Loading...
Intent to AwardTotal Price $124,658.00 Line #Description QTY UOM Unit Extended 1 2 Mobilization/ Demobilization 1 EA $12,000.00 $12,000.00 3 Surety Bonds 1 EA $6,000.00 $6,000.00 4 General Site Preparation 1 EA $11,000.00 $11,000.00 5 Traffic Control, Barricades, Barriers, and Warning Signs 1 EA $5,000.00 $5,000.00 6 Tree Removal 7 EA $500.00 $3,500.00 7 Temporary Erosion Control 1 EA $3,800.00 $3,800.00 8 Gravity Block Modular Wall 1 EA 9 Earthwork 1 EA $2,300.00 $2,300.00 10 Segmented Block Gravity Retaining Wall 366 SF $125.00 $45,750.00 11 4" Topsoil 183 SY $15.00 $2,745.00 12 Common Bermuda Solid Sod 183 SY $14.00 $2,562.00 13 Steel Casing 10 LF $2,400.10 $24,001.00 14 Safety Rail Fence 60 LF $100.00 $6,000.00 Infra Construction, LLC SECTION I - Project: Furnish all supervision, labor, material, supplies, tools, equipment and transportation to complete: 7947 Addendum 1 - Page 1