Loading...
7967 - Amendment 1 Executed Docusign City Council Transmittal Coversheet File Name Purchasing Contact City Council Target Date Piggy Back Option Contract Expiration Ordinance DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F FS 9, GMP Amendment 1 Christa Christian RFP No 7967 NOVEMBER 15, 2022 N/A 22-2313 Document A133™ – 2019 Exhibit A.1 Guaranteed Maximum Price Amendment Init. / AIA Document A133™ – 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 12:56:08 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (879772203) 1 This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AIA Document A201™–2017, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. This Amendment dated the day of in the year Two Thousand Twenty-Two , is incorporated into the accompanying AIA Document A133™–2019, Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the Twenty-Eighth day of June in the year Two Thousand Twenty-Two (the "Agreement") (In words, indicate day, month, and year.) for the following Work, which is a portion of the PROJECT: (Name and address or location) City of Denton’s Fire Station No. 09 GMP Amendment #01 – Site and Long Lead Items 5000 Airport Rd Denton, Texas 76207 THE OWNER: (Name, legal status, and address) City of Denton 215 East McKinney Street Denton, Texas 76201 (940) 349-8307 THE CONSTRUCTION MANAGER: (Name, legal status, and address) CORE Construction Services of Texas, Inc 6320 Research Road Frisco, TX 75033 TABLE OF ARTICLES A.1 GUARANTEED MAXIMUM PRICE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION A.3 INFORMATION UPON WHICH AMENDMENT IS BASED A.4 CONSTRUCTION MANAGER’S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND SUPPLIERS ARTICLE A.1 GUARANTEED MAXIMUM PRICE § A.1.1 Guaranteed Maximum Price Pursuant to Section 3.2.6 2.2.6 of the Agreement, the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price. Guaranteed Maximum Price for the scope of Work set forth in Exhibit "A.1.C" – Scope of the Work – GMP Amendment #01. All references in this Exhibit "A" to the Guaranteed Maximum Price shall mean and refer to the Guaranteed Maximum Price for the entire scope of Work set forth in Exhibit "A.1.C" – Scope of the Work – GMP Amendment #01, unless the context DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Init. / AIA Document A133™ – 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 12:56:08 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (879772203) 2 clearly indicates otherwise. As agreed by the Owner and Construction Manager, the Guaranteed Maximum Price is an amount that the Contract Sum for the scope of Work set forth in Exhibit "A.1.C" – Scope of the Work – GMP Amendment #01 shall not exceed. The Contract Sum consists of the Construction Manager’s Fee plus the Cost of the Work, as that term is defined in Article 6 of the Agreement. § A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed four million five hundred fifty thousand seven hundred eighty-six dollars and zero cents ($ 4,550,786.00 ), subject to additions and deductions by Change Order as provided in the Contract Documents. § A.1.1.2 Itemized Statement of the Guaranteed Maximum Price. Provided below is an itemized statement of the Guaranteed Maximum Price organized by trade categories, including allowances; categories; the Construction Manager’s contingency; alternates; Contingency; the Owner’s Contingency; the Construction Manager’s Fee; and other items that comprise the Guaranteed Maximum Price as defined in Section 3.2.1 of the Agreement. (Provide itemized statement below or reference an attachment.) See Exhibit "A.1.N" – Itemized Statement of the GMP and Clarifications § A.1.1.3 The Construction Manager’s Fee is set forth in converted to and fixed as a lump sum in accordance with Section 6.1.2 of the Agreement. § A.1.1.4 The method of adjustment of the Construction Manager’s Fee for changes in the Work is set forth in Section 6.1.3 Sections 6.1.2.1 6.1.2.3 of the Agreement. § A.1.1.5 Alternates § A.1.1.5.1 Alternates, if any, included in the Guaranteed Maximum Price: Item Price See Exhibit "A.1.J" – Alternates with Costs and Expiration Dates § A.1.1.5.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Exhibit A. Upon acceptance, the Owner shall issue a Modification to the Agreement. (Insert below each alternate and the conditions that must be met for the Owner to accept the alternate.) Item Price Conditions for Acceptance See Exhibit "A.1.J" – Alternates with Costs and Expiration Dates § A.1.1.6 Unit prices, if any: (Identify the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable.) Item Units and Limitations Price per Unit ($0.00) See Exhibit "A.1.K" – Unit Costs ARTICLE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § A.2.1 The date of commencement of the Work shall be: (Check one of the following boxes.) [ X ]The date of execution of this Amendment. [ ]Established as follows: (Insert a date or a means to determine the date of commencement of the Work.) If a date of commencement of the Work is not selected, then the date of commencement shall be the date of execution of this Amendment. DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Init. / AIA Document A133™ – 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 12:56:08 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (879772203) 3 § A.2.2 Unless otherwise provided, the Contract Time is the period of time, including authorized adjustments, allotted in the Contract Documents for Substantial Completion of the Work. The Contract Time shall be measured from the date of commencement of the Work. § A.2.3 Substantial Completion § A.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Construction Manager shall achieve Substantial Completion of the entire Work:Work by the date set forth in: (Check one of the following boxes and complete the necessary information.) [ ]Not later than ( ) calendar days from the date of commencement of the Work. [ ]By the following date: Exhibit "A.1.D" – Construction Manager’s Project Schedule. § A.2.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are to be completed prior to Substantial Completion of the entire Work, the Construction Manager shall achieve Substantial Completion of such portions by the following dates: If the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated damages, if any, shall be assessed as set forth in Section 8.6 of the General Conditions of the Agreement. Portion of Work Substantial Completion Date § A.2.3.3 If the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated damages, if any, shall be assessed as set forth in Section 6.1.6 of the Agreement. ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED § A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract Documents and the following: § A.3.1.1 The following Supplementary and other Conditions of the Contract: AIA A201 – General Conditions (2017) as amended and included in the original AIA A133 – O-CMaR Agreement, which shall remain unchanged by this Amendment. Document Title Date Pages § A.3.1.2 The following Specifications: (Either list the Specifications here, or refer to an exhibit attached to this Amendment.) See Exhibit "A.1.C" – Scope of the Work – GMP Amendment #01 Section Title Date Pages § A.3.1.3 The following Drawings: (Either list the Drawings here, or refer to an exhibit attached to this Amendment.) See Exhibit "A.1.C" – Scope of the Work – GMP Amendment #01 Number Title Date § A.3.1.4 The Sustainability Plan, if any: (If the Owner identified a Sustainable Objective in the Owner’s Criteria, identify the document or documents that comprise the Sustainability Plan by title, date and number of pages, and include other identifying information. The Sustainability Plan identifies and describes the Sustainable Objective; the targeted Sustainable Measures; DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Init. / AIA Document A133™ – 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 12:56:08 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (879772203) 4 implementation strategies selected to achieve the Sustainable Measures; the Owner’s and Construction Manager’s roles and responsibilities associated with achieving the Sustainable Measures; the specific details about design reviews, testing or metrics to verify achievement of each Sustainable Measure; and the Sustainability Documentation required for the Project, as those terms are defined in Exhibit C to the Agreement.) Title Date Pages Not Applicable Other identifying information: § A.3.1.5 Allowances, if any, included in the Guaranteed Maximum Price: (Identify each allowance.) Item Price See Exhibit "A.1.L" – Allowances § A.3.1.6 Assumptions and clarifications, if any, upon which the Guaranteed Maximum Price is based: (Identify each assumption and clarification.) See Exhibit "A.1.N" – Itemized Statement of the GMP and Clarifications § A.3.1.7 The Guaranteed Maximum Price is based upon the following other documents and information: (List any other documents or information here, or refer to an exhibit attached to this Amendment.) Exhibit "A.1" – Guaranteed Maximum Price Amendment Exhibit "A.1.B" – Insurance and Bonds – GMP Amendment #01 Exhibit "A.1.C" – Scope of the Work – GMP Amendment #01 Exhibit "A.1.D" – Construction Manager’s Project Schedule Exhibit "A.1.E" – Construction Manager’s Soft Costs and Fee Exhibit "A.1.F" – Key Personnel Exhibit "A.1.G" – Confidentiality of the Project Exhibit "A.1.H" – Customary and Usual Labor Rates Exhibit "A.1.I" – Rental Rates Exhibit "A.1.J" – Alternates with Costs and Expiration Dates Exhibit "A.1.K" – Unit Costs Exhibit "A.1.L" – Allowances Exhibit "A.1.M" – Schedule of Values – GMP Amendment #01 Exhibit "A.1.N" – Itemized Statement of the GMP and Clarifications Exhibit "A.1.O" – Escrow and Financing Conditions Exhibit "A.1.P" – Disputed Work Schedule Exhibit "A.1.Z" – Schedule of Exhibits ARTICLE A.4 CONSTRUCTION MANAGER’S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND SUPPLIERS § A.4.1 The Construction Manager shall retain the consultants, contractors, design professionals, and suppliers, as may (or may not) be identified in the Exhibit referenced below: (List name, discipline, address, and other information.) See Exhibit "A.1.N" – Itemized Statement of the GMP and Clarifications This Amendment to the Agreement entered into IN WITNESS WHEREOF, intending to be bound, the Parties have entered into this Agreement as of the day and year first written above. OWNER (Signature)CONSTRUCTION MANAGER (Signature) DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Init. / AIA Document A133™ – 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 12:56:08 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (879772203) 5 (Printed name and title)(Printed name and title) DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Init. / AIA Document A133™ – 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 12:56:08 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (879772203) 6 THIS AGREEMENT HAS BEEN BOTH REVIEWED AND APPROVED as to financial and operational obligations and business terms. _______________ ________________ SIGNATURE PRINTED NAME __________________________________ TITLE __________________________________ DEPARTMENT ATTEST: ROSA RIOS, CITY SECRETARY By;_______________________________ APPROVED AS TO LEGAL FORM: MACK REINWAND, CITY ATTORNEY By;_______________________________ CONSTRUCTION MANAGER BY: _______________________________ AUTHORIZED SIGNATURE Date: _______________________________ Printed Name: ________________________ Title: _______________________________ _______________________________ PHONE NUMBER _______________________________ EMAIL ADDRESS _______________________________ TEXAS ETHICS COMMISSION CERTIFICATE NUMBER CITY OF DENTON, TEXAS A Texas Municipal Corporation By: _________________________ SARA HENSLEY CITY MANAGER DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F 2022 - Gary Aanenson 949777 214-885-1039 garyaanenson@coreconstruction.com Gary Aanenson Vice President Interim Director of Facilities Facilities Management Trevor Crain AIA Document D401™ – 2003. Copyright © 1992 and 2003 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 12:56:08 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (879772203) 1 Certification of Document’s Authenticity AIA® Document D401™ – 2003 I, Chris Squadra, hereby certify, to the best of my knowledge, information and belief, that I created the attached final document simultaneously with this certification at 12:56:08 ET on 10/21/2022 under Order No. 2114332942 from AIA Contract Documents software and that in preparing the attached final document I made no changes to the original text of AIA® Document A133™ – 2019 Exhibit A, Guaranteed Maximum Price Amendment, as published by the AIA in its software, other than changes shown in the attached final document by underscoring added text and striking over deleted text. _____________________________________________________________ (Signed) _____________________________________________________________ (Title) _____________________________________________________________ (Dated) DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Chris Squadra, Peak Program Value, LLC 10/31/2022 Exhibit A.1.B - Insurance and Bonds To be sent after GMP Amendment is signed. DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F ENUMERATION OF DOCUMENTS City of Denton Fire Station No.9 GMP 1 August 26, 2022 Specification/ Drawing Description Spec Date Stamp Date CORE Received Date Revision DIVISIONS 00 – 01 Not Used 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISION 02 EXISTING CONDITIONS 28-Jun-22 29-Jun-22 30-Jun-22 NONE 02 41 00 Demolition 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISION 03 CONCRETE 28-Jun-22 29-Jun-22 30-Jun-22 NONE 03 10 00 Concrete Forming and Accessories 28-Jun-22 29-Jun-22 30-Jun-22 NONE 03 11 00 Concrete Forming 28-Jun-22 29-Jun-22 30-Jun-22 NONE 03 20 00 Concrete Reinforcing 28-Jun-22 29-Jun-22 30-Jun-22 NONE 03 30 00 Cast-in-Place Concrete 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISION 04 MASONRY 28-Jun-22 29-Jun-22 30-Jun-22 NONE Not Used 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISION 05 METALS 28-Jun-22 29-Jun-22 30-Jun-22 NONE 05 12 00 Structural Steel Framing 28-Jun-22 29-Jun-22 30-Jun-22 NONE 05 21 00 Steel Joists 28-Jun-22 29-Jun-22 30-Jun-22 NONE 05 31 00 Metal Roof Deck 28-Jun-22 29-Jun-22 30-Jun-22 NONE 05 31 13 Composite Metal Floor Deck and Field Welded Shear Studs 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISION 06 