Exhibit 2 - Pricing EvaluationPowell Electrical Systems, Inc.Crown Technical Systems
Houston, TX Fontana, CA
Line #Description QTY UOM Unit Unit
1
2 Line 1. Basic Building 4 EA $1,437,136.00 $1,636,134.03
3
4 Line 2. Price to increase length of building in 1' increments 4 EA $8,746.00 $6,914.00
5 Line 3. Deduction to decrease length of building in 1' increments 1 EA -$8,746.00 -$6,914.00
6 Line 4. Price to increase length of marshalling room in 1' increments 1 EA $8,746.00 $6,914.00
7 Line 5. Switchgear building with switchgear, marshalling room, doors, and other
equipment on the opposite side of building (mirror of the standard floor plan)1 EA $1.00 $1.00
8
9 Line 6. Substitute 25kV insulators for the bus (if feasible)1 EA $1.00 $1.00
10 Line 7. Substitute porcelain bus insulators 1 EA $2,112.00 $1.00
11 Line 8. Additional 1200A feeder section (would also require lengthening the building
by 4 feet; include only switchgear pricing on this line)1 EA $87,292.00 $125,259.00
12 Line 9. Remote circuit breaker racking capability (attached description)4 EA $2,650.00 $3,223.00
13 Line 10. Thermal monitoring for typical locations as described in the specification 4 EA $47,598.00 $34,866.00
14 Line 11. Additional battery charger (Refer to section J in spec)2 EA $14,734.00 $9,085.00
15 Line 12. Additional set of station batteries (Refer to Section J in spec)4 EA $49,021.00 $49,346.00
Item #Powell Electrical Systems Inc.Crown Technical Systems
1 4.00 3.00
2 28.00 28.00
3 18.67 13.33
4 40.00 38.00
90.67 82.33
Evaluation
Exhibit 2
Section A - Basic Building
Section B - Building Options
Section C - Switchgear Options
RFP 8156 - Pricing Evaluation for Medium Voltage Switchgear Buildings
Respondent's Business Name:
Principal Place of Business (City and State):
Delivery/Project Schedule - 5%
Standard Criteria
Total Score:
Compliance with Specifications - 35%
Probable Performance - 20%
Price, Total Cost of Ownership - 40%