8141-2 Bid Invitation8141-2 Addendum 1
RRWTP Capacity Re-rate and Performance Improvement
Issue Date:2/12/2024
Questions Deadline:2/29/2024 05:00 PM (CT)
Response Deadline:3/13/2024 01:00 PM (CT)
Denton - Purchasing
Contact Information
Contact:Erica Garcia
Address:Procurement
901-B Texas Street
Denton, TX 76209
Phone:(940) 349-7100
Email:erica.garcia@cityofdenton.com
Deadline: 3/13/2024 01:00 PM (CT)8141-2 Addendum 1Page 1 of 16 pages
Event Information
Number:8141-2 Addendum 1
Title:RRWTP Capacity Re-rate and Performance Improvement
Type:Competitive Sealed Proposal
Issue Date:2/12/2024
Question Deadline:2/29/2024 05:00 PM (CT)
Response Deadline:3/13/2024 01:00 PM (CT)
Notes:
CSP 8141-2 - RRWTP Capacity Re-rate and Performance Improvement
The submittal process may take significant time.
The City highly recommends that respondents do not wait until minutes
before the due date and time to submit proposal.
Submissions via email will not be accepted.
Hard copy bid bonds are required before the submission deadline.
________________________________________________________________
__________________________________
A Pre-Proposal Meeting and Project Walkthrough will be conducted for this
solicitation
on Monday, February 26, 2024 @ 9:30am
**Project Site-Walkthrough will directly follow (in-person only)**
To attend the Pre-Proposal meeting in-person, see physical location below:
City of Denton Water Production
9401 Lake Ray Roberts Dam Rd
Aubrey, TX 76227
To attend virtually follow the link:
Join on your computer, mobile app or room device
Click here to join the meeting
Meeting ID: 283 926 301 67
Passcode: pPDwFv
Download Teams | Join on the web
Learn More | Meeting options
Deadline: 3/13/2024 01:00 PM (CT)8141-2 Addendum 1Page 2 of 16 pages
________________________________________________________________
__________________________________
SECOND PRE-SOLICITAITON CONFERENCE - WALK-THROUGH ONLY- IN-
PERSON ONLY
A non-mandatory, second pre-solicitation conference- Walk Through Only, will be
available to interested contractors on Friday, March 8th from 1:30pm - 2:30pm.
This will be an in-person event only. This will also be the last opportunity to visit the
site and ask any additional questions you may have before submittals are due.
Location of Walk-Through:
City of Denton Water Production
9401 Lake Ray Roberts Dam Rd
Aubrey, TX 76227
________________________________________________________________
__________________________________
A Public Opening will be conducted for this solicitation
on Wednesday, March 13, 2024, at 1:45 PM CST.
To attend the Public Opening in-person, see physical location below:
City of Denton Civic Center
321 E McKinney Street
Denton, TX 76201
To attend virtually follow the link:
Join on your computer, mobile app or room device
Click here to join the meeting
Meeting ID: 211 812 665 025
Passcode: cdXxkn
________________________________________________________________
__________________________________
GENERAL DESCRIPTION OF WORK
The major work will consist of the (approximate) following:
Deadline: 3/13/2024 01:00 PM (CT)8141-2 Addendum 1Page 3 of 16 pages
1. Replacement of electric motor operators on existing butterfly valves and the flow
control valve at the existing Raw Water Pump Station.
2. Replacement of electric motor operators on existing slide/sluice gates and drain
valve replacement at the existing two Pre-Ozone Contactors.
3. Replacement of basin drain plug valves, electric motor operators and telescoping
valves, electric motor operators and plug valves, and rehabilitation of the existing
chain-and flight mechanisms at the existing two Flocculation/Sedimentation Basins.
4. Replacement of the electric motor operators and valves at the existing eight
Biologically Active Filters.
5. Replacement of the electric motor operator on the existing weir gate, replacement
of the electric motor operator and gate valve, and modification to the discharge
header to accommodate the new backwash storage tank at the existing Transfer
Pump Station.
6. Construction of a new Variable Frequency Drive Building adjacent to the existing
High Service Pump Station to support the replacement of two existing 1000 HP soft
starters with 1000 HP Medium Voltage (4160 VAC) Adjustable Speed Drives and
supporting electrical improvements.