WOOD, PLASTICS, AND COMPOSITES 28-Jun-22 29-Jun-22 30-Jun-22 NONE Not Used 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISION 07 THERMAL AND MOISTURE PROTECTION 28-Jun-22 29-Jun-22 30-Jun-22 NONE 07 21 00 Thermal Insulation 28-Jun-22 29-Jun-22 30-Jun-22 NONE 07 41 13 Metal Roof Panels 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISIONS 08 – 09 Not Used 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISION 10 SPECIALTIES 28-Jun-22 29-Jun-22 30-Jun-22 NONE 10 14 53 Traffic Signage 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISIONS 11 – 13 Not Used 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISION 14 CONVEYING EQUIPMENT 28-Jun-22 29-Jun-22 30-Jun-22 NONE 14 24 00 Machine Room-Less Hydraulic Passenger Elevators 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISION 21 FIRE SUPPRESSION 28-Jun-22 29-Jun-22 30-Jun-22 NONE Not Used 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISION 22 PLUMBING 28-Jun-22 29-Jun-22 30-Jun-22 NONE 22 14 24 Reinforced Concrete Storm Sewers 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISIONS 23 - 25 Not Used 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISION 26 ELECTRICAL 28-Jun-22 29-Jun-22 30-Jun-22 NONE 26 05 00 Basic Electrical Methods 28-Jun-22 29-Jun-22 30-Jun-22 NONE 26 05 26 Grounding and Bonding 28-Jun-22 29-Jun-22 30-Jun-22 NONE 26 05 33 Conduit 28-Jun-22 29-Jun-22 30-Jun-22 NONE 26 05 33.16 Boxes 28-Jun-22 29-Jun-22 30-Jun-22 NONE 26 05 53 Electrical Identification 28-Jun-22 29-Jun-22 30-Jun-22 NONE 26 05 73 Power System Studies 28-Jun-22 29-Jun-22 30-Jun-22 NONE 26 32 13 Engine Generator 28-Jun-22 29-Jun-22 30-Jun-22 NONE 26 36 13 Enclosed Transfer Switches 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISION 27 COMMUNICATIONS 28-Jun-22 29-Jun-22 30-Jun-22 NONE Not Used 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISION 31 EARTHWORK 28-Jun-22 29-Jun-22 30-Jun-22 NONE 31 00 00 Earthwork 28-Jun-22 29-Jun-22 30-Jun-22 NONE 31 05 13 Soils for Earthwork 28-Jun-22 29-Jun-22 30-Jun-22 NONE 31 05 16 Aggregates for Earthwork 28-Jun-22 29-Jun-22 30-Jun-22 NONE 31 11 00 Clearing and Grubbing 28-Jun-22 29-Jun-22 30-Jun-22 NONE 31 14 00 Site Preparation 28-Jun-22 29-Jun-22 30-Jun-22 NONE 31 23 33 Trenching and Backfilling 28-Jun-22 29-Jun-22 30-Jun-22 NONE 31 25 00 Erosion and Sedimentation Controls 28-Jun-22 29-Jun-22 30-Jun-22 NONE 31 32 00 Soil Stabilization 28-Jun-22 29-Jun-22 30-Jun-22 NONE 31 32 13 Lime-Stabilized Subgrade 28-Jun-22 29-Jun-22 30-Jun-22 NONE PROJECT MANUAL Page 1 of 3 Exhibit A.1.C - Scope of WorkDocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F ENUMERATION OF DOCUMENTS City of Denton Fire Station No.9 GMP 1 August 26, 2022 Specification/ Drawing Description Spec Date Stamp Date CORE Received Date Revision 31 41 33 Trench Shielding 28-Jun-22 29-Jun-22 30-Jun-22 NONE 31 63 29 Drilled Concrete Piers 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISION 32 EXTERIOR IMPROVEMENTS 28-Jun-22 29-Jun-22 30-Jun-22 NONE 32 13 13 Concrete Paving 28-Jun-22 29-Jun-22 30-Jun-22 NONE 32 13 73 Sealants and Caulkings 28-Jun-22 29-Jun-22 30-Jun-22 NONE 32 17 23 Pavement Markings 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISION 33 UTILITIES 28-Jun-22 29-Jun-22 30-Jun-22 NONE 33 41 00 Storm Utility Drainage Piping 28-Jun-22 29-Jun-22 30-Jun-22 NONE DIVISIONS 34 – 48 Not Used 28-Jun-22 29-Jun-22 30-Jun-22 NONE Specification/ Drawing Description Drawing Date Stamp Date CORE Received Date Revision G-001A Cover Sheet & Index Copy 1 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.01 General Notes 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.02 General Notes 2 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.03 Site Plan 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.04 Demolition Plan 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.05 Dimension Control Plan 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.06 Overall Grading Plan 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.07 Grading Plan 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.08 Grading Plan 2 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.09 Grading Plan 3 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.10 Grading Plan 4 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.11 Water Plan 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.12 Water Profile 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.13 Sanitary Sewer Plan 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.14 Sanitary Sewer Profile 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.15 Existing Drainage Area Map 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.16 Drainage Area Map 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.17 Storm Sewer Plan 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.18 Storm Sewer Profiles 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.19 Sediment Control Plan 28-Jun-22 28-Jun-22 28-Jun-22 NONE C1.20 Sediment Control Notes 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.01 Sidewalk Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.02 Paving Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.03 Signage & Striping Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.04 Embedment Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.05 Storm Sewer Detail 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.06 Sediment Control Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.07 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.08 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.09 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.10 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.11 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.12 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.13 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.14 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.15 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.16 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.17 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.18 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.19 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.20 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.21 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.22 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.23 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.24 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE DRAWINGS Page 2 of 3 Exhibit A.1.C - Scope of WorkDocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F ENUMERATION OF DOCUMENTS City of Denton Fire Station No.9 GMP 1 August 26, 2022 Specification/ Drawing Description Spec Date Stamp Date CORE Received Date Revision C2.25 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE C2.26 City Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-101A Structural Notes 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-101B Structural Notes 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-102 Special Inspections 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-103 Perspectives 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-104S Storm Shelter Structural Notes & Plans 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-105S Storm Shelter