Exhibit 2 - Cooperative PricingKoppl Pipeline Services, Inc. • Texas
Phone 346-600-3390 • jarred@koppl.com • www.koppl.com
Tipsusa - Ktx-4027jt - Tips Contract - Line Stops - Ts&Vs - Houston Tx 2/14/23
Quote Number: KTX-4027JT
February 2, 2023
Line Stop and Hot Tap Service Estimate
TIPS USA
TIPS USA Contract
Koppl Pipeline Services will provide and install: Epoxy coated line stop fitting with alloy hardware. Bar-Wrap
concrete line stops will be full encirclement weld on fitting. Prestressed will be bolt-on fitting.
LINE STOPS: Days allowed. Koppl will allow a certain number of days the equipment can be on the pipe before daily overnight
equipment charges will apply per day. No additional charges will apply if the equipment is removed by 7PM on the last day allowed.
• Line Stops – All Pipe Types
Qty Size Pipe Type Line Stop
%
Discount
TOTAL Line Stop Equipment charges:
Days allowed ( 2 - 15 days )
Begin at 7pm on days noted below
1 2”-4” DIP-CIP-PVC-AC $5,900.00 10% $5,310.00 $400.00 Per day each on 2nd day
1 6” DIP-CIP-PVC-AC $8,000.00 10% $7,200.00 $400.00 Per day each on 2nd day
1 8” DIP-CIP-PVC-AC $10,000.00 10% $9,000.00 $400.00 Per day each on 2nd day
1 10” DIP-CIP-PVC-AC $12,500.00 10% $11,250.00 $400.00 Per day each on 2nd day
1 12” DIP-CIP-PVC-AC $15,000.00 10% $13,500.00 $400.00 Per day each on 2nd day
1 12” PCCP – Concrete $20,000.00 10% $18,000.00 $400.00 Per day each on 2thday
1 14” DIP-CIP-PVC-AC $18,000.00 10% $16,200.00 $400.00 Per day each on 2nd day
1 14” PCCP – Concrete $28,000.00 10% $25,200.00 $400.00 Per day each on 2thday
1 16” DIP-CIP-PVC-AC $20,250.00 10% $18,225.00 $800.00 Per day each on 2nd day
1 16” PCCP – Concrete $34,000.00 10% $30,600.00 $800.00 Per day each on 2thday
1 18” DIP-CIP-PVC-AC $25,000.00 10% $22,500.00 $800.00 Per day each on 2nd day
1 18” PCCP – Concrete $39,000.00 10% $35,100.00 $800.00 Per day each on 2thday
1 20” DIP-CIP-PVC-AC $24,000.00 10% $21,600.00 $800.00 Per day each on 2nd day
1 20” PCCP – Concrete $44,000.00 10% $39,600.00 $800.00 Per day each on 2thday
1 24” DIP-CIP-PVC-AC $30,000.00 10% $27,000.00 $900.00 Per day each on 5th day
1 24” PCCP – Concrete $53,000.00 10% $47,700.00 $900.00 Per day each on 5thday
1 30” DIP-CIP-STL $42,000.00 10% $37,800.00 $1,250.00 Per day each on 5th day
1 30” PCCP-Concrete $60,000.00 10% $54,000.00 $1,250.00 Per day each on 5th day
1 36” DIP-CIP-STL $48,000.00 10% $43,200.00 $1,250.00 Per day each on 5th day
1 36” PCCP-Concrete $67,000.00 10% $60,300.00 $1,250.00 Per day each on 5th day
1 42” DIP-CIP-STL $52,000.00 10% $46,800.00 $1,250.00 Per day each on 10th day
1 42” PCCP-Concrete $72,000.00 10% $64,800.00 $1,250.00 Per day each on 10th day
1 48” DIP-CIP-STL $130,000.00 10% $117,000.00 $1,850.00 Per day each on 10th day
1 48” PCCP-Concrete $160,000.00 10% $144,000.00 $1,850.00 Per day each on 10th day
1 54” DIP-CIP-STL $150,000.00 10% $135,000.00 $2,550.00 Per day each on 15th day
Koppl Pipeline Services, Inc. • Texas
Phone 346-600-3390 • jarred@koppl.com CCL#844802 AZCL#ROC216719 NVCL#0060642
Koppl Pipeline Services, Inc. • Texas
Phone 346-600-3390 • jarred@koppl.com • www.koppl.com
Tipsusa - Ktx-4027jt - Tips Contract - Line Stops - Ts&Vs - Houston Tx 2/14/23
1 54” PCCP-Concrete $175,000.00 10% $157,500.00 $2,550.00 Per day each on 15th day
1 60” DIP-CIP-STL $160,000.00 10% $144,000.00 $2,550.00 Per day each on 15th day
1 60” PCCP-Concrete $200,000.00 10% $180,000.00 $2,550.00 Per day each on 15th day
1 66” DIP-CIP-STL $175,000.00 10% $157,500.00 $2,550.00 Per day each on 15th day
1 66” PCCP-Concrete $220,000.00 10% $198,000.00 $2,550.00 Per day each on 15th day
1 72”-96”
Inflatable Line
Stop
All Pipe Types $900,000.00 10% $810,000.00 $6,250.00 Per day each on 15th day
1 Adder 100-250 miles 100-250 miles
per each line
item
$1,250.00
each
10% $1,125.00
1 Adder 250+ Miles 250+ miles per
each line item
$2,400.00
each
10% $2,160.00
1 Adder Additional Mob 0-99 miles per
each line item
$1,250.00
each
10% $1,125.00
1 Adder Additional Mob 61-100 miles per
each line item
$1,750.00
each
10% $1,575.00
1 Adder Additional Mob 100-250 miles
per each line
item
$2,800.00
each
10% $2,520.00
1 Adder Additional Mob 250+ miles per
each line item
$4,000.00
each
10% $3,600.00
• Mobilizations: Koppl will allow (2) mobilizations to the jobsite to complete each Line Stop. Additional mobilizations will be
charged additional mob charges noted above. If the technician is enroute prior to cancellation a mobilization charge will apply. • Days Allowed: Koppl will allow line stopping equipment to be on to the pipe for days noted above. Daily overnight equipment
charges noted above will apply per day will begin at 7pm on the day noted above.
