7483 - Informal Amendment 2 Executed Procurement & Compliance 901 B Texas St., Denton, TX 76209  (940) 349-7100 OUR CORE VALUES Integrity  Fiscal Responsibility  Inclusion Transparency  Outstanding Customer Service March 23, 2022 Maslonka Powerline Services, LLC Attn: Dustin Maslonka 10103 N. Division St., Suite 106 Spokane, WA 99218 dustym@maslonkapowerline.com Re: Letter Agreement to Amend (this “Amendment”) Contract 7483 – Transmission Line Construction between the City of Denton (“COD”) and Maslonka Powerline Services, LLC., dated February 23, 2021 (the “Contract”) – Amendment #2 Dear Mr. Maslonka, Thank you for being such a valued partner. By signing this Amendment below, COD and Maslonka Powerline Services, LLC. agree that the Contract is hereby deemed amended to the updated Schedule of Charges, as shown in Attachment A. Additionally, we agree to the request for Maslonka to review rates yearly. Except as amended by this Amendment, the Contract is not otherwise amended and all other terms and conditions of the Contract remain in full force and effect, as amended hereby. This Amendment may be executed in any number of counterparts, each of which shall be deemed an original and all of which together shall constitute one and the same instrument. Signatures transmitted electronically shall have the same effect as the delivery of original signatures. The City of Denton reserves the right to re-evaluate pricing as the market conditions change and can ask your firm to provide updated proposed pricing, including, but not limited to, a decrease in pricing, as a result of any such change. We look forward to future business with your firm. Regards, ____________________________ ___________________________ Christa Christian, CPPB Dustin Maslonka, VP Procurement and Compliance or Authorized Representative City of Denton Maslonka Powerline Services, LLC DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC Proposer's Name: NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB. Item # 4 Year Estimated Quantity UOM Construction Unit Original Unit Price March 2022 price revision Original Extended Price Notes Section A 1 EA TPS-138DC - DC TANGENT BR POST 0-2 DEG (1-POLE) (EMBEDDED) ( <= 100' ) ( < 40K LBS ) $ 4,089.32 $ 4,498.25 $ - 10% 2 EA TPS-138DC - DC TANGENT BR POST 0-2 DEG (1-POLE) (EMBEDDED) ( > 100' ) ( < 40K LBS ) $ 4,224.65 $ 4,647.12 $ - 10% 3 EA TPS-138DCX - DC TANGENT BR POST 0-2 DEG W/ 2ND SW DE (1-POLE) (ON PIER) ( <= 100' ) ( < 40K LBS ) $ 4,295.25 $ 4,724.78 $ - 10% 4 EA TPS-138DCX - DC TANGENT BR POST 0-2 DEG W/ 2ND SW DE (1-POLE) (ON PIER) ( > 100' ) ( < 40K LBS ) $ 4,648.29 $ 5,113.12 $ - 10% 5 EA TUS-2DC - DC SMALL ANGLE BR POST 2-10 DEG (1-POLE) (ON PIER) ( <= 100' ) ( < 40K LBS ) $ 4,471.77 $ 4,918.95 $ - 10% 6 EA TUS-2DC - DC SMALL ANGLE BR POST 2-10 DEG (1-POLE) (ON PIER) ( > 100' ) ( < 40K LBS ) $ 4,589.45 $ 5,048.40 $ - 10% 7 EA TUS-7GA - DC DEADEND 20-40 DEG (1-POLE) (ON PIER) ( <= 100' ) ( < 40K LBS ) $ 5,413.20 $ 5,954.52 $ - 10% 8 EA TUS-7GA - DC DEADEND 20-40 DEG (1-POLE) (ON PIER) ( > 100' ) ( < 40K LBS ) $ 5,766.23 $ 6,342.85 $ - 10% 9 EA TUS-7GAX - DC DEADEND 20-40 DEG (1-POLE) (ON PIER) ( <= 100' ) ( < 40K LBS ) $ 5,766.23 $ 6,342.85 $ - 10% 10 EA TUS-7GX - DC DEADEND TANGENT (1-POLE) (ON PIER) ( <= 100' ) ( < 40K LBS ) $ 4,824.81 $ 5,307.29 $ - 10% 11 EA TUS-7A - DC DEADEND 90-100 DEG (2-POLE) (ON PIERS) ( <= 100' ) ( < 40K LBS EA ) $ 10,120.33 $ 11,132.36 $ - 10% 12 EA TUS-7A - DC DEADEND 90-100 DEG (2-POLE) (ON PIERS) ( > 100' ) ( < 40K LBS EA ) $ 10,708.72 $ 11,779.59 $ - 10% 13 EA TUS-7A - DC DEADEND 90-100 DEG (1-POLE) (ON PIER) ( <= 100' ) ( < 40K LBS EA ) $ 4,824.81 $ 5,307.29 $ - 10% 14 EA TUS-7A - DC DEADEND 90-100 DEG (1-POLE) (ON