Typical Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-111 Foundation Plan 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-121 Second Floor Framing Plan 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-131 Low & High Roof Framing Plans 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-301 Typical Concrete Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-310 Foundation Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-401 Typical Masonry, Notes, Details & Key Plan 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-501 Typical Steel Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-502 Typical Steel Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-503 Typical Steel Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-511 Second Floor Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-512 Roof Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE S-520 Vertical Brace Elevations and Details 28-Jun-22 28-Jun-22 28-Jun-22 NONE A-141A Roof Plan 28-Jun-22 28-Jun-22 28-Jun-22 NONE A-410A Stairs and Elevator 28-Jun-22 28-Jun-22 28-Jun-22 NONE E-001A Electrical Abbreviations & Legend 28-Jun-22 28-Jun-22 28-Jun-22 NONE E-100A Electrical Site Plan 28-Jun-22 28-Jun-22 28-Jun-22 NONE E-501A Electrical Riser Diagram 28-Jun-22 28-Jun-22 28-Jun-22 NONE Addendums Description Drawing Date Stamp Date CORE Received Date Revision ADDENDUMS Page 3 of 3 Exhibit A.1.C - Scope of WorkDocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F ID Task Name Actual Duration Remaining Duration DO NOT EDIT Start DO NOT EDIT Finish Notes 1 Denton Fire Station No. 9 0 days 459 days?Wed 6/29/22 Tue 4/16/24 2 Key Milestones 0 days 459 days?Wed 6/29/22 Tue 4/16/24 3 GMP 1- Early Procurement 0 days 317 days Wed 6/29/22 Mon 9/25/23 4 Receive Bid Package 1- Early Procurement 0 days 0 days Wed 6/29/22 Wed 6/29/22 5 Receive Bids, Prepare GMP 1 0 days 30 days Wed 6/29/22 Wed 8/10/22 6 GMP 1 Review by City Staff 0 days 67 days Thu 8/11/22 Mon 11/14/22 7 City Council to Consider GMP 1 0 days 0 days Tue 11/15/22 Tue 11/15/22 8 Critical Material Deliverys 0 days 215 days Tue 11/22/22 Mon 9/25/23 9 Structural Steel 0 wks 24 wks Tue 11/22/22 Wed 5/10/23 10 Elevator 0 wks 26 wks Tue 11/22/22 Wed 5/24/23 11 Roofing 0 wks 30 wks Tue 11/22/22 Thu 6/22/23 12 Generator(Allow 10 months allowance per Owner)0 wks 43 wks Tue 11/22/22 Mon 9/25/23 13 Switch gear 0 wks 40 wks Tue 11/22/22 Fri 9/1/23 14 GMP 2- Full Project Scope 0 days 56 days Mon 8/29/22 Tue 11/15/22 15 Receive Bid Package 2- Full Project Scope 0 days 0 days Mon 8/29/22 Mon 8/29/22 16 Receive Bids, Prepare GMP 2 0 days 30 days Mon 8/29/22 Mon 10/10/22 17 GMP 2 Review by City Staff 0 days 26 days Tue 10/11/22 Tue 11/15/22 18 City Council to Consider GMP 2 0 days 0 days Tue 11/15/22 Tue 11/15/22 19 Construction 0 days 357 days?Tue 11/22/22 Tue 4/16/24 20 Building Permit Approval 0 days 1 day?Tue 11/22/22 Tue 11/22/22 6/29 11/15 8/29 11/15 J J A S O N D J F M A M J J A S O N D J F M Half 2, 2022 Half 1, 2023 Half 2, 2023 Half 1, 2024 Updated Schedule 10.20.22 UPDATE 01 - Superintendent Input Status Date: Fri 3/27/20 Printed on: Thu 10/20/22 Page 1 of 3 Exhibit A.1.D - Schedule DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F ID Task Name Actual Duration Remaining Duration DO NOT EDIT Start DO NOT EDIT Finish Notes 21 Notice To Proceed 0 days 0 days Tue 11/22/22 Tue 11/22/22 22 Project Substantial Completion 0 days 0 days Tue 3/5/24 Tue 3/5/24 23 CMAR Completion of Punch List 0 days 20 days Wed 3/6/24 Tue 4/2/24 24 Owner Float 0 days 10 days Wed 3/6/24 Tue 3/19/24 25 Systems Start up/Commissioning 0 days 10 days Wed 3/20/24 Tue 4/2/24 26 Owner Training 0 days 5 days Wed 4/3/24 Tue 4/9/24 27 Owner Move In 0 days 5 days Wed 4/10/24 Tue 4/16/24 28 Fire Station Fully Operational 0 days 0 days Tue 4/16/24 Tue 4/16/24 29 Construction 0 days 327 days?Tue 11/22/22 Tue 3/5/24 30 Rough Site 0 days 74 days?Tue 11/22/22 Tue 3/7/23 37 Foundations 0 days 42 days Wed 1/11/23 Thu 3/9/23 44 Structure / Shell 0 days 70 days Thu 5/11/23 Fri 8/18/23 51 Finishes 0 days 164 days Wed 6/14/23 Tue 2/6/24 64 Schedule Allowances 0 days 325 days Mon 11/28/22 Tue 3/5/24 65 Receive/Install Generator(Per Owner Allowance)0 days 10 days Tue 9/26/23 Mon 10/9/23 66 Weather Days included in this schedule(thru Building Dry in)0 days 20 days Wed 2/7/24 Tue 3/5/24 67 Masonry 0 days 87 days Mon 11/28/22 Tue 3/28/23 68 Switchgear 0 days 110 days Mon 11/28/22 Fri 4/28/23 11/22 3/5 J J A S O N D J F M A M J J A S O N D J F M Half 2, 2022 Half 1, 2023 Half 2, 2023 Half 1, 2024 Updated Schedule 10.20.22 UPDATE 01 - Superintendent Input Status Date: Fri 3/27/20 Printed on: Thu 10/20/22 Page 2 of 3 Exhibit A.1.D - Schedule DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F City of Denton's Fire Station No. 9 Cost Proposal Detail Updated on August 30th, 2022 Exhibit C - Construction Manager's Soft Costs and Fee Item # Description Quantity Unit Unit Cost Total Cost 2.000 FS # 3 - CMAR's Proposal of Costs to Be Reimbursed (Not to Exceed Topset) 2.A Insurance 2.001 Performance & Payment Bonds 1 LS 29,983 31,937 2.002 Maintenance Bond 1 LS 3000 3,000 2.003 Builder's Risk Insurance 1 LS 4,195 4,195 2.004 General Liability Insurance 1 LS 44,751 44,751 2.005 Professional Liability Insurance LS INCLUDED 2.006 Pollution Liability Insurance LS INCLUDED 2.007 Excess\Umbrella Liability Insurance LS INCLUDED 2.008 Other Insurance Requirements LS NOT IN PROJECT 2.009 Subcontractor Default Insurance 1 LS 67,127 67,127 2.A 151,011 1.0% 2.B CMAR's Onsite Staff 2.009 Project Manager 3 MO 17,500 52,500 2.010 Project Superintendent 3 MO 18,229 54,688 2.011 Assistant Superintendent MO NOT IN PROJECT 2.012 Mechanical/Electrical Coordinator MO NOT IN PROJECT 2.013 Working Foreman MO NOT IN PROJECT 2.014 Project Engineer MO NOT IN PROJECT 2.015 Project Manager MO NOT IN PROJECT 2.016 Field Engineer MO NOT IN PROJECT 2.017 Field Estimator MO NOT IN PROJECT 2.018 General Laborer MO NOT IN PROJECT 2.019 Timekeeper MO NOT IN PROJECT 2.020 Field Office Manager MO NOT IN PROJECT 2.021 Warehouse Manager MO NOT IN PROJECT 2.022 Field Secretary MO NOT IN PROJECT 2.023 Other On-site Contractor Staff LS NOT IN PROJECT 2.024 Project Accountant MO NOT IN PROJECT Note: All bonds & insurance should assume a CMAR's total contract amount for FS # 3 of $ 7,051,326 w/o owner contingency CMAR's Estimated Cost of Insurance - Subtotal Percentage of Cost Proposed for CMAR's Insurance on Change Orders 1 Exhibit A.1.E - Construction Manager's Soft Costs and Fee DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F City of Denton's Fire Station No. 9 Cost Proposal Detail Updated on August 30th, 2022 Item # Description Quantity Unit Unit Cost Total Cost 2.025 Project Coordinator 3 MO 1,500 4,500 2.026 Safety Manager 3 MO 1,200 3,600 2.027 QA/QC Manager 3 MO 1,000 3,000 2.B 118,288 2.C CMAR's Onsite Reimbursable Expenses Mobilization 2.024 Field Engineering Equipment LS BY SUBCONTRACTOR(S) 2.025 Site Survey LS BY SUBCONTRACTOR(S) 2.026 Layout Within Site LS BY SUBCONTRACTOR(S) 2.027 Office Trailer 3 MO 1,500.00 4,500 2.028 Office Supplies & Equipment 3 MO 500.00 1,500 2.029 Storage Trailer 3 MO 750.00 2,250 2.030 Warehouse MO NOT IN PROJECT 2.031 Set Up Onsite Office 1 LS 10,000.00 10,000 2.032 Set Up Onsite Storage\Laydown