• Standby Charges 7am to 7PM: $175.00 per tech per hour
• Standby Charges 7pm to 7am: $250.00 per tech per hour
• Equipment Standby Charges: $1,000.00 per day per each piece of line stopping or hot tapping that is onsite not being used
due to contractor delays
• Concrete Encasement: Contractor is responsible for encasing the line stop fittings in concrete. All line stop fittings need to be
encased in concrete.
• Bypass Pipe: If bypass is required the contractor is responsible for the bypass piping and the connection of the bypass piping.
Koppl will supply line stopping equipment with bypass flanges.
• Hot Taps with Materials (TS&V): Koppl supplied tapping sleeve, valve, flange kit, pressure test, and hot tap. Hot taps 36”
and larger the customer will provide the gate valve and installation of the gate valve.
Qty Pipe Size/Tap Size Pipe Type Tapping Sleeve/Valve Price % Discount TIPS Price
1 6”-12” x 4” DIP-CIP-PVC-AC Epoxy/FLG x MJ $3,500.00 10% $3,150.00
1 6”-12” x 4” DIP-CIP-PVC-AC Stainless Steel/FLG x MJ $5,000.00 10% $4,500.00
1 6”-12” x 6” DIP-CIP-PVC-AC Epoxy/FLG x MJ $4,000.00 10% $3,600.00
1 6”-12” x 6” DIP-CIP-PVC-AC Stainless Steel/FLG x MJ $5,600.00 10% $5,040.00
1 8” x 8” DIP-CIP-PVC-AC Stainless Steel/FLG x MJ $6,000.00 10% $5,400.00
1 12” x 8” DIP-CIP-PVC-AC Epoxy/FLG x MJ $5,000.00 10% $4,500.00
1 12” x 8” DIP-CIP-PVC-AC Stainless Steel/FLG x MJ $7,000.00 10% $6,300.00
1 12” x 12” DIP-CIP-PVC-AC Stainless Steel/FLG x MJ $9,000.00 10% $8,100.00
1 14”-48 x 4” DIP-CIP-PVC-AC Epoxy/FLG x MJ $10,000.00 10% $9,000.00
1 14”-48 x 4” DIP-CIP-PVC-AC Stainless Steel/FLG x MJ $20,000.00 10% $18,000.00
1 14”-48 x 4” PCCP Epoxy/FLG x MJ $14,000.00 10% $12,600.00
1 14”-48” x 6” DIP-CIP-PVC-AC Epoxy/FLG x MJ $8,000.00 10% $7,200.00
1 14”-48” x 6” DIP-CIP-PVC-AC Stainless Steel/FLG x MJ $26,000.00 10% $23,400.00
1 14”-48” x 6” PCCP Epoxy/FLG x MJ $18,000.00 10% $16,200.00
1 14”-48” x 8” DIP-CIP-PVC-AC Epoxy/FLG x MJ $9,250.00 10% $8,325.00
Koppl Pipeline Services, Inc. • Texas
Phone 346-600-3390 • jarred@koppl.com • www.koppl.com
Tipsusa - Ktx-4027jt - Tips Contract - Line Stops - Ts&Vs - Houston Tx 2/14/23
1 14”-48” x 8” DIP-CIP-PVC-AC Stainless Steel/FLG x MJ $28,000.00 10% $25,200.00
1 14”-48” x 8” PCCP Epoxy/FLG x MJ $23,000.00 10% $20,700.00
1 14”-48” x 10”/12” DIP-CIP-PVC-AC Epoxy/FLG x MJ $15,000.00 10% $13,500.00
1 14”-48” x 10”/12” DIP-CIP-PVC-AC Stainless Steel/FLG x MJ $33,250.00 10% $29,925.00
1 14”-48” x 10”/12” PCCP Epoxy/FLG x MJ $24,000.00 10% $21,600.00
1 14” x 14” DIP-CIP-PVC-AC Stainless Steel/FLG x MJ $38,000.00 10% $34,200.00
1 16”-36” x 14” DIP-CIP-PVC-AC Epoxy/FLG x MJ $36,000.00 10% $32,400.00
1 16”-36” x 14” DIP-CIP-PVC-AC Stainless Steel/FLG x MJ $55,000.00 10% $49,500.00
1 16”-36” x 14” PCCP Epoxy/FLG x MJ $50,000.00 10% $45,000.00
1 16” x 16” DIP-CIP-PVC-AC Stainless Steel/FLG x MJ $41,000.00 10% $36,900.00
1 18”-36” x 16” DIP-CIP-PVC-AC Epoxy/FLG x MJ $44,000.00 10% $39,600.00
1 18”-36” x 16” DIP-CIP-PVC-AC Stainless Steel/FLG x MJ $72,110.00 10% $64,899.00
1 18”-36” x 16” PCCP Epoxy/FLG x MJ $63,350.00 10% $57,015.00
1 20” x 20” DIP-CIP-PVC Stainless Steel/FLG x MJ $78,000.00 10% $70,200.00
1 24-72” x 20” DIP-CIP-PVC Epoxy/FLG x MJ $65,000.00 10% $58,500.00
1 24-72” x 20” DIP-CIP-PVC Stainless Steel/FLG x MJ $98,000.00 10% $88,200.00
1 24-72” x 20” PCCP Epoxy/FLG x MJ $78,000.00 10% $70,200.00
1 24” x 24” DIP-CIP-PVC Stainless Steel/FLG x MJ $86,000.00 10% $77,400.00
1 42”-72” x 24” DIP-CIP-STL Epoxy/FLG x MJ $78,250.00 10% $70,425.00
1 42”-72” x 24” DIP-CIP-STL Epoxy/FLG x MJ $113,200.00 10% $101,880.00
1 42”-72” x 24” PCCP Epoxy/FLG x MJ $117,000.00 10% $105,300.00
1 36”-72” x 36-48” All Pipe Types Epoxy/Customer provided
Gate valve
$143,000.00 10% $128,700.00
1 Adder 100-250 miles 100-250 miles per each line
item
$1,250.00 each 10% $1,125.00
1 Adder 250+ Miles 250+ miles per each line item $2,400.00 each 10% $2,160.00
1 Adder Additional Mob 0-99 miles per each line item $1,250.00 each 10% $1,125.00
1 Adder Additional Mob 61-100 miles per each line item $1,750.00 each 10% $1,575.00
1 Adder Additional Mob 100-250 miles per each line
item
$2,800.00 each 10% $2,520.00
1 Adder Additional Mob 250+ miles per each line item $4,000.00 each 10% $3,600.00
• Mobilizations: Koppl will allow (1) mobilizations to the jobsite to complete each hot tap (TS&V). Additional mobilizations will be
charged additional mob charges noted above. If the technician is enroute prior to cancellation a mobilization charge will apply.
