DocuSign Envelope ID: 52B03E58-3B30-456A-9FAE-39B8FFD508B3
6861
N/A
Christa Christian
Procurement & Compliance
901 B Texas St., Denton, TX 76209 (940) 349-7100
OUR CORE VALUES
Integrity Fiscal Responsibility Inclusion Transparency Outstanding Customer Service
December 16, 2022
Mr. Hugo Bonjour
Power Engineers, Inc.
16825 Northchase Drive, Suite 1200
Houston, Texas 77060
Hugo.Bonjour@powereng.com
Re: Letter Agreement to Amend (this “Amendment”) File 6861 – Substation Transmission
Construction Engineering Services between the City of Denton (“COD”) and Power
Engineers, Inc., dated October 9, 2018 (the “Contract”) – Amendment #4
Dear Mr. Bonjour,
Thank you for being such a valued partner. By signing this Amendment below, COD and Power
Engineers, Inc agree that the Contract is hereby deemed amended to the updated Schedule of Charges,
as shown in Attachment A.
Except as amended by this Amendment, the Contract is not otherwise amended and all other terms
and conditions of the Contract remain in full force and effect, as amended hereby. This Amendment
may be executed in any number of counterparts, each of which shall be deemed an original and all of
which together shall constitute one and the same instrument. Signatures transmitted electronically
shall have the same effect as the delivery of original signatures.
The City of Denton reserves the right to re-evaluate pricing as the market conditions change and can
ask your firm to provide updated proposed pricing, including, but not limited to, a decrease in
pricing, as a result of any such change.
We look forward to future business with your firm.
Regards,
____________________________ ___________________________
Christa Christian, CPPB Hugo Bonjour, Senior Project
Procurement and Compliance Manager, P.E.
City of Denton Power Engineers, Inc
DocuSign Envelope ID: 52B03E58-3B30-456A-9FAE-39B8FFD508B3
Page 1
Denton Municipal Electric 2023 PTE Fees (12/14/2022) heb
POWER TESTING AND ENERGIZATION, INC. SCHEDULE OF CHARGES – 2023 DENTON MUNICIPAL ELECTRIC This standard Schedule of Charges is for professional field testing and energization services. Unless agreed otherwise, charges for work on continuing projects will be based on the then current Schedule of Charges. A new Schedule of Charges will be issued to be effective January 1 of each new year and as necessary on an intermediate basis to accommodate new items or revised charges. Invoices will be submitted monthly and/or upon completion of the work and will be due and payable when issued. All accounts not paid within thirty (30) days after Owner's receipt of the invoice will bear a SERVICE CHARGE OF 1.0% PER MONTH for each month the invoice is unpaid. GRADE PERSONNEL CLASSIFICATION 13, 14, 15 President .............................................................................................................................................................................................................. $242.00/hr. Executive Vice President PTE Senior Project Manager IV 12 PTE Senior Project Manager III........................................................................................................................................................................... $242.00/hr. 11 PTE Senior Project Manager II ............................................................................................................................................................................ $225.00/hr.
10 PTE Field Service Manager ................................................................................................................................................................................ $225.00/hr. PTE P&C Technician VI PTE Project Manager IV PTE Sales Manager V PTE Senior Project Manager I PTE Testing Supervisor V 9 PTE Engineer VI .................................................................................................................................................................................................. $217.00/hr. PTE P&C Technician V PTE Project Manager III PTE Sales Manage IV PTE Senior Project Engineer II PTE Testing Supervisor IV 8 PTE Engineer V ................................................................................................................................................................................................... $193.00/hr. PTE P&C Technician IV PTE Project Manager II PTE Sales Manager III PTE Test Technician VII PTE Testing Supervisor III PTE Training Manager 7 PTE Engineer IV .................................................................................................................................................................................................. $167.00/hr. PTE P&C Technician III PTE Project Manager I PTE Sales Manager II PTE Test Technician VI PTE Testing Supervisor II 6 PTE Engineer III .................................................................................................................................................................................................. $156.00/hr. PTE P&C Technician II PTE Sales Manager I PTE Test Technician V PTE Testing Supervisor I 5 Project Administrator I .......................................................................................................................................................................................... $143.00/hr. PTE Asset Administrator III PTE Engineer II PTE P&C Technician I PTE Test Technician IV 4 Project Manager Assistant III ................................................................................................................................................................................ $131.00/hr. PTE Asset Administrator II PTE Engineer I PTE Staff Assistant III PTE Test Technician III 3 Project Manager Assistant II ................................................................................................................................................................................. $113.00/hr. PTE Asset Administrator I PTE Staff Assistant II PTE Test Technician II
2 Project Manager Assistant I .................................................................................................................................................................................. $95.00/hr. PTE Staff Assistant I PTE Test Technician I 1 General Office Assistant I ....................................................................................................................................................................................... $76.00/hr. All rates shown are Straight time (S.T.) rates – S.T. for the first 40 hours per week. Overtime (O.T.) is for all time over 40 hours per week and will be invoiced at 1.50 times the S.T. rates. Premium time (P.T.) is for Sundays and Holidays and will be invoiced at 1.50 times the S.T. rates. All field service rates are based on portal-to-portal travel. Any forensic, legal, or other “expert witness” support shall be billed at the Project Manager, premium time rate. Personnel with specialized experience are employed by or on retainer to Contractor. Fees for these specialists are negotiated on an individual basis depending on the assignment. Personnel with specialized experience are employed by or on retainer to POWER. Charges for these specialists are negotiated on an individual basis depending on the assignment. Professional time for depositions and testimony is charged at 1.5 times the rate for services; full-day minimums apply.
