Loading...
7633 - Amendment 3 Executed DocuSign Transmittal Coversheet File Name Purchasing Contact Docusign Envelope ID: BDAFC774-E052-4214-9611-D0F9F081F183 633 Underground Electric Installation, Amendment 3 - Rate Increase Christa Christian Procurement & Compliance 901 B Texas St., Denton, TX 76209  (940) 349-7100 OUR CORE VALUES Integrity  Fiscal Responsibility  Inclusion Transparency  Outstanding Customer Service January 28, 2025 Mr. Billy Ryan FX5 Utility Construction, LLC PO Box 1297 Decatur, TX 76234 b.ryan@fx5utility.com Re: Letter Agreement to Amend (this “Amendment”) File 7633 – between the City of Denton (“COD”) and FX5 Utility Construction, LLC., dated May 18, 2021 (the “Contract”) – Amendment #3 Dear Mr. Ryan, Thank you for being such a valued partner. By signing this Amendment below, COD and FX5 Utility Construction, LLC. agree that the Contract is hereby deemed amended to the updated Schedule of Charges, as shown in Attachment A. Except as amended by this Amendment, the Contract is not otherwise amended and all other terms and conditions of the Contract remain in full force and effect, as amended hereby. This Amendment may be executed in any number of counterparts, each of which shall be deemed an original and all of which together shall constitute one and the same instrument. Signatures transmitted electronically shall have the same effect as the delivery of original signatures. The City of Denton reserves the right to re-evaluate pricing as the market conditions change and can ask your firm to provide updated proposed pricing, including, but not limited to, a decrease in pricing, as a result of any such change. We look forward to future business with your firm. Regards, ____________________________ ___________________________ Christa Christian, CPPB Billy Ryan, President Procurement and Compliance or Authorized Representative City of Denton FX5 Utility Construction, LLC ____________________________ Ralph Patterson Docusign Envelope ID: BDAFC774-E052-4214-9611-D0F9F081F183 DME Item # U O M Current Unit Prices Adjustment Proposed Unit Prices EXCAVATION & BACKFILL 5.00% D1 Ft Trench with Trencher 6" wide by 30" deep 1.49$ 5.00%1.56$ D2 Ft Trench with Trencher 6" wide by 48" deep 1.55$ 5.00%1.62$ D3 Ft Trench with Trencher 6" wide by 60" deep 1.90$ 5.00%2.00$ D4 Ft Trench with Backhoe 18" wide 48" deep 2.38$ 5.00%2.49$ D5 Ft Trench with Backhoe 18" wide 60" deep 2.68$ 5.00%2.81$ D6 Ft Trench with Backhoe 18" wide 72" deep 2.96$ 5.00%3.11$ D7 Ft Trench with Backhoe 18" wide 84" deep 4.15$ 5.00%4.36$ D8 Ft Trench with Backhoe 18" wide 96" deep 4.87$ 5.00%5.11$ D9 Ft Trench with Backhoe 24" wide 48" deep 4.87$ 5.00%5.11$ D10 Ft Trench with Backhoe 24" wide 60" deep 5.45$ 5.00%5.73$ D11 Ft Trench with Backhoe 24" wide 72" deep 6.11$ 5.00%6.42$ D12 Ft Trench with Backhoe 24" wide 84" deep 7.36$ 5.00%7.73$ D13 Ft Trench with Backhoe 24" wide 96" deep 9.73$ 5.00%10.22$ D14 Ft Trench with