Areas 1 LS 5,000.00 5,000 2.033 Set Up Onsite Parking Area(s)LS BY SUBCONTRACTOR(S) 2.034 Temporary Roadways LS BY SUBCONTRACTOR(S) 2.035 Temporary Fencing LF BY SUBCONTRACTOR(S) 2.036 Temporary Toilets 3 MO 750.00 2,250 2.037 Project Sign 1 EA 1,250.00 1,250 2.038 All Other Temporary Project Site Signage EA BY SUBCONTRACTOR(S) Safety 2.038 Safety Equipment 1 LS 3,500.00 3,500 2.039 First Aid Supplies 3 MO 150.00 450 2.040 Fire Protection LS BY SUBCONTRACTOR(S) 2.041 Fire Extinguishers 3 EA 75.00 225 2.042 Fall Protection 0 LS 13,650.00 To be included in GMP#2 2.043 Third Party Safety Inspections MO EXCLUDED 2.044 Temporary Walkways LS BY SUBCONTRACTOR(S) 2.045 Barricades LS BY SUBCONTRACTOR(S) 2.046 Traffic Control LS BY SUBCONTRACTOR(S) 2.047 Security\Watchman Services MO EXCLUDED CMAR's Estimated Cost of Onsite Staff - Subtotal 1 Exhibit A.1.E - Construction Manager's Soft Costs and Fee DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F City of Denton's Fire Station No. 9 Cost Proposal Detail Updated on August 30th, 2022 Item # Description Quantity Unit Unit Cost Total Cost 2.048 Temp Walls and Enclosures MO BY SUBCONTRACTOR(S) Utilities 2.048 Install Temporary Electric Service at Site Office LS BY SUBCONTRACTOR(S) 2.049 Install Temporary Teledata Service at Site Office LS NOT IN PROJECT 2.050 Install Temporary Water & Sewer Service at Site LS BY SUBCONTRACTOR(S) 2.051 Install Temporary Gas Service at Site LS BY SUBCONTRACTOR(S) 2.052 Ongoing Electric Charges for the Site Office 3 MO 500.00 1,500 2.053 Ongoing Teledata Charges for the Site Office MO NOT IN PROJECT 2.054 Ongoing Water & Sanitary District Charges 3 MO 250.00 750 2.055 Ongoing Gas Utility Charges (exluding Temp Heat) 3 MO 300.00 900 Ongoing Expenses 2.056 Jobsite Cell Phone(s) for Site Staff 3 MO 400.00 1,200 2.057 IT Expenses for Staff MO INCLUDED 2.058 Project Schedule Setup & Maintenance LS INCLUDED 2.059 BIM Model Setup & Maintenance 1 LS 3,130.00 3,130 2.060 Project Extranet Setup & Maintenance 1 LS 11,250.00 11,250 2.061 Project Photo Documentation 13 WK 25.00 325 2.062 Video\Webcam Documentation MO INCLUDED 2.063 Employee Parking MO BY SUBCONTRACTOR(S) 2.064 Home Office Travel Costs LS NOT IN PROJECT 2.065 Moving & Subsistence LS NOT IN PROJECT 2.066 Additional Plans & Specs during Construction 1 LS 2,500.00 2,500 2.067 Shipping, Couriers, & Postage 3 MO 50.00 150 2.068 Project-specific Delivery & Hauling to\from Site LS BY SUBCONTRACTOR(S) 2.069 Temporary Radios LS NOT IN PROJECT 2.070 Temporary Wiring & Lights MO BY SUBCONTRACTOR(S) 2.071 Water, Ice & Cups 3 MO 50.00 150 2.072 Ladders & Stairs LS BY SUBCONTRACTOR(S) 2.073 Erosion Control LS BY SUBCONTRACTOR(S) 2.074 Shoring LS BY SUBCONTRACTOR(S) 2.075 Weekly Clean-up 3 WK 400.00 1,200 1 Exhibit A.1.E - Construction Manager's Soft Costs and Fee DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F City of Denton's Fire Station No. 9 Cost Proposal Detail Updated on August 30th, 2022 Item # Description Quantity Unit Unit Cost Total Cost 2.076 Final Clean-up sf BY SUBCONTRACTOR(S) 2.077 Dumpster Rental 3 MO 100.00 300 2.078 Dumpster Pulls 5 EA 450.00 2,250 2.079 Temporary Generator MO BY SUBCONTRACTOR(S) 2.080 Misc. Power Equipment LS BY SUBCONTRACTOR(S) 2.081 Equipment Repairs & Maintenance LS BY SUBCONTRACTOR(S) 2.082 Temporary Partitions SF BY SUBCONTRACTOR(S) 2.083 Pick-Up Rental 3 MO 700.00 2,100 2.084 Automobile Rental MO NOT IN PROJECT 2.085 Pick-Up Fuel & Maintenance 3 MO 250.00 750 2.086 Automobile Fuel & Maintenance MO NOT IN PROJECT 2.087 Water Truck MO BY SUBCONTRACTOR(S) Hoisting & Material Management 2.088 Forklift Rental LS BY SUBCONTRACTOR(S) 2.089 Tower Crane Rental/Mobilization/Demobilization LS NOT IN PROJECT 2.090 Hydro-Crane Rental WK BY SUBCONTRACTOR(S) 2.091 Other Crane Costs LS BY SUBCONTRACTOR(S) 2.092 Material Hoist WK NOT IN PROJECT 2.093 Personnel Hoist LS NOT IN PROJECT 2.094 Erect Hoists LS NOT IN PROJECT 2.095 Hoist Landings LS NOT IN PROJECT 2.096 Temporary Hoist Operation MO NOT IN PROJECT 2.097 Hoisting for Subs LS BY SUBCONTRACTOR(S) 2.098 Scaffolding LS BY SUBCONTRACTOR(S) 2.099 Other Hoisting & Materials Management Costs LS BY SUBCONTRACTOR(S) Temporary Protection of the Work 2.100 Temporary Site Protection not w/Erosion Control LS BY SUBCONTRACTOR(S) 2.101 Temporary Building Protection WK BY SUBCONTRACTOR(S) 2.102 Temporary Building Heat not w/Gas Charges WK BY SUBCONTRACTOR(S) 2.103 Dewatering System & Other Water Removal LS BY SUBCONTRACTOR(S) 2.104 Snow Removal LS BY SUBCONTRACTOR(S) 1 Exhibit A.1.E - Construction Manager's Soft Costs and Fee DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F City of Denton's Fire Station No. 9 Cost Proposal Detail Updated on August 30th, 2022 Item # Description Quantity Unit Unit Cost Total Cost 2.105 Other Protection of Work Items WK BY SUBCONTRACTOR(S) Testing 2.106 Soil Testing LS BY OWNER 2.107 Concrete Testing LS BY OWNER 2.108 Masonry Testing LS BY OWNER 2.109 Weld Testing LS BY OWNER 2.110 Other Materials Testing LS BY OWNER Permits & Fees 2.111 Building Permit LS BY OWNER 2.112 Plan Check Fee LS BY OWNER 2.113 Water Tap Fees LS BY OWNER 2.114 Sanitary Sewer Tap Fees LS BY OWNER 2.115 Elevator Permit & Inspections LS BY SUBCONTRACTOR(S) 2.116 Mechanical & Electrical Permits & Inspections LS BY SUBCONTRACTOR(S) 2.117 Health Department Permits & Inspections LS BY SUBCONTRACTOR(S) 2.118 Other Government Fees\Permits Required for FCO LS BY SUBCONTRACTOR(S) Other CMAR Onsite Reimbursable Costs 2.119 Other CMAR's Onsite Costs Needed for the Work LS NOT IN PROJECT 2.C 59,380 2.000 328,678 CMAR's Estimated Onsite Reimbursable Expenses - Subtotal CMAR's Total Proposed Costs to Be Reimbursed 1 Exhibit A.1.E - Construction Manager's Soft Costs and Fee DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Exhibit A.1.F - Key Personnel Unchanged in this Amendment DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Exhibit “H” Denton Fire Station #9 Customary and Usual Labor Rates The following agreed to hourly rates will be used to determine and define “Actual Costs”. The Actual Costs for each of the agreed to rates includes all normal and customary payroll paid by the Contractor plus all fringe benefits, taxes, and insurances: Standard Rate Overtime Rate Project Management: Project Director 135 - Sr. Project Manager 125 - Project Manager 118 - Scheduler 105 Asst. Project Manager 90 - Construction Coordinator 85 - Project Accountant 80 - Contracts Administrator 75 - Information Systems Technician 70 - Intern 31 46.50 Field Operations: Director of Field Operations 145 - Sr. Superintendent 125 - Superintendent 105 - Safety Director 100 Asst. Superintendent 90 - Quality Control Manager 85 Carpenters 65 90 Water Truck Driver 65 90 Painters 65 90 Laborers 55 82 Construction Manager will provide Labor Rates for billing of the cost of the Construction Manager's staff" as mutually agreed with the Owner not later than ten (10) business days prior to Notice to Proceed with construction, or 22 NOV 2022 (whichever is earlier). Exhibit A.1.H - Labor Rates The Construction Manager acknowledges the Owner's requirement to confirm in writing with all subcontractors performing Work they will be paying their labor at or above the State of Texas Prevailing Wage Rates current as of the date