7.Replacement of the existing pumps, piping, and valves at the existing
Washwater Recover Basin.
8. Construction of a new ground storage tank, piping, valves, and programming to
support the conversion of the existing self-backwash Biologically Active Filter
complex to a ground storage tank support backwash system.
9. Replacement of the existing Chemical Containment Basin with a cast-in-place
concrete basin and pump station.
In accordance with the provisions of Texas State Law, the City of Denton (the City) is
requesting submissions to contract with an individual or business with considerable
experience in providing goods or services of this solicitation. The responses and the
cost solutions shall be submitted to the City of Denton in a sealed submission.
The awarded individual or business shall possess a proven track record of using
innovative approaches to providing goods and services that represent the best value
to their clients. The awarded individual or business shall have the ability to
accomplish all aspects of the requested services. The selected individual or firm
should be able to provide innovative methods to deal with municipal challenges, and
cost effective solutions.
A firm may submit a solicitation response for one or more of the categories of
product or services requested in this solicitation.
Ship To Information
Address:901B Texas Street
Denton, TX 76209
Billing Information
Contact:City of Denton
Address:Accounts Payable
215 E McKinney St
Denton, TX 76201-4299
Deadline: 3/13/2024 01:00 PM (CT)8141-2 Addendum 1Page 4 of 16 pages
Bid Activities
Pre-Proposal Conference & Site Walkthrough 2/26/2024 9:30:00 AM (CT)
A non-mandatory pre-solicitation conference will be available to interested contractors. Attendance at the pre-
solicitation conference is strongly encouraged prior to submission of a response. A project site walkthrough will directly
follow.
To attend the meeting virtually through Microsoft Teams, follow instructions on 'Event Details' Tab.
To attend the meeting in-person, see physical location below:
City of Denton Water Production
9401 Lake Ray Roberts Dam Rd
Aubrey, TX 76227
Bid Attachments
8141-2 RRWTP Rerate Prebid Recording.mp4 View Online
8141-2 Prebid Recording Addendum 1
8141-2 Addendum Number 001.pdf View Online
8141-2 Addendum 1
8141-2 RRWTP Capacity ReRate Project Manual - Specs.pdf View Online
8141-2 RRWTP Capacity Rerate and Performance Improvement - SPECS
8141-2 RRWTP Capacity ReRate - Plans-reduced.pdf View Online
8141-2 RRWTP Capacity Rerate and Performance Improvement - PLANS
8141-2 - Geotech Report Backwash Tank.pdf View Online
8141-2 - Geotech Report Backwash Tank
8141-2 - 00 42 44 Unit Price Proposal.xlsx View Online
8141-2 - Section 00 42 44 Unit Price Proposal Form
CSP_-_Past_Experience_Form.pdf View Online
CSP Past Experience Form
CSP_-_Key_Personnel_Resume_Form (1).pdf View Online
CSP Key Personnel Resume Form
Publiushed Questions from CSP 8141-1.pdf Download
Published Questions & Answers from CSP 8141-1
Requested Attachments
Construction Bid Documents
(Attachment required)
Must attach all required documents listed in Section 4 of Bid Specification 00 41 01 - Proposal Form.
Construction Unit Price Bid
(Attachment required)
Must attach Excel copy of Section 00 42 44 - Unit Price Proposal Form
Schedule and Written Plan
(Attachment required)
Please provide a detailed Schedule and Written Plan
Deadline: 3/13/2024 01:00 PM (CT)8141-2 Addendum 1Page 5 of 16 pages
CSP Past Experience Form
(Attachment required)
Please attach the complete CSP Past Experience Form.
CSP Key Personnel Resume Form
(Attachment required)
Please attach the completed CSP Key Personnel Resume Form.
Safety Record Documents
Respondents shall provide any supporting documentation necessary for evaluation as outlined in Specification
Section 00 21 16, Paragraph 12.2.5.
Bid Acceptance - Exceptions
If you answered yes - with exceptions to the bid acceptance question please attach a list of the exceptions
Bid Attributes
1 SECTION 1
General Information
Deadline: 3/13/2024 01:00 PM (CT)8141-2 Addendum 1Page 6 of 16 pages
2 Submittal Instructions
The City of Denton will accept electronic in Ionwave or hard copy submittals until the date and time on the cover
sheet of this solicitation. Any submission received after the date and/or hour set for solicitation opening will be
returned unopened. The City will not allow late submissions due to technical difficulties. Each respondent is
responsible for taking the necessary steps to ensure their submission is received by the date and time noted
herein. The City is not responsible for technical difficulties that may result in the submission arriving after the set
time.
