7670 - Change Order 3 ExecutedDocuSign Envelope ID: 61E3D18F-B644-4BED-A54F-28ACDD715A08 Christa Christian 9/14/2023 PARTIAL CONDUIT PLANHK-CD02HICKORY SUBSTATIONPlot Date: 6/29/2023 4:23:17 PMFile: V:\Beta EPC\B661\SE\Working Dwg Files\HK-CD01-07 per 5-15-23.dwg 3/32" = 1'-0"1 of 1Energizing tomorrow's community today!ENGINEER OF RECORDFOR PROJECT B661TBPE FIRM# F-20164725 HWY 28 EPINEVILLE, LOUISIANA 71360DISSUED FOR CONSTRUCTIONA11/23/22ISSUED FOR CONSTRUCTIONJCSHOLDHOLDB12/8/22REVISED PER COMMENTS AND RE-ISSUED FOR CONSTRUCTIONJCSC03/10/23REVISED PER COMMENTS AND RE-ISSUED FOR CONSTRUCTIONMJC58'-3 1/4"6'-3 3/4"13'-10 1/2"6'-4"5'-3 3/4"17'-10 1/4"8'-7"DocuSign Envelope ID: 61E3D18F-B644-4BED-A54F-28ACDD715A08 Beta Engineering 4725 Highway 28 East Pineville, LA 71360 318.487.9599 betaengineering.com Classification Rate Type Unit of Measure Rate President N/A Hour 200 Vice President N/A Hour 200 Project Executive N/A Hour 185 Senior Project Manager N/A Hour 175 Project Manager III N/A Hour 160 Project Manager II N/A Hour 145 Project Manager I N/A Hour 130 Scheduling Specialist N/A Hour 120 Project Coordinator III N/A Hour 130 Project Coordinator II N/A Hour 115 Project Coordinator I N/A Hour 100 Administrative Assistant N/A Hour 65 Construction Manager IV N/A Hour 160 Construction Manager III N/A Hour 140 Construction Manager II N/A Hour 120 Construction Manager I N/A Hour 105 Procurement Agent III N/A Hour 85 Procurement Agent II N/A Hour 80 Procurement Agent I N/A Hour 75 Project Engineer N/A Hour 155 Engineer V N/A Hour 155 Engineer IV N/A Hour 145 Engineer III N/A Hour 130 Engineer II N/A Hour 115 Engineer I N/A Hour 105 Technician III N/A Hour 120 Technician II N/A Hour 110 Technician I N/A Hour 100 Designer III N/A Hour 85 Designer II N/A Hour 75 Drafter I N/A Hour 65 EXHIBIT N DocuSign Envelope ID: D5F87594-CD3A-4C2C-93CF-7637E174F3B0DocuSign Envelope ID: 61E3D18F-B644-4BED-A54F-28ACDD715A08 KINGSLEY CONSTRUCTORS, INC.CHANGE REQUEST 25250 Borough Park Dr., Ste 106 The Woodlands, Texas 77380 KCI CO#:3 Phone 281-363-1979 Attn: DATE: Fax 281-363-1993 8/23/2023 JOB NAME/LOCATION: Hickory Substation TO: KCI JOB NUMBER: 4725 Highway 23 East 222050 Pineville, LA 71360 THE FOLLOWING WORK IS HEREBY DIRECTED BY THIS CHANGE ORDER: ITEM #DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL AMOUNT ADDITIONS 1 1 LS 31,247.30$ 31,247.30$ 2 7 EA 3,304.80$ 23,133.60$ 3 1 LS 29,095.00$ 29,095.00$ NET CHANGE ORDER AMOUNT 83,475.90$ THIS CHANGE ORDER BECOMES PART OF THE ABOVE REFERENCED EXISTING CONTRACT AND IS SUBJECT TO THE SAME TERMS AND CONDITIONS UNLESS STIPULATED OTHERWISE. NO OTHER WORK IS AUTHORIZED UNLESS ITEMIZED IN PRIOR OR SUBSEQUENT CHANGE ORDERS. COMMENCEMENT OF THE ABOVE LISTED WORK SHALL CONSTITUTE ACCEPTANCE PER THE ORIGINAL CONTACT TERMS OWNER APPROVAL BY: ISSUED BY: Brandon Britt TITLE: DATE: TITLE: Sr Project Manager 8/23/2023 Street Light Transformer Conduit Runs Installation of Porches Pecan Grove Parking Lot Jeremy Katusak Beta Engineering, LLC The below proposal is to cover the costs of installing additional conduit running from the Tranformer to the PME. KCI Assumed Material: $5,639.54 -(100) LF of 3" Sch 40 Conduit -(6) Ea 3" Sch 40 90°Elbows -(2) Ea 3" Sch 40 45°Elbows -(10) CY ofConcrete, -Lumber SubContractor: $615.00 -(1) Density Test -(1) Concrete Testing Labor & Equipment: $24,992.76 -(1) Superintendent -(1) Foreman -(3) Skilled Laborer -(1) Excavator -(1) Trench Roller-(3) Days Installation of Porches -this line item is to cover the installation of porches for the risers. Details provided