7714 - Contingency Use Authorization 1 Executed Docusign Transmittal Coversheet File Name Purchasing Contact Contract Expiration DocuSign Envelope ID: 1B46B59E-343B-4EFE-B7BE-11EDEB710EE6 7714 - CMAR for SED-B - CUA#1 N/A Cori Power CUA No.: 1 #7714 CMAR for Southeast Denton Package B Effective Date: City of Denton 401 N Elm St 12851 Manchester Rd Denton, TX 76201 Saint Louis, MO 63131 Seth Garcia / Capital Projects Riley Seahorn Tuesday, January 17, 2023 Completion Date: Sunday, May 5, 2024 465 9 0 474 ITEM No. Change from Owner's Contingency to Construction Manager's Cost of Work 1 $33,714.00 $33,714.00 Original GMP Amount: $21,014,409.00 Owner's Contingency: $567,969.00 Prior Approved CUA's:$0.00 This CUA Request: $33,714.00 Owner's Contingency Remaining: $534,255.00 Revised GMP Amount:$21,048,123.00 City of Denton Construction Manager Owner Signature Signature Signature Name, Title Name, Title Name Purchasing Agent Name Authorizations: NOT VALID UNTIL SIGNED BY CONTRACTOR, AND OWNER. This CUA is specific and final as to price, with no reservations or other provisions allowing for future additional money for these particular reallocation(s), as identified and fully compensated above, and more fully described in the PCOs they reference. Signature of the Construction Manager indicates its agreement herewith, including adjustments to the Contract Time, if any. This CUA does not change the Contract Sum. CONTINGENCY USE AUTHORIZATION (CUA) McCarthy Building Companies Inc Notice to Proceed Date: THE SCHEDULE OF VALUES IS REALLOCATED AS FOLLOWS: McCarthy Building Companies Inc New Contract Days: This CO Days Request: Prior Approved CO Days: Original Contract Days: Subtotal: Scope Changes from 90% to 100% design DESCRIPTION OF REVISIONS DocuSign Envelope ID: 1B46B59E-343B-4EFE-B7BE-11EDEB710EE6 Seth Garcia Program ManagerRiley SeahornProject Manager Trevor CrainDirector of Capital Projects Cori Power Purchasing Supervisor 4/7/2023 McCarthy Building Companies Inc. 3400 North Central Expressway Suite 500 Richardson, Texas 75082 Phone:  (972) 991-5500  Project:  002223.000  -  Southeast Denton Neighborhood Area B 215 E McKinney St, Denton, Texas 76201 Prime Contract Change Order #001: Allowance/Contingency Request #001 TO:City of Denton 401 N Elm Street Denton, Texas 76201 FROM:McCarthy Building Companies Inc 12851 Manchester Rd Saint Louis, Missouri 63131-1802 DATE CREATED:1/30/2023 CREATED BY:Riley Seahorn (McCarthy Building Companies Inc) CONTRACT STATUS:Pending - In Review REVISION:0 SCHEDULE IMPACT:0 days CONTRACT FOR:1:Southeast Denton Neighborhood Area B TOTAL AMOUNT:  $33,714.00 DESCRIPTION: Please see attached change proposal and backup for review. ATTACHMENTS: PCCO 1 - SED-B Change Request Breakdown.pdf     POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO #Title Schedule Impact Amount 001 CE #001 - GMP vs 100% Cost Delta 0 days $33,714.00 002 CE #002 - Impact Schedule Days 9 days $0.00 Total: $33,714.00 CHANGE ORDER LINE ITEMS: PCO # 001 : CE #001 - GMP vs 100% Cost Delta #Cost Code Description Type Amount 1 33028-33028.0056.00.00 - WC 5 UND UTILITIES SOV 11-WC 5: Underground Utilities Subcontracts $30,110.00 2 01800-01800.0810.00.00 - COST OF RISK SOV 15-Owner's Protective/General Liability Insurance Material $280.00 3 01900-01900.0955.00.00 - CONSTR CONTINGENCY SOV 17-Construction Contingency Material $912.00 4 01900-01900.0910.00.00 - INITIAL MARKUP SOV 17-Fee Fee $2,175.00 5 01700-01700.0730.00.00 - PERF & PAYMENT BOND SCO 18-Performance & Payment Bond Material $237.00 Subtotal:$33,714.00   Grand Total:$33,714.00 PCO # 002 : CE #002 - Impact Schedule Days #Cost Code Description Type Amount 1 Impact Schedule Days $0.00 Subtotal:$0.00   Grand Total:$0.00 The original (Contract Sum)$21,014,409.