ELECTRONIC COPY SUBMISSION FORMAT
Electronic submissions will be accepted via this portal only (dentontx.ionwave.net); submissions via email will not be
accepted. Electronic submissions require original hard copy of Bid Bonds. Hard copy bid bonds must be
submitted before the submission deadline using hard submission requirements. Electronic proposals without hard
copy bonds will be automatically rejected.
Hard copy submissions may be hand delivered (by firm or express courier) to the address listed below:
City of Denton
Materials Management
8141-2 RRWTP Capacity Rerate & Performance Improvements
901B Texas Street
Denton, TX 76209
The City of Denton reserves the right to accept or reject in part or in whole any submission, and to waive
technicalities of the submission, in the best interest of obtaining best value for the City.
Each respondent is responsible for taking the necessary steps to ensure their submission is received by the date
and time noted herein. The City is not responsible for missing, lost or late mail or any mail delays, internal or
external, that may result in the submission arriving after the set time.
HARD COPY SUBMISSION FORMAT
Respondents shall provide detailed information to allow the City to properly evaluate the submission. The City
requests the following format be used:
1. Hard copy submissions shall be bound only utilizing a staple or binder clip. Do not submit responses in a
binder or file folder.
2. Submission shall be no more than 200 pages in length
3. Utilize tabs to identify exhibits and attachments
4. Hard Copy Submittals shall include one (1) original signed by an officer authorized to bind the firm
5. Submit response, before the published due date. Hard copy submittals must be in a sealed envelope with the
solicitation number and name.
6. The submission shall include the following:
a. Completed Bid Invitation
b. Excel Pricing Sheet
c. Construction Bid Documents
d. CSP Required Response Attachments
e. Appendices may be used for additional documentation or clarification at the respondent's option
f. USB flash drive with all submittal documents
3 Submittal Requirement Acknowledgement
In addition to completing all required sections of the Proposal Documents, the Offeror shall provide documentation
demonstrating the Offeror’s qualifications and experience. This documentation shall be included with the Offeror’s
Ionwave submissions. The Offeror shall address each of the following items in the same order in which they are set
forth below. Qualification and experience documentation shall be submitted on letter-size (8-1/2” x 11”) PDF. The
qualifications and experience data provided shall include, but may not be limited to the following:
Proposal Form - Provide the information as required in Sections 00 41 01 - Proposal Form, and 00 42 44 –
Unit Price Proposal Form, to establish:
Offeror's General Information
Deadline: 3/13/2024 01:00 PM (CT)8141-2 Addendum 1Page 7 of 16 pages
Proposal Price
Offeror's Past Experience Form - Quality, Reputation, and Ability to Complete Similar Projects on Schedule
and Within Budget: The Offeror shall demonstrate experience in delivering similar work as expressed in the
Proposal Documents on schedule and within budget. Submit details of five (5) similar projects completed
within the last ten (10) years. The Offeror should include the following items for each project submitted:
Project Name
Owner Name
Project Owner Contact Name, Phone Number, and Email Address
Contract Time and Actual Completion Time
Original Contract Cost and Final Contract Cost
Detailed Project Description
The Offeror should present projects that demonstrate experience in the following categories:
Project Name
Owner Name
Project Owner Contract Name, Phone Number and Email Address
Contract Time and Actual Completion Time
Original Contract Cost and Final Contract Cost
Detailed Project Description
The Offeror should present projects that demonstrate experience in the following categories:
Water Treatment Plant Modifications
Construction of a prestressed concrete ground storage tank
Programmable Logic Controller Replacements
Offeror’s Key Personnel Resume Form: The Offeror shall include an organizational chart (maximum of 1
page) and resume (maximum of 1 page per person) of key team members that will be assigned to the Project.
The Offeror should, at a minimum, provide personnel experience for the Project Manager, Superintendent,
Safety Manager, Scheduler, Manager in charge of Submittals and Request for Information, and the
Foreman/Foremen. The Key Personnel resumes should include the following information:
Name and Job Title
Role and Responsibility
Total number of years of experience and total number of years with current firm.
