7574-027 - Formal Amendment 1 Executed
Docusign City Council Transmittal Coversheet
File Name
Purchasing Contact
City Council Target Date
Piggy Back Option
Contract Expiration
Ordinance
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
Erica Garcia
PSA 7574-027
PCWRP Expansion Amendment 1
Not Applicable
N/A
AUGUST 5, 2025
25-1343
7574-027 PSA – Amendment #1 Page 1 of 2
FIRST AMENDMENT TO CONTRACT
BY AND BETWEEN THE CITY OF DENTON, TEXAS
AND KIMLEY-HORN AND ASSOCIATES, INC.
PSA 7574-027
THE STATE OF TEXAS §
COUNTY OF DENTON §
THIS FIRST AMENDMENT TO CONTRACT 7574-027 (“Amendment”) by and
between the City of Denton, Texas (“City”) and Kimley-Horn and Associates, Inc.
(“Engineer”); to that certain contract executed on June 6, 2023, in the original not-to-
exceed amount of $14,952,000 (the “Agreement”); for services related to PCWRP
Expansion to 26MGD.
WHEREAS, the City deems it necessary to further expand the services provided by
Engineer to the City pursuant to the terms of the Agreement, and to provide an additional
not-to-exceed amount $18,840,500 with this Amendment for an aggregate not-to-exceed
amount of $33,792,500; and
FURTHERMORE, the City deems it necessary to further expand the goods/services
provided by Engineer to the City;
NOW THEREFORE, the City and Engineer (hereafter collectively referred to as the
“Parties”), in consideration of their mutual promises and covenants, as well as for other
good and valuable considerations, do hereby AGREE to the following Amendment, which
amends the following terms and conditions of the said Agreement, to wit:
1. The additional services described in Attachment “A” of this Amendment, attached
hereto and incorporated herein for all purposes, for professional services related to
the design of intersection improvements for the Small Transportation Project, are
hereby authorized to be performed by Engineer. For and in consideration of the
additional services to be performed by Engineer, the City agrees to pay, based on
the cost estimate detail attached as Attachment “A” a total fee, including
reimbursement for non-labor expenses an amount not to exceed $18,840,500.
2. This Amendment modifies the Agreement amount to provide an additional
$18,840,500 for the additional services with a revised aggregate not to exceed total
of $33,792,500.
The Parties hereto agree, that except as specifically provided for by this Amendment, that
all of the terms, covenants, conditions, agreements, rights, responsibilities, and obligations
of the Parties, set forth in the Agreement remain in full force and effect.
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
7574-027 PSA – Amendment #1 Page 2 of 2
IN WITNESS WHEREOF, the City and the Engineer, have each executed this
Amendment electronically, by and through their respective duly authorized representatives
and officers on this date _________________________.
“City”
CITY OF DENTON, TEXAS
A Texas Municipal Corporation
By:
_________________________________
AUTHORIZED SIGNOR, TITLE
“Engineer”
Kimley-Horn and Associates, Inc.
By:
_________________________________
AUTHORIZED SIGNOR, TITLE
ATTEST:
LAUREN THODEN, CITY SECRETARY
By: _________________________________
THIS AGREEMENT HAS BEEN
BOTH REVIEWED AND APPROVED
as to financial and operational
obligations and business terms.
_______________ ________________
SIGNATURE PRINTED NAME
__________________________________
TITLE
__________________________________
DEPARTMENT
APPROVED AS TO FORM:
MACK REINWAND, CITY ATTORNEY
BY: _______________________________
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
Vice President
Water Utilities and Street Operations
General Manager
Stephen D Gay
08/05/2025
City Manager
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 1 of 31
ATTACHMENT "A"
AMENDMENT NO.1 TO PROFESSIONAL SERVICES AGREEMENT
ADDITIONAL SERVICES
Professional Services Agreement:
PECAN CREEK WATER RECLAMATION PLANT
EXPANSION TO 30 MGD INCLUDING SOLIDS HANDLING AND
DISINFECTION SYSTEM IMPROVEMENTS
Project Understanding
The Pecan Creek Water Reclamation Plant (PCWRP) Expansion to 30 MGD is currently under
design with a construction manager at risk (CM@R) selected. The CITY has requested the
ENGINEER provide additional design and construction phase services for the PCWRP for the
following additions.
The CITY desires to include the design and construction phase services to expand to 30 MGD
utilizing membrane bioreactor (MBR) technology. This will add 25 MGD MBR treatment units
and allow the City to abandon the existing 21 MGD conventional activated sludge treatment
trains that are near the end of their remaining useful life as described in the Pecan Creek Water
Reclamation Plant Condition Assessment Report dated March 2024.
The new 25 MGD MBR treatment trains, when added to the 5 MGD MBR treatment train
included in the original contract will allow 30 MGD of wastewater to be treated with MBR
technology.
This project will also include operations buildings for the plant staff to operate and maintain the
new facility.
The ENGINEER understands this portion of the project will be delivered under the same
Construction Manager at Risk (CM@R) contract with Sundt Construction.
ENGINEER will provide professional services for the following tasks:
• Task 1a – Design Management
• Task 2a – Preliminary Design
• Task 4a – Final Design
• Task 5a – Construction Contract Documents
• Task 7a – Construction Phase Services
• Task 8a – Record Drawings
• Task 9a – Wastewater Discharge Permit Amendment
• Task 10a – Environmental Assessment Services
• Task 11a – Sludge Pump Station Replacements
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 2 of 31
Task 1a – DESIGN MANAGEMENT
A. Project Management
1. Develop project communication plan.
a. Develop project contact list.
b. Prepare and e-mail progress reports to the project team once a month to be
included with invoices. 24 months are assumed.
c. Prepare project schedule and provide schedule updates if the schedule changes.
2. Meetings
a. Prepare for and attend one (1) project kickoff meeting to determine design
criteria, project schedule, discuss project responsibilities.
b. Prepare for and attend up to forty-eight (48) project status meetings with the
CITY.
c. Prepare meeting notes and distribute to the CITY.
3. CM@R Program Documentation
4. The ENGINEER will assist the CITY with CM@R program documentation.
5. Assumptions:
a. It is assumed Project Management will be required for twenty-four
months.
b. Additional Project Management will be considered Additional Services.
6. Deliverables:
a. Monthly invoices and status reports
b. Meeting agendas and meeting notes
c. CM@R lesson learned
Task 2a – PRELIMINARY DESIGN
A. Prepare Preliminary Engineering Report (PER)
The ENGINEER shall prepare a Preliminary Engineering Report for the 30 MGD MBR,
non-potable water system, chemical feed system, Operations and Scada Control Building,
Maintenance Workshop, Storage Building and Electrical Workshop. The ENGINEER
shall perform the following tasks:
1. Update design and size of MBR treatment units. Calculations, analyses, graphs,
formulas, constants, and technical assumptions will be provided to support the design
and sizing of each unit.
2. Update the process flow diagram for the treatment facility for the 30 MGD MBR
facility.
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 3 of 31
3. Design and size chemical feed equipment. Calculations, analyses, graphs, formulas,
constants, and technical assumptions will be provided to support the design and
sizing of each unit.
4. Design and size a new non-potable water system for the PCWRP. Calculations,
analyses, graphs, formulas, constants, and technical assumptions will be provided to
support the design and sizing of each unit.
