Elec Substation Galvanized Tubular Steel Structure-5841-Amendment
MATERIALS MANAGEMENT DIVISION 901B TEXAS STREET DENTON, TEXAS 76201
940.349.7100 FAX 940.293.1837
“Dedicated to Quality and Service”
www.cityofdenton.com
May 16, 2016
Mr. Nathan Chan
Techline, Inc.
5401 Martin Street
Fort Worth, TX 76119
Ref: RFP 5841 – Supply of Substation Tubular Steel (1st Amendment)
Mr. James:
The City of Denton (COD) has reviewed and accepts the addition of the following new line items to contract
5841 with your firm:
Line Description Part # Unit Cost Delivery
23
H-frame take-off tubular steel structure 6.0 Kip,
55’ shaft w/20 connecting bolts TO2 $13,360.00 8 Weeks
24
40' H-frame take-off structure beam - 6.0 Kip,
37’-6” Beam w/10 connecting bolts 40TOB2 $2,945.00 8 Weeks
25
Anchor bolt assemblies for 6.0 Kip TO2,
Qty 8 each, 2-1/4” x 7’ w/template A615 gr 75 Anchor Cage $2,155/set 8 Weeks
All terms and conditions of the contract shall apply. We look forward to future business with Techline.
Regards,
Karen E. Smith, A.P.P
Assistant Purchasing Manager