Loading...
7574-010 - Amendment 1 Executed Docusign City Council Transmittal Coversheet File Name Purchasing Contact City Council Target Date Piggy Back Option Contract Expiration Ordinance DocuSign Envelope ID: 16EE7E28-AD0E-43B7-9728-C84141D8A9B7 PSA Not Applicable 7574-010 I-35 Split to Milam Phase 2 - Amendment #1 Cori Power SEPTEMBER 19, 2023 N/A 23-1660 7574-010 PSA – Amendment #1 Page 1 of 2 FIRST AMENDMENT TO CONTRACT BY AND BETWEEN THE CITY OF DENTON, TEXAS AND KIMLEY-HORN AND ASSOCIATES, INC. PSA 7574-010 THE STATE OF TEXAS § COUNTY OF DENTON § THIS FIRST AMENDMENT TO CONTRACT 7574-010 (“Amendment”) by and between the City of Denton, Texas (“City”) and Kimley-Horn and Associates, Inc. (“Engineer”); to that certain contract executed on May 17, 2022, in the original not-to- exceed amount of $751,100 (the “Agreement”); for professional services related to the I- 35 Split to Milam Phase II project. WHEREAS, the City deems it necessary to further expand the services provided by Engineer to the City pursuant to the terms of the Agreement, and to provide an additional not-to-exceed amount $224,300 with this Amendment for an aggregate not-to-exceed amount of $975,400; and FURTHERMORE, the City deems it necessary to further expand the goods/services provided by Engineer to the City; NOW THEREFORE, the City and Engineer (hereafter collectively referred to as the “Parties”), in consideration of their mutual promises and covenants, as well as for other good and valuable considerations, do hereby AGREE to the following Amendment, which amends the following terms and conditions of the said Agreement, to wit: 1. The additional services described in Exhibit “A” of this Amendment, attached hereto and incorporated herein for all purposes, for professional services related to the design of I-35 Split to Milam Phase II Project, are hereby authorized to be performed by Engineer. For and in consideration of the additional services to be performed by Engineer, the City agrees to pay, based on the cost estimate detail attached, a total fee, including reimbursement for non-labor expenses an amount not to exceed $224,300. 2. This Amendment modifies the Agreement amount to provide an additional $224,300 for the additional services with a revised aggregate not to exceed total of $975,400. The Parties hereto agree, that except as specifically provided for by this Amendment, that all of the terms, covenants, conditions, agreements, rights, responsibilities, and obligations of the Parties, set forth in the Agreement remain in full force and effect. DocuSign Envelope ID: 16EE7E28-AD0E-43B7-9728-C84141D8A9B7 7574-010 PSA – Amendment #1 Page 2 of 2 IN WITNESS WHEREOF, the City and the Engineer, have each executed this Amendment electronically, by and through their respective duly authorized representatives and officers on this date _________________________. “City” CITY OF DENTON, TEXAS A Texas Municipal Corporation By: _________________________________ SARA HENSLEY CITY MANAGER “Engineer” KIMLEY-HORN AND ASSOCIATES, INC. By: _________________________________ AUTHORIZED SIGNOR, TITLE THIS AGREEMENT HAS BEEN BOTH REVIEWED AND APPROVED as to financial and operational obligations and business terms. _______________ ________________ SIGNATURE PRINTED NAME __________________________________ TITLE __________________________________ DEPARTMENT ATTEST: JESUS SALAZAR, CITY SECRETARY BY: _______________________________ APPROVED AS TO LEGAL FORM: MACK REINWAND, CITY ATTORNEY BY: _______________________________ DocuSign Envelope ID: 16EE7E28-AD0E-43B7-9728-C84141D8A9B7 rector of Capital Projects Capital Projects Trevor Crain, PMP 09/19/2023 Amendment No. 1I-35 - SPLIT TO MILAM PHASE 2GANZER LIFT STAITON AND GRAVITY SEWER/FORCE MAIN July 28, 2023 1 of 8 AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT ADDITIONAL SERVICES Professional Services Agreement: I-35 - SPLIT TO MILAM PHASE 2 GANZER LIFT STAITON AND GRAVITY SEWER/FORCE MAIN Amendment Scope of Services This is Amendment Number 01 to the Professional Service Agreement (7574-010) between Kimley-Horn and Associates, Inc. (ENGINEER) and the City of Denton (City) executed on May 17, 2022. Scope of Services This project was originally intended to be bid and constructed as a single construction set, alongwith the I-35 Utility Relocations. There are now two (2) separate I-35 utility relocation projects, aswell as two (2) projects to be bid and constructed under this contract. Due to recent developments,the original corridor for design and proposed easement were no longer were feasible, thus therewas a need for additional survey and design phase services for the gravity and force main sewers.The CITY has requested that the ENGINEER perform the following additional services: Task 4 – FINAL DESIGN A.Final Waterline and Sanitary Sewer Design 1.Provide additional Preliminary/Final plan and profile drawings preparation for anaddition of approximately 500 linear feet water main, 330 linear feet of 12-inchsanitary sewer force main, and 400 feet of 18-inch through 33-inch gravitysanitary sewer line. Task 6 – BID PHASE SERVICES A.Bid Phase Services 1.Provide electronic bid documents to the City purchasing department for bidding. 2.Provide the Notice to Bidders to the City for publication. The City will be responsible for publication of the notice. The City will be responsible fordistribution of the bidding documents to prospective contractors, suppliers andplan rooms. 3.The following assistance will be provided to the City during the bidding phase: a.Preparation of addenda and delivery to City for distribution to plans holders. b.Responses to questions submitted by plans holders. c.Attend bid opening facilitated by City. d.Preparation of bid tabulation. e.Preparation of recommendation of award letter. 4.Conformance plans and specifications Exhibit A DocuSign Envelope ID: 16EE7E28-AD0E-43B7-9728-C84141D8A9B7 Amendment No. 1I-35 - SPLIT TO MILAM PHASE 2GANZER LIFT STAITON AND GRAVITY SEWER/FORCE MAIN July 28, 2023 2 of 8 a.Based on potential questions and addenda from the bidding phase, prepareconformance set of plans and specifications to be used during construction. i.Provide up to four (4) sets to City for execution. Task 7 – CONSTRUCTION PHASE SERVICES A.Construction Phase Services 1.Pre-Construction Conference a.Prepare for and attend a pre-construction conference prior to commencement of Work at the Site 2.Site Visits a.Visit the construction site up to twelve (12) times during construction to perform construction observation. 12 months construction time isassumed. b.Site Visits are not intended to be exhaustive or to extend to every aspect of Contractor’s work in progress. Observations are to be limited to spotchecking, selective measurement, and similar methods of general observation of the Work based on ENGINEER’s exercise of professionaljudgement. c.Based on information obtained during site visits, ENGINEER will determine if Contractor’s work is generally proceeding in accordance withthe Contract Documents, and ENGINEER will keep CITY informed ofthe general progress of the work. d.Hold monthly meetings with the contractor, either on site or off site for upto twelve (12) meetings. 3.Recommendations with Respect to Defective Work a.Provide recommendations to City that Contractor’s work be disapprovedand rejected while it is in progress if, on the basis of site visit evaluations,ENGINEER believes such work will not produce a completed Project thatconforms generally to Contract Documents or that it will prejudice theintegrity of the design concept of the completed Project as a functioningwhole as indicated in the Contract Documents. Notwithstanding the foregoing, the City reserves the right to disapprove or reject Contractor’swork without a recommendation from the ENGINEER. 4.Clarifications and Interpretations a.Issue necessary clarifications and interpretations of the ContractDocuments to City as appropriate to the orderly completion of Contractor’s work. Such clarifications and interpretations will beconsistent with the intent of the Contract Documents. Field ordersauthorizing variations from the requirements of the Contract Documentswill be made by City. 5.Change Orders DocuSign Envelope ID: 16EE7E28-AD0E-43B7-9728-C84141D8A9B7 Amendment No. 1I-35 - SPLIT TO MILAM PHASE 2GANZER LIFT STAITON AND GRAVITY SEWER/FORCE MAIN July 28, 2023 3 of 8 a.Recommend change orders to City, as appropriate. b.Review and make recommendations related to Change Orders submitted or proposed by the Contractor. 