Backhoe 36" wide 48" deep 6.11$ 5.00%6.42$ D15 Ft Trench with Backhoe 36" wide 60" deep 7.30$ 5.00%7.66$ D16 Ft Trench with Backhoe 36" wide 72" deep 8.55$ 5.00%8.97$ D17 Ft Trench with Backhoe 36" wide 84" deep 9.73$ 5.00%10.22$ D18 Ft Trench with Backhoe 36" wide 96" deep 12.17$ 5.00%12.77$ D19 Ft Special trencher for rock, 6" width 7.30$ 5.00%7.66$ D20 Ft Rock Adder, 8"w, Cutting & Jack Hammer 11.87$ 5.00%12.46$ D21 Ft Rock Adder, 24"w, Cutting & Jack Hammer 11.62$ 5.00%12.21$ D22 Ft Rock Adder, 36"w, Cutting & Jack Hammer 14.54$ 5.00%15.27$ D23 Ft Rock Adder, 18"w, Large Rock Qty 7.77$ 5.00%8.16$ D24 Ft Rock Adder, 24"w, Large Rock Qty 11.87$ 5.00%12.46$ D25 Ft Rock Adder, 36"w, Large Rock Qty 14.54$ 5.00%15.27$ D26 Ft Hand Digging 12" x 30" deep or less 11.69$ 5.00%12.28$ D27 Ft Hand Digging 12" x 31" - 48" deep 14.60$ 5.00%15.33$ D28 Cy Concrete Backfill of Trench 172.98$ 5.00%181.63$ D28A Ea Concrete Delivery Fee 290.95$ 325.00$ D29 Ft Mechanical Tamping of Trench 1.83$ 5.00%1.93$ D30 LF 2" - 4" Thick Asphalt Saw Cut 7.89$ 5.00%8.28$ D31 LF 1" - 6" Concrete Saw Cut 9.73$ 5.00%10.22$ D32 LF 8"+ Thick Concrete Saw Cut 14.60$ 5.00%15.33$ D33 LF 4"+ Asphalt and/or Concrete Saw Cut 10.98$ 5.00%11.53$ CONDUIT INSTALLATIONS IN 6" WIDE TRENCH -$ -$ Docusign Envelope ID: BDAFC774-E052-4214-9611-D0F9F081F183 Attachment A DME Item # U O M Current Unit Prices Adjustment Proposed Unit Prices CT1 Ft Conduit 1" PVC 0.59$ 5.00%0.62$ CT2 Ft Conduit 2" PVC 0.71$ 5.00%0.75$ CT3 Ft Conduit 2 & 1/2 " PVC 0.71$ 5.00%0.75$ CT4 Ft Conduit 3" PVC 0.77$ 5.00%0.81$ CT5 Ft Conduit 4" PVC 1.42$ 5.00%1.49$ CT6 Ea Conduit 1" PVC 90 degree sweep 5.22$ 5.00%5.49$ CT7 Ea Conduit 2" PVC 90 degree sweep 6.05$ 5.00%6.36$ CT8 Ea Conduit 2 & 1/2 " PVC 90 degree sweep 6.29$ 5.00%6.60$ CT9 Ea Conduit 3" PVC 90 degree sweep 6.53$ 5.00%6.85$ CT10 Ea Conduit 4" PVC 90 degree sweep 9.73$ 5.00%10.22$ CT11 Ea Conduit 2" PVC 45 degree sweep 6.05$ 5.00%6.36$ CT12 Ea Conduit 2 & 1/2 " PVC 45 degree sweep 6.29$ 5.00%6.60$ CT13 Ea Conduit 3" PVC 45 degree sweep 6.53$ 5.00%6.85$ CT14 Ea Conduit 4" PVC 45 degree sweep 9.73$ 5.00%10.22$ CT15 Ea Conduit 4" PVC 22 & 1/2 degree sweep 9.73$ 5.00%10.22$ CONDUIT INSTALLATIONS IN 18" to 36" TRENCH CB1 Ft Conduit 1" PVC 0.77$ 5.00%0.81$ CB2 0.77$ 5.00%0.81$ CB3 Ft Conduit 2" PVC 0.89$ 5.00%0.93$ CB4 0.89$ 5.00%0.93$ CB5 Ft Conduit 2 & 1/2 " PVC 0.95$ 5.00%0.99$ CB6 0.95$ 5.00%0.99$ CB7 Ft Conduit 3" PVC 0.77$ 5.00%0.81$ CB8 0.77$ 5.00%0.81$ CB9 Ft Conduit 4" PVC 1.83$ 5.00%1.93$ CB10 1.83$ 5.00%1.93$ CB11 Ft Conduit 6" PVC 2.49$ 5.00%2.62$ CB12 2.49$ 5.00%2.62$ CB13 Ft Bank of two 6", two 4", two 2", and two 1" installed in conduit spacers 7.30$ 5.00%7.66$ CB14 Ft Bank of three 6", three 4", three 2", and two 1" installed in conduit spacers 9.26$ 5.00%9.72$ CB15 Ea Conduit 1" PVC 90 degree sweep 6.70$ 5.00%7.04$ CB16 Ea Conduit 2" PVC 90 degree sweep 7.60$ 5.00%7.98$ CB17 Ea Conduit 2 & 1/2 " PVC 90 