PIER) ( > 100' ) ( < 40K LBS EA ) $ 5,707.39 $ 6,278.13 $ - 10% 15 EA TUS-2AU - SC SMALL ANGLE BR POST 2-10 DEG (1-POLE) (EMBEDDED) ( <= 100' ) ( < 40K LBS ) $ 4,236.42 $ 4,660.06 $ - 10% 16 EA TPS-138U - SC TANGENT BR POST 0-2 DEG (1-POLE) (EMBEDDED) (W/UNDERBUILD) $ 4,942.49 $ 5,436.74 $ - 10% 17 EA TPS-138U-XS - SC TANGENT BR POST 0-2 DEG (1-POLE) (EMBEDDED) (W/UNDERBUILD) $ 6,714.31 $ 7,385.74 $ - 10% 18 EA TPS-138U-XT - SC TANGENT BR POST 0-2 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 5,177.84 $ 5,695.62 $ - 10% 19 EA TUS-3AU - SC MED ANGLE 10-20 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 5,177.84 $ 5,695.62 $ - 10% 20 EA TUS-4AU - SC LARGE ANGLE 20-40 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 5,060.16 $ 5,566.18 $ - 10% 21 EA TUS-5AAU-2 - SC DEADEND 60-80 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 5,648.55 $ 6,213.41 $ - 10% 22 EA TUS-5AU - SC DEADEND 80-100 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 5,883.91 $ 6,472.30 $ - 10% 23 EA 1.5 TUS-5AU - SC DEADEND 90 DEG W/ TAP (1-POLE) (ON PIER) (W/UNDERBUILD) $ 6,001.59 $ 6,601.75 $ - 10% 24 EA TUS-SWT-1U - SC DEADEND INLINE 1-WAY SWITCH (1-POLE) (ON PIER) (W/UNDERBUILD) $ 6,825.34 $ 7,507.87 $ - 10% 25 EA TPS-138DCU - DC TANGENT BR POST 0-2 DEG (1-POLE) (EMBEDDED) (W/UNDERBUILD) $ 7,060.69 $ 7,766.76 $ - 10% 26 EA TUS-2DCU - DC SMALL ANGLE BR POST 2-10 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 5,295.52 $ 5,825.07 $ - 10% 27 EA TUS-7GAU - DC DEADEND 20-40 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 6,001.59 $ 6,601.75 $ - 10% 28 EA TUS-7GAU-2 - DC DEADEND 40-60 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 6,236.95 $ 6,860.65 $ - 10% RFP 7483 - Attachment A - Addendum #2 cost increase JRD, LLC dba Maslonka Powerline Services, LLC DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC Proposer's Name: NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB. Item # 4 Year Estimated Quantity UOM Construction Unit Original Unit Price March 2022 price revision Original Extended Price Notes JRD, LLC dba Maslonka Powerline Services, LLC 29 EA TUS-7GAU-3 - DC DEADEND 60-80 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 6,589.98 $ 7,248.98 $ - 10% 30 EA TUS-7GU - DC DEADEND 80-100 DEG (1-POLE) (ON PIER) (W/UNDERBUILD) $ 5,883.91 $ 6,472.30 $ - 10% 31 EA TUS-7GXU - DC DEADEND TANGENT (1-POLE) (ON PIER) (W/UNDERBUILD) $ 6,707.66 $ 7,378.43 $ - 10% 32 EA INSTALL WOOD POLE (EMBEDDED) (W/UNDERBUILD) $ 2,706.60 $ 2,977.26 $ - 10% 33 EA INSTALL WOOD POLE (EMBEDDED) (NO UNDERBUILD)) $ 1,867.52 $ 2,054.27 $ - 10% 34 EA INSTALL 138KV TRANSMISSION RISER STRUCTURE (OVERHEAD TO UNDERGROUND) (ON PIER) (HORIZONTAL TERMINATIONS) (<125') $ 9,213.11 $ 10,134.42 $ - 10% 35 EA INSTALL 138KV TRANSMISSION RISER STRUCTURE (OVERHEAD TO UNDERGROUND) (ON PIER) (VERTICAL TERMINATIONS) (< $ 10,707.13 $ 11,777.84 $ - 10% Section A - Subtotal $ - Section B - Foundation Construction Units 36 PER STR ASSEMBLING AND ERECTING STRUCTURE WEIGHING IN EXCESS OF 40,000 LBS (PER LB OVER 40,000 LBS) $ 10,651.32 $ 11,716.45 $ - 10% 37 LB ASSEMBLING AND ERECTING STRUCTURE WEIGHING IN EXCESS OF 40,000 LBS (PER LB OVER 40,000 LBS) $ 0.35 $ 0.39 $ - 10% 38 PER CY FOUNDATION - CONCRETE FOR ANCHOR BOLT CAGE $ 583.06 $ 641.37 $ - 10% 39 PER CY FOUNDATION - CONCRETE FOR DIRECT EMBEDDED POLE $ 449.92 $ 494.91 $ - 10% 40 PER 1K LBS FOUNDATION - REINFORCING STEEL PER 1,000 LBS $ 1,235.29 $ 1,358.82 $ - 10% 41 PER CY SLURRY PROCESSING OF FOUNDATION HOLES $ 462.08 $ 508.29 $ - 10% 42 LINEAR FOOT ROCK DRILLING, PER CUBIC YARD $ 945.30 $ 1,039.83 $ - 10% 43 PER FT CASING, 48" DIA, INSTALL AND REMOVE PER LINEAR FOOT $ 46.60 $ 51.26 $ - 10% 44 PER FT CASING, 60" DIA, INSTALL AND REMOVE PER LINEAR