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $21,014,409.00 The contract sum would be changed by this Change Order in the amount of $33,714.00 The new contract sum including this Change Order will be $21,048,123.00 The contract time will not be changed by this Change Order by 0 days. McCarthy Building Companies Inc.page 1 of 2 Printed On: 3/6/2023  11:35 AM PCCO #001 DocuSign Envelope ID: 1B46B59E-343B-4EFE-B7BE-11EDEB710EE6    City of Denton  McCarthy Building Companies Inc  401 N Elm Street  12851 Manchester Rd    Denton, Texas 76201  Saint Louis, Missouri 63131-1802             ProcoreArchitectSignHere ProcoreArchitectSignedDate  ProcoreOwnerSignHere ProcoreOwnerSignedDate  ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate SIGNATURE DATE  SIGNATURE DATE  SIGNATURE DATE McCarthy Building Companies Inc.page 2 of 2 Printed On: 3/6/2023  11:35 AM PCCO #001       SIGNATURE DATE   SIGNATURE DATE 3/6/23 DocuSign Envelope ID: 1B46B59E-343B-4EFE-B7BE-11EDEB710EE6 REVISED Unit Cost GMP GMP per Qty Cost Cost 01 CMAR & General Works -$ 02 General 1 LS 559,323$ 559,323$ $559,323 03 WC1: Asphalt Paving -$ 04 Jagoe Public 1 LS 4,313,789$ 4,313,789$ $4,313,789 05 WC2: Earthwork/Demo/Subgrade -$ 06 McCarthy Building Companies 1 LS 2,747,632$ 2,747,632$ $2,747,632 07 WC3: Concrete Flatwork -$ 08 McCarthy Building Companies 1 LS 1,259,490$ 1,259,490$ $1,259,490 09 WC4: Traffic Control -$ 10 McCarthy Building Companies 1 LS 184,086$ 184,086$ $184,086 12 WC5: Underground Utilities -$ 11 North Texas Contracting 1 LS 8,392,005$ 8,392,005$ $30,110 $8,422,115 13 -$ Cost of Work Subtotal 17,456,325$ $17,486,435 14 General Conditions 7.35%1,283,889$ $1,283,889 15 Owner's Protective/General Liability & Umbrella Insurance 0.93%174,284$ $280 $174,564 16 Builders Risk Insurance 17,815$ $17,815 Subtotal 18,932,313$ $18,962,703 17 Construction Contingency 3.00%567,969$ $912 $568,881 Subtotal 19,500,282$ $19,531,584 17 Fee 6.95%1,365,593$ $2,175 $1,367,768 Subtotal 20,865,875$ $20,899,352 18 McCarthy Performance & Payment Bond 0.71%148,535$ $237 $148,772 Grand Total 21,014,409$ $33,714 $0 $21,048,123 Schedule Impacts (Working Days)0 9 9 City of Denton Southeast Denton Neighborhood Area B Denton, TX Allowance/Contingency Request #01 SOV Item of Work Quantity Unit PCO - 1 90vs100% DWG Cost Delta PCO - 02 Impact Schedule Days DocuSign Envelope ID: 1B46B59E-343B-4EFE-B7BE-11EDEB710EE6 Prime Contract Potential Change Order #001:  CE #001 - GMP vs 100% Cost Delta TO:City of Denton 401 N Elm Street Denton Texas, 76201 FROM:McCarthy Building Companies Inc 20401 SW Birch St Ste 300 Newport Beach California, 92660-1798 PCO NUMBER/REVISION:001 / 0 CONTRACT:1 - Southeast Denton Neighborhood Area B   REQUEST RECEIVED FROM:Riley Seahorn  (McCarthy Building Companies Inc) CREATED BY:Riley Seahorn  (McCarthy Building Companies Inc) STATUS:Pending - In Review  CREATED DATE:1/30 /2023  REFERENCE: PRIME CONTRACT CHANGE ORDER: #001 - Allowance/Contingency Request #001   FIELD CHANGE:No    LOCATION:  SCHEDULE IMPACT:0 days     TOTAL AMOUNT:$33,714.00   POTENTIAL CHANGE ORDER TITLE: CE #001 - GMP vs 100% Cost Delta CHANGE REASON: Owner Contingency POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #001 - GMP vs 100% Cost Delta DESCRIPTION OF PROPOSED CHANGE:  CE-001-GMP vs 100% Cost Delta     SCOPE:  McCarthy submitted the GMP on the 90% Plan set dated September 2, 2022, post GMP the 100% plan set would be released with the agreement to review and submit increases or decrease in quantities. The only scope with major changes was Work Category 5: Underground Utilities. Cost delta's have been provided for the contract changes from the 90% drawings and the 100% Issued for Construction Plan set dated October 14, 2022.     