DocuSign Envelope ID: 52B03E58-3B30-456A-9FAE-39B8FFD508B3ATTACHMENT A
Page 2
Denton Municipal Electric 2023 PTE Fees (12/14/2022) heb
POWER TESTING AND ENERGIZATION, INC. SCHEDULE OF CHARGES – 2023 DENTON MUNICIPAL ELECTRIC
This standard Schedule of Charges is for professional field testing and energization services. Unless agreed otherwise, charges for work on continuing projects will be based on the then current Schedule of Charges. A new Schedule of Charges will be issued to be effective January 1 of each new year and as necessary on an intermediate basis to accommodate new items or revised charges. Invoices will be submitted monthly and/or upon completion of the work and will be due and payable when issued. All accounts not paid within thirty (30) days after Owner's receipt of the invoice will bear a SERVICE CHARGE OF 1.0% PER MONTH for each month the invoice is unpaid. POWER OWNED TEST EQUIPMENT Test Equipment will be billed at 20% of the labor billing charges, or at the daily rates set forth below: Current Transformer Tester $116.00 /day $578.00 /week 1000 amp Current Source $116.00 /day $578.00 /week 20 kA Current Source $346.00 /day $1,733.00 /week 80 kA Current Source $578.00 /day $2,888.00 /week 10 Amp Ductor (DLRO) $64.00 /day $318.00 /week 100 Amp Ductor (DLRO) $98.00 /day $491.00 /week Ground Resistance Tester $127.00 /day $635.00 /week DC Hi-Pot $127.00 /day $635.00 /week 5kV Meggar $64.00 /day $318.00 /week Watt-hour Standard $127.00 /day $635.00 /week Field Oil Test Set $87.00 /day $433.00 /week Phase Angle Meter $64.00 /day $318.00 /week Power Factor Test Set $346.00 /day $1,733.00 /week 3 Phase Relay Test Set $462.00 /day $2,310.00 /week 1 Phase TTR Set $75.00 /day $375.00 /week 3 Phase TTR Set $202.00 /day $1,011.00 /week Power Monitor $87.00 /day $433.00 /week Recloser Test Set $87.00 /day $347.00 /week Infrared Camera $231.00 /day $1,155.00 /week Vehicle $87.00 /day+fuel $433.00 /week+fuel or Mileage $1.73 /Mile
Other expenses such as rental equipment, photography, transportation, rental vehicles, shipping, outside computer services, lodging, meals, other reproduction, express mail, courier/delivery service, special supplies, or other out of pocket expenses are charged at cost plus an administrative charge of 5%. Meals and lodging for test technicians and test supervisors will be invoiced at $180 per day or based on Federal rates published by the US General Services Administration current year rates for the continental US (GSA CONUS).
Lodging and meals will be reimbursed as per diem for field personnel and actual expenses occurred for Project Managers and other non-field personnel. Pass through expenses for subcontractors are at cost plus an administrative charge of 10%. Training classes are provided on a fixed price basis.
DocuSign Envelope ID: 52B03E58-3B30-456A-9FAE-39B8FFD508B3
POWER Engineers Inc.