5. Update hydraulic model to determine the elevations of the treatment units and
determine the sizing of interconnected piping.
6. Prepare for and attend one space programming meeting with the CITY. Based on
feedback from the CITY, ENGINEER will prepare concept design layouts
7. Prepare the Preliminary Engineering Report Document including:
a. Types of units proposed and their capacities
b. Detention times, surface loadings and weir loadings for each unit
c. Plot of the hydraulic gradient at peak flow conditions
d. The recommended operation mode
e. Organic and volumetric loadings pertinent to each treatment unit
f. Preliminary site plan
g. Site access and security
h. Flood protection
i. Emergency power
j. Size and character of the building
k. Architectural systems
l. Architectural materials
Meetings:
a. Prepare for and conduct one (1) Preliminary Engineering Report review meeting
Deliverables:
a. Deliver an electronic (.pdf) file of the Preliminary Engineering Report
Services/Deliverables provided by the CITY and CM@R:
a. Participate in the Preliminary Engineering Report review meeting
b. Review and provide comments on the Final Engineering Report
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 4 of 31
B. Preliminary Design for 30 MGD MBR
1. The Consultant will incorporate the 5 MGD MBR design and perform preliminary
civil, mechanical, structural, electrical, and architectural design for the following:
a. Yard piping
b. Paving
c. MBR treatment units
d. Aeration basin treatment units
e. Permeate pumping system
f. Non-potable water system
g. Chemical feed system
h. Electrical building
It is assumed there will be no submittal packages for the preliminary design phase.
Deliverables will be developed during the Final Design Task for the 30 MGD MBR.
The ENGINEER will collaborate with the CM@R to answer questions about the
preliminary design.
Meetings:
a. Prepare for and conduct one (1) preliminary design meeting
Deliverables:
a. None
Services/Deliverables provided by the CITY:
a. Participate in preliminary design meeting
C. Preliminary Design for Operations Buildings
1. Prepare engineering plan sheets and technical specifications in accordance with the
preliminary engineering report for the Operations and SCADA Control Building,
Maintenance Workshop, Electrical Workshop and Storage Building. It is assumed
there will be no more than one (1) submittal packages for the 30% design phase. The
ENGINEER will collaborate with the CM@R on project phasing to determine a
submittal plan that adheres to the overall project schedule set in Task 1.
2. The 30 % plans will include:
a. Civil sheets:
i. General notes
ii. Overall Site Plan
iii. Parking and Paving plan
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 5 of 31
b. Architectural sheets:
i. General notes
ii. Site plans
iii. Floor plans
c. Structural sheets:
i. General notes
ii. Site plans
iii. Foundation plans
d. Electrical sheets:
i. Site plan
ii. One-line diagrams
iii. SCADA/instrumentation layout
Meetings:
a. Prepare for and conduct one (1) Preliminary Design review meeting
Deliverables:
a. Deliver an electronic (.pdf) file of the plans
Services/Deliverables provided by the CITY and CM@R:
a. Review and comment on the 30% plans
b. Participate in 30% design review meeting
Task 4a – FINAL DESIGN
A. 60% Design for 30 MGD MBR
1. Prepare 60% engineering plan sheets and specifications in accordance with the 30%
design review and incorporate the 5 MGD MBR plans.
2. The plans will include:
a. Civil sheets:
i. General notes
ii. Overall site plan
iii. Yard piping plan and profiles
iv. Paving plan and profile
v. Grading plan
vi. Details
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 6 of 31
b. Mechanical sheets:
i. General notes
ii. Membrane treatment equipment layouts and sections
iii. Aeration equipment layouts and sections
iv. Permeate pumping equipment layouts and sections
v. Non-potable water system pump layouts and sections
vi. Chemical storage and feed equipment layouts and sections
c. Structural sheets:
i. General notes
ii. Site plans
iii. Foundation plans
iv. Excavation plan
v. Sections
d. Electrical sheets:
i. Site plan
ii. Electrical plan
iii. Grounding plan
iv. One-line diagrams
v. Conduit and wiring plan
vi. Lighting plan
vii. SCADA/instrumentation layout
3. Prepare specifications that include CITY Standard and non-standard technical
specifications for materials and installation of the proposed facilities.
4. Provide review of the CM@R’s deliverable.
5. Conduct a 60% review meeting and respond to comments received from the project
team.
6. Attend one (1) meeting with CM@R to obtain input on constructability and value
engineering items to consider for the next project phase submittal.
7. Prepare preliminary summary of quantities.
Meetings:
a. Prepare for and conduct a 60% design review workshop
Deliverables:
a. Deliver an electronic (.pdf) file of the plans, specifications, and a preliminary
summary of quantities
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 7 of 31
Services/Deliverables provided by the CITY:
a. Review and comment on the 60% plans and specifications
b. Participate in the 60% design review workshop
B. 60% Design for Operations Buildings
1. Prepare 60% engineering plan sheets and specifications in accordance with the 30%
design review.
2. The plans will include:
a. Civil sheets:
i. General notes
ii. Overall site plan
iii. Paving plan and profile
iv. Grading plan
v. Details
b. Architectural sheets:
i. General notes
ii. Site plans
iii. Floor plans
iv. Roof plans
v. HVAC plan
vi. Plumbing plan
c. Structural sheets:
i. General notes
ii. Site plans
iii. Foundation plans
iv. Excavation plan
v. Sections
d. Electrical sheets:
i. Site plan
ii. Electrical plan
iii. Grounding plan
iv. One-line diagrams
v. Conduit and wiring plan
vi. Lighting plan
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 8 of 31
vii. SCADA/instrumentation layout
3. Specifications shall include CITY Standard and non-standard technical
specifications for materials and installation of the proposed facilities.
4. Provide review of the CM@R’s conceptual deliverable.
Meetings:
a. Prepare for and conduct a 60% design review workshop
b. Attend one (1) meeting with CM@R to obtain input on constructability and value
engineering items to consider for the next project phase submittal.
Deliverables:
a. Deliver an electronic (.pdf) file of the plans, specifications, and construction
documents
Services/Deliverables provided by the CITY:
a. Review and comment on the 60% plans, and specifications
b. Participate in the 60% design review workshop
C. 90% Design for 30 MGD MBR
1. Prepare 90% engineering plan sheets and specifications in accordance with the 60%
design review.
2. The plans will include:
a. Civil sheets:
i. General notes
ii. Overall site plan
iii. Yard piping plan and profiles
iv. Paving plan and profile
v. Grading plan
vi. Details
b. Mechanical sheets:
i. General notes
ii. Membrane treatment equipment layouts, sections, and details
iii. Aeration equipment layouts, sections, and details
iv. Permeate pumping equipment layouts, sections, and details
v. Non-potable water system equipment layouts, sections, and
details
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 9 of 31
vi. Chemical feed equipment layouts, sections, and details
c. Structural sheets:
i. General notes
ii. Site plans
iii. Foundation plans
iv. Excavation plan
v. Sections
vi. Details
d. Electrical sheets:
i. Site plan
ii. Electrical plans
iii. Grounding plans
iv. One-line diagrams
v. Conduit and wiring plans
vi. Lighting plans and details
vii. SCADA/instrumentation layout
viii. Details
3. Prepare specifications that include CITY Standard and non-standard technical
specifications for materials and installation of the proposed facilities.
4. Provide review of the CM@R’s deliverable.
5. Conduct a 90% review meeting and respond to comments received from the project
team.