REFERENCE:  CMAR Cover Letter, GMP Cost Allocation, and scope changes for WC 5: Underground Utilities - North Texas Contracting.  ATTACHMENTS: PCO 1 - SED-B Change Request Breakdown.pdf #Cost Code Description Type Amount 1 33028-33028.0056.00.00 - WC 5 UND UTILITIES SOV 11-WC 5: Underground Utilities Subcontracts $30,110.00 2 01800-01800.0810.00.00 - COST OF RISK SOV 15-Owner's Protective/General Liability Insurance Material $280.00 3 01900-01900.0955.00.00 - CONSTR CONTINGENCY SOV 17-Construction Contingency Material $912.00 4 01900-01900.0910.00.00 - INITIAL MARKUP SOV 17-Fee Fee $2,175.00 5 01700-01700.0730.00.00 - PERF & PAYMENT BOND SCO 18-Performance & Payment Bond Material $237.00 Grand Total:$33,714.00   McCarthy Building Companies Inc.page 1 of 2 Printed On: 1/30/ 2023  09 :15 AM PCO #001  Project: 002223.000 - Southeast Denton Neighborhood Area B 215 E McKinney St, Denton, Texas 76201 DocuSign Envelope ID: 1B46B59E-343B-4EFE-B7BE-11EDEB710EE6    City of Denton    401 N Elm Street      Denton Texas 76201                     SIGNATURE DATE  SIGNATURE DATE  SIGNATURE DATE McCarthy Building Companies Inc.page 2 of 2 Printed On: 1/30/ 2023  09 :04 AM PCO #001  Project: 002223.000 - Southeast Denton Neighborhood Area B 215 E McKinney St, Denton, Texas 76201 1/30/2023 McCarthy Building Companies Inc 12851 Manchester Rd Saint Louis, Missouri 63131-1802   DocuSign Envelope ID: 1B46B59E-343B-4EFE-B7BE-11EDEB710EE6 January 26, 2023 City of Denton 401 North Elm Denton, TX 76201 Southeast Denton Neighborhood Area B Re: GMP vs 100% Cost Delta Dear Mr. Garcia, McCarthy Building Companies, Inc. submit the Guaranteed Maximum Price (GMP) for the SED-B Project dated September 27, 2022. The Change Proposal Request 01 (CPR-01) is for the cost incurred between the GMP 90% drawing set and the 100% IFC drawings. Attached for your review is a quantity deltas for the Work Category 5: Underground Utilities from the 90% drawings dated September 2, 2022, and the 100% Issued for Construction Plan set dated October 14, 2022. The CPR-01 breakdown shows the cost allocation or the usage of Owner Contingency for the increased scope post GMP submission. Should you have any questions regarding this proposal, please do not hesitate to contact us. Sincerely, Riley Seahorn Project Manager McCarthy Building Companies, Inc. DocuSign Envelope ID: 1B46B59E-343B-4EFE-B7BE-11EDEB710EE6 FLEXIBLE PAVING REPAIR FOR UTILITY TRENCH 23 SY 250.00 5,750.00$ CONCRETE PAVING REPAIR FOR UTILITY TRENCH -9 SY 350.00 (3,150.00)$ CONCRETE PAVING (HES) REPAIR FOR UTILITY TRENCH -2 SY 330.00 (660.00)$ CONCRETE SIDEWALK REPAIR 54 SF 20.00 1,080.00$ 18" CASING BY OPEN CUT 10 LF 600.00 6,000.00$ 18" CASING BY OPEN CUT , CLSM BACKFILL 20 LF 775.00 15,500.00$ 18" CASING BY OTHER THAN OPEN CUT -70 LF 835.00 (58,450.00)$ 6" PVC WATER PRESSURE PIPE -12 LF 130.00 (1,560.00)$ 8" PVC WATER PRESSURE PIPE -31 LF 165.00 (5,115.00)$ 8" PVC WATER PRESSURE PIPE, CLSM BACKFILL 20 LF 200.00 4,000.00$ 12" PVC WATER PRESSURE PIPE -1 LF 295.00 (295.00)$ 6" GATE VALVE 1 EA 2,200.00 2,200.00$ 8" GATE VALVE 2 EA 3,300.00 6,600.00$ WATER MAIN CONNECTION W/SHUTDOWN 1 EA 3,500.00 3,500.00$ 1" WATER SERVICE -1 EA 2,000.00 (2,000.00)$ 1" WATER SERVICE LINE 17 LF 35.00 595.00$ EXISTING UTILITY CROSSINGS (POTHOLE, EXPOSE & CROSS)12 EA 975.00 11,700.00$ 4" PLUG WITH MEGALUGS 1 EA 675.00 675.00$ 6" PLUG WITH MEGALUGS 1 EA 765.00 765.00$ 8" X 6" TEE WITH MEGALUGS & BLOCKING -1 EA 1,465.00 (1,465.00)$ 8" X 8" TEE WITH MEGALUGS & BLOCKING 1 EA 1,585.00 1,585.00$ 12" X 6" TEE WITH MEGALUGS & BLOCKING 1 EA 1,835.00 1,835.00$ 6" 45 DEGREE BEND WITH MEGALUGS & BLOCKING 3 EA 855.00 2,565.00$ 8" 22.5 DEGREE BEND