Bid Invitation
Addendum No. 2 CSP 8681 Precision Drive Reconstruction Page 1 of 1 240013-1 Precision Drive Reconstruction CSP 8681 ADDENDUM NO. 2 The Plans, Specifications and Contract Documents for the above-referenced project are hereby revised and amended as follows: PROJECT MANUAL & SPEC BOOK 1. Revised Section 00 42 44 -Unit Price Proposal Form attached to this Addendum. Discrepancies have been resolved for the following: a. Item #13 – Concrete Pavement (12”), correct Qty is 4380 SY b. Item #14 – Concrete Curb and Gutter, correct Qty is 46 LF c. Item #16 – Concrete Flume (5’), correct Qty is 13 SY 2. Plan sheet 3 revised and attached to this Addendum to address the changes in quantity for the Concrete Pavement, Concrete Curb & Gutter, and Concrete Flume items. 3. Plan sheet 4 revised and attached to this Addendum to identify the changes in quantity call outs for the Concrete Pavement, Concrete Curb & Gutter, and Concrete Flume. 4. Plan sheet 9 revised and attached to this Addendum to modify the traffic control plan guidelines for the project to allow for the closure of Precision in two separate sections. END OF ADDENDUM No. 2 CHANGES To:From: PROJ.: CSP:8681 ENG PMO:240013-1 Item No.Spec. Section No. Description UOM BID QTY Unit Price Extended Price 1 01 58 13 Project Signs EA 2 -$ $ - 2 01 70 00 Mobilization LS 1 -$ -$ 3 02 41 15 Remove Asphalt Pavement SY 4,291 -$ -$ 4 02 41 15 Remove Concrete Curb & Gutter LF 1,569 -$ -$ 5 31 23 16 Unclassified Excavation CY 1,421 -$ -$ 6 31 25 14 Erosion Control Plan LS 1 -$ -$ 7 31 25 14 Erosion Control Plan Implementation LS 1 -$ -$ 8 32 11 29 Lime Treated Subgrade SY 4,690 -$ -$ 9 32 11 29 Hydrated Lime TN 148 -$ -$ 10 32 12 16 Asphalt Pavement Type B (5")SY 326 -$ -$ 11 32 12 16 Asphalt Pavement Type B (4")SY 320 -$ -$ 12 32 12 16 Asphalt Pavement Type D (3")SY 320 -$ -$ 13 32 16 00 Concrete Pavement (12")SY 4,380 -$ -$ 14 32 16 00 Concrete Curb & Gutter LF 46 -$ -$ 15 32 16 00 Concrete Edge Restraint LF 83 -$ -$ 16 32 16 00 Concrete Flume (5')SY 13 -$ -$ 17 32 17 23 4" Double Solid Yellow (RPM)LF 910 -$ -$ 18 32 17 23 24" Solid White LF 21 -$ -$ 19 32 93 00 Sod SY 398 -$ -$ 20 34 71 13 Traffic Control Plan LS 1 -$ -$ 21 34 71 13 Traffic Control Devices MO 4 -$ -$ TOTAL PROPOSAL: 901-B Texas Street Denton, TX 76209 OFFEROR'S APPLICATION - UNIT PRICE PROPOSAL STREET ADDRESS CITY, STATE CONTACT TOTAL BASE PROPOSAL: Precision Drive Reconstruction PHONE EMAIL SECTION 00 42 44 - UNIT PRICE PROPOSAL FORM - CSP Attn: Purchasing Dept. Precision Drive Reconstruction City of Denton - Capital Projects COMPANY NAME ENGINEERING SERVICES PRECISION DRIVE QUANTITY SUMMARY QUANTITY SUMMARY: PAVING AND DRAINAGE NORTH OF FM 1515 RECONSTRUCTION Item No.Spec Section No.Description UOM Total Qty SHT 4 SHT 9 02 41 15 Remove Asphalt Pavement SY 4,291 4,291 02 41 15 Remove Curb & Gutter LF 1,569 1,569 31 23 16 Unclassified Excavation CY 1,421 1,421 32 12 16 Asphalt Pavement Type B (5")SY 326 326 32 12 16 Asphalt Pavement Type B (4")SY 320 320 32 12 16 Asphalt Pavement Type D (3")SY 320 320 32 11 29 Lime Treated Subgrade SY 4,690 4,690 32 11 29 Hydrated Lime TN 148 148 32 16 00 Concrete Pavement SY 4,380 4,380 32 16 00 Concrete Curb & Gutter LF 46 46 32 16 00 Concrete Edge Restraint -2'LF 83 83 32 16 00 Concrete Flume SY 13 13 32 93 00 Sod SY 398 398 32 17 23 Striping-24" Stop Bar LF 21 21 32 17 23 Striping-Double Yellow 4" with RPM LF 910 910 PRECISION DRIVE F M 1 5 1 5 STA TO STAENGINEERING SERVICES PRECISION DRIVE PAVING AND DRAINAGE NORTH OF FM 1515 0+00.00 9+26.00 PRECISION DR. ℄ RECONSTRUCTION PLAN & PROFILE A B PHASE 1 ROAD CLOSURE PHASE 2 ROAD CLOSURE A B ENGINEERING SERVICES PRECISION DRIVE TRAFFIC CONTROL NARRATIVE & STRIPING PLAN PAVING AND DRAINAGE NORTH OF FM 1515 TRAFFIC CONTROL PLAN GUIDLINES: RECONSTRUCTION