of this Amendment. The Owner likewise confirms certified payrolls are not a requirement on this project. DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Exhibit A.1.H - Labor RatesDocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Exhibit “I” Denton Fire Station #9 Rental Rates See attached rental rate information approved and included as part of the GMP Amendment. Equipment will be billed at these rates when such equipment is available from the Construction Manager, and is demonstrably the most economical (or the most expedient) option for advancing the Work. Rental billing and payment terms and conditions will be per Section 7.5.2 of the A133 Agreement, and nothing in this Exhibit A.1.I is intended to supersede those terms, which shall govern. Exhibit A.1.I - Rental Rates DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Exhibit G Rental Rates for CORE owned Equipment Equipment Equipment Specs UR Rate/Daily UR Rate/Weekly UR Rate/Monthly Air Compressor Portable diesel air compressor $81 $195 $650 Air Compressor Sullair Compressor $81 $195 $650 Coring Machine Coring Machine and Accessories $50 $150 $450 Equipment Attachment Jack Hammer $50 $140 $390 Generator 3500W or 3,800W Honda Generator $50 $150 $380 Generator Honda Generator 5000 Watt $50 $180 $395 Skid Steer Multi Terrain Loader $250 $1,000 $4,200 Skid Steer Auger Attachment $30 $225 $675 Sweeper Ride on Broom 6' 3-wheel $250 $1,000 $4,200 Welder Miller Bobcat 225 Welder $50 $150 $450 Drop Deck Trailer 14 ft. - 16 ft., Tandem Axle $125 $339 $879 Drop Deck Trailer 16 ft. - 18 ft., Tandem Axle $61 $182 $559 Drop Deck Trailer 18 ft. - 20 ft., Tandem Axle $146 $394 $1,020 Dump Trailer 10 ft. x 12 ft., Tandem Axle $261 $749 $2,045 Equipment Trailer Double Axle $67 $135 $404 Hydraulic Ground Level Equip Trailer 6 ft. x 14 ft., Single Axle $47 $327 $572 Hydraulic Ground Level Equip Trailer 6 ft. x 14 ft., Tandem Axle $63 $258 $551 Mobile Restoration Trailer N/A N/A N/A Mobile Restoration Trailer 14 ft. N/A N/A N/A Permanent Fuel Tank for Trailer N/A N/A N/A Tilt Trailer 12 ft., Single Axle $55 $158 $402 Tilt Trailer 14 ft. - 16 ft., Tandem Axle $70 $303 $649 Tilt Trailer 14 ft. - 16 ft., Tandem Axle $58 $189 $515 Trailer Hitch Slide-in Pintle Ball Combination $11 $32 $86 Utility Trailer 10 ft. - 14 ft., Tandem Axle $75 $281 $571 Utility Trailer 8 ft. to 10 ft., Single Axle $66 $193 $424 Vacuum Trailer 512-575 CFM, Diesel Powered $431 $1,699 $3,736 Walk-behind Trencher Trailer $33 $66 $147 Water Trailer 500 Gallons $149 $492 $946 Track Loader Large, 2,800-4,107 lbs.$709 $1,683 $3,337 Track Loader Small, 1,300-1,699 lbs.$499 $1,319 $2,725 Track Loader Small, 1,700 lbs.$524 $1,385 $2,861 Track Loader Small, 2,000-2,399 lbs.$531 $1,489 $3,247 Track Loader Small, 2,400-2,999 lbs.$647 $1,674 $3,336 Walk-behind Track Loader $285 $757 $2,430 Skid Steer Loader 1,351-1,699 lbs.$413 $1,105 $2,900 Skid Steer Loader 1,700-1,899 lbs.$434 $1,160 $3,045 Skid Steer Loader 1,900-1,999 lbs.$435 $1,161 $3,309 Skid Steer Loader 2,001-2,799 lbs.$436 $1,233 $3,509 Skid Steer Loader 2,600-3,499 lbs.$416 $1,175 $3,969 2-seat UTV 2WD, Electric Powered $85 $267 $681 2-seat UTV 2WD, Gas Powered $164 $322 $718 2-seat UTV 4WD, Diesel Powered $169 $332 $746 2-seat UTV 4WD, Diesel Powered, Rollover Protection $163 $320 $716 2-seat UTV 4WD, Gas Powered $160 $314 $709 Pressure Washer Chemical Injector Attachment $12 $35 $69 Pressure Washer Hose $11 $35 $77 Pressure Washer Hose, 50 ft.$16 $35 $68 Pressuer Washer Spray Wand $12 $24 $69 Pressuer Washer Surface Cleaner, 4,000 PSI, Hydro Scrubber $41 $112 $231 Sandblast Pot XL350 $207 $628 $1,098 4-set UTV 2WD, Gas or Electric Powered $113 $285 $729 4-seat UTV 4WD, Diesel Powered, Rollover Protection $173 $342 $969 4-seat UTV 4WD, Gas Powered, Rollover Protection $170 $334 $751 Golf Cart Gas Powered $89 $281 $615 Industrial Electric Cart 2WD $90 $282 $728 UTV 4WD, Diesel $186 $436 $1,692 Pressure Washer 3,000 PSI, Gas Powered $98 $257 $690 Pressure Washer 3,000-3,500 PSI, Towable, Gas Powered $206 $904 $1,962 Pressure Washer 3,500 PSI, Gas Powered $95 $369 $751 Pressure Washer 3,500 PSI, Towable, Gas Powered $324 $1,155 $2,414 Pressure Washer 4,000 PSI, Gas Powered $112 $404 $789 Pressure Washer Hot Water, 3,500 PSI, Gas Powered $189 $520 $1,435 Exhibit A.1.I - Rental RatesDocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Exhibit A.1.J - Alternates with Costs and Expiration Dates No Alternates in this Amendment DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Exhibit “K” Denton Fire Station #9 Unit Costs a. Piers - Exhibit A.1.K - Unit Costs DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Exhibit “L” Denton Fire Station #9 Allowances · Escalation Allowance ($89,756 direct cost) – Escalation Allowance is included in this proposal a. This allowance shall account for an increase in price of materials equipment or products between the date of this proposal and the time when the job is ready for the installation of the affected material. The allowance shall be used to reflect the additional cost to obtain the materials, pending approval by the Owner and provided that the Contractor gives the Owner written notice and documentation of the increased costs. · Allowance #1 – Permit Review Comments - $50,000 · Allowance #2 – Fiber Line Conduit – $50,000 · Allowance #3 - Franchise Utilities – $50,000 · Allowance # 4 - Temporary Generator - $50,000 · Allowance #5 – Pier Casing - $75,000 • Allowance #6 – Texas Labor Rates - $100,000 Exhibit A.1.L - Allowances DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F 6320 Research Rd. Ste. 200 I Frisco, Tx 75033 I PH: 972.668.9340 I www.COREconstruction.com ARIZONA • FLORIDA • ILLINOIS • INDIANA • LOUISIANA • NEVADA • TEXAS September 8, 2022 VIA ELECTRONIC MAIL Sara Hensley City Manager City of Denton 215 East McKinney Street Denton, Texas, 76201 RE: GUARANTEED MAXIMUM PRICE PROPOSAL | Denton Fire Station #9 | GMP #1 of 2 Dear Sara, On behalf of CORE Construction, I am pleased to submit our Guaranteed Maximum Price (GMP #1) proposal for the Denton Fire Station #9. GMP #1 Summary: Total Guaranteed Maximum Price $ 4,550,786 Enclosed you will find the Basis of GMP Clarifications, GMP Cost Summary and Schedule of Values, an Enumeration of Documents, and a Construction Schedule. We look forward to a successful and enjoyable project together. Thank you for this opportunity, please do not hesitate to contact me directly with any questions or comments. Respectfully submitted, Steven Normand Steven Normand Director of Preconstruction CORE Construction October 20, 2022 Exhibit A.1.N - Itemized Statement of GMP and ClarificationsDocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Basis of Estimate- GMP Denton Fire Station #9 Page 2 of 4 The Basis of Estimate is a written explanation clarifying the scope, assumptions and exclusions used in establishing the GMP estimate dated 8/25/2022. All costs are based on CORE’s incorporation of the scope shown on the 6/28/2022 Package #1 Set of construction documents and the scope clarifications below. ASSUMPTIONS, CLARIFICATIONS, & EXCLUSIONS Schedule Project Construction Duration and Substantial Completion shall remain dependent upon the Building Permit Approval and the following criteria: · The following milestones