6. Attend one (1) meeting with CM@R to obtain input on constructability and value
engineering items to consider for the next project phase submittal.
7. Prepare final summary of quantities
Meetings:
a. Prepare for and conduct a 90% design review workshop
Deliverables:
a. Deliver an electronic (.pdf) file of the plans, specifications, construction
documents, and final summary of quantities
Services/Deliverables provided by the CITY:
a. Review and comment on the 90% plans and specifications
b. Participate in the 90% design review workshop
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 10 of 31
D. 90% Design for Operations Buildings
1. Prepare 90% engineering plan sheets and specifications in accordance with the 60%
design review.
2. The plans will include:
a. Civil sheets:
i. General notes
ii. Overall site plan
iii. Yard piping plan and profiles
iv. Paving plan and profile
v. Grading plan
vi. Details
b. Architectural sheets:
i. General notes
ii. Site plans
iii. Floor plans
iv. Elevations
v. Sections
vi. Roof plans
vii. HVAC plan
viii. Plumbing plan
ix. Details
c. Structural sheets:
i. General notes
ii. Site plans
iii. Foundation plans
iv. Excavation plan
v. Sections
vi. Details
d. Electrical sheets:
i. Site plan
ii. Electrical plans
iii. Grounding plans
iv. One-line diagrams
v. Conduit and wiring plans
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 11 of 31
vi. Lighting plans and details
vii. SCADA/instrumentation layout
viii. Details
3. Specifications shall include CITY Standard and non-standard technical
specifications for materials and installation of the proposed facilities.
4. Provide review of the CM@R’s deliverable.
Meetings:
a. Prepare for and conduct a 90% design review workshop
b. Attend one (1) meeting with CM@R to obtain input on constructability and value
engineering items to consider for the next project phase submittal.
Deliverables:
a. Deliver an electronic (.pdf) file of the plans, specifications, and construction
documents
Services/Deliverables provided by the CITY:
a. Review and comment on the 90% plans, and specifications
b. Participate in the 90% design review workshop
E. Final Engineering Report and Summary Transmittal Letter for 30 MGD MBR
The ENGINEER shall prepare a Final Engineering Report based on the comments
received on the Preliminary Engineering Report and design changes determined during
Final Design. The ENGINEER will prepare and submit a Summary Transmittal Letter to
the TCEQ. The Final Engineering Report will include:
a. Types of units proposed and their capacities
b. Detention times, surface loadings and weir loadings for each unit
c. Plot of the hydraulic gradient at peak flow conditions
d. The recommended operation mode
e. Organic and volumetric loadings pertinent to each treatment unit
f. Final site plan
g. Site access and security
h. Flood protection
i. Emergency power
j. Variance requests (if any)
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 12 of 31
Meetings:
a. N/A
Deliverables:
a. Deliver an electronic (.pdf) file of the Final Engineering Report
Services/Deliverables provided by the CITY:
a. Review and approve the report for submittal to TCEQ
Task 5a – CONSTRUCTION CONTRACT DOCUMENTS
A. Bidding Construction Contract Documents
1. Incorporate CITY and CM@R comments from final design submittals and
prepare construction contract documents and bid packages including final
summary of quantities.
2. Construction contract documents will consist of the final plans and project
manual, both signed and sealed by a licensed professional engineer in the State of
Texas and in accordance with comments provided by the CITY and CM@R
during final design.
3. Review and comment on CM@R’s Guaranteed Maximum Price (GMP).
Meetings:
a. Prepare for and conduct a construction contract document review workshop
Deliverables:
a. Construction Contract Documents Submittal
b. Submit five (5) 22”x34” plans, construction documents, and electronic (.pdf)
documents to the CITY and CM@R for bidding.
c. Submittal shall include the following:
a. Bid drawings
b. Bid project manual
Services/Deliverables provided by the CITY:
a. Review and approve the construction contract documents for bidding.
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 13 of 31
Task 7a – CONSTRUCTION PHASE SERVICES
A. Construction Phase Services for 30 MGD MBR, Operations Buildings and
Headworks Facility
The construction phase services are anticipated to extend the current construction phase
services contract by 48 months according to the construction schedule provided by the
CM@R.
1. Pre-Construction Conference
a. Prepare for and attend a pre-construction conference prior to
commencement of Work at the Site
2. Site Visits
a. Prepare for and conduct up to forty-eight (48) construction progress
meetings with the City and CM@R on site. Meetings will also be
considered site visits.
b. Site Visits are not intended to be exhaustive or to extend to every aspect
of CM@R’s work in progress. Observations are to be limited to spot
checking, selective measurement, and similar methods of general
observation of the Work based on ENGINEER’s exercise of professional
judgement.
c. Based on information obtained during site visits, ENGINEER will
determine if CM@R’s work is generally proceeding in accordance with
the Contract Documents, and ENGINEER will keep CITY informed of
the general progress of the work.
3. Recommendations with Respect to Defective Work
a. Provide recommendations to City that CM@R’s work be disapproved
and rejected while it is in progress if, on the basis of site visit
evaluations, ENGINEER believes such work will not produce a
completed Project that conforms generally to Contract Documents or that
it will prejudice the integrity of the design concept of the completed
Project as a functioning whole as indicated in the Contract Documents.
Notwithstanding the foregoing, the City reserves the right to disapprove
or reject CM@R’s work without a recommendation from the
ENGINEER.
4. Clarifications and Interpretations
a. Issue necessary clarifications and interpretations of the Contract
Documents to City as appropriate to the orderly completion of CM@R’s
work. Such clarifications and interpretations will be consistent with the
intent of the Contract Documents. Field orders authorizing variations
from the requirements of the Contract Documents will be made by City.
5. Change Orders
a. Recommend change orders to City, as appropriate.
b. Review and make recommendations related to Change Orders submitted
or proposed by the CM@R.
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 14 of 31
6. Shop Drawings and Samples
a. Review and approve or take other appropriate action in respect to Shop
Drawings and Samples and other data which CM@R is required to
submit, but only for conformance with the information given in the
Contract Documents and compatibility with the design concept of the
completed Project as a functioning whole as indicated in the Contract
Documents. Such review and approvals or other action will not extend to
means, methods, techniques, equipment choice and usage, sequences,
schedules, or procedures of construction or to related safety precautions
and programs. Assumes up to one hundred thirty (130) shop drawings.
7. Substitutes and “or-equal”
a. Evaluate and determine the acceptability of substitute or “or-equal”
materials and equipment proposed by CM@R in accordance with the
Contract Documents, but subject to the provisions of applicable
standards of state or local government entities.
b. Provide recommendations to City
8. Inspections and Tests
a. Review certificates of inspections and tests within ENGINEER’s area of
responsibility for the purpose of determining that the results certified
indicate compliance with the Contract Documents and will not constitute
an independent evaluation that the content or procedures of such
inspections, tests, or approvals comply with the requirements of the
Contract Documents. ENGINER will be entitled to rely on the results of
such tests and facts being certified. The scope of services assumes the
pumps and motors will go through a non-witnessed factory test.
Attending testing will be considered additional services.