WITH MEGALUGS & BLOCKING 2 EA 975.00 1,950.00$ 8" 11.25 DEGREE BEND WITH MEGALUGS & BLOCKING -2 EA 975.00 (1,950.00)$ 6" SLEEVE WITH MEGALUGS -1 EA 935.00 (935.00)$ 8" SLEEVE WITH MEGALUGS 1 EA 1,125.00 1,125.00$ WATER TOTAL (8,155.00)$ 4' CONCRETE DROP MANHOLE -1 EA 9,500.00 (9,500.00)$ 5' CONCRETE DROP MANHOLE 1 EA 16,500.00 16,500.00$ 4' EXTRA DEPTH CONCRETE MANHOLE (> 8')-7 VF 450.00 (3,150.00)$ 5' EXTRA DEPTH CONCRETE MANHOLE (> 8')7 VF 640.00 4,480.00$ CONNECT SERVICE TO EXIST WW 1 EA 7,000.00 7,000.00$ CONNECT TO EXIST MANHOLE -1 EA 7,000.00 (7,000.00)$ CONSTRUCT EXTERNAL DROP ON EXISTING MANHOLE 1 EA 10,945.00 10,945.00$ CSS BACKFILL ON MANHOLES 29 CY 135.00 3,915.00$ 6" SEWER SERVICE 1 EA 2,700.00 2,700.00$ 6" SERVICE LINE 17 LF 65.00 1,105.00$ 8" X 6" WYE WITH BLOCKING 2 EA 485.00 970.00$ CSS ENCASEMENT 30 LF 75.00 2,250.00$ EXISTING UTILITY CROSSINGS (POTHOLE, EXPOSE & CROSS)7 EA 1,150.00 8,050.00$ SEWER TOTAL 38,265.00$ TOTAL 30,110.00$ WATER SEWER Work Category 5: Underground Utilities Scope Changes DocuSign Envelope ID: 1B46B59E-343B-4EFE-B7BE-11EDEB710EE6 Prime Contract Potential Change Order #002:  CE #002 - Impact Schedule Days TO:City of Denton 401 N Elm Street Denton Texas, 76201 FROM:McCarthy Building Companies Inc 12851 Manchester Rd Saint Louis Missouri, 63131-1802 PCO NUMBER/REVISION:002 / 0 CONTRACT:1 - Southeast Denton Neighborhood Area B   REQUEST RECEIVED FROM:  CREATED BY:Riley Seahorn  (McCarthy Building Companies Inc) STATUS:Pending - In Review  CREATED DATE:3/6 /2023  REFERENCE: PRIME CONTRACT CHANGE ORDER: #001 - Allowance/Contingency Request #001   FIELD CHANGE:No    LOCATION:  SCHEDULE IMPACT:9 days     TOTAL AMOUNT:$0.00   POTENTIAL CHANGE ORDER TITLE: CE #002 - Impact Schedule Days CHANGE REASON: Functionally Unavoidable POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) DESCRIPTION OF PROPOSED CHANGE:  CE-02-Impact Schedule Days    SCOPE:  Notice 001 - Abnormal Weather Conditions Project has been impacted by abnormal weather conditions occurring the week of January 30, 2023, through February 3, 2023. Per Section 6.0.4 of the Agreement, McCarthy is hereby providing notice of an abnormal weather event causing adverse effect on the project’s critical path. Time extension of five (5) days to be added to the contract duration.   Notice 002 - ATMOS Energy - Smith Phase 1 The Southeast Denton Neighborhood Area B (SED-B) Project has been impacted by the actions of a third party contractor, ATMOS Energy, causing a delay to the critical path activates along Smith Phase 1.  Per Section 6.0.2 of the Agreement, McCarthy is hereby providing notice of impact to the critical path operations along Smith Phase 1 in Group 1 of the SED-B Project Schedule.      REFERENCE:  Please reference attached Notice of Delay for Impacts.  ATTACHMENTS: 2023.02.16_SED-B_Force Majeure_Notice 001.pdf 2023.02.16_SED-B_ATMOS_Energy_Notice 002.pdf #Cost Code Description Type Amount 1 Impact Schedule Days $0.00 Grand Total:$0.00   McCarthy Building Companies Inc.page 1 of 2 Printed On: 3/6/ 2023  11 :17 AM PCO #002  Project: 002223.000 - Southeast Denton Neighborhood Area B 215 E McKinney St, Denton, Texas 76201 DocuSign Envelope ID: 1B46B59E-343B-4EFE-B7BE-11EDEB710EE6    City of Denton  McCarthy Building Companies Inc  401 N Elm Street  12851 Manchester Rd    Denton Texas 76201  Saint Louis Missouri 63131-1802                   SIGNATURE DATE  SIGNATURE DATE  SIGNATURE DATE McCarthy Building Companies Inc.page 2 of 2 Printed On: 3/6/ 2023  11 :17 AM PCO #002  Project: 002223.000 - Southeast Denton Neighborhood Area B 215 E McKinney St, Denton, Texas 76201   SIGNATURE DATE 3/6/23 DocuSign Envelope ID: 1B46B59E-343B-4EFE-B7BE-11EDEB710EE6 Delivered via: Email 02/16/2023 