Licenses and Certifications.
Project Role and Responsibilities.
Relevant experience for the categories listed in 13.1.2.7, specifically within the last 5 years. Identify if
projects were completed with current firm or previous firm.
List of other active projects Key Personnel will be assigned to for the duration of this project and
include percentage of time allocated for each.
Detailed Schedule and Written Plan to Achieve Substantial Completion and Final Acceptance within the
Contract Time: The Offeror shall demonstrate means and methods to achieve Substantial Completion and
Final Acceptance within the Contract Time. The Offeror shall include the following:
Baseline Schedule – The Offeror shall submit a detailed Baseline Schedule in accordance with Section
01 32 16. The schedule should demonstrate the Offeror’s ability to complete the Project within the
Contract Time. The Plan should clearly identify the Critical Path Items and the Plan to keep the project
on schedule. The Plan should include, but not be limited to:
Critical Path and Preliminary Phasing Plan
Project Specific Tasks:
Work and shutdowns identified in Section 01 35 00 "Special Procedures"
Startup and Commissioning of Improvements
Equipment and material delivery
1000 HP Adjustable Frequency Drives.
Valves and Electrical Motor Operators
Chain and Flight Sludge Removal Equipment
Submersible Pumps
Hours of Operation
Offeror's resources to reach Substantial Completion, including the number of shifts or crews
working in parallel.
Offeror’s Safety Record: The Offeror shall provide responses and any supporting documentation necessary
for the Owner to evaluate the safety record for the Offeror and proposed Subcontractors. The response shall
Deadline: 3/13/2024 01:00 PM (CT)8141-2 Addendum 1Page 8 of 16 pages
include, but may not be limited to the following:
Documentation of any complaints to, or final orders entered by, the Occupational Safety and Health Review
Commission (OSHRC) against the Offeror or a proposed Subcontractor for violation(s) of OSHA regulations
within the last five (5) years.
Documentation of any citations received by the Offeror or a proposed Subcontractor from any federal,
state, or local environmental protection enforcement agency.
Provide records showing Total Recordable Incident Rate (TRIR) for each year for the last five (5) years
for the Offeror and each proposed Subcontractor.
Provide records documenting the Experience Modification Rate (EMR) for the last five (5) years for the
Offeror and each proposed Subcontractor.
List any fatalities in the safety history for the last ten (10) years for the Offeror and each proposed
Subcontractor.
Section 00 45 14 – Safety Record Questionnaire.
In addition to the information provided above the Offeror shall submit the following forms as part of the
Proposal:
Section 00 35 14 – Conflict of Interest Affidavit – CSP
Section 00 41 01 – Proposal Form – CSP
Section 00 42 44 – Unit Price Proposal Form – CSP
Section 00 43 14 – Offeror’s Bond – CSP (Hard copy required; must be submitted prior to deadline)
Section 00 43 38 – Proposed Subcontractors Form – CSP
Section 00 43 39 – Vendor Compliance to State Law Non-Resident Offeror – CSP
Section 00 45 14 – Safety Record Questionnaire – CSP
Section 00 45 27 – Contractors Compliance with Workers Compensation Law – CSP
Section 00 45 44 – Corporate Resolution of Authorized Signatories – CSP
4 Evaluation Procedures
Selection of a firm(s) to provide the aforementioned materials and services shall be in accordance with the City of
Denton Purchasing Policies and procedures. The City of Denton shall open all submissions and evaluate each
respondent in accordance to the below criteria:
Step 1: The City of Denton will evaluate the submission in accordance with the selection criteria and will rank the
firms on the basis of the submittals. The City of Denton, reserves the right to consider information obtained in
addition to the data submitted in the response. The selection criterion is listed below:
Offeror’s Key Personnel (FACTOR:10 %)
Key Personnel will be awarded points for the listed role and responsibility that the resume demonstrates with a
maximum score of ten (10) points for a single team member that demonstrates all desirable characteristics. The
scores of the individual team members will then be averaged to determine the score for the Offeror’s Key
Personnel.