FOOT $ 113.17 $ 124.49 $ - 10% 45 PER FT CASING, 72" DIA, INSTALL AND REMOVE PER LINEAR FOOT $ 157.11 $ 172.82 $ - 10% 46 PER FT CASING, 84" DIA, INSTALL AND REMOVE PER LINEAR FOOT $ 213.03 $ 234.33 $ - 10% 47 PER FT CASING, 96" DIA, INSTALL AND REMOVE PER LINEAR FOOT $ 259.63 $ 285.59 $ - 10% 48 PER FT CASING, 108" DIA, INSTALL AND REMOVE PER LINEAR FOOT $ 292.91 $ 322.20 $ - 10% 49 PER FT CASING, 120" DIA, INSTALL AND REMOVE PER LINEAR FOOT $ 360.81 $ 396.89 $ - 10% 50 PER FT CASING, 48" DIA, INSTALL AND LEAVE IN PLACE PER LINEAR FOOT $ 146.46 $ 161.11 $ - 10% 51 PER FT CASING, 60" DIA, INSTALL AND LEAVE IN PLACE PER LINEAR FOOT $ 219.68 $ 241.65 $ - 10% 52 PER FT CASING, 72" DIA, INSTALL AND LEAVE IN PLACE PER LINEAR FOOT $ 312.88 $ 344.17 $ - 10% 53 PER FT CASING, 84" DIA, INSTALL AND LEAVE IN PLACE PER LINEAR FOOT $ 426.05 $ 468.66 $ - 10% 54 PER FT CASING, 96" DIA, INSTALL AND LEAVE IN PLACE PER LINEAR FOOT $ 512.59 $ 563.85 $ - 10% 55 PER FT CASING, 108" DIA, INSTALL AND LEAVE IN PLACE PER LINEAR FOOT $ 705.65 $ 776.22 $ - 10% 56 PER FT CASING, 120" DIA, INSTALL AND LEAVE IN PLACE PER LINEAR FOOT $ 865.42 $ 951.96 $ - 10% DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC Proposer's Name: NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB. Item # 4 Year Estimated Quantity UOM Construction Unit Original Unit Price March 2022 price revision Original Extended Price Notes JRD, LLC dba Maslonka Powerline Services, LLC Section B - Subtotal $ - Section C: Wire / Assembly Installation Units 57 PER 1K FT SHIELD WIRE - 3/8'' EHS STEEL, 7-STRAND ( < 0.5 MI ) $ 922.05 $ 1,014.26 $ - 10% 58 PER 1K FT SHIELD WIRE - 3/8'' EHS STEEL, 7-STRAND ( > 0.5 MI ) $ 1,044.99 $ 1,149.49 $ - 10% 59 PER 1K FT SHIELD WIRE - OPGW AFL DNO-8168 (0.691") ( < 0.5 MI ) $ 1,475.29 $ 1,622.82 $ - 10% 60 PER 1K FT SHIELD WIRE - OPGW AFL DNO-8168 (0.691") ( > 0.5 MI ) $ 1,598.23 $ 1,758.05 $ - 10% 61 PER 1K FT CONDUCTOR - (1) 795 ACSR "DRAKE" ( < 0.5 MI ) $ 4,179.98 $ 4,597.98 $ - 10% 62 PER 1K FT CONDUCTOR - (1) 795 ACSR "DRAKE" ( > 0.5 MI ) $ 4,487.33 $ 4,936.06 $ - 10% 63 PER 1K FT CONDUCTOR - (1) 959.6 ACSS/TW/HS "SUWANEE" ( < 0.5 MI ) $ 4,671.74 $ 5,138.91 $ - 10% 64 PER 1K FT CONDUCTOR - (1) 959.6 ACSS/TW/HS "SUWANEE" ( > 0.5 MI ) $ 4,794.68 $ 5,274.15 $ - 10% 65 PER 1K FT CONDUCTOR - (2) 959.6 ACSS/TW/HS "SUWANEE" ( < 0.5 MI ) $ 7,991.13 $ 8,790.24 $ - 10% 66 PER 1K FT CONDUCTOR - (2) 959.6 ACSS/TW/HS "SUWANEE" ( > 0.5 MI ) $ 8,114.07 $ 8,925.48 $ - 10% 66a PER 1K FT CONDUCTOR - (1) 795 AAC "ARBUTUS" $ 3,934.10 $ 4,327.51 $ - 10% 66b PER 1K FT CONDUCTOR - (1) 556 AAC "Mistletoe" $ 2,950.57 $ 3,245.63 $ - 10% 67 PER 1K FT CONDUCTOR - (1) 795 ACSR "DRAKE" ( < 0.5 MI ) (STRINGING NEXT TO ENERGIZED CIRCUIT) $ 4,794.68 $ 5,274.15 $ - 10% 68 PER 1K FT CONDUCTOR - (1) 795 ACSR "DRAKE" ( > 0.5 MI ) (STRINGING NEXT TO ENERGIZED CIRCUIT) $ 5,040.56 $ 5,544.62 $ - 10% 69 PER 1K FT CONDUCTOR - (1) 959.6 ACSS/TW/HS "SUWANEE" ( < 0.5 MI ) (STRINGING NEXT TO ENERGIZED CIRCUIT) $ 5,040.56 $ 5,544.62 $ - 10% 70 PER 1K FT CONDUCTOR - (1) 959.6 ACSS/TW/HS "SUWANEE" ( > 0.5 MI ) (STRINGING NEXT TO ENERGIZED CIRCUIT) $ 5,286.44 $ 5,815.08 $ - 10% 71 PER 1K FT CONDUCTOR - (2) 959.6 ACSS/TW/HS "SUWANEE" ( < 0.5 MI ) (STRINGING NEXT TO ENERGIZED CIRCUIT) $ 8,155.40 $ 8,970.94 $ - 10% 72 PER 1K FT CONDUCTOR - (2) 959.6 ACSS/TW/HS "SUWANEE" ( > 0.5 MI ) (STRINGING NEXT TO ENERGIZED CIRCUIT) $ 8,398.85 $ 9,238.74 $ - 10% 73 EA SHIELDWIRE SUSPENSION ASSEMBLY - 3/8'' EHS STEEL $ 60.86 $ 66.95 $ - 10% 74 EA SHIELDWIRE SINGLE COMPRESSION DEADEND ASSEMBLY - 3/8'' EHS STEEL $ 91.29 $ 100.42 $ - 10% 75 EA SHIELDWIRE DOUBLE COMPRESSION DEADENED ASSEMBLY - 3/8'' EHS STEEL $ 121.72 $ 133.89 $ - 10% 76 EA SHIELDWIRE SINGLE