• Standby Charges 7am to 7PM: $175.00 per tech per hour
• Standby Charges 7pm to 7am: $250.00 per tech per hour • Equipment Standby Charges: $1,000.00 per day per each piece of line stopping or hot tapping that is onsite not being used due to contractor delays
• Insertion Valves: AVT EZ-Valve or Mueller PermaSeal
Qty Size Pipe Type Specified Insertion Valve Price % Discount Total
1 4” DIP-CIP-PVC EZ-Valve $7,700.00 10% $6,930.00
1 4” DIP-CIP-PVC Mueller PermaSeal $14,000.00 10% $12,600.00
1 6” DIP-CIP-PVC EZ-Valve $9,000.00 10% $8,100.00
1 6” DIP-CIP-PVC Mueller PermaSeal $16,000.00 10% $14,400.00
1 8” DIP-CIP-PVC EZ-Valve $12,500.00 10% $11,250.00
1 8” DIP-CIP-PVC Mueller PermaSeal $18,000.00 10% $16,200.00
1 10” DIP-CIP-PVC EZ-Valve $18,280.00 10% $16,425.00
1 10” DIP-CIP-PVC Mueller PermaSeal $32,000.00 10% $28,800.00
1 12” DIP-CIP-PVC EZ-Valve $24,000.00 10% $21,600.00
1 12” DIP-CIP-PVC Mueller PermaSeal $38,000.00 10% $34,200.00
Koppl Pipeline Services, Inc. • Texas
Phone 346-600-3390 • jarred@koppl.com • www.koppl.com
Tipsusa - Ktx-4027jt - Tips Contract - Line Stops - Ts&Vs - Houston Tx 2/14/23
1 14-16”” DIP-CIP-PVC EZ-Valve $53,000.00 10% $47,700.00
1 18-24” DIP-CIP-PVC EZ-Valve $70,000.00 10% $63,000.00
1 4”-12” Oversized
CIP-AC
Oversized CIP-AC pipe types.
Line item adder will apply
$4,200.00 10% $3,780.00
1 Adder 100-250 miles 100-250 miles per each line item $1,250.00 each 10% $1,125.00
1 Adder 250+ Miles 250+ miles per each line item $2,400.00 each 10% $2,160.00
1 Adder Additional Mob 0-99 miles per each line item $1,250.00 each 10% $1,125.00
1 Adder Additional Mob 61-100 miles per each line item $1,750.00 each 10% $1,575.00
1 Adder Additional Mob 100-250 miles per each line item $2,800.00 each 10% $2,520.00
1 Adder Additional Mob 250+ miles per each line item $4,000.00 each 10% $3,600.00
1 Adder Emergency 4”-12” standard OD $9,000.00 each 10% $8,100.00
• Mobilizations: Koppl will allow (1) mobilizations to the jobsite to complete each insertion valve. Additional mobilizations will be charged additional mob charges noted above. If the technician is enroute prior to cancellation a mobilization charge will apply.
• Standby Charges 7am to 7PM: $175.00 per tech per hour
• Standby Charges 7pm to 7am: $250.00 per tech per hour
• Equipment Standby Charges: $1,000.00 per day per each piece of line stopping or hot tapping that is onsite not being used
due to contractor delays
NOTE: Insertion Valve manufacturers do not guarantee a 100% seal. Insertion valves are not designed to be pressure tested against.
• 14” and larger insertion valves on PVC will require a 1” tap to remove any deflection from the pipe prior to the installation of the valve. • Please consult your Koppl sales representative prior to insertion valve installations on AC Pipe.
o Koppl does not recommend insertion valves on AC - Koppl recommends a line stop(s) and the contractor installing an inline valve.
o Koppl will assume no responsibility for AC insertion valves once the valve is pressure tested and installed.
o AC insertion valves seal on the ID of the pipe – if the valve is forced closed it could cause the pipe to crack. Insertion valves must
be operated up and down by the customer to soften the sealing element so allow it to seat on the ID of pipe. Koppl will not operate
valves after installed. Insertion valves must be operated by hand.
o Insertion valves must be encased in concrete for AC Pipe Applications
• Insertion valves cannot be installed on HDPE or any type of Concrete Pressure Pipe.
• Mueller PermaSeal Insertion Valves: Contractor must encase the valve fitting in concrete to support valve and equipment weight. • Customer must provide Pipe Type, Pipe OD, Class/DR rating, and wall thickness prior to ordering/scheduling installation.
• 14” – 24” EZ-Valves are special order items.