Quality, Reputation, and Ability to Complete Similar Projects on Schedule and Within Budget (FACTOR:
20%)
Points will be awarded based on the Offeror’s experience relevant to this Project, the reputation of the Offeror in
performance of similar past projects, overall reputation and experience of the Offeror, and percentage of time Key
Personnel is committed to this project. The City will evaluate the projects submitted in accordance with the
Submittal Requirements Paragraph, to determine relevancy to the specified scope of this Project and review the
Offeror’s performance on the submitted projects. The City may contact the references provided by the Offeror, as
well as any other additional references, as may be necessary to verify the qualifications, experience, and reputation
of the Offeror.
Detailed Schedule and Written Plan to achieve Substantial Completion and Final Acceptance within the
Contract Time (FACTOR: 25%)
The schedule and plan should clearly show the Critical Path and the means and methods the Offeror will use to
achieve Substantial Completion and Final Acceptance within the Contract Time. Scoring will be based on the
Deadline: 3/13/2024 01:00 PM (CT)8141-2 Addendum 1Page 9 of 16 pages
Offeror’s ability to communicate the plan and schedule.
Offeror’s Safety Record (FACTOR: 5%)
The Owner will award points based on evaluation of the safety documentation provided by the Offeror as required
in the Submittal Requirements paragraph. Safety documentation for the Offeror and Subcontractors will be
evaluated and considered in awarding points for this item.
Price, Total Cost of Ownership (FACTOR: 40%)
The price of items, to include total cost of ownership, such as installation costs, life cycle costs, and warranty
provisions.
The total possible score of the submissions shall be scored and weighted as indicated above. Based on the
outcome of the computations performed, each submission will be assigned a raw score. The assigned weight will
then be applied to these scores to calculate an overall score for each submission for completion of the final scoring
process.
Step 2: After the final ranking of the submissions and determination of the firm that provide the best value to the
City and are within the competitive range, provided the City of Denton elects to proceed without oral discussions,
the City will immediately proceed to negotiate Best and Final pricing, terms and conditions with the highest ranked
firm. The best and final pricing cannot be higher than the original proposal submitted unless justification is
provided showing increased costs. The City of Denton may elect to conduct oral discussions, request clarifications,
and presentations concerning the project approach and ability to furnish the requirements, as part of the
negotiation process. If an agreement cannot be reached with the top ranked firm, the City will terminate negotiations
and move to the next highest ranked firm. The process will continue until an agreement is reached of the
submissions are formally rejected by the City.
Step 3: Upon selection of the submission or Best and Final Offer that represents the “best value”, a written
recommendation will be presented to the appropriate approving authority for the City of Denton (the City Manager,
Public Utility Board, City Council) requesting authorization to proceed with contract execution for the proposed
services.
In accordance with Texas State Law, trade secrets and confidential information in competitive sealed proposals are
not open for public inspection. A public opening will be conducted with this process. Respondent names
and pricing will be read at the time and date published on the coversheet.
After the contract has been awarded all submissions will be open for public inspection, and the unsuccessful
respondent(s) may request a debriefing regarding their submittal. Please contact the City of Denton Materials
Management staff to document the request for a debriefing. A meeting with the City of Denton Materials
Management Staff and the using Division will be scheduled within a reasonable time.
5 Protests
Any interested party who is aggrieved in connection with a solicitation or award of a contract may protest per the
City of Denton policy located here on page 54 - Procurement Policy
6 Section 2
Terms and Conditions
Deadline: 3/13/2024 01:00 PM (CT)8141-2 Addendum 1Page 10 of 16 pages
7 General Provisions - Additional for Construction
1. AVAILABILITY OF TECHNICAL DRAWINGS AND SPECIFICATIONS
If applicable, Technical Specifications and Drawings/Plans related to this project are attached to this
solicitation.
2. EXAMINATION OF PLANS, SPECIFICATIONS AND SITE OF THE
WORK
Respondents are advised that the scope of work, attachments, plans (if applicable), specifications, and other
documents on file as stated in the proposal documents shall constitute all the information which the City shall
furnish. Respondents are required, prior to submitting any response, to review all documents (scope of
work, plans, specifications, exhibits, contract, amendments, bond forms, etc.,) carefully; to visit the site of the
work (if applicable); to examine carefully the local conditions; to inform themselves with their independent
research, tests, and investigations of the difficulties to be encountered and judge for themselves the
accessibility of the work and all attending circumstances affecting the cost of doing the work or the time
required for its completion and to obtain all information required to make an intelligent proposal.