9. Disagreements between City and CM@R
a. As necessary, ENGINEER will, with reasonable promptness, render
initial written decision on all claims of City and CM@R relating to the
acceptability of CM@R’s work or the interpretation of the requirements
of the Contract Documents pertaining to the progress of the CM@R’s
work. In rendering such decisions, ENGINEER will be fair and not show
partiality to City or CM@R and will not be liable in connection with any
decision rendered in good faith in such capacity. The initial decision of
the ENGINEER shall be required as a condition precedent to mediation
or litigation of any claim arising prior to the date final payment is due to
the CM@R, unless thirty (30) days have passed after a claim has been
referred to the ENGINEER with no decision having been rendered.
10. Final Walkthrough and Punchlist Preparation
a. Attend final walkthrough with CM@R and City to determine if the
completed work of CM@R is generally in accordance with the Contract
Documents.
i. Limitation of Responsibilities: The ENGINEER will not be
responsible for the acts or omissions of any CM@R, or of any
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 15 of 31
of their subcontractors, suppliers, or of any other individual
entity performing or furnishing the work. ENGINEER will not
have the authority or responsibility to stop the work of any
CM@R.
b. Compile punch list from information gathered during final walkthrough
with City and CM@R.
11. Resident Project Representative. ENGINEER’S role as Resident Project
Representative will include furnishing a Resident Project Representative ("RPR")
to assist ENGINEER in observing progress and quality of the work.
a. The duties and responsibilities of the RPR are limited to those of
ENGINEER in the Agreement with the CITY and in the Contract
Documents, and are further limited and described as follows:
i. General
a) RPR is the ENGINEER’S agent at the Site, will act as
directed by and under the supervision of the
ENGINEER, and will confer with the ENGINEER
regarding RPR's actions
b) RPR's dealings in matters pertaining to a CM@R's work
in progress shall in general be with the ENGINEER and
CM@R, keeping CITY advised as necessary
c) RPR's dealings with subcontractors shall only be
through or with the full knowledge and approval of
CM@R
d) RPR shall generally communicate with CITY with the
knowledge of and under the direction of the ENGINEER
ii. Schedules
a) Review the progress schedule, schedule of Shop
Drawing and submittals, and any other schedules
prepared by CM@R and consult with ENGINEER
concerning acceptability
iii. Conferences and Meetings
a) Attend meetings with CM@R, such as preconstruction
conferences, progress meetings, job conferences and
other project-related meetings, and prepare and circulate
copies of minutes thereof
iv. Liaison
a) Serve as ENGINEER’s liaison with CM@R, working
principally through CM@R's superintendent, and assist
in providing information regarding the intent of the
Contract Documents
b) Assist ENGINEER in serving as CITY 's liaison with
CM@R when CM@R's operations affect CITY 's on-site
operations
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 16 of 31
c) Assist in obtaining from CITY additional details or
information, when required for proper execution of the
Work
v. Interpretation of Contract Documents
a) Report to ENGINEER when clarifications and
interpretations of the Contract Documents are needed
and transmit to CM@R clarifications and interpretations
as issued by ENGINEER
vi. Shop Drawings and Submittals
a) Maintain Shop Drawing and Submittal Record log
b) Advise ENGINEER and CM@R of the commencement
of any portion of the Work requiring a Shop Drawing or
submittal for which RPR believes that the submittal has
not been approved by ENGINEER
vii. Modifications.
a) Consider and evaluate CM@R’s suggestions for
modifications in Drawings or Specifications and report
such suggestions, together with RPR's recommendations,
to ENGINEER. Transmit to CM@R in writing decisions
as issued by ENGINEER
viii. Review of Work and Rejection of Defective Work
a) Conduct on-Site observations of CM@R’s work in
progress to assist ENGINEER in determining if the
Work is in general proceeding in accordance with the
Contract Documents
b) Report to ENGINEER whenever RPR believes that any
part of CM@R's work in progress will not produce a
completed project that conforms generally to the
Contract Documents or will imperil the integrity of the
design concept of the completed Specific Project as a
functioning whole as indicated in the Contract
Documents, or has been damaged, or does not meet the
requirements of any inspection, test or approval required
to be made; and advise ENGINEER of that part of work
in progress that RPR believes should be corrected or
rejected or should be uncovered for observation, or
requires special testing, inspection or approval
ix. Inspections, Tests, and System Start-ups
a) Consult with ENGINEER in advance of scheduled
major inspections, tests, and systems start-ups of
important phases of the Work
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 17 of 31
b) Verify that tests, equipment, and systems start-ups and
operating and maintenance training are conducted in the
presence of appropriate CITY 's personnel, and that
CM@R maintains adequate records thereof
c) Observe, record, and report to ENGINEER appropriate
details relative to the test procedures and systems start-
ups
d) Accompany visiting inspectors representing public or
other agencies having jurisdiction over a Specific
Project, record the results of these inspections, and
report to ENGINEER
x. Records
a) Maintain at the Site orderly files for correspondence,
reports of job conferences, reproductions of original
Contract Documents including all Addenda, Change
Orders, Field Orders, additional Drawings issued
subsequent to the execution of the Contract,
ENGINEER's clarifications and interpretations of the
Contract Documents, progress reports, Shop Drawing
and submittals received from and delivered to CM@R,
and other Specific Project-related documents
b) Prepare a daily report or keep a diary or logbook,
recording CM@R's hours on the Site, weather
conditions, data relative to questions of Change Orders,
Field Orders, or changed conditions, Site visitors, daily
activities, decisions, observations in general, and
specific observations in more detail as in the case of
observing test procedures; and send copies to
ENGINEER
c) Record names, addresses, fax numbers, e-mail
addresses, web site locations and telephone numbers of
all CM@Rs, subcontractors, and major suppliers of
materials and equipment
d) Maintain records for use in preparing project
documentation
e) Upon completion of the Work, furnish original set of all
RPR Specific Project documentation to ENGINEER
xi. Reports
a) Furnish to ENGINEER periodic reports, as required, of
progress of the Work and of CM@R's compliance with
the progress schedule and schedule of Shop Drawing and
submittals
b) Draft and recommend to ENGINEER proposed Change
Orders and Field Orders. Obtain backup material from
CM@R
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 18 of 31
c) Furnish to ENGINEER and CITY copies of all
inspection, test, and system startup reports
d) Immediately notify ENGINEER of the occurrence of
any Site accidents, emergencies, acts of God
endangering the Work, damage to property by fire or
other causes, or the discovery of any Constituent of
Concern
xii. Payment Request
a) Review Applications for Payment with CM@R for
compliance with the established procedure for their
submission and forward with recommendations to
ENGINEER, noting particularly the relationship of the
payment requested to the Work completed, and materials
delivered at the Site but not incorporated in the Work
b) Certificates, Operation and Maintenance Manuals
c) During the course of the Work, verify that materials and
equipment certificates, operation and maintenance
manuals and other data required by the Specifications to
be assembled and furnished by CM@R are applicable to
the items actually installed and in accordance with the
Contract Documents, and have these documents
delivered to ENGINEER for review and forwarding to
CITY prior to payment for that part of the Work
xiii. Completion
a) Participate in a final inspection in the company of
ENGINEER, CITY, and CM@R and prepare a final list
of items to be completed and deficiencies to be remedied
b) Observe whether all items on the final list have been
completed or corrected and make recommendations to
ENGINEER concerning acceptance and issuance of the
Notice of Acceptability of the Work
xiv. Resident Project Representative shall not:
a) Authorize any deviation from the Contract Documents
or substitution of materials or equipment (including "or-
equal" items)
b) Exceed limitations of ENGINEER’s authority as set
forth in the Agreement or the Contract Documents
c) Undertake any of the responsibilities of a CM@R,
subcontractors, suppliers, or a CM@R's superintendent
d) Advise on, issue directions relative to, or assume
control over any aspect of the means, methods,
techniques, sequences, or procedures of the CM@R’s
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 19 of 31
work unless such advice or directions are specifically
required by the Contract Documents
e) Advise on, issue directions regarding, or assume control
over safety practices, precautions and programs in
connection with the activities or operations of CITY or
CM@R
f) Participate in specialized field or laboratory tests or
inspections conducted off-site by others except as
specifically authorized by ENGINEER
g) Accept Shop Drawings or submittals from anyone other
than CM@R
h) Authorize CITY to occupy a Specific Project in whole
or in part
i) Through such observations of CM@R's work in
progress and field checks of materials and equipment by
the RPR, ENGINEER shall endeavor to provide CITY a
greater degree of confidence that the completed Work
will conform in general to the Contract Documents.