degree sweep 8.55$ 5.00%8.97$ CB18 Ea Conduit 3" PVC 90 degree sweep 7.12$ 5.00%7.47$ CB19 Ea Conduit 4" PVC 90 degree sweep 12.17$ 5.00%12.77$ CB20 Ea Conduit 6" PVC 90 degree sweep 14.60$ 5.00%15.33$ CB21 Ea Conduit 2" PVC 45 degree sweep 7.60$ 5.00%7.98$ CB22 Ea Conduit 2 & 1/2 " PVC 45 degree sweep 8.55$ 5.00%8.97$ CB23 Ea Conduit 3" PVC 45 degree sweep 7.12$ 5.00%7.47$ Docusign Envelope ID: BDAFC774-E052-4214-9611-D0F9F081F183 DME Item # U O M Current Unit Prices Adjustment Proposed Unit Prices CB24 Ea Conduit 4" PVC 45 degree sweep 12.17$ 5.00%12.77$ CB25 Ea Conduit 6" PVC 45 degree sweep 14.60$ 5.00%15.33$ CB26 Ea Conduit 4" PVC 22 & 1/2 degree sweep 9.73$ 5.00%10.22$ CB27 Ea Conduit 6" PVC 22 & 1/2 degree sweep 11.62$ 5.00%12.21$ PRIMARY & SECONDARY CONDUCTOR INSTALLATIONS CI1 Ft Cable, Cu UF SOL, 12/2 awg Secondary 0.71$ 5.00%0.75$ CI2 Ft Cable, Al #6 Duplex 0.83$ 5.00%0.87$ CI3 Ft Cable, Al 4/0 4/0 2/0 Secondary 1.55$ 5.00%1.62$ CI4 Ft Cable, 350, 350, 4/0 Secondary 1.83$ 5.00%1.93$ CI5 Ft Cable, # 2 Al 15 kV Single Phase Pull 1.15$ 5.00%1.21$ CI5A Ft Cable, # 2 Al 25 kV Single Phase Pull 1.21$ CI6 Ft Cable, # 1/0 Al 15 kV Single Phase Pull 0.89$ 5.00%0.93$ CI6A Ft Cable, # 1/0 Al 25 kV Single Phase Pull 0.93$ CI7 Ft Cable, #4/0 Al 15 kV Single Phase Pull 1.55$ 5.00%1.62$ CI7A Ft Cable, #4/0 Al 25 kV Single Phase Pull 1.62$ CI8 Ft Cable, #2 Al 15 kV Three Phase Pull 2.49$ 5.00%2.62$ CI8A Ft Cable, #2 Al 25 kV Three Phase Pull 2.62$ CI9 Ft Cable, #1/0 Al 15 kV Three Phase Pull 1.90$ 5.00%2.00$ CI9A Ft Cable, #1/0 Al 25 kV Three Phase Pull 2.62$ CI10 Ft Cable, # 4/0 Al 15 kV Three Phase Pull 3.68$ 5.00%3.86$ CI10A Ft Cable, # 4/0 Al 25 kV Three Phase Pull 3.86$ CI11 Ft Cable, 250 MCM 3 Ph. (Incl 4/0 bare neutral)2.43$ 5.00%2.55$ CI11A Ft Cable, 250 MCM 25 kV 3 Ph. (Incl 4/0 bare neutral)2.55$ CI12 Ft Cable, 500 MCM 3 Ph. (Incl 4/0 bare neutral)3.68$ 5.00%3.86$ CI12A Ft Cable, 500 MCM 25 kV 3 Ph. (Incl 4/0 bare neutral)3.86$ CI13 Ft Cable, 750 MCM 3 Ph. (Incl 4/0 bare neutral)8.55$ 5.00%8.97$ CI13A Ft Cable, 750 MCM 25 kV 3 Ph. (Incl 4/0 bare neutral)8.97$ CI14 Ft Cable, 8 Triplex Cu 0.53$ 5.00%0.56$ CI15 Ea Install Fault Indicator Single Phase 13.05$ 5.00%13.71$ CI16 Set Install Fault Indicator Three Phase 20.17$ 5.00%21.18$ CI17 Ea Multiple Duct Bank Tagging of Conductors in Multiple Duct Banks (individual conduits and cables shall be included in base bid)4.87$ 5.00%5.11$ CI18 Ft Cable, 1,000 MCM 25 kV 3 Ph. (Incl 4/0 bare neutral)10.30$ TERMINATIONS T1 Ea Elbow, Loadbreak #2 AL 220 mil 15 kV 85.08$ 5.00%89.34$ T1A Ea Elbow, Loadbreak #2 AL 220 mil 25 kV 89.34$ Docusign Envelope ID: BDAFC774-E052-4214-9611-D0F9F081F183 DME Item # U O M Current Unit Prices Adjustment Proposed Unit Prices T2 Ea Elbow, Loadbreak #1/0 AL 220 mil 15 kV 67.99$ 5.00%71.39$ T2A Ea Elbow, Loadbreak #1/0 AL 220 mil 25 kV 89.34$ T3 Ea Elbow, Loadbreak #4/0 AL 220 mil 15 kV 109.76$ 5.00%115.25$ T3A Ea Elbow, Loadbreak #4/0 AL 220 mil 25 kV 115.25$ T4 Ea Elbow, T Nonloadbreak 250 MCM or 4/0 15 kV 97.07$ 5.00%101.92$ T4A Ea Elbow, T Nonloadbreak 250 MCM or 4/0 25 kV 101.92$ T5 Ea Elbow, T Nonloadbreak 500 MCM 15 kV 121.40$ 5.00%127.47$ T5A Ea Elbow, T Nonloadbreak 500 MCM 25 kV 127.47$ T6 Ea Elbow, T Nonloadbreak 750 MCM 15 kV 182.15$ 5.00%191.26$ T6A Ea Elbow, T Nonloadbreak 750 MCM 25 kV 191.26$ T7 Ea Termn. Rack / Util Pole single phase # 2 551.80$ 5.00%579.39$ T7A Ea Termn. Rack / Util Pole single phase # 2 25 Kv 579.39$ T8 Ea Termination Rack / Util Pole vee phase # 2 534.00$ 5.00%560.70$ T8A Ea Termination Rack / Util Pole vee phase # 2 25 kV 560.70$ T9 Ea Termination Rack / Util Pole 3 phase # 2 913.73$ 5.00%959.42$ T9A Ea Termination Rack / Util Pole 3 phase # 2 25 kV 959.42$ T10 Ea Termination Rack / Util Pole Single ph. #1/0 436.69$ 5.00%458.52$ T10A Ea Termination Rack / Util Pole Single ph. #1/0 25 kV 579.39$ T11 Ea Termination Rack / Util Pole vee ph. # 1/0 485.34$ 5.00%509.61$ T11A Ea Termination Rack / Util Pole vee ph. # 1/0 25 kV 560.70$ T12 Ea Termination Rack / Util Pole 3 ph. # 1/0 728.37$ 5.00%764.79$ T12A Ea Termination Rack / Util Pole 3 ph. # 1/0 25 kV 959.42$ T13 Ea Termn. Rack / Util Pole single ph. #4/0 436.69$ 5.00%458.52$ T13A Ea Termn. Rack / Util Pole single ph. #4/0 25 kV 458.52$ T14 Ea Termn. Rack / Util Pole vee ph. # 4/0 485.34$ 5.00%509.61$ T14A Ea Termn. Rack / Util Pole vee ph. # 4/0 25 kV 509.61$ T15 Ea Termn. Rack / Util Pole 3 ph. # 4/0 913.73$ 5.00%959.42$ T15A Ea Termn. Rack / Util Pole 3 ph. # 4/0 25 kV 959.42$ T16 Ea Termn. Rack / Util Pole 3 ph. 250 MCM 1,261.43$ 5.00%1,324.50$ T16A Ea Termn. Rack / Util Pole 3 ph. 250 MCM 25 kV 1,324.50$ T17 Ea Termn. Rack / Util Pole 3 ph. 500 MCM 1,358.74$ 5.00%1,426.67$ T17A Ea Termn. Rack / Util Pole 3 ph. 500 MCM 25 kV 1,426.67$ T18 Ea Termn. Rack / Util Pole 3 ph. 750 MCM 1,839.33$ 5.00%1,931.29$ T18A Ea Termn. Rack / Util Pole 3 ph. 750 MCM 25 kV 1,931.29$ T19 Ea 600 - 200 AMP Plug Adapter 13.05$ 5.00%13.71$ T20 Ea Insulated Plugs/Deadend Plugs 13.05$ 5.00%13.71$ T21 Ea Splice, #2 AL 220 mil 15 kV 178.00$ 5.00%186.90$ Docusign Envelope ID: BDAFC774-E052-4214-9611-D0F9F081F183 DME Item # U O M Current Unit Prices Adjustment Proposed Unit Prices T21A Ea Splice, #2 AL 220 mil 25 kV 186.90$ T22 Ea Splice, #1/0 AL 220 mil 15 kV 140.02$ 5.00%147.03$ T22A Ea Splice, #1/0 AL 220 mil 25 kV 186.90$ T23 Ea Splice, #4/0 AL 220 mil 15 kV 178.00$ 5.00%186.90$ T23A Ea Splice, #4/0 AL 220 mil 25 kV 186.90$ T24 Ea Splice, 250 MCM or 4/0 15 kV 144.78$ 5.00%152.01$ T24A Ea Splice, 250 MCM or 4/0 25 kV 152.01$ T25 Ea Splice, 500 MCM 15 kV 160.21$ 5.00%168.22$ T25A Ea Splice, 500 MCM 25 kV 168.22$ T26 Ea Splice, 750 MCM 15 kV 213.60$ 5.00%224.28$ T26A Ea Splice, 750 MCM 25 kV 224.28$ T27 Ea Indoor Termination 250MCM 194.02$ 5.00%203.72$ T27A Ea Indoor Termination 250MCM 25 Kv 203.72$ T28 Ea Indoor Termination 500 MCM 194.02$ 5.00%203.72$ T28A Ea