No information given by the City or any official thereof, other than that shown on the scope of work, plans (if
available) and contained in the specifications, exhibits, and other contract documents, shall be binding upon
the City. Respondents shall rely exclusively upon their own estimates, investigations, test and other data
which is necessary to full and complete information upon which the submission may be based. Any
respondent, by submitting a response, represents and warrants that he has prepared his submittal in
accordance with the specifications, with full knowledge and understanding of the terms and provisions
thereof; that he has reviewed, studied and examined the response prior to the signing and submission of
same; and that he was cognizant of the terms of his submittal, verified his calculations and found them to be
correct and agrees to be bound thereby.
3. BONDS
Successful awarded contractor will be required to sign original contract and submit a blanket performance
and payment bond as outlined in specifications before work is to commence. Bonds shall be in accordance
with the V.T.C.A Government Code Section 2253.021, as amended.
4. PREVAILING WAGE RATES
In accordance with Texas Government Code 2258, the awarded contractor shall comply with prevailing wage
rates as defined by the United States Department of Labor Davis-Bacon Wage Determination
at http://www.dol.gov/whd/contracts/dbra.htm and at the Wage Determinations website www.wdol.gov for
Denton County, Texas.
Notwithstanding any other provision of this Contract, the awarded contractor hereby represents and warrants
that the contractor shall pay to each of its employees a wage not less than what is currently known as the
"Federal Minimum Wage" and any increase or amendments thereto. Furthermore, contractor shall produce
proof of compliance with this provision by contractor to the City. The City shall withhold payments due to
contractor until contractor has complied with this provision. Prior to any payment being made for work
satisfactorily completed and accepted, contractor shall submit wage rate affidavits with its billing documents
affirming that all employees have been paid not less than the current "Federal Minimum Wage”.
5. PAYMENT AND PERFORMANCE REQUIREMENTS
Deadline: 3/13/2024 01:00 PM (CT)8141-2 Addendum 1Page 11 of 16 pages
a. PAYMENT AND INVOICES:
Payment processing: The City review, inspection, and processing procedures for invoices ordinarily
require thirty (30) days after receipt of invoices, materials, or services. Submissions which call for payment
before thirty (30) days from receipt of invoice, or cash discounts given on such payment, will be considered
only if, in the opinion of the Purchasing Manager, the review, inspection, and processing procedures can be
completed as specified. It is the intention of the City of Denton to make payment within thirty days after
receipt of valid invoices for which items or services have been received unless unusual circumstances arise.
The 30 day processing period for invoices will begin on the date the invoice is received or the date the items
or services are received, whichever is later.
Direct deposit for payments: Contractors are encouraged to arrange for receiving payments through
direct deposit. Information regarding direct deposit payments is available from the City of Denton Purchasing
website: www.dentonpurchasing.com.
Invoices shall be sent directly to the City of Denton Accounts Payable Department, 215 E McKinney St,
Denton, TX, 76201-4299. A pro-forma invoice shall be sent to the contract administrator as identified in the
Notice to Proceed. It is the intention of the City of Denton to make payment on completed orders within thirty
days after receipt of invoice or items; whichever is later, unless unusual circumstances arise. Invoices must
be fully documented as to labor, materials, and equipment provided, if applicable, and must
reference the City of Denton Purchase Order Number in order to be processed. No payments
shall be made on invoices not listing a Purchase Order Number.
b. PAYMENT TO PERFORMANCE MILESTONES
Awarded contractor shall prepare and submit monthly pay apps per the schedule of values outlined in the
attached STANDARD PURCHASE TERMS AND CONDITIONS FOR FACILITY CONSTRUCTION
SERVICES, Article 9 Payments and Completion.
c. TAX EXEMPTION
The City of Denton qualifies for sales tax exemption pursuant to the provisions of Article 20.04 (F) of the
Texas Limited Sales, Excise and Use Tax Act. Any Contractor performing work under this contract for the City
of Denton may purchase materials and supplies and rent or lease equipment sales tax free. This is
accomplished by issuing exemption certificates to suppliers. Certificates must comply with State Comptroller’s
ruling #95-0.07 and #95-0.09.
d. RELEASE OF LIENS AND CERTIFICATE OF CONTRACTOR
Upon award of the contract, the Contractor shall inform the City of the subcontractors and material sources
that will be used. Upon the completion by the Contractor of the construction of the project, but prior to final
payment to the Contractor, the Contractor shall deliver to the City releases of all liens, and of rights to claim
any lien, from all manufacturers, material-men, and subcontractors furnishing services or materials for the
project, to the effect that all materials or services used on or for the project have been paid for and indicating
that the City is released from all such claims.
e. PAYMENTS TO MATERIAL-MEN AND SUBCONTRACTORS
The Contractor shall pay each material-men, and each subcontractor, if any, as outlined in the project
specifications, the amount thereof allowed the Contractor for and on account of materials furnished or
construction performed by each material-men or each subcontractor.