• Mueller PermaSeal valves are special order items
• Bar-Wrap connection adapters/installation
Qty Size Pipe Type Description (C303 Bar-Wrap)
Price Each %
Discount
Total
1 12”-16” Bar-Wrap Plain End x Mega-Lug Connection adapter – Mortar Lined -Welded $15,000.00 10% $13,500.00
1 12”-16” Bar-Wrap Plain End x Flange Connection adapter – Mortar Lined -Welded $22,000.00 10% $19,800.00
1 14”-20” Bar-Wrap Plain End x Mega-Lug Connection adapter – Mortar Lined -Welded $19,000.00 10% $17,100.00
1 14”-20” Bar-Wrap Plain End x Flange Connection adapter – Mortar Lined -Welded $24,000.00 10% $21,600.00
1 24”-36” Bar-Wrap Plain End x Mega-Lug Connection adapter – Mortar Lined -Welded $25,000.00 10% $22,500.00
1 24”-36” Bar-Wrap Plain End x Flange Connection adapter – Mortar Lined -Welded $33,000.00 10% $29,700.00
1 42”-48” Bar-Wrap Plain End x Mega-Lug Connection adapter – Mortar Lined -Welded $32,000.00 10% $28,800.00
1 42”-48” Bar-Wrap Plain End x Flange Connection adapter – Mortar Lined -Welded $53,000.00 10% $47,700.00
1 54”-60” Bar-Wrap Plain End x Mega-Lug Connection adapter – Mortar Lined -Welded $45,000.00 10% $40,500.00
1 54”-60” Bar-Wrap Plain End x Flange Connection adapter – Mortar Lined -Welded $63,000.00 10% $56,700.00
1 12”-24” Bar-Wrap Plain end Cut-in TEE Fittings with 4’-24” Plain Connection - Welded $35,000.00 10% $31,500.00
1 12”-24” Bar-Wrap Plain end Cut-in TEE Fittings with 4”-24” Flanged Connection-Welded $45,000.00 10% $40,500.00
1 30”-48” Bar-Wrap Plain end Cut-in TEE Fittings with 30”-48” Plain Connection-Welded $52,000.00 10% $46,800.00
1 30”-48” Bar-Wrap Plain end Cut-in TEE Fittings with 30”-48” Flanged Connection-Welded $70,000.00 10% $63,000.00
1 12”-24” Bar-Wrap 6ft/8ft Replacement Section – Plain End – Mortar Coated/Lined-
Welded
$22,000.00 10% $19,800.00
1 30”-48” Bar-Wrap 6ft/8ft Replacement Section – Plain End – Mortar Coated/Lined-
Welded
$40,000.00 10% $36,000.00
1 54”-60” Bar-Wrap 6ft/8ft Replacement Section – Plain End – Mortar Coated/Lined-
Welded
$75,000.00 10% $67,500.00
Koppl Pipeline Services, Inc. • Texas
Phone 346-600-3390 • jarred@koppl.com • www.koppl.com
Tipsusa - Ktx-4027jt - Tips Contract - Line Stops - Ts&Vs - Houston Tx 2/14/23
1 12”-16” Bar-Wrap 12”-16” Replacement Pipe (full joint) Installed $24,000.00 10% $21,600.00
1 14”-20” Bar-Wrap 14”-20” Replacement Pipe (full joint) Installed $30,000.00 10% $27,000.00
1 24”-36” Bar-Wrap 24”-36” Replacement Pipe (full joint) Installed $50,000.00 10% $45,000.00
1 42”-48” Bar-Wrap 42”-48” Replacement Pipe (full joint) Installed $90,000.00 10% $81,000.00
1 12”-16” Bar-Wrap 12”-16” Butt Strap Installed $7,500.00 10% $6,750.00
1 14”-20” Bar-Wrap 14”-20” Butt Strap Installed $9,500.00 10% $8,550.00
1 24”-36” Bar-Wrap 24”-36” Butt Strap Installed $14,000.00 10% $12,600.00
1 42”-60” Bar-Wrap 42”-60” Butt Strap Installed $18,000.00 10% $16,200.00
1 Adder Bar-Wrap 12” – 36” Welding/Installation Service per “EACH” line item of
customer supplied materials
$10,000.00 10% $9,000.00
1 Adder Bar-Wrap 42” – 60” Welding/Installation Service per “EACH” line item of
customer supplied materials
$20,000.00 10% $18,000.00
1 Adder 100-250
miles
100-250 miles per each line item $1,250.00
each
10% $1,125.00
1 Adder 250+ Miles 250+ miles per each line item $2,400.00
each
10% $2,160.00
1 Adder Additional
Mob
0-99 miles per each line item $1,250.00
each
10% $1,125.00
1 Adder Additional
Mob
61-100 miles per each line item $1,750.00
each
10% $1,575.00
1 Adder Additional
Mob
100-250 miles per each line item $2,800.00
each
10% $2,520.00
1 Adder Additional
Mob
250+ miles per each line item $4,000.00
each
10% $3,600.00
• Mobilizations: Koppl will allow (1) mobilizations to the jobsite to complete per each welding service adapter. Additional mobilizations will be charged additional mob charges noted above. If the technician is enroute prior to cancellation a mobilization
charge will apply.
• Standby Charges 7am to 7PM: $175.00 per tech per hour
• Standby Charges 7pm to 7am: $250.00 per tech per hour
• Equipment Standby Charges: $1,000.00 per day per each piece of line stopping or hot tapping that is onsite not being used
due to contractor delays
• LCP adapters: Customer will install these at the Bell and Spigot Ends.
Qty Size Pipe Type Description (PRESTRESSED Pipe)
Price Each % Discount Total
1 16”-24” Prestressed LCP BELL x SPIGOT ADAPTER or SPIGOT x BELL Mega-Lug
Connection
$15,000.00 10% $13,500.00
1 16”-24” Prestressed LCP BELL x SPIGOT ADAPTER or SPIGOT x BELL FLG Connection $20,000.00 10% $18,000.00
1 30”-48” Prestressed LCP BELL x SPIGOT ADAPTER or SPIGOT x BELL Mega-Lug
Connection
$28,000.00 10% $25,200.00
1 30”-48” Prestressed LCP BELL x SPIGOT ADAPTER or SPIGOT x BELL FLG Connection $31,000.00 10% $27,900.00
1 54”-66” Prestressed LCP BELL x SPIGOT ADAPTER or SPIGOT x BELL Mega-Lug
Connection
$45,000.00 10% $40,500.00
1 54”-66” Prestressed LCP BELL x SPIGOT ADAPTER or SPIGOT x BELL FLG Connection $51,000.00 10% $45,900.00
• LCP Welded adapters: Prestressed adapters with welded joint connection (joint ring x back up ring)
Qty Size Pipe Type Description (PRESTRESSED Pipe)
Price Each % Discount Total
1 16”-24” Prestressed LCP BELL x SPIGOT ADAPTER or SPIGOT x BELL Mega-Lug
Connection
Joint Ring x Back Ring (welded connection)
$15,000.00 10% $13,500.00
1 16”-24” Prestressed LCP BELL x SPIGOT ADAPTER or SPIGOT x BELL FLG Connection
Joint Ring x Back Ring (welded connection)
$20,000.00 10% $18,000.00
1 30”-48” Prestressed LCP BELL x SPIGOT ADAPTER or SPIGOT x BELL Mega-Lug
Connection
Joint Ring x Back Ring (welded connection)
$28,000.00 10% $25,200.00
Koppl Pipeline Services, Inc. • Texas
Phone 346-600-3390 • jarred@koppl.com • www.koppl.com
Tipsusa - Ktx-4027jt - Tips Contract - Line Stops - Ts&Vs - Houston Tx 2/14/23
1 30”-48” Prestressed LCP BELL x SPIGOT ADAPTER or SPIGOT x BELL FLG Connection
Joint Ring x Back Ring (welded connection)
$31,000.00 10% $27,900.00
1 54”-66” Prestressed LCP BELL x SPIGOT ADAPTER or SPIGOT x BELL Mega-Lug
Connection
Joint Ring x Back Ring (welded connection)
$45,000.00 10% $40,500.00
1 54”-66” Prestressed LCP BELL x SPIGOT ADAPTER or SPIGOT x BELL FLG Connection
Joint Ring x Back Ring (welded connection)
$51,000.00 10% $45,900.00
• Bar-Wrap Pipe LEAK REPAIR – JOINT REPAIR - Welding Service