Proposed Schedule of Charges ‐2023
Denton Municipal Electric
Grade Current DME
Rates (2018)
2023 DME
Rates
13,14,15 $214.00 $242.00
12 $214.00 $242.00
11 $199.00 $225.00
10 $199.00 $225.00
9 $192.00 $217.00
8 $171.00 $193.00
7 $148.00 $167.00
6 $138.00 $156.00
5 $127.00 $143.00
4 $116.00 $131.00
3 $100.00 $113.00
2 $84.00 $95.00
1 $67.00 $76.00
Total % Increase 13.0%
Per Year % Increase 3.1%
DocuSign Envelope ID: 52B03E58-3B30-456A-9FAE-39B8FFD508B3
Page 1
Denton Municipal Electric 2023 Fees (12/06/2022) kc
POWER ENGINEERS, INC. SCHEDULE OF CHARGES – 2023 DENTON MUNICIPAL ELECTRIC
This standard Schedule of Charges is for professional services. Unless agreed otherwise, charges for work on continuing projects will be based on the then current Schedule of Charges. A new Schedule of Charges will be issued to be effective January 1 of each new year and as necessary on an intermediate basis to accommodate new items or revised charges. Invoices will be submitted monthly and/or upon completion of the work and will be due and payable when issued. All accounts not paid within thirty (30) days after Owner's receipt of the invoice will bear a SERVICE CHARGE OF 1.0% PER MONTH for each month the invoice is unpaid. GRADE PERSONNEL CLASSIFICATION 13, 14, 15 President ............................................................................................................................................................................................................. $242.00/hr. Executive Vice President Senior Project Manager IV 12 Project Manager Director .................................................................................................................................................................................... $242.00/hr. Senior Project Manager III 11 Senior Project Manager II .................................................................................................................................................................................... $225.00/hr. Senior Program Manager II Principal Engineer II 10 Senior Project Manager I ..................................................................................................................................................................................... $225.00/hr. Senior Program Manager I Senior Project Engineer III Senior Project Lead III Strategic Consultant III Principal Engineer I 9 Project Manager III .............................................................................................................................................................................................. $217.00/hr. Senior Project Lead II Construction Manager III Senior Project Engineer II Strategic Consultant II Senior Consultant III Senior Engineer II 8 Project Manager II ............................................................................................................................................................................................... $193.00/hr. Senior Project Lead I Strategic Consultant I Senior Consultant II Senior Project Engineer I Construction Manager II Senior Engineer I 7 Project Manager I ................................................................................................................................................................................................ $167.00/hr. Project Lead II Construction Manager I Environmental Specialist IV Project Engineer II Engineer IV Designer V Project Administrator III Senior Consultant I 6 Project Lead I ...................................................................................................................................................................................................... $156.00/hr. Project Engineer I Engineer III Designer IV Environmental Specialist III Procurement Specialist III Scheduling Specialist III Project Administrator II Consultant III 5 Engineer II ........................................................................................................................................................................................................... $143.00/hr. Designer III Technician IV Environmental Specialist II Procurement Specialist II Scheduling Specialist II Project Administrator I Consultant II 4 Engineer I ............................................................................................................................................................................................................ $131.00/hr. Designer II Drafter IV Technician III Environmental Specialist I Procurement Specialist I Field Representative IV Scheduling Specialist I Project Managers Assistant III Consultant I 3 Designer I ............................................................................................................................................................................................................ $113.00/hr. Drafter III Technician II Field Representative III Staff Assistant II Project Managers Assistant II 2 Drafter II ................................................................................................................................................................................................................ $95.00/hr. Staff Assistant Field Representative II Project Managers Assistant I 1 Drafter I ................................................................................................................................................................................................................. $76.00/hr. General Office Assistant Field Representative I Personnel with specialized experience are employed by or on retainer to POWER. Charges for these specialists are negotiated on an individual basis depending on the assignment. Professional time for depositions and testimony is charged at 1.5 times the rate for services; full-day minimums apply.