6. WARRANTIES
The contractor shall provide a warranty as outlined in the project specifications.
Deadline: 3/13/2024 01:00 PM (CT)8141-2 Addendum 1Page 12 of 16 pages
8 Bid Acceptance
I have read and understand the Terms and Conditions, Specifications, and Insurance requirements, contained
herein, and further agree to abide and accept said Terms, Conditions and Specifications.
Yes Yes - with exceptions (Please Select)
(Required: Check only one)
9 Bid Acceptance Exceptions
If you answered yes - with exceptions to the above question you must attach exceptions narrative in attachment
tab.
(Additional exceptions will not be allowed during the negotiation process)
Yes, I understand any exceptions must be attached
(Required: Check if applicable)
1
0
Acknowledgement
The undersigned agrees this submission becomes the property of the City of Denton after the official opening.
The undersigned affirms he has familiarized himself with the specification, drawings, exhibits and other documents;
the local conditions under which the work is to be performed; satisfied himself of the conditions of delivery, handling
and storage of materials and equipment; and all other matters that will be required for the work before submitting a
response.
The undersigned agrees, if this submission is accepted, to furnish any and all items/services upon which prices are
offered, at the price(s) and upon the terms and conditions contained in the specification. The period for acceptance
of this submission will be 120 calendar days unless a different period is noted.
The undersigned affirms that they are duly authorized to execute this contract, that this submission has not been
prepared in collusion with any other respondent, nor any employee of the City of Denton, and that the contents of
this submission have not been communicated to any other respondent or to any employee of the City of Denton
prior to the acceptance of this submission.
Respondent hereby assigns to the City any and all claims for overcharges associated with this contract which arise
under the antitrust laws of the United States, 15 USCA Section 1 et seq., and which arise under the antitrust laws of
the State of Texas, Tex. Bus. & Com. Code, Section 15.01, et seq.
The undersigned affirms that they have read and do understand the specifications, all exhibits and attachments
contained in this solicitation package.
The undersigned agrees that the solicitation package posted on the website are the official specifications and shall
not alter the electronic copy of the specifications and/or pricing sheet, without clearly identifying changes.
The undersigned understands they will be responsible for monitoring the City of Denton Purchasing Website at: City
of Denton Solicitations to ensure they have downloaded all addendum(s).
I certify that I have made no willful misrepresentations in this submission, nor have I withheld information in my
statements and answers to questions. I am aware that the information given by me in this submission will be
investigated, with my full permission, and that any misrepresentations or omissions may cause my submission to be
rejected.
If awarded this construction Contract, the Bidder agrees to complete the work covered by this Contract within
the time frame outlined in the agreement.
The Bidder hereby agrees that the City reserves the right to waive informalities in any bid and to reject any or
all bids, or to accept any bid that in its judgment will be for the best interest of the City.
Acknowledge
(Required: Check if applicable)
Deadline: 3/13/2024 01:00 PM (CT)8141-2 Addendum 1Page 13 of 16 pages
1
1
Certificate of Interested Parties Electronic Filing
In 2015, the Texas Legislature adopted House Bill 1295, which added section 2252.908 of the Government Code.
The law states that the City may not enter into this contract unless the Contractor submits a disclosure of interested
parties (Form 1295) to the City at the time the Contractor submits the signed contract. The Texas Ethics
Commission has adopted rules requiring the business entity to file Form 1295 electronically with the Commission.
Contractor will be required to furnish an original Certificate of Interest Parties before the contract is
awarded, in accordance with Government Code 2252.908.