However, ENGINEER shall not, during such visits or as
a result of such observations of CM@R's work in
progress, supervise, direct, or have control over
CM@R's work, nor shall ENGINEER have authority
over or responsibility for the means, methods,
techniques, equipment choice and usage, sequences,
schedules, or procedures of construction selected by
CM@R, for safety precautions and programs incident to
CM@R's work, nor for any failure of CM@R to comply
with laws and regulations applicable to CM@R's
furnishing and performing the Work. Accordingly,
ENGINEER neither guarantees the performance of any
CM@R nor assumes responsibility for any CM@R's
failure to furnish and perform its work in accordance
with the Contract Documents.
Task 8a – RECORD DRAWINGS
A. Record Drawings
1. Obtain and review comments and field changes on the construction plans from
CITY and Contractor.
2. Prepare record drawings based on comments and field changes. The ENGINEER
will not be providing resident engineering services and will not be observing on a
full-time basis and will therefore not seal the record drawings. The record
drawings will be provided in the following format:
a. .pdf electronic copy
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 20 of 31
Task 9a – Wastewater Discharge Permit Amendment
A. Preparation of Permit Application
1. Following approval by the CITY of the preliminary design, the ENGINEER shall
prepare and submit a WWDP Major Amendment Application with the TCEQ. For the
purposes of this scope, it is assumed that the application shall be prepared as a Texas
Pollution Discharge Elimination System (TPDES) application for the discharge of the
treated effluent into Pecan Creek approximately 1,000 linear feet downstream of the
existing discharge location. The ENGINEER shall prepare the following tasks in
support of a WWDP Major Amendment Application:
a. Prepare a TCEQ WWDP Major Amendment Application for the Project. For the
purposes of this scope, it is assumed that the following application components
will be required:
1. Domestic Administrative Report 1.0;
2. Domestic Administrative Report 1.1;
3. Supplemental Permit Information Form (SPIF);
4. Domestic Technical Report 1.0;
5. Domestic Technical Report 1.1;
6. Receiving Waters Worksheet 2.0;
7. Stream Physical Characteristics Worksheet 2.1;
8. Pollutant Analyses Requirements Worksheet 4.0;
9. Toxicity Testing Requirements Worksheet 5.0;
10. Industrial Waste Contribution Worksheet 6.0;
b. Prepare supporting documents required for the WWDP Major Amendment
Application, including the following:
1. Schematic site plan with buffer zone and floodplain requirements
incorporated;
2. Affected Landowner Map;
3. Landowner Disc or Labels;
4. Original USGS Map;
5. Treatment Process Flow Diagram;
6. Treatment Unit Dimensions Summary;
7. Design Calculations;
8. Solids Management Plan;
9. Original Photographs;
10. Public Involvement Plan
For the purposes of this scope, it is assumed that the floodplain determination will be
made by existing Federal Emergency Management Agency (FEMA) Flood Insurance
Rate Maps.
2. A Sewage Sludge Technical Report will be developed to document the quantities of
sludge anticipated in the treatment process and the ultimate disposal of the sludge. If
final treatment is to be by contract offsite, formal commitment and treatment
capability will be obtained by the CITY from the received treatment provider and
document to the TCEQ.
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 21 of 31
3. Visit the proposed WRF site to gather site data, such as photographs of the proposed
WRF site and discharge route, as required for the proposed WWDP Application.
4. Following review of the Draft Permit Application packet by the CITY, incorporate
any CITY comments and submit the Application packet to the TCEQ.
B. TCEQ Permit Review Process Coordination
1. Respond to comments from the TCEQ to assist in a TCEQ determination that the
Application is administratively complete. When notified by the TCEQ, publish a
Notice of Receipt of Application and Intent to Obtain a Water Quality Permit
(NORI) in minimum one (1) local newspaper and submit documentation to the
TCEQ clerk. Distribute copies of the WWDP Major Amendment Application in a
public location determined by the CITY.
2. Respond to technical questions raised by the TCEQ in review of the WWDP
Major Amendment Application. For the purposes of this scope, it is assumed that
there will be no more than two (2) rounds of technical comments from the
TCEQ.
3. Review TCEQ issued Draft Discharge Permit and offer corrections or
suggestions for Permit conditions. Coordinate review and comment input from
the CITY and system operators.
4. ENGINEER will prepare and submit publication for public notice requirements
for the TCEQ Permit. ENGINEER will complete the Public Notice Verification
Form required by the TCEQ and submit the Public Notice Verification Form,
proof of publication, and publisher’s affidavit to the TCEQ. ENGINEER will
coordinate the posting of the permit application and preliminary decision in a
public place determined by the CITY for viewing.
5. Once authorized by the TCEQ, ENGINEER will publish Notice of Application
and Preliminary Decision in minimum one (1) local newspaper and monitor
request for public hearings or inquiries from interested parties and respond to
questions. For this scope, it is assumed that responses will be required from the
ENGINEER for up to five (5) inquiries.
Services/Deliverables provided by the CITY:
a. Participate in review of TCEQ issued Draft Discharge Permit.
b. Provide public location for required documentation to be posted.
Meetings:
a. Prepare for and attend (1) project kickoff meeting.
b. Prepare for and attend (1) Technical Memorandum review meeting.
c. Prepare for and attend (1) Draft Permit Major Amendment Application review meeting.
Deliverables:
a. Draft Permit Major Amendment Application in electronic form.
b. WWDP Major Amendment Application in electronic form.
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 22 of 31
Services/Deliverables provided by the CITY:
a. Participate in project kickoff meeting and Draft Permit Major Amendment
Application review meetings.
b. Background data required for the preparation of the WWDP Major Amendment
Application, including but not limited to CITY contact information, CITY tax
information, TCEQ enforcement information, and plant operator information.
c. Attend proposed WRF site visit.
Task 10a – Environmental Assessment Services
A. Early Coordination
1. Kimley-Horn will prepare early coordination letters with appropriate
attachments/exhibits to be distributed to cooperating agencies. The early
coordination letters will describe the proposed projects and offer cooperating
agencies an opportunity to comment on the proposed project activities. At this
time, it is anticipated agencies to be consulted with include:
• Texas Historical Commission
• City and County (If applicable)
• General Land Office
• Texas Parks and Wildlife Department
• Environmental Protection Agency
• Federal Emergency Management Agency
If the CITY is aware of other potential cooperating agencies to be included in
early coordination, please notify Kimley-Horn prior to execution of this
agreement.