are to be met. The dates listed below are the latest possible dates to meet these milestones and any delays will impact the Substantial Completion Date. o GMP approval to be received no later than 11/15/2022 o NTP received by 11/22/2022 o If NTP is received prior to the date listed above, the Substantial Completion date will not adjust to an earlier date, due to material lead times. o If the above criteria are unachievable Substantial Completion will need to be adjusted or acceleration costs further discussed. · Substantial Completion: March 5th, 2024 Owner Items · Material Testing, Assembly Testing, as well as and Special Inspections, are by Owner, and are not included. · Third-party Commissioning is by Owner and is not included. CORE will provide coordination as required. · Platting and/or re-platting, licensing agreements, land-use permitting, and site development permits as well as any cost related thereto, is not included. · General Condition expenses included through date of Final Completion. · Contractor Fee shall be considered a Lump Sum and subject to the terms of the Agreement. · Building permit costs, plan expediter fees, plan check fees, impact fees and their associated permits, site development permits/fees, gas and electrical service charges, utility recovery or tap fees, and/or water meter fees shall be paid for by Owner and are not included. Contingency and Allowances · Preconstruction Contingency ($102,393 direct cost) – Escalation Allowance is included in this proposal · Additional Marketplace Risk of 1% ($45,508 direct cost) – is included in this proposal · Construction Contingency of 1% ($45,508 direct cost) is included in this proposal · Owner Contingency of 2% ($91,016 direct cost) – is included in this proposal Exhibit A.1.N - Itemized Statement of GMP and ClarificationsDocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Basis of Estimate- GMP Denton Fire Station #9 Page 3 of 4 · Allowance #1 – Permit Review Comments - $50,000 · Allowance #2 – Fiber Line Conduit – $50,000 · Allowance #3 - Franchise Utilities – $50,000 · Allowance # 4 - Temporary Generator - $50,000 · Allowance #5 – Pier Casing - $75,000 · Allowance #6 – Texas Labor Rates - $100,000 General Assumptions 1. Price is based on documents issued by Parkhill as enumerated in the List of Documents. 2. We assume normal working hours. However, to maintain the schedule we may perform work outside of normal working hours. We will request permission from the City, as required by local ordinances, when we plan to work outside of normal work hours. Specific Exclusions to GMP a. Guaranteed Delivery Date of Generator - Due to the long lead time and volatility of this item, delays to the delivery and installation of the generator caused by circumstances not the responsibility of the Contractor under the agreement will not be subject to liquidated damages. It is assumed that we can achieve substantial completion and occupancy prior to the arrival of the generator. Other Scope Specific Assumptions and Clarifications: DIVISION 7 | Earthwork & Paving A. Included: a. Lime Stabilization DIVISION 8 | Site Utilities A. Included: a. CORE reserves the right to cap and abandon existing utilities in place. B. Excluded: a. Site electrical and technology conduit. This will be included as part of the electrical scope in GMP#2. b. Fiber Line Relocation & Coordination DIVISION 27 | Concrete A. Included: a. 5” Slab at apparatus bay per the current construction documents. Any changes will be covered in GMP #2. Exhibit A.1.N - Itemized Statement of GMP and ClarificationsDocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Basis of Estimate- GMP Denton Fire Station #9 Page 4 of 4 DIVISION 30 | Steel Package A. Included: a. Structural Steel as shown. B. Excluded: a. Any changes to structural design will be priced in GMP#2. DIVISION 49 | Roofing A. Included: a. Roofing price is subject to change at time of manufacturing. Any change in cost at the time of material production will be covered by the preconstruction contingency, if this contingency is exceeded, owner contingency will be used. DIVISION 104 | Generator A. Included: a. 400KW Kohler Generator B. Excluded: a. Generator Installation. This will be included in GMP #2. b. Specification modifications to generator. Any changes to the generator specifications will result in further delays to the procurement of the generator. Exhibit A.1.N - Itemized Statement of GMP and ClarificationsDocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F LOCATION:Denton, TX ARCHITECT:Martinez & Parkhill DURATION(mnths):15 WARRANTY(yrs):1 SITE ACREAGE:4.0 SQUARE FOOTAGE:14,421 DEMOLITION/ OFF-SITE INFRASTRUCTURE $138,688 $0.00 3.96% 5 General Requirements $138,688 $9.62 3.96% SITE WORK (ROUGH)$715,124 $49.59 20.43% 7 Earthwork RPMX $255,115 $17.69 7.29% 8 Site Utilities Trophy Construction $460,009 $31.90 13.14% SITE WORK (FINISH)$928,750 $64.40 26.54% 19 Concrete Redden $928,750 $64.40 26.54% STRUCTURE $1,024,750 $71.06 29.28% 30 Steel Package Patriot $1,024,750 $71.06 29.28% ENCLOSURE $374,270 $25.95 10.69% 49 Metal Roofing Castro $374,270 $25.95 10.69% EQUIPMENT $100,000 $6.93 2.86% 93 Elevators TK Elevator Corporation $100,000 $6.93 2.86% MEP SYSTEMS $172,871 $11.99 4.94% 104 Generator Loftin $172,871 $11.99 4.94% Contractor's Construction Contingency $45,508 $3.16 1.30% 1.0%Contractor's Construction Contingency $45,508 $3.16 1.30% GENERAL REQUIREMENTS BASED ON SUB TOTAL REQUIRED General Conditions $59,223 $177,668 INSURANCE, BONDS, AND BUILDERS RISK BASED ON SUB TOTAL REQUIRED General Liability 1%$39,369 REQUIRED Subcontractor Insurance 1.5%$59,053 REQUIRED Payment and Performance Bond $4,550,786 $28,411 REQUIRED Builders Risk Insurance $4,550,786 $3,691 RATE CONTRACTOR'S FEE BASED ON SUB TOTAL 3.50%Construction Manager At Risk Fee $3,677,628 $128,717 RATE Contingency and Allowances SUB TOTAL 2.25%Preconstruction Contingency $102,393 1.0%Additional Marketplace Risk $45,508 2.0%Owner Contingency $91,016 AL1 Allowance #1 - Permit Review Comments $50,000 AL2 Allowance #2 - Fiber Line Conduit $50,000 AL3 Allowance #3 - Franchise Utility $50,000 AL4 Allowance #4 - Temporary Generator $50,000 AL5 Allowance #5 - Pier Casing $75,000 AL6 Allowance #6 - Texas Labor Rates $100,000 $/SF $273.00 Subtotal (with Contingency and Allowances)$4,550,786 Description# Denton Fire Station #9 GMP #1 % (of direct cost total) $/SF (direct cost)Base PriceSUBCONTRACTOR Subtotal (GR's, Prof Services, Insurance, Tax, & Fee)$3,936,869 GMP#1 Total GMP Amount $4,550,786 Subtotal Subtotal (with GR's, Prof. Services, & Insurance) $3,499,961 Subtotal (with General Requirements)$3,677,628 $3,808,152 Exhibit A.1.N - Itemized Statement of GMP and Clarifications DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F City of Denton's Fire Station No. 9 GMP Amendment #01 - Site and Long Lead Items Exhibit "A.1.Z" - Schedule of Exhibits Updated 22 AUG 2022 Printed on 9/8/2022 at 1:18 PM Prepared By Status Exhibits to A133 Exhibit A.1 – Guaranteed Maximum Price Amendment #01 Exhibit "A.1" – Guaranteed Maximum Price Amendment Owner Attached Exhibit "A.1.B" – Insurance and Bonds - GMP Amendment #01 Construction Manager After GMP Amdmt #01 is Signed Exhibit "A.1.C" – Scope of Work - GMP Amendment #01 Construction Manager