6.Shop Drawings and Samples a.Review and approve or take other appropriate action in respect to ShopDrawings and Samples and other data which Contractor is required tosubmit, but only for conformance with the information given in theContract Documents and compatibility with the design concept of thecompleted Project as a functioning whole as indicated in the ContractDocuments. Such review and approvals or other action will not extend tomeans, methods, techniques, equipment choice and usage, sequences,schedules, or procedures of construction or to related safety precautionsand programs. Assumes up to thirty (30) shop drawings. 7.Substitutes and “or-equal” a.Evaluate and determine the acceptability of substitute or “or-equal”materials and equipment proposed by Contractor in accordance with the Contract Documents, but subject to the provisions of applicable standardsof state or local government entities. b.Provide recommendations to City 8.Inspections and Tests a.Review certificates of inspections and tests within ENGINEER’s area ofresponsibility for the purpose of determining that the results certifiedindicate compliance with the Contract Documents and will not constitutean independent evaluation that the content or procedures of suchinspections, tests, or approvals comply with the requirements of theContract Documents. ENGINER will be entitled to rely on the results ofsuch tests and facts being certified. The scope of services assumes thepumps and motors will go through a non-witnessed factory test. Attending testing will be considered additional services. 9.Disagreements between City and Contractor a.As necessary, ENGINEER will, with reasonable promptness, render initialwritten decision on all claims of City and Contractor relating to theacceptability of Contractor’s work or the interpretation of the requirements of the Contract Documents pertaining to the progress of theContractor’s work. In rendering such decisions, ENGINEER will be fairand not show partiality to City or Contractor and will not be liable in connection with any decision rendered in good faith in such capacity. Theinitial decision of the ENGINEER shall be required as a conditionprecedent to mediation or litigation of any claim arising prior to the date final payment is due to the Contractor, unless thirty (30) days have passedafter a claim has been referred to the ENGINEER with no decision havingbeen rendered. 10.Final Walkthrough and Punchlist Preparation DocuSign Envelope ID: 16EE7E28-AD0E-43B7-9728-C84141D8A9B7 Amendment No. 1I-35 - SPLIT TO MILAM PHASE 2GANZER LIFT STAITON AND GRAVITY SEWER/FORCE MAIN July 28, 2023 4 of 8 a.Attend final walkthrough with Contractor and City to determine if thecompleted work of Contractor is generally in accordance with the Contract Documents. i.Limitation of Responsibilities: The ENGINEER will not beresponsible for the acts or omissions of any Contractor, or ofany of their subcontractors, suppliers, or of any other individualentity performing or furnishing the work. ENGINEER will nothave the authority or responsibility to stop the work of any Contractor. b.Compile punch list from information gathered during final walkthroughwith City and Contractor. Task 10 – SURVEY AND EASEMENTS A.Design Survey 1.Provide an additional 7,000 linear feet of topographic survey due to a change inalignment. Survey will be provided per the previously authorized scope items. Task 15 – LIFT STATION BID PHASE SERVICES A.Bid Phase Services 1.Provide electronic bid documents to the City purchasing department for bidding. 2.Provide the Notice to Bidders to the City for publication. The City will be responsible for publication of the notice. The City will be responsible fordistribution of the bidding documents to prospective contractors, suppliers andplan rooms. 3.The following assistance will be provided to the City during the bidding phase: a.Preparation of addenda and delivery to City for distribution to plansholders. b.Responses to questions submitted by plans holders. c.Attend bid opening facilitated by City. d.Preparation of bid tabulation. e.Preparation of recommendation of award letter. 