in April 2023. Pecan Grove Apartment Paking Lot Total = $83,475.90 * Provision & Installation of the 15KV cable will be completed by others. DocuSign Envelope ID: 61E3D18F-B644-4BED-A54F-28ACDD715A08 1 Jeremy Katusak From:Jeremy Katusak Sent:Wednesday, August 23, 2023 8:56 AM To:Zimmerer, Mark J Cc:Tenorio, Cody R; Noah Rebouche; Logan Barton; Jake Woodard; B661Contract Subject:RE: B661 - Known Change Requests Good morning Mark, Schneider Engineering has clarified that the pole mount transformer is being relocated from one pole to another. I’ll proceed with puƫng together the change request to include the following:  Include the Porch Install Cost  Include Street Light Transformer  Include Parking Lot Repair  Include DME supplied Material Credit previously submiƩed Thank you, betaengineering.com Jeremy Katusak, PE, PMP Project Manager 956.455.3419 Jeremy.Katusak@betaengineering.com From: Zimmerer, Mark J <Mark.Zimmerer@cityofdenton.com> Sent: Wednesday, August 23, 2023 7:53 AM To: Jeremy Katusak <jeremy.katusak@betaengineering.com> Cc: Tenorio, Cody R <Cody.Tenorio@cityofdenton.com> Subject: RE: B661 - Known Change Requests From External Sender Jeremy, For this change order, I would like to propose:  Include the Porch Install Cost  Include Street Light Transformer  Include Parking Lot Repair  Include DME supplied Material Credit  Include the DME supplied pole mounted transformer. We should have this in stock so I would like to get it now before it is used on other projects. DocuSign Envelope ID: 61E3D18F-B644-4BED-A54F-28ACDD715A08 2 Let me know your thoughts. Thanks, Mark Zimmerer, P.E. Electric Engineering Supervisor 1671 Spencer Road Denton, TX 76205 Denton Municipal Electric Office: (940) 349-7169 From: Jeremy Katusak <jeremy.katusak@betaengineering.com> Sent: Tuesday, August 22, 2023 5:55 PM To: Zimmerer, Mark J <Mark.Zimmerer@cityofdenton.com> Cc: Noah Rebouche <noah.rebouche@betaengineering.com> Subject: B661 - Known Change Requests Importance: High This message has originated from an External Source. Please be cauƟous regarding links and aƩachments. Good AŌernoon Mark, Per our discussion today, I’ve put together 2 spreadsheets covering all known/anƟcipated Change Requests. 1. InstallaƟon of porches at riser poles 2. AddiƟonal pull box material and installaƟon based on distribuƟon clarificaƟons 3. AddiƟonal engineering and material to add Owner-supplied transformer outside of Screen Wall as power source for street lights 4. Parking lot repair requested by apartment owner 5. Credit for distribuƟon materials that may be provided by DME 6. Redesign of distribuƟon due to City delays in easement acquisiƟon 7. AddiƟonal credit for pole mounted transformer As noted in the spreadsheets, Beta does not currently have an esƟmate on the impact of the distribuƟon redesign. This is pending Schneider Engineering’s sketch, DME approval, City approval, and the necessary supplier/subcontractor quotes to determine the financial impact of the change. We are also awaiƟng addiƟonal informaƟon from Schneider Engineering to proceed with the request for the pole mounted transformer. In the spreadsheet Ɵtled “B661_20230822 Change Request_Proposed”, I’ve highlighted in green which Change Requests I’d suggest we move forward with at this Ɵme. These changes include: • InstallaƟon of porches at riser poles • AddiƟonal engineering and material to add Owner-supplied transformer outside of Screen Wall as power source for street lights • Credit for distribuƟon materials that may be provided by DME a. Please note that we are sƟll waiƟng