B. Impact Analysis
1. An environmental analysis will be conducted for the proposed project. Kimley-
Horn will compile and review readily available published documentation and
data in order to perform and document a preliminary assessment of
environmental and socioeconomic conditions associated with the project.
Existing conditions and trends, proposed project parameters, potential beneficial
and adverse environmental impacts, further compliance requirements, avoidance
and minimization practices, and reasonable alternatives may be addressed. The
level of detail needed to address each impact category (below) depends on the
nature of the resource. Kimley-Horn will identify and describe the existing
environment which may be affected if the proposed projects are implemented.
This includes the natural, built, and socioeconomic environment. Data will be
mapped, and background information will be gathered. Field reconnaissance will
be conducted to augment existing data as necessary for various resources. Input
from the CITY will be necessary to accurately analyze some of the applicable
impact categories. Impact categories to be evaluated may include the following;
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 23 of 31
however, Kimley-Horn reserves the right to modify this list upon coordination
with the reviewing agency.
• Airport Hazards
• Coastal Barrier Resources
• Air Quality
• Hazardous and Toxic Materials and Waste
• Endangered Species
• Explosive and Flammable Hazards
• Farmlands
• Floodplain Management
• Historic Preservation
• Noise and Vibration
• Sole Source Aquifers
• Wetlands Protection
• Human Health and Safety
• Wild and Scenic Rivers
• Environmental Justice
• Land Use
• Geology and Soils
• Safety
• Parks, Open Space, and Recreation
• Transportation and Accessibility
• Water Resources
• Vegetation
• Wildlife
2. Kimley-Horn will assess each of the applicable impact categories to evaluate if
potential cumulative impacts would result from the proposed project.
Cumulative impacts will be assessed by reviewing past, present, and reasonably
foreseeable projects in the areas surrounding the proposed projects. It is assumed
information regarding these other projects to consider will be provided to
Kimley-Horn by the CITY.
3. Potential mitigation measures will be taken into consideration, in consultation
with the CITY as necessary, but only on a preliminary, conceptual basis.
4. Initial assessment findings may identify a need for more detailed study. Such
additional services, such as noise and air quality monitoring and/or modeling,
presence-absence biological surveys and on-site archeological survey, are not
included in the agreement. Public participation services, such as notices and
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 24 of 31
meetings, are also not included. Additionally, the cost of public notices in a
newspaper are not included in this agreement as public notice costs vary and are
unknown at this time. It is our understanding that public notice
documentation/information will be provided by Kimley-Horn to the CITY and
the CITY will perform the public notification.
C. Environmental Assessment (EA) Documentation
1. This agreement assumes one EA document will be prepared for the project. It is
assumed alternatives evaluations have been completed and a detailed alternatives
analysis will not be required. It is assumed the CITY will provide information
pertaining to alternatives evaluations to be included in the EA. Using the data
collected and analyzed above, the EA will be completed. This will also include
supporting text, figures, exhibits, graphics, and appendices to support impact
category determinations for the proposed project. A draft EA will be provided to
the CITY for review and comment. Upon receipt of comments from the CITY, a
final EA will be prepared and an electronic copy will be provided to the CITY.
This task also assumes responding to one round of comments from the reviewing
agency.
Task 11a – Sludge Pump Station Replacements
The services under this task will not be initiated until the ENGINEER has received authorization
from the CITY.
A. Preliminary Engineering Report
1. Design and size each pump station. Calculations, analyses, graphs, formulas,
constants, and technical assumptions will be provided to support the design and
sizing of each unit.
2. Develop a process flow diagram for each pump station facility.
3. Develop hydraulic model to determine pump selection and the sizing of
interconnected piping for each pump station.
4. Prepare the Preliminary Engineering Report Document including:
a. Types of proposed pumps and their capacities
b. Plot of the hydraulic gradient at peak flow conditions
c. The recommended operation mode
d. Preliminary site plan
e. Site access and security
f. Flood protection
g. Emergency power
Meetings:
a. Prepare for and conduct one (1) Preliminary Engineering Report review meeting
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 25 of 31
Deliverables:
a. Five (5) copies of the Preliminary Engineering Report and .pdf electronic copy of
each
Services/Deliverables provided by the CITY:
a. Participate in the Preliminary Engineering Report review meeting
b. Review and provide comments on the Final Engineering Report
B. Preliminary Design
1. Prepare engineering plan sheets and technical specifications for replacing the three
(3) existing sludge pump stations.
2. The 30 % plans will include:
a. Civil sheets:
i. General notes
ii. Overall site plan
iii. Yard piping plan
b. Mechanical sheets:
i. General notes
ii. Sludge pump station equipment layouts
c. Structural sheets:
i. General notes
ii. Site plans
iii. Foundation plans
d. Electrical sheets:
i. Site plan
ii. Electrical plan
iii. Grounding plan
iv. One-line diagrams
v. Conduit and wiring plan
vi. SCADA/instrumentation layout
3. Prepare 30% quantity take-off for proposed improvements and engineer’s opinion of
probable construction cost (OPCC).
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 26 of 31
Meetings:
a. Prepare for and conduct one (1) Preliminary Design review meeting
Deliverables:
a. Deliver an electronic (.pdf) file of the plans and preliminary summary of
quantities
Services/Deliverables provided by the CITY:
a. Review and comment on the 30% plans, preliminary specifications and OPCC
b. Participate in 30% design review meeting
C. 60% Design
1. Prepare 60% engineering plan sheets and specifications.
2. The plans will include:
a. Civil sheets:
i. General notes
ii. Overall site plan
iii. Yard piping plan and profiles
iv. Details
b. Mechanical sheets:
i. General notes
ii. Sludge pump station equipment layouts and sections
c. Structural sheets:
i. General notes
ii. Site plans
iii. Foundation plans
iv. Excavation plan
v. Sections
d. Electrical sheets:
i. Site plan
ii. Electrical plan
iii. Grounding plan
iv. One-line diagrams
v. Conduit and wiring plan
vi. SCADA/instrumentation layout
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 27 of 31
3. Specifications shall include CITY Standard and non-standard technical
specifications for materials and installation of the proposed facilities.
Meetings:
a. Prepare for and conduct a 60% design review workshop
Deliverables:
a. Deliver an electronic (.pdf) file of the plans and specifications
Services/Deliverables provided by the CITY:
a. Review and comment on the 60% plans, specifications, and OPCC
b. Participate in the 60% design review workshop
D. 90% Design
1. Prepare 90% engineering plan sheets and specifications in accordance with the
preliminary engineering report.
2. The plans will include:
a. Civil sheets:
i. General notes
ii. Overall site plan
iii. Yard piping plan and profiles
iv. Details
b. Mechanical sheets:
i. General notes
ii. Sludge pump station equipment layouts, sections, and details
c. Structural sheets:
i. General notes
ii. Site plans
iii. Foundation plans
iv. Excavation plan
v. Sections
vi. Details
d. Electrical sheets:
i. Site plan
ii. Electrical plans
iii. Grounding plans
iv. One-line diagrams
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 28 of 31
v. Conduit and wiring plans
vi. SCADA/instrumentation layout
vii. Details
3. Specifications shall include CITY Standard and non-standard technical
specifications for materials and installation of the proposed facilities.