City of Denton 401 North Elm Denton, TX 76201 Southeast Denton Neighborhood Area B Re: Notice 001 – Abnormal Weather Conditions Dear Mr. Garcia, The Southeast Denton Neighborhood Area B (SED-B) Project has been impacted by abnormal weather conditions occurring the week of January 30, 2023, through February 3, 2023. Per Section 6.0.4 of the Agreement, McCarthy is hereby providing notice of an abnormal weather event causing adverse effect on the project’s critical path. McCarthy has sustained multiple days of weather delays due to freezing precipitation and ice accumulation. The graphic below illustrates the normal minimum temperatures for Denton, which are above freezing. The below normal temperatures coupled with precipitation on the dates mentioned, resulted in an ice storm (abnormal weather condition) that shut down the entire DFW metroplex, including City of Denton facilities. This incident caused the site to be inaccessible and a safety concern for the employees to work. McCarthy is requesting a time extension of five (5) days be added to the contract duration due to this abnormal weather event. Upon acceptance of this schedule extension, a zero dollar change order, including an updated project schedule, will be sent for execution. Should you have any questions regarding this notice, please do not hesitate to contact us. Sincerely, Riley Seahorn Project Manager McCarthy Building Companies, Inc. DocuSign Envelope ID: 1B46B59E-343B-4EFE-B7BE-11EDEB710EE6 Delivered via: Email 02/16/2023 City of Denton 401 North Elm Denton, TX 76201 Southeast Denton Neighborhood Area B Re: Notice 002 – ATMOS Energy – Smith Phase 1 Dear Mr. Garcia, The Southeast Denton Neighborhood Area B (SED-B) Project has been impacted by the actions of a third party contractor, ATMOS Energy, causing a delay to the critical path activates along Smith Phase 1. Per Section 6.0.2 of the Agreement, McCarthy is hereby providing notice of impact to the critical path operations along Smith Phase 1 in Group 1 of the SED-B Project Schedule. On February 4, 2023, McCarthy arrived onsite to install the traffic control and SWPPP along Smith Phase 1 when McCarthy discovered an overlapping detour route between the ATMOS Energy’s work along Johnson Street. The detour being used for their operation sent the public traffic by way of Smith Street to Dallas Drive. Due to the conflict Smith Street could not be closed per schedule or else it would have caused confusion and impacts to the residents of the Southeast Denton Neighborhood. McCarthy, ATMOS and the City of Denton have been coordinating to reroute the traffic and alleviate the impacts to the residents and the SED-B Project. As of now, the team estimates the delay to only four working days. The impact has been noted in the January 2023 Field Reflection and Schedule Narrative. At this time, McCarthy requests to reserve our right for a schedule extension and cost impacts pending the completion of ATMOS Energy’s work from Johnson Street to Smith Street. Should you have any questions regarding the notice, please do not hesitate to contact us. Sincerely, Riley Seahorn Project Manager McCarthy Building Companies, Inc. DocuSign Envelope ID: 1B46B59E-343B-4EFE-B7BE-11EDEB710EE6 Certificate Of Completion Envelope Id: 1B46B59E343B4EFEB7BE11EDEB710EE6 Status: Completed Subject: ***Purchasing Approval*** 7714 - CMAR for SED-B - CUA#1 Source Envelope: Document Pages: 13 Signatures: 4 Envelope Originator: Certificate Pages: 5 Initials: 1 Cori Power AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-06:00) Central Time (US & Canada) 901B Texas Street Denton, TX 76209 cori.power@cityofdenton.com IP Address: 198.49.140.10 Record Tracking Status: Original 4/5/2023 8:38:36 AM