for Schneider Engineering’s confirmaƟon on the nameplates The net impact to the contract value for these 3 changes would be $940.13 in DME’s favor. Please let me know if I can put together the formal paperwork for approval. Thank you, DocuSign Envelope ID: 61E3D18F-B644-4BED-A54F-28ACDD715A08 STRUCTURE TABLESTRUCTURE #APPROX. LINEANGLE (Ø)FOR REFERENCEDocuSign Envelope ID: 61E3D18F-B644-4BED-A54F-28ACDD715A08 STRUCTURE TABLESTRUCTURE #APPROX. LINEANGLE (Ø)FOR REFERENCEDocuSign Envelope ID: 61E3D18F-B644-4BED-A54F-28ACDD715A08 STRUCTURE TABLESTRUCTURE #APPROX. LINEANGLE (Ø)FOR REFERENCEDocuSign Envelope ID: 61E3D18F-B644-4BED-A54F-28ACDD715A08 1 Jeremy Katusak From:Zimmerer, Mark J <Mark.Zimmerer@cityofdenton.com> Sent:Tuesday, August 22, 2023 1:42 PM To:Jeremy Katusak; Key, Randy A Cc:Noah Rebouche; B661Contract; Chad Jarick; Tenorio, Cody R; Tenorio, Cody R; Tenorio, Cody R Subject:RE: Junction box Yes sir. They are $6,937.00 each. Thanks, Mark Zimmerer, P.E. Electric Engineering Supervisor 1671 Spencer Road Denton, TX 76205 Denton Municipal Electric Office: (940) 349-7169 From: Jeremy Katusak <jeremy.katusak@betaengineering.com> Sent: Tuesday, August 22, 2023 1:16 PM To: Zimmerer, Mark J <Mark.Zimmerer@cityofdenton.com>; Key, Randy A <Randy.Key@cityofdenton.com> Cc: Noah Rebouche <noah.rebouche@betaengineering.com>; B661Contract <B661Contract@betaengineering.com>; Chad Jarick <chad.jarick@betaengineering.com>; Tenorio, Cody R <Cody.Tenorio@cityofdenton.com>; Tenorio, Cody R <Cody.Tenorio@cityofdenton.com> Subject: RE: Junction box Thank you, Mark. Do you still have any 4’x6’ pull boxes in stock? Thank you, betaengineering.com Jeremy Katusak, PE, PMP Project Manager 956.455.3419 Jeremy.Katusak@betaengineering.com From: Zimmerer, Mark J <Mark.Zimmerer@cityofdenton.com> Sent: Tuesday, August 22, 2023 1:12 PM To: Jeremy Katusak <jeremy.katusak@betaengineering.com>; Key, Randy A <Randy.Key@cityofdenton.com> Cc: Noah Rebouche <noah.rebouche@betaengineering.com>; B661Contract <B661Contract@betaengineering.com>; DocuSign Envelope ID: 61E3D18F-B644-4BED-A54F-28ACDD715A08 2 Chad Jarick <chad.jarick@betaengineering.com>; Tenorio, Cody R <Cody.Tenorio@cityofdenton.com>; Tenorio, Cody R <Cody.Tenorio@cityofdenton.com> Subject: RE: Junction box Jeremy/Noah, Please see below pricing and attached nameplates for your review. We do have this material in stock. Please let us know if you would like to proceed. 300 KVA 120/240 Delta - $39.011.58 50 KVA 120/240 Pad mount - $9,846.32 Single Phase PCC - $615.00 x 3 = $1,845 Transformer pad concrete 83x83x8 - $1861.28 Single phase pad fibercrete - $385.53 Totaling - $52,949.71 Thanks, Mark Zimmerer, P.E. Electric Engineering Supervisor 1671 Spencer Road Denton, TX 76205 Denton Municipal Electric Office: (940) 349-7169 From: Jeremy Katusak <jeremy.katusak@betaengineering.com> Sent: Friday, August 18, 2023 2:31 PM To: Zimmerer, Mark J <Mark.Zimmerer@cityofdenton.com>; Key, Randy A <Randy.Key@cityofdenton.com> Cc: Noah Rebouche <noah.rebouche@betaengineering.com>; B661Contract <B661Contract@betaengineering.com>; Chad Jarick <chad.jarick@betaengineering.com>; Tenorio, Cody R <Cody.Tenorio@cityofdenton.com> Subject: RE: Junction box Good Afternoon Mark, Please see attached. I’ve highlighted the material in question on Schneider’s BOM and have attached the reference material I currently have available. Not shown on this BOM are the two pull boxes Kinglsey had also requested. Please let me know if any of this material is available and how much credit we would apply for each. Kingsley is hoping