MECHANICAL DEADEND ASSEMBLY - 3/8'' EHS STEEL $ 91.29 $ 100.42 $ - 10% 77 EA SHIELDWIRE DOUBLE MECHANICAL DEADENED ASSEMBLY - 3/8'' EHS STEEL $ 152.15 $ 167.37 $ - 10% 78 EA CONDUCTOR BRACED POST ASSEMBLY - (2) 959.6 ACSS\TW\HS "SUWANEE" $ 237.36 $ 261.10 $ - 10% 79 EA CONDUCTOR BRACED POST ASSEMBLY - (1) 795 ACSR "DRAKE" OR (1) 959.6 ACSS\TW\HS "SUWANEE" $ 186.81 $ 205.49 $ - 10% 80 EA CONDUCTOR HORIZONTAL POST INSULATOR JUMPER ASSEMBLY - (2) 959.6 ACSS\TW\HS "SUWANEE" $ 213.49 $ 234.84 $ - 10% 81 EA CONDUCTOR HORIZONTAL POST INSULATOR JUMPER ASSEMBLY - (1) 795 ACSR "DRAKE" OR (1) 959.6 ACSS\TW\HS "SUWANEE" $ 208.16 $ 228.98 $ - 10% 82 EA CONDUCTOR VERTICAL POST INSULATOR JUMPER ASSEMBLY - (2) 959.6 ACSS\TW\HS "SUWANEE" $ 234.84 $ 258.32 $ - 10% DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC Proposer's Name: NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB. Item # 4 Year Estimated Quantity UOM Construction Unit Original Unit Price March 2022 price revision Original Extended Price Notes JRD, LLC dba Maslonka Powerline Services, LLC 83 EA CONDUCTOR VERTICAL POST INSULATOR JUMPER ASSEMBLY - (1) 795 ACSR "DRAKE" OR (1) 959.6 ACSS\TW\HS "SUWANEE" $ 229.51 $ 252.46 $ - 10% 84 EA CONDUCTOR COMPRESSION DEADEND ASSEMBLY - (2) 959.6 ACSS\TW\HS "SUWANEE" $ 640.48 $ 704.53 $ - 10% 85 EA CONDUCTOR COMPRESSION DEADEND ASSEMBLY - (1) 795 ACSR "DRAKE" OR (1) 959.6 ACSS\TW\HS "SUWANEE" $ 320.24 $ 352.26 $ - 10% 86 EA CONDUCTOR COMPRESSION ANGLE ASSEMBLY - (2) 959.6 ACSS\TW\HS "SUWANEE" $ 640.48 $ 704.53 $ - 10% 87 EA CONDUCTOR SUBSTATION JUMPER WITH COMPRESSION TERMINAL FOR (2) 959.6 ACSS/TW/HS "SUWANEE" $ 651.16 $ 716.28 $ - 10% 88 EA CONDUCTOR SUBSTATION JUMPER COMPRESSION TEE TAP FOR (2) 959.6 ACSS/TW/HS "SUWANEE" $ 693.86 $ 763.25 $ - 10% 89 EA CONDUCTOR MECHANICAL DEADEND ASSEMBLY - (1) 795 ACSR "DRAKE" OR (1) 959.6 ACSS\TW\HS "SUWANEE" $ 266.87 $ 293.56 $ - 10% 89a EA CONDUCTOR MECHANICAL DEADEND ASSEMBLY - (1) 795 AAC "ARBUTUS" $ 266.87 $ 293.56 $ - 10% 89b EA CONDUCTOR MECHANICAL DEADEND ASSEMBLY - (1) 556 AAC "MISTLETOE" $ 245.52 $ 270.07 $ - 10% 90 EA OPGW SUSPENSION ASSEMBLY - AFL DNO-8186 (0.691") $ 160.12 $ 176.13 $ - 10% 91 EA OPGW DOUBLE SUSPENSION ASSEMBLY - AFL DNO-8168 (0.691") $ 208.16 $ 228.98 $ - 10% 92 EA OPGW SINGLE DEADEND ASSEMBLY - AFL DNO-8168 (0.691") $ 213.49 $ 234.84 $ - 10% 93 EA OPGW DOUBLE DEADEND ASSEMBLY ASSEMBLY - AFL DNO-8168 (0.691") $ 279.13 $ 307.04 $ - 10% 94 EA OPGW FLOATING DEADEND ASSEMBLY - AFL DNO-8168 (0.691") $ 257.66 $ 283.43 $ - 10% 95 EA OPGW DOWNLEADS AND COIL BRACKET - AFL DNO-8168 (0.691") $ 644.14 $ 708.55 $ - 10% 96 EA OPGW COIL WIRE AND INSTALL SPLICE ENCLOSURE $ 1,073.57 $ 1,180.93 $ - 10% 97 EA SPLICE FIBER OPTIC CABLE - 72 FIBER COUNT $ 4,470.59 $ 4,917.65 $ - 10% 98 EA GROUNDING - CONCRETE DRILLED PIER FOUNDATION $ 375.75 $ 413.33 $ - 10% 99 EA GROUNDING - DIRECT EMBED FOUNDATION $ 322.07 $ 354.28 $ - 10% 100 EA GROUNDING - ADDITIONAL GROUNDING ASSEMBLY ON NEW STRUCTURE $ 214.71 $ 236.18 $ - 10% 101 EA GROUNDING - FIELD REPLACEMENT ON EXISTING STRUCTURE $ 213.49 $ 234.84 $ - 10% 102 EA MEGGAR EXISTING GROUNDS PER STRUCTURE $ 106.75 $ 117.43 $ - 10% 103 EA GUY WIRE AND MULTI-HELIX SCREW ANCHOR ASSEMBLY $ 320.24 $ 352.26 $ - 10% 104 EA GUY WIRE AND CONCRETE ANCHOR ASSEMBLY $ 426.99 $ 469.69 $ - 10% 105 EA BIRD DETERRENT PER CIRCUIT (ON STRUCTURE) $ 186.81 $ 205.49 $ - 10% 106 EA MARKER BALLS ON SHIELDWIRE OR CONDUCTOR (IN SPAN, FROM GROUND) $ 266.87 $ 293.56 $ - 10% 107 EA CONDUCTOR STOCKBRIDGE VIBRATION DAMPERS - 795 ACSR "DRAKE" OR 959.6 ACSS/TW/HS "SUWANEE" $ 80.06 $ 88.07 $ - 10% 108 EA SHIELDWIRE SPIRAL VIBRATION DAMPERS - 3/8" EHS OR OPGW $ 53.37 $ 58.71 $ - 10% 109 EA SHIELDWIRE STOCKBRIDGE VIBRATION DAMPERS - 3/8" EHS OR OPGW $ 53.37 $ 58.71 $ - 10% Section C - Subtotal $ - DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC Proposer's Name: NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB. Item # 4 Year Estimated Quantity UOM Construction Unit Original Unit Price March 2022 price revision Original Extended Price Notes JRD, LLC dba Maslonka Powerline Services, LLC Section D: Removal / Repair Units 110 EA REMOVE AND REPLACE EXISTING INSULATOR ASSEMBLY $ 290.46 $ 319.51 $ - 10% 111 EA REMOVE AND REPLACE CONDUCTOR OR STATIC ARMS $ 474.23 $ 521.65 $ - 10% 112 PER STR REMOVE - SHIELDWIRE AND/OR CONDUCTOR HARDWARE ASSEMBLY $ 219.33 $ 241.26 $ - 10% 113 PER 1K FT REMOVE - SHIELDWIRE $ 592.78 $ 652.06 $ - 10% 114 PER 1K FT REMOVE -CONDUCTOR $ 948.45 $ 1,043.30 $ - 10% 115 EA REMOVE - DIRECT EMBEDDED WOOD POLE $ 474.23 $ 521.65 $ - 10% 116 EA REMOVE - DIRECT EMBEDDED STEEL POLE $ 1,778.34 $ 1,956.17 $ - 10% 117 EA REMOVE - POLE ON CONCRETE FOUNDATION $ 2,371.13 $ 2,608.24 $ - 10% 118 EA REMOVE - GUY MULTI-HELIX ANCHOR $ 108.78 $ 119.66 $ - 10% 119 EA REMOVE - GUY CONCRETE ANCHOR $ 326.33 $ 358.96 $ - 10% 120 EA REMOVE - CONCRETE PIER FOUNDATION $ 4,351.03 $ 4,786.13 $ - 10% Section D - Subtotal $ - DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC Proposer's Name: NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB. Item # 4 Year Estimated Quantity UOM Construction Unit Original Unit Price March 2022 price revision Original Extended Price Notes JRD, LLC dba Maslonka Powerline Services, LLC Section E - Mobiliation Units 121 1-LOT MOBILIZATION / DEMOBILIZATION - PROJECTS ( < $50,000 ) $ 5,000.00 $ 5,500.00 $ - 10% 122 1-LOT MOBILIZATION / DEMOBILIZATION - PROJECTS ( $50,000 < $250,000 ) $ 20,000.00 $ 22,000.00 $ - 10% 123 1-LOT MOBILIZATION / DEMOBILIZATION - PROJECTS ( $250,000 < $1,000,000 ) $ 35,000.00 $ 38,500.00 $ - 10% 124 1-LOT MOBILIZATION / DEMOBILIZATION - PROJECTS ( > $1,000,000 ) $ 50,000.00 $ 55,000.00 $ - 10% 125 1-LOT MOVE OFF PROJECT AND RETURN AT A LATER DATE FOR LABOR AND EQUIPMENT $ 25,000.00 $ 27,500.00 $ - 10% Section E - Subtotal $ - Section F - Miscellaneous Unit 126 PER DAY EQUIPMENT - CRANE, 50 TON, 110 FT BOOM $ 515.00 $ 618.00 $ - 20% 127 PER DAY EQUIPMENT - CRANE, 100 TON, 160 FT BOOM $ 697.00 $ 836.40 $ - 20% 128 PER DAY HEAVY CRANE WITH OPERATOR AND RIGGER - SUBCONTRACTED (10 HOUR DAY) $ 8,625.00 $ - New item we will need for I-35 crossing project 129 LS MOB IN/OUT FOR HEAVY CRANE ABOVE - SUBCONTRACTED $ 12,000.00 $ - New item we will need for I-35 crossing project 130 PER DAY CREW AND EQUIPMENT TIME AND EXPENSES - NORMAL WEEKDAY $ 4,120.00 $ 4,532.00 $ - 10% 131 PER DAY CREW AND EQUIPMENT TIME AND EXPENSES - NIGHT $ 6,176.00 $ 6,793.60 $ - 10% 132 PER DAY CREW AND EQUIPMENT TIME AND EXPENSES - HOLIDAY $ 8,240.00 $ 9,064.00 $ - 10% 133 PER DAY HYDROVAC CREW $ 2,720.00 $ 2,992.00 $ - 10% 134 PER DAY TRAFFIC CONTROL - with NO traffic plan required $ 4,500.00 $ - No Change 135 % Add TRAFFIC CONTROL - REQUIRES A TRAFFIC PLAN estimated $6,500/event. billed at Cost +10% $ 10,000.00 $ - No Change 136 PER ACRE ROW CLEARING - SCATTERED LIGHT CLEARING $ 1,600.00 $ 1,920.00 $ - 10% 137 PER ACRE ROW CLEARING - HEAVY CLEARING $ 9,800.00 $ 11,760.00 $ - 10% 138 TN INSTALL & REMOVE FLEX BASE MATERIAL FOR EQUIPMENT ACCESS (LABOR, MATERIAL, & EQUIPMENT) $ 35.00 $ 42.00 $ - 10% 139 PER FT TEMPORAY ACCESS ROAD (10’ wide access road using gravel; price should include removal of access road. ) $ 2,675.00 $ 3,210.00 $ - 10% 140 EA INSTALL AND REMOVE CULVERT 1'-2' DIA. BY 20' LENGTH $ 2,400.00 $ 2,880.00 $ - 10% 141 EA INSTALL AND REMOVE CULVERT 2'-4' DIA. BY 20' LENGTH $ 2,800.00 $ 3,360.00 $ - 10% 142 EA INSTALL AND REMOVE CULVERT 4'-6' DIA. BY 20' LENGTH $ 3,400.00 $ 4,080.00 $ - 10% 143 EA INSTALL AND REMOVE CULVERT >6' DIA. BY 20' LENGTH $ 3,800.00 $ 4,560.00 $ - 10% 144 MAT MAT RENTAL, PRICE PER MAT, PER DAY INCLUDING TRANSPORTATION, INSTALLATION AND REMOVAL $ 115.00 $ 80.50 $ - -30% 145 TN ROCK, COARSE AGGREGATE (3X5), DELIVERED, INSTALLED AND REMOVED $ 35.00 $ 42.00 $ - 10% 146 LF SILT FENCE, INSTALLED, MAINTAINED IN OPERABLE CONDITION, AND REMOVED AT CONCLUSION OF PROJECT $ 6.50 $ 7.80 $ - 10% 147 LF Chemical Spraying for ROW Clearing (75' ROW Width) $ 0.80 $ 0.96 $ - 10% Section F - Subtotal $0.00 DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC Proposer's Name: NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB. Item # 4 Year Estimated Quantity UOM Construction Unit Original Unit Price March 2022 price revision Original Extended Price Notes JRD, LLC dba Maslonka Powerline Services, LLC Section G - Hourly Rates For Additional Services - Equipment - ADDENDUM # 1 (Required section; IT will not contribute to pricing score) 150 HOUR 1 TON FLATBED $ 31.26 $ 37.51 $0.00 20% 151 HOUR 1100 DIGGER $ 54.51 $ 65.41 $0.00 20% 152 HOUR 115 TON CRANE $ 95.21 $ 114.25 $0.00 20% 153 HOUR 130 TON CRANE $ 106.84 $ 128.21 $0.00 20% 154 HOUR 135 TON CRANE $ 106.84 $ 128.21 $0.00 20% 155 HOUR 15 TON CRANE $ 51.02 $ 61.22 $0.00 20% 156 HOUR 165 TON CRANE $ 112.65 $ 135.18 $0.00 20% 157 HOUR 1-DRUM PULLER $ 39.98 $ 47.98 $0.00 20% 158 HOUR 2 TON A-FRAME $ 34.16 $ 40.99 $0.00 20% 159 HOUR 2 TON FLATBED $ 31.26 $ 37.51 $0.00 20% 160 HOUR 20' FLATBED TRAILER $ 10.91 $ 13.09 $0.00 20% 161 HOUR 25 TON CRANE $ 48.70 $ 58.44 $0.00 20% 162 HOUR 270 DIGGER $ 37.07 $ 44.48 $0.00 20% 163 HOUR 30' GOOSENECK TRAILER $ 15.27 $ 18.32 $0.00 20% 164 HOUR 30 TON CRANE W/BASKET $ 54.51 $ 65.41 $0.00 20% 165 HOUR 50 TON CRANE W/BASKET $ 80.86 $0.00 NEW ITEM 166 HOUR 3100 DIGGER $ 106.84 $ 128.21 $0.00 20% 167 HOUR 330 DIGGER $ 37.07 $ 44.48 $0.00 20% 168 HOUR 3-DRUM PULLER $ 98.12 $ 117.74 $0.00 20% 169 HOUR 4-DRUM PULLER $ 72.14 $0.00 NEW ITEM 170 HOUR 20K PULLER $ 104.12 $0.00 NEW ITEM 171 HOUR 30K PULLER $ 153.53 $0.00 NEW ITEM 172 HOUR 50K PULLER $ 159.35 $0.00 NEW ITEM 173 HOUR 4-6 WHEEL ATV $ 13.81 $ 16.57 $0.00 20% 174 HOUR 50 TON CRANE $ 71.95 $ 86.34 $0.00 20% 175 HOUR 54" SMOOTH DRUM ROLLER $ 29.80 $ 35.76 $0.00 20% 176 HOUR 55 TON CRANE $ 74.86 $ 89.83 $0.00 20% 177 HOUR 600 DIGGER $ 37.07 $ 44.48 $0.00 20% 178 HOUR 65' BUCKET $ 29.80 $ 35.76 $0.00 20% 179 HOUR 70 TON CRANE $ 77.77 $ 93.32 $0.00 20% DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC Proposer's Name: NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB. Item # 4 Year Estimated Quantity UOM Construction Unit Original Unit Price March 2022 price revision Original Extended Price Notes JRD, LLC dba Maslonka Powerline Services, LLC 180 HOUR 70 TON CRANE MANTIS $ 86.49 $ 103.79 $0.00 20% 181 HOUR 700 DIGGER $ 63.23 $ 75.88 $0.00 20% 182 HOUR 75’ BUCKET $ 28.35 $ 34.02 $0.00 20% 183 HOUR 800 DIGGER $ 63.23 $ 75.88 $0.00 20% 184 HOUR 85' BUCKET $ 28.35 $ 34.02 $0.00 20% 185 HOUR AIR COMPRESSOR $ 13.23 $ 15.88 $0.00 20% 186 HOUR ARCO CONC MIX 6 YD $ 16.72 $ 20.06 $0.00 20% 187 HOUR ARCO DOODLE BUG $ 14.98 $ 17.98 $0.00 20% 188 HOUR BACKHOE $ 22.53 $ 27.04 $0.00 20% 189 HOUR BUCKET TRUCK, 100' $ 57.42 $ 68.90 $0.00 20% 190 HOUR BUCKET TRUCK, 125' $ 69.05 $ 82.86 $0.00 20% 191 HOUR BUCKET TRUCK, 150' $ 74.86 $ 89.83 $0.00 20% 192 HOUR BUCKET TRUCK, 170' $ 80.67 $ 96.80 $0.00 20% 193 HOUR CAT CHALLENGER CRAWLER TRACTOR $ 63.42 $0.00 NEW ITEM 194 HOUR CHIPPER $ 14.98 $ 17.98 $0.00 20% 195 HOUR CONCRETE MIXER 10 YD $ 28.35 $ 34.02 $0.00 20% 196 HOUR CREW BOAT $ 16.72 $ 20.06 $0.00 20% 197 HOUR CREW CAB $ 31.26 $ 37.51 $0.00 20% 198 HOUR CREW TRUCK $ 32.42 $ 38.90 $0.00 20% 