Qty Size Pipe Type Description (Concrete Cylinder Pipe Welded Repair)
Price Each % Discount Total
1 12”-60” Bar-Wrap Concrete Pressure Pipe Joint Leak Repair-welded $25,000.00 10% $22,500.00
1 Adder 100-250 miles 100-250 miles per each line item $1,250.00
each
10% $1,125.00
1 Adder 250+ Miles 250+ miles per each line item $2,400.00
each
10% $2,160.00
1 Adder Additional Mob 0-99 miles per each line item $1,250.00
each
10% $1,125.00
1 Adder Additional Mob 61-100 miles per each line item $1,750.00
each
10% $1,575.00
1 Adder Additional Mob 100-250 miles per each line item $2,800.00
each
10% $2,520.00
1 Adder Additional Mob 250+ miles per each line item $4,000.00
each
10% $3,600.00
• Mobilizations: Koppl will allow (1) mobilizations to the jobsite to complete per each welding service adapter. Additional
mobilizations will be charged additional mob charges noted above. If the technician is enroute prior to cancellation a mobilization
charge will apply.
• Standby Charges 7am to 7PM: $175.00 per tech per hour
• Standby Charges 7pm to 7am: $250.00 per tech per hour
• Equipment Standby Charges: $1,000.00 per day per each piece of line stopping or hot tapping that is onsite not being used
due to contractor delays
*Includes all taxes and delivery of material unless otherwise noted.
Customer Delays: Delays caused on the jobsite that are of no fault of Koppl Pipeline Services will be billed at $175.00 per
hour per technician 7am to 7pm and $250.00 per tech per hour 7pm to 7am, plus any applicable overtime.
Coupon Retention: Koppl Pipeline Services uses the latest technology for coupon retention, yet there is no guarantee of its
retrieval. All costs associated with retrieving the coupon will be the responsibility of the customer.
Payment Terms: Net 30 – Pending Credit Approval
Customer Acknowledgement
Customer has reviewed and agreed upon the above estimate for the work described herein. Customer is aware of the fact that job
parameters may change and extra charges may occur. If the job scope changes upon our arrival, customer is entitled, at customer’s
request, to receive a revised estimate. Signatures below indicate acknowledgement and acceptance of this estimate and additional
references, along with its standard terms and conditions. Thank you in advance for considering Koppl Pipeline Services for your hot tapping, line stopping, pipe freezing, and valve insertion
needs.
Authorized Koppl Representative:
Jarred Tompkins
EVP of Sales6
346-600-3390 jarred@koppl.com
Koppl Pipeline Services, Inc. • Texas
Phone 346-600-3390 • jarred@koppl.com • www.koppl.com
Tipsusa - Ktx-4027jt - Tips Contract - Line Stops - Ts&Vs - Houston Tx 2/14/23
Additional References
Site Preparation Customer is responsible for safe preparation of the work site. For underground work, this may include traffic control, excavation, shoring, permits, etc. For work performed
inside of a building or other structure, safe access to the work area must be provided, such as scaffolding, a manlift, or ladders. Please contact your sales representative for detailed requirements depending on the work to be performed.
Pipe Information
Customer must provide accurate dimensional information for the pipe in which the line stopping operation will occur. This will include type of pipe, class, outside diameter, inside diameter, pressure, temperature, etc. If the information is found to be inaccurate at the time the work begins, a re-quote may be required. A brief summary of the
work to be performed while the line stop is in line should also be provided.
Thrust Restraint Any type of thrust restraint that is required to properly prevent pipe movement shall be provided by the customer. Any engineering necessary for the design of the restraint shall also be the responsibility of the customer.
Equipment Support Block
Support of our equipment at the line stop location may be required. This typically consists of a concrete support block placed under and around our line stop fitting to carry the loads imposed on the pipe by our equipment. Consult with your sales representative for clarification.
Suspension of Flow
Customer must provide suspension of flow at the time the line stop head is inserted into the line. Pressure may be maintained, but flow must be stopped. Consult with your sales representative for clarification.
Chlorination It will be the customer’s responsibility to provide any chlorination services that may be required. This applies to any equipment, bypasses, or fittings that are related to the
line stop process. Requirements for flushing must be discussed before prior to the line stop being scheduled.
Blow Down and Draining After the line stops have been set, it will be the customer’s responsibility to blow down the line and drain its contents in a safe and controlled manner.
Leakage Due to various internal piping conditions, a 100% seal on the line stop may not be possible. Koppl will attempt to obtain the best seal attainable given the conditions, but no
guarantee can be made as to the quality of the line stop. The customer must be prepared for containing and working with any leakage that may occur. Consult with your sales representative for clarification.
Equalization
Equalization of pressure on both sides of the line stop location is required prior to removing the line stop head. A means of equalization must be provided.
Duration of Line Stop The line stop shall remain in line for the duration stated above. If additional days are required, additional equipment charges may apply.
Pipe Coating Prior to our arrival on site, the customer is responsible for removing any existing coating on the pipe. This includes insulation, tape wrap, concrete, tar coating, etc. Any
coating containing asbestos will need to be abated before we can begin any work on site.
Welding If Koppl Pipeline Services is to provide welding services, connection of a welding machine may be necessary. An electrician must be available to connect our portable welding
machine to a suitable power source (208 or 480 3-phase, minimum 20 amp breaker). Our truck mounted welding machine may be used if we can park within 200 feet of the job location. If Koppl provides a welder, the customer must provide a fire watch.
