Loading...
7714 GMP1 - Subcontractor Scoring Summary7714 CMAR for SED-B Subcontractor Scoring Summary for GMP 1 Work Category 1: Asphalt Paving Jagoe Public Eurovia Texas Bit Reynolds Asphalt Proposed Construction Price 40 40 32.5 26.6 5.5 Safety, Accident Rates and OSHA Record 20 20 20 20 20 Schedule and Planning 15 15 15 15 15 Financial Strength 10 10 10 10 10 Qualifications / Experience / References 15 15 15 15 10 TOTAL 100 100 92.5 86.6 60.5 Jagoe Public was both the low bidder and the best value selection. Work Category 2: Earthwork McCarthy Proposed Construction Price 40 40 Safety, Accident Rates and OSHA Record 20 20 Schedule and Planning 15 15 Financial Strength 10 10 Qualifications / Experience / References 15 15 TOTAL 100 100 McCarthy was both the low bidder and the best value selection. 7714 CMAR for SED-B Subcontractor Scoring Summary for GMP 1 Work Category 3: Concrete McCarthy Beam Proposed Construction Price 40 40 31.8 Safety, Accident Rates and OSHA Record 20 20 0 Schedule and Planning 15 15 0 Financial Strength 10 10 10 Qualifications / Experience / References 15 15 0 TOTAL 100 100 41.8 McCarthy was both the low bidder and the best value selection. Work Category 4: Traffic Control Barricades Unlimited Eagle Barricade McCarthy Proposed Construction Price 40 40 0.7 37 Safety, Accident Rates and OSHA Record 20 10 15 20 Schedule and Planning 15 15 15 15 Financial Strength 10 10 10 10 Qualifications / Experience / References 15 15 15 15 TOTAL 100 90 55.7 97 Barricades Unlimited was the low bidder but McCarthy was the best value contractor, based on strict adherence to the scoring criteria outlined in the Front End Documents. 7714 CMAR for SED-B Subcontractor Scoring Summary for GMP 1 Work Category 5: Utilities John Burns Inc. North Texas Cont. Fort Worth Civil Proposed Construction Price 40 36.4 40 29.5 Safety, Accident Rates and OSHA Record 20 20 20 20 Schedule and Planning 15 15 15 5 Financial Strength 10 10 10 10 Qualifications / Experience / References 15 10 15 15 TOTAL 100 91.4 100 79.5 North Texas Contracting was both the low bidder and the best value selection.