Attached Exhibit "A.1.D" – Construction Manager’s Project Schedule Construction Manager Unchanged in this Amendment Exhibit "A.1.E" – Construction Manager’s Soft Costs and Fee Construction Manager Attached Exhibit "A.1.F" – Key Personnel Construction Manager Unchanged in this Amendment Exhibit "A.1.G" – Confidentiality of the Project Owner TBD Exhibit "A.1.H" – Customary and Usual Labor Rates Construction Manager Attached Exhibit "A.1.I" – Rental Rates Construction Manager Attached Exhibit "A.1.J" – Alternates with Costs and Expiration Dates Construction Manager Not Applicable Exhibit "A.1.K" – Unit Costs Construction Manager Attached Exhibit "A.1.L" – Allowances Construction Manager Attached Exhibit "A.1.M" – Schedule of Values - GMP Amendment #01 Construction Manager After GMP Amdmt #01 is Signed Exhibit "A.1.N" – Itemized Statement of GMP and Clarifications Construction Manager Attached Exhibit "A.1.Z" – Schedule of Exhibits for Exhibit A.1 Construction Manager This Document Description Copy of 220822 DFS9 A133 Exhibit A.1.Z - Schedule of Exhibits (GMP) REV 01.00 to Team Page 1 of 1 © 2022 Peak Program Value, LLC All Rights Reserved DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F Certificate Of Completion Envelope Id: 2B77208AB5754C6D884D6CA7BC8DAC2F Status: Completed Subject: Please DocuSign: City Council Contract 7967 - FS 9, GMP Amendment 1 Source Envelope: Document Pages: 39 Signatures: 6 Envelope Originator: Certificate Pages: 6 Initials: 1 Christa Christian AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-06:00) Central Time (US & Canada) 901B Texas Street Denton, TX 76209 Christa.Christian@cityofdenton.com IP Address: 198.49.140.10 Record Tracking Status: Original 10/26/2022 9:43:17 AM Holder: Christa Christian Christa.Christian@cityofdenton.com Location: DocuSign Signer Events Signature Timestamp Christa Christian christa.christian@cityofdenton.com Senior Buyer City of Denton Security Level: Email, Account Authentication (None) Completed Using IP Address: 198.49.140.10 Sent: 10/26/2022 10:04:08 AM Viewed: 10/26/2022 10:04:19 AM Signed: 10/26/2022 10:05:26 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Lori Hewell lori.hewell@cityofdenton.com Purchasing Manager City of Denton Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Sent: 10/26/2022 10:05:30 AM Viewed: 10/26/2022 10:38:25 AM Signed: 10/26/2022 10:39:05 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Marcella Lunn marcella.lunn@cityofdenton.com Deputy City Attorney City of Denton Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Sent: 10/26/2022 10:39:09 AM Viewed: 10/26/2022 10:49:40 AM Signed: 10/26/2022 10:51:54 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Gary Aanenson garyaanenson@coreconstruction.com Vice President CORE Construction Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 162.247.135.154 Sent: 10/26/2022 10:51:57 AM Viewed: 10/28/2022 7:47:34 AM Signed: 10/31/2022 9:10:07 AM Electronic Record and Signature Disclosure: Accepted: 6/13/2022 4:01:32 PM ID: 96bdaf13-b4a5-49f0-ae76-ac48511280c5 Signer Events Signature Timestamp Chris Squadra csquadra@peakprogramvalue.com Chris Squadra, Peak Program Value, LLC Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 71.229.204.176 Sent: 10/31/2022 9:10:12 AM Viewed: 10/31/2022 10:51:20 AM Signed: 10/31/2022 10:51:47 AM Electronic Record and Signature Disclosure: Accepted: 10/31/2022 10:51:20 AM ID: 8aa00e62-27fc-4870-948b-6858bb54e06d Trevor Crain trevor.crain@cityofdenton.com Interim Director of Facilities Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Sent: 10/31/2022 10:51:52 AM Viewed: 10/31/2022 10:57:30 AM Signed: 10/31/2022 10:57:48 AM Electronic Record and Signature Disclosure: Accepted: 10/31/2022 10:57:30 AM ID: f68e3ef1-8c4e-49cd-b1f6-33b3c5202a92 Cheyenne Defee cheyenne.defee@cityofdenton.com Procurement Administration Supervisor City of Denton Security Level: Email, Account Authentication (None) Completed Using IP Address: 198.49.140.10 Sent: 10/31/2022 10:57:54 AM Viewed: 11/16/2022 9:36:55 AM Signed: 11/16/2022 9:37:00 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Sara Hensley sara.hensley@cityofdenton.com City Manager City of Denton Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 107.77.198.132 Signed using mobile Sent: 11/16/2022 9:37:04 AM Resent: 11/17/2022 10:27:10 AM Viewed: 11/17/2022 10:29:55 AM Signed: 11/17/2022 10:30:02 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Rosa Rios rosa.rios@cityofdenton.com City Secretary Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Sent: 11/17/2022 10:30:07 AM Viewed: 11/17/2022 11:12:15 AM Signed: 11/17/2022 11:12:53 AM Electronic Record and Signature Disclosure: Accepted: 11/17/2022 11:12:15 AM ID: a7e5e311-ed21-4989-9e7c-2ee60cb41070 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Cheyenne Defee cheyenne.defee@cityofdenton.com Procurement Administration Supervisor City of Denton Security Level: Email, Account Authentication (None) Sent: 10/26/2022 10:05:30 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Gretna Jones gretna.jones@cityofdenton.com Legal Secretary City of Denton Security Level: Email, Account Authentication (None) Sent: 10/31/2022 10:57:52 AM Viewed: 10/31/2022 11:15:53 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign City Secretary Office citysecretary@cityofdenton.com Security Level: Email, Account Authentication (None) Sent: 11/17/2022 11:12:57 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Hailey Payne hailey.payne@cityofdenton.com Administration Manager City of Denton Security Level: Email, Account Authentication (None) Sent: 11/17/2022 11:12:59 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 10/26/2022 10:04:08 AM Certified Delivered Security Checked 11/17/2022 11:12:15 AM Signing Complete Security Checked 11/17/2022 11:12:53 AM Completed Security Checked 11/17/2022 11:12:59 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Denton (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. Electronic Record and Signature Disclosure created on: 7/21/2017 3:59:03 PM Parties agreed to: Gary Aanenson, Chris Squadra, Trevor Crain, Rosa Rios How to contact City of Denton: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: purchasing@cityofdenton.com To advise City of Denton of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at melissa.kraft@cityofdenton.com and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from City of Denton To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to purchasing@cityofdenton.com and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Denton To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to purchasing@cityofdenton.com and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows2000? or WindowsXP? Browsers (for SENDERS): Internet Explorer 6.0? or above Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0, NetScape 7.2 (or above) Email: Access to a valid email account Screen Resolution: 800 x 600 minimum Enabled Security Settings: •Allow per session cookies •Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings via proxy connection ** These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify City of Denton as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by City of Denton during the course of my relationship with you.