Meetings:
a. Prepare for and conduct a 90% design review workshop
Deliverables:
a. Deliver an electronic (.pdf) file of the plans and specifications
Services/Deliverables provided by the CITY:
a. Review and comment on the 90% plans, specifications, and OPCC
b. Participate in the 90% design review workshop
E. Final Engineering Report and Summary Transmittal Letter
The ENGINEER shall prepare a Final Engineering Report based on the comments
received on the Preliminary Engineering Report and design changes determined during
Final Design. The ENGINEER will prepare and submit a Summary Transmittal Letter to
the TCEQ. The Final Engineering Report will include:
a. Types of proposed pumps and their capacities
b. Plot of the hydraulic gradient at peak flow conditions
c. The recommended operation mode
d. Final site plan
e. Site access and security
f. Flood protection
g. Emergency power
h. Variance requests (if any)
Meetings:
a. N/A
Deliverables:
a. Submit one electronic (.pdf) copy of the Final Engineering Report
Services/Deliverables provided by the CITY:
a) Review and approve the report for submittal to TCEQ
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 29 of 31
F. Construction Contract Documents
a. Incorporate CITY comments from final design submittal and prepare
construction contract documents, bid plans, and opinion of probable construction
cost.
b. Construction contract documents will consist of the final plans and project
manual, both signed and sealed by a licensed professional engineer in the State of
Texas and in accordance with comments provided by the CITY during final
design.
Meetings:
a. Prepare for and conduct a construction contract document review workshop
Deliverables:
a. Construction Contract Documents Submittal
b. Submit five (5) 22” x 34” copies and electronic (.pdf) documents to the CITY for
bidding.
c. Submittal shall include the following:
i. Bid drawings
ii. Bid project manual
iii. Opinion of probable construction cost
Services/Deliverables provided by the CITY:
a. Review and approve the construction contract documents for bidding.
G. Bid Phase Services
1. Provide information below for up to two (2) separate bid packages.
2. Provide electronic bid documents to the City purchasing department for bidding.
3. Provide the Notice to Bidders to the CITY for publication. The CITY will be
responsible for publication of the notice. The CITY will be responsible for
distribution of the bidding documents to prospective contractors, suppliers, and plan
rooms.
4. The following assistance will be provided to the CITY during the bidding phase:
a. Preparation of addenda and delivery to CITY for distribution to plans holders.
b. Responses to questions submitted by plans holders.
c. Attend bid opening facilitated by CITY.
d. Preparation of bid tabulation.
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 30 of 31
e. Preparation of recommendation of award letter.
5. Conformance plans and specifications
a. Based on potential questions and addenda from the bidding phase, prepare
conformance set of plans and specifications to be used during construction.
b. Provide up to four (4) sets to CITY for execution.
Compensation
Total compensation for the ENGINEER contemplated under the terms of this agreement shall be
a total of $33,792,500 for all services listed including reimbursable expenses. The CITY shall
compensate the ENGINEER as follows:
For Tasks 1a-6a, 8a, 9a and 11a of this contract amendment, the total compensation shall be on a
lump sum basis and not to exceed $13,417,500.
For Task 7a and 10a of this contract amendment, the compensation will be on a labor fee plus
expense basis. Labor fee will be billed on an hourly basis according to our then-current rates.
Based on current information, Kimley-Horn estimates that labor fees will be approximately
$5,423,000. Fee estimates in this Agreement are for general budgeting purposes only. Actual fees
may be less or more than the estimates.
Payment will be due within 25 days of your receipt of the invoice and should include the invoice
number and Kimley-Horn project number.
Progress payments shall be paid monthly based on the actual work satisfactorily completed per
month in each phase, with the following amounts of the total compensation for each phase of the
Project:
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
ATTACHMENT A AMENDMENT NO. 1 FOR
PECAN CREEK WATER RECLAMATION PLANT EXPANSION TO 30 MGD
INCLUDING SOLIDS HANDLING AND DISINFECTION SYSTEM IMPROVEMENTS
City of Denton, Texas
Attachment A
Page 31 of 31
The following table summarizes the recommended budget revisions and revised contract amount:
Task Original
Contract Amend. No. 1 Revised
Contract
Task 1a – Design Management $ 189,000 $ 200,000 $ 389,000
Task 2a – Preliminary Design $ 3,684,000 $ 7,384,000
• 30 MGD MBR $ 2,943,000
• Non-Potable Water System $ 300,000
• Chemical Feed System $ 100,000
• Operations Buildings $ 500,000
Task 3 – Survey and Geotechnical Services $ 80,000 $ - $ 80,000
Task 4a – Final Design $ 6,898,000 $14,993,000
• 30 MGD MBR $ 6,825,000
• Non-Potable Water System $ 500,000
• Chemical Feed System $ 100,000
• Operations Buildings $ 1,000,000
Task 5a – Construction Contract Documents $ 235,000 $ 285,000 $ 520,000
Task 6 – Bid Phase Services $ 35,000 $ - $ 35,000
Task 7a – Construction Phase Services
• CCA (Hourly) $ 2,906,000 $4,090,000 $ 6,996,000
• RPR (Hourly) $ 860,000 $1,273,000 $ 2,133,000
Task 8a – Record Drawings $ 65,000 $ 81,000 $ 146,000
Task 9a – Wastewater Discharge Permit Amendment $ - $ 90,000 $ 90,000
Task 10a – Environmental Assessment Services (Hourly) $ - $ 60,000 $ 60,000
Task 11a – Sludge Pump Station Replacements $ 493,500 $ 966,500
Totals: $14,952,000 $18,840,500 $33,792,500
Docusign Envelope ID: 8647729E-B149-4891-9F0B-DF6CB1B20F25
Certificate Of Completion
Envelope Id: 8647729E-B149-4891-9F0B-DF6CB1B20F25 Status: Completed
Subject: Please DocuSign: City Council Contract 7574-027 PCWRP Expansion Amendment 1
Source Envelope:
Document Pages: 34 Signatures: 5 Envelope Originator:
Certificate Pages: 6 Initials: 1 Erica Garcia
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-06:00) Central Time (US & Canada)
901B Texas Street
Denton, TX 76209
erica.garcia@cityofdenton.com
IP Address: 198.49.140.10
Record Tracking
Status: Original
6/25/2025 8:46:26 AM
Holder: Erica Garcia
erica.garcia@cityofdenton.com
Location: DocuSign
Signer Events Signature Timestamp
Erica Garcia
erica.garcia@cityofdenton.com
Senior Buyer
City of Denton
Security Level: Email, Account Authentication
(None)
Completed
Using IP Address: 198.49.140.10
Sent: 6/25/2025 8:48:56 AM
Viewed: 6/25/2025 8:49:04 AM
Signed: 6/25/2025 8:49:29 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Lori Hewell
lori.hewell@cityofdenton.com
Purchasing Manager
City of Denton
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 198.49.140.10
Sent: 6/25/2025 8:49:30 AM
Viewed: 6/25/2025 9:20:07 AM
Signed: 6/25/2025 9:21:01 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Marcella Lunn
marcella.lunn@cityofdenton.com
Senior Deputy City Attorney
City of Denton
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 198.49.140.10
Sent: 6/25/2025 9:21:03 AM
Viewed: 6/25/2025 10:29:44 AM
Signed: 6/25/2025 10:31:19 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Scott Arnold
Scott.arnold@kimley-horn.com
Vice President
Kimley-Horn and Associates, Inc.