4.Conformance plans and specifications a.Based on potential questions and addenda from the bidding phase, prepareconformance set of plans and specifications to be used duringconstruction. ii.Provide up to four (4) sets to City for execution. Task 16 – LIFT STATION CONSTRUCTION PHASE SERVICES A.Construction Phase Services 1.Pre-Construction Conference a.Prepare for and attend a pre-construction conference prior tocommencement of Work at the Site DocuSign Envelope ID: 16EE7E28-AD0E-43B7-9728-C84141D8A9B7 Amendment No. 1I-35 - SPLIT TO MILAM PHASE 2GANZER LIFT STAITON AND GRAVITY SEWER/FORCE MAIN July 28, 2023 5 of 8 2.Site Visits a.Visit the construction site up to twelve (12) times during construction to perform construction observation. 12 months construction time isassumed. b.Site Visits are not intended to be exhaustive or to extend to every aspectof Contractor’s work in progress. Observations are to be limited to spotchecking, selective measurement, and similar methods of generalobservation of the Work based on ENGINEER’s exercise of professional judgement. c.Based on information obtained during site visits, ENGINEER willdetermine if Contractor’s work is generally proceeding in accordance withthe Contract Documents, and ENGINEER will keep CITY informed ofthe general progress of the work. d.Hold monthly meetings with the contractor, either on site or off site for upto twelve (12) meetings. 3.Recommendations with Respect to Defective Work a.Provide recommendations to City that Contractor’s work be disapprovedand rejected while it is in progress if, on the basis of site visit evaluations,ENGINEER believes such work will not produce a completed Project that conforms generally to Contract Documents or that it will prejudice theintegrity of the design concept of the completed Project as a functioningwhole as indicated in the Contract Documents. Notwithstanding theforegoing, the City reserves the right to disapprove or reject Contractor’swork without a recommendation from the ENGINEER. 4.Clarifications and Interpretations a.Issue necessary clarifications and interpretations of the ContractDocuments to City as appropriate to the orderly completion ofContractor’s work. Such clarifications and interpretations will beconsistent with the intent of the Contract Documents. Field ordersauthorizing variations from the requirements of the Contract Documentswill be made by City. 5.Change Orders a.Recommend change orders to City, as appropriate. b.Review and make recommendations related to Change Orders submittedor proposed by the Contractor. 6.Shop Drawings and Samples a.Review and approve or take other appropriate action in respect to ShopDrawings and Samples and other data which Contractor is required tosubmit, but only for conformance with the information given in the Contract Documents and compatibility with the design concept of thecompleted Project as a functioning whole as indicated in the ContractDocuments. Such review and approvals or other action will not extend tomeans, methods, techniques, equipment choice and usage, sequences, DocuSign Envelope ID: 16EE7E28-AD0E-43B7-9728-C84141D8A9B7 Amendment No. 1I-35 - SPLIT TO MILAM PHASE 2GANZER LIFT STAITON AND GRAVITY SEWER/FORCE MAIN July 28, 2023 6 of 8 schedules, or procedures of construction or to related safety precautionsand programs. Assumes up to fifty (50) shop drawings. b.Substitutes and “or-equal” c.Evaluate and determine the acceptability of substitute or “or-equal”materials and equipment proposed by Contractor in accordance with theContract Documents, but subject to the provisions of applicable standardsof state or local government entities. d.Provide recommendations to City 7.Inspections and Tests a.Review certificates of inspections and tests within ENGINEER’s area ofresponsibility for the purpose of determining that the results certifiedindicate compliance with the Contract Documents and will not constitutean independent evaluation that the content or procedures of such inspections, tests, or approvals comply with the requirements of theContract Documents. ENGINER will be entitled to rely on the results ofsuch tests and facts being certified. The scope of services assumes the pumps and motors will go through a non-witnessed factory test. Attendingtesting will be considered additional services. b.Disagreements between City and Contractor c.As necessary, ENGINEER will, with reasonable promptness, render initialwritten decision on all claims of City and Contractor relating to theacceptability of Contractor’s work or the interpretation of therequirements of the Contract Documents pertaining to the progress of theContractor’s work. In rendering such decisions, ENGINEER will be fairand not show partiality to City or Contractor and will not be liable inconnection with any decision rendered in good faith in such capacity. Theinitial decision of the ENGINEER shall be required as a conditionprecedent to mediation or litigation of any claim arising prior to the datefinal payment is due to the Contractor, unless thirty (30) days have passedafter a claim has been referred to the ENGINEER with no decision havingbeen rendered. 