we’ll be able to at least get the (2) pull boxes early next week. I’ve attached the Pull Box Details to this email; they’re the same 4’ x 6’ boxes that they were originally supposed to purchase from you. Please let me know if this would be possible. Thank you, betaengineering.com Jeremy Katusak, PE, PMP Project Manager 956.455.3419 Jeremy.Katusak@betaengineering.com DocuSign Envelope ID: 61E3D18F-B644-4BED-A54F-28ACDD715A08 3 From: Zimmerer, Mark J <Mark.Zimmerer@cityofdenton.com> Sent: Friday, August 4, 2023 1:12 PM To: Jeremy Katusak <jeremy.katusak@betaengineering.com>; Key, Randy A <Randy.Key@cityofdenton.com> Cc: Noah Rebouche <noah.rebouche@betaengineering.com>; B661Contract <B661Contract@betaengineering.com>; Chad Jarick <chad.jarick@betaengineering.com>; Tenorio, Cody R <Cody.Tenorio@cityofdenton.com> Subject: RE: Junction box Jeremy, We need more details on what is needed. Can you provide a BOM to help clarify? Thanks, Mark Zimmerer, P.E. Electric Engineering Supervisor 1671 Spencer Road Denton, TX 76205 Denton Municipal Electric Office: (940) 349-7169 From: Jeremy Katusak <jeremy.katusak@betaengineering.com> Sent: Friday, August 4, 2023 8:51 AM To: Zimmerer, Mark J <Mark.Zimmerer@cityofdenton.com> Cc: Noah Rebouche <noah.rebouche@betaengineering.com>; B661Contract <B661Contract@betaengineering.com>; Chad Jarick <chad.jarick@betaengineering.com> Subject: FW: Junction box This message has originated from an External Source. Please be cautious regarding links and attachments. Good morning Mark, In addition to the pull boxes that Kingsley needs, I was wondering if DME happened to have (3) junction boxes per the detail below for the distribution scope that Beta could purchase. We’re also looking at options for single phase transformer (50kVA, 120/240V) and three phase transformer (300kVA, 120/240) called out in Schnieder’s drawing and the associated pads. Does DME have this material? As you suggested, Beta would put together a change request showing a billing line item that is a credit back to DME for the purchase. Thank you, DocuSign Envelope ID: 61E3D18F-B644-4BED-A54F-28ACDD715A08 4 betaengineering.com Jeremy Katusak, PE, PMP Project Manager 956.455.3419 Jeremy.Katusak@betaengineering.com From: Greg W. Baumbach <gbaumbach@se-texas.com> Sent: Thursday, July 20, 2023 9:57 AM To: Jeremy Katusak <jeremy.katusak@betaengineering.com> Cc: Noah Rebouche <noah.rebouche@betaengineering.com>; Chad Jarick <chad.jarick@betaengineering.com> Subject: RE: Junction box Jeremy, Denton uses the following standard for the junction box. I do not have their approved manufacturers for their warehouse numbers, but I am sure they can provide it to us. Or they might be willing to provide the equipment, which is what I thought was happening for some of this equipment such as the service transformers, etc. DocuSign Envelope ID: 61E3D18F-B644-4BED-A54F-28ACDD715A08 5 DocuSign Envelope ID: 61E3D18F-B644-4BED-A54F-28ACDD715A08 6 GREG BAUMBACH, P.E. gbaumbach@se-texas.com Schneider Engineering, LLC TX Reg. #F-1594 191 Menger Springs Parkway – Boerne, TX 78006 O: 830.249.3887 | C: 830.660.1471 www.se-texas.com From: Jeremy Katusak <jeremy.katusak@betaengineering.com> Sent: Thursday, July 20, 2023 9:14 AM To: Greg W. Baumbach <gbaumbach@se-texas.com> Cc: Noah Rebouche <noah.rebouche@betaengineering.com>; Chad Jarick <chad.jarick@betaengineering.com> Subject: FW: Junction box From External Sender Greg, Please see below. Is this the same type of junction box we’ll need for JB1 and JB2? Thank you, betaengineering.com Jeremy Katusak, PE, PMP