dc6dbb80ba8
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Cheyenne Defee
cheyenne.defee@cityofdenton.com
Procurement Administration Supervisor
City of Denton
Security Level: Email, Account Authentication
(None)
Sent: 3/23/2022 12:29:08 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Carbon Copy Events Status Timestamp
Donna K Anderson
Donna.Anderson@cityofdenton.com
Security Level: Email, Account Authentication
(None)
Sent: 3/23/2022 12:29:09 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 3/23/2022 12:18:38 PM
Certified Delivered Security Checked 3/23/2022 12:24:04 PM
Signing Complete Security Checked 3/23/2022 12:29:07 PM
Completed Security Checked 3/23/2022 12:29:09 PM
Payment Events Status Timestamps
Electronic Record and Signature Disclosure
ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, City of Denton (we, us or Company) may be required by law to provide to
you certain written notices or disclosures. Described below are the terms and conditions for
providing to you such notices and disclosures electronically through your DocuSign, Inc.
(DocuSign) Express user account. Please read the information below carefully and thoroughly,
and if you can access this information electronically to your satisfaction and agree to these terms
and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of
this document.
Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available
electronically to you by us. For such copies, as long as you are an authorized user of the
DocuSign system you will have the ability to download and print any documents we send to you
through your DocuSign user account for a limited period of time (usually 30 days) after such
documents are first sent to you. After such time, if you wish for us to send you paper copies of
any such documents from our office to you, you will be charged a $0.00 per-page fee. You may
request delivery of such paper copies from us by following the procedure described below.
Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time
change your mind and tell us that thereafter you want to receive required notices and disclosures
only in paper format. How you must inform us of your decision to receive future notices and
disclosure in paper format and withdraw your consent to receive notices and disclosures
electronically is described below.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. To indicate to us that you are changing your mind, you must
withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your
DocuSign account. This will indicate to us that you have withdrawn your consent to receive
required notices and disclosures electronically from us and you will no longer be able to use your
DocuSign Express user account to receive required notices and consents electronically from us
or to sign electronically documents from us.
All notices and disclosures will be sent to you electronically
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through your DocuSign user account all required notices, disclosures,
authorizations, acknowledgements, and other documents that are required to be provided or
made available to you during the course of our relationship with you. To reduce the chance of
you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process, please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
electronically from us.
Electronic Record and Signature Disclosure created on: 7/21/2017 3:59:03 PM
Parties agreed to: Dustin Maslonka
How to contact City of Denton:
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to: purchasing@cityofdenton.com
To advise City of Denton of your new e-mail address
To let us know of a change in your e-mail address where we should send notices and disclosures
electronically to you, you must send an email message to us at melissa.kraft@cityofdenton.com
and in the body of such request you must state: your previous e-mail address, your new e-mail
address. We do not require any other information from you to change your email address..
In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected
in your DocuSign account by following the process for changing e-mail in DocuSign.
To request paper copies from City of Denton
To request delivery from us of paper copies of the notices and disclosures previously provided
by us to you electronically, you must send us an e-mail to purchasing@cityofdenton.com and in
the body of such request you must state your e-mail address, full name, US Postal address, and
telephone number. We will bill you for any fees at that time, if any.
To withdraw your consent with City of Denton
To inform us that you no longer want to receive future notices and disclosures in electronic
format you may:
i. decline to sign a document from within your DocuSign account, and on the subsequent
page, select the check-box indicating you wish to withdraw your consent, or you may;
ii. send us an e-mail to purchasing@cityofdenton.com and in the body of such request you
must state your e-mail, full name, IS Postal Address, telephone number, and account
number. We do not need any other information from you to withdraw consent.. The
consequences of your withdrawing consent for online documents will be that transactions
may take a longer time to process..
Required hardware and software
Operating Systems: Windows2000? or WindowsXP?
Browsers (for SENDERS): Internet Explorer 6.0? or above
Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0,
NetScape 7.2 (or above)
Email: Access to a valid email account
Screen Resolution: 800 x 600 minimum
Enabled Security Settings:
•Allow per session cookies
•Users accessing the internet behind a Proxy
Server must enable HTTP 1.1 settings via
proxy connection
** These minimum requirements are subject to change. If these requirements change, we will
provide you with an email message at the email address we have on file for you at that time
providing you with the revised hardware and software requirements, at which time you will
have the right to withdraw your consent.
Acknowledging your access and consent to receive materials electronically
To confirm to us that you can access this information electronically, which will be similar to
other electronic notices and disclosures that we will provide to you, please verify that you
were able to read this electronic disclosure and that you also were able to print on paper or
electronically save this page for your future reference and access or that you were able to
e-mail this disclosure and consent to an address where you will be able to print on paper or
save it for your future reference and access. Further, if you consent to receiving notices and
disclosures exclusively in electronic format on the terms and conditions described above,
please let us know by clicking the 'I agree' button below.
By checking the 'I Agree' box, I confirm that:
• I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF
ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and
• I can print on paper the disclosure or save or send the disclosure to a place where I can
print it, for future reference and access; and
• Until or unless I notify City of Denton as described above, I consent to receive from
exclusively through electronic means all notices, disclosures, authorizations,
acknowledgements, and other documents that are required to be provided or made
available to me by City of Denton during the course of my relationship with you.