Stand-By Time and Overtime
Delays beyond our control will be subject to a charge of $175.00 per man / per hour for straight time $250.00 per man / per hour for overtime, after hours, holiday, or emergency projects plus any applicable overtime.
Coupon Retention Koppl Pipeline Services uses the latest technology for coupon retention, yet there is no guarantee of its retrieval. All costs associated with retrieving the coupon will be the
responsibility of the customer.
C900 and PVC Piping On certain systems, C900 piping might have a tendency to crack and catastrophically fail. Although Koppl follows all industry standard tapping procedures when tapping into
C900, there is no way to determine the integrity of the pipe being tapped. If a failure should occur, Koppl shall be relieved of all liability related to the incident. Prevailing Wage & Project Labor Agreements
KOPPL PIPELINE SERVICES, INC. IS A NON-UNION CONTRACTOR. Customer must notify Koppl, in advance, of any requirement to be signatory to a union in order to comply with a site project labor agreement. We must also be notified to pay prevailing wage rates or to provide certified payroll reports. Requirement to do so shall warrant a
requote. Pricing
Pricing is based on the scope of work described. Any changes to this scope may change unit pricing or total pricing. Please contact us for a new quote if the quantities, sizes, or scope of work is modified.
I have read the above additional references:
Signature: Date:
Koppl Pipeline Services, Inc. • Texas
Phone 346-600-3390 • jarred@koppl.com • www.koppl.com
Tipsusa - Ktx-4027jt - Tips Contract - Line Stops - Ts&Vs - Houston Tx 2/14/23
ON-STREAM SERVICES & PRODUCTS
TERMS AND CONDITIONS
GOVERNING TERMS
THESE TERMS AND CONDITIONS ARE AN OFFER BY US TO YOU SUBJECT TO THE APPROVAL OF OUR CREDIT DEPARTMENT, AND MAY BE ACCEPTED ONLY ON THESE EXACT TERMS AND CONDITIONS. THE CONTRACT FORMED BY YOUR ACCEPTANCE OF THIS QUOTATION, OR BY YOUR REQUEST THAT WE ENTER A SALES ORDER FOR
YOU, OR BY YOUR ACCEPTANCE OF A SHIPMENT FROM KOPPL PIPELINE SERVICES, INC PIPELINE SERVICES, INC WILL CONSTITUTE THE EXCLUSIVE, COMPLETE AND FINAL AGREEMENT BETWEEN KOPPL PIPELINE SERVICES, INC PIPELINE SERVICES, INC AND YOU AND THERE ARE NO OTHER AGREEMENTS, REPRESENTATIONS, PROMISES, OR STATEMENTS BETWEEN US EITHER EXPRESSED OR IMPLIED. IF YOU ISSUE A DOCUMENT OF YOUR OWN, THIS DOCUMENT SHALL SUPERSEDE THE
TERMS AND CONDITIONS OF YOUR DOCUMENT. ALL TERMS AND CONDITIONS, DISPUTES AND LEGAL ACTIVITIES SHALL BE CONDUCTED IN AND INTERPRETED BY THE JURISDICTION AND LAWS OF THE STATE OF CALIFORNIA, LOS ANGELES COUNTY.
SHIPMENT
DELIVERIES SHALL BE MADE IN ACCORDANCE WITH A DELIVERY SCHEDULE, WHICH MAY BE REVISED BY MUTUAL AGREEMENT TO ADJUST TO JOB CONDITIONS OR MANUFACTURING REQUIREMENTS. WE CANNOT GUARANTEE PRECISE DELIVERY OR INSTALLATION DATES AND SHALL NOT BE RESPONSIBLE FOR DELAYS IN
DELIVERIES, NOR LIABLE FOR ANY LOSSES, EXPENSES OR DAMAGES, INCLUDING LIQUIDATED DAMAGES OR PENALTIES OF ANY KIND, WHICH YOU OR YOUR CUSTOMER MAY INCUR. ACCEPTANCE OF DELIVERY BY YOU CONSTITUTES CONFIRMATION OF YOUR ACCEPTANCE OF THE DELIVERY SCHEDULE AGAINST WHICH THE DELIVERY
WAS MADE. UNLESS STATED OTHERWISE IN THE QUOTATION, SHIPMENTS ARE QUOTED F.O.B. OUR DOCK OR OUR VENDOR'S DOCK. PRICES, PAYMENT AND TAXES
PRICE DOES NOT INCLUDE ANY STATE, FEDERAL, OR LOCAL TAXES UNLESS SPECIFICALLY NOTED. TERMS OF PAYMENT ARE STATED ON THE QUOTATION. OUR TERMS OF SALE DO NOT PERMIT OR ALLOW THE WITHHOLDING FROM PAYMENT OF ANY PERCENTAGE OF DOLLAR AMOUNT DUE AND PAYABLE TO KOPPL PIPELINE SERVICES,
INC PIPELINE SERVICES, INC BECAUSE THE OWNER OR FINANCING AGENCY WITHHOLDS FUNDS AS RETENTION, OR FOR SOME OTHER REASON, UNTIL SOME FUTURE CONDITION IS FULFILLED. ALL FUNDS RECEIVED BY YOU OR PAYABLE TO YOU FOR SATISFACTION OF THE AMOUNT DUE KOPPL PIPELINE SERVICES, INC PIPELINE
SERVICES, INC HEREUNDER SHALL BE HELD AS A TRUST FUND FOR PAYMENT OF YOUR OBLIGATIONS TO KOPPL PIPELINE SERVICES, INC PIPELINE SERVICES, INC, AND SHALL NOT BE APPLIED TO OTHER PURPOSES UNTIL YOUR OBLIGATION TO KOPPL PIPELINE SERVICES, INC PIPELINE SERVICES, INC IS SATISFIED. PAYMENT SHALL BE
IN UNITED STATES OF AMERICA DOLLARS. NO BACKCHARGES, WITHHOLDING OR DEDUCTS OF ANY KIND ARE ALLOWED. PRICES ARE SUBJECT TO INCREASE TO COMPENSATE FOR ANY INCREASE IN OUR COSTS DUE TO NEW OR INCREASED TAXES OR GOVERNMENTAL REGULATORY MEASURES. PRICES ON THE QUOTATION ARE BASED ON THE QUANTITIES GIVEN. ANY QUANTITY CHANGES OR OTHER ORDER MODIFICATIONS MAY RESULT IN PRICE CHANGES. EXCEPT AS ABOVE NOTED, PRICES
ON THE QUOTATION ARE VALID FOR A PERIOD OF THIRTY DAYS AFTER THE DATE OF THE QUOTATION UNLESS A SPECIFIC VARIANCE IS GRANTED ON THE ATTACHED QUOTATION.