Security Level: Email, Account Authentication
(None)
Signature Adoption: Uploaded Signature Image
Using IP Address: 130.41.212.55
Sent: 6/25/2025 10:31:22 AM
Viewed: 6/25/2025 10:59:42 AM
Signed: 6/25/2025 1:32:43 PM
Electronic Record and Signature Disclosure:
Accepted: 3/27/2020 10:55:11 AM
ID: a1f38400-e5cc-4b57-8548-4dd7e031355d
Signer Events Signature Timestamp
Stephen D Gay
stephen.gay@cityofdenton.com
General Manager
Water Utilities
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 198.49.140.10
Sent: 6/25/2025 1:32:45 PM
Viewed: 6/25/2025 2:50:41 PM
Signed: 6/25/2025 2:51:20 PM
Electronic Record and Signature Disclosure:
Accepted: 6/25/2025 2:50:41 PM
ID: 7d1c9ef4-a187-42d2-a6fc-7cc81e3bf1c8
Cheyenne Defee
cheyenne.defee@cityofdenton.com
Procurement Administration Supervisor
City of Denton
Security Level: Email, Account Authentication
(None)
Completed
Using IP Address: 198.49.140.10
Sent: 6/25/2025 2:51:24 PM
Viewed: 8/6/2025 8:39:03 AM
Signed: 8/6/2025 8:39:21 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Sara Hensley
sara.hensley@cityofdenton.com
City Manager
City of Denton
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 198.49.140.10
Sent: 8/6/2025 8:39:24 AM
Viewed: 8/6/2025 9:16:07 AM
Signed: 8/6/2025 9:16:14 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Lauren Thoden
lauren.thoden@cityofdenton.com
City Secretary
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 198.49.140.10
Sent: 8/6/2025 9:16:17 AM
Viewed: 8/6/2025 10:20:22 AM
Signed: 8/6/2025 10:20:44 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Cheyenne Defee
cheyenne.defee@cityofdenton.com
Procurement Administration Supervisor
City of Denton
Security Level: Email, Account Authentication
(None)
Sent: 6/25/2025 8:49:31 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Carbon Copy Events Status Timestamp
Gretna Jones
gretna.jones@cityofdenton.com
Legal Secretary
City of Denton
Security Level: Email, Account Authentication
(None)
Sent: 6/25/2025 2:51:23 PM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
City Secretary Office
citysecretary@cityofdenton.com
Security Level: Email, Account Authentication
(None)
Sent: 8/6/2025 10:20:48 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 6/25/2025 8:48:56 AM
Certified Delivered Security Checked 8/6/2025 10:20:22 AM
Signing Complete Security Checked 8/6/2025 10:20:44 AM
Completed Security Checked 8/6/2025 10:20:48 AM
Payment Events Status Timestamps
Electronic Record and Signature Disclosure
ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, City of Denton (we, us or Company) may be required by law to provide to
you certain written notices or disclosures. Described below are the terms and conditions for
providing to you such notices and disclosures electronically through your DocuSign, Inc.
(DocuSign) Express user account. Please read the information below carefully and thoroughly,
and if you can access this information electronically to your satisfaction and agree to these terms
and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of
this document.
Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available
electronically to you by us. For such copies, as long as you are an authorized user of the
DocuSign system you will have the ability to download and print any documents we send to you
through your DocuSign user account for a limited period of time (usually 30 days) after such
documents are first sent to you. After such time, if you wish for us to send you paper copies of
any such documents from our office to you, you will be charged a $0.00 per-page fee. You may
request delivery of such paper copies from us by following the procedure described below.
Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time
change your mind and tell us that thereafter you want to receive required notices and disclosures
only in paper format. How you must inform us of your decision to receive future notices and
disclosure in paper format and withdraw your consent to receive notices and disclosures
electronically is described below.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. To indicate to us that you are changing your mind, you must
withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your
DocuSign account. This will indicate to us that you have withdrawn your consent to receive
required notices and disclosures electronically from us and you will no longer be able to use your
DocuSign Express user account to receive required notices and consents electronically from us
or to sign electronically documents from us.
All notices and disclosures will be sent to you electronically
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through your DocuSign user account all required notices, disclosures,
authorizations, acknowledgements, and other documents that are required to be provided or
made available to you during the course of our relationship with you. To reduce the chance of
you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process, please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
electronically from us.
Electronic Record and Signature Disclosure created on: 7/21/2017 3:59:03 PM
Parties agreed to: Scott Arnold, Stephen D Gay
How to contact City of Denton:
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to: purchasing@cityofdenton.com
To advise City of Denton of your new e-mail address
To let us know of a change in your e-mail address where we should send notices and disclosures
electronically to you, you must send an email message to us at melissa.kraft@cityofdenton.com
and in the body of such request you must state: your previous e-mail address, your new e-mail
address. We do not require any other information from you to change your email address..
In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected
in your DocuSign account by following the process for changing e-mail in DocuSign.
To request paper copies from City of Denton
To request delivery from us of paper copies of the notices and disclosures previously provided
by us to you electronically, you must send us an e-mail to purchasing@cityofdenton.com and in
the body of such request you must state your e-mail address, full name, US Postal address, and
telephone number. We will bill you for any fees at that time, if any.
To withdraw your consent with City of Denton
To inform us that you no longer want to receive future notices and disclosures in electronic
format you may:
i. decline to sign a document from within your DocuSign account, and on the subsequent
page, select the check-box indicating you wish to withdraw your consent, or you may;
ii. send us an e-mail to purchasing@cityofdenton.com and in the body of such request you
must state your e-mail, full name, IS Postal Address, telephone number, and account
number. We do not need any other information from you to withdraw consent.. The
consequences of your withdrawing consent for online documents will be that transactions
may take a longer time to process..
Required hardware and software
Operating Systems: Windows2000? or WindowsXP?
Browsers (for SENDERS): Internet Explorer 6.0? or above
Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0,
NetScape 7.2 (or above)
Email: Access to a valid email account
Screen Resolution: 800 x 600 minimum
Enabled Security Settings:
•Allow per session cookies
•Users accessing the internet behind a Proxy
Server must enable HTTP 1.1 settings via
proxy connection
** These minimum requirements are subject to change. If these requirements change, we will
provide you with an email message at the email address we have on file for you at that time
providing you with the revised hardware and software requirements, at which time you will
have the right to withdraw your consent.
Acknowledging your access and consent to receive materials electronically
To confirm to us that you can access this information electronically, which will be similar to
other electronic notices and disclosures that we will provide to you, please verify that you
were able to read this electronic disclosure and that you also were able to print on paper or
electronically save this page for your future reference and access or that you were able to
e-mail this disclosure and consent to an address where you will be able to print on paper or
save it for your future reference and access. Further, if you consent to receiving notices and
disclosures exclusively in electronic format on the terms and conditions described above,
please let us know by clicking the 'I agree' button below.
By checking the 'I Agree' box, I confirm that:
• I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF
ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and
• I can print on paper the disclosure or save or send the disclosure to a place where I can
print it, for future reference and access; and
• Until or unless I notify City of Denton as described above, I consent to receive from
exclusively through electronic means all notices, disclosures, authorizations,
acknowledgements, and other documents that are required to be provided or made
available to me by City of Denton during the course of my relationship with you.