DocuSign Envelope ID: 52B03E58-3B30-456A-9FAE-39B8FFD508B3
Page 2
Denton Municipal Electric 2023 Fees (12/06/2022) kc
POWER ENGINEERS, INC. SCHEDULE OF CHARGES – 2023 DENTON MUNICIPAL ELECTRIC
This standard Schedule of Charges is for professional services. Unless agreed otherwise, charges for work on continuing projects will be based on the then current Schedule of Charges. A new Schedule of Charges will be issued to be effective January 1 of each new year and as necessary on an intermediate basis to accommodate new items or revised charges. Invoices will be submitted monthly and/or upon completion of the work and will be due and payable when issued. All accounts not paid within thirty (30) days after Owner's receipt of the invoice will bear a SERVICE CHARGE OF 1.0% PER MONTH for each month the invoice is unpaid. REPRODUCTION Drawings – Black & White Large Scale Drawings (C Size) $1.90/ea. Large Scale Drawings (D Size) $3.30/ea. Large Scale Drawings (E Size) $5.50/ea. Drawings – Color Large Scale Drawings (C Size) $6.00/ea. Large Scale Drawings (D Size) $10.90/ea. Large Scale Drawings (E Size) $17.50/ea. Documents – Black & White Single-sided Copies 8 x 11 $0.11/ea. 11 x 17 $0.17/ea. Double-sided Copies 8 x 11 $0.22/ea. 11 x 17 $0.34/ea. Documents – Color Single-sided Copies 8 x 11 $0.50/ea. 11 x 17 $1.00/ea. Double-sided Copies 8 x 11 $1.00/ea. Spiral Comb $2.65/ea. 3 Ring Binder Dependent on size Special Copy Center Projects (Labor) $45.00/hr.
SURVEY EQUIPMENT Survey Equip. to support field crew $70.00/day GPS Equipment 2 Units $60.00/hour $350.00/day GPS Equipment 3 Units $80.00/hour $450.00/day
Other expenses including but not limited to subcontractors, airfare, lodging, meals, postage and shipping, purchases, rentals, are charged at cost plus a carrying and handling charge of 10%. Communication Charge - including but not limited to VOIP charges, file sharing cloud services, and web collaboration sites, charged at 1% of labor billing charges. CAD and Software Usage Charge – charged at 3% of labor billing charges. This charge covers CAD application and design software including: AutoCAD, MicroStation, Autodesk Revit, PLS-Cad, Smart Plant P&ID, electrical studies software, and other design software as required.
DocuSign Envelope ID: 52B03E58-3B30-456A-9FAE-39B8FFD508B3
Certificate Of Completion
Envelope Id: 52B03E583B30456A9FAE39B8FFD508B3 Status: Completed
Subject: ***Purchasing Approval*** 6861 - Amendment 4, 2023 Schedule of Charges
Source Envelope:
Document Pages: 7 Signatures: 2 Envelope Originator:
Certificate Pages: 5 Initials: 0 Christa Christian
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-06:00) Central Time (US & Canada)
901B Texas Street
Denton, TX 76209
Christa.Christian@cityofdenton.com
IP Address: 198.49.140.104
Record Tracking
Status: Original
12/16/2022 11:12:23 AM
Holder: Christa Christian
Christa.Christian@cityofdenton.com
Location: DocuSign
Signer Events Signature Timestamp
Christa Christian
christa.christian@cityofdenton.com
Senior Buyer
City of Denton
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 198.49.140.104
Sent: 12/16/2022 11:16:33 AM
Viewed: 12/16/2022 11:16:44 AM
Signed: 12/16/2022 11:17:04 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Hugo Bonjour
hugo.bonjour@powereng.com
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 72.191.13.148
Sent: 12/16/2022 11:17:06 AM
Viewed: 12/16/2022 11:29:36 AM
Signed: 12/19/2022 9:41:28 AM
Electronic Record and Signature Disclosure:
Accepted: 12/19/2022 9:39:22 AM
ID: 6129108d-d796-481a-93c5-0fd478a90aff
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Cheyenne Defee
cheyenne.defee@cityofdenton.com
Procurement Administration Supervisor
City of Denton
Security Level: Email, Account Authentication
(None)
Sent: 12/19/2022 9:41:30 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Carbon Copy Events Status Timestamp
Mark Zimmerer
mark.zimmerer@cityofdenton.com
Electric Engineering Supervisor
Security Level: Email, Account Authentication
(None)
Sent: 12/19/2022 9:41:30 AM
Electronic Record and Signature Disclosure:
Accepted: 11/22/2022 6:25:38 PM
ID: 5080502d-7963-4595-b569-f8160389366d
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 12/16/2022 11:16:33 AM
Certified Delivered Security Checked 12/16/2022 11:29:36 AM
Envelope Updated Security Checked 12/16/2022 11:55:52 AM
Envelope Updated Security Checked 12/19/2022 8:34:07 AM
Signing Complete Security Checked 12/19/2022 9:41:28 AM
Completed Security Checked 12/19/2022 9:41:30 AM
Payment Events Status Timestamps
Electronic Record and Signature Disclosure
ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, City of Denton (we, us or Company) may be required by law to provide to
you certain written notices or disclosures. Described below are the terms and conditions for
providing to you such notices and disclosures electronically through your DocuSign, Inc.