The contractor shall:
1. Log onto the State Ethics Commission Website at :
https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm
2. Register utilizing the tutorial provided by the State
3. Print a copy of the completed Form 1295
4. Enter the Certificate Number on page 2 of this contract.
5. Sign the Form 1295
6. Email the form to purchasing@cityofdenton.com with the contract number in the subject line. (EX: Contract
1234 - Form 1295)
7. The City must acknowledge the receipt of the filed Form 1295 not later than the 30th day after Council award.
Once a Form 1295 is acknowledged, it will be posted to the Texas Ethics Commission's website within seven
business days.
Acknowledge
(Optional: Check if applicable)
1
2
Prohibition on Contracts with Companies Boycotting Israel
Pursuant to Section 2270.002 of the Texas Government Code, Respondent certifies that either (i) it meets an
exemption criteria under Section 2270.002; or (ii) it does not boycott Israel and will not boycott Israel during the term
of the contract resulting from this solicitation. Respondent shall state any facts and provide documentation that
make it exempt from the boycott certification in its Response.
Exemption criteria includes the following:
1. Company is a sole proprietorship;
2. Company employs less than 10 full-time employees;
3. Value of the contract is less than $100,000
“Boycott Israel” is defined to mean refusing to deal with, terminating business activities with, or otherwise taking any
action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with Israel, or
with a person or entity doing business in Israel or in an Israeli-controlled territory, but does not include an action
made for ordinary business purposes. “Company” is defined to mean a for-profit sole proprietorship, organization,
association, corporation, partnership, joint venture, limited partnership, limited liability partnership, or limited liability
company, including a wholly owned subsidiary, majority-owned subsidiary, parent company, or affiliate of those
entities or business associations that exists to make a profit.
Sole proprietorship Employs less than 10 Full time employees
Value of the contract is less than $100,000 Does not Boycott Israel
(Required: Check only one)
1
3
Firm's Legal Name
(Required: Maximum 1000 characters allowed)
Deadline: 3/13/2024 01:00 PM (CT)8141-2 Addendum 1Page 14 of 16 pages
1
4
Agent Authorized to sign contract
The agents name and email who is authorized to sign the contract
(Required: Maximum 1000 characters allowed)
1
5
Organization Class
Partnership Corporation Individual Association
(Required: Check only one)
Bid Lines
1 TOTAL PROPOSAL AMOUNT
Item Notes: Copy your responses from Section 5.2 of Bid Specification 00 41 01 - Proposal Form in the following
fields. Please note that the following totals must match your total amounts listed in Bid Specification 00 42 44 -
Unit Price Proposal Form and Section 5.2 of Bid Specifications 00 41 01 - Proposal Form. If different, the
amounts listed in Section 5.2 of Bid Specifications 00 41 01 - Proposal Form will take precedence.
(Line excluded from response total)
2 Total Amount for Base Contract Items (BC)
(Response required)
Base Bid:$Total:$
Supplier Notes:
Additional notes
(Attach separate sheet)
3 Total Amount for Alternate Extra Work Items (EW)
(Response required)
Alternate Bid:$Total:$
Supplier Notes:
Additional notes
(Attach separate sheet)
Deadline: 3/13/2024 01:00 PM (CT)8141-2 Addendum 1Page 15 of 16 pages
Supplier Information
Company Name:
Contact Name:
Address:
Phone:
Fax:
Email:
Supplier Notes
The undersigned agrees this submission becomes the property of the City of Denton after the official opening. The
undersigned affirms they have familiarized themselves with the specification, drawings, exhibits and other documents; the
local conditions under which the work is to be performed; satisfied himself of the conditions of delivery, handling and
storage of materials and equipment; and all other matters that will be required for the work before submitting a response.
The undersigned affirms that they are duly authorized to execute this contract, that this submission has not been
prepared in collusion with any other respondent, nor any employee of the City of Denton, and that the contents of this
submission have not been communicated to any other respondent or to any employee of the City of Denton prior to the
acceptance of this submission. The undersigned affirms that they have read and do understand the specifications, all
exhibits and attachments contained in this solicitation package. I certify that I have made no willful misrepresentations in
this submission, nor have I withheld information in my statements and answers to questions. I am aware that the
information given by me in this submission will be investigated, with my full permission, and that any misrepresentations or
omissions may cause my submission to be rejected.
Print Name Signature
Deadline: 3/13/2024 01:00 PM (CT)8141-2 Addendum 1Page 16 of 16 pages