Holder: Cori Power cori.power@cityofdenton.com Location: DocuSign Signer Events Signature Timestamp Cori Power cori.power@cityofdenton.com Purchasing Supervisor City of Denton Security Level: Email, Account Authentication (None) Completed Using IP Address: 198.49.140.10 Sent: 4/5/2023 8:39:58 AM Viewed: 4/5/2023 8:40:10 AM Signed: 4/5/2023 8:40:28 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Lori Hewell lori.hewell@cityofdenton.com Purchasing Manager City of Denton Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Sent: 4/5/2023 8:40:30 AM Viewed: 4/5/2023 8:45:05 AM Signed: 4/5/2023 8:46:20 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Seth Garcia Seth.Garcia@cityofdenton.com Program Manager Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Sent: 4/5/2023 8:46:22 AM Viewed: 4/5/2023 8:47:07 AM Signed: 4/5/2023 8:47:34 AM Electronic Record and Signature Disclosure: Accepted: 4/5/2023 8:47:07 AM ID: 4ae1582a-4199-412b-b265-eba57e0c074c Riley Seahorn RSeahorn@mccarthy.com Project Manager Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 165.225.34.115 Sent: 4/5/2023 8:47:36 AM Viewed: 4/6/2023 2:32:52 PM Signed: 4/6/2023 2:35:00 PM Electronic Record and Signature Disclosure: Accepted: 4/6/2023 2:32:52 PM ID: cf385760-c63b-45f8-b094-cd8dd0d501b0 Signer Events Signature Timestamp Trevor Crain Trevor.Crain@cityofdenton.com Director of Capital Projects City of Denton Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Sent: 4/6/2023 2:35:02 PM Viewed: 4/6/2023 2:46:39 PM Signed: 4/6/2023 2:46:55 PM Electronic Record and Signature Disclosure: Accepted: 4/6/2023 2:46:39 PM ID: ee944522-9b0a-4400-9512-37fe4560c405 Cori Power cori.power@cityofdenton.com Purchasing Supervisor City of Denton Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Sent: 4/6/2023 2:46:57 PM Viewed: 4/7/2023 11:58:48 AM Signed: 4/7/2023 11:58:58 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Cheyenne Defee cheyenne.defee@cityofdenton.com Procurement Administration Supervisor City of Denton Security Level: Email, Account Authentication (None) Sent: 4/7/2023 11:59:00 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 4/5/2023 8:39:58 AM Certified Delivered Security Checked 4/7/2023 11:58:48 AM Signing Complete Security Checked 4/7/2023 11:58:58 AM Completed Security Checked 4/7/2023 11:59:00 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Denton (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. Electronic Record and Signature Disclosure created on: 7/21/2017 3:59:03 PM Parties agreed to: Seth Garcia, Riley Seahorn, Trevor Crain How to contact City of Denton: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: purchasing@cityofdenton.com To advise City of Denton of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at melissa.kraft@cityofdenton.com and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from City of Denton To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to purchasing@cityofdenton.com and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Denton To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to purchasing@cityofdenton.com and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows2000? or WindowsXP? Browsers (for SENDERS): Internet Explorer 6.0? or above Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0, NetScape 7.2 (or above) Email: Access to a valid email account Screen Resolution: 800 x 600 minimum Enabled Security Settings: •Allow per session cookies •Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings via proxy connection ** These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify City of Denton as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by City of Denton during the course of my relationship with you.