Indoor Termination 500 MCM 25 kV 203.72$ T29 Ea Indoor Termination 750 MCM 243.27$ 5.00%255.44$ T29A Ea Indoor Termination 750 MCM 25 kV 255.44$ T30 Ea Splice, 1,000 MCM 25 kV 257.92$ T31 Ea Indoor Termination 1,000 MCM 25 kV 293.76$ T32 Ea Termn. Rack / Util Pole 3 ph. 1,000 MCM 25 kV 2,124.42$ ARRESTERS A1 Ea Arrester Elbow, 10 kV 16.62$ 5.00%17.45$ A1A Ea Arrester Elbow, 18 kV 17.45$ A2 Ea Arrester, Bushing 10 kV 16.62$ 5.00%17.45$ A2A Ea Arrester, Bushing 18 kV 17.45$ A3 Ea Arrester, Parking Stand 10 kV 16.62$ 5.00%17.45$ A3A Ea Arrester, Parking Stand 18 kV 17.45$ MANHOLES & VAULTS V1 Ea 2 Way Manhole 12' X 12' X 9' with 5' of Cover 4,797.40$ 5.00%5,037.26$ V2 Ea 4 Way Manhole 12' X 12' X 9' with 5' of Cover 4,797.40$ 5.00%5,037.26$ V3 Ea 3 Way Manhole 12' X 10' X 9' with 5' of Cover 4,797.40$ 5.00%5,037.26$ V4 Ft Addl ft of cover for 4 Way or 3 Way to 10'848.47$ 5.00%890.89$ V5 Ea Polymer Concr. Vault 4'W X 5'D x 8'L Surface Mount 1,104.78$ 5.00%1,160.02$ V6 Ea Polymer Concr. Vault 4'W X 5'D x 6'L Surface Mount 1,008.66$ 5.00%1,059.10$ V7 Ea Polymer Concr. Vault 3'W X 5'D x 5'L Surface Mount 679.96$ 5.00%713.96$ V8 Ea Polymer Concr. Vault 4'W X 4'D x 4'L Surface Mount 509.79$ 5.00%535.28$ V9 Ea Polymer Concr. Box 13"W X 18"D x 24"L Surface Mount 242.67$ 5.00%254.81$ Docusign Envelope ID: BDAFC774-E052-4214-9611-D0F9F081F183 DME Item # U O M Current Unit Prices Adjustment Proposed Unit Prices V10 Ea Polymer Concr. Box 12"W X 12"D x 12"L Surface Mount 154.27$ 5.00%161.98$ V11 Ea Fiberglass Sleeve, PCC Single Phase 183.94$ 5.00%193.14$ V12 Ea Fiberglass Sleeve, PCC Three Phase 308.53$ 5.00%323.96$ V13 Ea Excavation to Access side of a Manhole 849.65$ 5.00%892.13$ V14 Ea Excavation to Access side of a Vault 424.82$ 5.00%446.06$ V15 Ea 6" Conduit Entry into Manhole 169.70$ 5.00%178.18$ V16 Ea 4" Conduit Entry into Manhole 145.96$ 5.00%153.26$ V17 Ea 2 1/2" Conduit Entry into Manhole 121.04$ 5.00%127.09$ V18 Ea 2" Conduit Entry into Manhole 121.04$ 5.00%127.09$ V19 Ea 6" Conduit Entry into Vault 145.96$ 5.00%153.26$ V20 Ea 4" Conduit Entry into Vault 97.31$ 5.00%102.17$ V21 Ea 2 1/2" Conduit Entry into Vault 72.39$ 5.00%76.01$ V22 Ea 2" Conduit Entry into Vault 72.39$ 5.00%76.01$ V23 Ea Installation of 4' x 6' Concrete Pull Box 2,306.44$ 5.00%2,421.76$ V24 Ea Installation of 3' x 5' Concrete Pull Box 2,018.14$ 5.00%2,119.04$ V25 Ea Installation of Fiber Communications Box 498.40$ 5.00%523.32$ FOUNDATIONS P1 Ea Transformer Pad 48" X 54" Fibercrete 213.60$ 5.00%224.28$ P2 Ea Switch Gear Pad 7' x 7' x 3'860.34$ 5.00%903.35$ P2A Ea Switch Gear Pad 7' x 7' x 3' (Vista Gear)903.35$ P3 Ea Transformer Pad 83" X 83" Old Castle 735.73$ 5.00%772.52$ EQUIPMENT E1 Ea Secondary Connection Pedestal 112.74$ 5.00%118.38$ E2 Ea Single Phase Transformer on Pad 461.29$ 5.00%484.35$ E3A Ea Three Phase Trans. on Pad up to 500KVA 1,499.19$ 5.00%1,574.15$ E3B Ea Three Ph. Trans. > 500KVA up to 1500KVA 3,678.66$ 5.00%3,862.59$ E3C Ea Three Phase Transformer above 1500KVA 6,170.65$ 5.00%6,479.18$ E4 Ea Switch Gear on Pad - (PME Gear)617.06$ 5.00%647.92$ E4A Ea Switch Gear on Pad - (Vista Gear)647.92$ E5 Ea Primary Single Ph. Sect. Pedestal on Sleeve 189.87$ 5.00%199.36$ E6 Ea Primary Three Ph. Sect. Pedestal on Sleeve 308.53$ 5.00%323.96$ E7 Ea Fused Cabinet 486.53$ 5.00%510.86$ E8 Ea Fused Cabinet Sleeve 617.06$ 5.00%647.92$ OTHER SL1 Ea 20 Ft Concr. Pole & Street Light, 976 lbs 474.67$ 5.00%498.40$ SL2 Ea 35 Ft Concrete Pole & Street Light 1,750 lbs 534.00$ 5.00%560.70$ Docusign Envelope ID: BDAFC774-E052-4214-9611-D0F9F081F183 DME Item # U O M Current Unit Prices Adjustment Proposed Unit Prices SL3 Ea 45 Ft Fiberglass Pole and Street Light 492.47$ 5.00%517.09$ SL4 Ea Streetlight Poles with either bases or anchor cages on street lights 534.00$ 5.00%560.70$ SL5 1,095.56$ 5.00%1,150.34$ SERVICES S1 Ft Install 2.5" conduit with secondary & warning tape 9.23$ 5.00%9.69$ S2 Ea Secondary Riser 450.93$ 5.00%473.48$ S3 Trip Trip charge for addl trips after initial trip 142.40$ 5.00%149.52$ S4 Ft Bore for service installations (Residential)24.92$ 5.00%26.17$ HOURLY M1 HR Three man crew to perform small projects 224.88$ 5.00%236.12$ M2 HR Two man crew and backhoe to perform small projects 207.58$ 5.00%217.96$ M3 HR Three man crew and backhoe to perform medium projects 299.84$ 5.00%314.83$ M4 HR Four man crew and backhoe to perform large projects 345.97$ 5.00%363.26$ M5 HR Dump truck used on projects where all excav. matl is removed 78.32$ 5.00%82.23$ M6 Ea Large Track Hoe per day 1,079.86$ 5.00%1,133.86$ M7 Ea Large Track Hoe per week 3,233.66$ 5.00%3,395.35$ M8 Ea Delivery & Pickup of Large Track Hoe 302.60$ 5.00%317.74$ M9 Ea Aluminum Trench Box per day 422.45$ 5.00%443.57$ M10 Ea Aluminum Trench Box per week 1,267.35$ 5.00%1,330.72$ M11 Ea Delivery & Pickup of Aluminum Trench Box 427.20$ 5.00%448.56$ M12 Ea Steel Trench Box 8'Hx16'L per day 303.78$ 5.00%318.97$ M13 Ea Steel Trench Box 8'Hx16'L per week 911.36$ 5.00%956.92$ M14 Ea Delivery & Pickup of Steel 8'Hx16'L Trench Box 424.82$ 5.00%446.06$ Docusign Envelope ID: BDAFC774-E052-4214-9611-D0F9F081F183 Certificate Of Completion Envelope Id: BDAFC774-E052-4214-9611-D0F9F081F183 Status: Completed Subject: ***Purchasing Approval*** 7633 Underground Electric Installation, Amendment 3 - Rate Increase Source Envelope: Document Pages: 9 Signatures: 3 Envelope Originator: Certificate Pages: 5 Initials: 0 Christa Christian AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-06:00) Central Time (US & Canada) 901B Texas Street Denton, TX 76209 Christa.Christian@cityofdenton.com IP Address: 198.49.140.104 Record Tracking Status: Original 1/30/2025 8:57:21 AM Holder: Christa Christian Christa.Christian@cityofdenton.com Location: DocuSign Signer Events Signature Timestamp Christa Christian christa.christian@cityofdenton.com Purchasing Supervisor City of Denton Security Level: Email, Account Authentication (None) Completed Using IP Address: 198.49.140.104 Sent: 1/30/2025 9:02:02 AM Viewed: 1/30/2025 9:02:13 AM Signed: 1/30/2025 9:02:13 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Ralph Patterson Rowdy.patterson@cityofdenton.com Electric Line Division Manager Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Sent: 1/30/2025 9:02:15 AM Viewed: 1/30/2025 9:03:57 AM Signed: 1/30/2025 9:05:26 AM Electronic Record and Signature Disclosure: Accepted: 1/30/2025 9:03:57 AM ID: 145fefbc-b1dc-454c-8878-256ce5b5cb3f Billy Ryan b.ryan@fx5utility.com President & COO Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 107.178.13.174 Sent: 1/30/2025 9:05:27 AM Viewed: 2/3/2025 7:18:45 AM Signed: 2/3/2025 7:23:04 AM Electronic Record and Signature Disclosure: Accepted: 2/3/2025 7:18:45 AM ID: 5db46547-571a-45d2-a07e-639bec119c1f Christa Christian christa.christian@cityofdenton.com Purchasing Supervisor City of Denton Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Sent: 2/3/2025 7:23:06 AM Viewed: 2/3/2025 11:37:32 AM Signed: 2/3/2025 11:37:38 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Cheyenne Defee cheyenne.defee@cityofdenton.com Procurement Administration Supervisor City of Denton Security Level: Email, Account Authentication (None) Sent: 2/3/2025 11:37:39 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 1/30/2025 9:02:02 AM Certified Delivered Security Checked 2/3/2025 11:37:32 AM Signing Complete Security Checked 2/3/2025 11:37:38 AM Completed Security Checked 2/3/2025 11:37:39 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Denton (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. Electronic Record and Signature Disclosure created on: 7/21/2017 3:59:03 PM Parties agreed to: Ralph Patterson, Billy Ryan How to contact City of Denton: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: purchasing@cityofdenton.com To advise City of Denton of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at melissa.kraft@cityofdenton.com and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from City of Denton To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to purchasing@cityofdenton.com and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Denton To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to purchasing@cityofdenton.com and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows2000? or WindowsXP? Browsers (for SENDERS): Internet Explorer 6.0? or above Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0, NetScape 7.2 (or above) Email: Access to a valid email account Screen Resolution: 800 x 600 minimum Enabled Security Settings: •Allow per session cookies •Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings via proxy connection ** These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify City of Denton as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by City of Denton during the course of my relationship with you.