INDEMNITY
FOLLOWING DELIVERY OR KOPPL PIPELINE SERVICES, INC PIPELINE SERVICES, INC'S INSTALLATION, YOU EXPRESSLY AGREE TO INDEMNIFY AND HOLD KOPPL PIPELINE SERVICES, INC HARMLESS FROM ANY AND ALL LOSS, COST, LIABILITY OR EXPENSE, INCLUDING ATTORNEY'S FEES RELATING TO OR IN CONNECTION WITH ANY
PROCEEDING, CAUSE FOR ACTION, OR ANY DAMAGE TO PERSONS OR PROPERTY INVOLVING THE USE, APPLICATION, TRANSPORTATION, STORAGE, DISPOSAL, OR YOUR'S OR OTHER'S INSTALLATION OF THE ITEMS ON THIS QUOTATION, OR SALES ORDER, OR SHIPMENT.
FORCE MAJEURE KOPPL PIPELINE SERVICES, INC IS NOT RESPONSIBLE OR LIABLE FOR ANY DELAYS OR NONPERFORMANCE IN THE EVENT OF EARTH MOVEMENT, FIRE, FLOOD,
EXPLOSION, THE ELEMENTS, OR OTHER CATASTROPHE, ACTS OF GOD, WAR, RIOT, CIVIL DISTURBANCE, STRIKE, LOCKOUT, REFUSAL OF EMPLOYEES TO WORK, LABOR DISPUTES, SHORTAGE, OR INABILITY TO OBTAIN RAW MATERIALS, INCLUDING ENERGY REQUIREMENTS, FAILURE OF CARRIERS TO DELIVER, IN THE EVENT OF ANY
LEGISLATIVE, EXECUTIVE OR JUDICIAL ACT OF ANY GOVERNMENTAL AUTHORITY SUBSTANTIALLY AFFECTING KOPPL PIPELINE SERVICES, INC OPERATIONS, IN THE EVENT KOPPL PIPELINE SERVICES, INC SUSPENDS OR DISCONTINUES BUSINESS FOR ANY REASON, OR ANY OTHER REASON BEYOND THE CONTROL OF KOPPL PIPELINE
SERVICES, INC. LIMITED WARRANTY LABOR AND PRODUCTS MANUFACTURED BY KOPPL PIPELINE SERVICES, INC ARE WARRANTED FREE FROM DEFECTS IN MATERIAL AND WORKMANSHIP FOR A PERIOD OF 365 DAYS FROM THE DATE OF SHIPMENT FROM KOPPL PIPELINE SERVICES, INC TO ANY LOCATION (MATERIALS) OR SERVICE. THE WARRANTY ON ITEMS NOT
MANUFACTURED BY KOPPL PIPELINE SERVICES, INC OR SUBCONTRACTED SERVICES SHALL NOT EXCEED THE WARRANTY OF OUR SUBCONTRACTOR OR SUPPLIER OR HIS MANUFACTURER. IF DEFECT UNDER THIS WARRANTY APPEARS, KOPPL PIPELINE SERVICES, INC, AT ITS OPTION WILL REWORK OR REPLACE THAT ITEM OR
REFUND THE PURCHASE PRICE OF THE DEFECTIVE PORTION, LESS AN ALLOWANCE FOR SERVICES RENDERED BY THE SERVICE OR PRODUCT PRIOR TO THE CLAIM, BUT IN NO EVENT WILL KOPPL PIPELINE SERVICES, INC BE RESPONSIBLE FOR CONSEQUENTIAL OR INCIDENTAL DAMAGES. THIS WARRANTY SHALL NOT APPLY TO ANY
PRODUCT OR INSTALLATION WHICH HAS BEEN REPAIRED OR ALTERED BY ANYONE OTHER THAN KOPPL PIPELINE SERVICES, INC, OR WHICH HAS BECOME DEFECTIVE DUE IN TOTAL OR IN PART TO MISUSE, MISHANDLING, NEGLIGENCE OR CASUALTY, OR WHICH HAS BECOME DEFECTIVE IN TOTAL OR IN PART DUE TO NATURAL OR
MAN-MADE EXPOSURE DAMAGE (EG., POLLUTION CONTACT DAMAGE) OR ANY SEISMIC OR OTHER MOTIONS OF THE INSTALLATION OR ANY PRESSURE/THERMAL CYCLING OR HAS BEEN OPERATED CONTRARY TO MANUFACTURER'S INSTRUCTIONS. REMEDIES AVAILABLE TO AN OWNER FOR BREACH OF WARRANTY ARE EXPRESSLY LIMITED TO AN ACTION TO RECOVER FOR THE VALUE OF REPAIRS OR REPLACEMENTS DUE HEREUNDER OF OUR PRODUCT ONLY, AND KOPPL PIPELINE SERVICES, INC'S
LIABILITY FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES ARE HEREBY EXPRESSLY EXCLUDED TO THE FULL EXTENT PERMITTED BY APPLICABLE LAW. ANY SHORTAGES OR SHIPPING DAMAGE MUST BE REPORTED IN WRITING OR FAX TO KOPPL PIPELINE SERVICES, INC WITHIN THREE BUSINESS DAYS OF YOUR RECEIPT OF
SHIPMENT. KOPPL PIPELINE SERVICES, INC MAKES NO WARRANTY THAT THE GOODS SOLD UNDER THIS CONTRACT ARE FIT FOR ANY PARTICULAR PURPOSE. THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THOSE SET FORTH HEREIN.