Project Manager 956.455.3419 Jeremy.Katusak@betaengineering.com DocuSign Envelope ID: 61E3D18F-B644-4BED-A54F-28ACDD715A08 Certificate Of Completion Envelope Id: 61E3D18FB6444BEDA54F28ACDD715A08 Status: Completed Subject: 7670 hickory GIS Substation Design Build Change Order 3 - SOW Reduction Source Envelope: Document Pages: 15 Signatures: 1 Envelope Originator: Certificate Pages: 5 Initials: 1 Christa Christian AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-06:00) Central Time (US & Canada) 901B Texas Street Denton, TX 76209 Christa.Christian@cityofdenton.com IP Address: 198.49.140.10 Record Tracking Status: Original 9/14/2023 2:43:26 PM Holder: Christa Christian Christa.Christian@cityofdenton.com Location: DocuSign Signer Events Signature Timestamp Christa Christian christa.christian@cityofdenton.com Purchasing Supervisor City of Denton Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Sent: 9/14/2023 2:47:40 PM Viewed: 9/14/2023 2:47:50 PM Signed: 9/14/2023 2:48:00 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Mark Zimmerer mark.zimmerer@cityofdenton.com Electric Engineering Supervisor Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Sent: 9/14/2023 2:48:09 PM Viewed: 9/14/2023 2:53:43 PM Signed: 9/14/2023 2:53:50 PM Electronic Record and Signature Disclosure: Accepted: 9/14/2023 2:53:43 PM ID: 0890ffb4-4aca-419b-9910-6e08d0956ed6 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp George Brashear george.brashear@betaengineering.com Executive Vice President Beta Engineering, LLC Security Level: Email, Account Authentication (None) Sent: 9/14/2023 2:54:00 PM Electronic Record and Signature Disclosure: Accepted: 5/12/2023 10:49:37 AM ID: 4ec1115c-d2d5-4923-b4a6-b5b76c361fb2 Carbon Copy Events Status Timestamp Cheyenne Defee cheyenne.defee@cityofdenton.com Procurement Administration Supervisor City of Denton Security Level: Email, Account Authentication (None) Sent: 9/14/2023 2:54:00 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 9/14/2023 2:47:40 PM Certified Delivered Security Checked 9/14/2023 2:53:43 PM Signing Complete Security Checked 9/14/2023 2:53:50 PM Completed Security Checked 9/14/2023 2:54:00 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Denton (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. Electronic Record and Signature Disclosure created on: 7/21/2017 3:59:03 PM Parties agreed to: Mark Zimmerer, George Brashear How to contact City of Denton: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: purchasing@cityofdenton.com To advise City of Denton of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at melissa.kraft@cityofdenton.com and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from City of Denton To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to purchasing@cityofdenton.com and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Denton To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to purchasing@cityofdenton.com and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows2000? or WindowsXP? Browsers (for SENDERS): Internet Explorer 6.0? or above Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0, NetScape 7.2 (or above) Email: Access to a valid email account Screen Resolution: 800 x 600 minimum Enabled Security Settings: •Allow per session cookies •Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings via proxy connection ** These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify City of Denton as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by City of Denton during the course of my relationship with you.