8.Final Walkthrough and Punchlist Preparation a.Attend final walkthrough with Contractor and City to determine if the completed work of Contractor is generally in accordance with theContract Documents. b.Limitation of Responsibilities: The ENGINEER will not be responsible for the acts or omissions of any Contractor, or of any of theirsubcontractors, suppliers, or of any other individual entity performing orfurnishing the work. ENGINEER will not have the authority or responsibility to stop the work of any Contractor. c.Compile punch list from information gathered during final walkthroughwith City and Contractor. DocuSign Envelope ID: 16EE7E28-AD0E-43B7-9728-C84141D8A9B7 Amendment No. 1I-35 - SPLIT TO MILAM PHASE 2GANZER LIFT STAITON AND GRAVITY SEWER/FORCE MAIN July 28, 2023 7 of 8 SCHEDULE At a mutually agreed upon date. Compensation The additional services described above will be accommodated by increasing the contract amountby $224,300. The following table summarizes the revised contract amount: Task Original Contract Amendment No. 1 Revised Contract Task 1 – Design Management $5,500 -$5,500 Task 2 – Alignment Study $19,700 -$19,700 Task 3 – Preliminary Design $142,000 -$142,000 Task 4 – Final Design $98,600 $22,700 $121,300 Task 5 – Construction Contract Documents $4,600 - Task 6 – Bid Phase Services $3,800 $12,200 $16,000 Task 7 – Construction Phase Services $6,600 $61,100 $67,700 Task 8 – Record Drawings Preparation $5,000 - Task 9 – Permitting $50,200 -$50,200 Task 10 – Survey and Easements $80,100 $25,300 $105,400 Task 11 – Easement Acquisition Services $80,800 -$80,800 Task 12 – Conflict Analysis N/A -- Task 13 – Lift Station Preliminary Engineering Report (PER)$26,000 -$26,000 Task 14 – Lift Station Prelim/Final Design $184,300 -$184,300 Task 15 – Lift Station Bid Phase Services $6,300 $28,900 $35,200 Task 16 – Lift Station Const. Phase Services $37,600 $74,100 $111,700 Totals:$751,100 $224,300 $975,400 DocuSign Envelope ID: 16EE7E28-AD0E-43B7-9728-C84141D8A9B7 Amendment No. 1I-35 - SPLIT TO MILAM PHASE 2GANZER LIFT STAITON AND GRAVITY SEWER/FORCE MAIN July 28, 2023 8 of 8 Duly executed by each party’s designated representative to be effective on the date subscribed by theCITY. BY:CITY OF DENTON, TEXAS BY:ENGINEER Title:______________________ Date:_______________________ Kimley-Horn and Associates, Inc Title: John Atkins, Vice President . Date:_____07/28/2023_______________________ DocuSign Envelope ID: 16EE7E28-AD0E-43B7-9728-C84141D8A9B7 Certificate Of Completion Envelope Id: 16EE7E28AD0E43B79728C84141D8A9B7 Status: Completed Subject: Please DocuSign: City Council Contract 7574-010 I35 Split to Milam Phase II Amendment #1 Source Envelope: Document Pages: 11 Signatures: 5 Envelope Originator: Certificate Pages: 6 Initials: 1 Cori Power AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-06:00) Central Time (US & Canada) 901B Texas Street Denton, TX 76209 cori.power@cityofdenton.com IP Address: 198.49.140.104 Record Tracking Status: Original 8/21/2023 7:12:12 PM Holder: Cori Power cori.power@cityofdenton.com Location: DocuSign Signer Events Signature Timestamp Cori Power cori.power@cityofdenton.com Purchasing Supervisor City of Denton Security Level: Email, Account Authentication (None) Completed Using IP Address: 198.49.140.104 Sent: 8/21/2023 7:20:44 PM Viewed: 8/21/2023 7:20:54 PM Signed: 8/21/2023 7:21:06 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Lori Hewell lori.hewell@cityofdenton.com Purchasing Manager City of Denton Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.104 Sent: 8/21/2023 7:21:07 PM Viewed: 8/22/2023 7:44:59 AM Signed: 8/22/2023 7:45:38 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Marcella Lunn marcella.lunn@cityofdenton.com Mack Reinwand City Attorney City of Denton Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Sent: 8/22/2023 7:45:41 AM Viewed: 8/23/2023 10:08:28 AM