(DocuSign) Express user account. Please read the information below carefully and thoroughly,
and if you can access this information electronically to your satisfaction and agree to these terms
and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of
this document.
Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available
electronically to you by us. For such copies, as long as you are an authorized user of the
DocuSign system you will have the ability to download and print any documents we send to you
through your DocuSign user account for a limited period of time (usually 30 days) after such
documents are first sent to you. After such time, if you wish for us to send you paper copies of
any such documents from our office to you, you will be charged a $0.00 per-page fee. You may
request delivery of such paper copies from us by following the procedure described below.
Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time
change your mind and tell us that thereafter you want to receive required notices and disclosures
only in paper format. How you must inform us of your decision to receive future notices and
disclosure in paper format and withdraw your consent to receive notices and disclosures
electronically is described below.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. To indicate to us that you are changing your mind, you must
withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your
DocuSign account. This will indicate to us that you have withdrawn your consent to receive
required notices and disclosures electronically from us and you will no longer be able to use your
DocuSign Express user account to receive required notices and consents electronically from us
or to sign electronically documents from us.
All notices and disclosures will be sent to you electronically
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through your DocuSign user account all required notices, disclosures,
authorizations, acknowledgements, and other documents that are required to be provided or
made available to you during the course of our relationship with you. To reduce the chance of
you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process, please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
electronically from us.
Electronic Record and Signature Disclosure created on: 7/21/2017 3:59:03 PM
Parties agreed to: Hugo Bonjour, Mark Zimmerer
How to contact City of Denton:
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to: purchasing@cityofdenton.com
To advise City of Denton of your new e-mail address
To let us know of a change in your e-mail address where we should send notices and disclosures
electronically to you, you must send an email message to us at melissa.kraft@cityofdenton.com
and in the body of such request you must state: your previous e-mail address, your new e-mail
address. We do not require any other information from you to change your email address..
In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected
in your DocuSign account by following the process for changing e-mail in DocuSign.
To request paper copies from City of Denton
To request delivery from us of paper copies of the notices and disclosures previously provided
by us to you electronically, you must send us an e-mail to purchasing@cityofdenton.com and in
the body of such request you must state your e-mail address, full name, US Postal address, and
telephone number. We will bill you for any fees at that time, if any.
To withdraw your consent with City of Denton
To inform us that you no longer want to receive future notices and disclosures in electronic
format you may:
i. decline to sign a document from within your DocuSign account, and on the subsequent
page, select the check-box indicating you wish to withdraw your consent, or you may;
ii. send us an e-mail to purchasing@cityofdenton.com and in the body of such request you
must state your e-mail, full name, IS Postal Address, telephone number, and account
number. We do not need any other information from you to withdraw consent.. The
consequences of your withdrawing consent for online documents will be that transactions
may take a longer time to process..
Required hardware and software
Operating Systems: Windows2000? or WindowsXP?
Browsers (for SENDERS): Internet Explorer 6.0? or above
Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0,
NetScape 7.2 (or above)
Email: Access to a valid email account
Screen Resolution: 800 x 600 minimum
Enabled Security Settings:
•Allow per session cookies
•Users accessing the internet behind a Proxy
Server must enable HTTP 1.1 settings via
proxy connection
** These minimum requirements are subject to change. If these requirements change, we will
provide you with an email message at the email address we have on file for you at that time
providing you with the revised hardware and software requirements, at which time you will
have the right to withdraw your consent.
Acknowledging your access and consent to receive materials electronically
To confirm to us that you can access this information electronically, which will be similar to
other electronic notices and disclosures that we will provide to you, please verify that you
were able to read this electronic disclosure and that you also were able to print on paper or
electronically save this page for your future reference and access or that you were able to
e-mail this disclosure and consent to an address where you will be able to print on paper or
save it for your future reference and access. Further, if you consent to receiving notices and
disclosures exclusively in electronic format on the terms and conditions described above,
please let us know by clicking the 'I agree' button below.
By checking the 'I Agree' box, I confirm that:
• I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF
ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and
• I can print on paper the disclosure or save or send the disclosure to a place where I can
print it, for future reference and access; and
• Until or unless I notify City of Denton as described above, I consent to receive from
exclusively through electronic means all notices, disclosures, authorizations,
acknowledgements, and other documents that are required to be provided or made
available to me by City of Denton during the course of my relationship with you.