199 HOUR D-4 DOZER $ 34.16 $ 40.99 $0.00 20% 200 HOUR D-5 DOZER $ 37.07 $ 44.48 $0.00 20% 201 HOUR D-6 CAT OR EQUIV $ 45.79 $ 54.95 $0.00 20% 202 HOUR D-7 DOZER $ 48.70 $ 58.44 $0.00 20% 203 HOUR D-8 DOZER SAG CAT $ 80.86 $0.00 NEW ITEM 204 HOUR DUMP TRUCK 12 YD $ 31.26 $ 37.51 $0.00 20% 205 HOUR DUMP TRUCK 6 YD $ 19.63 $ 23.56 $0.00 20% 206 HOUR FIBER PULLER $ 29.80 $ 35.76 $0.00 20% 207 HOUR FIBER TENSIONER $ 29.80 $ 35.76 $0.00 20% 208 HOUR FIELD OFFICE $ 18.47 $ 22.16 $0.00 20% 209 HOUR FORKLIFT $ 25.44 $ 30.53 $0.00 20% 210 HOUR FOUNDATION DRILL EX130 $ 200.05 $0.00 NEW ITEM DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC Proposer's Name: NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB. Item # 4 Year Estimated Quantity UOM Construction Unit Original Unit Price March 2022 price revision Original Extended Price Notes JRD, LLC dba Maslonka Powerline Services, LLC 211 HOUR FOUNDATION DRILL 3110 $ 153.53 $0.00 NEW ITEM 212 HOUR GREASE TRUCK $ 22.53 $ 27.04 $0.00 20% 213 HOUR HAUL TRUCK & TRAILER $ 35.62 $ 42.74 $0.00 20% 214 HOUR HEAVY HAUL TRUCK AND TRAILER $ 89.04 $0.00 215 HOUR HD-19 DOZER $ 66.14 $ 79.37 $0.00 20% 216 HOUR HOT SHOT TRUCK $ 31.26 $ 37.51 $0.00 20% 217 HOUR IT-28 $ 57.42 $ 68.90 $0.00 20% 218 HOUR LARGE TRACK HOE $ 34.16 $ 40.99 $0.00 20% 219 HOUR LIGHT PLANT $ 10.91 $ 13.09 $0.00 20% 220 HOUR LINE TRUCK / DIGGER $ 63.42 $0.00 NEW ITEM 221 HOUR LOADER 1 CY $ 39.98 $ 47.98 $0.00 20% 222 HOUR LOADER 4CY $ 45.79 $ 54.95 $0.00 20% 223 HOUR LOG SKIDDER $ 39.98 $ 47.98 $0.00 20% 224 HOUR MANLIFT 45' $ 19.63 $ 23.56 $0.00 20% 225 HOUR MANLIFT 65' $ 21.08 $ 25.30 $0.00 20% 226 HOUR MINI EXCAVATOR $ 22.53 $ 27.04 $0.00 20% 227 HOUR MOTOR GRADER 12' $ 66.14 $ 79.37 $0.00 20% 228 HOUR MUD SLED $ 14.98 $ 17.98 $0.00 20% 229 HOUR PICKUP $ 13.52 $ 16.22 $0.00 20% 230 HOUR PONTOON BOAT $ 25.44 $ 30.53 $0.00 20% 231 HOUR ROPE RIG $ 35.62 $ 42.74 $0.00 20% 232 HOUR STATIC TENSIONER $ 29.80 $ 35.76 $0.00 20% 233 HOUR TENSIONER $ 41.43 $ 49.72 $0.00 20% 234 HOUR TENSIONER/BUNDLED $ 121.56 NEW ITEM 235 HOUR TOOL VAN $ 57.42 $ 68.90 $0.00 20% 236 HOUR TRACK CRANE $ 112.84 $0.00 NEW ITEM 237 HOUR TRAILER-WIRE REEL STDS $ 28.35 $ 34.02 $0.00 20% 238 HOUR TRENCHER 3500 DW $ 22.53 $ 27.04 $0.00 20% 239 HOUR VAC-TRON $ 31.26 $ 37.51 $0.00 20% 240 HOUR VAN TRAILER $ 18.17 $ 21.80 $0.00 20% 241 HOUR V-GROVE $ 57.42 $ 68.90 $0.00 20% DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC Proposer's Name: NOTE: PRICING SHALL INCLUDE ALL COSTS AS OUTLINED IN THE SPECIFICATIONS. SUBTOTALS MUST BE ADDED TO IONWAVE PAGE/ATTRIBUTES TAB. Item # 4 Year Estimated Quantity UOM Construction Unit Original Unit Price March 2022 price revision Original Extended Price Notes JRD, LLC dba Maslonka Powerline Services, LLC 242 HOUR VIBER HAMMER $ 22.53 $ 27.04 $0.00 20% 243 HOUR WACKER PACKER $ 13.52 $ 16.22 $0.00 20% 244 HOUR WATER TRUCK 2000 GAL. $ 31.26 $ 37.51 $0.00 20% 245 HOUR WIRE BOAT $ 43.07 $0.00 NEW ITEM 246 HOUR WELDER $ 12.65 $ 15.18 $0.00 20% Section G - Subtotal $0.00 Section H - Hourly Rates For Additional Services - Labor - ADDENDUM # 1 (Required section; IT will not contribute to pricing score) 247 HOUR SUPERINTENDENT $ 59.29 $ 65.22 $0.00 10% 248 HOUR PROJECT MANAGER $ 95.00 $0.00 No Change 249 HOUR SAFETY MANAGER $ 50.00 $0.00 No Change 250 HOUR GENERAL FOREMAN $ 56.74 $ 62.42 $0.00 10% 251 HOUR FOREMAN $ 54.19 $ 59.61 $0.00 10% 252 HOUR LINEMAN $ 51.65 $ 56.81 $0.00 10% 253 HOUR SUBSTATION TECH $ 50.05 $ 55.05 $0.00 10% 254 HOUR OPERATOR $ 49.09 $ 54.00 $0.00 10% 255 HOUR TRUCK DRIVER $ 32.71 $ 35.98 $0.00 10% 256 HOUR IRONWORKER $ 32.71 $ 35.98 $0.00 10% 257 HOUR GROUNDMAN $ 32.52 $ 35.77 $0.00 10% 258 HOUR LABORER $ 27.42 $ 30.16 $0.00 10% 259 HOUR INSTRUMENT MAN $ 32.71 $ 35.98 $0.00 10% 260 HOUR MECHANIC $ 41.45 $ 45.59 $0.00 10% 261 HOUR FIELD CLERK $ 28.69 $ 31.56 $0.00 10% 262 HOUR WELDER $ 44.00 $ 48.40 $0.00 10% 263 HOUR CONCRETE FINISHER $ 27.42 $ 30.16 $0.00 10% 264 DAY PIER DIEM $ 100.00 $ 120.00 $0.00 20% 265 LS BOND COSTS $ - Section H - Subtotal $0.00 Total (Section A - F)$0.00 DocuSign Envelope ID: EEB8D90C-0E32-4224-B60D-8F64240DD8BC Certificate Of Completion Envelope Id: EEB8D90C0E324224B60D8F64240DD8BC Status: Completed Subject: Please DocuSign: 7483 - Amendment 2 Source Envelope: Document Pages: 11 Signatures: 2 Envelope Originator: Certificate Pages: 5 Initials: 0 Christa Christian AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-06:00) Central Time (US & Canada) 901B Texas Street Denton, TX 76209 Christa.Christian@cityofdenton.com IP Address: 198.49.140.10 Record Tracking Status: Original 3/23/2022 12:16:35 PM Holder: Christa Christian Christa.Christian@cityofdenton.com Location: DocuSign Signer Events Signature Timestamp Christa Christian christa.christian@cityofdenton.com Senior Buyer City of Denton Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Sent: 3/23/2022 12:18:38 PM Viewed: 3/23/2022 12:18:48 PM Signed: 3/23/2022 12:18:53 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Dustin Maslonka dustym@maslonkapowerline.com VP Security Level: Email, Account Authentication (None)Signature Adoption: Drawn on Device Using IP Address: 52.144.111.99 Signed using mobile Sent: 3/23/2022 12:18:55 PM Viewed: 3/23/2022 12:24:04 PM Signed: 3/23/2022 12:29:07 PM Electronic Record and Signature Disclosure: Accepted: 3/23/2022 12:24:04 PM ID: 5946d8ec-691b-4e22-a625-3dc6dbb80ba8 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Cheyenne Defee cheyenne.defee@cityofdenton.com Procurement Administration Supervisor City of Denton Security Level: Email, Account Authentication (None) Sent: 3/23/2022 12:29:08 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Carbon Copy Events Status Timestamp Donna K Anderson Donna.Anderson@cityofdenton.com Security Level: Email, Account Authentication (None) Sent: 3/23/2022 12:29:09 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 3/23/2022 12:18:38 PM Certified Delivered Security Checked 3/23/2022 12:24:04 PM Signing Complete Security Checked 3/23/2022 12:29:07 PM Completed Security Checked 3/23/2022 12:29:09 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Denton (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. Electronic Record and Signature Disclosure created on: 7/21/2017 3:59:03 PM Parties agreed to: Dustin Maslonka How to contact City of Denton: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: purchasing@cityofdenton.com To advise City of Denton of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at melissa.kraft@cityofdenton.com and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from City of Denton To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to purchasing@cityofdenton.com and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Denton To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to purchasing@cityofdenton.com and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows2000? or WindowsXP? Browsers (for SENDERS): Internet Explorer 6.0? or above Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0, NetScape 7.2 (or above) Email: Access to a valid email account Screen Resolution: 800 x 600 minimum Enabled Security Settings: •Allow per session cookies •Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings via proxy connection ** These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify City of Denton as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by City of Denton during the course of my relationship with you.