Signed: 8/23/2023 10:15:23 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign John Atkins john.atkins@kimley-horn.com Vice President Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 134.238.205.73 Sent: 8/23/2023 10:15:24 AM Viewed: 8/23/2023 9:21:07 PM Signed: 8/23/2023 9:21:36 PM Electronic Record and Signature Disclosure: Accepted: 8/23/2023 9:21:07 PM ID: cdcbea80-0f86-4a03-9e91-3bdda39cdec2 Signer Events Signature Timestamp Trevor Crain, PMP Trevor.Crain@cityofdenton.com rector of Capital Projects City of Denton Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Sent: 8/23/2023 9:21:38 PM Viewed: 8/24/2023 8:16:28 AM Signed: 8/24/2023 8:16:58 AM Electronic Record and Signature Disclosure: Accepted: 8/24/2023 8:16:28 AM ID: 0d2af5eb-8f38-4f32-9ac3-1827df06a9c8 Cheyenne Defee cheyenne.defee@cityofdenton.com Procurement Administration Supervisor City of Denton Security Level: Email, Account Authentication (None) Completed Using IP Address: 198.49.140.10 Sent: 8/24/2023 8:17:03 AM Viewed: 9/20/2023 10:27:16 AM Signed: 9/20/2023 10:27:50 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Sara Hensley sara.hensley@cityofdenton.com City Manager City of Denton Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Sent: 9/20/2023 10:27:52 AM Viewed: 9/20/2023 10:30:01 AM Signed: 9/20/2023 6:12:35 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Jesus Salazar jesus.salazar@cityofdenton.com Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Sent: 9/20/2023 6:12:38 PM Viewed: 9/21/2023 7:47:39 AM Signed: 9/21/2023 7:48:29 AM Electronic Record and Signature Disclosure: Accepted: 9/21/2023 7:47:39 AM ID: 4b426d1f-37d9-43d2-898b-78a25f9a1a9d In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Cheyenne Defee cheyenne.defee@cityofdenton.com Procurement Administration Supervisor City of Denton Security Level: Email, Account Authentication (None) Sent: 8/21/2023 7:21:07 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Carbon Copy Events Status Timestamp Gretna Jones gretna.jones@cityofdenton.com Legal Secretary City of Denton Security Level: Email, Account Authentication (None) Sent: 8/24/2023 8:17:01 AM Viewed: 8/25/2023 9:21:28 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign City Secretary Office citysecretary@cityofdenton.com Security Level: Email, Account Authentication (None) Sent: 9/21/2023 7:48:31 AM Viewed: 9/21/2023 8:06:57 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Cole Tankersley Cole.Tankersley@cityofdenton.com Security Level: Email, Account Authentication (None) Sent: 9/21/2023 7:48:33 AM Electronic Record and Signature Disclosure: Accepted: 9/14/2023 10:24:15 AM ID: 8d6fe3ea-da2d-4116-807e-3aff08dcceaa Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 8/21/2023 7:20:44 PM Certified Delivered Security Checked 9/21/2023 7:47:39 AM Signing Complete Security Checked 9/21/2023 7:48:29 AM Completed Security Checked 9/21/2023 7:48:33 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Denton (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. Electronic Record and Signature Disclosure created on: 7/21/2017 3:59:03 PM Parties agreed to: John Atkins, Trevor Crain, PMP, Jesus Salazar, Cole Tankersley How to contact City of Denton: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: purchasing@cityofdenton.com To advise City of Denton of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at melissa.kraft@cityofdenton.com and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from City of Denton To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to purchasing@cityofdenton.com and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Denton To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to purchasing@cityofdenton.com and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows2000? or WindowsXP? Browsers (for SENDERS): Internet Explorer 6.0? or above Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0, NetScape 7.2 (or above) Email: Access to a valid email account Screen Resolution: 800 x 600 minimum Enabled Security Settings: •Allow per session cookies •Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings via proxy connection ** These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify City of Denton as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by City of Denton during the course of my relationship with you.