OTHER SPECIFIC WARRANTY EXCLUSIONS
(1). ANY PRODUCT FAILURES OR DAMAGE DUE TO CORROSION. (2). THE FINISH ON THE PRODUCT. (3). IF THE PRODUCT IS NOT INSTALLED BY KOPPL PIPELINE SERVICES, INC, ANY SEAL LEAKAGE OR SEAL FAILURE FOR ANY REASON WHATSOEVER. (4). IF THE PRODUCT IS INSTALLED BY KOPPL PIPELINE SERVICES, INC, ANY
SEAL LEAKAGE OR SEAL FAILURE, FOR ANY REASON WHATSOEVER, WHICH MAY OCCUR AT ANY TIME AFTER EITHER THE FIRST ACCEPTANCE OF AN INSTALLATION OR A FIRST PRESSURE TEST ACCEPTANCE, WHICHEVER OCCURS FIRST. EITHER VERBAL JOBSITE APPROVAL OR SIGNATURES ON KOPPL PIPELINE SERVICES, INC'S FIELD WORK DOCUMENTS CONSTITUTE ACCEPTANCE.
MISCELLANEOUS
(1). ALL DOCUMENTATION SUBJECT TO CORRECTION OF STENOGRAPHIC ERRORS. (2). A FIELD REPRESENTATIVE MAY ASSIST YOU, HOWEVER THAT REPRESENTATIVE HAS NO AUTHORITY TO BIND KOPPL PIPELINE SERVICES, INC IN ANY MODIFICATION OF THIS AGREEMENT. KOPPL PIPELINE SERVICES, INC SHALL NOT BE HELD
RESPONSIBLE FOR ANY INSTRUCTIONS OR TECHNICAL ADVICE IN CONNECTION WITH THE DESIGN AND/OR USE OF MATERIAL HEREUNDER. (3). KOPPL PIPELINE
Koppl Pipeline Services, Inc. • Texas
Phone 346-600-3390 • jarred@koppl.com • www.koppl.com
Tipsusa - Ktx-4027jt - Tips Contract - Line Stops - Ts&Vs - Houston Tx 2/14/23
SERVICES, INC MAY REFER TO AND USE VARIOUS GENERALLY ACCEPTED CODES AND FORMULAS FOR DESIGNS. THIS IN NO WAY INDICATES OUR APPROVAL OR AGREE-MENT TO SUCH CODES OR FORMULAS. CITING ANY CODE, FORMULA, OR STANDARD IN NO WAY IMPLIES SUITABILITY OR USABILITY OF ANY PRODUCT FOR ANY SPECIFIC APPLICATION. (4). THIS AGREEMENT SHALL BE BINDING UPON AND INURE TO THE BENEFIT OF THE RESPECTIVE HEIRS, EXECUTORS, ADMINISTRATORS,
RECEIVERS, LEGAL REPRESENTATIVES, SUCCESSORS AND ASSIGNS OF THE PARTIES HERETO. (5). ALL CHANGES IN THE THIS AGREEMENT/ORDER MUST BE IN WRITING, SHOWING THE ORIGINAL ORDER NUMBER AND THE CHANGE ORDER NUMBER. ALL COSTS FOR THE CHANGES IN THE ORDER WILL BE AT YOUR EXPENSE,
SUBJECT TO THE TERMS AND CONDITIONS HEREIN. (6). INVOICING TO YOU FROM KOPPL PIPELINE SERVICES, INC WILL OCCUR AS SOON AS POSSIBLE AFTER THE DATE OF SHIPMENT OF OUR PRODUCT TO YOUR SITE OR REPRESENTATIVE, OR THE DATE OF ACCEPTANCE BY YOUR REPRESENTATIVE, WHICHEVER IS EARLIER, AND
PAYMENT SHALL BE DUE PER THE TERMS OF OUR QUOTATION (BUT NOT LONGER THAN 30 DAYS AFTER DATE OF INVOICE) REGARDLESS WHETHER OR NOT ACTUAL SHIPMENT HAS BEEN MADE, UNLESS SUCH LACK OF SHIPMENT IS THE FAULT OF KOPPL PIPELINE SERVICES, INC'S FAILURE TO ALLOW SUCH SHIPMENT OR TO FOLLOW
OUR STANDARD SHIPPING PROCEDURES. FAILURE OF YOU TO PROVIDE SHIPPING INSTRUCTIONS OR TO AUTHORIZE SHIPPING SHALL NOT BE VALID REASON FOR YOU TO DELAY OR REFUSE PAYMENT. (7). AFTER OUR DATE OF INVOICE, IF WITHIN 30 DAYS WE HAVE NOT RECEIVED AUTHORIZATION OR WORKABLE INSTRUCTIONS TO SHIP, A STORAGE FEE, IN MONTHLY INCREMENTS EQUAL TO 2.75% OF THE INVOICE TOTAL, SHALL BE ASSESSED TO YOU AND PAYABLE BY YOU WITHIN 30 DAYS.
FAILURE OF YOU TO PAY THIS STORAGE FEE ON TIME OR STORAGE WHICH LASTS LONGER THAN 12 MONTHS SHALL BE CONSIDERED TO BE ABANDONMENT BY YOU OF THE PRODUCT AND KOPPL PIPELINE SERVICES, INC SHALL BE FREE TO SELL OR OTHERWISE DISPOSE OF THE STORED ITEMS. SUCH ACTIVITY IN NO WAY RELIEVES
YOU OF YOUR OBLIGATION TO PAY FOR THE ITEM(S) IN QUESTION UNDER THE TERMS OF THIS AGREEMENT.
WARNING THE USE OR APPLICATION OF ANY KOPPL PIPELINE SERVICES, INC PRODUCT OR MATERIAL SOLD BY KOPPL PIPELINE SERVICES, INC IS STRICLTY AND COMPLETELY AT
YOUR OWN RISK. NAMES OF PRODUCTS OR VERBAL OR PRINTED APPLICATION AND USAGE SUGGESTIONS ARE NOT TO BE CONSTRUED OR ASSUMED TO BE SAFE OR WORKABLE IN YOUR SITUATION. READ AND UNDERSTAND ALL SAFETY INSTRUCTION. EXPERIMENT FIRST, AT YOUR OWN RISK AND EXPENSE, BEFORE APPLYING OR USING ANY PRODUCT. MANY PRODUCTS HAVE HAZARDOUS, DANGEROUS OR TOXIC APPLICATION CHARACTERISTICS.
I have read the above additional references:
Signature: Date: