Loading...
8465 Project Manual Scope of Work – Request for Proposal Landfill Gas-to-Energy Project City of Denton Landfill RFP#8465 Prepared for: City of Denton Solid Waste and Recycling 1527 South Mayhill Road Denton, Texas 76208 1901 Central Drive, Suite 550 Bedford, Texas 76021 (817) 571-2288   SCS No. 16220114.00 | March 2024    RFP for LFGE Project (#8465) www.scsengineers.com Page i Table of Contents Section Page EXECUTIVE SUMMARY ................................................................................................................... 1  1 SITE INFORMATION .............................................................................................................. 2  1.1 Landfill ......................................................................................................................... 2  1.2 Wastewater Treatment Plant ..................................................................................... 4  1.3 Atmos Pipelines .......................................................................................................... 4  1.4 Land for Contractor’s Facility/Pipeline Route Information ...................................... 5  1.5 Gas Quality and Quantity Information ....................................................................... 5  1.5.1 Historical Landfill Gas Recovery Rates ........................................................ 5  1.5.2 Landfill Gas Recovery Projections ............................................................... 6  1.5.3 WWTP Flow Data ........................................................................................... 8  1.5.4 Laboratory Analytical Data ........................................................................... 8  1.6 Permitting and Compliance ........................................................................................ 8  1.7 Landfill or Digester Gas Samples .............................................................................. 9  1.8 Project Interface with City Facilities........................................................................... 9  2 EVALUATION CRITERIA ....................................................................................................... 11  2.1 Similar Projects ......................................................................................................... 11  2.2 Project Approach and Schedule .............................................................................. 11  2.3 Qualifications/Financial Resources......................................................................... 13  2.4 Price Proposal ........................................................................................................... 13  3 PRICE PROPOSAL FORM .................................................................................................... 14  3.1 EXCEPTIONS .............................................................................................................. 15  4 CONTRACT TERMS .............................................................................................................. 17  5 LIMITATIONS ....................................................................................................................... 19  Appendices A GCCS and WWTP Drawings B Atmos Gas Quality Specifications C Denton Property and Landfill Phasing/Development Information C1 - Aerial and Development Drawings C2 - Flood Control Wall Detail RFP for LFGE Project (#8465) www.scsengineers.com Page ii C3 - Landfill Utilities and Fill Phasing D Landfill and WWTP Gas Data D1 - Gas Processed Annually 2017-2020 (TCEQ Fiscal Years) D2 - Wellfield Data, GHG Report, and Tier 2 NMOC Emission Rate Report D3 - Landfill Gas Recovery Projections D4 - WWTP Data D5 - Laboratory Data RFP for LFGE Project (#8465) www.scsengineers.com Page 1 EXECUTIVE SUMMARY This Request for Proposals (RFP), has been issued by the City of Denton (City) to solicit qualifications and innovative proposals for the development of a landfill gas-to-energy (LFGE) project for the City of Denton Landfill (landfill). Additional biogas for this project will be provided for the project from the Pecan Creek Wastewater Treatment Plant (WWTP). The landfill is located at 1527 S. Mayhill Road, Denton, Texas 76208. The WWTP is located adjacent and to the east/northeast of the landfill at 1100 S. Mayhill Road. Up until 2020, the City had an LFGE project to create electricity through the combustion of landfill gas (LFG); however, Denton Municipal Electric (DME) recently bought out the contract for this end-use and decommissioned the project, which was not financially advantageous to DME. The City commissioned a study on possible LFGE projects at the landfill, with the refinement of the gas into high-Btu fuel (hereafter referred as the high-Btu option) for export into a nearby natural gas pipeline owned by Atmos being the preferred option. As such, this is the preferred end-use option the City is considering, although other options by the proposer teams will be reviewed on a case-by-case basis. Please refer to the City’s purchasing portal (https://dentontx.ionwave.net) for required content and details regarding this RFP. However, this scope of work document will contain technical information related to the proposed work. RFP for LFGE Project (#8465) www.scsengineers.com Page 2 1 SITE INFORMATION 1.1 LANDFILL The landfill was developed in the early 1980s and first accepted waste in 1985. Since that time, the landfill has received a cumulative total of approximately 6.5 million tons of waste. As of August 31, 2022, the landfill reported having 43.95 million cubic yards (yd3) of remaining capacity1. Assuming an in-place waste density of 1,200 lbs/yd3 and adding tons in-place, the total site capacity is estimated to be 32,870,000 tons, which is adequate for about 40 more years of operation at projected waste disposal rates (see Section 1.5.2). Figure 1 depicts the general location of the landfill’s permit boundary. Figure 1 – Landfill Location Source: Parkhill, Smith and Cooper, Figure I-4.2 from January 2017 Permit Application. The City previously provided LFG to an on-site facility that was creating biodeiesel although this program was suspended. From 2009 through 2020, electricity was generated on-site via a 1.6-MW, Caterpillar® (CAT) Model 3520 internal engine-generator set, which was owned and operated by DTE Biomass. The electricity was then sold to Denton Municipal Electric (DME). This project was discontinued due to the high cost of this power compared to other renewable electricity sources. 1 TCEQ, Municipal Solid Waste, MSW Annual Report 2022. Pecan Creek WWTP City of Denton Landfill RFP for LFGE Project (#8465) www.scsengineers.com Page 3 The landfill’s footprint is divided into two main “hills” referred to as Units 1 and 2. Figure 2 shows a key-map that was part of the expansion application. This key-map shows the general outline of Unit 1 (the currently approved fill extents including Cells O through 6) and Unit 2 (disposal areas - Cells 7 through 11). This key-map also shows the cell designations included within each unit. Estimates prepared by SCS Engineers (will be discussed later for LFG recovery projections) assume that filling would continue in Unit 1 through approximately to the year 2030, and Unit 2 through approximately year 2063. Cell 0 is the only area that will require an overliner prior to filling above the existing waste mass since it is pre-Subtitle D fill area without a composite liner. The landfill has an existing gas collection and control system (GCCS). The current blower/flare facility consists of a 2,131 scfm utility flare and two 700 scfm blowers (maximum flow of 1,400 scfm), which were installed in 2008 within the limits of waste. Appendix A contains drawings showing the current wellfield layout map, a conceptual final build-out gas system layout of Unit 1 at final grade, and a conceptual build-out gas system layout for Units 1 and 2 at final grade from the currently approved Appendix III-F – Landfill Gas Management Plan. The first wells for this system were completed in 2005, and subsequent expansions included the installation of an open flare for landfill gas destruction, and periodic expansions for control of LFG; including a extension of the header pipe adjacent to Cells 0, 5 and 6 at the end of 2021 and beginning of 2022. The landfill is not currently subject to the control requirements under New Source Performance Standards (NSPS) or National Emissions Standards for Hazardous Air Pollutants (NESHAPS) rules. The estimated 2023 NMOC emission rate was calculated to be 32.0 Mg/year during the 2023 Tier 2 NMOC Emission Rate Report (see Appendix D2)2. In prior years the City also performed enhanced leachate recirculation. The City injected a total of 4.4 million gallons of liquids into Cell 2 in 2009-2017 and 8.2 million gallons into Cell 3A/B between 2010 and 2014 as part of an enhanced liquids recirculation (ELR) program. This amount of liquids introduced into the landfill is estimated to have had an impact on waste moisture and organic waste decay rates, particularly in Cell 3A/B, which received an average of about 1.6 million gallons per year from 2010- 2014. In addition, unusually rainy years in 2015 (60 inches) and 2018 (55 inches) likely had the effect of delaying declines in waste moisture levels after leachate injection rates were decreased starting in 2015 and ending in 2018. At this time, the City does not intend to perform enhance leachate recirculation in the future. Currently the condensate is disposed back into the landfill waste mass and leachate from the landfill is 2 Weaver Consultants Group, LLC, Federal Plan Subpart OOO Tier 2 NMOC Emission Rate Report, August 2, 2023. Source: Parkhill, Smith and Cooper, Figure III-31 from January 2017 Permit Application. Figure 2 – Landfill Layout (Units 1 and 2 and Cells) RFP for LFGE Project (#8465) www.scsengineers.com Page 4 sent directly to the adjacent WWTP. Contractor will be allowed to discharge condensate from the LFGE facility to the adjacent WWTP provided that this condensate meets the WWTP disposal standards. If the condensate does not meet the WWTP disposal standards; then the Contractor will be required to either treat to meet discharge standards or otherwise dispose the condensate at the Contractor’s expense, including any additional charges from the WWTP. 1.2 WASTEWATER TREATMENT PLANT The Pecan Creek Wastewater Treatment Plant (WWTP) is adjacent to the landfill and creates biogas in the plant’s digesters. Although some of the produced gas is used in the digester’s heat exchange process, more of the gas is currently combusted in the waste gas burner. This waste gas will also be made available to the winning Contractor as part of the project. Appendix A includes WWTP drawings showing that current digesters and the waste gas burner. Section 1.5.3 discusses gas quantity information provided for this digester gas. 1.3 ATMOS PIPELINES Since landfill gas-fired electric generation was not successful in the past, and since most new LFGE projects being developed in Texas are high-Btu projects, the natural gas pipeline owner/operator (Atmos) in the area was contacted and provided information for inclusion in this RFP. Figure 3 below shows a pipeline map from Atmos in the area near the landfill. Appendix B includes the Atmos gas quality specifications provided to SCS for this RFP. FIGURE 3 – ATMOS PIPELINES IN AREA OF THE LANDFILL RFP for LFGE Project (#8465) www.scsengineers.com Page 5 1.4 LAND FOR CONTRACTOR’S FACILITY/PIPELINE ROUTE INFORMATION The City of Denton owns a large amount of property between the landfill and adjacent WWTP and will work with the selected developer to lease property for the LFGE beneficial use project. Appendix C includes Denton Property and Landfill Phasing/Development Information to assist the developer in determining where a suitable location might be available as well as information to help the developer determine possibly pipeline routing. The content in Appendix C provides more detailed information as follows:  Appendix C1 includes site development drawings from the landfill’s approved permit application. The drawings depict the permitted landfill boundary (in red) with the property boundary (in cyan). Pecan Creek is also depicted on the drawings, including a 100-year floodplain. Other features of note in these drawings includes the waste boundaries, as well as the screening, and flood control wall depicted in dark yellow on the drawing set.  Appendix C2 provides narrative and a general detail for the flood protection wall.  Appendix C3 provides an excerpt from the permit application showing utility information, and information on landfill base grades and fill sequencing. Additional information on property owners can be found on the Denton County website or the Denton County GIS Map (https://www.dentoncounty.gov/1147/Geographic-Information-Systems-GIS). 1.5 GAS QUALITY AND QUANTITY INFORMATION Information regarding gas quality and quantity information for both the landfill and WWTP are included in this section. 1.5.1 Historical Landfill Gas Recovery Rates Annual average LFG recovery rates in standard cubic feet per minute (scfm), methane content, and LFG recovery adjusted to 50 percent methane in 2015 through 2023 are shown in Table 1. Appendix D1 provides four years of gas processing totals for the landfill. This table was created to provide the City with numbers for their TCEQ annual report for landfill gas beneficially used and is setup per the TCEQ’s fiscal year cycle (September 1st through August 31st annually). It should be noted that from prior modeling efforts, the wellfield likely has more recovery capacity than was needed for the single CAT generator that was on-site during this time; and as such, these numbers should not be assumed to represent total available recovery. Appendix D2 provides wellfield data provided by Denton Power from January 2020 through June 2020 and from Weaver Consultants Group, LLC for January 2022 through August 2023, 2022 calendar year greenhouse gas reporting, and 2023 Tier 2 NMOC Emission Rate Report for the landfill. Table 1 - Denton Landfill 2015-2023 LFG Recovery Rates Pecan Creek WWTP City of Denton Landfill Line F Line F18 - Atmos Line F2 RFP for LFGE Project (#8465) www.scsengineers.com Page 6 Year / Month Average LFG Recovery (scfm) % CH4 Average LFG Recovery at 50% CH4 (scfm) 2015 531 52.8% 561 2016 662 55.2% 731 2017 696 51.2% 713 2018 688 51.8% 712 2019 696 53.4% 744 2020 809 52.1% 843 2021 684 35.3% 483 2022 944 35.1% 663 2023 (9Months) 911 46.6% 850 Jan. 2023 1,058 46.5% 983 Feb. 2023 816 52.6% 858 Mar. 2023 808 50.2% 811 Apr. 2023 730 47.0% 686 May 2023 818 45.1% 738 June 2023 793 45.8% 726 July 2023 813 44.8% 728 Aug. 2023 1,457 43.5% 1,267 1.5.2 Landfill Gas Recovery Projections The SCS LFG recovery model projects LFG recovery rates achievable given the limitations of the existing and planned collection system. The LFG recovery model is empirically calibrated using historical flow data and an independent collection system “coverage” estimate, which is a percentage applied to the theoretical maximum collection rate achievable under optimal conditions, or “LFG recovery potential”. Like collection efficiency, collection system coverage accounts for both the physical extent of wellfield coverage and the efficiency of collection system operations. SCS evaluated current collection system coverage based on a review of the site drawings showing the GCCS layout, monthly wellfield monitoring data covering January through August 2023, and actual LFG recovery rates. Wells are installed in older disposal Cells 0, 1, 2A, 2B, 2C, 3A, 3B, and 4A. Newer Cells 3C, 3D, 4B, and 5 have been filled but have no wells installed. The 2022 GHG report lists collection efficiency as 42 percent, which is calculated based on the percentage of landfill area with waste, different cover types, and wells installed. SCS estimates that effective collection system coverage is approximately 75 to 80 percent in disposal cells with wells installed and 35 to 40 percent overall, which is a flow-weighted average considering the higher LFG production from younger disposal cells without wells. RFP for LFGE Project (#8465) www.scsengineers.com Page 7 SCS assumed the following schedule for improvements to the existing collection system to assign future collection system coverage estimates:  The existing wellfield will be maintained, with ongoing efforts to repair or replace wells.  No new collection system expansions are assumed to occur until the Contractors first expansion. Currently, the collection system coverage is projected to be 37 percent.  A major collection system expansion occurs in 2025 and 2026 (constructed by the selected Contractor) in anticipation of the development of an RNG project. Vertical wells and horizontal collectors will be installed in all areas with waste, starting with Cells 3B, 3C, and 3D, to achieve 60 percent total site coverage in 2025 and 65 percent coverage in 2026.  Collection system expansions occur on an annual basis after 2026, causing incremental increases in collection system coverage to reach 70 percent in 2028 and 75 percent in 2033.  Smaller increases in collection system coverage occur after 2033 until 80 percent coverage is reached in 2047, and a maximum of 85 percent coverage is reached in 2058 after the landfill closes and a final cover is installed. Appendix D3 provides LFG recovery projections prepared by SCS in November 2023 for the City of Denton. The LFG recovery projections provide the following information:  Annual historical and projected future waste disposal rates. An annual waste intake increase of 2.5 percent per year was assumed based on current population growth rates for Denton County. This is conservative considering that the annual increase in waste disposal tonnages was about 5 percent in 2022 and averaged 12 percent over the past five years. The annual growth in waste disposal is assumed to slow to 1.5 percent from 2031 through 2040, and to 1 percent starting in 2041. At these projected waste disposal rates, the site capacity of 32.35 million tons is projected to be exhausted in 2063.  Annual waste in place values.  Projected LFG recovery potential, which is the maximum amount of LFG that is recoverable with a fully comprehensive and efficiently operated collection system.  Estimated collection system coverage values.  Projected LFG recovery from the existing and planned collection system, which is equal to the recovery potential multiplied by the estimated system coverage. Figure 1 below shows the LFG recovery projection in graphic form and includes annual average LFG recovery rates in 2010 through 2023. RFP for LFGE Project (#8465) www.scsengineers.com Page 8 Figure 1. LFG Recovery Projections: City of Denton Landfill 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 1995 2000 2005 2010 2015 2020 2025 2030 2035 2040 2045 2050LFG Flow at 50% Methane (scfm)Recovery Potential Recovery from Existing/Planned System Actual LFG Recovery 1.5.3 WWTP Flow Data Appendix D4 provides digester gas flow data from the WWTP provided for this RFP between 2018 and 2020. The average digester gas flow data between 2020 and present were between 90 and 180 mcf/day. The City anticipates that these gas quantities will continue to grow in the future with the City’s population base. 1.5.4 Laboratory Analytical Data A silicon test sample report is included in Appendix D5 that DTE provided to the City from 2019 for the landfill gas. If the Contractor wishes to perform additional testing on the landfill or digester gas at their own expense, the City has included provisions in this RFP to facilitate this (see Section 1.7). 1.6 PERMITTING AND COMPLIANCE The winning Contractor will be responsible for all permitting of the new LFGE facility (including but not limited to Appendix G – Cost Estimate for Closure & Post-Closure Care and Financial Assurance and Appendix III-F – Landfill Gas Management Plan). If the LFGE facility is located within the landfill’s permit boundary, a Type IX registration will likely be required and this would be solely under the Contractor’s name. The Contractor will be responsible for obtaining required air permits as well. Denton County is a RFP for LFGE Project (#8465) www.scsengineers.com Page 9 moderate to serious ozone non-attainment area.3 The landfill is not currently subject to the control requirements of either the New Source Performance Standard (NSPS) 40 CFR §62, Subpart OOO or the National Emissions Standards for Hazardous Air Pollutants (NESHAPS) 40 CFR §63, Subpart AAAA; however, the reported 2023 NMOC emission rate was calculated to be 32.0 Mg/year during the 2023 Tier 2 NMOC Emission Rate Report (see Appendix X) and an annual NMOC Emission Rate Report will be submitted in 2024. The evaluation process will include an review of the contract provisions to be included regarding the Contractor’s obligation to: a) collect LFG to NSPS/NESHAP standards, and b) to operate and maintain the GCCS within NSPS/NESHAP requirements. The City will expect that the Contractor would operate and expand the GCCS as required to at a minimum to meet NSPS/NESHAP control requirements. 1.7 LANDFILL OR DIGESTER GAS SAMPLES The Contractor may submit a request to collect landfill or digester gas samples for analysis. The results of any such analyses shall be shared with the City, but will be noted as confidential and will not be shared with other Contractors. Any request for samples will be accommodated if there is sufficient time prior to the proposal date. The Contractor will be responsible for all sampling and analysis costs, including shipping, sampling containers, and be responsible for collecting the samples. The sampling shall not impact normal operations or damage existing systems/structures of the landfill or WWTP. The City does not in any way guarantee that any sample results will be representative of long-term gas quality or quantity. The City may also grant requests it finds reasonable if the Contractor wishes to visit the site to perform other due diligence including: examination of the wellfield or existing blower/flare skid; examination of the WWTP layout; or potential pipeline routes. Any results from the additional examinations, tests, etc. will be shared with the City, but can be marked as confidential and will not be shared with other Contractors. 1.8 PROJECT INTERFACE WITH CITY FACILITIES The Contractor’s proposal should assume that they will be provided with sales points parallel to the City’s blower skids at both the landfill and WWTP. The Contractor would then be responsible for the preparation of appropriate gas system modifications and meter installations for the required diversion to their facility with City approval. The Contractor will also have sole responsibility for the landfill gas system operation, monitoring, and 3 Based on data from 2012 through 2014, the DFW area is monitoring attainment of the 1997 eight-hour ozone NAAQS. On February 27, 2015, the TCEQ submitted a request for a finding that the DFW area is attaining the 1997 eight-hour ozone NAAQS. On September 1, 2015, the EPA finalized a clean data determination for the DFW 1997 eight-hour ozone nonattainment area (80 FR 52630 ). On November 8, 2016, the EPA published approval of the DFW area redesignation substitute for the one-hour ozone and 1997 eight-hour ozone NAAQS (81 FR 78688 ), effective December 8, 2016. On April 5, 2019, the TCEQ submitted a redesignation request and maintenance plan SIP revision to the EPA requesting formal redesignation of the DFW area to attainment for the 1997 eight-hour ozone NAAQS. On June 24, 2019, the EPA proposed approval of the redesignation request SIP revision (84 FR 39471). RFP for LFGE Project (#8465) www.scsengineers.com Page 10 maintenance upon project award including future expansions. The City will only be responsible for the coast of repairing or replacing components of the landfill gas system or the Contractor’s facilities or equipment if damaged by the City. The wellfield must be operated within standard NSPS parameters for oxygen, vacuum, and temperature, whether under vacuum from the City’s blowers at the flare or the proposed facility’s blowers. The Contractor will also be required to purchase all usable landfill and digester waste gas per relevant benchmarks included in the contract between the City and Contractor, whether that usable gas is used at the LFGE facility or flared. The City will be responsible for NSPS reporting and will coordinate all surface emissions monitoring. The Contractor will be required to have their own flare within their facility boundary to combust any waste gas or off-spec gas (this gas will not be piped back to the landfill flare or WWTP waste gas burner for combustion). No treated gas for the LFGE facility shall ever be vented; only beneficially used or combusted per NSPS requirements. The City will maintain capacity for combustion of the landfill and digester waste gas in the event that the LFGE facility is not accepting gas for any reason. As noted previously, however, the City’s combustion devices will only be used to combust excess landfill or digester waste gas that is not collected by the LFGE facility, or in the event that the gas is not usable by the LFGE facility. RFP for LFGE Project (#8465) www.scsengineers.com Page 11 2 EVALUATION CRITERIA The evaluation criteria will follow the categories and scoring as follows:  Similar Projects (20% of overall score);  Project Approach and Schedule (30% of overall Score);  Qualifications/Financial Resources (20% of overall score); and  Price Proposal (30% of overall score). Additional information on the specific content requested for the RFP for each of these categories is provided below. 2.1 SIMILAR PROJECTS The Contractor must include a minimum of three similar projects that have been consistently operating by the Contractor for at least two years. The written submittal should fully describe these projects and include the following information:  Identify employees at referenced projects that would be involved with the City’s development and what their roles would be;  Identify whether the wellfield for the project is subject to NSPS requirements, and in what capacity the Contractor operates the wellfield? Also, if the wellfield is required under NSPS, how does the Contractor assure compliance while balancing that compliance with the LFGE project’s needs;  How is condensate managed for the project;  If the project involves refining landfill gas into high-Btu natural gas, discuss whether nitrogen removal is included at the plant and what the wellfield operating tolerances are;  How long has the project been operational;  Location of project  Contact information for the Owner of the facility that the project is located;  How often is the existing collection system expanded; and  What attributes of the project provide benefits that the Contractor can directly utilize for the City of Denton’s project? 2.2 PROJECT APPROACH AND SCHEDULE For this portion of the proposal, the Contractor should provide the following:  A detailed discussion on the permitting, design, construction, operation, technology, and maintenance for the proposed LFGE project.  Discuss the LFGE usage selected for the project and why that use was selected.  Discuss how the City’s gas recovery projections will make the project possible and support the values included in the price proposal. A sufficient description must be included to convey an RFP for LFGE Project (#8465) www.scsengineers.com Page 12 understanding of the project, including the proposed technology. The feasibility of the proposed project will be factored into the scoring analysis, including both the viability and history of the proposed technology, and examples of functioning technology in Texas and the United States.  Provide an approach that includes sufficient detail of the proposed process, how the gas will be converted for its beneficial use, the ultimate distribution system, and the marketing strategy, if applicable. The technical soundness of the proposed process and Contractor’s understanding of the development process will be factored into the scoring analysis, including consideration of both the viability and history of the proposed technology in the United States.  A process flow diagram must be provided to illustrate the proposed process, as well as a schedule that shows development milestones for the proposed project. Details to be included in the project approach that will impact the City directly should include the following:  Estimated area required for the facility;  Annual assumed future value of natural gas sales, RINs, and RECs through the project period;  Specifics regarding facility access and utility needs for the project (e.g., water, wastewater, electrical, etc.);  Specific challenges to the project based on Contractor’s review of the information provided;  Contractor’s proposed wellfield upgrades needed prior to LFGE project startup, and proposed subsequent wellfield expansions as filling continues (both for regulatory requirements and the LFGE project);  How will the LFGE facility and gas collection system be expanded to keep pace with available landfill and digester waste gas, and to what extent the landfill flare or WWTP waste gas burner might be utilized to combust excess gas while the LFGE facility is operating;  How the Contractor will address potential environmental impacts, including but not limited to stormwater, air quality, ambient noise and odor levels, traffic conditions, and surrounding areas and visual screening;  Specify what safety and security measures will be implemented;  Challenges and opportunities of blending in WWTP digester gas with the landfill gas and how the Contractor would specifically maximize the utilization of both gas streams;  Identify all waste products from the process and how they will be managed;  Permits that must be obtained (including all permits required from TCEQ and/or EPA);  How the Contractor will maintain a working relationship and communicate with the City;  The proposed location of the flow and methane meters for payment;  How the Contractor proposes to manage landfill or digester gas that may have high hydrogen sulfide values or landfill gas wells with low methane production or high oxygen content; and  A proposed project schedule identifying major milestones The Contractor must outline the proposed project team that will be utilized for the project including all subcontractors. An organization chart must be included showing this structure along with key personnel. RFP for LFGE Project (#8465) www.scsengineers.com Page 13 2.3 QUALIFICATIONS/FINANCIAL RESOURCES For this portion of the proposal, information on the Contractor’s qualifications must be included. The Contractor must have a minimum five years of experience with the type of proposed technology, and a minimum of three similar projects consistently operating by the Contractor for at least two years. In addition to any other information the Contractor believes will be useful to the City in its evaluation, the following information must be included:  Years and summary of experience operating the proposed type of LFGE facility;  Directly relevant experience for the proposed project (for the type of LFGE project proposed) outside of the referenced projects;  Relevant indirect experience for other types of LFGE projects;  Years of and summary of experience in operation, monitoring, and maintenance of LFGE facilities;  Experience in marketing and negotiating energy and environmental attribute sales agreements;  Summaries of experience of relevant key personnel;  Summaries of and qualifications of subcontractors included on the project team; and  Years of and summary of experience operating landfill gas collection and control systems and experience operating wellfields under NSPS control requirements. To evaluate the financial resources and ability of the Contractor to perform as set forth in the proposal, the following information is required in the proposal:  Information for the City to judge the financial strength and stability of the company and its ability to perform and to meet the long-term obligations set forth in the proposal;  Discuss how the Contractor will satisfy closure and post-closure financial assurance requirements;  Discussion of the ability of the Contractor to secure financing, maintain letters of credit, or other guarantees as required by the City; and  Discussion of any material lawsuits or litigation within the past 5-years. 2.4 PRICE PROPOSAL This criteria will be scored based on the values populated in the price proposal form (see Section 3), and based on the City’s evaluation of any supplemental information provided by the Contractor. As part of the evaluation of this criteria the Contractor must also provide a copy of the proposed sample contract for the City’s review. RFP for LFGE Project (#8465) www.scsengineers.com Page 14 3 PRICE PROPOSAL FORM The form on the following page must be utilized by the Contractor for their response to this RFP. The Contractor should take note of the footnotes on this form as well. Additional information can also be provided if needed for clarification, or to set forth additional options for the City’s consideration; however any such information will not be in lieu of the attached price proposal form. The Contractor must ultimately agree to make payments to the City based either on metered quantities and measured quality of landfill and waste digester gas delivered and/or based on some mutually agreed upon revenue sharing arrangement. The scope of services and pricing should assume that the Contractor will be responsible for all planning, permitting, financing, design, construction, operations, maintenance, and environmental monitoring services for facilities associated with the LFGE facility. Any upgrades and subsequent wellfield expansions will be the Contractor’s sole responsibility (including future wellfield expansions for NSPS compliance) as noted also in Section 1.8. Any landfill permitting that might be required for changes to the gas system or WWTP will, however, be the City’s responsibility; although all permitting related to the LFGE facilities will be the Contractor’s responsibility. The pricing should also assume that the Contractor will utilize their own flare to combust any off-spec or waste gasses (the City’s combustion devices will only be used to combust unprocessed landfill or digester waste gas when the LFGE project is not able to receive it). The form assumes a 20-year project period for consistency among responses. The initial columns indicate the amount of gas anticipated to be used, and not used. The modeled recovery potential with (Appendix D3) should be utilized as an upper limit when the Contractor determines a recovery quantity to ensure that inflated projections are not utilized to show more revenue than might be possible. Columns are provided to show the proposed unit quantity royalty payments on both a fixed and indexed basis. Columns are also provided to show the total annual compensation along with various categories or revenue. A range of options is provided to accommodate various LFGE project types. Lastly, a column is provided to indicate what the purchase price would be for the City to take ownership of the project after the fifth year of operation. As noted, the City is also open to a revenue sharing agreement as well to guarantee the Contractor a reasonable return on investment, but also share in the potential revenue as opposed to a royalty payment. The City’s evaluation of proposals that include this option will include an assessment of the risks associated with future natural gas and environmental attributes. Respondents are to provide their assumed forward annual price assumption for natural gas, including the natural gas index price deemed most appropriate by the respondent. Here it should be noted that the City’s utility also has the ability to hedge future natural gas prices to provide a more stabilized revenue stream, which could be beneficial in a partnership/revenue sharing situation. The City is not offering to lend its balance sheet for the purpose of future hedging natural gas and environmental attributes RFP for LFGE Project (#8465) www.scsengineers.com Page 15 3.1 EXCEPTIONS If the Contractor takes exception to any of the terms included in the RFP and supporting documents, they must be clearly identified in this section of the proposal. Any such exceptions must also be clearly defined with respect to the revenue impact, if any, to the City. If any proposed change would increase the City’s revenue, then the Contractor must clearly describe and quantify the nature and scope of this increase. It should be noted that, regardless of any exceptions, the Contractor’s RFP must still include a proposal with the City’s conditions as set forth in this RFP. RFP for LFGE Project (#8465) www.scsengineers.com Page 16 PRICE PROPOSAL FORM CITY OF DENTON RFP FOR LFGE PROJECT1 Year Anticipated LFG Used by Project2 (scfm) Anticipated Excess LFG Not Used by Project (scfm) Total Guaranteed Royalty Payment3 Portion of Payment by Category5 Total Annual Royalty Payment (Compensation) to City ($)5 Estimated Cost for City to Purchase Remaining Equity in Project after Years 5 or 10 (dollars) Fixed Landfill Gas Purchase Price/MMBtu ($/per million Btu) Indexed Landfill Gas Purchase Price/MMBtu4 ($/per million Btu) Portion of Annual Royalty Attributed to Power Sales ($) Portion of Annual Royalty Attributed to RECs ($) Portion of Annual Royalty Attributed to Gas Sales ($) Portion of Annual Royalty Attributed to RINs ($) Portion of Annual Royalty Attributed to Other Sources ($) Fixed Indexed Fixed Indexed Fixed Indexed Fixed Indexed Fixed Indexed Fixed Indexed Fixed Payment Scenario Indexed Payment Scenario 2025 N/A 2026 2027 2028 2029 2030 2031 N/A 2032 2033 2034 2035 2036 N/A 2037 2038 2039 2040 2041 2042 2043 2044 1 All dollar values are to be presented in 2024 dollars, assuming an annual inflation rate of 2 percent. This form assumes that landfill and digester waste gas will be compensated for equally by category. If this is not the case the Contractor must indicate otherwise in their response and provide information on each category for each gas stream. 2 The value of gas utilized or not utilized should not exceed the recovery potential from the applicable models provided in Appendix D3. 3 If other unit of payment is preferred, please specify unit provided, but this sheet must still be populated. 4 Indexed price assumes a base price that would be adjusted monthly (increase or decrease in $/MMBtu) to match the change in Henry Hub or other specified natural gas index pricing on the last day of the prior month for which a price was published. 5 The individual components in these columns should match the Total Guaranteed Royalty Payment. RFP for LFGE Project (#8465) www.scsengineers.com Page 17 4 CONTRACT TERMS The City has an interest in ensuring that the landfill and digester gas is beneficially used when entering into this agreement, and also has an interest in continuity of ownership to achieve this goal. As such the City is putting forward the following provisions to be included in the contract negotiations for any final agreement. Please note that, per Section 2.4 of this RFP, the Contractor must provide a copy of the propose sample contract for the City’s review.  The City will be compensated for all landfill and digester waste gas that is metered into the facility’s inlet meters. If, and at the City’s sole discretion, it observes a significant amount of flow being directed to the City’s combustion devices for an extended period of time (and not being beneficially reused), the City reserves the right to initiate one or more projects to use the gasses for a more advantageous beneficial use than flaring.  At all times, the City retains the right to terminate the contract for failure to perform as required. Default of the Contractor may include, but is not limited to: (a) failure to operate and maintain the facility and project in full compliance with all applicable laws and environmental compliance requirements; (b) operating the facility and project in a manner that creates a non-compliance event for the landfill; (c) operating the facility and project in a manner that creates a nuisance condition or environmental hazard; (d) failure to make timely and full payments to the City; or (e) failure to operate the facility and project in a manner that beneficially uses all but an insignificant portion of the landfill and digester gases.  If the Contractor utilizes less than 50 percent of available gas quantities (or other value stipulated in a contract resulting out of a negotiations phase following this RFP process) made available by the City, as measured on a 12-month rolling average, the City retains the right to either sell excess gas to another entity (excess to be defined as the average quantity of gas not utilized over the 12-month period), or if revised terms cannot be negotiated with the Contractor, terminate the contract. For the initial year after commencement of operations, the calculation of the 12-month rolling average of quantities shall supplement the data recorded by the Contractor’s meters with historic data recorded by the City’s measuring and monitoring equipment.  If, at any time, the Contractor receives a bona fide offer (“Offer”) to sell the project/facility to a third-party purchaser, and the Contractor decides to sell pursuant to such an Offer, the City retains the first right to purchase the project/facility before the Contractor may sell them to a third-party purchaser. The Contractor must provide the City a notice (“Offer Notice”) of the Offer within ten (10) business days after Contractor receives it. The Offer Notice must include the pricing and the purchase terms included in the Offer. Upon receiving the Offer Notice from the Contractor, the City will solicit proposals from independent appraisers to estimate the value of the assets offered for sale by the Contractor. The City will select an independent appraiser that is mutually agreeable to the Contractor and the City. If Contractor and City cannot agree on an appraiser, Contractor and City will each select RFP for LFGE Project (#8465) www.scsengineers.com Page 18 an appraiser and the two appraisers will select the appraiser who will do the independent appraisal. Upon completion of the appraisal, the City may elect to purchase the Contractor’s project/facility at the value estimated by the independent appraiser. If, within fifteen (15) business days after receiving estimated value from the independent appraiser, the City does not provide to the Contractor notice of City’s intent to purchase the project and facility (“Intent to Purchase Notice”) at the value estimated by the independent appraiser, then the Contractor may proceed with the sale to the third-party purchaser. If the City provides the Contractor a timely Intent to Purchase Notice, the City shall have the sole and absolute right to purchase the project/facilities at the value determined by the independent appraiser. RFP for LFGE Project (#8465) www.scsengineers.com Page 19 5 LIMITATIONS This Scope of Work and its contents has been prepared in accordance with the care and skill generally exercised by reputable landfill gas professionals, under similar circumstances, in this or similar localities. No other warranty, express or implied, is made as to the professional opinions presented herein. The content in this scope of work was prepared for the use of the City of Denton. Other parties use this report at their own risk. SCS assumes no responsibility for the accuracy of information obtained from, or provided by, third-party sources. Any future landfill gas or digester waste gas recovery projections provided are conceptual projections that were derived from information provided to SCS by the City of Denton, including available records of landfill waste receipts and in-situ waste. SCS has not made an independent verification of the accuracy of these records. Through this scope of work, SCS is not making any representations of the accuracy of the data obtained to develop the landfill gas recovery projections nor providing any guarantees as to the quality and/or quantity of gas available for extraction from the landfill. Further, these recovery projections are not intended to be used for New Source Review (NSR) submittals or any permit-related emissions estimates. Lastly, certain assumptions have been made in this scope of work which are subject to change, and any assessments are for informational purposes only and is not intended to be legal, budgetary, or tax advice. Therefore, SCS makes no guarantees of the potential revenue, tax credits, or incentives that may ultimately be realized from potential recovery. RFP for LFGE Project (#8465) www.scsengineers.com Appendix A GCCS and WWTP Drawings RFP for LFGE Project (#8465) www.scsengineers.com GCCS Drawings  Existing GCCS  Unit 1 Build-Out Conceptual Drawing  Future GCCS Layout (Units 1 and 2) LFG2LFG3LFG5LFG6LFG7LFG8LFG16LFG17LFG18LFG19LFG20LFG21LFG22LFG23LFG24LFG25LFG26LFG27LFG28LFG29LFG30GW-48GW-50GW-51GW-52GW-49GW-53GW-54GW-55GW-56GW-57GW-58GW-59GW-60GW-62GW-63GW-64GW-65GW-66GW-67GW-68GW-47LFG31LFG32LFG33LFG34LFG35LFG36LFG37LFG38LFG39H23H22H21H20H19H18H17H16H15H14H13H12H11H10H8H7H6H5H3H2H1LFG41LFG42LFG43H29H30H31H32H33H34H35H25H26GW-87GW-88GW-89GW-92GW-95GW-99GW-102GW-100GW-101GW-93GW-94GW-90GW-97GW-98GW-91GW-77GW-76GW-75GW-78GW-79GW-74GW-80GW-81GW-82GW-84GW-85GW-86GW-83GW-96LFG26LFG2LFG3LFG5LFG6LFG7LFG8LFG16LFG17LFG18LFG19LFG20LFG21LFG22LFG23LFG24LFG25LFG26LFG27LFG28LFG29LFG30GW-46GW-45GW-44GW-107GW-108GW-109GW-110GW-111GW-112GW-113GW-114GW-115GW-116GW-117GW-118EXISTING CONDITIONSAS OF 11/9/2023CITY OF DENTON LANDFILLSCS ENGINEERSGW-48630H14 RFP for LFGE Project (#8465) www.scsengineers.com WWTP Drawings RFP for LFGE Project (#8465) www.scsengineers.com Appendix B Atmos Gas Quality Specifications GAS QUALITY SPECIFICATIONS The “Applicable Gas Quality Specifications” or “Gas Quality Specifications” will be as follows: (a) all of the gas (including but not limited to, natural gas, manufactured gas, landfill gas, biogas, and biomethane) flowing into facilities owned or operated by ATMOS located in any county served by Atmos Pipeline – Texas, must: (i) be primarily methane of merchantable quality; (ii) be commercially free of dust, gum, gum-forming constituents, gasoline, liquid hydrocarbons, water and any other substance of any kind that may become separated from the gas during the handling thereof or that may cause injury to or interference with proper operation of the lines, meters, regulators or other appliances, including those of a downstream customer, through which it flows; (iii) contain not more than ¼ grain of hydrogen sulfide per 100 cubic feet of gas; (iv) contain not more than five grains of total sulfur, including not more than one grain of mercaptan sulfur, per 100 cubic feet of gas; (v) contain not more than 2% by volume of carbon dioxide; and contain not more than: A) a total of 3% by volume of non-hydrocarbon gases in Coke, Crane, Fisher, Jones, Glasscock, Midland, Mitchell Nolan, Pecos, Reeves, Runnels, Scurry, Sterling, Taylor, Tom Green, Upton and Ward counties; B) a total of 4% by volume of non-hydrocarbon gases in any county served by Atmos Pipeline – Texas, other than Coke, Crane, Fisher, Jones, Glasscock, Midland, Mitchell Nolan, Pecos, Reeves, Runnels, Scurry, Sterling, Taylor, Tom Green, Upton and Ward counties; (vi) contain not more than 0.05% oxygen; (vii) contain a gross heating value of at least 950 British Thermal Units (“Btu”) per cubic foot and not more than 1,100 Btu per cubic foot; (viii) contain not more than seven pounds of water vapor per million cubic feet of gas; (ix) have a temperature of not more than 120 degrees Fahrenheit, nor less than 40 degrees Fahrenheit; (x) have a hydrocarbon dewpoint below 40 degrees Fahrenheit at the delivery pressure; and (xi) have an interchangeability factor (calculated by dividing each Btu of gas, saturated with water vapor at a temperature of 60 degrees Fahrenheit and at a pressure of 14.65 psia, by the square root of the specific gravity of the gas) that deviates no more than 7% from the interchangeability factor of the gas contained in ATMOS’ pipeline system at the Receipt Point. b) In addition to the gas quality specifications set out in Section (a), “Applicable Gas Quality Specifications” or “Gas Quality Specifications” shall also include the following requirements: (i) ATMOS reserves the right to reject, and not purchase, transport or accept into its facilities, equipment or pipeline system any gas or material that contains one or more constituents, or has one or more physical or chemical characteristics, not otherwise covered by Section (a) that would, in ATMOS’ sole opinion: (A) damage any of the facilities, pipelines or equipment of ATMOS or a downstream customer of ATMOS; or injure any personnel of ATMOS or a downstream customer of ATMOS; or (B) adversely affect the ability of ATMOS’ or a downstream customer of ATMOS to safely receive, handle, contain and/or transport such gas; or (C) form an acid or acidic mixture, which over time would, in ATMOS’ sole opinion, adversely affect the integrity of the facilities, pipelines, equipment or personnel of ATMOS or a downstream customer of ATMOS; or (D) degrade the odorization of the gas; or (E) cause ATMOS, or ATMOS’ facilities, pipelines or equipment, or any gas in ATMOS’ facilities, pipelines or equipment to be in violation of any law, court order, rule or regulation of any regulatory authority with jurisdiction such as, but not limited to, the EPA, OSHA, the Railroad Commission of Texas, the Pipeline and Hazardous Materials Safety Administration, TCEQ or any successor agencies. (ii) ATMOS reserves the right to: (1) reject, and not purchase, transport or accept into its facilities, equipment or pipeline system any gas or material that contains particulate matter and/or microbes larger than 0.2 microns; or (2) require that the gas involved be effectively filtered to prevent particulate matter and/or microbes larger than 0.2 microns from entering Atmos’ facilities, pipelines or equipment. (c) Notwithstanding the foregoing, ATMOS may waive a customer’s obligations with regard to maximum Btu content, hydrocarbon dewpoint interchangeability or other factors, subject to ATMOS’ continuing right to withdraw such waiver at any time in the future by written notice to such a customer or customers. (d) ATMOS reserves the right, at any time and from time to time, to unilaterally amend the “Applicable Gas Quality Specifications” or “Gas Quality Specifications” set forth above, on a reasonable and nondiscriminatory basis, upon giving ATMOS’ affected shippers and suppliers at least 30 days’ prior written notice of such changes. RFP for LFGE Project (#8465) www.scsengineers.com Appendix C Denton Property and Landfill Phasing/ Development Information RFP for LFGE Project (#8465) www.scsengineers.com Appendix C1 Aerial and Development Drawings FACILITY SITEENTRANCE LOCATIONSO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 3\3.01 Facility Site Entrance Locations.dwg LAYOUT NAME: Site Entrance Locations PRINTED: Thursday, November 10, 2016 - 4:47pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE III-1N MIDDLE SITE ENTRANCEO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 3\3.02 Middle Site Entrance.dwg LAYOUT NAME: Middle Site Entrance PRINTED: Thursday, November 10, 2016 - 4:48pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE III-2N NORTH SITE ENTRANCEO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 3\3.03 North Site Entrance.dwg LAYOUT NAME: Middle Site Entrance PRINTED: Thursday, November 10, 2016 - 4:49pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE III-3N PROTECTIVE BARRIERSO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 3\3.04 Protective Barriers.dwg LAYOUT NAME: Protective Barriers PRINTED: Thursday, November 10, 2016 - 4:50pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE III-4N¶¶ COMPLEXPROCESS SCHEMATICNO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 3\3.06 Complex Schematic Diagram.dwg LAYOUT NAME: Process Diagram PRINTED: Thursday, November 10, 2016 - 5:12pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE III-6 1%0.5%1%1%1%0.5%1%1%0.5%1%1%0.5% 1%1%0.5%1%1%0.5%2C2B2A14D3D3C3B3A4C4B4A560FINAL CONTOUR MAPUNIT 1NO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 3\3.31 Final Contour Map Unit 1.dwg LAYOUT NAME: Unit 1 PRINTED: Thursday, November 10, 2016 - 6:39pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE III-31 FINAL CONTOUR MAPUNIT 2NO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 3\3.32 Final Contour Map Unit 2.dwg LAYOUT NAME: Unit 1 PRINTED: Thursday, November 10, 2016 - 6:41pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE III-32 RFP for LFGE Project (#8465) www.scsengineers.com Appendix C2 Flood Control Wall Detail City of Denton ECO-W.E.R.C.S. COMPLEX TCEQ MSW Permit No. 1590B November 2016 PARKHILL, SMITH & COOPER, INC. 01017416 PART III 9 TABLE 1 – GENERALIZED CONSTRUCTION DETAIL LOCATIONS Storage or Processing Unit Figure or Section SSO Compost Facility (Currently Approved in Existing Permit - Included for information only) Figure III-7A & III-7B HCC Facility (Currently Approved in Existing Permit - Included for information only) Figure III-8 Grease and Grit Processing Facility (Currently Approved in Existing Permit - Included for information only) Figure III-9, III-10, III-11, & III-12 Part IV Appendix A – Table 3.1 Liquid Waste Bulking Facility Figure III-13 Containment Dikes or Walls §330.63(b)(2)(F) Landfill Retaining Wall The landfill retaining wall located on the west boundary of each unit and on a portion of the south boundary of Unit 1 provides site screening from S. Mayhill Road and adjacent areas. The wall also enables the lateral expansion of Unit 1. The wall is constructed by placing prefabricated blocks on a prepared foundation. Phase 1 of wall construction will terminate at the north end of landfill Unit 1. Once landfill operations move into Landfill Unit 2, the remaining length of the wall will be built in phases as needed for screening. Typical details of this wall are presented in Figure III-14. The location is shown on Figure II-6 – Complex Layout. City of Denton ECO-W.E.R.C.S. COMPLEX TCEQ MSW Permit No. 1590B November 2016 PARKHILL, SMITH & COOPER, INC. 01017416 PART III 10 Flood Protection Wall When landfill or compost operations move into the area shown as Phases 10 and 11, a flood protection wall is required to protect this area from the flooding of Pecan Creek. A mechanically stabilized earth (MSE) or gravity retaining wall system will be used in this location. Typical details of this wall are presented in Figure III-15. The location is shown on Figure II-6 – Complex Layout. More information regarding flood protection is presented in Part II – Appendix D. Liquid Waste Bulking Facility Processing or bulking of liquid material is typically needed to allow direct disposal to the landfill. The liquid material will be processed in bulking pits. Bulking pits are designed to process liquids, contain precipitation from the 25-year 24-hour storm, and provide 1-ft of freeboard. Generalized construction details for the liquid waste bulking pits are provided in Figure III-13. The location is shown on Figure III-6 – Complex Process Schematic. GGTF All grease and grit processing activities occur either within an enclosed building or within a containment structure with the capacity to hold the volume of the largest storage tank, precipitation from the 25-year 24-hour storm (design storm), and 1-ft of freeboard. Grit trap processing may also involves outdoor drying units, surrounded by walls sufficient to contain storm water from the design storm within the facility. Generalized construction details show the design of the walls of the GGTF building and the surrounding grit trap units. Generalized construction details for the GGTF containment structures are provided in Figures III-9, III-10, III-11, & III-12. Also see Figure III-6 – Complex Process Schematic. RFP for LFGE Project (#8465) www.scsengineers.com Appendix C3 Landfill Utilities and Fill Phasing COMPLEX EASEMENTSNO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 2\II-5 Complex Easements.dwg LAYOUT NAME: Easements PRINTED: Thursday, November 10, 2016 - 11:54am USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE II-5 COMPLEX LAYOUTNO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 2\II-6 Complex Layout.dwg LAYOUT NAME: Facility Layout PRINTED: Thursday, November 10, 2016 - 12:05pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE II-6 1%0.5%1%1%1%0.5%1%1%0.5%1%1%0.5% 1 %1%0.5%1 %1%0.5%2C2B2A14D3D3C3B3A4C4B4A560COMPLEX LAYOUTLANDFILL UNIT 1OPTION ANO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 2\II-7A Complex Layout Landfill Unit 1 Option A.dwg LAYOUT NAME: Facility Layout PRINTED: Thursday, November 10, 2016 - 12:08pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE II-7A 1%0.5%1%1%1%0.5%1%1%0.5%1%1%0.5% 1 %1%0.5%1 %1%0.5%2C2B2A14D3D3C3B3A4C4B4A5601%1%0.5%1 %1%0.5%NO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 2\II-7B Complex Layout Landfill Unit 1 Option B.dwg LAYOUT NAME: Facility Layout PRINTED: Thursday, November 10, 2016 - 12:11pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE II-7BCOMPLEX LAYOUTLANDFILL UNIT 1OPTION B 2. 5 %2.5%1.5%2. 5%2.5%1.5%2.5 %2.5%1.5%2. 5 %2.5%1.5%2. 5 %2.5%1.5%7A8A9A10A11A7B8B9B10B11C11BCOMPLEX LAYOUTLANDFILL UNIT 2NO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 2\II-8 Complex Layout Landfill Unit 2.dwg LAYOUT NAME: II-8 Facility Layout North PRINTED: Thursday, November 10, 2016 - 12:20pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE II-8 562 2C2B2A14D3D3C3B3A4C4B4A560NO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 2\II-9 Complex Development Landfill Unit 1 - Existing.dwg LAYOUT NAME: Unit 1 PRINTED: Thursday, November 10, 2016 - 2:07pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016COMPLEXDEVELOPMENT LANDFILLUNIT 1 - EXISTINGFIGURE II-9 2C2B2A14D3D3C3B3A4C4B4A560COMPLEXDEVELOPMENT LANDFILLUNIT 1 - PHASE 1NO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 2\II-10 Complex Development Landfill Unit 1 - Phase 1.dwg LAYOUT NAME: Unit 1 PRINTED: Thursday, November 10, 2016 - 1:46pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE II-10 2C2B2A14D3D3C3B3A4C4B4A560NO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 2\II-11 Complex Development Landfill Unit 1 - Phase 2.dwg LAYOUT NAME: Unit 1 PRINTED: Thursday, November 10, 2016 - 1:48pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE II-11COMPLEXDEVELOPMENT LANDFILLUNIT 1 - PHASE 2 2C2B2A14D3D3C3B3A4C4B4A560NO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 2\II-12 Complex Development Landfill Unit 1 - Phase 3.dwg LAYOUT NAME: Unit 1 PRINTED: Thursday, November 10, 2016 - 1:50pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE II-12COMPLEXDEVELOPMENT LANDFILLUNIT 1 - PHASE 3 1%0.5%1%1%1%0.5%1%1%0.5%1%1%0.5% 1%1%0.5%1%1%0.5%2C2B2A14D3D3C3B3A4C4B4A560NO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 2\II-13 Complex Development Landfill Unit 1 - Phase 4.dwg LAYOUT NAME: Unit 1 PRINTED: Thursday, November 10, 2016 - 1:52pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE II-13COMPLEXDEVELOPMENT LANDFILLUNIT 1 - PHASE 4 7A8A9A10A11A7B8B9B10B11C11BNO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 2\II-14 Complex Development Landfill Unit 2 - Phase 1.dwg LAYOUT NAME: Unit 2 PRINTED: Thursday, November 10, 2016 - 4:05pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE II-14COMPLEXDEVELOPMENT LANDFILLUNIT 2 - PHASE 1 5657A8A9A10A11A7B8B9B10B11C11BNO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 2\II-15 Complex Development Landfill Unit 2 - Phase 2.dwg LAYOUT NAME: Unit 2 PRINTED: Thursday, November 10, 2016 - 4:07pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE II-15COMPLEXDEVELOPMENT LANDFILLUNIT 2 - PHASE 2 7A8A9A10A11A7B8B9B10B11C11BNO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 2\II-16 Complex Development Landfill Unit 2 - Phase 3.dwg LAYOUT NAME: Unit 2 PRINTED: Thursday, November 10, 2016 - 4:09pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE II-16COMPLEXDEVELOPMENT LANDFILLUNIT 2 - PHASE 3 7A8A9A10A11A7B8B9B10B11C11BNO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 2\II-17 Complex Development Landfill Unit 2 - Phase 4.dwg LAYOUT NAME: Unit 1 PRINTED: Thursday, November 10, 2016 - 4:10pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE II-17COMPLEXDEVELOPMENT LANDFILLUNIT 2 - PHASE 4 NO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 2\II-18 Complex Development Landfill Unit 2 - Phase 5.dwg LAYOUT NAME: Unit 1 PRINTED: Thursday, November 10, 2016 - 4:12pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE II-18COMPLEXDEVELOPMENT LANDFILLUNIT 2 - PHASE 5 COMPLEXDEVELOPMENTUNIT 2 - PHASE 6NO. SANCHEZProject No. 0174.16MAY 2016F. PUGSLEY, P.E.F. PUGSLEY, P.E.AS NOTEDScale:Date:Designed:Drawn:Reviewed:LEGENDNO.REVISIONDATEBYCITY OF DENTON LANDFILLPERMIT 1590B1527 S. MAYHILL ROADDENTON, TEXAS 76208PREPARED FOR:PREPARED BY:NOTES:NFILE NAME: X:\2016\0174.16\02_DSGN\02_DWG\050_CIVIL\PERMIT-MODIFIED-SHEETS-CADFILES\Cut Sheets\Part 2\II-19 Complex Development Landfill Unit 2 - Phase 6.dwg LAYOUT NAME: Unit 1 PRINTED: Thursday, November 10, 2016 - 4:13pm USER: ONFRE FRANK E. PUGSLEY9846011/11/2016FIGURE II-19 RFP for LFGE Project (#8465) www.scsengineers.com Appendix D Landfill and WWTP Gas Data RFP for LFGE Project (#8465) www.scsengineers.com Appendix D1 Gas Processed Annually 2017-2020 (TCEQ Fiscal Years) Denton Power, LLC City of Denton MSW Annual Report ‐ Estimated Gas Processed During Fiscal Year Ended: August 31, 2020 FY 2020 FY 2019 FY 2018 FY 2017 Sep 28,662.00          31,019.32        31,453.07         29,588.23          Oct 28,357.20          31,356.00        31,674.17         28,186.60          Nov 31,883.57          30,914.47        27,894.35         28,108.48          Dec 32,734.05          29,115.32        30,639.68         28,495.78          Jan 29,242.59          30,565.23        28,213.79         30,360.02          Feb 28,136.43          27,829.32        27,644.83         27,734.45          Mar 35,929.04          26,530.86        33,270.95         30,715.65          Apr 37,639.15          29,041.06        27,114.44         30,844.41          May 39,572.57          32,996.88        31,741.05         33,186.49          Jun 37,663.06          31,372.30        29,916.94         23,782.08          Jul 39,664.97          33,677.53        32,312.57         30,635.16          Aug 43,026.06          32,427.61        28,806.10         37,022.33          mcf 412,510.69       366,845.92      360,681.93       358,659.68        ft3 412,510,692     366,845,916    360,681,932     358,659,682      ‐                  FY 2020 FY 2019 FY 2018 FY 2017 Sep 13,922.85          17,025.21        16,332.18         14,156.58          Oct 14,389.79          17,337.51        15,987.68         15,523.15          Nov 17,354.55          17,358.71        13,967.75         15,602.23          Dec 17,749.12          16,921.08        15,170.81         21,352.39          Jan 15,318.89          17,891.43        13,268.13         15,689.86          Feb 15,593.26          15,833.42        13,746.00         14,762.78          Mar 19,341.11          14,880.79        17,025.61         15,857.62          Apr 19,278.97          16,114.46        13,841.04         15,857.17          May 21,894.07          18,619.72        16,133.91         16,513.59          Jun 21,515.24          17,428.96        14,776.45         13,023.45          Jul 21,637.57          18,153.20        16,662.15         16,776.31          Aug 24,494.25          15,423.87        15,409.38         20,256.39          MMBtu 222,489.67       202,988.37      182,321.07       195,371.53        FY 2020 FY 2019 FY 2018 FY 2017 Sep 48.00% 54.23% 51.31% 47.28% Oct 50.14% 54.64% 49.88% 54.42% Nov 53.79% 55.48% 49.48% 54.85% Dec 53.58% 57.43% 48.93% 74.04% Jan 51.76% 57.84% 46.47% 51.07% Feb 54.76% 56.22% 49.13% 52.60% Mar 53.19% 55.42% 50.57% 51.01% Apr 50.61% 54.83% 50.44% 50.80% May 54.67% 55.76% 50.23% 49.17% Jun 56.45% 54.90% 48.81% 54.11% Jul 53.90% 53.26% 50.95% 54.11% Aug 56.25% 47.00% 52.86% 54.07% Avg CH4 53.30% 54.68% 49.95% 53.83% Fiscal Year Ended August 31, MMBtu CH4 mcf / ft3 Fiscal Year Ended August 31, Fiscal Year Ended August 31, D1 - 1 RFP for LFGE Project (#8465) www.scsengineers.com Appendix D2 Wellfield Data, GHG Report, and Emissions Inventory (2020) Device Name Date TimeCH4 (Methane)(%)CO2 (Carbon Dioxide)(%)O2 (Oxygen)(%)Balance Gas(%)Initial Static Pressure(''H2O)Adjusted Differential Pressure(''H2O)Initial Temp. (oF)Adjusted Temp. (oF)Adjusted Static Pressure(''H2O)Initial Differential Pressure(''H2O)System Pressure(''H2O)Initial Flow(SCFM)Adjusted Flow(SCFM)Id CommentsDPHCO001 1/30/2020 15:0832.5 23.6 9.4 34.5 -1.28 1.24 51.1 51.1 -1.25 1.24 -1.21 69.1 69.2 No Adj Made;Fully ClosedDPHW0001 1/23/2020 16:0660.8 38.9 0.3 0 -6.79 0.39 61.5 61.6 -6.78 0.4 -7.64 41.4 41 No Adj Made;Fully OpenDPHW0002 1/23/2020 16:0260.3 37.4 0.2 2.1 -6.07 0.38 63.4 63.1 -6.14 0.38 -7.62 40.6 40.4 Fully Open;Inc Flow/VacDPHW0003 1/23/2020 15:5712.2 6.4 16.1 65.3 -4.48 0.42 68.4 68.5 -4.52 0.43 -7.65 41.7 41.3 No Adj Made;Fully ClosedDPHW0005 1/23/2020 15:5157.6 35.4 0.6 6.4 -7.49 0.38 64.8 64.6 -7.52 0.39 -7.51 40.7 40.1 No Adj Made;Fully OpenDPHW0006 1/23/2020 15:4737.4 26.8 0.4 35.4 6.2 0.38 65.7 65.7 6.2 0.38 -7.48 40.1 40.1 No Adj Made;Fully ClosedDPHW0007 1/23/2020 15:4432.5 13.7 10.8 43 -2.58 0.37 63.9 61.9 0 0.37 -7.51 40.1 40.3 Fully Closed;Dec Flow/VacDPHW0008 1/23/2020 15:4030.3 21.4 5.2 43.1 -1.46 0.37 63.8 59.8 -0.72 0.38 -7.67 39.4 39.2 No Adj Made;Fully ClosedDPHW0010 1/23/2020 15:3555.6 36.6 0.6 7.2 -6.51 0.38 63.3 63 -7.58 0.39 -7.66 40.4 40.2 Fully Open;Inc Flow/VacDPHW0011 1/23/2020 15:162.8 2.1 18.6 76.5 -4.84 6.32 69.6 58.1 -0.06 6.32 -7.74 162 164.9 Fully Closed;Dec Flow/VacDPHW0012 1/23/2020 15:2253.1 27.8 0.1 19 0.99 0.38 68.7 68.1 -1.29 0.38 -7.66 41.2 40.8 Barely Open;Inc Flow/VacDPHW0014 1/23/2020 15:270.4 2.7 17.2 79.7 -2.5 0.36 60 58.1 -0.08 0.37 -7.82 38.5 38.3 Fully Closed;Dec Flow/VacDPHW0015 1/23/2020 15:0960.5 38.7 0.2 0.6 -3.99 6.32 66.6 66 -4.6 6.34 -7.84 169.2 168.8 Inc Flow/VacDPHW0017 1/23/2020 15:0557.5 37.2 1.5 3.8 -7.82 6.33 69.3 69.4 -7.82 6.33 -7.83 167.1 167.1 No Adj Made;Fully OpenDPHW0018 1/23/2020 15:0112 11.5 10.7 65.8 -7.72 6.32 68.2 59.3 -0.83 6.32 -7.7 161.6 164.5 Fully ClosedDPHW0019 1/23/2020 14:5660.5 39.1 0.4 0 -7.77 5.72 68.7 68.6 -7.77 5.58 -7.77 157.3 159.3 No Adj MadeDPHW0020 1/21/2020 16:2660.7 39.1 0.3 -0.1 -6.46 6.32 55 54.7 -6.81 6.33 -6.84 170.3 170.1 Fully Open;Inc Flow/VacDPHW0021 1/21/2020 16:2273.4 26.4 0.1 0.1 5.06 6.31 56.2 54.9 -2.72 6.35 -6.8 185.4 183.3 Barely Open;Inc Flow/VacDPHW0022 1/21/2020 16:1761.8 37.7 0.4 0.1 -4.59 6.32 56 56.1 -5.9 6.32 -6.88 171.6 171.2 Inc Flow/VacDPHW0023 1/21/2020 16:1259 40.7 0.3 0 -3.75 6.32 56.1 56 -4.83 6.35 -6.87 169.6 168.9 Inc Flow/VacDPHW0025 1/21/2020 16:0759.3 39.9 0.8 0 -5.56 6.22 58.9 58.9 -6.18 6.23 -6.92 167.6 167.3 Inc Flow/VacDPHW0026 1/21/2020 16:0361.8 38.1 0.1 0 -2.67 6.22 56.9 56.5 -4.33 6.22 -6.97 170.3 169.9 Inc Flow/VacDPHW0029 1/18/2020 12:2750.3 36.9 0.3 12.5 -6.01 0.58 76.4 76.4 -6 0.59 -10.3 49.1 48.6 No Adj MadeDPHW0029 1/21/2020 15:5870.2 29.8 0 0 1.45 6.22 58.5 56.1 -2.09 6.23 -6.96 179 178.4 Barely Open;Inc Flow/VacDPHW0030 1/30/2020 15:3212.3 32 9.5 46.2 0.51 3.66 52.8 52.7 0.53 3.67 -7.66 119.6 119.4 No Adj Made;Fully ClosedDPHW0031 1/21/2020 15:515.7 19 3.3 72 0.12 6.25 58.5 58.5 0.11 6.26 -7.13 159.6 159.5 No Adj Made;Fully ClosedDPHW0032 1/21/2020 15:4760.8 39.1 0.1 0 -5.84 6.22 58.7 57.7 -7.02 6.24 -7.04 168.6 168.4 Fully Open;Inc Flow/VacDPHW0033 1/21/2020 15:4163.8 36.2 0 0 2.11 6.22 61.5 55.8 -1.12 6.23 -7.01 172.4 172.6 Barely Open;Inc Flow/VacDPHW0034 1/21/2020 15:2960.6 38.3 0.6 0.5 -5.5363.3 63.5 -6.29-7.22Inc Flow/VacDPHW00351/21/2020 15:2459.2 38.6 0.5 1.7 -4.0158.458.4-5.13-7.25Inc Flow/VacDPHW0036 1/30/2020 13:4642 36.2 0.2 21.6 -3.23 1.19 86.8 84.1 -1.1 2.01 -6.17 89.6 68.8 Barely Open;Dec Flow/VacDPVW0002 1/18/2020 14:3358.8 40.2 0.5 0.5 -6.24 10.01 76.7 78.6 -7.3-9.68208.2 Inc Flow/VacDPVW0003 1/18/2020 13:3152.4 36.4 0.1 11.1 -0.31 -8.46 75 75 -0.33 -8.45 -10.01 0 0 No Adj MadeDPVW0005 1/18/2020 13:2854.8 37.9 0.1 7.2 -1.179.6 79.6 -1.1-10.15No Adj MadeDPVW0006 1/18/2020 13:3957.5 36 0.1 6.4 0.32 -0.25 58.5 68.3 0.01 -10.04 -9.47 0 0 Fully Open;Inc Flow/VacDPVW0007 1/30/2020 15:5058.5 41.2 0.3 0 -0.58 3.95 65.8 80.4 -1.01 3.66 -8.25 127.1 130.2 Barely Open;Inc Flow/VacDPVW0008 1/18/2020 14:2659.1 40.9 0 0 -0.9 -10.04 55.6 56.7 -2.21 -10.04 -8.78 0 0 Inc Flow/VacDPVW0016 1/18/2020 14:2058.2 41.8 0 0 0.03 -9.99 74.6 56.2 -2.69 -7.48 -8.7 0 0DPVW0017 1/18/2020 14:1258.9 41.1 0 0 0.29 9.84 64.1 71.9 -0.84 9.2 -7.96 203.8 209 Barely OpenDPVW0018 1/18/2020 14:0457 38.5 0 4.5 0.266.2 69.4 -0.4-8.98Barely Open;Inc Flow/VacDPVW0019 1/18/2020 13:4760.4 39.6 0 0 0.59 -9.94 59.1 59.2 -1.92 -9.98 -9.05 0 0 Barely Open;Inc Flow/VacDPVW0020 1/18/2020 13:5659.6 40.4 0 0 0.4165.1 71.5 -1.35-8.83Barely Open;Inc Flow/VacDPVW0021 1/18/2020 13:1061 38.9 0.1 0 -1.2177.8 78.7 -1.43 10.01 -9.88 211.8Inc Flow/Vac;Barely OpenDPVW0022 1/18/2020 13:1559.4 38.6 0.1 1.9 -1.3875.8 78.6 -1.81-9.86Barely Open;Inc Flow/VacDPVW0023 1/18/2020 13:223.4 5.1 18.6 72.9 0.19 -10.04 58.5 58.5 0.19 -10.04 -9.45 0 0 No Adj Made;Fully ClosedDPVW0024 1/18/2020 13:0456.3 39.2 0 4.5 -0.62 -6.49 68.8 72.5 -1.08 -9.32 -10.31 0 0 Inc Flow/VacDPVW0025 1/18/2020 12:5858.4 36.9 1.2 3.5 -10.46 9.06 60.8 60.9 -10.46 9.06 -10.45 202.2 202.1 No Adj MadeDPVW0026 1/18/2020 12:4848.1 37.9 0 14 -7.4 -6.63 79.6 79.6 -7.4 -6.63 -11.01 0 0 No Adj MadeDPVW0027 1/18/2020 12:5251.7 36.3 0.1 11.9 -8.64 -6.74 60.3 60.3 -8.64 -6.74 -10.19 0 0 No Adj MadeDPVW0028 1/18/2020 12:3444.3 34.9 0.2 20.6 -5.86 0.6 70.7 69.3 -5.24 0.43 -10.82 41.4 49.4 Dec Flow/VacDPVW0029 1/18/2020 12:3849.6 37.5 0.2 12.7 -6.04 0.52 76.4 76.5 -6.04 0.53 -10.59 46 45.9 No Adj MadeDPVW0030 1/18/2020 12:4444.8 36.3 0.1 18.8 -7.53 -0.05 74.7 74.5 -7.3 0.19 -10.4 26.8Dec Flow/VacDPVW0031 1/21/2020 14:5954.8 37.6 0.2 7.4 -1.58 -9.97 78.3 79.5 -1.93 -10.04 -8.27 0 0 Inc Flow/VacDenton Power Landfill Gas Collection System Monthly Summary - Janaury 2020D2 - 1 Device Name Date TimeCH4 (Methane)(%)CO2 (Carbon Dioxide)(%)O2 (Oxygen)(%)Balance Gas(%)Initial Static Pressure(''H2O)Adjusted Differential Pressure(''H2O)Initial Temp. (oF)Adjusted Temp. (oF)Adjusted Static Pressure(''H2O)Initial Differential Pressure(''H2O)System Pressure(''H2O)Initial Flow(SCFM)Adjusted Flow(SCFM)Id CommentsDenton Power Landfill Gas Collection System Monthly Summary - Janaury 2020DPVW0032 1/21/2020 15:0351.2 33.2 0.2 15.4 0.03 -9.86 52.5 54.2 -1.01 -10.04 -8.16 0 0 Barely Open;Inc Flow/VacDPVW0033 1/30/2020 13:5542 35 0.1 22.9 -0.1 -1.21 60.2 60.3 -0.09 -1.21 -7.85 0 0 No Adj Made;Fully ClosedDPVW0034 1/30/2020 13:5044.4 37 0.2 18.4 -0.04 -1.27 50.5 50.3 -0.04 -1.27 -4.53 0 0 No Adj Made;Barely OpenDPVW0035 1/21/2020 15:100.5 3.5 16.5 79.5 0.06 -10.04 61.2 61 0.06 -10.04 -7.94 0 0 No Adj Made;Fully ClosedDPVW0036 1/21/2020 15:1857.1 39.6 0.2 3.1 -5.79 -10.04 57.8 56.8 -6.39 -10.04 -7.33 0 0 Inc Flow/VacDPVW0037 1/30/2020 13:3843.6 36.3 0.4 19.7 -1.14 -0.43 81.3 80.4 -0.87 0.59 -8.43 10.2 0 Dec Flow/VacDPVW0038 1/21/2020 15:1526.5 25.6 0.8 47.1 0.22 -10.04 62.2 62.1 0.23 -10.04 -8.41 0 0 No Adj Made;Fully ClosedDPVW0039 1/30/2020 13:4154.4 41.4 0.5 3.7 -2.63 -0.53 79.6 79.6 -2.64 -0.75 -9.25 0 0 No Adj MadeDPVW0041 1/30/2020 15:0035 30.1 0.2 34.7 -3.24 -2.1 75 46.5 -2.48 -1.72 -6.56 0 0 Barely Open;Dec Flow/VacDPVW0042 1/27/2020 15:0856.6 39.2 0 4.2 -2.12 -1.47 72.9 73.5 -2.3 -2.94 -5.95 0 0 Inc Flow/VacDPVW0043 1/27/2020 15:1657 37 0 6 -5.06 -3.17 85 85.2 -5.07 -3.04 -5.13 0 0 No Adj Made;Fully OpenDPVW0044 1/27/2020 15:0254.5 39.8 0 5.7 0.63 -1.71 71.6 72.1 -0.2 -3.32 -6.07 0 0 Barely Open;Inc Flow/VacDPVW0045 1/27/2020 15:2253.8 37 0 9.2 -1.97 -3.1 91.2 91.2 -1.98 -2.85 -6.6 0 0 No Adj MadeDPVW0046 1/27/2020 15:2861.9 37.8 0.3 0 -1.52 -4.06 89.9 90 -1.51 -4.15 -1.49 0 0 No Adj Made;Fully OpenDPVW0047 1/27/2020 15:3658.4 36.7 0.1 4.8 -4.93 -3.25 73.1 73.2 -5.47 -3.29 -6.43 0 0 Inc Flow/VacDPVW0048 1/27/2020 15:3258.8 37.7 0.2 3.3 -4.37 -1.52 91.4 91.5 -4.41 -1.5 -6.4 0 0 No Adj Made;Fully OpenDPVW0049 1/30/2020 12:5558.2 39.4 0.1 2.3 -3.97 0.42 88.8 89 -3.98 0.18 -3.64 9.4 14.4 No Adj Made;Fully OpenDPVW0050 1/30/2020 12:3958.8 40.9 0.3 0 -4.42 -0.43 83.5 84 -4.48 -0.7 -4.67 0 0 No Adj Made;Fully OpenDPVW0051 1/30/2020 12:4757 38.6 0.3 4.1 -3.1 0.86 87.2 87.2 -3.09 1.63 -6.02 9.4 6.8 No Adj Made;Watered In;Fully OpenDPVW0052 1/30/2020 12:5157.8 37.9 0.3 4 -5.07 -0.16 84.5 84.6 -5.11 -0.17 -5.99 0 0 No Adj Made;Fully OpenDPVW0053 1/30/2020 13:0259.2 40.6 0.2 0 0.47 -0.98 53.2 53.1 0.47 -0.98 0.35 0 0 No Adj Made;Watered In;Fully OpenDPVW0054 1/30/2020 12:5959.2 40.6 0.2 0 0.25 -1.16 54 53.8 0.26 -1.16 0.24 0 0 No Adj Made;Watered In;Fully OpenDPVW0055 1/30/2020 13:070.3 3.2 19.2 77.3 0.06 -1.14 50.1 50 0.08 -1.14 0.37 0 0 No Adj Made;Watered In;Fully ClosedDPVW0056 1/30/2020 13:1646.6 37.2 0.2 16 -0.48 -0.97 67.7 67.7 -0.48 -0.97 -6.35 0 0 No Adj Made;Barely OpenDPVW0057 1/30/2020 13:1158.5 38.4 0.6 2.5 -4.65 0.84 53.7 53.7 -4.65 0.89 -6.34 7.2 7 No Adj Made;Fully OpenDPVW0058 1/30/2020 13:2157.1 37.9 0.3 4.7 -4.96 -0.65 90.4 91.6 -5.13 -0.69 -5.74 0 0 Fully Open;Inc Flow/VacDPVW0059 1/30/2020 14:0145 35.1 0 19.9 0.36 -1.27 50.9 50.8 0.37 -1.27 0.3 0 0 No Adj Made;Watered In;Fully OpenDPVW0060 1/30/2020 13:2552.7 36.1 1.4 9.8 -3.93 -0.63 80.8 81 -3.95 0.39 -3.98 4.6 0 No Adj MadeDPVW0061 1/30/2020 13:3055.3 38.2 0 6.5 -2.99 -0.63 94 94.1 -3.07 -0.95 -3.93 0 0 No Adj MadeDPVW0062 1/30/2020 14:0743.9 34.7 0 21.4 -0.42 0.68 88.3 88.3 -0.42 0.78 -4.53 2.8 2.6 No Adj Made;Barely OpenDPVW0063 1/30/2020 14:1555.8 43.9 0 0.3 -3.67 -1.66 65.8 61.8 -3.69 -1.48 -4.16 0 0 No Adj MadeDPVW0064 1/30/2020 14:1957.8 41.9 0.3 0 -2.2 -0.33 90.1 90.2 -2.18 0.34 -2.57 4.3 0 No Adj Made;Fully OpenDPVW0065 1/30/2020 14:2356.8 42.9 0.3 0 -2.24 -0.48 87.7 87.7 -2.28 -1.26 -2.56 0 0 No Adj Made;Fully OpenDPVW0066 1/27/2020 16:3258.6 41.4 0 0 -2.28 -1.14 80.6 80.6 -2.26 -1.14 -2.34 0 0 No Adj Made;Fully OpenDPVW0067 1/27/2020 15:4159.4 35.5 0.3 4.8 -3.23 -3.08 93.7 93.6 -3.2 -3.08 -3.24 0 0 No Adj Made;Fully OpenDPVW0068 1/27/2020 14:4660.4 39.4 0.2 0 -3.13 -1.42 92.5 93.6 -3.39 -1.66 -3.32 0 0 Fully Open;Inc Flow/VacDPVW0074 1/25/2020 11:4244.5 30.1 5.4 20 -0.29 -0.4 63.4 61.3 -0.26 -0.39 -4.45 0 0 No Adj Made;Fully ClosedDPVW0075 1/25/2020 11:3548.6 32.7 0.4 18.3 -1.29 0.02 95 95.1 -1.28 0.13 -4.58 10.6 4 No Adj MadeDPVW0076 1/30/2020 15:2359.8 37.9 0.3 2 -3.77 3.65 103.6 104.1 -5.99 2.57 -4.83 103.3 123.1 No Adj Made;Fully OpenDPVW0077 1/30/2020 14:4258.5 41.5 0 0 1.32 -1.25 91.5 91.7 1.32 -1.25 1.23 0 0 No Adj Made;Watered In;Fully OpenDPVW0078 1/25/2020 12:1862 37.7 0.3 0 0.56 -0.6 68.5 68.5 0.55 -0.6 0.87 0 0 Watered InDPVW0079 1/25/2020 12:2253.8 34 0.2 12 -1.4 -0.12 90.7 90.7 -1.39 -0.26 -4.84 0 0 No Adj MadeDPVW0080 1/25/2020 12:140.6 2.5 19.6 77.3 0.07 0.07 65.6 65.5 0.06 0.08 -3.55 3.7 3.6 No Adj Made;Fully ClosedDPVW0081 1/25/2020 12:260.4 2.4 19.5 77.7 0.01 -0.14 64.5 64.5 0.02 -0.14 -6.65 0 0 No Adj Made;Fully ClosedDPVW0082 1/25/2020 12:1161.1 37 0.2 1.7 -4.07 -0.15 105.1 105.2 -4.19 -0.21 -5.4 0 0 Fully Open;Inc Flow/VacDPVW0083 1/25/2020 11:5950 34 0.3 15.7 -1.03 -0.63 78.1 78.1 -1.04 -0.63 -5.65 0 0 No Adj Made;Barely OpenDPVW0084 1/25/2020 12:0658.4 38.5 0.7 2.4 -4.43 1.03 100.3 100.4 -4.38 0.9 -4.38 12.6 13.5 No Adj Made;Fully OpenDPVW0085 1/25/2020 11:5620.7 6.6 15.4 57.3 0.03 0.08 64 64.2 0.03 0.09 -6.39 4 3.9 No Adj Made;Fully ClosedDPVW0086 1/25/2020 11:5035 29.1 0.2 35.7 -2.19 -0.35 96 64.4 -0.97 -0.33 -5.29 0 0 Barely Open;Dec Flow/VacDPVW0087 1/27/2020 14:5350.5 35.8 0.1 13.6 -1.25 -1.06 87.2 89.5 -1.67 -1.01 -4.13 0 0 Inc Flow/VacDPVW0088 1/27/2020 14:3658.6 37.8 0.2 3.4 -1.7 -1.48 99.8 73.2 -3.05 -0.75 -3.41 0 0 Fully Open;Inc Flow/VacDPVW00891/25/2020 12:4455.4 37.7 0 6.9 -1.69-0.2697.7 97.8 -1.76 -0.17 -1.93 0 0 No Adj Made;Watered In;Fully OpenDPVW0089 1/27/2020 14:2855.9 38 0.3 5.8 -2.44 -0.87 103.2 103.2 -2.42 -0.83 -2.98 0 0 No Adj Made;Fully OpenD2 - 2 Device Name Date TimeCH4 (Methane)(%)CO2 (Carbon Dioxide)(%)O2 (Oxygen)(%)Balance Gas(%)Initial Static Pressure(''H2O)Adjusted Differential Pressure(''H2O)Initial Temp. (oF)Adjusted Temp. (oF)Adjusted Static Pressure(''H2O)Initial Differential Pressure(''H2O)System Pressure(''H2O)Initial Flow(SCFM)Adjusted Flow(SCFM)Id CommentsDenton Power Landfill Gas Collection System Monthly Summary - Janaury 2020DPVW0090 1/25/2020 12:3661.3 38.6 0.2 -0.1 -2.69 -3.15 106 106 -2.74 -3.03 -3.63 0 0 No Adj Made;Fully OpenDPVW0091 1/30/2020 14:3659.5 40.3 0.3 -0.1 -1.11 -0.56 101.3 101.5 -1.14 -0.48 -3.69 0 0 No Adj Made;Fully OpenDPVW0092 1/27/2020 15:4759.9 39.7 0.1 0.3 -2.33 -3.35 101.3 101.2 -2.32 -3.35 -2.71 0 0 No Adj Made;Fully OpenDPVW0093 1/27/2020 15:5962.1 37.7 0.2 0 0.29 -0.67 69.5 93.8 -0.64 -2.14 -1.94 0 0 Inc Flow/VacDPVW0094 1/27/2020 15:5358.4 41.6 0 0 -1.8 -1.51 104.2 104.2 -1.8 -1.66 -2.7 0 0 No Adj Made;Fully OpenDPVW0095 1/27/2020 16:0459.5 40.5 0 0 -1.73 -2.16 100.6 100.6 -1.77 -2.16 -1.84 0 0 No Adj Made;Fully OpenDPVW0096 1/27/2020 16:0861 38.7 0.3 0 0.55 -1.64 66.3 90.7 -0.42 -2.15 -1.54 0 0 Inc Flow/VacDPVW0097 1/27/2020 16:1360.1 39.9 0 0 -1.22 -2.12 107.6 107.3 -1.22 -2.12 -1.4 0 0 No Adj Made;Fully OpenDPVW0098 1/30/2020 14:3357.8 42.2 0 0 -1.29 -1.42 110.7 110.6 -1.28 -1.38 -2.3 0 0 No Adj Made;Fully OpenDPVW0099 1/27/2020 16:2762 37.8 0.2 0 0.37 -0.42 66.1 66.5 -0.42 -1.19 -2.48 0 0 Inc Flow/VacDPVW0100 1/27/2020 16:2260.4 39.5 0.1 0 0.53 0.17 81.7 107.8 -1.06 -1.2 -1.59 0 3 Fully Open;Inc Flow/VacDPVW0101 1/27/2020 16:1760.3 39.5 0.2 0 -1.29 -0.51 109.6 109.7 -1.3 -0.32 -2.63 0 0 No Adj Made;Fully OpenDPVW0102 1/30/2020 14:2853 46.2 0.8 0 -2.02 -0.58 91.4 91.3 -1.97 -0.72 -2.85 0 0 No Adj MadeD2 - 3 Device NameDate TimeCH4 (Methane)(%)CO2 (Carbon Dioxide)(%)O2 (Oxygen)(%)Balance Gas(%)Initial Static Pressure(''H2O)Adjusted Differential Pressure(''H2O)Initial Temp. (oF)Adjusted Temp. (oF)Adjusted Static Pressure(''H2O)Initial Differential Pressure(''H2O)System Pressure(''H2O)Initial Flow(SCFM)Adjusted Flow(SCFM)Id CommentsDPVW0002 2/22/2020 11:4958.5 39.4 0.9 1.2 -9.48 4.11 78.3 78.5 -10.14 3.99 -10.25 130.3 132.1 Fully Open;Inc Flow/VacDPVW0003 2/22/2020 11:0558.8 38.8 0.1 2.3 -1.18 0.51 74.9 77.1 -1.38 -2.21 -10.21 0 2.3DPVW0005 2/22/2020 10:5959.1 38.4 0.2 2.3 -1.14 3.94 80.2 83.3 -1.54 3.67 -11.05 126.6 130.8 Inc Flow/VacDPVW0006 2/22/2020 11:1033.3 32.1 0 34.6 -1.25 -3.18 78.4 76.3 -0.13 4.78 -9.64 4.4 0 Fully Closed;Dec Flow/VacDPVW0007 2/22/2020 11:4355.2 38.9 0 5.9 -1.61 4.09 88.6 88.5 -1.62 4.09 -9.37 131.3 131.3 No Adj MadeDPVW0008 2/22/2020 11:3950.7 36.7 0.3 12.3 -0.67 -1.68 70.8 71 -0.67 -1.68 -9.88 0 0 No Adj MadeDPVW0016 2/22/2020 11:3655.2 38.3 0.1 6.4 -5.12 -5.46 64.4 57 -5.14 -5.52 -9.31 0 0 Inc Flow/VacDPVW0017 2/22/2020 11:2852.7 38.8 0.3 8.2 -2.81 2.98 77.1 77.1 -2.8 2.98 -9.8 112.2 112.2 No Adj MadeDPVW0018 2/22/2020 11:251.4 3.7 17.1 77.8 -1.35 3.26 68.3 67.1 -0.04 3.98 -9.19 128 116 Fully Closed;Dec Flow/VacDPVW0019 2/22/2020 11:1442.5 35.4 0 22.1 -0.98 -1.82 69.2 69.2 -0.98 -1.69 -9.01 0 0 No Adj MadeDPVW0020 2/22/2020 11:1939.5 33.6 0.1 26.8 -3.74 0.48 79.2 58.1 -0.06 3.12 -9.3 113 44.5 Fully Closed;Dec Flow/VacDPVW0021 2/22/2020 12:0250.6 36.1 0.4 12.9 -3.6 4.26 81.6 81.6 -3.59 4.27 -9.76 134.3 134.2 No Adj MadeDPVW0022 2/22/2020 11:5846.3 34.7 0.7 18.3 -3.63 4.12 81 81.1 -3.64 4.13 -9.77 131.4 131.3 No Adj MadeDPVW0023 2/22/2020 11:5414.4 20.3 2 63.3 -0.14 -3.85 63.5 63.5 -0.13 -3.84 -10.04 0 0 No Adj Made;Fully ClosedDPVW0024 2/22/2020 10:4833.3 29.1 1.4 36.2 -1.88 -3.27 74.9 68.4 -0.13 -0.79 -9.69 0 0 Fully Closed;Dec Flow/VacDPVW0025 2/22/2020 10:4452.4 32.1 3.5 12 -8.91 3.63 69.1 69.1 -9.52 3.67 -9.63 126.7 126.1 No Adj MadeDPVW0026 2/22/2020 10:3348 37.2 0.1 14.7 -8.66 -3.35 80.8 80.8 -8.65 -3.45 -10.55 0 0 No Adj MadeDPVW0027 2/22/2020 10:3754.8 37 0.1 8.1 -9.22 -3.38 62.3 62.2 -9.22 -3.39 -9.86 0 0 No Adj MadeDPVW0028 2/22/2020 10:2342.1 34 0.5 23.4 -5.49 3.62 69.2 57.1 -5.08 3.67 -10.95 124.2 124.7 Dec Flow/VacDPVW0029 2/22/2020 10:1750 36.6 0.5 12.9 -6.69 3.94 78.5 78.4 -6.69 3.94 -10.62 128.5 128.5 No Adj MadeDPVW0030 2/22/2020 10:2845 34.8 0.3 19.9 -8.19 3.57 76.9 76.9 -8.19 3.57 -10.52 121.5 121.5 No Adj MadeDPVW0042 2/22/2020 14:2451.1 35.9 0 13 -1.28 -0.16 73.6 73.6 -1.27 0.11 -8.19 1.1 0 No Adj MadeDPVW0043 2/22/2020 14:2859.3 37.9 0 2.8 -4.77 -4.62 84.7 84.7 -4.83 -4.23 -5.58 0 0 No Adj Made;Fully OpenDPVW0044 2/22/2020 14:2156.8 38.8 0.2 4.2 -0.72 -3.01 84.5 89 -1.08 -5.08 -5.73 0 0 Inc Flow/VacDPVW0045 2/22/2020 14:3647.3 35.8 0 16.9 -1.5 -4.38 91.3 85.9 -0.51 -2.45 -6.26 0 0 Dec Flow/Vac;Barely OpenDPVW0046 2/22/2020 14:4162.6 35.8 1.6 0 0.28 -6.3 64.9 65.4 0.32 -6.3 0.42 0 0 No Adj Made;Watered InDPVW0068 2/22/2020 14:4553.1 35.4 2.4 9.1 -4.72 -3.51 93.3 90.4 -4.02 -3.76 -4.55 0 0 No Adj Made;Fully OpenDPVW0074 2/22/2020 13:1560.9 39 0.100.07 -5.66 60.6 70.7 -2.92 -3.79 -4.09 0 0 Inc Flow/VacDPVW0075 2/22/2020 13:0845.4 33 0.1 21.5 -1.11 -3.26 96.2 96.3 -1.1 -3.26 -4.84 0 0 No Adj MadeDPVW0076 2/22/2020 13:0452.9 35.7 0.3 11.1 -5.77 5.59 105.3 105.3 -6.32 4.98 -4.78 142.6 151.3 No Adj MadeDPVW0078 2/22/2020 13:4959.7 40.3 0 0 0.92 -4.13 63.7 63.8 0.95 -4.13 1.2 0 0 No Adj Made;Watered In;Fully OpenDPVW0079 2/22/2020 13:4449.4 36.3 0 14.3 -0.88 -3.88 88.6 88.7 -0.86 -3.89 -3.87 0 0 No Adj MadeDPVW0080 2/22/2020 13:5560.9 37 0.3 1.8 0.17 -2.95 64.4 87.5 -1.03 -3.89 -3.11 0 0 Inc Flow/VacDPVW0081 2/22/2020 13:4160.1 36.7 0.8 2.4 -0.03 -3.92 61.8 61.9 -0.03 -3.92 -0.03 0 0 No Adj MadeDPVW0082 2/22/2020 14:0057.5 37.6 0.1 4.8 -3.67 -3.55 104.6 104.7 -3.57 -3.53 -4.55 0 0 No Adj MadeDPVW0083 2/22/2020 13:3454.8 38.1 0.1 7 -0.67 -4.53 79.2 79.2 -0.64 -4.53 -5.77 0 0 No Adj MadeDPVW0084 2/22/2020 14:1157.6 37.5 0.2 4.7 -3.88 -2.29 100 99.8 -3.89 -2.92 -4.85 0 0 No Adj Made;Fully OpenDPVW0085 2/22/2020 13:2957.8 37 0.3 4.9 0.46 -3.55 64.2 74 -0.77 -4.43 -5.88 0 0 Barely Open;Inc Flow/VacDPVW0086 2/22/2020 13:2362.6 37.2 0.2 0 0.42 -4.03 65.3 85.2 -1.29 -3.93 -3.05 0 0 Inc Flow/VacDPVW0087 2/22/2020 14:1443.4 33.5 0.1 23 -3.54 -3.88 94.7 76.7 -2.89 -2.56 -5.2 0 0 Dec Flow/VacDPVW0088 2/22/2020 14:5057.4 37.5 0.2 4.9 -2.8 -1.98 99.7 99.7 -2.78 -1.88 -4.93 0 0 No Adj Made;Fully OpenDPVW0089 2/22/2020 14:5354.7 37.8 0 7.5 -0.53 -3.92 89.9 89.9 -0.57 -3.82 -0.49 0 0 No Adj Made;Fully OpenDPVW0090 2/22/2020 14:5761.2 38.5 0.2 0.1 -2.2 -3.83 106.7 106.7 -2.2 -3.83 -3.24 0 0 No Adj Made;Fully OpenDPVW0093 2/28/2020 16:0751 36.9 0.7 11.4 -1.92 -2.61 102.1 102.1 -1.89 -2.71 -2.69 0 0 No Adj Made;Barely OpenDPVW0094 2/28/2020 16:0258.9 40.7 0.3 0.1 -2.32 -3.3 104.2 104.2 -2.31 -3.48 -3.29 0 0 No Adj Made;Fully OpenDPVW0095 2/28/2020 16:1158.7 41.2 0.2 -0.1 -0.78 -3.67 82.7 82.7 -0.76 -3.67 -0.31 0 0 No Adj Made;Watered In;Fully OpenDPVW0096 2/28/2020 16:1459.2 38.8 0.1 1.9 -0.81 -3.69 89 89.1 -0.78 -3.7 -0.57 0 0 No Adj Made;Watered In;Fully OpenDPVW0097 2/28/2020 16:1959.4 40.6 0 0 -0.76 -3.66 99.5 99.6 -0.74 -3.66 -0.62 0 0 No Adj Made;Watered In;Fully OpenDPVW0098 2/28/2020 16:2560.3 39.5 0.2 0 -6.25 -3.63 87.8 87.8 -5.85 -3.63 -5.97 0 0 No Adj Made;Fully OpenDPVW0099 2/28/2020 16:2958.9 40.8 0.3 0 -0.2 -3.65 69.6 70.6 -0.15 -3.68 -0.15 0 0 No Adj Made;Watered In;Fully OpenDenton Power Landfill Gas Collection System Monthly Summary - February 2020D2 - 4 Device NameDate TimeCH4 (Methane)(%)CO2 (Carbon Dioxide)(%)O2 (Oxygen)(%)Balance Gas(%)Initial Static Pressure(''H2O)Adjusted Differential Pressure(''H2O)Initial Temp. (oF)Adjusted Temp. (oF)Adjusted Static Pressure(''H2O)Initial Differential Pressure(''H2O)System Pressure(''H2O)Initial Flow(SCFM)Adjusted Flow(SCFM)Id CommentsDPHCO001 3/27/2020 17:2247 36 1.8 15.2 -2.1 0.16 83.4 83.4 -2.06 0.28 -1.65 31.7 23.8 No Adj MadeDPHW0001 3/27/2020 10:5961.5 38.3 0.2 0 -6.29 0 69.2 69.1 -6.27 0.01 -6.65 6.7 Watered InDPHW0002 3/27/2020 11:0360.2 37.1 0.5 2.2 -4.94 0 69.5 69.4 -4.95 0.02 -6.74 8.7 4 Watered InDPHW0003 3/27/2020 11:0963.3 36.4 0.3 0 -1.09 0 70.7 70.7 -1.07 0.01 -6.85 6.9 1.9 Fully OpenDPHW0005 3/27/2020 11:1262.9 37 0.2 -0.1 -6.92 -0.61 70 69.9 -6.89 -0.6 -6.87 Watered InDPHW0006 3/27/2020 11:1639.8 31.3 0.1 28.8 24.89 0 71.9 71.8 24.91 0 -7.04 No Adj MadeDPHW0007 3/27/2020 11:2067.5 32.4 0.1 0 25.89 -0.01 71.7 69.3 -1.04 0.01 -7.08 7 Inc Flow/VacDPHW0008 3/27/2020 11:2537.2 31.3 0.6 30.9 -0.98 0 72.3 72.3 -0.94 0.01 -7.1 6.9 Fully ClosedDPHW0010 3/27/2020 11:2957.1 38.3 0.2 4.4 -7.22 0 69.6 69.4 -7.17 0 -7.1 2.9 1 Fully OpenDPHW0011 3/27/2020 11:3266.8 31.1 0.3 1.8 -0.24 0 72.8 72.6 -0.06 0.01 -7.16 4.3 Inc Flow/VacDPHW0012 3/27/2020 11:3549.1 27.6 0.1 23.2 4.32 0.01 72.7 72.6 4.34 0.03 -7.32 10.1 7.1 No Adj MadeDPHW0014 3/27/2020 11:4047 35.7 0.9 16.4 -0.82 0 72.2 72.2 -0.83 0.01 -7.28 4.7 3.1 No Adj MadeDPHW0015 3/27/2020 11:4356.2 39.2 0.2 4.4 -5.04 0 71.5 71.3 -5.07 0.01 -7.39 4.7 2.1 Inc Flow/VacDPHW0017 3/27/2020 11:4657 40.7 0.1 2.2 -7.47 -0.01 72.4 72.4 -7.44 -0.01 -7.32 Fully OpenDPHW0018 3/27/2020 11:4926.6 20.1 0.1 53.2 5.23 -0.01 72.9 72.8 5.25 -0.01 -7.42 No Adj MadeDPHW0019 3/27/2020 11:5259.2 38.8 0.1 1.9 -7.75 -0.22 69 68.9 -7.73 -0.22 -7.44 Fully OpenDPHW0020 3/27/2020 11:5459 38.9 0.1 2 -7.37 0 71.1 71 -7.36 0 -7.32 3.7 2.9 No Adj MadeFully OpenDPHW0021 3/27/2020 11:5866.3 27.6 0.6 5.5 -0.65 0 71.7 71.7 -0.76 0 -7.3 3.5 Inc Flow/VacDPHW0022 3/27/2020 12:0059.7 37.7 0.2 2.4 -7.5 0.01 73.2 73.1 -7.49 0.02 -7.48 8.7 7.1 Fully OpenDPHW0023 3/27/2020 12:0356.5 40.8 0.2 2.5 -6.81 0 70.8 70.6 -7.03 0.01 -7.64 4.9 2.6 Inc Flow/VacDPHW0025 3/27/2020 12:0657.9 40 0.1 2 -7.18 0.01 68.9 68.5 -7.2 0.02 -7.5 8.8 6.2 Inc Flow/VacDPHW0026 3/27/2020 12:0956.8 39.9 0.3 3 -6.67 0 71.9 71.8 -7.18 0 -7.7 0 Inc Flow/VacDPHW0029 3/27/2020 12:1262 36.2 0.1 1.7 -7.52 0 74.9 74.6 -7.55 0 -7.61 3.7 2.2 Inc Flow/VacDPHW0030 3/27/2020 12:167.5 34.6 5.1 52.8 -0.61 -0.03 74.8 73.5 -6.68 -0.06 -7.69 Fully ClosedDPHW0031 3/27/2020 12:193.1 22.2 0.1 74.6 -2.76 -0.02 75.7 75.6 -2.14 -0.03 -7.6 Fully ClosedDPHW0032 3/26/2020 16:2538 29 0.2 32.8 -7.19 0.03 96.3 96.4 -2.7 -0.06 -8.75 10.7 Dec Flow/VacDPHW0032 3/26/2020 18:1460.6 37.1 0.1 2.2 -8.21 -0.34 91.1 91.4 -8.22 -0.32 -8.2 Inc Flow/VacWatered InDPHW0033 3/26/2020 18:0945.9 29.4 3.5 21.2 -8.27 0 94.3 94.4 -8.23 0 -8.22 2.3 Dec Flow/VacDPHW0034 3/26/2020 16:3146.7 34.4 0.2 18.7 0.11 0.01 90.2 90 0.12 0.01 -5.44 5 5 Fully ClosedDPHW0034 3/26/2020 18:0460.9 37.3 0 1.8 -7.56 0.01 76.7 76.6 -7.63 0.02 -8.29 9.3 7.3 Inc Flow/VacDPHW0035 3/26/2020 17:4760.3 37.4 0.1 2.2 -6.99 0 79.1 77.9 -7.64 0.01 -8.07 4.6 4 Inc Flow/VacDPHW0036 3/26/2020 17:5157.5 39.1 0.2 3.2 -7.42 0.01 91.9 91.8 -7.95 0.03 -8.09 10.4 7.1 Inc Flow/VacDPVW0002 3/26/2020 14:0058.8 35.7 0.2 5.3 -10.41 0.07 85.8 85.5 -10.36 0.06 -10.56 14.6 16.8 Inc Flow/VacDPVW0003 3/26/2020 16:0548.2 34.3 0.2 17.3 -1.52 3.05 85.7 85.4 -1.49 3.02 -10.3 5.6 5.6 Dec Flow/VacDPVW0005 3/26/2020 14:0447.7 33.1 0.1 19.1 -3.09 0.05 88 87.9 -3.04 0.37 -10.66 38.6 14.3 Dec Flow/VacDPVW0006 3/26/2020 14:1740.2 31.2 0.1 28.5 -1.2 -0.02 83.1 83.4 -1.2 -0.02 -10.04 0 0 Fully ClosedDPVW0007 3/26/2020 14:5050 35.7 0 14.3 -2.14 -0.12 91.6 91.6 -2.12 -0.03 -10.17 No Adj MadeDPVW0008 3/26/2020 14:4647.7 36 0.1 16.2 -1.18 2.25 81 81 -1.16 2.25 -10.13 3.1 3.1 Dec Flow/VacDPVW0016 3/26/2020 14:4253.6 36.9 0.1 9.4 -0.9 5.1 83.8 84 -0.9 4.99 -10.41 4.6 4.7 No Adj MadeDPVW0017 3/26/2020 14:3748.3 34.3 0.2 17.2 -3.34 -0.68 82.3 82.3 -3.27 -0.47 -10.27 Dec Flow/VacDPVW0018 3/26/2020 14:330.2 1.4 19.6 78.8 -1.47 0.01 77 77.3 -1.4 0.01 -9.98 6.9 6.2 Fully ClosedDPVW0019 3/26/2020 14:2147.2 33.5 0.1 19.2 -1.1 1.71 78 78 -1.11 2 -10.01 4.6 4.2 Dec Flow/VacDPVW0020 3/26/2020 14:2553.1 35.4 0.3 11.2 -0.59 0.02 93 93.2 -0.55 0.02 -9.71 8.9 8.6 No Adj MadeDPVW0021 3/26/2020 13:0452.4 35.2 0.2 12.2 -4.37 0.04 86.7 86.7 -4.36 0.04 -10.48 11.6 11.5 No Adj MadeDPVW0022 3/26/2020 13:0953.5 36.3 0 10.2 -4.62 0.03 85.9 86 -4.58 0.03 -10.28 10.9 11 No Adj MadeDPVW0023 3/26/2020 14:1130.9 26 0.2 42.9 -1.1 -0.01 89 88.7 -1.1 -0.01 -10.58 0 0 Fully ClosedDPVW0024 3/26/2020 13:2160.6 39 0 0.4 0.65 0.09 89.6 89 0.6 -0.01 -10.5 0 1 Inc Flow/VacDPVW0025 3/26/2020 13:1663 36.3 0.1 0.6 -10.67 0.01 97.7 97.8 -10.66 0.01 -10.57 6.9 6.3 Inc Flow/VacDPVW0026 3/26/2020 13:3248.7 38.2 0 13.1 -8.73 -0.28 82.8 82.8 -8.66 -0.24 -10.92 0 0 Dec Flow/VacDPVW0027 3/26/2020 13:2653.7 36.3 0 10 -10.02 0.27 85.3 85.4 -10.03 0.27 -10.68 1.1 1.1DPVW0028 3/26/2020 13:4547.2 35.3 1.5 16 -4.87 0.01 94.4 94.6 -4.86 0.01 0.03 4.7 4.9 Fully ClosedDPVW0029 3/26/2020 13:5054.9 37.6 0.1 7.4 -6.92 0.22 82.6 82.6 -6.88 0.24 -11.2 31.2 29.6 No Adj MadeDPVW0030 3/26/2020 13:3645.6 35.4 0.2 18.8 -8.43 0.23 80.4 80.5 -8.39 0.26 -10.99 31.8 29.9 Dec Flow/VacDPVW0031 3/26/2020 16:2052.5 37.7 0.3 9.5 -2.84 1.35 88.5 89.1 -2.85 1.36 -9.23 8.5 8.5 No Adj MadeDPVW0032 3/26/2020 17:2340.6 26.1 0.3 33 0.05 0.23 88.8 92.9 -8.55 -0.03 -8.88 0 1 Fully ClosedWatered InDenton Power Landfill Gas Collection System Monthly Summary - March 2020D2 - 5 Device NameDate TimeCH4 (Methane)(%)CO2 (Carbon Dioxide)(%)O2 (Oxygen)(%)Balance Gas(%)Initial Static Pressure(''H2O)Adjusted Differential Pressure(''H2O)Initial Temp. (oF)Adjusted Temp. (oF)Adjusted Static Pressure(''H2O)Initial Differential Pressure(''H2O)System Pressure(''H2O)Initial Flow(SCFM)Adjusted Flow(SCFM)Id CommentsDenton Power Landfill Gas Collection System Monthly Summary - March 2020DPVW0033 3/26/2020 16:3551.7 34.2 0.2 13.9 -0.15 0.07 88.1 88.3 -0.14 0.07 -9.2 1.9 2 Watered InDPVW0034 3/27/2020 17:4749.2 39.5 1.1 10.2 -0.98 -0.41 82.8 82.6 -0.41 -1 -5.75 0 0 Fully ClosedDPVW0035 3/26/2020 17:1619.1 11.7 15 54.2 -0.62 -0.02 90.5 89 -0.19 -0.25 -8.24 0 0 Fully ClosedDPVW0036 3/26/2020 16:4447.2 35.4 1.4 16 -0.35 0.04 93.2 87.5 -0.35 0.09 -4.12 0.6 0.4 SurgingNo Adj MadeDPVW0037 3/26/2020 16:5849.9 36 0.1 14 -0.79 0.58 85.9 85.8 -0.65 0.84 -8.76 12.2 10.2 Dec Flow/VacDPVW0038 3/26/2020 17:0929.5 22.2 2 46.3 -0.28 0 82.7 83.5 -0.14 0 -7.62 0 0 Fully ClosedDPVW0039 3/26/2020 16:5249.8 36 2.1 12.1 -1.75 1.29 84.2 84.4 -1.57 1.91 -7.16 30.7 25.3 Dec Flow/VacDPVW0041 3/27/2020 13:5458.7 35.9 0.1 5.3 0.11 0.01 81 74.3 -0.01 0 -7.13 0.6 3.4 Inc Flow/VacDPVW0042 3/27/2020 13:5946.6 34.3 0.1 19 -1.55 2.74 76.9 76.9 -1.45 2.79 -6.78 5.4 5.4 Dec Flow/VacDPVW0043 3/27/2020 14:0454.9 37.1 0.1 7.9 -5.76 -0.23 86.4 86.4 -5.83 -0.21 -5.83 0 0 Fully OpenDPVW0044 3/27/2020 13:4951.5 36.6 0.2 11.7 -1.94 0.23 98.9 99.1 -1.9 -0.92 -6.12 0 6.4 Inc Flow/VacSurgingDPVW0045 3/27/2020 13:4354.8 38.9 0.1 6.2 -0.12 0.09 85.2 86 -0.11 0.07 -6.89 0.9 1 Inc Flow/VacDPVW0046 3/27/2020 13:3856.7 39.8 0.1 3.4 -1.63 -0.68 93.5 93.6 -1.59 -0.6 -1.33 0 0 Fully OpenDPVW0047 3/27/2020 13:3453.1 37.6 0.1 9.2 -6.35 0.07 82.6 82.4 -6.4 0.02 -7.16 1 1.9 Inc Flow/VacDPVW0048 3/27/2020 13:3054.4 38.7 0.2 6.7 -5.6 1.5 93.9 93.9 -5.59 1.32 -6.87 8.3 8.9 Fully OpenDPVW0049 3/27/2020 13:1352.2 37.2 0.2 10.4 -4.35 1.62 90.1 90.1 -4.31 0.17 -3.9 9.1 28.1 Fully OpenSurgingDPVW0050 3/27/2020 13:2554.8 39.3 0.1 5.8 -5.19 0.53 91.5 91.5 -5.22 0.58 -5.47 10.1 9.7 Fully OpenDPVW0051 3/27/2020 13:2250.9 36.7 0.1 12.3 -3.22 2.55 92.5 92.5 -3.24 3.04 -6.34 12.7 11.6 Fully OpenDPVW0052 3/27/2020 13:1751.5 37.1 0.1 11.3 -5.29 1.19 87.4 87.4 -5.3 1.16 -6.13 7.9 7.9 Fully OpenDPVW0053 3/27/2020 13:0758.6 38.2 0.2 3 0.12 0.09 77.8 77.7 0.12 0.08 0.06 2.1 2.3 No Adj MadeDPVW0054 3/27/2020 13:0450.4 36.7 1.9 11 -0.09 0 78.4 78.2 -0.04 -0.01 0 0 0 Fully OpenDPVW0055 3/27/2020 12:5924.8 17.7 10.3 47.2 -0.41 0.8 76.5 75.9 -0.35 0 0.06 0 6.6 No Adj MadeFully ClosedDPVW0056 3/27/2020 12:5148.1 36 0.1 15.8 -1.07 0.23 74.5 74.5 -1.07 0.23 -6.9 3.5 3.5 No Adj MadeDPVW0057 3/27/2020 12:4757.4 39.2 0.1 3.3 -5.29 0.91 88.5 88.6 -5.29 0.99 -6.83 7.3 7 No Adj MadeFully OpenDPVW0058 3/27/2020 12:4251 38.5 0.1 10.4 -6.01 0.51 92.4 92.4 -6.06 0.5 -6.77 20.6 20.8 Fully OpenDPVW0059 3/27/2020 12:3532 27.2 0.1 40.7 -1.91 0.87 80.8 80.8 -1.87 0.95 -2.7 7.1 6.8 Dec Flow/VacSurgingDPVW0060 3/27/2020 12:2955.8 35.5 0.2 8.5 -6.91 0.4 87 87.1 -6.85 0.5 -7.47 5.2 4.7 Inc Flow/VacDPVW0061 3/26/2020 17:3455 34.4 0.1 10.5 -4.02 0.23 96 96.1 -3.98 -0.07 -4.56 0 14.2 Watered InInc Flow/VacSurgingDPVW0062 3/27/2020 15:0926.7 27.5 0.3 45.5 -2.12 1.14 98.4 98.2 -2.05 1.73 -5.12 4.1 3.3 Dec Flow/VacDPVW0063 3/27/2020 15:0443.4 38 0.1 18.5 -0.54 2.59 85.7 85.8 -0.5 4.19 -7.13 6.5 5.1 Dec Flow/VacDPVW0064 3/27/2020 14:5854.7 42 0.1 3.2 -2.84 0.64 92.1 92.1 -2.82 1.33 -4.41 8.3 5.8 Fully OpenDPVW0065 3/27/2020 14:5454.1 42.3 0.2 3.4 -4.19 -0.32 89.9 89.6 -4.32 -0.52 -4.18 0 0 No Adj MadeDPVW0066 3/27/2020 14:4954.5 40 0.2 5.3 -2.85 0 88.3 88.3 -2.76 0 -2.83 0 0 No Adj MadeDPVW0067 3/27/2020 14:3452.4 38.2 0.2 9.2 -3.04 -0.12 94.3 93.9 -3.04 -0.13 -4.35 0 0 No Adj MadeDPVW0068 3/27/2020 14:2856.3 38.6 0.2 4.9 -3.47 0.05 92.9 92.7 -3.48 0.11 -3 9.8 6.3 Fully OpenDPVW0074 3/27/2020 14:1231.1 28.9 0.1 39.9 -0.59 -0.32 90.8 90.7 -0.57 0.46 -3.63 19.6 0 Dec Flow/VacDPVW0075 3/27/2020 14:1543.3 32.7 0.1 23.9 -1.3 -1.01 98.2 97.6 -1.94 0.45 -3.87 19.6 0 Dec Flow/VacDPVW0076 3/27/2020 14:2153.4 36.7 0.2 9.7 -3.87 2.32 105.9 105.9 -6.04 0.11 -5.35 19.9 96.3 SurgingDPVW0077 3/27/2020 15:2948.2 34.7 0.2 16.9 -1.73 -0.38 92.8 92.9 -1.65 -0.2 -2.64 0 0 No Adj MadeDPVW0078 3/27/2020 15:3360 36.2 0.2 3.6 0.49 0 82.9 82.7 0.47 -0.02 0.64 0 0.9 No Adj MadeDPVW0079 3/27/2020 15:4248.5 34.6 0.2 16.7 -1.58 -0.2 92.8 92.9 -1.57 0.01 -3.62 1.4 0 No Adj MadeDPVW0080 3/27/2020 15:3846.6 35.3 0.1 18 -1.67 0.02 102.4 102.1 -1.63 0.02 -2.7 1.9 1.7 Dec Flow/VacDPVW0081 3/27/2020 15:237.5 4.8 17.3 70.4 -0.74 0.05 83.1 83 -0.69 0.06 -3.2 3.2 3.1 Fully ClosedDPVW0082 3/27/2020 15:4754.2 38.7 0.1 7 -2.71 -0.12 104.2 103.9 -2.65 0.03 -3.94 2.3 0 No Adj MadeSurgingDPVW0083 3/27/2020 15:5554.6 41.3 0.2 3.9 -1.24 -0.04 83.7 83.7 -1.24 -0.02 -5.36 0 0 No Adj MadeSurgingDPVW0084 3/27/2020 16:0154.9 37.3 0.2 7.6 -4.44 0.64 101.3 101.4 -3.91 0.25 -8.38 6.6 10.6 Fully OpenDPVW0085 3/27/2020 15:1638.2 32.4 0.2 29.2 -1.99 -0.48 89.8 89.9 -1.87 -0.65 -4.42 0 0 Dec Flow/VacDPVW0086 3/27/2020 15:2028 26.2 0.2 45.6 -2.52 0.27 98.7 98.7 -2.45 0.26 -3.48 6.6 6.8 Dec Flow/VacDPVW0087 3/27/2020 16:0446.2 34.4 0.2 19.2 -1.77 0.26 94 93.9 -1.74 0.34 -4.2 4.2 3.7 Dec Flow/VacDPVW0088 3/27/2020 16:0952.6 39.3 0.1 8 -2.51 0.44 99.9 99.9 -2.52 0.36 -3.49 1.2 1.3 Fully OpenDPVW0089 3/27/2020 16:1354.2 37 0.2 8.6 -2.77 0.13 102.6 102.8 -2.85 0.39 -4.11 2 1.1 Fully OpenDPVW0090 3/27/2020 16:1956.2 40.1 0.2 3.5 -2.93 -0.07 108.1 108 -2.87 0.07 -3.46 1.8 0DPVW0091 3/27/2020 16:2556.3 41.1 0.1 2.5 -1.35 1.04 101.7 101.7 -1.33 0.32 -3.43 4.1 7.4 Fully OpenDPVW0093 3/27/2020 16:3950.2 39.5 0 10.3 -1.53 0.78 101.7 101.7 -1.51 0.64 -2.46 5.7 6.3 No Adj MadeDPVW0094 3/27/2020 16:3555.7 41.3 0 3 -1.82 0.27 105.3 105.2 -1.82 0.15 -2.62 2.8 3.8 No Adj MadeD2 - 6 Device NameDate TimeCH4 (Methane)(%)CO2 (Carbon Dioxide)(%)O2 (Oxygen)(%)Balance Gas(%)Initial Static Pressure(''H2O)Adjusted Differential Pressure(''H2O)Initial Temp. (oF)Adjusted Temp. (oF)Adjusted Static Pressure(''H2O)Initial Differential Pressure(''H2O)System Pressure(''H2O)Initial Flow(SCFM)Adjusted Flow(SCFM)Id CommentsDenton Power Landfill Gas Collection System Monthly Summary - March 2020DPVW0095 3/27/2020 16:4357.6 38.6 0.2 3.6 -1.38 0 96.3 96.4 -1.39 0.01 -1.4 0.8 0.5 Fully OpenDPVW0096 3/27/2020 16:4752.5 39.2 0.1 8.2 -1.26 0.08 101.1 101.2 -1.26 0.08 -1.28 2 2DPVW0097 3/27/2020 16:5156.4 40.2 0.1 3.3 -1.34 -0.01 109.4 109.2 -1.3 -0.02 -1.27 0 0 Fully OpenDPVW0098 3/27/2020 16:5455.9 40.8 0.1 3.2 -2.07 -0.07 111.8 111.9 -1.95 -0.03 -2.1 0 0 Fully OpenDPVW0099 3/27/2020 17:0248.9 38.6 0.1 12.4 -1.55 0.52 99 103.6 -1.57 0.65 -3.08 5.8 5.1 Fully OpenDPVW0100 3/27/2020 17:0554 39.4 0.2 6.4 -2.12 0.71 112.7 112.7 -1.94 0.71 -2.54 6 6 Fully OpenDPVW0101 3/27/2020 17:0757.7 38.2 0.2 3.9 -1.81 0.25 110.8 110.7 -1.7 0.17 -2.28 3 3.7 Fully OpenDPVW0102 3/27/2020 17:1253.2 43.2 0.2 3.4 -2.78 0.17 93.8 93.6 -2.73 0.17 -2.82 0.8 0.8 Fully OpenSurgingD2 - 7 Device NameDate TimeCH4 (Methane)(%)CO2 (Carbon Dioxide)(%)O2 (Oxygen)(%)Balance Gas(%)Initial Static Pressure(''H2O)Adjusted Differential Pressure(''H2O)Initial Temp. (oF)Adjusted Temp. (oF)Adjusted Static Pressure(''H2O)Initial Differential Pressure(''H2O)System Pressure(''H2O)Initial Flow(SCFM)Adjusted Flow(SCFM)Id CommentsDPHCO001 4/27/2020 12:5123.3 17.2 12.4 2.74 -1.82 5.37 89.3 89.5 -1.82 5.36 -1.8 139.8 139.9 No Adj Made;Fully ClosedDPHW0001 4/22/2020 9:3260.1 36.9 0.8 0.06 -7.15 -3.44 69.6 69 -7.14 -3.41 -7.65 No Adj Made;Fully OpenDPHW0002 4/22/2020 9:3657.9 37.6 0.5 0.11 -5.96 -3.47 69 68.9 -5.93 -3.47 -7.58 No Adj Made;Fully OpenDPHW0003 4/23/2020 12:514.5 1.9 18 39.79 -6.24 -3.48 87.6 87.9 -6.23 -3.48 -8.06 No Adj Made;Fully ClosedDPHW0005 4/23/2020 12:5548.8 32.7 1 0.54 -8.22 -3.52 88.2 88.3 -8.21 -3.52 -8.31 No Adj Made;Fully OpenDPHW0006 4/23/2020 13:0342.1 32 0.3 0.8 5.1 -3.47 91 91.2 5.17 -3.47 -7.95 No Adj Made;Fully ClosedDPHW0007 4/23/2020 13:0967.2 32.7 0.1 0 4.21 -3.48 92.9 92.1 -1.81 -3.44 -8.38 Barely Open;Inc Flow/VacDPHW0008 4/23/2020 13:1238.7 29.7 2 1 -2.17 2.77 88 88 -2.16 2.78 -8.34 106.5 106.3 No Adj Made;Fully ClosedDPHW0010 4/23/2020 13:1655.2 36.6 0.6 0.21 -8.62 2.75 83.7 83.7 -8.44 2.77 -7.45 107.8 107.6 No Adj Made;Fully OpenDPHW0011 4/23/2020 13:2069.5 30.4 0.1 0 0.61 8.12 90.8 90.5 -3.7 8.16 -8.43 197.9 196.5 Barely Open;Inc Flow/VacDPHW0012 4/23/2020 13:2551.9 27 0.2 0.77 5.15 8.13 92.1 89 -1.63 8.16 -8.34 192.5 191 Barely Open;Inc Flow/VacDPHW0014 4/23/2020 13:3361.3 37.4 0.2 0.03 4.33 8.12 94.7 86.4 -2.93 8.17 -8.4 190.3 189.6 Barely Open;Inc Flow/VacDPHW0015 4/23/2020 13:3656.4 37.6 1 0.13 -6.16 8.16 89.1 89.1 -6.16 8.16 -8.31 186.4 186.4 No Adj MadeDPHW0017 4/21/2020 15:5450.6 34.3 2.8 0.36 -7.91 -3.47 96.9 95.9 -0.48 -3.44 -7.73 Fully Closed;Dec Flow/VacDPHW0018 4/21/2020 15:4934.6 19.8 0.1 2.3 3.42 0.05 98.7 98.8 3.43 0.06 -7.87 14.7 13.8 No Adj Made;Fully ClosedDPHW0019 4/21/2020 15:4455.2 36.2 1.4 0.2 -8.09 -0.21 92.8 92.8 -8.1 -0.28 -8.04 No Adj Made;Fully OpenDPHW0020 4/21/2020 15:4058.4 37.7 0.6 0.09 -8.16 0.02 87.6 87.3 -8.13 0.03 -8.12 9.6 8.7 No Adj Made;Fully OpenDPHW0021 4/21/2020 15:3526.4 9.8 12.7 5.21 -7.85 0.02 93.5 92.1 -0.7 0.05 -8.06 13.5 9.4 Fully Closed;Dec Flow/VacDPHW0022 4/21/2020 15:3131.2 18.7 10.5 2.12 -8.22 0.02 94 91.2 -0.52 0.04 -8.04 11.3 8.8 Fully Closed;Dec Flow/VacDPHW0023 4/21/2020 15:2759 39.2 0.3 0.04 -7.84 0.01 92.8 93.8 -8.16 0.06 -8.17 15 4.8 Fully Open;Inc Flow/VacDPHW0025 4/21/2020 15:2258.4 38.2 0.6 0.07 -8.23 0.03 95.9 96.3 -8.22 0.07 -8.17 16.2 10.5 No Adj Made;Fully OpenDPHW0026 4/21/2020 15:2039.9 31.6 0.6 0.88 -7.58 0.02 95.4 95.2 -5.88 0.05 -8.1 13.4 7.7 Barely Open;Dec Flow/VacDPHW0029 4/21/2020 15:1341.8 24.6 6.8 1.09 -8.35 0.02 97.8 90.1 -1.19 0.04 -8.23 11.6 8.7 Fully Closed;Dec Flow/VacDPHW0030 4/21/2020 14:4731.4 34.6 1.8 0.93 1.96 0.07 98.9 99 1.97 0.08 -8.27 17.1 15.9 No Adj Made;Fully ClosedDPHW0031 4/21/2020 14:455.6 22.1 0 3.27 0.71 0.02 97 97.6 0.79 0.02 -8.2 8.7 7.7 No Adj Made;Fully ClosedDPHW0032 4/21/2020 14:4152.6 35.6 1.8 0.28 -8.47 0.02 96.5 89.3 -4.6 0.02 -8.23 7.5 8.5 Barely Open;Dec Flow/VacDPHW0033 4/21/2020 14:3534.5 20.9 6.9 1.8 -0.25 0.02 92 91.4 -0.35 0.02 -8.37 8.8 8.5 No Adj Made;Fully ClosedDPHW0034 4/21/2020 14:3061 37.8 0.1 0.03 -8.08 0.01 85.2 85 -8.19 0.03 -8.18 10.5 6.3 Fully OpenDPHW0035 4/21/2020 14:0556.7 32.4 1.1 0.3 -0.12 0.37 96.8 102.2 -6.37 0.06 -10.08 15.5 38.7 Inc Flow/VacDPHW0036 4/27/2020 10:4955.4 39.9 0.1 0.12 -0.73 5.42 86.1 87.2 -0.91 5.77 -5.43 156.5 151.5 Inc Flow/Vac;Barely OpenDPVW0002 4/15/2020 15:1156 38.3 1.1 0.12 -9.52 0.04 81.3 81.5 -9.5 0.03 -9.7 11.4 11.5 No Adj MadeDPVW0003 4/15/2020 14:5947.6 36.8 0 0.42 -0.9 3.02 82.5 82.5 -0.89 3.02 -0.88 5.6 5.6 No Adj MadeDPVW0005 4/15/2020 13:5655.2 36.8 0.5 0.2 -1.76 0.25 85.8 85.8 -1.75 0.26 -9.72 32.2 31.7 No Adj Made;Barely OpenDPVW0006 4/15/2020 14:060 0.6 20.3 131.83 -0.35 -0.03 69.2 68.9 -0.31 -0.04 -9.68 0 0 No Adj Made;Fully ClosedDPVW0007 4/15/2020 14:5449.9 38.1 0 0.31 -0.94 0.1 90.2 90.2 -0.94 0.1 -8.42 19.7 19.4 No Adj Made;Barely OpenDPVW0008 4/15/2020 14:4948.9 37.4 0.1 0.36 -0.15 1.34 74.7 74.7 -0.12 1.35 -8.72 2.4 2.4 No Adj Made;Barely OpenDPVW0016 4/15/2020 14:4354.7 38.6 0 0.17 -0.03 4.21 80 80.2 -0.07 4.5 -8.57 4.4 4.3 Barely Open;Inc Flow/VacDPVW0017 4/15/2020 14:2750.1 37.7 0.2 0.32 -1.42 0.03 77.8 77.9 -1.44 0.04 -8.63 11.7 11.4 No Adj MadeDPVW0018 4/15/2020 14:230 1.3 19.3 61.08 0.02 0.03 76.7 76.7 0.03 0.04 -7.64 11.4 10.1 No Adj Made;Fully ClosedDPVW0019 4/15/2020 14:1153.2 35.5 0.3 0.31 -0.14 5.26 73.1 74.7 -0.2 1.5 -9.34 4 7.5 Barely Open;Inc Flow/VacDPVW0020 4/15/2020 14:1856.6 38 0 0.14 0.35 0.02 75.2 73.9 -0.41 0.02 -8.7 8.5 9 Barely Open;Inc Flow/VacDPVW0021 4/21/2020 13:4350 34.9 0.7 0.41 -4.23 0.05 85.8 85.8 -4.23 0.06 -9.29 15.3 14.1 No Adj MadeDPVW0022 4/21/2020 13:4048.1 34.6 1.4 0.46 -4.47 0.05 85.2 85.3 -4.46 0.06 -4.46 15.5 13.9 No Adj MadeDPVW0023 4/15/2020 14:0120.2 26 0.8 2.04 -0.1 -0.04 73.8 73.6 -0.1 -0.05 -9.99 0 0 No Adj Made;Fully ClosedDPVW0024 4/15/2020 10:5960.6 39.2 0.2 0 0.24 1.22 72.9 71.5 -0.25 -0.02 -9.91 0 3.7DPVW0025 4/15/2020 11:0749.9 30.7 3.9 0.5 -9.77 0.01 79.6 61.8 -1.84 0.02 -9.58 8.2 6.1DPVW0026 4/15/2020 10:4845.9 36.5 0.40.47-7.99 0.58 81.1 81.2 -7.99 0.55 -10.66 2.4 2.4DPVW0027 4/15/2020 10:5249.5 36.6 0.6 0.36 -9.63 0.27 67.3 67.2 -9.61 0.28 -10.39 1.7 1.7DPVW0028 4/15/2020 10:2732.6 27 6.8 1.24 -4.48 -4.43 75.3 74.9 0.11 0.02 -11.18 8.8DPVW0029 4/15/2020 10:2351.4 39.3 0.3 0.23 -6.79 0.29 80 80 -6.79 0.29 -10.95 34 33.6DPVW0030 4/15/2020 10:4342.3 35.7 0.4 0.61 -7.97 0.21 77.9 77.9 -7.95 0.3 -10.74 33.8 28.1DPVW0031 4/21/2020 13:5356.8 40.2 0 0.07 -2.51 2.17 86.8 86.9 -3.27 0.99 -9.97 7.3 10.8 Inc Flow/VacDPVW0032 4/21/2020 13:5755.2 38.7 0.3 0.15 -0.09 0.93 89.6 93.3 -3.06 -0.03 -9.04 0 2 Barely Open;Inc Flow/VacDPVW0033 4/27/2020 11:0053.5 39.6 0.1 0.17 -0.51 -5.08 81 81.1 -0.54 -5.08 -9.45 0 0 No Adj MadeDPVW0034 4/27/2020 10:5651 37.8 1.5 0.26 -0.09 -5.42 76.3 76.3 -0.08 -5.42 -6.73 0 0 No Adj Made;Fully ClosedDenton Power Landfill Gas Collection System Monthly Summary - April 2020D2 - 8 Device NameDate TimeCH4 (Methane)(%)CO2 (Carbon Dioxide)(%)O2 (Oxygen)(%)Balance Gas(%)Initial Static Pressure(''H2O)Adjusted Differential Pressure(''H2O)Initial Temp. (oF)Adjusted Temp. (oF)Adjusted Static Pressure(''H2O)Initial Differential Pressure(''H2O)System Pressure(''H2O)Initial Flow(SCFM)Adjusted Flow(SCFM)Id CommentsDenton Power Landfill Gas Collection System Monthly Summary - April 2020DPVW0035 4/21/2020 14:1759.3 38.6 0.1 0.05 -8.04 -0.02 90.1 86.2 -8.26 -0.05 -8.5 0 0 Fully Open;Inc Flow/VacDPVW0036 4/21/2020 14:1356.1 39.1 0.3 0.12 -8.22 -0.05 93.9 94.4 -8.23 -0.06 -8.27 0 0 No Adj Made;Fully OpenDPVW0037 4/27/2020 10:3555.4 38.2 0.2 0.16 -0.75 -4.94 82.6 82.6 -0.74 -4.83 -9.2 0 0 No Adj Made;Barely OpenDPVW0038 4/21/2020 14:090.3 5.2 14.8 15.33 0.01 -0.03 98.8 98.8 0.04 -0.04 -7.97 0 0 No Adj Made;Fully ClosedDPVW0039 4/27/2020 10:4357.6 42.4 0 0 -1.95 -3.58 82.2 82.2 -2.45 -4.04 -8.14 0 0 Inc Flow/VacDPVW0041 4/27/2020 12:1045.2 35 0 0.57 -1.43 -5.42 73.8 73.8 -1.41 -5.43 -8.37 0 0 No Adj Made;Barely OpenDPVW0042 4/24/2020 9:4954.4 36.6 0.2 0.24 -2.66 -3.55 76.7 76.6 -2.65 -3.24 -9.15 0 0 No Adj Made;Fully OpenDPVW0043 4/24/2020 9:5452.7 37.1 0 0.27 -6.21 -5.98 86.8 86.9 -6.21 -5.99 -6.44 0 0 No Adj Made;Fully OpenDPVW0044 4/24/2020 9:4450.9 37.6 0.1 0.3 -3.2 -3.85 100.7 100.8 -3.19 -3.85 -7.3 0 0 No Adj Made;Barely OpenDPVW0045 4/24/2020 10:1059.2 39.5 0.1 0.03 -1.28 -4.64 88.7 91.8 -1.84 -5.35 -7.56 0 0 Inc Flow/VacDPVW0046 4/24/2020 10:1660 39.9 0.1 0 -3.61 -5.87 94.9 94.9 -3.57 -5.94 -3.58 0 0 No Adj Made;Fully OpenDPVW0047 4/24/2020 10:3045.8 31.8 4.4 0.57 -7.94 -5.44 77.1 75.5 -1.09 -5.53 -8.19 0 0 Barely Open;Dec Flow/VacDPVW0048 4/24/2020 10:2457.6 39.4 0.2 0.07 -5.93 -2.89 93.4 93.4 -5.91 -3.8 -8.13 0 0 No Adj Made;Fully OpenDPVW0049 4/24/2020 14:1452.7 37.2 0 0.27 -4.7 -5.15 90.7 90.7 -4.07 -4.38 -4.4 0 0 No Adj Made;Fully OpenDPVW0050 4/24/2020 13:5858.2 37.9 0.3 0.09 -5.59 -5.03 94.8 94.8 -5.57 -5.24 -5.77 0 0 No Adj Made;Fully OpenDPVW0051 4/24/2020 14:0349.7 34.7 0.2 0.44 -3.6 -2.42 95.1 95.1 -3.62 -2.64 -6.31 0 0 No Adj Made;Fully OpenDPVW0052 4/24/2020 14:0844.7 31.7 2.4 0.67 -5.83 -5.63 89.5 80.1 -4.67 -4.55 -6.99 0 0 Dec Flow/VacDPVW0053 4/24/2020 14:2360.3 37.8 0.2 0.04 0.29 -5.05 93 93.1 0.31 -5.06 0.26 0 0 No Adj Made;Fully OpenDPVW0054 4/24/2020 14:1959.6 39.3 0 0.03 0.15 -5.45 85.8 85.8 0.16 -5.46 0.15 0 0 No Adj Made;Fully OpenDPVW0055 4/24/2020 14:2742.7 24.2 4.7 1.17 -0.14 -5.44 95 95 -0.13 -5.45 -0.1 0 0 Fully ClosedDPVW0056 4/27/2020 10:0637.9 33 0.1 0.88 -1.83 -3.64 80.5 70.4 0.22 -5.04 -8.24 0 0 Fully Closed;Dec Flow/VacDPVW0057 4/27/2020 10:1059.5 37.6 0.6 0.06 -6.28 -3.62 89.9 90.2 -6.24 -3.54 -8.12 0 0DPVW0058 4/27/2020 10:1752 37.2 0.5 0.28 -7.14 -4.84 93 93.2 -7.16 -4.85 -7.93 0 0 No Adj Made;Fully Open;Inc Flow/VacDPVW0059 4/27/2020 10:2232.1 26.1 1.2 1.56 -0.46 -5.42 78.8 76.7 -0.39 -5.44 -0.38 0 0 Fully ClosedDPVW0060 4/27/2020 10:2752.5 35.5 0.2 0.33 -5.51 -4.63 88 88.1 -5.51 -3.6 -5.98 0 0 No Adj MadeDPVW0061 4/27/2020 10:3051.4 35.3 0.1 0.37 -4.78 -5.47 96.2 96.2 -4.76 -5.53 -5.24 0 0 No Adj MadeDPVW0062 4/27/2020 11:1024.5 24.9 1.7 1.96 -1.36 -5.42 100.4 74.3 -0.68 -4.88 -6.62 0 0 Fully Closed;Dec Flow/VacDPVW0063 4/27/2020 11:1825.6 27.6 0.5 1.68 -0.47 -5.92 84.6 73.5 -0.32 -0.04 -7.12 0 0 Fully Closed;Dec Flow/VacDPVW0064 4/27/2020 11:2657.9 42.1 0 0 -3.42 -4.57 91.9 91.9 -3.39 -3.21 -4.39 0 0 No Adj Made;Fully OpenDPVW0065 4/27/2020 11:2258.5 41.1 0.4 0 -3.94 -9.13 89.9 90 -4.14 -9.58 -5.45 0 0 Inc Flow/VacDPVW0066 4/27/2020 12:0158.8 39.8 0 0.04 -4.96 -5.42 88.6 88.8 -4.83 -5.42 -4.67 0 0 No Adj Made;Fully OpenDPVW0067 4/24/2020 10:3953.5 38 0.3 0.22 -6.36 -5.49 99.1 99.1 -6.37 -5.56 -6.31 0 0 No Adj Made;Fully OpenDPVW0068 4/24/2020 9:3940.1 27.9 6.4 0.92 -6.54 -5.47 98 75.6 -4.2 -5.31 -6.43 0 0 Fully Closed;Dec Flow/VacDPVW0074 4/23/2020 15:0430.1 26.2 0.2 1.66 -0.87 -8.88 96 96.3 -0.78 -8.16 -4.37 0 0 Barely Open;Dec Flow/VacDPVW0075 4/23/2020 14:5940.5 31.6 0.1 0.88 -1.23 -8.71 98.9 98.3 -1.15 -8.1 -4.82 0 0 Barely Open;Dec Flow/VacDPVW0076 4/23/2020 14:5344.3 32.9 0.9 0.67 -4.64 6.58 106.7 106.7 -3.45 8.14 -4.45 181.1 162.8 Dec Flow/VacDPVW0077 4/27/2020 11:5462 37.9 0.1 0 1.3 -5.44 79.2 79.1 1.26 -5.45 1.06 0 0 No Adj Made;Watered In;Fully OpenDPVW0078 4/24/2020 8:4959.9 39.3 0.8 0 -0.08 -5.71 75 75.1 -0.07 -5.75 0.1 0 0 No Adj Made;Fully OpenDPVW0079 4/24/2020 8:5546.3 35.9 0 0.5 -1.92 -4.99 97 97 -1.91 -5.15 -5.45 0 0 No Adj MadeDPVW0080 4/23/2020 15:5643.6 32.9 0.8 0.69 -2.01 -5.42 104.7 99.3 -1.49 -5.31 -4.16 0 0 Barely Open;Dec Flow/VacDPVW0081 4/24/2020 9:090 0.2 19.6 401 -0.48 -5.37 78.6 79.1 -0.46 -5.38 -5.96 0 0 No Adj Made;Fully ClosedDPVW0082 4/23/2020 15:4353.8 36.9 0 0.25 -4.37 -7.38 107.3 107.4 -4.39 -7.58 -0.01 0 0 No Adj Made;Fully OpenDPVW0083 4/23/2020 15:2042 32 0.2 0.81 -1.55 -8.31 93 93 -1.54 -8.32 -6.65 0 0 No Adj Made;Barely OpenDPVW0084 4/23/2020 15:3753.2 37.1 0.4 0.25 -5.23 -6.57 104.8 104.8 -5.21 -7.19 -6.83 0 0 Fully OpenDPVW0085 4/23/2020 15:1633.8 28.4 1.3 1.29 -1.44 -7.61 94 78.7 -0.86 -7.5 -6.71 0 0 Fully ClosedDPVW0086 4/23/2020 15:1028.6 26.3 0.2 1.71 -3.18 -8.14 99.7 78.8 -1.3 -7.85 -4.64 0 0 Fully ClosedDPVW0087 4/23/2020 15:3140.1 33.1 0.2 0.8 -2.48 -8.13 96.8 92.7 -1.87 -7.85 -6.65 0 0 Barely Open;Dec Flow/VacDPVW0088 4/24/2020 9:3049.7 37.9 0 0.33 -4.12 -3.31 79.1 79.1 -4.1 -4.55 -6.54 0 0 No Adj Made;Fully OpenDPVW0089 4/24/2020 9:2447.2 37.4 0 0.41 -2.45 -5.3 100 100 -2.42 -5.3 -2.41 0 0 No Adj Made;Fully OpenDPVW0090 4/24/2020 9:1556.7 39.2 0.3 0.1 -3.37 -4.75 108.5 108.5 -3.35 -4.87 -3.83 0 0 No Adj Made;Fully OpenDPVW0091 4/27/2020 11:5159.9 40.1 0.1 0 -1.73 -4.27 102.6 102.6 -1.72 -4.42 -3.76 0 0 No Adj Made;Fully OpenDPVW0092 4/24/2020 10:4556.4 38.9 0.30.11-3.02 -5.81 101.8 101.8 -2.94-6 -2.85 0 0 No Adj Made;Fully OpenDPVW0093 4/24/2020 10:5738.6 34.7 0 0.77 -2.35 -5.55 102.7 101.4 -1.27 -5.33 -3.65 0 0 Barely OpenDPVW0094 4/24/2020 10:5055 38.8 1.1 0.13 -3.11 -5.05 104.9 105 -2.51 -5.21 -2.94 0 0 No Adj Made;Fully OpenDPVW0095 4/24/2020 11:0159.3 40.1 0.2 0.01 -1.84 -5.96 87.5 87.5 -1.25 -6.16 -0.8 0 0 No Adj MadeD2 - 9 Device NameDate TimeCH4 (Methane)(%)CO2 (Carbon Dioxide)(%)O2 (Oxygen)(%)Balance Gas(%)Initial Static Pressure(''H2O)Adjusted Differential Pressure(''H2O)Initial Temp. (oF)Adjusted Temp. (oF)Adjusted Static Pressure(''H2O)Initial Differential Pressure(''H2O)System Pressure(''H2O)Initial Flow(SCFM)Adjusted Flow(SCFM)Id CommentsDenton Power Landfill Gas Collection System Monthly Summary - April 2020DPVW0096 4/24/2020 11:1149.4 35.1 0.4 0.43 -1.59 -5.6 102.2 102.2 -1.57 -5.6 -1.1 0 0 No Adj Made;Fully OpenDPVW0097 4/24/2020 11:1657.9 40.4 0 0.04 -1.63 -5.55 108.9 108.7 -1.64 -5.68 -1.68 0 0 No Adj Made;Fully OpenDPVW0098 4/24/2020 11:2557.9 39.2 0.2 0.07 -6.01 -5.74 88.9 88.9 -5.78 -5.93 -4.96 0 0 No Adj Made;Fully OpenDPVW0098 4/27/2020 11:4258.7 41.3 0 0 -2.15 -5.3 111.9 111.9 -2.11 -5.33 -2.95 0 0 No Adj Made;Fully OpenDPVW0099 4/24/2020 11:3259.5 40.2 0.2 0 -0.6 -5.67 85.3 85.6 -0.35 -5.88 -0.19 0 0 No Adj Made;Fully OpenDPVW0100 4/24/2020 11:3659.3 39.9 0.2 0.02 -1.08 -6.03 102.5 101.9 -0.44 -6.82 -0.34 0 0 No Adj Made;Fully OpenDPVW0101 4/24/2020 11:4059 40.4 0.1 0.01 -0.24 -5.91 105.9 105.9 -0.23 -6 0.75 0 0 No Adj Made;Fully OpenDPVW0102 4/27/2020 11:3150.8 40.3 2 0.17 -2.85 -4.88 93.4 93.4 -2.87 -3.9 -4.13 0 0 No Adj Made;Fully OpenD2 - 10 Device NameDate TimeCH4 (Methane)(%)CO2 (Carbon Dioxide)(%)O2 (Oxygen)(%)Balance Gas(%)Initial Static Pressure(''H2O)Adjusted Differential Pressure(''H2O)Initial Temp. (oF)Adjusted Temp. (oF)Adjusted Static Pressure(''H2O)Initial Differential Pressure(''H2O)System Pressure(''H2O)Initial Flow(SCFM)Adjusted Flow(SCFM)Id CommentsDPHCO001 5/11/2020 13:0347.9 35.8 1.9 0.4 -0.39 2.91 94 93.9 -0.29 3.11 -0.25 106.6 103.1 No Adj Made;Barely OpenDPHW0001 5/5/2020 9:5763.4 36.3 0.2 0 -7.05 0.03 75.7 75.7 -7.04 0.04 -7.38 13.3 10.6 No Adj Made;Fully OpenDPHW0002 5/5/2020 10:0561.8 36.8 0.4 0.03 -6.08 0.04 74.6 74.6 -6.07 0.05 -6.07 13.7 12 No Adj Made;Fully OpenDPHW0003 5/5/2020 10:0850.8 29.1 3.7 0.56 -0.99 0.03 77.7 77.6 -0.99 0.03 -6.97 10.9 10.2 No Adj Made;Fully ClosedDPHW0005 5/5/2020 10:1361.1 36.4 0.7 0.05 -7.29 0.01 77.7 77.5 -7.33 0.02 -7.17 9.2 6.5 No Adj Made;Fully OpenDPHW0006 5/5/2020 10:1740.7 33.1 0.3 0.78 -0.14 0.01 78.4 78.5 -0.12 0.01 -7.36 6 5.2 No Adj Made;Fully ClosedDPHW0007 5/5/2020 10:2224.7 9.1 13.3 5.81 -7.25 0.01 78.3 74.6 -0.41 0.03 -7.23 11.1 4.9 Fully Closed;Dec Flow/VacDPHW0008 5/5/2020 10:2536 25.2 5.4 1.33 -1.49 0.02 85.8 84.8 -1.43 0.02 -7.25 9 8.3 No Adj Made;Fully Closed;Influenced by DPHW0010 5/5/2020 10:3053.1 35.7 1.6 0.27 -7.37 0.01 78.6 78.6 -7.39 0.02 -7.19 7.7 7.1 No Adj MadeDPHW0011 5/5/2020 10:332.4 2.5 19.1 30.4 -2.24 0.01 73.7 72.4 -0.98 0.02 -7.35 7.9 4.9 Fully Closed;Dec Flow/Vac;Influenced by DPHW0012 5/5/2020 10:3720.4 8.2 13.5 7.06 -5.55 0.02 77.3 73.6 -2.04 0.03 -7.45 10.8 9.3 Fully Closed;Dec Flow/Vac;Influenced by DPHW0014 5/5/2020 10:440.2 0.7 20.1 112.86 -5.93 0.01 78.2 89.2 -0.46 0.02 -7.36 7.7 5.6 Fully Closed;Dec Flow/VacDPHW0015 5/5/2020 10:4655.9 37.1 0.6 0.17 -5.74 0.06 79.4 79.3 -5.74 0.07 -7.49 16.1 15.5 No Adj MadeDPHW0017 5/5/2020 10:5265.6 34.2 0.1 0 1.87 0.01 79.1 76.3 -1.12 0.05 -7.44 14.2 7.6 Barely Open;Inc Flow/VacDPHW0018 5/5/2020 10:5537.3 20.1 0.1 2.11 3.2 0.03 79.1 79.1 3.19 0.03 -7.39 10.6 10.7 No Adj Made;Fully ClosedDPHW0019 5/5/2020 10:5752.5 34.3 2.9 0.3 -7.61 0.03 78.1 78.2 -7.59 0.03 -7.53 10.6 10.1 No Adj MadeDPHW0020 5/5/2020 11:4860.3 37.5 0.7 0.04 -7.28 0.02 80 80.1 -7.32 0.05 -7.32 13.4 8.1 No Adj Made;Fully OpenDPHW0021 5/5/2020 11:5470.7 27 0 0.09 3.98 0.01 80.8 79 -1.46 0.04 -7.16 12.7 5.3 Barely Open;Inc Flow/VacDPHW0022 5/5/2020 11:5647.8 28.1 5.1 0.68 -1.05 0.02 77.6 77.6 -1.03 0.02 -7.29 8.7 8.2 No Adj Made;Fully ClosedDPHW0023 5/5/2020 12:0157.9 38.6 1 0.06 -7.28 0.01 79.1 79.1 -7.24 0.03 -7.23 11.2 7 No Adj Made;Fully OpenDPHW0025 5/5/2020 12:0356.3 36.9 1.6 0.14 -7.32 0.03 78.9 78.9 -7.31 0.03 -7.29 10.9 10.3 No Adj Made;Fully OpenDPHW0026 5/5/2020 12:0846.1 34.9 0.2 0.54 -3.93 0.02 80 80.1 -3.92 0.02 -7.26 7.6 7.3 No Adj MadeDPHW0029 5/5/2020 12:1370 30 0 0 -0.13 0.01 81.1 80.8 -1.08 0.03 -7.23 11 4.8 Barely Open;Inc Flow/VacDPHW0030 5/5/2020 12:1636.7 30.6 0.2 1.06 0.26 0.04 79.4 79.4 0.26 0.04 -7.36 12.4 11.7 No Adj Made;Fully ClosedDPHW0031 5/5/2020 12:196.7 19.5 0.1 3.78 2.71 0.03 81.2 81.2 2.69 0.03 -7.6 10.4 9.7 No Adj Made;Fully ClosedDPHW0032 5/5/2020 12:3065.6 34.3 0.1 0 1.09 0.01 80.5 78.1 -1.19 0.05 -7.29 13.8 6.1 Barely Open;Inc Flow/VacDPHW0033 5/5/2020 12:3441.3 25 4.3 1.18 -3.13 0.02 78.6 78.5 -3.06 0.03 -7.5 10.1 8.8 No Adj Made;Fully Closed;Influenced by DPHW0034 5/5/2020 12:3759.7 37.2 0.7 0.06 -7.53 0.04 76.9 76.8 -7.53 0.04 -7.53 13.1 12 No Adj Made;Fully OpenDPHW0035 5/5/2020 12:4154.8 36.8 1.6 0.18 -7.48 0.04 75.6 75.5 -7.48 0.05 -7.47 14.3 13 No Adj MadeDPHW0036 5/5/2020 12:4556.8 40.3 0.2 0.07 -7.39 0.04 79.3 79.4 -7.37 0.04 -7.48 12.6 12.2 No Adj Made;Fully OpenDPVW0002 5/6/2020 10:1554.1 36.6 1.9 0.2 -10.82 0.03 83.9 84 -10.72 -0.05 -10.72 10.6 No Adj Made;Fully OpenDPVW0003 5/6/2020 9:3548.3 35.4 0 0.46 -3.52 2.15 83.8 83.8 -3.51 2.15 -10.71 4.7 4.7 No Adj MadeDPVW0005 5/6/2020 9:2649.1 37.1 0.4 0.36 -4.82 0.06 87.9 87.8 -4.81 0.06 -10.96 15.5 15.5 No Adj MadeDPVW0006 5/6/2020 9:4142.1 32.7 0 0.77 -2.54 -0.02 80.6 80.6 -2.53 -0.02 -10.61 0 0 No Adj Made;Fully ClosedDPVW0007 5/6/2020 10:0947.3 36.5 0.7 0.42 -3.82 0.1 90.7 90.7 -3.82 0.11 -10.31 20.1 19.1 No Adj MadeDPVW0008 5/6/2020 10:0443.3 36.3 0 0.56 -2.78 0.36 80.4 75.7 -2.73 1.18 -10.4 2.2 1.2 Barely Open;Dec Flow/VacDPVW0016 5/6/2020 10:0147 33.7 0.2 0.57 -2.78 4.22 83.2 83.2 -2.76 5.22 -10.38 4.7 4.2 No Adj MadeDPVW0017 5/6/2020 9:5647.1 35.5 0.8 0.47 -4.33 0.03 80.7 80.7 -4.32 0.03 -10.18 10.9 10.9 No Adj MadeDPVW0018 5/6/2020 9:530.1 1.8 19.3 43.78 -0.75 0 84.2 82.8 -0.73 0 -10.57 2.3 No Adj Made;Fully ClosedDPVW0019 5/6/2020 9:4640 33.5 0 0.79 -2.88 1.82 81.6 78.8 -2.77 3.61 -10.67 6.1 4.3 Barely Open;Dec Flow/VacDPVW0020 5/6/2020 9:5045.1 35.3 0.2 0.55 -3.81 0.01 80.9 80.9 -3.81 0.01 -10.97 6 6.1 No Adj MadeDPVW0021 5/6/2020 9:1650.8 34.7 1 0.39 -5.6 0.03 83.8 83.8 -5.6 0.03 -10.56 10.5 10.6 No Adj MadeDPVW0022 5/6/2020 9:1946.9 35.2 1.4 0.47 -5.78 0.02 83.5 83.5 -5.78 0.02 -10.56 8.5 8.5 No Adj MadeDPVW0023 5/6/2020 9:316.9 18.8 0.9 3.9 -2.31 -0.02 75.5 75 -2.31 -0.02 -10.77 0 0 No Adj Made;Fully Closed;Influenced by DPVW0024 5/5/2020 14:0156.4 38.9 0.1 0.12 -0.92 1.88 80.2 80.6 -1.21 0.38 -11.13 2 4.5 Barely Open;Inc Flow/VacDPVW0025 5/5/2020 13:5564.5 35.5 0 0 12.2 0.02 85.1 85.4 -1.73 0.03 -11.24 11.2 8 Barely Open;Inc Flow/VacDPVW0026 5/5/2020 13:4141.4 37 0.1 0.58-8.89 0.39 82.8 82.9 -8.88 0.56 -11.79 16.2 13.5 No Adj MadeDPVW0027 5/5/2020 14:0744.8 35.9 0.4 0.53 -10.6 0.14 77.3 77.1 -10.47 -10.04 -11.56 0 0.8 Barely Open;Dec Flow/Vac;Influenced by DPVW0028 5/5/2020 13:2610.29 16 7.2 -5.23 0.02 75.5 75.3 -5.23 0.02 -11.31 9.2 8.3 No Adj Made;Fully Closed;Influenced by DPVW0029 5/5/2020 13:2147.1 36.6 0.7 0.43 -7.49 0.28 81.1 81.1 -7.47 0.29 -11.28 33.6 33 No Adj MadeDPVW0030 5/5/2020 13:3236.4 34.5 0.6 0.83 -8.65 0.03 79.8 75 -7.76 0.24 -11.68 30.2 10.6 Fully Closed;Dec Flow/Vac;Influenced by DPVW0031 5/5/2020 13:1050.9 37.7 0.8 0.28 -3.79 1.63 83.2 83.2 -3.79 1.62 -8.88 9.3 9.3 No Adj MadeDPVW0032 5/5/2020 13:077.9 14.6 3.9 5.04 -0.54 -0.03 68.1 68.9 -0.51 -0.03 -8.53 0 0 No Adj Made;Fully ClosedDPVW0033 5/11/2020 10:4545.1 37 0.2 0.48 -0.67 -2.25 84.9 85.2 -0.67 -2.25 -8.55 0 0 No Adj Made;Barely OpenDenton Power Landfill Gas Collection System Monthly Summary - May 2020D2 - 11 Device NameDate TimeCH4 (Methane)(%)CO2 (Carbon Dioxide)(%)O2 (Oxygen)(%)Balance Gas(%)Initial Static Pressure(''H2O)Adjusted Differential Pressure(''H2O)Initial Temp. (oF)Adjusted Temp. (oF)Adjusted Static Pressure(''H2O)Initial Differential Pressure(''H2O)System Pressure(''H2O)Initial Flow(SCFM)Adjusted Flow(SCFM)Id CommentsDenton Power Landfill Gas Collection System Monthly Summary - May 2020DPVW0034 5/11/2020 10:4039.9 29.6 4.3 0.89 -0.35 -2.55 79.3 79.3 -0.33 -2.55 -5.52 0 0 No Adj Made;Fully ClosedDPVW0035 5/5/2020 12:5953.3 35 2 0.28 -7.57 0.29 70.3 71.4 -7.65 1.05 -8 2.1 1.1 No Adj Made;Fully Closed;Influenced by DPVW0036 5/11/2020 10:3549.5 39.3 0.2 0.28 -1.26 -2.52 90.6 90.7 -1.28 -2.51 -7.21 0 0 No Adj MadeDPVW0037 5/11/2020 10:2453 39.4 0 0.19 -0.97 -1.8 83.5 83.5 -0.96 -1.79 -7.98 0 0 No Adj Made;Barely OpenDPVW0038 5/5/2020 12:500.3 3.3 19.3 23.36 -0.33 -0.02 77.5 75.7 -0.32 -0.03 -8.45 0 0 No Adj Made;Fully ClosedDPVW0039 5/11/2020 10:3157.7 42.2 0.1 0 -2.61 0.63 83.1 83.1 -2.97 -0.04 -7.74 0 17.6 Inc Flow/VacDPVW0041 5/7/2020 13:0445.7 36.4 0 0.49 -0.35 -2.06 76.1 76.2 -0.26 -2.07 -5.81 0 0 No Adj Made;Barely OpenDPVW0042 5/7/2020 12:4856.1 38.9 0 0.13 -1.44 -3.17 78.7 78.5 -1.41 -3.15 -5.65 0 0 No Adj MadeDPVW0043 5/7/2020 12:4455.9 37.4 0 0.18 -2.73 -1.77 87.9 88 -2.79 -1.75 -3.64 0 0 No Adj Made;Fully OpenDPVW0044 5/7/2020 12:3858.8 38.7 0.1 0.06 -1.59 -1.66 101.3 101.4 -1.59 -1.57 -4.11 0 0 No Adj MadeDPVW0045 5/7/2020 13:0851.9 37.8 0 0.27 -1.16 -1.81 93.9 94 -1.17 -1.67 -6.03 0 0 No Adj MadeDPVW0046 5/7/2020 13:1461.8 38.2 0 0 2.48 -1.71 88.4 88.4 2.44 -1.71 1.75 0 0 No Adj Made;Fully Open;Header Watered DPVW0047 5/8/2020 10:440.1 1.7 20 46 -1.5 -1.91 67.6 67.6 -1.5 -1.91 -6.56 0 0 No Adj Made;Fully Closed;Influenced by DPVW0048 5/8/2020 10:5360 39.6 0.3 0 -5.24 -1.24 90.3 90.5 -5.07 -0.65 -6.59 0 0 No Adj Made;Fully OpenDPVW0049 5/8/2020 11:0954.7 36.8 0.3 0.22 -4.37 -1.71 89.2 89.3 -4.36 -1.67 -5.43 0 0 No Adj Made;Fully OpenDPVW0050 5/8/2020 10:5857.3 40.3 0.1 0.06 -4.84 3.62 87.2 87.7 0.6 -1.7 -4.85 0 25.5 No Adj Made;Fully OpenDPVW0051 5/8/2020 11:0250.5 36.5 0 0.36 -3.94 0.66 91.1 91.2 -3.89 -0.19 -6.42 0 5.9 No Adj Made;Fully OpenDPVW0052 5/8/2020 11:050.1 1.5 20 52.27 -2.46 -1.92 69.8 69.2 -2.45 -1.93 -6.44 0 0 No Adj Made;Fully Open;Influenced by DPVW0053 5/8/2020 11:190 0.3 20.7 263.33 -1.3 -1.93 72.2 72.2 -1.3 -1.93 -0.45 0 0 No Adj Made;Fully Closed;Influenced by DPVW0054 5/8/2020 11:140 1 20.4 78.6 -1.23 -1.92 71.6 70.7 -1.12 -1.93 -0.96 0 0 No Adj Made;Fully Closed;Influenced by DPVW0055 5/8/2020 11:2328 18.5 10.6 2.32 -1.5 -1.95 71.8 71.9 -1.46 -1.99 0.01 0 0 No Adj Made;Fully Closed;Influenced by DPVW0056 5/11/2020 10:0050.2 32 3.2 0.46 -0.44 -1.92 78.5 78.6 -0.43 -1.92 -4.79 0 0 No Adj Made;Fully ClosedDPVW0057 5/11/2020 9:5859 38.6 0.1 0.06 -4.48 0.05 73.6 73.7 -4.45 0.08 -6.01 2.1 1.6 No Adj Made;Fully OpenDPVW0058 5/11/2020 9:5255.2 38.3 0.3 0.16 -5.29 -1.47 93.4 93.4 -5.29 -1.47 -5.8 0 0 No Adj Made;Fully OpenDPVW0059 5/11/2020 10:0961.9 37.8 0.3 0 -0.02 -1.95 77.7 78.1 -0.03 -1.96 -0.04 0 0 No Adj Made;No / Low VacuumDPVW0060 5/11/2020 10:1556.7 36.3 0.1 0.19 -6.08 -2.89 89.4 89.4 -4.24 0.21 -4.17 3.4 0 No Adj Made;SurgingDPVW0061 5/11/2020 10:1952.8 35.8 0 0.32 -3.47 -1.74 96.2 96.1 -3.5 -1.89 -3.45 0 0 No Adj MadeDPVW0062 5/11/2020 10:5460.6 39.2 0.2 0 0.08 0.31 76.7 94 -0.43 -2.1 -5.12 0 1.8 Barely Open;Inc Flow/VacDPVW0063 5/11/2020 11:0160.6 39.3 0.1 0 -0.01 2.55 78.9 81.7 -0.15 -1.81 -4.65 0 5.2 Barely Open;Inc Flow/VacDPVW0064 5/11/2020 11:1058.2 41.7 0.1 0 -2.67 0.08 92.4 92.4 -2.71 0.95 -5.49 7.1 2.1 No Adj Made;Fully OpenDPVW0065 5/11/2020 11:0558 41.9 0.1 0 -2.92 -1.71 90.2 90.1 -2.89 -1.33 -4.32 0 0 No Adj Made;Fully OpenDPVW0066 5/7/2020 12:3058.8 40.2 0 0.02 -3.97 -1.93 90.9 91.1 -3.96 -1.92 -4.09 0 0 No Adj Made;Fully Open;Influenced by DPVW0067 5/7/2020 9:4755.1 38.9 0 0.15 -4.36 -1.79 73.6 73.7 -4.42 -1.93 -2.88 0 0 No Adj Made;Fully Open;Header Watered DPVW0068 5/6/2020 14:1362.9 36.9 0.2 0 0.89 0.03 86.7 89.8 -0.32 -0.03 -4.61 0 5.2 Barely Open;Inc Flow/VacDPVW0074 5/6/2020 10:5048.6 36.2 0 0.42 -0.79 0.19 85.6 86.5 -0.44 -0.62 -4 0 12.8 Barely OpenDPVW0075 5/6/2020 10:4457.2 37.8 0 0.13 -0.4 0.43 88.5 93.6 -0.62 -0.08 -4.02 0 19.4 Inc Flow/VacDPVW0076 5/6/2020 10:3639.5 33.4 0.2 0.81 -4.14 -0.66 106.7 82.3 -1 0.2 -4.41 27.2 Fully Closed;Dec Flow/VacDPVW0077 5/11/2020 11:3261.8 38.2 0 0 -1.44 -2.74 83.5 83.3 -1.44 -2.75 -1.46 0 0 No Adj Made;Fully OpenDPVW0078 5/6/2020 11:230.1 0.7 20 113.14 -0.35 -0.03 87.4 87.2 -0.35 -0.03 -0.33 0 0 No Adj Made;Fully Closed;Header Watered DPVW0079 5/6/2020 11:1650.9 33.2 0.1 0.48 -1.67 -0.14 97.7 97.8 -1.67 0.28 -4.36 7.1 0 No Adj MadeDPVW0080 5/6/2020 11:3047.4 33.7 1.3 0.52 -1.2 -0.01 96.4 96.2 -1.18 0 -3.1 0 0 No Adj Made;Barely OpenDPVW0081 5/6/2020 11:133 2.5 18.9 30.24 -0.45 -0.31 89.5 89.3 -0.45 -0.31 -4.76 0 0 No Adj Made;Fully ClosedDPVW0082 5/6/2020 11:3456.5 37.5 0 0.16 -3.24 0.3 106 105.9 -3.83 -0.08 -3.19 0 7.3 No Adj Made;Fully OpenDPVW0083 5/6/2020 11:0943.2 33.8 0.4 0.67 -1.04 -0.01 94.6 85.2 -0.93 0 -6.69 0 0 Barely Open;Dec Flow/VacDPVW0084 5/6/2020 11:3858.7 36.7 0.1 0.12 -4.33 1 104.5 104.5 -4.32 1.11 -4.3 14 13.3 No Adj Made;Fully OpenDPVW0085 5/6/2020 11:0258.7 35.5 0.1 0.16 -0.24 0.01 89.9 91.1 -0.93 -0.03 -5.49 0 1.4 Barely Open;Inc Flow/VacDPVW0086 5/6/2020 10:550.2 1.4 20.2 55.86 -0.15 -0.03 89.4 89 -0.15 -0.03 -3.58 0 0 No Adj Made;Fully ClosedDPVW0087 5/6/2020 11:4249.8 31.4 0.1 0.6 -0.1 0.12 91.9 92.1 -0.06 0.11 -5.25 2.5 2.5 No Adj Made;Barely OpenDPVW0088 5/6/2020 14:1852.1 35.9 0.1 0.33 -2.72 1.22 100.9 100.9 -2.71 0.61 -3.16 1.6 2.2 No Adj Made;Fully OpenDPVW0089 5/6/2020 14:2250.1 33.5 0.2 0.48 -1.05 0.03 100.2 100.5 -1.06 0.04 -1.1 0.6 0.6 No Adj Made;Fully Open;Header Watered DPVW0090 5/6/2020 14:2851.7 38.2 0 0.26 -2.53 -0.74 108.9 108.8 -2.65 -0.47 -1.75 0 0 No Adj Made;Fully Open;Header Watered DPVW0091 5/11/2020 11:2957.8 39.6 0.10.06-3.32 -2.24 104.9 104.9 -3.3 -2.43 -4.23 0 0 No Adj Made;Fully OpenDPVW0092 5/7/2020 9:3958.6 40 0.1 0.03 -2.09 -0.18 69.7 69.9 -2.07 -0.18 -1.97 0 0 No Adj Made;Fully Open;Header Watered DPVW0093 5/7/2020 9:3240.7 36.2 0 0.64 -0.4 -0.53 90.7 75.2 -0.27 -2.34 -2.31 0 0 Fully Closed;Dec Flow/Vac;Header Watered D2 - 12 Device NameDate TimeCH4 (Methane)(%)CO2 (Carbon Dioxide)(%)O2 (Oxygen)(%)Balance Gas(%)Initial Static Pressure(''H2O)Adjusted Differential Pressure(''H2O)Initial Temp. (oF)Adjusted Temp. (oF)Adjusted Static Pressure(''H2O)Initial Differential Pressure(''H2O)System Pressure(''H2O)Initial Flow(SCFM)Adjusted Flow(SCFM)Id CommentsDenton Power Landfill Gas Collection System Monthly Summary - May 2020DPVW0094 5/7/2020 9:2657.2 40 0.4 0.06 -1.97 0.27 104.2 104.3 -1.96 0.25 -2.51 3.6 3.8 No Adj Made;Fully Open;Header Watered DPVW0095 5/7/2020 9:5458.8 41.2 0 0 -0.77 -2.64 92 92.2 -0.76 -2.63 -0.4 0 0 No Adj Made;Fully Open;Header Watered DPVW0096 5/7/2020 12:0658.5 38 0.2 0.09 -0.02 -1.91 102.8 102.8 -0.01 -1.91 -0.03 0 0 No Adj Made;Fully OpenDPVW0097 5/7/2020 12:1060 38.7 0.2 0.03 -0.04 -1.87 106.5 106.6 -0.02 -1.87 -0.02 0 0 No Adj Made;Fully Open;Header Watered DPVW0098 5/11/2020 11:2257.9 42.1 0 0 -2.38 -4.6 110.7 111.7 -2.47 -4.49 -0.03 0 0 No Adj Made;Fully OpenDPVW0099 5/7/2020 12:2359.7 40.2 0.1 0 0.61 -1.16 80.8 80.9 0.65 -1.23 0.66 0 0 No Adj Made;Fully Open;Header Watered DPVW0100 5/7/2020 12:1959.7 40.3 0 0 0.67 -1.1 99.5 99.7 0.74 -1.1 0.75 0 0 No Adj Made;Fully Open;Header Watered DPVW0101 5/7/2020 12:1660.2 39.7 0.2 0 0.79 -1.95 79.2 79.2 0.78 -2.06 0.75 0 0 Fully Open;Header Watered INDPVW0102 5/11/2020 11:1654.8 43.4 0.5 0.03 -2.3 -2.9 94.2 94.2 -2.31 -2.92 -3.07 0 0 No Adj Made;Fully OpenDPVW0107 5/11/2020 11:3956.9 40.4 0 0.07 -3.72 -2.22 110.3 110.4 -3.75 -2.06 -4.86 0 0 No Adj Made;Fully OpenDPVW0108 5/11/2020 11:4357.6 41.2 0 0.03 -2.7 -0.77 109.7 109.7 -2.7 -0.85 -4.85 0 0 No Adj Made;Fully OpenDPVW0109 43962.49306 58.5 41.5 0 0 -3.07 -1.19 115.3 115.3 -3.07 -1.19 -4.74 0 0No Adj Made;Fully OpenDPVW0110 43962.49583 59 41 0.1 0 -2.64 -0.76 113.9 114 -2.63 -0.83 -2.81 0 0No Adj Made;Fully OpenDPVW0111 43962.49792 55.7 40.6 0.1 0.09 -1.03 1.26 111.2 111.2 -1.03 1.25 -2.66 32.4 32.4No Adj Made;Fully OpenDPVW0112 43962.50139 32.5 30.8 0.1 1.19 -0.78 0.01 108.5 107.9 -0.22 2.49 -3.02 20.2 1.5Barely Open;Dec Flow/VacDPVW0113 43962.50347 41.8 35.7 0 0.63 -0.99 1.95 107.6 108.7 -0.98 2.08 -2.97 18.6 18No Adj Made;Fully OpenDPVW0114 43962.50625 55 41.1 0 0.09 -0.92 2.11 109.9 110.3 -0.91 2.24 -2.73 19.5 18.9No Adj Made;Fully OpenDPVW0115 43962.52917 55 40.6 0.2 0.1 -1.27 0.48 106.5 106.5 -1.27 0.48 -2.66 15 15.1No Adj Made;Fully OpenDPVW0116 43962.53194 51.8 39.3 0.2 0.22 -0.88 1.8 107.6 107.6 -0.88 1.69 -2.69 28.2 29.1No Adj Made;Fully OpenDPVW0117 43962.53403 45.7 38.2 0.1 0.42 -0.91 1.97 107.6 107.8 -0.9 2.02 -2.55 18.3 18.1No Adj Made;Fully OpenDPVW0118 43962.53681 48.9 38.8 0.1 0.31 -0.83 2.22 102.6 102.8 -0.76 2.18 -2.61 19.3 19.4No Adj Made;Fully OpenD2 - 13 Device Name Date TimeCH4 (Methane)(%)CO2 (Carbon Dioxide)(%)O2 (Oxygen)(%)Balance Gas(%)Initial Static Pressure(''H2O)Adjusted Differential Pressure(''H2O)Initial Temp. (oF)Adjusted Temp. (oF)Adjusted Static Pressure(''H2O)Initial Differential Pressure(''H2O)System Pressure(''H2O)Initial Flow(SCFM)Adjusted Flow(SCFM)Id CommentsCALIBCH4 6/2/2020 6:5849.2 34.7 0 0.46 -0.09 2.9 71.8 71.8 -0.08 2.91 0 0CALIBR02 6/2/2020 6:550 0.2 4.1 478.5 -0.02 2.87 71.4 71.4 -0.05 2.87 0 0DPHCO001 6/18/2020 10:4058.5 40.2 0.2 0.03 0.04 3.51 95.8 96 0.05 3.41 0.1 113 114.7 No Adj Made;Fully Open;No / Low VacuumDPHW0001 6/2/2020 8:4361.6 37.8 0.6 0 -6.44 2.89 77.2 77.2 -6.39 2.9 -6.86 112.6 112.5 No Adj Made;Fully OpenDPHW0001 6/18/2020 8:1654 38.9 0.2 0.18 -0.84 -0.38 84.2 84.2 -0.84 -0.38 -6.46 No Adj Made;Barely OpenDPHW0002 6/3/2020 7:0060.7 39.2 0.1 0 -4.95 2.89 73.8 73.9 -5.03 2.9 -6.75 112.6 112.4 No Adj Made;Fully OpenDPHW0003 6/3/2020 7:0558.4 34.7 1.8 0.15 -1.7 2.89 73.3 73.3 -1.69 2.89 -6.61 113.6 113.6 No Adj Made;Fully Closed;High O2DPHW0005 6/3/2020 7:1061.7 37.8 0.6 0 -6.91 2.71 73.5 73.4 -7.01 3.27 -6.68 120.2 109.2 Inc Flow/VacDPHW0006 6/3/2020 7:1442.7 32.6 0.2 0.75 6.77 2.89 74.3 74.3 6.75 2.89 -6.75 111.6 111.6 No Adj Made;Fully ClosedDPHW0007 6/3/2020 7:2066.5 31.6 0.2 0.05 5.18 2.89 74.5 74.4 -1.54 2.89 -6.76 118 117 Barely Open;Inc Flow/VacDPHW0008 6/3/2020 7:2657.5 37.1 0.2 0.14 0.11 2.89 76.7 75 -0.72 2.9 -6.75 113 112.7 Barely Open;Inc Flow/VacDPHW0010 6/3/2020 7:3059.3 37.6 0.9 0.06 -7.11 9.62 76.5 76.5 -7.09 9.62 -7.06 206.2 206.2 No Adj Made;Fully OpenDPHW0011 68.9 30.9 0.2 0 -0.22 3.92 77.3 75.9 -1.03 2.9 -6.93 118 137.5 Barely Open;Inc Flow/VacDPHW0012 6/3/2020 7:3944.8 27.3 2.1 0.95 -0.19 2.91 77.6 77.5 -0.17 2.92 -6.2 112.8 112.7 No Adj Made;Fully ClosedDPHW0014 6/3/2020 7:4660.8 38.6 0.1 0.01 7.84 2.9 77.4 76.7 -1.04 2.91 -7 114.4 113 Barely OpenDPHW0015 6/3/2020 7:5160.5 39 0.4 0 -5.09 2.89 77.9 77.2 -5.11 2.89 -5.12 112 112 No Adj Made;Fully OpenDPHW0017 6/3/2020 7:5660.2 39.8 0 0 -5.66 9.48 80.5 80.2 -6.86 8.42 -7.03 191.6 203.2 Inc Flow/VacDPHW0018 6/3/2020 7:5941.3 21.2 0.4 1.75 6.35 2.89 81 81 6.34 2.89 -7.1 114.1 114.1 No Adj Made;Fully ClosedDPHW0019 6/3/2020 8:0260.9 38.9 0.1 0 -7.15 2.59 80.7 80.6 -7.16 2.52 -7.15 103.9 105.5 No Adj Made;Fully OpenDPHW0020 6/3/2020 8:0661.3 38.4 0.2 0 -7.03 9.71 81.1 81 -7.13 9.67 -7.15 206.4 206.9 Fully Open;Inc Flow/VacDPHW0021 6/3/2020 8:1272.9 27 0 0 9.52 2.9 84.2 81.3 -1.13 2.9 -7.03 121.5 120 Barely Open;Inc Flow/VacDPHW0022 6/3/2020 8:1764.1 35.9 0 0 4.12 2.91 86 81 -1.03 2.89 -7.25 114.4 114.5 Barely Open;Inc Flow/VacDPHW0023 6/3/2020 8:2058.4 39.2 0.5 0.05 -7.28 9.68 82.3 82.2 -7.22 9.74 -7.07 205 204.4 No Adj Made;Fully OpenDPHW0025 6/3/2020 8:2356.4 36.5 1.4 0.16 -7.3 9.85 83.4 83.3 -7.3 9.74 -6.87 205.4 206.4 No Adj Made;Fully OpenDPHW0026 6/3/2020 8:2760.2 38.3 0.3 0.03 -4.24 0 84.9 83.8 -6.06 4.39 -7.01 137.9 Inc Flow/VacDPHW0029 6/3/2020 8:3345.7 24.7 5.6 0.97 -0.46 0 84.1 83.3 -0.06 0 -6.93 1.5 2.6 Fully Closed;Dec Flow/VacDPHW0030 6/3/2020 8:3950.2 35.4 0 0.41 1.81 0.01 87 85.4 -0.81 -2.05 -6.97 5.2 Barely Open;Inc Flow/VacDPHW0031 6/3/2020 8:439.9 23.8 0.1 2.78 9.16 0.04 87.5 87.6 9.15 0.05 -7.01 12.7 12.2 No Adj Made;Fully ClosedDPHW0032 6/3/2020 8:5349 32.5 3.4 0.46 -6.5 0.01 89.2 85.8 -0.19 0.02 -7.13 9.3 4.1 Fully Closed;Dec Flow/Vac;High O2DPHW0033 6/3/2020 8:5850.4 28 0.1 0.77 3.18 0 91.8 90.7 -0.82 0.02 -7.13 8.1 Barely Open;Inc Flow/VacDPHW0034 6/3/2020 9:0259.8 37 0.6 0.07 -7.22 0.02 81.2 81.2 -7.22 0.02 -7.25 8.5 8 No Adj Made;Fully OpenDPHW0035 6/3/2020 9:0558.6 37.9 0.6 0.08 -7.37 0.01 82.6 82.6 -7.38 0.02 -7.4 8.6 7.2 No Adj Made;Fully OpenDPHW0036 6/3/2020 9:0758.3 39.8 0.1 0.05 -7.34 0.01 88.4 88.4 -7.33 0 -7.26 3.9 4.4 No Adj Made;Fully OpenDPVW0002 6/3/2020 10:4754.7 36.2 1.6 0.21 -10.33 2.24 92.4 89.4 -2.29 2.23 -10.53 95.5 97 Dec Flow/Vac;High O2DPVW0003 6/3/2020 10:1444.4 34.4 0.1 0.61 -2.44 1.2 88.6 89.3 -2.27 2.65 -10.91 5.2 3.5 Dec Flow/VacDPVW0005 6/3/2020 10:1149.9 36 0.2 0.39 -3.85 0.09 89.5 89.5 -3.83 0.1 -10.79 19.2 18.8 No Adj MadeDPVW0006 6/3/2020 10:1713.8 10.9 14 5.62 -1.56 -0.01 88.4 87.5 -1.54 -0.01 -10.79 0 0 No Adj Made;Fully Closed;Influenced by DPVW0007 6/3/2020 10:4147.8 35.9 0.4 0.44 -2.5 0.09 92.7 92.7 -2.5 0.1 -10.1 19.1 18.5 No Adj MadeDPVW0008 6/3/2020 10:3749.7 36.1 0.2 0.39 -1.42 1 84.6 84.5 -1.39 0.92 -10.29 2.1 2 No Adj MadeDPVW0016 6/3/2020 10:3451.3 36.3 0.1 0.34 -1.36 6.05 89.2 88.6 -1.34 5.93 -10.33 5 5 No Adj MadeDPVW0017 6/3/2020 10:3149.2 35.7 0.5 0.41 -2.97 0.05 87.2 87 -2.97 0.06 -10.33 15 13.6 No Adj MadeDPVW0018 6/3/2020 10:280.1 1.1 19.1 72.45 -0.46 0.02 97.5 97.1 -0.45 0.02 -10.36 8.4 7.7 No Adj Made;Fully ClosedDPVW0019 6/3/2020 10:2046.1 32.8 0.2 0.64 -1.65 2 89.2 88.7 -1.64 1.99 -10.63 4.5 4.5 No Adj Made;Barely OpenDPVW0020 6/3/2020 10:2346.5 35.1 0.2 0.52 -2.87 0.04 87.4 87.4 -2.86 0.04 -10.51 12.1 11.4 No Adj MadeDPVW0021 6/3/2020 10:5851.6 35.2 0.5 0.36 -4.63 2.28 94 93.5 -4.6 2.29 -10.63 96.9 96.8 No Adj MadeDPVW0022 6/3/2020 10:5546.7 34.1 0.6 0.55 -4.83 2.27 89.9 89.9 -4.83 2.28 -10.51 96.4 96.3 No Adj MadeDPVW0023 6/3/2020 10:503 3.9 17.4 19.41-1.27 -2.24 94.1 93.9 -1.26 -2.24 -10.79 0 0 No Adj Made;Fully ClosedDPVW0024 6/3/2020 10:0739.8 31.9 0.1 0.88 -1.660 83.5 85.1 -1.13 0.67 -10.74 2.6 0 Barely Open;Dec Flow/VacDPVW0025 6/3/2020 10:0241.3 24.1 7 1.15 -9.54 0.01 97.6 87.3 -0.25 0.04 -10.28 12.5 7 Fully Closed;Dec Flow/VacDPVW0026 6/3/2020 9:5153.1 38.9 0.2 0.2 -3.89 0.61 85.5 85.1 -3.87 0.61 -11.16 17.3 17.2 No Adj MadeDPVW0027 6/3/2020 9:5448.2 35.5 1.3 0.42 -7.66 0.69 89.4 89.5 -7.64 0.6 -10.59 1.6 1.7 No Adj Made;Barely Open;Influenced by DPVW0028 6/3/2020 9:4533.3 24.5 6.2 1.47 -0.95 0.03 93.1 93.2 -0.95 0.03 -11.08 10.5 9.7 No Adj Made;Fully ClosedDPVW0029 6/3/2020 9:4053 38.7 0.2 0.21 -5.41 0.31 84.3 84.1 -5.34 0.31 -10.98 35.2 35.3 No Adj MadeDPVW0030 6/3/2020 9:481 1.4 19.6 55.71 -1.32 0.01 92.4 92.3 -1.31 0.02 -11.02 7.5 6.8 No Adj Made;Fully ClosedDenton Power Landfill Gas Collection System Monthly Summary - June 2020D2 - 14 Device Name Date TimeCH4 (Methane)(%)CO2 (Carbon Dioxide)(%)O2 (Oxygen)(%)Balance Gas(%)Initial Static Pressure(''H2O)Adjusted Differential Pressure(''H2O)Initial Temp. (oF)Adjusted Temp. (oF)Adjusted Static Pressure(''H2O)Initial Differential Pressure(''H2O)System Pressure(''H2O)Initial Flow(SCFM)Adjusted Flow(SCFM)Id CommentsDenton Power Landfill Gas Collection System Monthly Summary - June 2020DPVW0031 6/3/2020 9:2957.1 39.9 0.1 0.07 -3.75 2.09 88.6 88.7 -4.22 1.28 -8.7 8.3 10.6 Inc Flow/VacDPVW0032 6/3/2020 9:2664.8 32.9 0.3 0.06 0.12 0.3 86.1 87.8 -1.95 -0.01 -8.63 0 1.2 Barely Open;Inc Flow/VacDPVW0033 6/18/2020 8:3847 37.6 0.1 0.41 -0.7 0.18 89.7 89.7 -0.64 0.18 -8.27 3 3 No Adj Made;Barely OpenDPVW0034 6/18/2020 8:3549.3 37.2 1.4 0.33 -0.08 -0.04 83.3 83.4 -0.07 -0.04 -4.9 0 0 Fully Closed;High O2DPVW0035 6/3/2020 9:1636.5 23.6 7.9 1.36 -6.76 -1.41 85 84.9 -7.27 -0.99 -9.24 0 0 No Adj Made;Fully Closed;Influenced by DPVW0036 6/18/2020 8:3149.9 38.2 0.4 0.3 -1.21 -0.25 86.7 86.9 -1.21 -0.26 -6.37 0 0 No Adj MadeDPVW0037 6/18/2020 8:1953.8 38.8 0.2 0.19 -0.87 0.42 84.4 84.4 -0.86 0.42 -7.01 8.7 8.7 No Adj Made;Barely OpenDPVW0038 6/3/2020 9:1044.7 32.3 0 0.71 -0.19 -0.01 87.4 87.6 -0.18 -0.01 -7.39 0 0 No Adj Made;Fully ClosedDPVW0039 6/18/2020 8:2857.3 40.6 0.4 0.04 -2.71 3.75 83.9 83.8 -2.87 2.29 -7.03 33.8 43.2 Inc Flow/VacDPVW0041 6/10/2020 10:4951.4 34 0.3 0.42 -2.68 -6.89 80.9 80.7 -2.67 -6.96 -5.61 0 0 No Adj MadeDPVW0042 6/10/2020 10:3857.4 36.4 0.4 0.16 -3.21 0.52 80.7 80 -3.43 -1.18 -6.47 0 2.4 Fully Open;Inc Flow/VacDPVW0043 6/10/2020 10:4559.7 37.9 0 0.06 -6.28 -8.08 88.5 88.5 -6.28 -8.08 -6.02 0 0 No Adj Made;Fully OpenDPVW0044 6/10/2020 10:320 0.3 20.3 264.67 0.18 -2.52 84.8 85 0.19 1.72 -6.15 17.3 0 Fully Closed;Dec Flow/VacDPVW0045 6/10/2020 10:5354 36 0.2 0.27 -2.85 -6.42 94.1 94.3 -2.83 -6.43 -6.2 0 0 No Adj MadeDPVW0046 6/10/2020 10:5960.8 37.8 0.2 0.03 -3.06 -7.32 97.7 97.6 -3.06 -7.54 -3.4 0 0 No Adj Made;Fully OpenDPVW0047 6/10/2020 11:1134.4 20 6.8 1.94 -2.2 -6.54 91.1 90.7 -2.2 -6.99 -6.56 0 0 No Adj Made;Fully Closed;Influenced by DPVW0048 6/10/2020 11:0754.8 37.4 0.3 0.2 -4.61 -4.64 94.9 95 -4.66 -4.64 -6.48 0 0 No Adj Made;Fully Open;Influenced by DPVW0049 6/10/2020 11:3358.1 37.6 0.1 0.11 -4.31 -0.62 91.1 91.1 -4.38 -0.97 -6.11 0 0 No Adj Made;Fully OpenDPVW0050 6/10/2020 11:1856.5 37.4 0.7 0.14 -4.08 -6.19 93.6 93.9 -4.09 -6.2 -4.5 0 0 No Adj Made;Fully Open;Influenced by DPVW0051 6/10/2020 11:2956 36.1 0.1 0.22 -3.6 0.7 94.6 94.9 -3.56 0.54 -6.27 5.4 6.2 No Adj Made;Fully OpenDPVW0052 6/10/2020 11:250 0.6 19 134 -0.15 -4.97 85.4 85.4 -0.11 -5.09 -6.69 0 0 No Adj Made;Fully ClosedDPVW0053 6/10/2020 11:430 0.5 19.6 159.8 -0.62 -2.17 86 86 -0.62 -2.18 -0.5 0 0 No Adj Made;Fully Closed;No / Low DPVW0054 6/10/2020 11:3952.5 34 1.9 0.34 -0.74 -1.84 78.3 79.3 -0.74 -1.84 -0.25 0 0 No Adj Made;Fully Closed;No / Low DPVW0055 6/10/2020 11:4736.6 21.4 7.4 1.62 -0.25 -1.16 87 87 -0.24 -1.16 -0.23 0 0 No Adj Made;Fully Closed;No / Low DPVW0056 6/10/2020 11:5644.9 27.9 3 0.87 -0.22 -0.96 86.8 87 -0.22 -0.96 -5.23 0 0 No Adj Made;Fully Closed;High O2DPVW0057 6/10/2020 11:5259.4 36.9 0.3 0.09 -5.18 -0.07 90.8 91.2 -5.19 -0.06 -6.64 0 0 No Adj Made;Fully OpenDPVW0058 6/10/2020 12:0052.8 35.6 1.1 0.29 -5.68 -0.4 93.9 93.9 -5.67 -0.4 -6.13 0 0 No Adj Made;Fully OpenDPVW0059 6/10/2020 12:0649.4 27.9 2.2 0.73 -0.18 -0.82 90.7 90.3 -0.19 -0.82 -0.21 0 0 Fully Closed;Dec Flow/Vac;No / Low DPVW0060 6/10/2020 12:1059.2 36.1 0.3 0.12 -4.6 0.2 90.1 90.1 -4.62 -0.85 -5.58 0 3.3 No Adj MadeDPVW0061 6/10/2020 12:1555.1 35.9 0 0.25 -4.15 -0.69 97.3 97.3 -4.16 -0.7 -4.32 0 0 No Adj MadeDPVW0062 6/18/2020 8:4452.4 36 0.1 0.32 0.05 0.95 81.5 80.8 -0.16 0.02 -4.66 0.5 3.2 Barely Open;Inc Flow/VacDPVW0063 6/18/2020 8:5460.1 39.9 0 0 0.11 -0.32 89.4 82.6 -4.05 1.06 -3.47 3.4 0DPVW0064 6/18/2020 9:0059.5 40.3 0.2 0 -2.53 0.8 93.4 93.4 -2.41 2.78 -3.06 12.2 6.6 No Adj Made;Fully OpenDPVW0065 6/18/2020 9:0358.5 41.2 0.2 0 -2.74 -0.09 91.4 91.4 -2.77 0.01 -3.81 0.8 0 No Adj Made;Fully OpenDPVW0065 6/18/2020 9:0558.5 41.2 0.1 0 -2.8 0.68 91.4 91.4 -2.8 0.62 -3.58 5.8 6 No Adj Made;Fully OpenDPVW0066 6/9/2020 13:0357.8 39.2 0.1 0.07 -2.65 -2.55 94.3 94.1 -2.64 -2.55 -2.47 0 0 No Adj Made;Fully OpenDPVW0067 6/9/2020 7:3560.5 38.6 0.2 0.02 -4.62 -2.43 85.3 86.4 -4.48 -7.18 -4.72 0 0 No Adj Made;Fully OpenDPVW0068 6/5/2020 8:3016.1 11.2 14.9 5.16 -2.21 1.15 88.6 88.3 -0.12 -0.86 -4.79 0 31.3 Fully Closed;Dec Flow/VacDPVW0074 6/5/2020 7:2660.6 39.4 0 0 -1.63 1.05 85.8 91.4 -1.71 -2.69 -4.75 0 30.6 Inc Flow/VacDPVW0075 6/5/2020 7:1662 37.7 0.2 0 -0.56 0.24 93.9 99.7 -1.01 -0.52 -4.15 0 14.5 Barely Open;Inc Flow/VacDPVW0076 6/5/2020 7:1060.7 39.1 0.2 0 1.03 2.23 77.8 95 -0.52 2.23 -3.5 98.8 97.1 Barely Open;Inc Flow/VacDPVW0077 6/18/2020 9:3246.2 29.1 5.2 0.67 0.22 -0.18 85.4 85.4 0.23 -0.18 0.23 0 0 No Adj Made;Fully ClosedDPVW0078 6/5/2020 7:5647.1 28.4 5.2 0.68 -0.24 -0.31 84.2 84.3 -0.24 -0.31 -0.23 0 0 Fully Closed;No / Low Vacuum;High O2DPVW0079 6/5/2020 7:5260.3 37.4 0.4 0.05 -1.72 0.94 97.7 99 -1.89 -0.37 -3.1 0 13 Inc Flow/VacDPVW0080 6/5/2020 8:0357.8 37.4 1.1 0.1 -1.22 0.27 95.9 102.6 -1.93 -0.33 -2.9 0 6.9 Barely Open;Inc Flow/Vac;High O2DPVW0081 6/5/2020 7:480.1 0.5 19.5 159.8 -0.19 0.22 82.9 83 -0.18 0.21 -3.82 6.1 6.2 No Adj Made;Fully ClosedDPVW0082 6/5/2020 8:0860.3 38.7 0.2 0.02 -3.31 -1.67 104.9 104.9 -3.02 -1.82 -4.63 0 0 No Adj Made;Fully OpenDPVW0083 6/5/2020 7:4455.8 37.1 0.8 0.17 -2.57 -0.5 96.4 96.4 -2.55 -0.5 -5.7 0 0 No Adj MadeDPVW0084 6/5/2020 8:190.9 1.9 18.9 41.21 -1.57 -1.68 87.9 87.9 -1.55 -1.69 -5.4 0 0 Fully Closed;Dec Flow/Vac;Influenced by DPVW0085 6/5/2020 7:3657.8 36.2 0.3 0.16 -1.53 0.09 91.8 96.3 -2.45 -0.3 -5.77 0 4.1 Inc Flow/VacDPVW0086 6/5/2020 7:3245.1 30.4 5 0.64 -0.43 -0.91 81.9 81.9 -0.41 -0.92 -3.58 0 0 No Adj Made;Fully ClosedDPVW0087 6/5/2020 8:2360.9 38.6 0.30.01-0.78 0.52 87.9 90.8 -1.53 -1.43 -5.43 0 5.3 Inc Flow/VacDPVW0087 6/18/2020 9:2160.3 39.1 0.2 0.01 -0.51 0.47 95.6 95.6 -0.52 0.47 -3.42 5.1 5.1 No Adj Made;Barely OpenDPVW0088 6/5/2020 8:3358.9 37.9 0.2 0.08 -3.34 -0.76 101 101 -3.34 -1.03 -5.1 0 0 No Adj Made;Fully OpenD2 - 15 Device Name Date TimeCH4 (Methane)(%)CO2 (Carbon Dioxide)(%)O2 (Oxygen)(%)Balance Gas(%)Initial Static Pressure(''H2O)Adjusted Differential Pressure(''H2O)Initial Temp. (oF)Adjusted Temp. (oF)Adjusted Static Pressure(''H2O)Initial Differential Pressure(''H2O)System Pressure(''H2O)Initial Flow(SCFM)Adjusted Flow(SCFM)Id CommentsDenton Power Landfill Gas Collection System Monthly Summary - June 2020DPVW0089 6/5/2020 8:3756.9 38.2 0.2 0.12 -2.94 -2.42 104.4 104.7 -2.94 -2.31 -3.28 0 0 No Adj Made;Fully OpenDPVW0090 6/5/2020 8:4060.2 38.7 0.2 0.02 -3.45 -5.7 108.4 108.5 -3.4 -5.69 -3.47 0 0DPVW0091 6/18/2020 9:2957.7 39.7 0.2 0.06 -1.77 0.48 104.2 104.2 -1.76 0.56 -3.54 5.4 5 No Adj Made;Fully OpenDPVW0092 6/9/2020 7:2660.1 39.6 0.3 0 0.32 -2.55 84.4 84.3 0.32 -2.55 0.33 0 0DPVW0092 6/9/2020 12:2360 38.7 0.2 0.03 -2.01 -2.54 98.6 98.9 -2.06 -4.56 -2.42 0 0 No Adj Made;Fully OpenDPVW0093 6/9/2020 7:2160.4 39.3 0.3 0 0.08 -2.54 82.5 81.7 0.34 -2.54 0.33 0 0 Fully Open;Inc Flow/Vac;Header Watered DPVW0093 6/9/2020 12:1958.1 38.1 0.4 0.09 -1.36 -3.93 107.5 107.4 -1.35 -3.95 -2.24 0 0 No Adj Made;Fully OpenDPVW0094 6/5/2020 8:480.7 1.9 19.3 41.11 -0.25 -2.6 82.4 82.6 -0.23 -2.6 0.06 0 0 Fully Closed;Dec Flow/VacDPVW0095 6/9/2020 12:3258.6 39.8 0.1 0.04 -0.04 -2.56 98 98.1 -0.03 -2.57 -0.32 0 0 No Adj Made;Fully OpenDPVW0096 6/9/2020 12:3558.4 38.5 0.3 0.07 -0.15 -2.58 109.8 109.8 -0.14 -2.59 -0.05 0 0 No Adj Made;Fully OpenDPVW0097 6/9/2020 12:4060.2 37 0.3 0.07 0.14 -2.56 96 96.2 0.15 -2.57 0.17 0 0 No Adj Made;Fully Open;Header Watered DPVW0098 6/18/2020 9:2659.3 40.3 0.1 0.01 -1.6 -0.79 113.5 113.5 -1.62 -0.68 -1.11 0 0 No Adj Made;Fully Open;No / Low VacuumDPVW0099 6/9/2020 12:5750.2 35.3 2.1 0.35 -0.4 -2.56 98.6 98.6 -0.41 -2.57 -2.28 0 0 Fully Closed;Dec Flow/VacDPVW0100 43991.53333 58 38.5 0.2 0.09 -1.55 -2.08 114.8 114.8 -1.55 -2.08 -1.98 0 0No Adj Made;Fully OpenDPVW0101 43991.53056 57.9 38.7 0.2 0.08 -1.55 -2.5 114.3 114.4 -1.46 -2.5 -2.17 0 0No Adj Made;Fully OpenDPVW0102 44000.38056 57 42.6 0.1 0.01 -2.25 0.83 94.8 94.9 -2.26 0.44 -3.03 1.4 1.8No Adj Made;Fully OpenDPVW0107 44000.40139 54.2 39.4 0 0.16 -2.52 0.87 110 109.9 -2.48 0.78 -3.56 25.6 26.9No Adj Made;Fully OpenDPVW0108 44000.40417 54.5 39.4 0.1 0.15 -0.99 2.74 110.5 110.7 -0.98 2.59 -3.27 21 21.7No Adj Made;Fully OpenDPVW0109 44000.40833 58.5 41 0.1 0.01 -1.58 1.01 116.6 116.7 -1.99 2.09 -3.19 18.9 13.1Fully Open;Inc Flow/VacDPVW0110 44000.4125 58.6 40.4 0.2 0.02 -0.84 1.05 115 115.5 -1.66 2.72 -3 21.6 13.4Fully Open;Inc Flow/VacDPVW0111 44000.41458 53.2 40.5 0 0.16 -0.86 1.4 108 108 -0.83 1.4 -2.87 34.1 34.1Fully OpenDPVW0112 44000.41875 47.7 37 0 0.41 0.16 1.94 106.1 111.7 -0.16 -0.13 -2.99 0 18.1Barely Open;Inc Flow/VacDPVW0113 44000.42222 44.9 36.8 0.1 0.49 -0.89 1.7 109.3 109.3 -0.75 2.09 -2.59 18.7 16.9Dec Flow/VacDPVW0114 44000.42361 54 39.7 0.2 0.15 -0.89 2.09 111.7 111.7 -0.88 2.09 -3.06 18.9 18.9No Adj Made;Fully OpenDPVW0115 44000.42639 53.8 40.2 0.2 0.14 -1.67 -2.12 106.5 106.6 -1.66 -2.12 -3.24 0 0No Adj Made;Fully OpenDPVW0116 44000.42917 48.5 38.9 0.2 0.32 -1.21 -1.31 107.3 107.3 -1.19 -1.38 -3.11 0 0No Adj Made;Fully OpenDPVW0117 44000.43333 42.5 36.1 0.3 0.58 -1.23 -1.91 108.4 109.2 -0.97 -1.4 -2.99 0 0Barely Open;Inc Flow/VacD2 - 16 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCG002 1/20/2022 8:35 0.00 0.00 10.90 89.10 0.00 -0.01 0.00 0.01 0.01 21.00 20.00 NR NR Calibration GasCDNCG0021/20/2022 18:08 0.00 0.00 10.80 89.20 0.30 0.02 0.01 0.02 0.02 30.00 28.00 NR NR Calibration Gas CDNCG002 1/21/2022 8:24 0.00 0.00 11.00 89.00 0.30 -1.24 -1.19 1.24 1.20 19.00 19.00 NR NR Calibration Gas CDNCG002 1/21/2022 18:00 0.00 0.00 10.90 89.10 0.00 -0.93 -0.82 0.93 0.82 45.00 45.00 NR NR Calibration GasCDNCG0021/24/2022 8:25 0.00 0.00 10.80 89.20 0.30 -1.13 -1.15 1.13 1.15 46.00 46.00 NR NR Calibration Gas CDNCG002 1/24/2022 17:37 0.00 0.00 10.80 89.20 -0.01 -1.00 -0.97 1.01 0.99 55.00 55.00 NR NR Calibration GasCDNCGCH41/20/2022 8:43 49.90 35.00 0.00 15.10 0.00 -1.05 -1.19 1.06 1.20 21.00 21.00 NR NR Calibration Gas CDNCGCH4 1/20/2022 18:14 49.90 35.10 0.00 15.00 -0.73 -1.62 -1.74 1.67 1.78 27.00 28.00 NR NR Calibration GasCDNCGCH41/21/2022 8:36 49.80 34.30 0.00 15.90 0.69 -0.01 -0.01 0.00 0.00 19.00 19.00 NR NR Calibration Gas CDNCGCH4 1/21/2022 18:03 50.00 35.10 0.00 14.90 0.00 -0.28 -1.09 0.27 1.09 45.00 45.00 NR NR Calibration Gas CDNCGCH4 1/24/2022 8:41 49.80 35.50 0.00 14.70 -0.39 17.32 -0.12 0.00 0.11 46.00 46.00 NR NR Calibration Gas CDNCGCH4 1/24/2022 17:44 50.00 35.70 0.00 14.30 -0.03 80.04 17.32 0.00 0.00 55.00 55.00 NR NR Calibration Gas CDNINLT1 1/20/2022 8:55 32.20 25.70 5.10 37.00 -18.15 0.05 -18.08 18.18 18.13 58.00 55.00 1055.00 1055.00 Flare InletCDNINLT11/21/2022 8:46 28.20 22.30 7.60 41.90 -18.08 0.69 -18.20 17.97 17.91 60.00 60.00 1156.00 1156.00 Flare Inlet CDNINLT1 1/24/2022 9:02 34.70 27.00 5.10 33.20 -17.66 0.40 -17.60 17.92 17.92 60.00 60.00 1130.00 1130.00 Flare InletCDNINLT21/20/2022 18:20 29.00 23.00 7.00 41.00 -18.37 -0.70 -0.70 18.12 18.12 60.00 60.00 1150.00 1150.00 Flare Inlet CDNINLT2 1/21/2022 18:08 36.50 29.20 4.00 30.30 -17.98 0.04 -18.07 18.23 18.22 60.00 60.00 1164.00 1164.00 Flare InletCDNINLT21/24/2022 17:50 36.00 28.70 5.40 29.90 -18.29 0.02 0.02 18.28 18.28 62.00 62.00 1015.00 1015.00 Flare Inlet CDNBLWR1 1/20/2022 8:59 31.90 26.00 5.20 36.90 0.05 4.12 4.19 0.00 0.00 72.00 72.00 1055.00 1055.00 Blower Outlet CDNBLWR1 1/21/2022 8:50 31.00 25.00 6.50 37.50 0.99 4.91 4.91 0.00 0.00 82.00 82.00 1152.00 1152.00 Blower Outlet CDNBLWR1 1/24/2022 9:05 35.10 27.70 4.80 32.40 0.40 4.70 4.63 0.00 0.00 90.00 90.00 1130.00 1130.00 Blower Outlet CDNBLWR2 1/20/2022 18:24 31.20 24.10 6.00 38.70 -0.64 4.91 4.85 0.00 0.00 80.00 80.00 1150.00 1150.00 Blower OutletCDNBLWR21/21/2022 18:12 36.30 29.50 4.00 30.20 0.02 4.92 4.88 0.00 0.00 95.00 95.00 1165.00 1165.00 Blower Outlet CDNBLWR2 1/24/2022 17:53 35.40 27.50 5.40 31.70 0.02 3.93 3.94 0.00 0.00 86.00 83.00 1015.00 1015.00 Blower OutletCDN00GHG1/24/2022 17:54 35.70 27.40 5.40 31.50 0.01 3.87 3.98 0.00 0.00 83.00 83.00 1015.00 1015.00 Flare GHG CDNGW044 1/24/2022 12:23 50.80 37.60 0.00 11.60 -6.59 -2.83 -2.84 4.17 3.91 90.00 90.00 6.46 6.26 No Change, lateral needs to raised CDNGW045 1/24/2022 12:13 35.30 33.00 0.00 31.70 -9.90 -2.63 -2.20 0.30 0.45 81.00 81.00 7.24 8.86 Closed Valve 1/2 turn or lessCDNGW0461/24/2022 10:31 49.70 35.30 0.00 15.00 -5.16 -5.06 -5.11 0.00 0.00 86.00 86.00 0.00 0.00 Closed Valve > 1 turnCDNGW0471/21/2022 17:24 43.00 31.60 4.60 20.80 -9.54 -8.52 -8.56 0.02 0.01 70.00 76.00 0.98 0.63 Closed Valve 1/2 turn or lessCDNGW0481/21/2022 17:16 51.50 37.20 0.00 11.30 -9.58 -8.27 -7.83 2.00 2.29 81.00 81.00 10.20 10.91 No ChangeCDNGW0491/21/2022 17:20 0.00 0.00 20.90 0.00 -0.01 0.01 0.01 0.00 0.00 60.00 60.00 2.76 1.59 Capped CDNGW050 1/21/2022 16:06 56.00 31.80 2.90 9.30 -10.57 -9.38 -9.39 9.17 9.22 68.00 68.00 40.05 40.16 No Change, Wellhead needs to be replaced CDNGW051 1/21/2022 15:49 61.10 36.80 0.00 2.10 2.70 2.54 2.58 0.04 0.01 62.00 62.00 1.52 0.59 No Change, No Vacuum on lateral CDNGW052 1/21/2022 15:56 60.80 37.00 0.00 2.20 -0.01 1.75 1.81 0.03 0.01 60.00 60.00 2.46 1.03 No Change,Valve completely closed, No CDNGW053 1/21/2022 15:35 0.00 0.00 20.90 0.00 -0.05 0.01 0.01 0.00 0.00 33.00 33.00 2.25 2.76 Buried Missing Entire EW CDNGW054 1/21/2022 15:34 0.00 0.00 20.90 0.00 -0.05 0.01 0.01 0.00 0.00 33.00 33.00 0.00 0.00 Capped CDNGW054 1/21/2022 15:36 0.00 0.00 20.90 0.00 -0.05 0.00 0.00 0.00 0.00 33.00 33.00 3.90 0.00 Capped CDNGW055 1/21/2022 15:17 61.70 35.30 0.00 3.00 0.01 4.24 4.28 0.05 0.01 62.00 62.00 0.71 0.30 No Change,Valve completely closedCDNGW0561/21/2022 15:05 60.00 39.80 0.00 0.20 -1.06 4.72 4.75 0.00 0.00 74.00 72.00 0.00 0.00 No Change, No Vacuum On Lateral Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data P:\O&M\City of Denton\2022\(1) January\Forms\City of Denton O&M Report January 2022.xlsx Weaver Consultants Group, LLC 1/31/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW057 1/21/2022 14:53 60.60 37.70 0.00 1.70 -0.40 3.18 3.22 0.14 0.14 102.00 102.00 2.72 2.73 No Change, No Vacuum On Lateral CDNGW058 1/21/2022 14:50 59.90 37.60 0.00 2.50 5.45 4.99 4.98 0.01 0.01 101.00 101.00 2.62 2.52 No Change, No Vacuum On Lateral CDNGW059 1/21/2022 13:50 60.70 37.90 0.00 1.40 1.04 3.81 3.83 0.02 0.00 72.00 72.00 1.11 0.32 No Change,Valve completely closed,No CDNGW060 1/21/2022 13:38 59.80 38.10 0.10 2.00 2.07 1.10 1.10 0.06 0.06 72.00 71.00 1.74 1.84 No Change, No Vacuum On Lateral CDNGW061 1/21/2022 14:33 54.50 34.60 0.10 10.80 1.03 -0.03 -0.03 0.01 0.00 82.00 82.00 8.05 3.69 No Change, Wellhead Destroyed. Lateral CDNGW062 1/21/2022 14:05 60.30 39.70 0.00 0.00 1.05 3.94 3.96 0.02 0.00 72.00 72.00 1.81 0.33 No Change,Valve completely closed, Kanaflex CDNGW063 1/21/2022 15:21 0.00 0.00 20.90 0.00 -0.01 0.00 0.00 0.00 0.00 33.00 33.00 0.00 0.00 Buried Missing Entire EWCDNGW0641/21/2022 15:24 59.80 38.90 0.00 1.30 -0.01 4.21 4.27 0.66 0.72 78.00 78.00 10.90 11.42 No ChangeCDNGW0651/21/2022 15:37 0.00 0.00 20.90 0.00 -0.05 0.01 0.01 0.00 0.01 33.00 33.00 0.00 4.78 Capped CDNGW066 1/21/2022 16:24 58.10 36.30 0.30 5.30 -6.68 -6.83 -6.34 0.07 0.02 72.00 72.00 8.10 3.76 No ChangeCDNGW0671/21/2022 17:27 55.50 37.10 0.00 7.40 -5.20 -7.75 -7.37 0.17 0.28 69.00 69.00 12.21 15.64 No Change, Lateral Surging CDNGW068 1/24/2022 10:06 57.70 39.00 0.00 3.30 -8.14 -4.43 -4.49 0.02 0.01 64.00 64.00 2.98 2.59 Opened Valve 1/2 turn or less P:\O&M\City of Denton\2022\(1) January\Forms\City of Denton O&M Report January 2022.xlsx Weaver Consultants Group, LLC 1/31/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW074 1/24/2022 12:49 0.30 0.30 22.70 76.70 -7.27 -0.18 -0.18 0.00 0.00 58.00 58.00 0.10 0.10 No Change,Valve completely closed CDNGW075 1/24/2022 12:58 30.90 30.80 0.00 38.30 -7.45 -1.52 -1.49 0.54 0.38 90.00 90.00 5.31 4.43 Closed Valve 1/2 turn or lessCDNGW0761/24/2022 13:07 35.60 30.10 0.00 34.30 -6.52 -2.79 -0.49 0.04 0.00 74.00 74.00 13.79 0.00 Closed Valve > 1 turn CDNGW077 1/24/2022 13:55 0.50 0.30 22.50 76.70 -2.06 -0.39 -0.21 0.20 0.00 57.00 57.00 13.49 1.76 Closed Valve > 1 turn,Valve completely CDNGW078 1/24/2022 11:24 45.00 28.50 5.00 21.50 -0.39 -0.91 -0.90 0.04 0.01 59.00 59.00 0.69 0.35 Closed Valve > 1 turn,Valve completely CDNGW079 1/24/2022 11:31 38.00 32.70 0.00 29.30 -7.29 -3.88 -3.88 0.89 0.89 76.00 59.00 6.88 6.88 Closed Valve 1/2 to 1 turn CDNGW080 1/24/2022 11:16 43.00 34.40 0.00 22.60 -6.96 -3.61 -3.41 0.24 0.14 98.00 98.00 14.41 10.92 Closed Valve > 1 turnCDNGW0811/24/2022 11:37 2.10 2.10 21.70 74.10 -8.14 -1.32 -1.25 0.07 0.02 57.00 57.00 0.56 0.28 Valve completely closed CDNGW082 1/24/2022 11:12 54.20 35.10 0.00 10.70 -6.73 -6.60 -5.61 0.38 0.73 62.00 62.00 18.49 25.70 Closed Valve > 1 turnCDNGW0831/24/2022 11:51 26.70 27.90 0.00 45.40 -8.89 -4.47 -4.42 0.30 0.30 70.00 70.00 12.24 12.09 Closed Valve 1/2 turn or less CDNGW084 1/24/2022 11:06 54.80 37.40 0.00 7.80 -8.84 -2.78 -2.98 0.38 0.16 55.00 55.00 4.60 2.96 Opened Valve 1/2 turn or lessCDNGW0851/24/2022 12:33 27.10 28.40 1.20 43.30 -8.76 -4.14 -4.14 0.96 0.96 90.00 90.00 28.81 28.81 Closed Valve > 1 turn CDNGW086 1/24/2022 12:37 7.50 5.30 19.90 67.30 -7.18 -0.38 -0.36 0.00 0.01 57.00 57.00 1.76 2.98 No Change,Valve completely closed CDNGW087 1/24/2022 11:00 33.90 30.40 0.00 35.70 -8.76 -3.99 -3.99 0.27 0.27 60.00 60.00 3.86 3.86 Closed Valve 1/2 to 1 turn CDNGW088 1/24/2022 9:57 36.20 31.60 0.00 32.20 -6.79 -4.88 -3.55 2.37 0.18 90.00 90.00 33.56 9.29 Closed Valve > 1 turn CDNGW089 1/24/2022 9:48 13.90 23.70 0.50 61.90 -1.33 -1.75 -1.61 0.00 0.36 54.00 54.00 0.00 42.67 Closed Valve > 1 turn,Valve completely closedCDNGW0901/24/2022 9:37 0.10 0.10 22.30 77.50 -0.68 -1.13 -1.13 0.01 0.01 54.00 54.00 3.06 3.06 Closed Valve > 1 turn,Valve completely closed CDNGW091 1/24/2022 9:29 39.80 34.30 0.00 25.90 -6.56 -3.97 -3.97 3.01 3.01 106.00 106.00 37.30 37.30 Closed Valve > 1 turnCDNGW0921/21/2022 17:42 50.60 36.80 0.00 12.60 -6.49 -5.54 -5.21 0.42 0.25 69.00 69.00 46.74 35.88 No Change, Surging lateral CDNGW093 1/21/2022 17:34 53.40 36.10 0.00 10.50 -2.48 -2.92 -2.91 0.12 0.08 66.00 66.00 25.37 20.33 No Change, Surging lateral CDNGW093 1/21/2022 17:39 37.20 33.00 0.90 28.90 -6.02 -3.34 -3.23 0.81 0.77 71.00 71.00 20.06 19.47 Closed Valve > 1 turn, Surging lateralCDNGW0941/21/2022 17:46 46.30 35.70 0.00 18.00 -6.16 -1.58 -1.58 0.06 0.03 62.00 62.00 7.11 5.32 Closed Valve 1/2 turn or less, Surging lateral CDNGW095 1/21/2022 17:05 59.10 39.20 0.00 1.70 -3.23 -3.25 -3.45 0.01 0.00 75.00 75.00 7.57 4.06 No Change, Surging lateral CDNGW096 1/21/2022 16:57 59.10 38.30 0.00 2.60 -2.43 -2.90 -3.31 0.07 0.19 81.00 82.00 7.79 12.82 No ChangeCDNGW0971/21/2022 16:53 59.20 39.50 0.00 1.30 -2.74 -2.66 -2.87 0.02 0.04 82.00 82.00 9.41 14.45 No Change CDNGW098 1/21/2022 16:47 57.80 39.10 0.00 3.10 -5.87 -4.07 -4.06 0.63 0.58 98.00 98.00 23.22 22.20 No ChangeCDNGW0991/21/2022 16:31 57.80 37.40 0.40 4.40 0.60 0.69 0.70 0.00 0.00 70.00 70.00 1.31 1.17 No Change, No vacuum due to a belly CDNGW100 1/21/2022 16:38 60.00 38.40 0.00 1.60 1.37 1.41 1.39 0.03 0.00 58.00 58.00 3.94 0.67 No Change,No vacuum due to a belly CDNGW101 1/21/2022 16:42 59.50 37.50 0.00 3.00 -0.01 1.33 1.34 0.25 0.21 60.00 59.00 15.08 14.09 No Change, No vacuum due to a belly CDNGW102 1/21/2022 15:40 57.60 36.60 0.00 5.80 3.77 3.88 3.90 0.62 0.62 74.00 74.00 1.63 1.63 No vacuum on lateral CDNGW106 1/24/2022 14:10 0.30 0.20 22.50 77.00 0.39 -0.23 0.00 1.39 1.18 66.00 66.00 26.43 24.36 No Change,Valve completely closed CDNGW107 1/24/2022 15:35 29.40 29.50 0.00 41.10 -8.36 -6.11 -2.10 2.25 0.02 109.00 109.00 43.11 3.75 Closed Valve > 1 turn CDNGW108 1/24/2022 15:40 28.00 26.40 0.00 45.60 -8.84 -4.01 -1.99 6.50 0.01 114.00 114.00 32.64 1.38 Closed Valve > 1 turn,Valve completely closed CDNGW109 1/24/2022 15:44 46.10 36.60 0.00 17.30 -9.63 -7.48 -5.12 2.55 0.01 118.00 118.00 33.86 1.89 Closed Valve > 1 turnCDNGW1101/24/2022 15:50 47.90 36.80 0.00 15.30 -10.49 -7.48 -7.48 2.93 0.01 117.00 117.00 48.72 3.75 Closed Valve > 1 turn CDNGW111 1/24/2022 15:55 38.30 32.70 0.00 29.00 -12.31 -3.24 -2.52 1.67 0.45 114.00 114.00 37.19 NR Closed Valve > 1 turnCDNGW1121/24/2022 15:59 23.30 17.60 11.40 47.70 -11.09 -0.16 -0.11 0.05 0.00 66.00 66.00 2.93 0.71 No Change,Valve completely closed CDNGW113 1/24/2022 16:03 30.70 29.90 0.00 39.40 -11.30 -0.91 -0.93 0.45 0.45 104.00 104.00 8.75 8.76 No Change CDNGW114 1/24/2022 16:08 41.10 34.00 0.00 24.90 -10.78 -4.34 -2.77 4.57 2.99 116.00 116.00 27.36 22.21 Closed Valve > 1 turn CDNGW115 1/24/2022 16:12 43.40 34.00 0.00 22.60 -12.80 -2.55 -2.40 1.74 1.25 110.00 110.00 29.70 24.03 Closed Valve 1/2 turn or less P:\O&M\City of Denton\2022\(1) January\Forms\City of Denton O&M Report January 2022.xlsx Weaver Consultants Group, LLC 1/31/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW116 1/24/2022 16:16 38.20 33.20 0.90 27.70 -12.76 -1.48 -1.23 1.64 0.81 110.00 110.00 27.52 19.33 Closed Valve 1/2 to 1 turn CDNGW117 1/24/2022 16:20 43.80 35.10 0.00 21.10 -11.46 -1.04 -0.98 0.70 0.71 108.00 108.00 10.86 10.96 No ChangeCDNGW1181/24/2022 16:25 42.70 33.90 0.00 23.40 -11.66 -3.97 -2.52 10.26 2.22 107.00 107.00 41.14 19.29 Closed Valve > 1 turn CDNGW119R 1/24/2022 16:33 0.50 0.70 22.00 76.80 -11.84 -12.01 -11.22 0.02 0.01 59.00 59.00 0.44 0.30 Closed Valve > 1 turn,Valve completely closed CDNGW120R 1/24/2022 16:37 56.90 36.70 0.20 6.20 -11.89 -11.38 -11.27 0.45 0.49 62.00 62.00 2.17 2.25 Closed Valve 1/2 turn or less CDNGW121R 1/24/2022 16:47 6.80 5.40 21.70 66.10 -11.91 -12.15 -12.26 0.02 0.02 56.00 56.00 11.27 10.69 Closed Valve > 1 turn,Valve completely closed CDNGW122R 1/24/2022 16:51 1.50 1.20 22.10 75.20 -11.84 -12.02 -12.09 0.01 0.01 58.00 58.00 5.65 7.48 Closed Valve > 1 turn,Valve completely closedCDNGW123R1/24/2022 17:04 0.00 0.00 22.60 77.40 -11.90 -12.27 -11.94 0.04 0.14 55.00 55.00 14.72 27.04 Closed Valve > 1 turn,Valve completely closed CDNGW124R 1/24/2022 17:15 60.60 38.90 0.00 0.50 -11.91 -12.48 -12.46 0.05 0.08 57.00 57.00 15.80 20.76 Closed Valve 1/2 turn or lessCDNGW125R1/24/2022 17:19 1.00 1.10 22.30 75.60 -12.08 -3.52 -3.49 0.04 0.02 54.00 54.00 14.24 8.98 No Change,Valve completely closed DEWLCR3 1/24/2022 14:18 4.80 17.70 10.90 66.60 0.30 0.24 0.18 0.03 0.02 61.00 61.00 5.22 3.94 No Change,Valve completely closed, No DEWLCR4 1/21/2022 12:42 57.20 40.00 0.10 2.70 -2.70 -4.18 -4.17 0.38 0.45 71.00 71.00 44.78 48.69 No Change DEWLCR5 1/21/2022 12:19 59.50 40.50 0.00 0.00 -12.18 0.10 0.01 1.68 2.58 75.00 75.00 9.50 11.76 Opened Valve 1/2 turn or less Notes:1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =79 Number of Wells with Methane > 58%=18 Total Number of Well Readings =79 Number of Wells with Oxygen ≥ 2%=22 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =18 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =22 Number of Wells with No Room to Run (NRTR)=57 P:\O&M\City of Denton\2022\(1) January\Forms\City of Denton O&M Report January 2022.xlsx Weaver Consultants Group, LLC 1/31/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNSV001 1/21/2022 10:41 5.10 11.60 10.40 72.90 -5.60 -6.81 -0.64 0.01 0.00 74.00 74.00 7.22 0.00 Closed Valve > 1 turnCDNSV0021/21/2022 10:47 3.70 11.10 10.70 74.50 -5.65 -6.64 -0.73 0.22 0.26 72.00 72.00 32.33 34.82 Closed Valve > 1 turn CDNSV003 1/21/2022 11:08 26.20 26.70 1.80 45.30 -5.72 -6.52 -2.19 0.21 0.25 72.00 72.00 31.91 34.82 Closed Valve > 1 turn CDNSV004 1/21/2022 11:17 11.60 14.50 9.50 64.40 -3.02 -3.81 -0.32 0.00 0.01 75.00 75.00 0.00 5.35 Closed Valve > 1 turn CDNSV005 1/21/2022 11:23 1.40 0.80 21.30 76.50 -5.97 -7.03 -0.79 0.12 0.00 76.00 76.00 23.80 1.98 Closed Valve > 1 turn CDNSV006 1/21/2022 10:35 0.00 0.00 20.20 79.80 -5.84 -0.75 -0.73 0.00 0.00 74.00 74.00 0.00 0.00 No ChangeCDNSV0071/21/2022 10:24 0.00 0.00 21.50 78.50 -5.50 -4.76 -0.69 0.04 0.00 20.00 20.00 13.83 0.00 Closed Valve > 1 turn CDNSV008 1/21/2022 10:15 0.00 0.50 21.20 78.30 -5.76 -5.98 -0.22 0.02 0.00 25.00 25.00 10.04 0.00 Closed Valve > 1 turnCDNSV0091/21/2022 10:19 0.00 0.00 22.00 78.00 -5.84 0.01 0.00 0.01 0.00 26.00 26.00 6.38 1.65 No Change CDNSV010 1/21/2022 10:05 0.00 0.10 22.20 77.70 -5.23 -5.95 -0.69 0.05 NR 28.00 28.00 16.88 0.00 Closed Valve > 1 turnCDNSV0111/21/2022 9:30 10.90 19.30 3.90 65.90 -5.15 -6.06 -0.64 0.01 NR 28.00 28.00 5.02 4.62 Closed Valve 1/2 turn or less CDNSV012 1/21/2022 9:19 17.50 16.90 7.30 58.30 -5.12 -6.14 -6.14 0.01 0.01 28.00 28.00 6.40 5.28 Closed Valve 1/2 turn or less CDNSV013 1/21/2022 9:13 3.40 2.40 19.80 74.40 -5.13 -6.14 -0.94 0.00 0.00 19.00 19.00 0.00 0.00 Closed Valve > 1 turn CDNSV014 1/21/2022 9:04 45.70 33.40 0.60 20.30 -5.15 -6.18 -0.73 0.00 0.01 19.00 19.00 4.85 0.00 No Change Soil Vapor Extraction Well Data P:\O&M\City of Denton\2022\(1) January\Forms\City of Denton O&M Report January 2022.xlsx Weaver Consultants Group, LLC 1/31/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNLFG02 1/20/2022 10:05 59.70 39.20 0.00 1.10 -13.44 -4.32 -4.39 0.31 0.28 64.00 65.00 38.79 37.09 Opened Valve 1/2 turn or less CDNLFG03 1/20/2022 10:00 55.90 37.90 0.00 6.20 -11.07 -3.03 -3.10 2.76 2.90 60.00 60.00 116.97 120.01 Opened Valve 1/2 turn or less CDNLFG05 1/20/2022 10:14 46.20 34.30 0.00 19.50 -5.11 -4.97 -4.88 0.00 0.00 62.00 62.00 0.00 0.00 No ChangeCDNLFG061/20/2022 9:56 0.10 0.20 23.20 76.50 -13.65 -2.36 -2.36 0.02 0.02 60.00 60.00 9.10 9.77 No Change,Valve completely closedCDNLFG071/20/2022 11:11 57.80 39.40 0.00 2.80 -12.79 -3.49 -3.47 0.00 0.00 74.00 74.00 0.00 0.00 Opened Valve 1/2 turn or lessCDNLFG081/20/2022 10:40 0.20 0.20 23.10 76.50 -0.71 -2.27 -2.28 0.02 0.02 68.00 68.00 9.06 10.78 No Change,Valve completely closedCDNLFG161/20/2022 10:47 0.40 0.10 23.10 76.40 -0.73 -1.79 -1.79 1.79 1.79 62.00 62.00 94.35 94.34 No Change,Valve completely closedCDNLFG171/20/2022 10:55 59.10 40.90 0.00 0.00 -0.73 -2.45 -2.35 0.14 0.04 72.00 72.00 25.64 13.91 No Change,Valve completely closed, Slope CDNLFG18 1/20/2022 11:06 1.00 1.20 22.30 75.50 -13.87 -0.28 -0.24 0.02 0.02 60.00 60.00 9.62 8.67 No Change,Valve completely closedCDNLFG191/20/2022 11:15 52.80 37.00 0.00 10.20 -13.85 -2.49 -2.27 2.42 0.67 77.00 77.00 107.91 NR No ChangeCDNLFG201/20/2022 11:24 54.60 39.20 0.00 6.20 -13.68 -4.66 -5.47 0.19 0.01 74.00 74.00 30.31 56.44 No ChangeCDNLFG211/20/2022 11:30 55.60 38.70 0.00 5.70 -4.91 -8.14 -8.02 1.25 1.20 81.00 79.00 76.30 74.81 No ChangeCDNLFG221/20/2022 11:36 39.50 33.50 0.00 27.00 -13.99 -7.03 -7.04 0.31 0.35 73.00 73.00 38.17 40.50 Closed Valve 1/2 turn or lessCDNLFG231/20/2022 9:51 1.20 1.60 20.90 76.30 -13.56 -2.04 -2.09 0.02 0.01 70.00 70.00 9.02 8.13 No Change,Valve completely closedCDNLFG241/20/2022 11:44 37.80 34.70 0.00 27.50 -13.97 -0.56 -0.59 0.00 0.03 72.00 72.00 0.14 0.53 No Change,Valve completely closedCDNLFG251/20/2022 11:55 62.60 37.40 0.00 0.00 -13.84 -13.25 -13.14 0.04 0.04 74.00 75.00 14.14 13.26 Opened Valve 1/2 turn or lessCDNLFG261/20/2022 9:41 38.60 35.40 0.00 26.00 -13.76 -6.80 -6.19 0.00 0.11 78.00 80.00 0.00 23.19 Closed Valve 1/2 to 1 turnCDNLFG271/20/2022 9:45 32.50 30.60 0.00 36.90 -13.81 -10.53 -10.58 0.00 0.00 40.00 40.00 0.00 0.00 Opened Valve 1/2 turn or lessCDNLFG281/20/2022 9:29 0.80 0.60 22.20 76.40 -13.65 -2.41 -2.44 0.01 0.00 30.00 30.00 7.21 4.00 Closed Valve > 1 turnCDNLFG291/20/2022 9:24 43.20 35.80 0.00 21.00 -11.83 -7.84 -7.51 0.52 0.47 42.00 42.00 51.33 48.82 Closed Valve 1/2 turn or less CDNLFG30 1/20/2022 9:35 0.00 0.00 23.10 76.90 -13.63 -3.05 -3.02 0.01 0.01 40.00 40.00 8.38 8.26 Closed Valve 1/2 turn or less CDNLFG31 1/20/2022 13:19 57.90 42.10 0.00 0.00 0.73 1.16 1.18 0.70 0.80 78.00 78.00 6.14 6.54 No Change CDNLFG32 1/20/2022 13:34 59.20 40.80 0.00 0.00 -8.30 -0.44 -1.28 0.61 0.00 72.00 72.00 54.77 0.00 Opened Valve 1/2 turn or less CDNLFG33 1/20/2022 14:17 58.20 40.20 0.00 1.60 -10.63 0.12 0.06 0.31 0.52 82.00 82.00 4.05 5.25 Opened Valve 1/2 turn or less CDNLFG34 1/20/2022 14:47 58.10 40.70 0.00 1.20 -8.20 0.47 0.49 0.00 0.00 77.00 78.00 0.00 0.00 Opened Valve 1/2 turn or less CDNLFG35 1/20/2022 13:44 60.20 38.30 0.00 1.50 -3.62 -5.91 -6.02 2.58 2.10 72.00 72.00 111.15 100.22 Opened Valve 1/2 turn or less Gas Extraction Monitoring Wellfield Data City of Denton Landfill Extraction Well Data P:\O&M\City of Denton\2022\(1) January\Forms\City of Denton O&M Report January 2022.xlsx Weaver Consultants Group, LLC 1/31/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNLFG36 1/20/2022 14:25 58.50 41.50 0.00 0.00 -8.12 0.73 0.73 0.03 0.03 78.00 78.00 12.65 11.81 Opened Valve 1/2 turn or less CDNLFG37 1/20/2022 14:39 58.40 41.60 0.00 0.00 -9.45 0.08 -0.06 0.00 0.00 78.00 78.00 0.00 0.00 Opened Valve 1/2 to 1 turnCDNLFG381/20/2022 13:54 58.30 41.20 0.00 0.50 -11.76 0.05 0.02 0.02 0.04 69.00 69.00 0.32 0.41 Opened Valve 1/2 turn or less CDNLFG38 1/20/2022 14:31 59.00 40.60 0.00 0.40 -9.33 0.42 0.32 0.27 0.33 78.00 78.00 36.22 40.21 Opened Valve 1/2 turn or less CDNLFG41 1/24/2022 13:41 14.00 10.40 15.40 60.20 -10.04 -0.56 -0.54 0.02 0.00 59.00 59.00 4.35 1.22 No Change,Valve completely closed CDNLFG42 1/24/2022 13:37 37.40 32.00 0.00 30.60 -10.15 -3.16 -2.85 7.35 3.84 76.00 76.00 8.66 6.28 Closed Valve > 1 turn CDNLFG43 1/24/2022 13:28 43.90 33.30 0.00 22.80 -8.65 -8.39 -5.30 0.19 0.03 87.00 87.00 12.84 11.81 Closed Valve > 1 turn CDNHZ001 1/20/2022 17:58 49.80 33.10 0.00 17.10 -11.19 -9.88 -5.30 0.04 0.06 77.00 77.00 12.68 16.93 Closed Valve 1/2 turn or lessCDNHZ0021/20/2022 17:50 54.00 35.40 0.00 10.60 -11.09 -7.49 -7.63 0.03 0.03 71.00 71.00 12.25 12.28 Opened Valve 1/2 turn or less CDNHZ003 1/20/2022 17:41 52.50 36.20 0.00 11.30 -11.03 -5.49 -5.47 0.04 0.04 70.00 70.00 14.27 13.51 No ChangeCDNHZ0041/20/2022 17:37 0.00 0.00 20.90 0.00 -136.86 4.44 4.44 4.39 4.39 28.00 28.00 148.32 12.31 Capped CDNHZ005 1/20/2022 17:35 39.20 30.80 0.00 30.00 -11.00 -9.38 -8.82 0.25 0.04 75.00 75.00 34.44 13.73 Closed Valve 1/2 turn or less CDNHZ006 1/20/2022 17:29 29.10 24.00 2.60 44.30 -10.94 0.96 0.96 0.03 0.03 71.00 71.00 12.31 11.96 No Change,Valve completely closed CDNHZ007 1/20/2022 17:22 22.20 11.70 13.80 52.30 -10.93 -0.01 -0.03 0.02 0.02 71.00 71.00 10.27 10.67 No Change CDNHZ008 1/20/2022 17:16 39.60 34.60 0.00 25.80 -10.84 -2.27 -1.98 0.03 0.03 74.00 74.00 11.72 11.67 Closed Valve 1/2 turn or lessCDNHZ0091/20/2022 17:10 0.00 0.00 20.90 0.00 -0.71 0.02 0.01 0.03 0.03 75.00 75.00 13.00 11.40 capped CDNHZ010 1/20/2022 17:09 60.90 38.00 0.00 1.10 -9.43 -10.29 -10.37 0.15 0.25 71.00 74.00 26.50 34.15 Valve completely closedCDNHZ0111/20/2022 17:02 3.00 1.50 21.30 74.20 -10.98 0.26 0.28 0.02 0.02 76.00 76.00 9.68 9.45 No Change,Valve completely closed CDNHZ012 1/20/2022 16:58 41.90 32.50 0.50 25.10 -10.86 -10.41 -10.33 0.03 0.03 73.00 74.00 11.15 11.39 Closed Valve 1/2 turn or less CDNHZ013 1/20/2022 16:52 0.00 0.00 20.90 0.00 -0.73 0.01 0.00 0.03 0.03 32.00 32.00 12.35 11.75 Capped CDNHZ014 1/20/2022 16:50 4.80 19.00 5.70 70.50 -10.83 -0.04 0.00 0.02 0.02 74.00 74.00 10.05 10.19 cap or change well head CDNHZ015 1/20/2022 16:44 61.40 35.40 0.00 3.20 -10.94 -7.50 -7.50 0.04 0.03 74.00 72.00 13.08 11.66 Closed Valve 1/2 turn or less CDNHZ016 1/20/2022 16:37 0.00 0.00 20.90 0.00 -0.99 -0.38 0.00 0.36 0.00 71.00 71.00 42.25 42.25 Capped CDNHZ017 1/20/2022 16:32 59.40 37.50 0.00 3.10 -10.80 -6.49 -6.02 0.03 0.03 72.00 72.00 12.77 12.84 No Change CDNHZ018 1/20/2022 16:16 47.20 21.30 0.00 31.50 -10.93 1.02 1.04 0.03 0.03 74.00 75.00 11.48 11.09 No Change,Valve completely closedCDNHZ0191/20/2022 16:23 0.00 0.00 0.40 99.60 -11.14 -10.46 0.00 0.03 0.00 73.00 73.00 11.75 11.39 No Change, unable to adjust CDNHZ020 1/20/2022 16:08 62.40 37.00 0.00 0.60 -10.93 -10.39 -10.46 0.03 0.03 70.00 73.00 12.17 10.93 Closed Valve 1/2 turn or lessCDNHZ0211/20/2022 16:00 19.40 14.40 9.80 56.40 -10.91 -10.48 -10.34 0.02 0.02 70.00 70.00 9.97 9.21 Closed Valve 1/2 turn or lessCDNHZ0221/20/2022 16:03 62.20 37.70 0.00 0.10 -10.79 -0.11 -0.10 0.04 0.04 70.00 70.00 14.45 13.56 Opened Valve 1/2 turn or less CDNHZ023 1/20/2022 15:49 59.90 40.10 0.00 0.00 -10.95 -10.40 -10.42 0.03 0.04 37.00 37.00 12.83 14.58 No Change CDNHZ025 1/20/2022 15:40 60.90 38.70 0.00 0.40 -10.88 -10.32 -10.50 0.05 0.04 75.00 75.00 15.89 14.36 No Change CDNHZ026 1/20/2022 15:35 67.90 28.60 0.00 3.50 -10.95 1.45 -0.64 0.03 0.03 78.00 78.00 12.92 11.93 Opened Valve 1/2 turn or less CDNHZ027 1/20/2022 15:32 0.00 0.00 20.90 0.00 -0.99 -0.02 -0.10 0.04 0.04 31.00 31.00 10.13 11.64 No Change, Capped and Abandoned CDNHZ028 1/20/2022 15:32 0.00 0.00 20.90 0.00 -0.99 -0.02 -0.10 0.04 0.04 31.00 31.00 14.86 11.39 No Change, Capped and Abandoned CDNHZ029 1/20/2022 15:28 70.50 29.30 0.00 0.20 -10.91 5.80 5.81 0.03 0.03 82.00 84.00 12.24 11.76 Opened Valve 1/2 turn or lessCDNHZ0301/20/2022 15:24 61.70 36.80 0.00 1.50 -10.93 6.10 3.53 0.04 0.03 79.00 79.00 13.31 12.71 Opened Valve 1/2 turn or less CDNHZ031 1/20/2022 15:18 8.00 22.10 5.60 64.30 -10.81 1.98 1.98 0.02 0.02 71.00 71.00 10.60 9.48 Opened Valve 1/2 turn or less CDNHZ032 1/20/2022 15:14 61.80 37.40 0.00 0.80 -10.83 6.41 4.86 0.03 0.03 78.00 80.00 13.05 11.84 Opened Valve 1/2 turn or less CDNHZ033 1/20/2022 15:08 33.40 23.20 4.90 38.50 -10.77 1.10 1.10 0.02 0.03 89.00 89.00 10.13 11.64 No Change,Valve completely closed Horizontal Well Data P:\O&M\City of Denton\2022\(1) January\Forms\City of Denton O&M Report January 2022.xlsx Weaver Consultants Group, LLC 1/31/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCGCH4 2/14/2022 9:09 50.00 35.20 0.00 14.80 0.00 -0.01 -0.02 0.01 0.01 102.80 102.90 NR NR Calibration Gas CDNCG002 2/14/2022 9:11 0.00 0.00 10.70 89.30 0.00 0.01 0.01 0.00 0.00 103.30 103.50 NR NR Calibration Gas CDNINLT1 2/14/2022 9:19 34.60 25.10 6.70 33.60 0.00 -17.94 -17.93 17.89 17.90 60.00 60.00 1015.00 1015.00 Flare Inlet CDNBLWR1 2/14/2022 9:21 34.30 24.90 6.70 34.10 0.01 3.96 4.03 0.00 0.00 87.00 87.00 1015.00 1015.00 Flare Blower CDN00GHG 2/14/2022 9:22 34.40 25.40 6.70 33.50 0.00 3.97 3.97 0.00 0.00 87.00 87.00 NR NR Flare GHGCDNCGCH42/15/2022 7:58 49.90 35.10 0.00 15.00 -0.01 -0.02 -0.01 0.02 0.02 98.30 98.60 NR NR Calibration Gas CDNCG002 2/15/2022 8:00 0.00 0.00 10.90 89.10 -0.01 0.01 0.01 0.00 0.00 99.10 99.30 NR NR Calibration Gas CDNCGCH4 2/15/2022 10:30 50.00 35.00 0.00 15.00 0.00 0.00 -0.01 0.01 0.01 85.40 85.20 NR NR Calibration Gas CDNCG002 2/15/2022 10:32 0.00 0.00 10.80 89.20 0.00 0.03 0.03 0.00 0.00 85.60 84.90 NR NR Calibration Gas CDNINLT2 2/15/2022 10:36 36.70 25.50 6.40 31.40 0.00 -17.95 -18.09 18.08 18.24 62.00 62.00 1010.00 1010.00 Flare InletCDNBLWR22/15/2022 10:38 36.50 25.30 6.30 31.90 0.00 3.99 3.93 0.00 0.00 84.00 84.00 1010.00 1010.00 Flare Blower CDNGW040 2/15/2022 9:17 3.90 2.70 21.10 72.30 -12.35 -11.90 -11.88 0.07 0.03 59.20 60.50 18.55 12.22 No Change,Valve completely closedCDNGW0442/14/2022 13:44 52.00 38.90 0.00 9.10 -6.54 -2.38 -2.40 2.40 2.36 95.30 95.30 4.88 4.85 No ChangeCDNGW0452/14/2022 14:18 43.20 34.80 0.00 22.00 -10.46 -0.45 -0.39 0.04 0.01 87.20 87.20 2.67 1.15 Closed Valve 1/2 turn or lessCDNGW0462/14/2022 14:22 50.20 37.20 0.00 12.60 -6.63 -4.44 -4.43 0.00 0.01 95.20 95.10 0.00 4.76 No ChangeCDNGW0472/14/2022 14:56 36.20 27.60 5.20 31.00 -11.84 -9.54 -6.79 0.02 0.10 79.50 79.50 1.07 2.33 Closed Valve 1/2 turn or less,Valve CDNGW048 2/14/2022 14:59 49.90 38.70 0.00 11.40 -11.19 -9.04 -8.93 1.98 2.25 93.50 93.50 10.03 10.68 No ChangeCDNGW0492/14/2022 15:38 0.80 0.60 22.00 76.60 0.26 -0.03 0.01 0.01 0.01 76.20 75.60 4.70 8.14 No ChangeCDNGW0502/14/2022 15:01 56.40 39.00 0.00 4.60 -10.12 -8.75 -8.84 9.20 9.39 92.60 92.70 39.24 39.64 No ChangeCDNGW0512/14/2022 15:18 57.90 39.00 0.00 3.10 -7.61 -0.58 -0.57 8.37 7.62 86.90 87.10 20.84 19.89 No ChangeCDNGW0522/14/2022 15:42 58.80 38.50 0.00 2.70 -8.42 1.44 1.39 0.23 0.10 76.70 77.60 6.48 4.15 Opened Valve 1/2 turn or lessCDNGW0542/14/2022 15:37 1.30 0.50 21.80 76.40 0.36 0.00 -0.02 0.00 0.01 73.40 73.70 0.00 4.71 No ChangeCDNGW0552/14/2022 15:31 60.70 36.40 0.00 2.90 1.54 4.68 4.71 0.07 0.04 78.20 78.20 0.86 0.62 No ChangeCDNGW0562/14/2022 15:26 57.60 38.70 0.00 3.70 -1.31 5.13 5.18 0.06 0.02 79.90 80.40 17.22 10.95 No ChangeCDNGW0572/14/2022 15:29 58.00 38.80 0.00 3.20 3.93 3.73 3.73 0.05 0.05 80.70 80.60 1.69 1.69 No ChangeCDNGW0582/15/2022 8:45 58.60 39.00 0.00 2.40 4.36 3.97 3.97 0.09 0.08 73.20 73.40 8.96 8.29 No ChangeCDNGW0592/15/2022 8:44 0.80 0.40 22.00 76.80 0.07 -0.05 -0.04 0.04 0.03 49.50 50.00 1.46 1.24 No ChangeCDNGW0602/15/2022 8:42 56.40 38.60 0.00 5.00 0.33 0.35 0.36 0.05 0.04 62.90 63.00 1.63 1.44 No ChangeCDNGW0612/15/2022 8:40 0.10 0.00 21.90 78.00 0.01 -0.03 -0.03 0.03 0.03 51.10 51.10 5.27 5.28 No ChangeCDNGW0622/15/2022 8:48 58.80 37.50 0.00 3.70 -0.01 2.05 2.06 0.04 0.04 53.50 53.70 2.86 2.55 No Change,Valve completely closedCDNGW0632/15/2022 9:34 57.60 36.10 0.00 6.30 -2.32 3.69 3.71 0.05 0.03 61.80 62.00 15.70 11.77 No ChangeCDNGW0642/14/2022 15:22 57.30 40.10 0.00 2.60 -0.05 4.13 4.14 0.35 0.29 84.20 84.20 7.91 7.16 No ChangeCDNGW0652/14/2022 15:20 0.70 0.50 21.90 76.90 0.30 -0.07 -0.16 0.00 0.00 72.10 71.10 0.00 0.00 No ChangeCDNGW0662/14/2022 15:04 57.20 39.70 0.00 3.10 -10.00 -9.63 -8.75 0.04 0.13 78.70 78.80 5.55 10.74 No ChangeCDNGW0672/14/2022 14:51 51.10 37.80 0.00 11.10 -9.40 -8.91 -8.75 0.39 0.25 73.10 74.70 18.55 14.72 No ChangeCDNGW0682/14/2022 14:25 49.10 35.20 1.70 14.00 -9.19 -4.67 -4.67 0.13 0.13 83.20 83.20 7.88 7.88 No ChangeCDNGW0742/14/2022 13:35 20.00 19.50 5.90 54.60 -7.47 -0.10 -0.09 0.03 0.04 74.90 75.00 0.33 0.38 No Change,Valve completely closed Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data P:\O&M\City of Denton\2022\(2) February\Forms\City of Denton O&M Report February 2022 Weaver Consultants Group, LLC GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW075 2/14/2022 13:32 36.80 31.00 0.00 32.20 -8.19 -1.27 -1.15 0.50 0.22 96.00 95.60 5.08 3.37 Closed Valve 1/2 turn or less CDNGW076 2/14/2022 13:18 59.10 37.50 0.00 3.40 -8.37 0.11 0.05 0.02 0.02 74.40 76.00 9.60 9.95 Opened Valve 1/2 turn or less CDNGW077 2/14/2022 13:14 59.20 38.00 0.00 2.80 0.34 0.79 0.79 0.01 0.01 72.20 72.30 3.30 3.40 No ChangeCDNGW0782/14/2022 14:00 54.40 32.70 1.80 11.10 2.67 0.28 0.30 0.04 0.03 75.40 75.40 0.64 0.59 No Change CDNGW079 2/14/2022 13:57 41.10 32.90 0.00 26.00 -8.42 -2.72 -2.16 0.74 0.03 98.80 97.60 6.15 1.13 Closed Valve 1/2 turn or less CDNGW080 2/14/2022 14:03 43.80 34.20 0.20 21.80 -10.20 -1.79 -1.57 1.77 1.56 101.30 100.70 38.73 36.40 Closed Valve 1/2 turn or lessCDNGW0812/14/2022 13:52 18.30 14.80 11.50 55.40 -8.52 -0.63 -0.61 0.04 0.02 75.50 75.70 0.39 0.29 No Change,Valve completely closed CDNGW082 2/14/2022 14:08 49.60 37.00 0.00 13.40 -6.37 -4.61 -4.62 0.17 0.17 103.30 103.40 11.78 12.11 No ChangeCDNGW0832/14/2022 13:48 29.50 29.50 0.00 41.00 -10.00 -3.81 -3.86 0.19 0.38 95.70 95.00 9.40 13.45 Closed Valve 1/2 turn or less CDNGW084 2/14/2022 14:10 52.50 37.30 0.00 10.20 -11.03 -4.00 -4.04 0.67 0.86 97.80 97.80 5.86 6.62 Opened Valve 1/2 turn or less CDNGW085 2/14/2022 13:42 31.50 29.40 0.00 39.10 -10.69 -4.77 -3.89 4.70 3.69 96.90 96.10 62.99 55.96 Closed Valve 1/2 turn or lessCDNGW0862/14/2022 13:39 31.70 21.20 8.70 38.40 -8.36 -0.34 -0.34 0.03 0.03 74.90 75.00 4.84 4.82 No Change,Valve completely closed CDNGW087 2/14/2022 14:14 35.50 32.60 0.00 31.90 -9.77 -2.47 -2.14 0.35 0.48 91.90 91.80 4.25 4.97 Closed Valve 1/2 turn or lessCDNGW0882/14/2022 14:28 37.80 32.60 0.00 29.60 -9.62 -2.01 -1.74 2.00 1.77 97.20 96.80 30.75 28.92 Closed Valve 1/2 turn or lessCDNGW0892/14/2022 14:32 2.80 2.40 19.90 74.90 -3.81 -0.79 -0.71 0.02 0.00 72.80 73.90 9.21 0.00 No Change,Valve completely closed CDNGW090 2/14/2022 14:34 0.20 0.10 22.20 77.50 -1.71 -0.35 -0.30 0.33 0.27 74.70 74.60 17.11 15.52 No Change,Valve completely closedCDNGW0912/14/2022 14:37 51.10 36.80 0.00 12.10 -8.27 -0.96 -0.94 0.04 0.02 105.40 105.30 4.44 2.70 No Change CDNGW092 2/14/2022 14:47 48.10 37.30 0.00 14.60 -7.49 -5.85 -5.40 0.26 0.08 104.00 104.10 36.05 19.27 No Change CDNGW093 2/14/2022 14:44 35.10 32.30 0.00 32.60 -7.55 -2.96 -2.68 2.43 2.61 102.40 102.10 33.67 34.89 Closed Valve 1/2 turn or lessCDNGW0942/14/2022 14:41 41.60 33.20 0.00 25.20 -6.37 -0.91 -0.85 0.03 0.01 96.10 95.80 5.28 3.53 No Change CDNGW095 2/15/2022 9:41 56.50 36.90 0.40 6.20 -1.04 -1.04 -1.02 0.05 0.04 64.80 65.10 16.32 14.20 No Change CDNGW096 2/15/2022 9:44 56.50 38.50 0.00 5.00 -6.74 -5.09 -5.09 1.06 1.04 56.40 56.80 31.18 30.86 No ChangeCDNGW0972/15/2022 9:47 55.50 39.00 0.00 5.50 -6.56 -5.78 -5.73 0.02 0.02 111.30 111.30 9.76 9.57 No Change CDNGW098 2/15/2022 9:50 55.70 38.20 0.00 6.10 -7.33 -5.10 -5.10 0.95 0.75 111.40 111.40 28.06 24.86 No Change CDNGW099 2/14/2022 15:07 56.60 39.30 0.00 4.10 1.02 0.75 0.77 0.81 0.81 77.10 77.20 19.99 20.05 No ChangeCDNGW1002/14/2022 15:09 56.40 40.20 0.00 3.40 1.71 1.46 1.50 0.05 0.03 77.80 77.80 4.73 3.86 No Change CDNGW101 2/14/2022 15:11 56.70 40.10 0.00 3.20 1.37 1.39 1.39 0.04 0.02 77.70 77.70 5.63 4.02 No Change CDNGW102 2/14/2022 15:15 57.30 38.90 0.00 3.80 4.45 3.99 4.10 0.17 0.04 79.30 79.50 0.84 0.41 No ChangeCDNGW1062/14/2022 13:25 0.10 1.30 21.80 76.80 0.09 -0.01 -0.01 0.02 0.01 72.90 73.20 3.12 2.45 No Change,Valve completely closed CDNGW107 2/14/2022 13:10 57.20 40.70 0.00 2.10 -9.31 0.77 0.67 0.02 0.01 74.50 72.60 4.45 3.18 Opened Valve 1/2 turn or less CDNGW108 2/14/2022 13:08 56.60 41.00 0.00 2.40 -9.71 0.73 0.57 0.02 0.07 76.80 77.40 1.90 3.41 Opened Valve 1/2 turn or lessCDNGW1092/14/2022 13:05 56.30 40.60 0.00 3.10 -9.94 -0.97 -1.09 0.29 0.46 116.50 116.60 11.49 14.55 Opened Valve 1/2 turn or less CDNGW110 2/14/2022 13:01 56.50 40.80 0.00 2.70 -10.65 -0.67 -0.79 0.38 0.40 115.20 115.30 17.73 18.20 No Change CDNGW111 2/14/2022 12:57 56.20 40.20 0.00 3.60 -10.41 -0.55 -1.05 0.10 0.53 113.90 114.30 9.21 21.01 Opened Valve 1/2 turn or lessCDNGW1122/14/2022 12:53 58.30 39.80 0.00 1.90 -11.02 0.17 0.01 0.02 0.03 75.80 74.90 1.64 2.16 Opened Valve 1/2 turn or less CDNGW113 2/14/2022 12:46 49.10 37.90 0.00 13.00 -11.27 -0.37 -0.37 0.25 0.53 109.30 109.30 6.43 9.42 No ChangeCDNGW1142/14/2022 12:44 50.00 38.20 0.00 11.80 -11.23 -1.19 -1.19 1.75 1.74 115.00 115.10 17.06 16.98 No Change CDNGW115 2/14/2022 12:40 46.70 36.70 0.00 16.60 -11.14 -1.49 -1.42 1.25 1.12 109.90 109.70 24.03 22.73 Closed Valve 1/2 turn or less CDNGW116 2/14/2022 12:38 44.50 35.20 0.00 20.30 -11.27 -0.51 -0.41 0.81 0.48 108.90 108.70 19.36 14.96 Closed Valve 1/2 turn or lessCDNGW1172/14/2022 12:32 48.00 36.30 0.00 15.70 -10.92 -0.51 -0.50 0.91 0.68 109.40 109.40 12.34 10.65 No Change P:\O&M\City of Denton\2022\(2) February\Forms\City of Denton O&M Report February 2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW118 2/14/2022 12:27 0.10 0.80 21.50 77.60 -10.52 -0.12 -0.09 0.01 0.01 74.80 75.00 1.34 1.15 No Change,Valve completely closed CDNGW118 2/14/2022 12:35 45.70 36.00 0.00 18.30 -11.27 -1.19 -1.06 2.28 1.54 105.90 105.50 19.60 16.15 Opened Valve 1/2 turn or less CDNGW119R 2/14/2022 12:30 56.70 39.90 0.00 3.40 -10.97 -10.35 -10.36 0.41 0.41 80.40 80.60 2.04 2.02 Opened Valve 1/2 turn or lessCDNGW120R2/14/2022 12:24 0.30 0.20 21.90 77.60 -10.97 -6.46 -6.38 0.01 0.01 76.70 76.80 0.24 0.23 Closed Valve 1/2 turn or less,Valve CDNGW121R 2/14/2022 12:20 4.00 2.50 20.50 73.00 -10.80 15.76 15.68 0.04 0.00 76.90 77.20 14.26 3.67 No Change,Valve completely closed CDNGW122R 2/14/2022 12:17 0.50 0.30 21.90 77.30 -10.71 -6.61 -6.56 0.00 0.00 76.10 76.20 4.41 2.79 Closed Valve 1/2 turn or less,Valve CDNGW123R 2/14/2022 12:09 57.00 38.40 0.00 4.60 -10.72 6.20 -10.31 0.02 0.01 79.30 83.10 9.05 7.13 Opened Valve 1/2 turn or less CDNGW124R 2/14/2022 12:11 5.80 15.80 6.10 72.30 -10.59 5.27 5.30 0.02 0.01 80.10 80.70 9.91 5.17 Closed Valve 1/2 turn or less,Valve CDNGW125R 2/14/2022 12:13 22.80 15.20 13.50 48.50 -10.85 -10.85 -10.80 0.02 0.00 75.50 75.40 9.89 4.12 Closed Valve 1/2 to 1 turn DEWLCR3 2/14/2022 13:21 3.60 12.00 14.90 69.50 0.09 -0.04 -0.04 0.03 0.04 73.60 73.80 5.54 5.93 No Change,Valve completely closed DEWLCR4 2/14/2022 12:01 56.80 41.50 0.00 1.70 -1.18 -1.10 -1.09 0.18 0.13 79.60 79.70 30.37 26.43 No ChangeDEWLCR52/15/2022 9:56 56.90 37.70 0.00 5.40 -14.07 -0.09 -0.14 2.76 4.74 74.60 74.50 12.15 15.92 Opened Valve 1/2 turn or less Notes: 1)Methane readings shaded orange are < 48%, and red are ≥ 58%.2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5)Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6)Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =77 Number of Wells with Methane > 58%=7 Total Number of Well Readings =77 Number of Wells with Oxygen ≥ 2%=20 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =14 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =23Number of Wells with No Room to Run (NRTR)=42 P:\O&M\City of Denton\2022\(2) February\Forms\City of Denton O&M Report February 2022 Weaver Consultants Group, LLC GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNSV001 2/14/2022 11:44 2.60 15.00 5.20 77.20 -6.99 -6.95 -7.00 0.02 0.02 68.80 68.60 10.05 8.35 No Change CDNSV002 2/14/2022 11:50 5.80 17.70 3.30 73.20 -7.18 -7.05 -7.05 0.10 0.06 76.90 76.80 21.40 16.43 No ChangeCDNSV0032/14/2022 11:53 35.90 30.30 0.50 33.30 -7.18 -7.14 -7.10 0.09 0.09 67.20 66.90 20.83 20.31 No Change CDNSV004 2/14/2022 11:55 25.90 22.10 0.40 51.60 -7.18 -7.22 -7.01 0.13 0.07 72.00 71.90 24.96 17.96 No Change CDNSV005 2/14/2022 11:57 4.70 2.20 20.20 72.90 -7.18 -7.05 -7.20 0.05 0.08 71.50 70.90 15.39 19.32 No ChangeCDNSV0062/14/2022 11:42 0.10 0.80 20.60 78.50 -7.20 -7.11 -6.42 0.28 0.28 60.30 60.30 37.11 36.78 No Change CDNSV007 2/14/2022 11:39 0.00 0.50 21.00 78.50 -7.08 -7.05 -6.95 0.14 0.14 62.70 62.60 25.98 25.77 No Change CDNSV008 2/14/2022 11:26 0.00 1.10 20.40 78.50 -7.12 -7.05 -7.05 0.10 0.07 63.50 63.50 22.34 18.30 No Change CDNSV009 2/14/2022 11:21 0.30 0.50 21.70 77.50 -7.18 -7.05 -6.88 0.04 0.10 61.50 61.00 13.52 21.90 No Change CDNSV010 2/14/2022 11:18 6.00 18.10 3.10 72.80 -7.18 -7.18 -7.14 0.05 0.00 70.10 70.40 15.86 0.00 No ChangeCDNSV0112/14/2022 11:14 11.40 20.30 3.60 64.70 -7.18 -7.22 -7.05 0.10 0.05 73.30 73.20 21.21 15.24 No Change CDNSV012 2/14/2022 11:08 19.50 19.10 5.90 55.50 -7.18 -7.05 -7.22 0.05 0.06 72.50 72.70 14.66 16.38 No Change CDNSV013 2/14/2022 11:05 8.10 5.20 18.50 68.20 -7.18 -7.05 -6.71 0.05 0.05 76.80 77.30 15.31 15.77 No ChangeCDNSV0142/14/2022 11:02 41.30 30.00 2.30 26.40 -7.16 -7.23 -6.88 0.06 0.05 72.70 73.00 17.30 16.06 No Change Soil Vapor Extraction Well Data P:\O&M\City of Denton\2022\(2) February\Forms\City of Denton O&M Report February 2022 Weaver Consultants Group, LLC GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNLFG02 2/14/2022 10:46 56.90 39.90 0.00 3.20 -12.93 -2.96 -3.77 0.11 0.14 75.20 75.20 22.96 25.74 Opened Valve 1/2 turn or lessCDNLFG032/14/2022 10:41 54.60 39.80 0.00 5.60 -12.82 -1.73 -1.88 1.10 1.87 78.70 78.60 3.36 4.38 Opened Valve 1/2 turn or lessCDNLFG052/14/2022 10:48 45.30 36.60 0.00 18.10 -12.89 -3.72 -3.60 0.11 0.08 86.80 86.80 22.36 19.34 Closed Valve 1/2 turn or lessCDNLFG062/14/2022 10:34 0.40 0.40 22.30 76.90 -12.70 -0.87 -0.86 0.00 0.00 61.50 62.00 0.06 0.08 No Change,Valve completely closedCDNLFG072/14/2022 10:28 55.10 39.60 0.00 5.30 -12.40 -1.82 -1.90 0.04 0.14 89.60 89.70 13.78 25.63 Opened Valve 1/2 turn or lessCDNLFG082/14/2022 10:26 52.90 38.20 1.10 7.80 0.00 -0.13 -0.13 0.01 0.01 63.70 63.90 0.14 0.15 No ChangeCDNLFG162/14/2022 10:23 57.50 39.60 0.00 2.90 0.03 0.68 0.68 0.01 0.01 66.80 67.00 0.19 0.18 No Change CDNLFG17 2/14/2022 10:20 56.40 40.50 0.00 3.10 0.01 0.18 0.18 0.02 0.02 70.70 71.00 8.75 8.75 No Change,Valve completely closed CDNLFG18 2/14/2022 10:18 42.50 34.60 0.80 22.10 -12.44 -0.03 -0.03 0.01 0.01 70.10 70.40 8.19 7.22 No Change CDNLFG19 2/14/2022 10:31 54.40 38.90 0.00 6.70 -12.38 -0.98 -0.99 1.07 1.47 69.70 69.80 2.14 2.51 Opened Valve 1/2 turn or less CDNLFG20 2/14/2022 10:15 53.50 37.40 0.00 9.10 -13.00 -3.30 -3.82 0.04 0.06 74.50 75.10 13.75 16.69 Opened Valve 1/2 turn or less CDNLFG21 2/14/2022 10:12 54.00 38.30 0.00 7.70 -13.17 -5.16 -5.29 0.08 0.07 82.40 82.50 18.84 18.52 Opened Valve 1/2 turn or less CDNLFG22 2/14/2022 10:02 41.70 33.50 0.00 24.80 -13.13 -5.01 -4.92 0.06 0.03 82.40 81.80 17.17 12.22 Closed Valve 1/2 turn or less CDNLFG23 2/14/2022 10:37 21.10 26.80 1.80 50.30 -13.00 -0.85 -0.83 0.01 0.01 68.80 68.90 0.23 0.21 No Change,Valve completely closed CDNLFG24 2/14/2022 9:59 38.80 33.30 0.00 27.90 -13.34 -0.64 -0.64 0.24 0.20 70.00 69.90 1.59 1.44 No Change CDNLFG25 2/14/2022 9:56 56.00 33.50 1.70 8.80 -13.34 -13.17 -13.17 0.06 0.05 75.40 76.00 15.99 15.32 No Change CDNLFG26 2/14/2022 9:49 46.60 39.40 0.00 14.00 -13.32 -2.94 -2.82 0.46 0.68 98.60 98.50 46.02 55.94 Closed Valve 1/2 turn or less CDNLFG27 2/14/2022 9:53 33.70 32.60 0.00 33.70 -13.34 -9.38 -9.30 0.80 0.56 65.80 65.90 1.84 1.54 Closed Valve 1/2 turn or less CDNLFG28 2/14/2022 9:43 0.70 0.50 22.10 76.70 -13.35 -0.76 -0.76 0.00 0.00 63.50 63.80 0.00 0.00 No Change,Valve completely closed CDNLFG29 2/14/2022 9:29 45.20 36.70 0.00 18.10 -12.82 -6.57 -6.02 0.55 0.29 79.80 79.70 50.88 37.24 Closed Valve 1/2 turn or less CDNLFG30 2/14/2022 9:46 10.20 8.20 18.20 63.40 -12.76 -0.72 -0.72 0.01 0.01 67.70 68.30 6.96 5.57 No Change,Valve completely closed CDNLFG31 2/15/2022 9:02 49.80 39.40 0.00 10.80 -12.84 -7.10 -7.10 2.49 2.56 89.10 89.20 11.30 11.47 No Change CDNLFG32 2/15/2022 9:06 9.80 20.50 3.60 66.10 -8.44 -0.72 -0.59 0.00 0.00 68.20 68.00 0.00 0.00 Closed Valve 1/2 turn or less,Valve CDNLFG33 2/15/2022 8:59 56.30 41.50 0.00 2.20 -12.38 -0.82 -0.94 0.43 0.86 71.80 71.90 4.79 6.80 Opened Valve 1/2 turn or less CDNLFG34 2/15/2022 9:26 57.20 40.80 0.00 2.00 -8.89 -0.16 -0.17 0.21 0.29 67.20 67.90 3.38 4.00 Opened Valve 1/2 turn or less CDNLFG35 2/15/2022 9:09 55.30 40.60 0.00 4.10 -12.60 -8.50 -8.74 0.00 0.00 59.80 60.00 0.00 0.00 Opened Valve 1/2 turn or less CDNLFG36 2/15/2022 8:56 50.20 36.60 2.50 10.70 -4.28 -0.04 -0.04 0.03 0.02 59.40 59.40 12.22 10.31 No ChangeCDNLFG372/15/2022 9:19 56.10 42.40 0.00 1.50 -12.13 -0.92 -1.06 0.00 0.00 82.50 82.80 0.00 0.00 Opened Valve 1/2 turn or less Gas Extraction Monitoring Wellfield Data City of Denton Landfill Extraction Well Data P:\O&M\City of Denton\2022\(2) February\Forms\City of Denton O&M Report February 2022 Weaver Consultants Group, LLC GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNLFG38 2/15/2022 8:53 57.40 39.50 0.00 3.10 -12.09 -0.15 -0.34 0.06 0.15 80.60 80.90 17.40 27.18 Opened Valve 1/2 turn or less CDNLFG38 2/15/2022 9:14 28.80 27.10 2.70 41.40 -11.97 -0.12 -0.07 0.06 0.04 68.20 68.20 0.51 0.39 Closed Valve 1/2 turn or less CDNLFG39 2/15/2022 9:23 57.30 39.20 0.00 3.50 -11.54 -0.74 -1.01 0.18 0.27 81.70 81.90 29.70 36.32 Opened Valve 1/2 turn or lessCDNLFG412/14/2022 15:55 53.20 33.50 0.00 13.30 -11.44 0.06 0.05 0.05 0.01 77.20 77.00 6.61 3.54 Opened Valve 1/2 turn or less CDNLFG42 2/14/2022 15:52 42.50 33.60 0.00 23.90 -11.39 -1.95 -1.76 5.60 3.27 76.60 76.60 7.58 5.81 Closed Valve 1/2 turn or less CDNLFG43 2/14/2022 15:48 49.40 35.90 0.00 14.70 -8.64 -4.76 -4.76 0.02 0.04 86.80 86.80 4.07 5.51 No Change CDNHZ001 2/14/2022 15:59 59.70 34.30 0.00 6.00 -11.44 0.83 -1.43 0.04 0.02 81.20 81.50 14.70 10.60 Opened Valve 1/2 turn or lessCDNHZ0022/14/2022 16:05 53.30 33.60 0.00 13.10 -11.29 -7.67 -7.78 0.07 0.06 73.80 73.90 17.85 16.35 Opened Valve 1/2 turn or less CDNHZ003 2/14/2022 16:08 50.30 34.40 0.60 14.70 -11.05 -5.01 -5.10 0.05 0.04 74.00 74.10 15.19 14.46 No Change CDNHZ005 2/14/2022 16:14 38.50 30.10 0.00 31.40 -11.29 -9.72 -9.49 0.07 0.05 76.00 76.10 18.55 14.99 No ChangeCDNHZ0062/14/2022 16:17 21.40 21.00 3.50 54.10 -11.54 1.51 1.53 0.02 0.01 82.70 82.60 10.83 7.16 No Change,Valve completely closed CDNHZ007 2/14/2022 16:19 48.50 26.80 2.20 22.50 -11.49 0.18 -0.47 0.04 0.00 79.00 81.10 13.58 0.00 Opened Valve 1/2 turn or lessCDNHZ0082/14/2022 16:21 43.00 27.00 3.20 26.80 -11.31 0.27 -0.12 0.06 0.01 79.10 80.60 16.36 8.01 Opened Valve 1/2 turn or lessCDNHZ0102/14/2022 16:33 56.60 37.70 0.00 5.70 -11.35 -9.47 -9.82 0.00 0.00 74.90 74.80 0.00 0.00 Opened Valve 1/2 turn or less CDNHZ011 2/14/2022 16:36 4.20 1.40 21.20 73.20 -11.38 -0.06 -0.05 0.00 0.00 81.40 81.70 0.00 0.00 No Change,Valve completely closedCDNHZ0122/14/2022 16:39 13.30 10.40 14.10 62.20 -11.68 -9.43 -9.46 0.04 0.04 82.00 82.60 14.20 14.07 No Change CDNHZ014 2/14/2022 16:44 37.50 32.70 0.00 29.80 -11.54 -1.97 -1.97 0.01 0.02 80.90 74.50 5.42 8.55 No Change CDNHZ015 2/14/2022 16:50 56.20 37.90 0.10 5.80 -11.58 -8.40 -8.42 0.07 0.04 75.00 75.30 17.91 13.74 No ChangeCDNHZ0172/14/2022 16:53 57.50 38.90 0.00 3.60 -11.35 0.32 -1.07 0.03 0.01 80.70 80.50 11.79 6.92 Opened Valve 1/2 turn or lessCDNHZ0182/14/2022 16:57 38.40 20.00 0.00 41.60 -11.60 1.47 0.69 0.01 0.00 77.10 78.30 5.93 0.00 Opened Valve 1/2 turn or less CDNHZ019 2/14/2022 16:59 54.60 37.30 0.00 8.10 -11.40 -11.22 -11.23 0.05 0.05 75.10 75.00 15.52 15.56 No ChangeCDNHZ0202/14/2022 17:04 58.00 38.70 0.00 3.30 -11.40 -11.22 -11.33 0.06 0.05 72.10 72.10 16.00 15.82 No Change CDNHZ021 2/14/2022 17:08 17.40 13.50 5.30 63.80 -11.16 -1.35 -1.33 0.03 0.00 80.90 81.20 11.74 0.00 Closed Valve 1/2 turn or less,Valve CDNHZ022 2/14/2022 17:10 57.90 38.30 0.00 3.80 -11.65 1.27 1.14 0.04 0.01 77.50 77.70 13.86 6.43 Opened Valve 1/2 turn or lessCDNHZ0232/14/2022 17:15 54.80 37.80 0.70 6.70 -11.63 -11.56 -11.39 0.09 0.08 77.60 77.90 20.48 19.35 No Change CDNHZ025 2/14/2022 17:20 56.40 39.20 0.00 4.40 -11.61 -11.56 -11.56 0.03 0.04 73.50 73.50 12.26 12.95 No Change CDNHZ026 2/14/2022 17:22 58.40 38.80 0.00 2.80 -11.57 0.20 -0.10 0.03 0.00 79.40 80.40 11.95 0.99 Opened Valve 1/2 turn or lessCDNHZ0292/14/2022 17:28 67.10 29.20 0.00 3.70 -11.30 8.16 -3.06 0.02 0.00 74.30 73.90 9.40 0.00 Opened Valve 1/2 turn or lessCDNHZ0302/14/2022 17:32 58.90 38.40 0.00 2.70 -11.57 6.44 3.26 0.00 0.00 77.60 80.10 0.00 0.00 Opened Valve 1/2 turn or less CDNHZ031 2/14/2022 17:37 5.30 20.70 6.00 68.00 -11.40 1.72 1.71 0.01 0.00 72.50 72.60 7.97 0.00 No Change,Valve completely closedCDNHZ0322/14/2022 17:42 55.30 41.20 0.00 3.50 -11.76 7.52 3.28 0.12 0.00 71.90 72.90 24.40 0.00 Opened Valve 1/2 turn or less CDNHZ033 2/14/2022 17:44 32.90 23.90 4.50 38.70 -11.72 3.19 3.17 0.06 0.00 74.90 75.30 17.88 0.00 No Change CDNHZ034 2/14/2022 17:48 55.40 37.50 0.00 7.10 -11.63 -11.56 -11.56 0.04 0.02 70.60 70.50 13.52 9.18 No ChangeCDNHZ0352/14/2022 17:51 57.10 38.40 0.00 4.50 -11.62 0.73 0.20 0.02 0.00 72.00 75.00 8.63 0.00 Opened Valve 1/2 turn or less CDNHZ036 2/14/2022 17:55 55.30 38.10 0.20 6.40 -11.42 -8.86 -9.94 0.09 0.04 69.90 69.50 20.07 13.07 Opened Valve 1/2 turn or lessNotes:1)Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. Horizontal Well Data P:\O&M\City of Denton\2022\(2) February\Forms\City of Denton O&M Report February 2022 Weaver Consultants Group, LLC GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCGCH4 2/14/2022 9:09 50.00 35.20 0.00 14.80 0.00 -0.01 -0.02 0.01 0.01 102.80 102.90 NR NR Calibration Gas CDNCG002 2/14/2022 9:11 0.00 0.00 10.70 89.30 0.00 0.01 0.01 0.00 0.00 103.30 103.50 NR NR Calibration Gas CDNINLT1 2/14/2022 9:19 34.60 25.10 6.70 33.60 0.00 -17.94 -17.93 17.89 17.90 60.00 60.00 1015.00 1015.00 Flare Inlet CDNBLWR1 2/14/2022 9:21 34.30 24.90 6.70 34.10 0.01 3.96 4.03 0.00 0.00 87.00 87.00 1015.00 1015.00 Flare Blower CDN00GHG 2/14/2022 9:22 34.40 25.40 6.70 33.50 0.00 3.97 3.97 0.00 0.00 87.00 87.00 NR NR Flare GHG CDNCGCH4 2/15/2022 7:58 49.90 35.10 0.00 15.00 -0.01 -0.02 -0.01 0.02 0.02 98.30 98.60 NR NR Calibration Gas CDNCG002 2/15/2022 8:00 0.00 0.00 10.90 89.10 -0.01 0.01 0.01 0.00 0.00 99.10 99.30 NR NR Calibration Gas CDNCGCH4 2/15/2022 10:30 50.00 35.00 0.00 15.00 0.00 0.00 -0.01 0.01 0.01 85.40 85.20 NR NR Calibration Gas CDNCG002 2/15/2022 10:32 0.00 0.00 10.80 89.20 0.00 0.03 0.03 0.00 0.00 85.60 84.90 NR NR Calibration Gas CDNINLT2 2/15/2022 10:36 36.70 25.50 6.40 31.40 0.00 -17.95 -18.09 18.08 18.24 62.00 62.00 1010.00 1010.00 Flare Inlet CDNBLWR2 2/15/2022 10:38 36.50 25.30 6.30 31.90 0.00 3.99 3.93 0.00 0.00 84.00 84.00 1010.00 1010.00 Flare Blower CDNGW040 3/3/2022 12:45 31.80 21.90 9.90 36.40 -9.57 -9.41 -9.48 0.19 0.18 81.30 81.70 29.91 29.13 No Change CDNGW044 3/3/2022 10:32 52.30 37.10 0.80 9.80 -6.87 -2.58 -2.48 2.58 2.49 95.00 95.00 5.06 4.97 No Change CDNGW045 3/3/2022 10:29 48.40 35.60 0.00 16.00 -9.13 -1.04 -1.02 0.03 0.02 83.40 83.40 2.30 1.78 No Change CDNGW046 3/3/2022 10:59 50.70 37.10 0.00 12.20 -5.01 -4.05 -4.04 0.06 0.05 96.00 96.10 17.10 15.08 No Change CDNGW047 3/3/2022 11:31 3.00 1.20 21.50 74.30 -9.38 -0.36 -0.32 0.04 0.01 76.20 76.10 1.48 0.64 No Change,Valve completely closed CDNGW048 3/3/2022 11:33 48.90 37.80 0.00 13.30 -9.50 -7.61 -7.48 1.89 1.01 94.50 94.50 9.80 7.18 No Change CDNGW049 3/3/2022 13:23 0.10 0.10 22.20 77.60 0.10 0.08 0.09 0.00 0.00 74.50 76.80 0.00 0.00 No Change CDNGW050 3/3/2022 11:36 55.10 39.20 0.00 5.70 -8.13 -7.21 -7.22 7.67 7.77 92.50 92.50 35.95 36.20 No Change CDNGW051 3/3/2022 13:25 57.80 39.80 0.00 2.40 -5.09 -3.12 -3.42 4.10 3.21 92.90 92.90 14.50 12.83 No Change CDNGW052 3/3/2022 13:27 58.00 39.00 0.00 3.00 -7.89 -1.69 -2.22 1.70 2.21 87.60 87.70 17.20 19.59 Opened Valve 1/2 to 1 turn CDNGW054 3/3/2022 13:10 1.30 0.60 21.80 76.30 0.01 -0.03 0.01 0.04 0.00 76.80 76.80 14.35 0.00 No Change CDNGW055 3/3/2022 13:08 60.70 37.10 0.00 2.20 3.86 3.72 3.72 0.03 0.03 85.00 86.50 0.50 0.51 No Change CDNGW057 3/3/2022 13:04 58.00 39.50 0.00 2.50 3.32 3.08 3.01 0.07 0.15 80.10 80.30 1.96 2.79 No Change CDNGW058 3/3/2022 13:01 57.80 40.20 0.00 2.00 4.69 3.91 3.99 0.50 0.40 83.40 83.50 21.10 18.91 No Change CDNGW059 3/3/2022 12:54 2.50 1.00 21.50 75.00 0.24 0.00 0.02 0.01 0.02 73.90 74.70 0.82 0.94 No Change CDNGW060 3/3/2022 12:52 58.80 38.80 0.00 2.40 0.93 0.49 0.50 0.08 0.07 76.30 76.30 2.13 1.98 No Change CDNGW061 3/3/2022 12:50 11.30 4.80 21.10 62.80 0.22 -0.02 0.02 0.01 0.01 78.20 77.90 2.32 3.28 No Change CDNGW062 3/3/2022 12:56 55.00 40.70 0.00 4.30 -7.66 2.31 2.17 0.22 0.10 88.10 81.50 6.21 4.30 Opened Valve 1/2 turn or less CDNGW063 3/3/2022 13:06 58.20 39.60 0.00 2.20 2.25 4.02 4.08 0.22 0.15 86.30 86.50 32.80 26.87 No Change CDNGW064 3/3/2022 13:17 57.50 40.20 0.00 2.30 3.39 3.19 3.21 0.01 0.02 85.30 85.30 0.97 1.84 No Change CDNGW065 3/3/2022 13:20 0.40 0.30 22.00 77.30 0.26 0.02 0.02 0.00 0.00 70.30 66.60 0.00 0.00 No Change CDNGW066 3/3/2022 12:16 57.50 40.60 0.00 1.90 0.82 0.34 0.35 0.08 0.08 86.20 86.20 8.57 8.11 No Change CDNGW067 3/3/2022 11:30 56.40 38.00 0.00 5.60 0.34 0.13 0.13 0.23 0.23 76.80 77.20 14.33 14.33 No Change CDNGW068 3/3/2022 11:04 33.30 21.70 9.70 35.30 0.03 -1.85 -1.85 0.04 0.04 80.70 83.80 4.63 4.53 No Change CDNGW074 3/3/2022 10:07 57.30 38.60 0.00 4.10 -6.98 0.10 0.11 0.03 0.03 72.90 73.10 0.37 0.37 No Change,Valve completely closed CDNGW075 3/3/2022 10:03 50.70 34.20 0.00 15.10 -7.26 -0.51 -0.51 0.36 0.36 90.40 90.40 4.32 4.32 No Change CDNGW076 3/3/2022 10:01 60.00 37.70 0.00 2.30 -7.00 0.19 -0.44 0.04 0.03 83.00 87.10 12.94 12.41 Opened Valve 1/2 turn or less CDNGW077 3/3/2022 9:58 60.80 37.70 0.00 1.50 0.97 0.41 0.43 0.11 0.08 74.60 74.80 9.97 8.54 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data P:\O&M\City of Denton\2022\(3) March\City of Denton O&M Report March 2022.xlsx Weaver Consultants Group, LLC 4/8/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW078 3/3/2022 10:41 61.10 37.00 0.00 1.90 0.25 0.63 0.66 0.08 0.05 78.30 78.50 0.92 0.72 No Change CDNGW079 3/3/2022 10:45 56.50 36.60 0.00 6.90 -7.00 -0.84 -1.08 0.23 0.49 95.00 95.50 3.48 5.04 Opened Valve 1/2 turn or less CDNGW080 3/3/2022 10:48 58.00 37.10 0.00 4.90 0.03 0.13 0.13 0.11 0.11 77.70 77.90 9.87 10.08 No Change CDNGW081 3/3/2022 10:38 60.00 38.60 0.00 1.40 -6.38 0.43 0.43 0.03 0.03 76.40 76.80 0.37 0.35 No Change,Valve completely closed CDNGW082 3/3/2022 10:51 57.50 37.90 0.00 4.60 0.52 0.24 0.25 0.19 0.20 84.50 84.50 12.88 13.15 No Change CDNGW083 3/3/2022 10:35 57.70 38.90 0.00 3.40 0.98 0.40 0.43 0.05 0.03 78.30 78.40 4.80 3.66 No Change CDNGW084 3/3/2022 10:53 58.60 38.00 0.00 3.40 0.16 0.38 0.41 0.07 0.05 84.40 84.40 1.90 1.57 No Change CDNGW085 3/3/2022 10:13 58.30 38.90 0.00 2.80 0.03 0.15 -0.33 0.16 0.33 77.90 78.70 11.84 17.06 No Change CDNGW086 3/3/2022 10:10 59.10 38.80 0.00 2.10 -6.84 0.27 0.31 0.08 0.03 73.20 73.80 8.46 5.46 No Change,Valve completely closed CDNGW087 3/3/2022 10:56 57.10 37.20 0.00 5.70 0.27 -0.23 -0.22 0.23 0.22 77.40 77.70 3.50 3.42 No Change CDNGW088 3/3/2022 11:06 57.40 37.90 0.00 4.70 0.12 0.05 0.08 0.04 0.09 79.40 79.50 4.53 6.78 No Change CDNGW089 3/3/2022 11:10 58.50 37.30 0.00 4.20 3.15 0.05 0.06 0.05 0.04 78.90 79.00 5.10 4.48 No Change CDNGW090 3/3/2022 11:13 2.70 1.20 21.40 74.70 0.98 -0.08 -0.06 0.08 0.07 75.40 75.60 8.59 7.88 No Change CDNGW091 3/3/2022 11:17 55.20 38.10 0.00 6.70 -6.73 -0.94 -1.00 0.18 0.14 106.50 106.50 9.17 8.14 No Change CDNGW092 3/3/2022 11:27 52.90 37.90 0.00 9.20 -2.59 -2.52 -2.07 2.48 2.36 103.30 94.90 110.78 109.03 No Change CDNGW093 3/3/2022 11:22 40.30 33.60 0.00 26.10 -5.16 -1.31 -1.14 1.31 1.14 103.30 103.10 24.73 23.10 Closed Valve 1/2 turn or less CDNGW094 3/3/2022 11:19 46.00 34.40 0.00 19.60 -5.38 -0.77 -0.72 0.09 0.05 90.50 90.60 8.83 6.87 No Change CDNGW095 3/3/2022 11:39 57.40 40.70 0.00 1.90 0.35 0.30 0.34 0.09 0.06 82.00 82.10 21.51 17.03 No Change CDNGW096 3/3/2022 11:42 56.80 40.50 0.00 2.70 -4.97 -3.85 -3.66 0.95 0.91 77.20 77.50 28.91 28.36 No Change CDNGW097 3/3/2022 11:47 54.80 38.80 0.00 6.40 -5.06 -4.71 -4.70 0.12 0.05 113.70 113.60 23.99 14.82 No Change CDNGW098 3/3/2022 12:07 56.00 40.10 0.00 3.90 -4.44 -3.56 -3.55 0.57 0.54 112.30 112.20 21.65 21.10 No Change CDNGW099 3/3/2022 12:14 57.30 40.20 0.00 2.50 0.95 0.68 0.69 0.67 0.68 83.90 84.00 18.07 18.20 No Change CDNGW100 3/3/2022 12:11 57.40 40.50 0.00 2.10 1.40 1.18 1.19 0.11 0.10 79.40 79.40 7.32 6.88 No Change CDNGW101 3/3/2022 12:09 57.30 39.80 0.00 2.90 1.38 1.07 1.08 0.10 0.09 86.00 85.90 9.14 8.64 No Change CDNGW102 3/3/2022 12:19 57.00 39.20 0.00 3.80 3.11 2.76 2.82 0.16 0.23 89.20 89.60 0.81 0.97 No Change CDNGW106 3/3/2022 13:55 0.80 7.40 19.80 72.00 -0.02 -0.32 -0.32 0.09 0.09 91.10 92.50 6.58 6.57 No Change CDNGW107 3/3/2022 8:51 57.80 39.80 0.00 2.40 -9.14 0.09 -0.01 0.13 0.03 72.80 80.30 10.77 4.80 Opened Valve 1/2 turn or less CDNGW108 3/3/2022 8:53 58.60 39.40 0.00 2.00 -8.71 0.01 -0.02 0.05 0.05 97.00 99.40 3.01 2.82 Opened Valve 1/2 turn or less CDNGW109 3/3/2022 8:56 58.20 40.30 0.00 1.50 -9.35 -2.43 -2.53 0.39 0.62 116.40 116.60 13.27 16.80 Opened Valve 1/2 turn or less CDNGW110 3/3/2022 8:59 57.60 40.40 0.00 2.00 -9.68 -2.20 -2.40 0.02 0.42 115.40 115.60 3.47 18.65 Opened Valve 1/2 turn or less CDNGW111 3/3/2022 9:01 51.90 39.00 0.00 9.10 -9.57 -1.72 -1.68 0.77 0.80 113.30 113.20 25.31 25.87 No Change CDNGW112 3/3/2022 9:03 39.70 33.00 0.00 27.30 -9.76 -0.18 -0.18 0.03 0.02 91.80 91.70 2.14 1.62 No Change CDNGW113 3/3/2022 9:05 41.50 34.50 0.00 24.00 -10.55 -0.90 -0.64 1.80 0.97 108.50 108.40 17.38 12.76 Closed Valve 1/2 turn or less CDNGW114 3/3/2022 9:07 49.80 37.90 0.00 12.30 -9.74 -1.39 -1.39 1.35 1.38 114.60 114.70 14.99 15.13 No Change CDNGW115 3/3/2022 9:09 50.10 38.10 0.00 11.80 -10.57 -1.49 -1.47 0.78 0.78 109.00 109.00 19.07 18.97 No Change CDNGW116 3/3/2022 9:11 48.50 37.10 0.00 14.40 -10.39 -0.55 -0.55 0.40 0.44 108.70 108.80 13.72 14.26 No Change CDNGW117 3/3/2022 9:16 50.10 38.00 0.00 11.90 -10.32 -0.65 -0.62 0.90 0.86 109.00 108.60 12.31 12.02 No Change CDNGW118 3/3/2022 9:14 49.50 38.50 0.00 12.00 -10.41 -1.01 -0.98 1.13 1.14 104.40 104.50 13.80 13.87 No Change CDNGW119R 3/3/2022 9:21 0.30 0.90 21.80 77.00 -9.88 -0.05 -0.05 0.01 0.01 68.20 68.30 0.24 0.23 No Change,Valve completely closed P:\O&M\City of Denton\2022\(3) March\City of Denton O&M Report March 2022.xlsx Weaver Consultants Group, LLC 4/8/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW120R 3/3/2022 9:23 58.00 39.20 0.00 2.80 -9.78 -9.28 -9.31 0.26 0.36 74.00 74.10 1.62 1.92 Opened Valve 1/2 to 1 turn CDNGW121R 3/3/2022 9:28 3.80 2.80 20.90 72.50 -9.71 -9.46 -9.45 0.13 0.11 73.80 73.50 26.30 24.15 No Change,Valve completely closed CDNGW122R 3/3/2022 9:30 3.60 2.60 20.90 72.90 -9.72 1.57 1.63 0.09 0.03 75.20 75.70 22.28 12.30 No Change,Valve completely closed CDNGW123R 3/3/2022 9:34 0.40 0.90 21.80 76.90 -9.84 0.91 0.98 0.10 0.04 79.10 79.40 23.00 14.05 No Change,Valve completely closed CDNGW124R 3/3/2022 9:37 51.40 35.00 2.30 11.30 -9.66 -9.72 -9.43 0.07 0.08 74.10 74.30 18.81 19.71 No Change CDNGW125R 3/3/2022 9:39 1.20 15.00 5.70 78.10 -9.87 3.09 3.36 0.37 0.05 76.90 77.00 44.08 16.94 No Change,Valve completely closed CDNGW126R 3/3/2022 9:46 9.20 5.00 19.30 66.50 -9.87 -9.73 -9.69 0.05 0.03 75.80 75.70 15.74 12.44 No Change,Valve completely closed DEWLCR3 3/3/2022 13:57 1.20 4.00 19.20 75.60 -0.07 -0.13 -0.11 0.13 0.12 79.90 79.90 10.72 10.10 No Change DEWLCR4 3/3/2022 13:44 56.80 40.60 0.00 2.60 -0.93 -0.77 -0.92 0.22 0.18 81.20 81.80 34.04 30.38 No Change DEWLCR5 3/3/2022 13:39 51.50 37.90 0.50 10.10 -13.68 -0.84 -0.85 3.78 3.27 80.40 80.70 14.13 13.15 No Change Notes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =77 Number of Wells with Methane > 58%=13 Total Number of Well Readings =77 Number of Wells with Oxygen ≥ 2%=18 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =16 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =35 Number of Wells with No Room to Run (NRTR)=49 CDNSV001 3/3/2022 14:10 6.50 11.10 10.40 72.00 -5.73 -5.52 -5.18 0.07 0.30 77.20 77.00 17.54 37.86 No Change CDNSV002 3/3/2022 14:08 7.30 11.50 10.10 71.10 -5.77 -5.52 -5.61 0.04 0.07 82.20 82.40 14.34 18.05 No Change CDNSV003 3/3/2022 13:52 25.70 25.10 1.90 47.30 -5.33 -5.06 -5.07 0.00 0.00 83.10 83.10 0.00 0.00 No Change CDNSV004 3/3/2022 13:49 13.80 13.20 9.00 64.00 -5.61 -5.42 -5.78 0.00 0.00 86.30 86.60 0.00 0.00 No Change CDNSV005 3/3/2022 13:47 2.40 1.20 21.00 75.40 -5.39 -5.28 -4.98 0.00 0.00 79.20 79.40 0.00 0.00 No Change CDNSV006 3/3/2022 14:12 0.40 0.50 21.10 78.00 -5.43 -4.67 -4.89 0.44 0.44 59.50 59.30 46.33 46.47 No Change CDNSV007 3/3/2022 14:14 0.10 0.50 21.00 78.40 -5.39 -5.27 -5.10 0.22 0.15 67.30 67.30 32.30 26.48 No Change CDNSV008 3/3/2022 14:19 0.90 1.50 19.40 78.20 -5.48 -5.52 -5.48 0.18 0.10 71.20 71.10 29.73 21.69 No Change CDNSV009 3/3/2022 14:21 0.10 0.10 21.60 78.20 -5.39 -5.31 -5.48 0.21 0.11 64.10 63.80 32.17 22.82 No Change CDNSV010 3/3/2022 14:23 7.60 16.10 3.80 72.50 -5.52 -5.48 -5.40 0.18 0.13 82.00 82.50 29.11 25.11 No Change CDNSV011 3/3/2022 14:26 10.90 19.70 3.40 66.00 -5.50 -5.46 -5.47 0.13 0.13 85.70 86.20 24.68 24.83 No Change CDNSV012 3/3/2022 14:28 17.20 16.90 6.80 59.10 -5.56 -5.50 -5.31 0.19 0.18 86.00 86.40 29.54 29.30 No Change CDNSV013 3/3/2022 14:30 4.50 2.60 19.40 73.50 -5.52 -5.44 -5.52 0.12 0.13 84.00 84.30 23.48 25.02 No Change CDNSV014 3/3/2022 14:32 38.00 29.00 2.80 30.20 -5.34 -5.27 -5.48 0.26 0.18 84.50 84.90 34.65 29.09 No Change Soil Vapor Extraction Well Data P:\O&M\City of Denton\2022\(3) March\City of Denton O&M Report March 2022.xlsx Weaver Consultants Group, LLC 4/8/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNLFG02 3/3/2022 16:47 54.50 39.00 0.30 6.20 -9.00 -6.12 -6.46 0.12 0.49 81.40 81.50 23.64 47.98 No Change CDNLFG03 3/3/2022 16:40 55.60 41.30 0.00 3.10 -8.27 0.29 0.33 1.79 1.76 80.10 80.10 4.29 4.26 No Change CDNLFG05 3/3/2022 16:48 54.60 38.60 0.00 6.80 -9.04 -0.58 -0.56 0.09 0.10 84.20 84.20 20.92 22.34 No Change CDNLFG06 3/3/2022 16:42 54.40 39.00 0.00 6.60 -7.42 0.89 0.93 0.09 0.05 80.20 80.50 0.61 0.47 No Change CDNLFG07 3/3/2022 16:31 56.10 41.00 0.00 2.90 0.06 1.06 1.08 0.09 0.08 86.40 86.40 20.96 19.80 No Change CDNLFG08 3/3/2022 16:38 56.30 40.70 0.00 3.00 -0.26 1.72 1.74 0.08 0.06 84.70 84.80 0.57 0.50 No Change CDNLFG16 3/3/2022 16:36 53.60 40.80 0.00 5.60 -0.03 2.22 2.24 0.10 0.08 84.00 84.10 0.63 0.56 No Change CDNLFG17 3/3/2022 16:35 0.60 0.50 21.90 77.00 -0.09 -0.05 -0.02 0.04 0.02 82.00 82.20 13.22 9.73 No Change CDNLFG18 3/3/2022 16:34 1.40 0.80 21.70 76.10 -0.04 -0.04 -0.03 0.03 0.00 74.80 75.80 12.15 0.00 No Change CDNLFG19 3/3/2022 16:29 56.60 39.60 0.00 3.80 -5.77 0.99 1.03 0.83 0.87 79.80 79.80 1.87 1.91 No Change CDNLFG20 3/3/2022 16:27 56.40 39.10 0.00 4.50 -4.30 -1.88 -1.88 0.09 0.07 79.80 80.00 20.73 18.45 No Change CDNLFG21 3/3/2022 16:25 56.30 38.50 0.00 5.20 -5.42 -1.37 -1.36 0.11 0.08 83.90 84.00 22.78 19.36 No Change CDNLFG22 3/3/2022 16:22 55.80 37.30 0.00 6.90 -5.90 -0.57 -0.57 0.06 0.07 81.40 81.30 16.29 18.29 No Change CDNLFG23 3/3/2022 16:44 48.70 35.60 0.00 15.70 -8.42 0.65 0.68 0.09 0.05 84.80 84.90 0.62 0.46 No Change CDNLFG24 3/3/2022 16:18 57.50 38.90 0.00 3.60 -7.14 -0.36 -0.37 0.18 0.41 82.20 83.50 1.37 2.04 Opened Valve 1/2 turn or less CDNLFG25 3/3/2022 16:20 52.10 31.40 1.40 15.10 -6.76 -6.63 -6.46 0.06 0.05 87.10 87.70 16.71 15.63 No Change CDNLFG26 3/3/2022 16:14 54.10 43.20 0.00 2.70 -9.34 0.18 0.07 0.00 0.00 94.90 95.40 0.00 0.00 Opened Valve 1/2 turn or less CDNLFG27 3/3/2022 16:16 52.10 37.50 0.00 10.40 -8.64 -5.50 -5.51 0.48 0.50 78.20 78.60 1.42 1.44 No Change CDNLFG28 3/3/2022 16:08 54.30 41.00 0.00 4.70 -10.64 0.85 0.79 0.07 0.04 88.00 91.90 18.12 14.50 Opened Valve 1/2 turn or less CDNLFG29 3/3/2022 16:05 51.90 39.90 0.00 8.20 -10.82 -2.19 -2.18 0.26 0.17 83.80 83.90 35.04 28.49 No Change CDNLFG30 3/3/2022 16:11 54.30 42.80 0.00 2.90 -9.15 1.36 1.33 0.04 0.04 88.40 89.40 12.91 13.08 Opened Valve 1/2 turn or less CDNLFG31 3/3/2022 15:53 44.40 36.80 0.10 18.70 -10.65 -6.12 -6.12 2.20 1.72 95.40 95.40 10.57 9.36 No Change CDNLFG32 3/3/2022 15:50 45.50 32.30 1.20 21.00 -2.28 -0.08 -0.04 0.06 0.04 90.40 92.20 17.25 12.86 No Change,Valve completely closed CDNLFG33 3/3/2022 12:37 46.60 38.90 0.00 14.50 -10.36 -1.15 -1.02 0.41 0.43 84.50 84.50 4.63 4.74 Closed Valve 1/2 turn or less CDNLFG34 3/3/2022 12:35 37.10 35.80 0.00 27.10 -5.83 -0.25 -0.26 0.10 0.10 82.60 82.70 2.35 2.33 No Change CDNLFG35 3/3/2022 15:46 34.70 35.00 0.00 30.30 -9.83 -7.44 -7.35 0.00 0.00 90.90 91.10 0.00 0.00 No Change CDNLFG36 3/3/2022 12:40 47.20 33.50 4.10 15.20 -1.72 -0.10 -0.06 0.07 0.04 89.30 90.40 17.71 13.19 Closed Valve 1/2 turn or less,Valve CDNLFG37 3/3/2022 12:47 52.00 40.50 0.00 7.50 -9.85 -1.47 -1.38 1.71 1.55 84.00 84.00 17.32 16.48 No Change CDNLFG38 3/3/2022 15:44 33.20 29.00 2.40 35.40 -10.17 -0.06 -0.04 0.06 0.04 91.20 91.40 0.48 0.39 No Change,Valve completely closed CDNLFG39 3/3/2022 12:42 56.10 40.60 0.00 3.30 -8.26 -2.09 -2.34 0.53 0.60 84.30 84.30 50.13 53.64 Opened Valve 1/2 turn or less CDNLFG41 3/3/2022 10:26 41.70 32.80 0.00 25.50 -9.47 -0.74 -0.74 0.03 0.03 73.00 73.00 4.70 5.07 No Change CDNLFG42 3/3/2022 10:21 46.80 35.20 0.00 18.00 -9.46 -1.94 -1.90 2.19 2.17 75.60 75.60 4.76 4.73 No Change CDNLFG43 3/3/2022 10:16 55.00 37.90 0.00 7.10 -7.56 -4.60 -4.63 0.03 0.11 86.40 86.70 5.44 9.78 Opened Valve 1/2 turn or less Gas Extraction Monitoring Wellfield Data City of Denton Landfill Extraction Well Data P:\O&M\City of Denton\2022\(3) March\City of Denton O&M Report March 2022.xlsx Weaver Consultants Group, LLC 4/8/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ001 3/3/2022 14:38 54.70 35.50 0.20 9.60 -9.83 -4.69 -4.96 0.12 0.06 90.10 90.10 23.76 16.43 Opened Valve 1/2 turn or less CDNHZ002 3/3/2022 14:41 53.50 34.80 0.00 11.70 -9.53 -7.42 -7.78 0.47 0.15 88.30 88.40 46.72 26.45 No Change CDNHZ003 3/3/2022 14:47 49.60 35.50 0.30 14.60 -9.81 -1.69 -1.67 0.38 0.36 84.30 84.20 42.53 41.41 No Change CDNHZ005 3/3/2022 14:45 47.80 32.40 0.00 19.80 -9.83 -5.95 -6.03 0.11 0.08 84.50 84.50 22.59 19.31 No Change CDNHZ006 3/3/2022 14:50 23.20 23.10 1.90 51.80 -9.84 -0.54 -0.57 0.41 0.43 86.40 87.10 44.37 45.37 No Change CDNHZ007 3/3/2022 14:51 47.80 35.60 1.20 15.40 -9.85 -9.86 -9.86 0.48 0.48 91.10 91.80 46.81 46.39 No Change CDNHZ008 3/3/2022 14:53 23.00 24.20 3.30 49.50 -9.83 -1.58 -1.57 0.19 0.19 90.30 90.90 30.24 29.58 No Change CDNHZ010 3/3/2022 14:55 53.30 37.60 0.20 8.90 -9.88 -9.75 -9.69 0.25 0.22 79.80 79.70 33.86 32.12 No Change CDNHZ011 3/3/2022 14:57 59.70 35.30 0.00 5.00 -9.83 -0.23 -0.21 0.09 0.07 90.80 91.40 20.64 17.54 No Change CDNHZ012 3/3/2022 14:59 8.80 9.00 15.70 66.50 -9.75 -9.54 -9.52 0.12 0.09 92.40 92.60 23.72 20.56 No Change CDNHZ014 3/3/2022 15:00 1.70 1.90 19.40 77.00 -9.73 -5.31 -5.52 0.11 0.07 86.60 86.90 22.97 18.55 No Change CDNHZ015 3/3/2022 15:03 55.60 37.70 0.40 6.30 -9.79 -7.74 -7.33 0.24 0.09 88.10 88.50 33.33 20.66 No Change CDNHZ017 3/3/2022 15:05 55.70 38.50 0.00 5.80 -9.83 -1.72 -1.71 0.11 0.09 89.80 89.90 22.25 21.12 No Change CDNHZ018 3/3/2022 15:07 1.90 1.30 20.60 76.20 -10.07 -9.05 -8.98 0.11 0.10 87.10 87.80 22.37 21.38 No Change CDNHZ019 3/3/2022 15:09 50.80 36.80 0.90 11.50 -9.83 -9.54 -9.52 0.14 0.10 85.40 85.50 25.07 21.18 No Change CDNHZ020 3/3/2022 15:10 56.50 36.90 0.20 6.40 -9.83 -9.52 -9.53 0.14 0.14 84.40 84.50 25.23 25.27 No Change CDNHZ021 3/3/2022 15:12 25.30 16.90 0.10 57.70 -9.85 -2.17 -2.15 0.03 0.03 94.70 90.90 12.22 12.62 No Change CDNHZ022 3/3/2022 15:15 58.60 38.00 0.00 3.40 -9.89 -2.78 -3.36 0.05 0.04 84.80 84.70 15.21 13.68 Opened Valve 1/2 turn or less CDNHZ023 3/3/2022 15:18 53.00 36.80 1.30 8.90 -9.77 -9.54 -9.56 0.10 0.09 93.20 93.50 20.84 20.64 No Change CDNHZ025 3/3/2022 15:21 54.40 37.10 0.60 7.90 -9.83 -9.75 -9.56 0.11 0.07 87.30 87.40 22.63 17.20 No Change CDNHZ026 3/3/2022 15:23 39.70 30.50 0.80 29.00 -9.83 -1.66 -1.63 0.09 0.07 91.80 92.20 20.55 17.86 No Change CDNHZ029 3/3/2022 15:25 48.30 22.60 5.60 23.50 -9.83 -9.52 -9.52 0.10 0.08 91.50 91.70 20.99 19.55 No Change CDNHZ030 3/3/2022 15:27 46.60 30.00 4.20 19.20 -10.08 -7.93 -7.99 0.40 0.39 91.20 91.50 42.75 42.40 No Change CDNHZ031 3/3/2022 15:31 4.50 22.80 3.90 68.80 -9.83 -7.90 -7.95 0.06 0.06 91.30 90.70 16.50 16.66 No Change CDNHZ032 3/3/2022 15:33 49.90 34.40 1.60 14.10 -9.88 -8.88 -8.88 0.13 0.12 89.50 89.80 24.17 23.79 No Change CDNHZ033 3/3/2022 15:36 28.50 23.50 4.60 43.40 -9.90 -6.12 -6.12 0.09 0.08 90.90 91.20 20.59 19.67 No Change CDNHZ034 3/3/2022 15:37 48.10 34.10 0.00 17.80 -9.83 -9.52 -9.01 0.09 0.11 76.80 76.00 20.00 23.14 No Change CDNHZ035 3/3/2022 15:39 55.20 34.70 0.40 9.70 -9.85 -2.59 -2.92 0.11 0.12 84.80 86.90 22.90 23.76 Opened Valve 1/2 turn or less CDNHZ036 3/3/2022 15:41 54.30 36.80 0.50 8.40 -9.83 -9.58 -9.56 0.13 0.13 88.50 88.60 23.87 24.11 No Change Horizontal Well Data P:\O&M\City of Denton\2022\(3) March\City of Denton O&M Report March 2022.xlsx Weaver Consultants Group, LLC 4/8/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill Notes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =63 Number of Wells with Methane > 58%=2 Total Number of Well Readings =63 Number of Wells with Oxygen ≥ 2%=12 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =5 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =10 Number of Wells with No Room to Run (NRTR)=35 P:\O&M\City of Denton\2022\(3) March\City of Denton O&M Report March 2022.xlsx Weaver Consultants Group, LLC 4/8/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCGCH4 4/18/2022 8:31 49.80 34.90 0.00 15.30 0.01 -0.01 -0.01 0.00 0.00 50.00 50.00 NR NR Calibration Gas CDNCG002 4/18/2022 8:32 0.00 0.00 10.90 89.10 0.01 0.01 0.01 0.00 0.00 50.00 50.00 NR NR Calibration Gas CDNCGCH4 4/18/2022 8:37 49.40 35.50 0.00 15.10 0.20 -1.36 -1.41 1.36 1.41 76.30 76.30 NR NR Calibration Gas CDNCG002 4/18/2022 8:41 0.00 0.00 10.90 89.10 0.20 0.00 0.00 0.00 0.00 76.10 76.10 NR NR Calibration Gas CDNINLT1 4/18/2022 8:49 27.00 20.00 10.60 42.40 0.29 -18.32 -18.34 18.38 18.37 63.40 64.30 730.00 730.00 Flare Inlet CDNBLWR1 4/18/2022 8:51 27.00 20.30 10.50 42.20 0.28 2.31 2.29 0.00 0.00 68.70 68.10 730.00 730.00 Flare Blower CDN00GHG 4/18/2022 8:52 27.10 20.10 10.40 42.40 0.29 2.31 2.31 0.00 0.00 67.60 68.40 730.00 730.00 Flare GHG CDNCGCH4 4/18/2022 17:26 49.80 35.60 0.00 14.60 0.36 -1.28 -1.26 1.28 1.26 78.10 78.00 NR NR Calibration Gas CDNCG002 4/18/2022 17:30 0.00 0.00 10.90 89.10 0.31 -1.12 -1.01 1.13 1.01 78.40 78.50 NR NR Calibration Gas CDNINLT2 4/18/2022 17:38 40.10 27.80 5.70 26.40 0.32 -17.79 -17.83 17.89 17.91 84.90 84.20 933.00 933.00 Flare Inlet CDNBLWR2 4/18/2022 17:46 45.30 31.20 3.80 19.70 0.33 3.34 3.32 0.00 0.00 91.10 91.10 933.00 933.00 Flare Blower CDNGW040 4/18/2022 14:36 2.60 1.10 21.70 74.60 -11.60 -4.67 -4.59 0.05 0.02 76.20 76.20 15.17 10.65 No Change,Valve completely closed CDNGW044 4/18/2022 14:57 55.30 39.10 0.70 4.90 -8.59 -2.44 -2.19 4.39 4.17 92.90 93.00 6.62 6.45 No Change CDNGW045 4/18/2022 14:52 57.00 39.00 0.00 4.00 -10.37 -0.92 -0.92 0.04 0.09 87.90 88.30 2.72 4.03 Opened Valve 1/2 turn or less CDNGW046 4/18/2022 14:46 58.90 39.50 0.00 1.60 -7.24 -4.02 -3.94 0.00 0.00 92.30 92.70 0.00 0.00 Opened Valve 1/2 turn or less CDNGW047 4/18/2022 12:51 0.00 0.30 22.00 77.70 -10.17 -1.80 -1.79 0.01 0.02 71.50 71.40 0.73 1.03 No Change,Valve completely closed CDNGW048 4/18/2022 12:48 55.10 39.40 0.00 5.50 -9.57 -8.87 -8.90 1.22 0.96 91.80 91.80 7.89 6.99 No Change CDNGW049 4/18/2022 16:09 58.40 38.20 0.00 3.40 0.42 -0.04 -0.04 0.02 0.05 75.50 75.30 10.88 15.15 No Change,Valve completely closed CDNGW050 4/18/2022 12:43 57.40 40.50 0.00 2.10 -8.64 -8.44 -8.46 8.41 8.43 88.90 88.90 37.69 37.75 No Change CDNGW051 4/18/2022 16:04 58.50 39.10 0.00 2.40 -7.48 -4.17 -4.13 4.56 3.28 92.80 92.90 15.27 12.98 No Change CDNGW052 4/18/2022 16:07 58.20 38.70 0.00 3.10 -10.95 -4.40 -4.42 0.50 0.38 91.40 91.50 9.29 8.06 No Change CDNGW054 4/18/2022 16:20 NR NR NR NR 0.03 -0.01 NR 0.01 NR 81.40 NR 6.05 NR Capped CDNGW055 4/18/2022 16:29 62.10 36.80 0.00 1.10 3.83 3.53 3.53 0.06 0.04 82.70 82.90 0.81 0.60 No Change CDNGW057 4/18/2022 16:38 59.40 40.20 0.00 0.40 3.10 3.02 3.02 0.02 0.03 81.60 81.70 1.12 1.25 No Change CDNGW058 4/18/2022 16:43 58.30 41.00 0.00 0.70 4.40 4.13 4.15 0.08 0.04 82.10 82.10 8.22 6.08 No Change CDNGW059 4/18/2022 16:50 NR NR NR NR -0.03 -0.02 NR 0.03 NR 87.30 NR 1.15 NR Capped CDNGW060 4/18/2022 16:47 59.60 38.80 0.00 1.60 0.56 0.17 0.26 0.17 0.08 82.50 82.60 3.01 2.09 No Change CDNGW061 4/18/2022 16:57 NR NR NR NR NR NR NR NR NR 83.70 NR NR NR Capped CDNGW062 4/18/2022 16:54 58.40 40.30 0.00 1.30 -4.95 1.80 1.82 0.04 0.06 85.30 85.40 2.77 3.33 No Change CDNGW063 4/18/2022 16:34 NR NR NR NR -0.02 -0.01 NR 0.00 NR 79.20 NR 0.00 NR Capped CDNGW064 4/18/2022 16:26 58.60 40.40 0.00 1.00 0.00 3.03 3.05 0.15 0.18 85.00 85.00 5.21 5.59 No Change CDNGW065 4/18/2022 16:19 NR NR NR NR 0.01 0.01 0.01 0.00 0.00 76.00 77.30 1.22 2.43 No Change,Valve completely closed CDNGW066 4/18/2022 12:40 58.50 41.50 0.00 0.00 -4.50 -4.90 -5.47 0.01 0.00 69.80 69.90 3.08 1.34 No Change CDNGW067 4/18/2022 12:57 55.40 39.30 0.00 5.30 -9.15 -9.14 -8.87 0.33 0.12 68.80 70.00 17.15 10.39 No Change CDNGW068 4/18/2022 13:35 58.00 39.20 0.00 2.80 -10.92 -4.27 -4.30 0.00 0.03 71.90 72.20 1.22 3.77 Opened Valve 1/2 turn or less CDNGW074 4/18/2022 15:08 18.80 13.00 15.00 53.20 -10.86 -0.19 -0.19 0.01 0.01 74.10 74.00 0.14 0.17 No Change,Valve completely closed CDNGW075 4/18/2022 15:11 60.30 39.10 0.00 0.60 -21.81 -4.26 -0.89 4.69 0.24 90.20 90.20 15.52 3.52 No Change CDNGW076 4/18/2022 15:16 60.00 39.30 0.00 0.70 -9.98 -1.05 -1.05 0.00 0.00 98.30 98.30 0.00 0.00 No Change CDNGW077 4/18/2022 10:08 55.70 35.70 1.50 7.10 0.43 0.00 0.00 0.01 0.01 56.60 62.50 2.56 2.36 No Change,Valve completely closed Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data P:\O&M\City of Denton\2022\(4) April\Forms\City of Denton O&M Report April 2022.xlsx Weaver Consultants Group, LLC 5/5/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW078 4/18/2022 13:49 0.00 0.20 21.80 78.00 1.85 -0.25 -0.24 0.01 0.01 79.20 78.70 0.32 0.36 No Change,Valve completely closed CDNGW079 4/18/2022 13:55 59.70 39.90 0.00 0.40 0.49 -2.86 -2.87 1.16 1.26 95.70 95.80 7.72 8.04 Opened Valve 1/2 turn or less CDNGW080 4/18/2022 14:05 55.00 37.80 1.40 5.80 -11.14 -1.61 -1.62 0.07 0.04 96.70 96.90 7.72 5.45 Opened Valve 1/2 turn or less CDNGW081 4/18/2022 14:09 0.00 0.30 21.50 78.20 -10.05 -0.68 -0.72 0.02 0.02 75.40 75.50 0.28 0.29 No Change,Valve completely closed CDNGW082 4/18/2022 14:18 57.90 39.10 0.00 3.00 -11.04 -5.45 -5.36 0.41 0.30 103.70 103.80 18.50 15.97 Opened Valve 1/2 turn or less CDNGW083 4/18/2022 14:28 43.80 35.30 0.00 20.90 -11.31 -2.70 -2.80 0.45 0.33 93.70 94.00 14.69 12.43 Opened Valve 1/2 turn or less CDNGW084 4/18/2022 14:34 58.80 39.70 0.00 1.50 -10.63 -4.37 -4.63 0.26 0.84 97.40 97.90 3.66 6.55 Opened Valve 1/2 turn or less CDNGW085 4/18/2022 14:59 43.30 35.00 0.00 21.70 -10.85 -7.68 -6.21 6.86 5.29 96.70 96.60 75.65 66.67 Opened Valve 1/2 turn or less CDNGW086 4/18/2022 15:03 12.40 8.60 15.70 63.30 -10.63 -0.43 -0.48 0.01 0.07 79.80 79.30 3.21 7.86 No Change,Valve completely closed CDNGW087 4/18/2022 14:39 57.80 38.80 0.00 3.40 -10.42 -1.49 -1.25 0.50 0.17 87.30 87.50 5.13 2.96 Opened Valve 1/2 turn or less CDNGW088 4/18/2022 13:39 49.70 38.20 0.00 12.10 -8.35 -1.84 -1.92 1.80 1.86 93.20 93.40 29.26 29.72 Opened Valve 1/2 turn or less CDNGW089 4/18/2022 15:55 4.70 2.60 18.80 73.90 -3.53 -1.28 -1.25 0.04 0.01 79.80 79.70 4.56 2.28 No Change,Valve completely closed CDNGW090 4/18/2022 13:45 0.10 0.40 21.70 77.80 -1.28 -1.02 -1.01 0.14 0.16 71.70 71.50 11.02 12.12 No Change,Valve completely closed CDNGW091 4/18/2022 12:11 59.60 40.40 0.00 0.00 -10.10 -2.04 -2.11 0.09 0.16 107.90 108.00 6.39 8.73 Opened Valve 1/2 turn or less CDNGW092 4/18/2022 13:27 56.70 41.00 0.00 2.30 -9.47 -8.50 -8.52 8.50 8.61 104.30 104.30 201.85 203.10 No Change CDNGW093 4/18/2022 13:23 52.20 39.70 0.00 8.10 -9.92 -2.01 -2.27 1.94 2.23 98.70 99.00 30.27 32.42 Opened Valve 1/2 turn or less CDNGW094 4/18/2022 13:15 57.70 36.70 0.00 5.60 -9.79 -1.49 -1.53 0.03 0.04 90.80 91.20 4.82 5.96 Opened Valve 1/2 turn or less CDNGW095 4/18/2022 13:06 25.20 18.30 12.80 43.70 -1.11 -1.57 -1.55 0.01 0.01 72.40 72.60 5.65 8.05 Closed Valve 1/2 to 1 turn CDNGW096 4/18/2022 13:08 58.50 41.20 0.00 0.30 -7.99 -6.65 -6.48 1.30 2.03 72.80 72.90 33.91 42.29 No Change CDNGW097 4/18/2022 16:00 57.70 40.50 0.00 1.80 -8.10 -7.63 -7.53 0.02 0.02 113.10 113.20 10.29 10.46 No Change CDNGW098 4/18/2022 12:14 58.40 41.30 0.00 0.30 -7.50 -6.33 -6.48 0.38 0.79 111.80 111.80 17.62 25.50 No Change CDNGW099 4/18/2022 12:33 27.70 20.30 10.80 41.20 -0.01 -0.33 -0.32 0.01 0.01 71.40 71.60 2.02 2.15 Closed Valve 1/2 turn or less CDNGW100 4/18/2022 12:27 54.50 39.00 1.20 5.30 0.36 0.04 0.03 0.00 0.00 69.40 69.10 1.01 1.46 No Change CDNGW101 4/18/2022 12:19 58.60 41.40 0.00 0.00 0.38 0.02 0.03 0.00 0.00 71.60 71.30 1.68 1.62 Closed Valve 1/2 turn or less CDNGW102 4/18/2022 16:14 57.50 41.30 0.00 1.20 3.04 2.32 2.34 0.88 0.91 83.10 83.10 1.93 1.95 No Change CDNGW106 4/18/2022 17:07 0.10 0.60 21.30 78.00 0.02 -3.26 -3.10 0.05 0.01 84.40 84.00 4.93 2.62 No Change,Valve completely closed CDNGW107 4/18/2022 10:15 59.00 41.00 0.00 0.00 -11.03 -0.11 -0.20 0.20 0.17 86.80 87.80 13.31 12.01 Opened Valve 1/2 turn or less CDNGW108 4/18/2022 10:19 58.60 41.30 0.00 0.10 -11.41 -0.62 -0.55 0.77 0.55 97.80 98.40 11.47 9.70 Opened Valve 1/2 turn or less CDNGW109 4/18/2022 10:24 57.80 42.20 0.00 0.00 -11.68 -3.36 -3.41 0.80 0.77 118.10 118.10 19.08 18.66 No Change CDNGW110 4/18/2022 10:30 57.70 42.30 0.00 0.00 -12.13 -4.51 -4.77 1.66 1.79 117.60 117.70 36.82 38.26 Opened Valve 1/2 turn or less CDNGW111 4/18/2022 10:36 58.10 41.90 0.00 0.00 -11.48 -2.34 -2.43 0.36 0.50 116.80 116.90 17.31 20.37 Opened Valve 1/2 turn or less CDNGW112 4/18/2022 10:39 59.20 40.80 0.00 0.00 -11.63 -0.24 -0.29 0.01 0.08 82.70 82.90 1.08 3.64 Opened Valve 1/2 turn or less CDNGW113 4/18/2022 10:46 58.20 41.80 0.00 0.00 -11.53 -0.49 -0.49 0.34 0.44 100.40 100.80 7.57 8.70 Opened Valve 1/2 turn or less CDNGW114 4/18/2022 10:51 57.80 42.20 0.00 0.00 -11.63 -1.49 -1.49 1.67 1.82 115.20 115.30 16.66 17.35 Opened Valve 1/2 turn or less CDNGW115 4/18/2022 10:56 58.40 41.60 0.00 0.00 -12.56 -1.48 -1.54 0.92 1.08 110.40 110.30 20.65 22.34 Opened Valve 1/2 turn or less CDNGW116 4/18/2022 11:02 58.70 40.80 0.00 0.50 -12.23 -0.61 -0.61 0.43 0.60 107.50 107.80 14.22 16.67 Opened Valve 1/2 turn or less CDNGW117 4/18/2022 11:07 58.00 42.00 0.00 0.00 -11.80 -0.67 -0.72 0.65 0.83 104.60 104.60 10.50 11.85 Opened Valve 1/2 turn or less CDNGW118 4/18/2022 11:26 57.40 42.60 0.00 0.00 -11.91 -1.13 -1.14 1.39 1.44 104.60 104.50 15.32 15.63 Opened Valve 1/2 turn or less CDNGW119R 4/18/2022 11:16 0.00 1.30 21.60 77.10 -12.03 0.00 0.02 0.01 0.01 65.30 65.30 0.35 0.34 No Change,Valve completely closed CDNGW120R 4/18/2022 11:20 58.30 41.30 0.00 0.40 -11.96 -11.62 -11.65 0.49 0.53 71.50 71.40 2.22 2.32 Opened Valve 1/2 turn or less P:\O&M\City of Denton\2022\(4) April\Forms\City of Denton O&M Report April 2022.xlsx Weaver Consultants Group, LLC 5/5/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW121R 4/18/2022 11:32 5.70 8.60 18.00 67.70 -11.82 1.49 1.49 0.00 0.01 74.00 74.00 3.69 8.25 No Change,Valve completely closed CDNGW122R 4/18/2022 11:43 2.70 3.30 20.70 73.30 -11.68 0.28 0.31 0.00 0.01 68.40 68.40 4.34 4.92 No Change,Valve completely closed CDNGW123R 4/18/2022 11:48 8.40 6.50 17.50 67.60 -11.82 -0.35 -0.34 0.00 0.01 74.60 74.60 2.82 6.22 No Change,Valve completely closed CDNGW124R 4/18/2022 11:53 47.70 33.20 4.30 14.80 -11.85 -12.02 -12.01 0.02 0.01 69.60 69.70 9.68 6.57 Closed Valve 1/2 turn or less CDNGW125R 4/18/2022 11:57 0.00 14.80 7.20 78.00 -11.71 -0.27 -0.27 0.01 0.00 68.00 68.00 6.25 3.70 No Change,Valve completely closed CDNGW126R 4/18/2022 12:00 12.70 9.50 17.20 60.60 -11.81 0.35 0.35 0.00 0.00 70.10 70.30 3.75 2.57 No Change,Valve completely closed DEWLCR3 4/18/2022 17:09 0.00 0.30 21.30 78.40 0.02 -0.03 -0.03 0.03 0.04 88.60 88.50 5.30 5.78 No Change DEWLCR4 4/18/2022 17:11 1.90 0.70 21.50 75.90 -12.15 -11.90 0.01 0.02 -11.82 70.50 70.50 8.59 11.25 Closed Valve > 1 turn DEWLCR5 4/18/2022 17:06 50.90 34.80 1.50 12.80 -14.38 -1.27 14.84 13.98 -1.29 78.40 78.40 27.80 27.00 Closed Valve 1/2 turn or less Notes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =77 Number of Wells with Methane > 58%=27 Total Number of Well Readings =77 Number of Wells with Oxygen ≥ 2%=20 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =18 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =15 Number of Wells with No Room to Run (NRTR)=32 CDNSV001 4/18/2022 10:13 8.50 13.40 9.30 68.80 -9.76 -9.79 -9.85 0.06 0.00 60.40 60.40 16.80 0.00 No Change CDNSV002 4/18/2022 10:11 13.40 16.00 7.70 62.90 -9.61 -9.32 -9.61 0.06 0.05 61.10 61.10 16.99 14.80 No Change CDNSV003 4/18/2022 10:06 34.10 27.80 1.00 37.10 -10.02 -10.00 -9.98 0.00 0.00 59.00 59.00 0.00 0.00 No Change CDNSV004 4/18/2022 9:52 16.60 16.10 4.90 62.40 -9.43 -9.42 -9.81 0.05 0.05 55.80 55.80 16.14 14.95 No Change CDNSV005 4/18/2022 9:48 33.70 18.30 5.80 42.20 -9.25 -9.31 -9.64 0.00 0.00 59.70 59.70 4.26 0.00 No Change CDNSV006 4/18/2022 10:17 1.80 3.10 18.70 76.40 -9.55 -9.52 -9.38 0.16 0.14 61.30 61.30 27.41 26.13 No Change CDNSV007 4/18/2022 10:19 0.70 2.20 19.10 78.00 -9.56 -9.51 -9.45 0.09 0.08 59.90 59.90 21.15 19.75 No Change CDNSV008 4/18/2022 10:23 2.90 4.80 17.40 74.90 -9.37 -9.32 -9.32 0.08 0.06 58.10 58.10 19.26 17.40 No Change CDNSV009 4/18/2022 10:27 0.10 0.40 21.60 77.90 -9.42 -9.18 -9.40 0.13 0.08 59.70 59.70 25.27 19.75 No Change CDNSV010 4/18/2022 10:30 19.60 25.00 2.40 53.00 -9.27 -9.22 -9.51 0.06 0.08 60.00 60.00 16.82 19.14 No Change CDNSV011 4/18/2022 10:36 11.80 20.30 3.80 64.10 -9.50 -9.25 -9.36 0.07 0.07 59.50 59.50 17.75 18.89 No Change CDNSV012 4/18/2022 10:52 18.60 17.60 7.10 56.70 -9.21 -9.15 -9.20 0.09 0.07 60.00 60.00 20.34 18.70 No Change CDNSV013 4/18/2022 10:55 1.40 0.90 21.40 76.30 -9.42 -9.18 -9.42 0.05 0.06 62.40 62.40 15.55 17.20 No Change CDNSV014 4/18/2022 10:59 42.60 31.10 2.60 23.70 -9.44 -9.18 -9.27 0.08 0.08 61.70 61.70 19.11 19.04 No Change Soil Vapor Extraction Well Data P:\O&M\City of Denton\2022\(4) April\Forms\City of Denton O&M Report April 2022.xlsx Weaver Consultants Group, LLC 5/5/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNLFG02 4/18/2022 16:47 57.40 40.50 0.00 2.10 0.20 0.64 0.92 0.00 0.00 79.30 79.30 0.00 0.00 No Change CDNLFG03 4/18/2022 16:44 57.60 40.30 0.00 2.10 0.33 1.16 1.17 0.13 0.14 77.50 77.50 1.17 1.18 No Change CDNLFG05 4/18/2022 16:48 57.30 40.40 0.00 2.30 0.10 0.85 0.88 0.00 0.00 77.10 77.10 0.00 0.00 No Change CDNLFG06 4/18/2022 16:39 55.30 37.00 0.00 7.70 0.18 1.11 1.12 0.03 0.01 73.20 73.20 0.34 0.22 No Change CDNLFG07 4/18/2022 16:37 52.10 37.70 0.50 9.70 0.03 1.03 1.05 0.00 0.00 85.60 85.60 0.00 0.00 No Change CDNLFG08 4/18/2022 16:35 57.20 39.30 0.00 3.50 0.22 1.30 1.32 0.00 0.03 81.80 81.80 0.13 0.32 No Change CDNLFG16 4/18/2022 16:33 55.50 40.60 0.00 3.90 -0.01 1.47 1.48 0.03 0.02 79.50 79.50 0.33 0.27 No Change CDNLFG17 4/18/2022 16:31 0.00 0.00 20.80 79.20 0.23 0.00 0.00 0.00 0.00 73.00 73.00 3.42 0.00 No Change CDNLFG18 4/18/2022 16:31 0.00 0.00 21.80 78.20 0.33 0.01 0.01 0.00 0.00 73.00 73.00 0.00 0.00 No Change CDNLFG19 4/18/2022 16:28 58.90 39.70 0.00 1.40 -0.01 1.14 1.21 0.08 0.11 74.80 74.80 0.59 0.69 No Change CDNLFG20 4/18/2022 16:26 58.90 39.60 0.00 1.50 -0.01 0.40 0.41 0.00 0.00 74.60 74.60 0.00 0.00 No Change CDNLFG21 4/18/2022 16:23 59.20 38.80 0.00 2.00 0.10 0.87 0.91 0.02 0.01 81.80 81.80 10.12 7.51 No Change CDNLFG22 4/18/2022 16:20 60.70 35.80 0.00 3.50 0.14 1.01 1.04 0.05 0.02 80.40 80.40 15.09 9.47 No Change CDNLFG23 4/18/2022 16:42 56.30 37.00 0.00 6.70 0.33 0.91 0.91 0.02 0.01 77.10 77.10 0.28 0.19 No Change CDNLFG24 4/18/2022 16:16 60.00 38.50 0.00 1.50 0.33 0.18 0.21 0.03 0.01 81.80 81.80 0.56 0.26 No Change CDNLFG25 4/18/2022 16:18 62.00 36.60 0.20 1.20 0.33 0.02 0.02 0.02 0.02 87.40 87.40 10.40 8.59 No Change CDNLFG26 4/18/2022 16:12 56.20 42.50 0.00 1.30 0.33 1.54 1.56 0.00 0.00 92.10 92.10 0.00 0.00 No Change CDNLFG27 4/18/2022 16:14 57.10 40.90 0.00 2.00 0.27 0.42 0.42 0.04 0.05 78.80 78.80 0.41 0.46 No Change CDNLFG28 4/18/2022 16:07 56.30 41.30 0.00 2.40 1.36 1.31 1.35 0.05 0.02 80.20 80.20 15.46 9.67 No Change CDNLFG29 4/18/2022 16:05 43.80 32.00 2.30 21.90 1.44 1.10 1.13 0.04 0.01 81.30 81.30 13.27 6.92 No Change CDNLFG30 4/18/2022 16:09 56.00 42.50 0.00 1.50 0.50 1.74 1.77 0.03 0.01 86.30 86.30 12.81 6.79 No Change CDNLFG31 4/18/2022 14:17 40.70 34.50 0.60 24.20 -12.99 -6.83 -6.53 2.71 1.92 93.50 93.50 11.75 9.90 Closed Valve 1/2 turn or less CDNLFG32 4/18/2022 14:14 25.30 22.40 6.60 45.70 -12.79 -0.13 -0.12 0.04 0.01 76.60 76.60 14.09 7.04 No Change,Valve completely closed CDNLFG33 4/18/2022 14:21 43.20 34.30 0.00 22.50 -12.71 -1.12 -1.05 0.77 0.20 75.70 75.70 6.43 3.26 Closed Valve 1/2 turn or less CDNLFG34 4/18/2022 14:23 20.10 27.10 0.00 52.80 -8.39 -0.57 -0.52 0.19 0.11 77.70 77.70 3.16 2.45 Closed Valve 1/2 turn or less CDNLFG35 4/18/2022 14:11 25.30 29.10 0.00 45.60 -12.30 -7.71 -7.57 0.00 0.00 80.60 80.60 0.00 0.00 No Change CDNLFG36 4/18/2022 14:26 57.80 39.50 0.30 2.40 -0.42 -0.44 -0.41 0.03 0.02 87.00 87.00 11.06 9.79 No Change CDNLFG37 4/18/2022 14:34 48.40 36.40 0.00 15.20 -11.66 -2.10 -2.11 2.08 2.09 80.40 80.40 19.15 19.20 No Change CDNLFG38 4/18/2022 14:08 0.40 4.00 18.20 77.40 -11.64 -0.09 -0.09 0.09 0.09 79.90 79.80 0.61 0.62 No Change,Valve completely closed CDNLFG39 4/18/2022 14:29 54.50 38.30 1.20 6.00 -11.23 -3.41 -3.36 0.35 0.34 79.10 79.10 40.90 40.02 No Change CDNLFG41 4/18/2022 15:01 49.20 35.40 0.00 15.40 -12.44 -0.66 -0.64 0.04 0.02 75.90 75.90 5.56 3.89 No Change CDNLFG42 4/18/2022 15:04 50.70 35.10 0.00 14.20 -12.08 -2.04 -2.02 2.80 2.89 73.90 73.90 5.38 5.47 No Change CDNLFG43 4/18/2022 15:06 55.10 37.50 0.00 7.40 -8.52 -6.76 -6.73 0.04 0.16 88.80 88.80 6.07 11.70 Opened Valve 1/2 turn or less Gas Extraction Monitoring Wellfield Data City of Denton Landfill Extraction Well Data P:\O&M\City of Denton\2022\(4) April\Forms\City of Denton O&M Report April 2022.xlsx Weaver Consultants Group, LLC 5/5/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ001 4/18/2022 11:07 58.80 38.00 0.30 2.90 -10.61 -9.12 -9.09 0.04 0.02 67.40 67.40 13.01 10.57 No Change CDNHZ002 4/18/2022 11:11 60.90 36.30 0.00 2.80 -10.49 -7.64 -7.89 0.03 0.00 65.60 65.60 11.60 3.18 Opened Valve 1/2 to 1 turn CDNHZ003 4/18/2022 11:17 59.90 37.70 0.00 2.40 -10.34 -4.68 -4.69 0.01 0.00 63.30 63.30 5.43 4.38 No Change CDNHZ005 4/18/2022 11:24 42.60 30.60 1.20 25.60 -10.46 -7.03 -7.07 0.02 0.01 64.20 64.20 8.74 5.63 No Change CDNHZ006 4/18/2022 11:32 4.40 4.00 18.20 73.40 -10.42 -1.40 -1.40 0.01 0.00 69.00 69.00 5.44 0.00 No Change CDNHZ007 4/18/2022 11:36 54.90 33.70 2.30 9.10 -10.34 -9.92 -9.87 0.02 0.01 68.70 68.70 10.50 7.30 No Change CDNHZ008 4/18/2022 11:39 15.70 19.60 6.60 58.10 -10.34 -3.03 -2.90 0.02 0.00 67.40 67.40 8.80 1.21 Closed Valve 1/2 turn or less CDNHZ010 4/18/2022 11:43 57.80 37.60 0.00 4.60 -10.31 -10.11 -10.00 0.02 0.02 68.30 68.30 9.04 10.69 No Change CDNHZ011 4/18/2022 11:47 61.40 34.10 0.00 4.50 -10.32 -0.34 -8.94 0.03 0.02 70.70 70.70 12.19 10.19 Opened Valve 1/2 turn or less CDNHZ012 4/18/2022 11:52 39.20 27.90 5.40 27.50 -10.57 -10.09 -10.13 0.08 0.06 66.70 66.70 19.35 16.14 No Change CDNHZ014 4/18/2022 11:56 0.50 1.20 20.90 77.40 -10.27 -5.10 -5.17 0.01 0.01 67.40 67.40 8.11 7.60 No Change CDNHZ015 4/18/2022 12:02 60.40 38.30 0.20 1.10 -10.34 -8.41 -8.35 0.03 0.02 68.00 68.00 11.44 10.74 No Change CDNHZ017 4/18/2022 12:46 58.00 37.50 0.80 3.70 -10.41 -2.43 -4.36 0.03 0.00 75.90 75.90 11.55 0.00 Opened Valve 1/2 turn or less CDNHZ018 4/18/2022 12:50 1.50 3.20 19.80 75.50 -10.37 -10.09 -10.05 0.06 0.03 72.30 72.30 16.94 12.67 No Change CDNHZ019 4/18/2022 12:53 47.10 32.30 4.30 16.30 -10.30 -9.96 -9.51 0.00 0.00 71.60 71.60 0.00 0.00 Closed Valve 1/2 turn or less CDNHZ020 4/18/2022 12:56 59.10 38.20 0.40 2.30 -10.17 -9.97 -10.00 0.05 0.03 73.40 73.40 15.40 12.16 No Change CDNHZ021 4/18/2022 12:59 13.10 7.20 14.30 65.40 -10.52 -7.49 -7.57 0.04 0.03 73.50 73.50 14.16 11.53 No Change CDNHZ022 4/18/2022 13:07 61.00 37.50 0.10 1.40 -12.79 -10.05 -11.45 0.07 0.06 71.40 71.40 18.52 16.07 Opened Valve 1/2 turn or less CDNHZ023 4/18/2022 13:11 57.50 37.90 0.60 4.00 -12.77 -12.58 -12.82 0.00 0.01 75.00 75.00 1.86 5.31 No Change CDNHZ025 4/18/2022 13:15 59.50 39.00 0.00 1.50 -12.87 -12.62 -12.29 0.00 0.00 70.50 70.50 3.20 3.74 No Change CDNHZ026 4/18/2022 13:20 50.60 35.70 0.00 13.70 -13.01 -1.88 -9.44 0.03 0.13 73.00 73.00 11.30 25.00 Opened Valve 1/2 turn or less CDNHZ029 4/18/2022 13:24 56.50 27.10 3.20 13.20 -12.67 -12.24 -12.24 0.05 0.03 74.60 74.60 14.91 11.25 No Change CDNHZ030 4/18/2022 13:29 20.60 13.00 14.70 51.70 -12.87 -10.33 -9.36 0.24 0.23 72.30 72.30 33.77 32.59 Closed Valve 1/2 turn or less CDNHZ031 4/18/2022 13:32 4.50 9.30 17.10 69.10 -12.50 -12.02 -11.90 0.02 0.01 73.50 7.50 8.54 6.76 Closed Valve 1/2 turn or less CDNHZ032 4/18/2022 13:39 55.50 34.10 1.80 8.60 -12.85 -12.21 -12.18 0.03 0.01 75.20 75.20 10.93 7.36 No Change CDNHZ033 4/18/2022 13:44 11.80 11.30 16.20 60.70 -12.72 -12.27 -12.31 0.05 0.03 74.30 74.30 15.15 11.23 Closed Valve 1/2 turn or less CDNHZ034 4/18/2022 13:47 57.90 37.50 0.10 4.50 -12.60 -12.37 -12.46 0.04 0.02 71.00 71.00 14.36 8.41 No Change CDNHZ035 4/18/2022 13:50 59.00 36.50 0.40 4.10 -12.77 -7.14 -9.63 0.10 0.08 72.10 72.10 22.02 19.48 Opened Valve 1/2 turn or less CDNHZ036 4/18/2022 13:53 56.40 37.00 0.60 6.00 -12.73 -12.15 -12.26 0.07 0.06 73.00 73.00 18.48 17.25 No Change Horizontal Well Data P:\O&M\City of Denton\2022\(4) April\Forms\City of Denton O&M Report April 2022.xlsx Weaver Consultants Group, LLC 5/5/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill Notes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =63 Number of Wells with Methane > 58%=15 Total Number of Well Readings =63 Number of Wells with Oxygen ≥ 2%=17 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =8 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =21 Number of Wells with No Room to Run (NRTR)=48 P:\O&M\City of Denton\2022\(4) April\Forms\City of Denton O&M Report April 2022.xlsx Weaver Consultants Group, LLC 5/5/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCGCH4 5/16/2022 8:09 49.90 35.00 0.00 15.10 0.00 -0.03 -0.03 0.04 0.03 73.60 73.60 NR NR Calibration Gas CDNCG002 5/16/2022 8:14 0.00 0.00 11.00 89.00 0.00 0.00 0.00 0.01 0.00 73.90 74.10 NR NR Calibration Gas CDNINLT1 5/16/2022 8:28 39.50 29.10 5.30 26.10 0.17 -18.00 -18.01 18.07 18.04 78.00 78.00 1040.00 1040.00 Flare Inlet CDNBLWR1 5/16/2022 8:30 39.30 28.90 5.20 26.60 0.17 3.91 3.98 0.00 0.00 90.00 90.00 1040.00 1040.00 Flare Blower CDN00GHG 5/16/2022 8:30 39.40 29.20 5.30 26.10 0.17 3.83 4.01 0.00 0.00 90.00 90.00 NR NR Flare GHG CDNCGCH4 5/17/2022 9:10 50.20 34.70 0.00 15.10 0.29 0.03 0.01 0.00 0.00 78.70 78.80 NR NR Calibration Gas CDNCG002 5/17/2022 9:16 0.00 0.00 11.20 88.80 0.13 0.00 0.00 0.00 0.00 79.20 79.30 NR NR Calibration Gas CDNCGCH4 5/17/2022 13:30 50.10 35.00 0.00 14.90 0.14 0.00 0.00 0.01 0.00 74.60 75.60 NR NR Calibration Gas CDNCG002 5/17/2022 13:34 0.00 0.00 10.90 89.10 0.19 0.01 0.01 0.00 0.00 75.10 82.90 NR NR Calibration Gas CDNINLT2 5/17/2022 13:39 42.00 31.20 4.20 22.60 0.01 -19.16 -19.25 19.05 19.10 82.00 82.00 1060.00 1060.00 Flare Inlet CDNBLWR2 5/17/2022 13:40 42.10 31.00 4.10 22.80 0.17 4.16 4.16 0.00 0.00 100.00 100.00 1060.00 1060.00 Flare Blower CDNGW040 5/16/2022 15:37 22.50 16.20 13.30 48.00 -8.44 -8.37 -8.37 0.06 0.05 95.10 95.60 16.45 14.54 No Change,Valve completely closed CDNGW044 5/17/2022 10:00 53.30 37.40 0.00 9.30 -6.00 -2.36 -2.43 2.35 2.42 91.60 92.30 4.85 4.92 Opened Valve 1/2 turn or less CDNGW045 5/17/2022 9:53 49.80 36.20 0.00 14.00 -10.70 -1.38 -1.36 0.06 0.10 90.40 90.30 3.12 4.21 No Change CDNGW046 5/17/2022 9:50 50.80 36.50 0.00 12.70 -5.63 -5.17 -5.20 0.02 0.00 96.70 96.30 9.86 0.00 No Change CDNGW047 5/17/2022 9:45 0.10 0.00 21.30 78.60 -10.67 -2.28 -2.24 0.01 0.00 88.20 88.20 0.73 0.37 No Change,Valve completely closed CDNGW048 5/17/2022 9:48 50.80 37.10 0.20 11.90 -10.49 -9.70 -9.68 1.45 1.70 95.50 95.40 8.55 9.26 No Change CDNGW049 5/16/2022 16:42 0.00 0.00 22.70 77.30 0.07 0.01 0.01 0.00 0.00 79.60 79.50 0.00 0.00 CDNGW050 5/17/2022 9:41 55.50 35.90 0.00 8.60 -9.98 -9.55 -9.51 9.50 9.62 95.30 95.40 39.75 40.00 No Change CDNGW051 5/17/2022 9:30 60.00 37.40 0.00 2.60 -7.71 -4.56 -4.60 4.75 4.84 94.60 94.50 15.56 15.70 No Change CDNGW052 5/17/2022 9:32 58.70 35.40 0.10 5.80 -8.83 -4.14 -4.15 4.12 4.14 95.20 95.90 26.47 26.52 No Change CDNGW054 5/16/2022 16:41 0.00 0.00 22.60 77.40 0.03 0.02 0.02 0.00 0.00 81.30 81.10 0.00 0.00 CDNGW055 5/16/2022 16:36 62.30 37.40 0.00 0.30 4.07 3.99 4.00 0.02 0.01 99.80 100.00 0.44 0.21 No Change CDNGW057 5/16/2022 16:34 59.10 39.40 0.00 1.50 3.40 3.64 3.64 0.07 0.07 88.80 88.80 1.96 1.92 No Change CDNGW058 5/16/2022 16:29 58.60 39.20 0.00 2.20 5.20 5.49 5.49 0.00 0.00 92.50 93.00 1.15 1.82 No Change CDNGW059 5/16/2022 16:21 0.00 0.00 22.70 77.30 -0.11 -0.02 0.00 0.03 0.00 78.70 78.40 1.22 0.00 CDNGW060 5/16/2022 16:23 55.40 35.60 0.00 9.00 0.71 0.41 0.41 0.00 0.01 90.60 90.60 0.28 0.69 No Change CDNGW061 5/16/2022 16:20 0.00 0.00 23.20 76.80 -0.09 0.00 0.01 0.00 0.00 81.00 81.10 1.42 1.64 CDNGW062 5/16/2022 16:26 59.80 38.20 0.00 2.00 -3.04 2.26 1.89 0.04 2.57 91.30 91.60 2.55 21.15 Opened Valve 1/2 to 1 turn CDNGW063 5/16/2022 16:32 58.90 39.40 0.00 1.70 4.07 4.71 4.71 0.00 0.00 84.30 86.70 0.00 0.00 No Change CDNGW064 5/16/2022 16:39 60.10 37.10 0.00 2.80 3.40 3.54 3.55 0.18 0.20 91.00 91.10 5.58 5.88 No Change CDNGW065 5/16/2022 16:43 0.00 0.00 22.10 77.90 -0.09 0.00 -0.02 0.01 0.03 78.50 78.50 7.18 11.51 CDNGW066 5/17/2022 10:24 59.40 39.00 0.00 1.60 -4.74 -5.16 -5.13 0.00 0.00 88.40 88.90 1.91 0.93 No Change CDNGW067 5/17/2022 10:22 49.90 36.30 0.00 13.80 -9.95 -9.73 -9.73 0.32 0.31 81.00 82.70 16.53 16.37 No Change CDNGW068 5/17/2022 10:19 55.80 37.30 0.00 6.90 -10.11 -5.96 -6.03 0.40 0.30 94.70 94.60 13.70 11.79 Opened Valve 1/2 turn or less CDNGW074 5/17/2022 11:38 1.80 1.10 21.60 75.50 -10.43 -0.27 -0.25 0.01 0.01 86.20 86.20 0.22 0.18 No Change,Valve completely closed CDNGW075 5/17/2022 11:41 44.20 35.70 0.00 20.10 -10.87 -0.92 -0.95 0.16 0.22 96.10 96.10 2.84 3.35 Closed Valve 1/2 turn or less CDNGW076 5/17/2022 11:43 57.10 37.60 0.00 5.30 -9.04 -1.05 -1.34 0.03 0.04 103.40 103.70 12.23 13.51 Opened Valve 1/2 turn or less Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data P:\O&M\City of Denton\2022\(5) May\City of Denton O&M Report May 2022.xlsx Weaver Consultants Group, LLC 6/10/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW077 5/17/2022 11:53 59.50 38.10 0.50 1.90 -0.86 0.12 0.11 0.04 0.03 91.30 91.20 5.58 5.38 No Change CDNGW078 5/17/2022 11:19 1.30 1.10 21.50 76.10 -0.82 -0.39 -0.39 0.34 0.35 86.00 86.00 1.86 1.88 No Change,Valve completely closed CDNGW079 5/17/2022 11:23 45.30 35.90 0.00 18.80 -10.57 -3.37 -3.38 1.16 1.26 101.90 101.90 7.68 7.99 No Change CDNGW080 5/17/2022 11:17 47.40 36.90 0.00 15.70 -9.84 -2.12 -2.13 2.15 2.14 99.00 98.90 42.72 42.70 No Change CDNGW081 5/17/2022 11:26 0.20 0.10 21.60 78.10 -10.77 -0.92 -0.92 0.01 0.01 86.90 86.90 0.21 0.18 No Change,Valve completely closed CDNGW082 5/17/2022 11:13 52.40 35.90 0.00 11.70 -12.10 -5.46 -5.62 0.02 0.19 104.80 104.80 3.57 12.58 No Change CDNGW083 5/17/2022 11:31 30.60 30.40 0.00 39.00 -10.36 -3.11 -3.01 0.05 0.02 97.50 97.50 4.63 3.27 Closed Valve 1/2 turn or less CDNGW084 5/17/2022 11:10 52.80 36.70 0.00 10.50 -10.79 -5.30 -5.41 0.58 1.02 100.50 100.60 5.43 7.19 Opened Valve 1/2 turn or less CDNGW085 5/17/2022 11:34 36.00 32.50 0.00 31.50 -10.47 -5.51 -4.37 5.64 4.32 96.80 96.80 68.83 60.39 Closed Valve 1/2 turn or less CDNGW086 5/17/2022 11:36 9.20 6.60 18.20 66.00 -10.77 -0.44 -0.44 0.02 0.02 84.60 84.80 4.08 3.65 No Change,Valve completely closed CDNGW087 5/17/2022 10:16 36.60 31.90 0.00 31.50 -10.14 -2.18 -2.19 0.42 0.36 87.00 86.20 4.67 4.33 Closed Valve 1/2 turn or less CDNGW088 5/17/2022 11:07 39.90 35.00 0.00 25.10 -10.16 -2.21 -2.20 2.24 2.24 95.80 95.80 32.55 32.56 No Change CDNGW089 5/17/2022 11:02 0.80 0.60 20.90 77.70 -2.91 -1.67 -1.65 1.68 1.68 85.80 85.80 28.52 28.45 No Change,Valve completely closed CDNGW090 5/17/2022 10:59 0.20 0.30 21.60 77.90 0.15 0.01 0.01 0.01 0.01 84.80 85.80 2.16 2.16 No Change CDNGW091 5/17/2022 10:57 52.80 39.10 0.00 8.10 -9.92 -2.45 -2.41 0.16 0.13 106.10 106.20 8.56 7.88 No Change CDNGW092 5/17/2022 10:48 51.40 37.10 0.00 11.50 -9.10 -7.90 -7.93 7.79 7.79 105.00 105.00 193.40 193.42 No Change CDNGW093 5/17/2022 10:51 41.90 36.20 0.00 21.90 -9.10 -2.21 -2.20 2.14 2.18 100.40 100.30 31.70 31.98 Closed Valve 1/2 turn or less CDNGW094 5/17/2022 10:54 42.70 35.70 0.00 21.60 -7.82 -1.75 -1.75 0.03 0.01 99.80 99.80 4.88 3.21 No Change CDNGW095 5/17/2022 10:45 26.70 18.70 10.70 43.90 -1.30 -1.52 -1.59 0.10 0.01 88.80 88.80 22.32 4.87 Closed Valve 1/2 to 1 turn CDNGW096 5/17/2022 10:42 56.80 38.60 0.00 4.60 -7.74 -6.13 -6.30 1.39 1.50 85.30 85.50 34.59 36.00 No Change CDNGW097 5/17/2022 10:39 56.60 38.00 0.00 5.40 -7.82 -7.30 -7.31 0.02 0.06 113.20 113.30 10.23 17.52 No Change CDNGW098 5/17/2022 10:36 59.00 39.20 0.00 1.80 -8.24 -5.96 -6.30 0.86 0.97 112.00 112.00 26.59 28.28 No Change CDNGW099 5/17/2022 10:29 1.50 1.30 21.10 76.10 0.08 -0.01 -0.03 0.02 0.00 88.10 88.50 3.07 0.00 No Change CDNGW100 5/17/2022 10:32 56.00 38.40 1.10 4.50 0.67 0.16 0.17 0.02 0.02 90.20 90.20 3.42 3.36 No Change CDNGW101 5/17/2022 10:34 58.20 38.60 0.00 3.20 0.39 0.16 0.16 0.02 0.02 88.50 88.50 4.50 4.41 No Change CDNGW102 5/17/2022 9:25 59.90 40.10 0.00 0.00 2.35 2.03 2.04 0.04 0.03 90.20 90.20 0.41 0.33 No Change CDNGW106 5/17/2022 11:49 0.40 10.80 17.70 71.10 0.24 -0.01 -0.01 0.01 0.01 87.30 87.60 2.06 1.88 No Change CDNGW107 5/17/2022 11:55 59.30 38.50 0.00 2.20 -11.35 -0.42 -0.53 0.09 0.24 107.20 107.20 8.64 14.17 Opened Valve 1/2 turn or less CDNGW108 5/17/2022 11:57 58.60 39.00 0.00 2.40 -10.68 -0.21 -0.30 0.16 0.18 113.10 112.90 5.20 5.43 Opened Valve 1/2 turn or less CDNGW109 5/17/2022 12:01 56.90 38.90 0.00 4.20 -10.88 -3.32 -3.56 0.80 1.37 118.00 118.00 19.07 24.97 Opened Valve 1/2 turn or less CDNGW110 5/17/2022 12:03 57.50 39.50 0.00 3.00 -11.69 -3.44 -3.55 0.79 1.07 116.50 116.40 25.56 29.69 Opened Valve 1/2 turn or less CDNGW111 5/17/2022 12:05 49.80 38.70 0.00 11.50 -10.92 -2.02 -2.03 0.70 0.69 113.40 113.40 24.03 23.91 No Change CDNGW112 5/17/2022 12:07 34.60 33.50 0.00 31.90 -11.13 -0.35 -0.33 0.07 0.09 110.30 110.40 3.42 3.86 No Change CDNGW113 5/17/2022 12:09 40.70 35.60 0.00 23.70 -11.10 -0.58 -0.59 0.34 0.12 111.50 111.30 7.57 4.55 No Change CDNGW114 5/17/2022 12:11 51.90 39.00 0.00 9.10 -10.83 -1.54 -1.54 1.82 1.82 116.70 116.70 17.36 17.36 No Change CDNGW115 5/17/2022 12:13 52.90 38.70 0.00 8.40 -11.14 -1.55 -1.62 1.06 1.39 111.80 111.80 22.09 25.32 Opened Valve 1/2 turn or less CDNGW116 5/17/2022 12:15 53.10 38.70 0.00 8.20 -10.62 -0.45 -0.49 0.47 0.69 111.80 111.80 14.70 17.93 Opened Valve 1/2 turn or less CDNGW117 5/17/2022 12:17 53.10 38.60 0.00 8.30 -11.10 -0.67 -0.68 0.90 1.08 112.10 112.30 12.24 13.41 Opened Valve 1/2 turn or less CDNGW118 5/17/2022 12:19 53.30 38.90 0.00 7.80 -10.79 -0.92 -0.95 1.43 1.50 108.30 108.00 15.49 15.91 Opened Valve 1/2 turn or less CDNGW119R 5/17/2022 12:22 4.70 4.60 20.60 70.10 -10.81 -0.03 -0.01 0.00 0.01 89.50 89.70 0.11 0.30 No Change,Valve completely closed P:\O&M\City of Denton\2022\(5) May\City of Denton O&M Report May 2022.xlsx Weaver Consultants Group, LLC 6/10/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW120R 5/17/2022 12:24 58.10 39.80 0.00 2.10 -10.77 -10.76 -10.69 0.38 0.51 90.20 90.20 1.94 2.24 No Change CDNGW121R 5/17/2022 12:26 8.10 11.40 15.50 65.00 -10.88 1.59 1.58 0.01 0.01 92.50 92.60 8.04 8.08 No Change,Valve completely closed CDNGW122R 5/17/2022 12:28 3.30 4.60 19.80 72.30 -11.07 -5.11 -5.19 0.02 0.02 89.90 91.30 10.72 9.52 No Change,Valve completely closed CDNGW123R 5/17/2022 12:31 3.30 4.80 18.30 73.60 -11.10 -0.03 -0.01 0.04 0.03 93.70 93.70 13.31 11.77 No Change,Valve completely closed CDNGW124R 5/17/2022 12:34 41.80 28.20 5.70 24.30 -11.03 -10.38 -7.79 0.04 0.03 90.70 90.60 14.28 12.10 Closed Valve 1/2 turn or less,Valve CDNGW125R 5/17/2022 12:36 4.10 16.50 6.30 73.10 -11.10 0.49 0.49 0.01 0.01 93.90 93.90 7.52 7.52 No Change,Valve completely closed CDNGW126R 5/17/2022 12:38 12.30 8.90 16.90 61.90 -11.10 0.24 0.24 0.44 0.44 94.30 94.20 47.06 47.53 No Change,Valve completely closed DEWLCR3 5/17/2022 11:47 0.70 0.90 21.40 77.00 0.25 -0.01 0.00 0.01 0.00 87.60 87.80 2.64 0.00 No Change,Valve completely closed DEWLCR4 5/17/2022 13:19 56.70 38.90 0.00 4.40 -10.92 0.38 0.37 0.39 0.38 97.60 97.50 44.36 43.72 Opened Valve 1/2 turn or less DEWLCR5 5/17/2022 13:15 46.10 33.50 2.50 17.90 -13.67 -1.17 -1.09 12.91 10.11 87.90 88.00 25.75 22.84 Closed Valve 1/2 turn or less Notes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =77 Number of Wells with Methane > 58%=16 Total Number of Well Readings =77 Number of Wells with Oxygen ≥ 2%=25 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =19 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =20 Number of Wells with No Room to Run (NRTR)=39 CDNSV001 5/16/2022 11:22 10.80 15.00 8.40 65.80 -9.76 -9.81 -9.68 0.25 0.19 86.10 86.10 33.78 29.76 No Change CDNSV002 5/16/2022 11:20 19.60 17.20 8.00 55.20 -9.75 -9.81 -9.82 0.11 0.11 85.30 85.30 22.88 22.60 No Change CDNSV003 5/16/2022 11:14 32.20 26.30 2.10 39.40 -9.65 -9.47 -9.47 0.16 0.16 88.80 89.20 26.58 26.57 No Change CDNSV004 5/16/2022 11:16 20.60 18.10 4.80 56.50 -9.75 -9.81 -9.81 0.11 0.11 91.10 91.80 22.54 22.32 No Change CDNSV005 5/16/2022 11:11 39.40 26.80 0.80 33.00 -9.46 -9.52 -9.47 0.04 0.06 82.20 82.20 12.85 16.49 No Change CDNSV006 5/16/2022 11:27 1.90 3.20 19.50 75.40 -9.71 -9.78 -9.81 0.17 0.18 76.00 76.00 27.97 28.83 No Change CDNSV007 5/16/2022 11:29 0.50 3.10 18.90 77.50 -9.76 -9.81 -9.47 0.35 0.22 78.90 78.80 39.97 32.12 No Change CDNSV008 5/16/2022 11:33 1.30 3.90 18.20 76.60 -9.59 -9.57 -9.68 0.24 0.18 81.10 81.00 33.17 29.19 No Change CDNSV009 5/16/2022 11:38 0.00 0.70 21.40 77.90 -9.48 -9.55 -9.57 0.13 0.12 80.20 79.90 24.10 23.94 No Change CDNSV010 5/16/2022 11:41 3.30 21.30 1.80 73.60 -9.75 -9.86 -9.83 0.14 0.13 86.70 86.70 25.26 24.72 No Change CDNSV011 5/16/2022 11:44 11.10 20.30 3.00 65.60 -9.71 -9.75 -9.81 0.05 0.10 89.00 90.40 15.64 21.60 No Change CDNSV012 5/16/2022 12:29 19.10 18.30 6.70 55.90 -9.72 -9.78 -9.81 0.14 0.13 90.20 90.90 24.79 24.14 No Change CDNSV013 5/16/2022 12:33 1.20 1.00 22.00 75.80 -9.96 -9.72 -9.72 0.14 0.13 87.10 87.30 25.61 24.74 No Change CDNSV014 5/16/2022 12:36 42.10 31.30 2.00 24.60 -9.97 -10.06 -10.06 0.11 0.12 88.30 89.20 22.18 23.14 No Change Soil Vapor Extraction Well Data P:\O&M\City of Denton\2022\(5) May\City of Denton O&M Report May 2022.xlsx Weaver Consultants Group, LLC 6/10/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNLFG02 5/16/2022 10:38 58.40 40.00 0.00 1.60 -11.86 -10.06 -11.09 0.30 0.31 83.60 83.80 37.20 37.81 Opened Valve 1/2 turn or less CDNLFG03 5/16/2022 10:34 57.80 41.00 0.00 1.20 -12.28 -1.54 -1.67 1.87 3.19 82.40 82.50 4.37 5.70 Opened Valve 1/2 turn or less CDNLFG05 5/16/2022 10:40 58.40 39.30 0.00 2.30 -12.36 -2.56 -2.86 0.49 0.39 87.10 87.60 48.33 42.91 Opened Valve 1/2 turn or less CDNLFG06 5/16/2022 10:30 0.30 0.40 22.60 76.70 -12.11 -0.73 -0.66 0.13 0.06 82.10 82.20 0.73 0.51 No Change,Valve completely closed CDNLFG07 5/16/2022 10:22 2.60 2.10 22.40 72.90 0.56 -0.34 -0.33 0.08 0.07 89.20 89.30 19.02 17.70 No Change CDNLFG08 5/16/2022 10:20 32.50 25.40 10.90 31.20 0.20 -0.27 -0.23 0.11 0.05 80.80 80.80 0.68 0.48 No Change CDNLFG16 5/16/2022 10:16 58.70 41.30 0.00 0.00 0.34 0.01 0.07 0.17 0.11 88.10 88.10 0.84 0.69 No Change CDNLFG17 5/16/2022 10:14 0.00 0.00 22.40 77.60 0.24 0.00 0.01 0.00 0.00 75.10 75.30 0.00 0.00 No Change CDNLFG18 5/16/2022 10:11 56.90 39.30 0.10 3.70 0.21 -0.14 -0.10 0.15 0.10 88.10 88.30 26.39 22.17 No Change CDNLFG19 5/16/2022 10:27 59.80 39.80 0.00 0.40 -12.11 -1.13 -1.04 1.37 3.40 79.40 79.20 2.40 3.78 Opened Valve 1/2 turn or less CDNLFG20 5/16/2022 10:08 56.60 39.00 0.00 4.40 -12.26 -6.36 -6.72 0.18 0.12 82.50 82.40 28.60 23.47 Opened Valve 1/2 turn or less CDNLFG21 5/16/2022 10:04 56.80 39.30 0.00 3.90 -12.38 -5.75 -5.84 0.15 0.12 86.40 86.50 26.42 23.49 No Change CDNLFG22 5/16/2022 9:37 39.20 34.90 0.80 25.10 -12.27 -4.61 -4.42 0.19 0.07 83.60 83.60 29.65 17.89 Closed Valve 1/2 turn or less CDNLFG23 5/16/2022 10:32 28.20 20.60 12.50 38.70 -12.22 -0.82 -0.81 0.18 0.16 82.50 82.50 0.88 0.83 No Change,Valve completely closed CDNLFG24 5/16/2022 9:40 38.90 36.20 0.00 24.90 -12.53 -0.80 -0.79 0.21 0.40 78.40 78.40 1.46 2.02 No Change CDNLFG25 5/16/2022 9:58 60.00 35.50 0.60 3.90 -12.45 -12.53 -12.56 0.00 0.01 94.90 96.00 2.50 7.20 No Change CDNLFG26 5/16/2022 9:49 51.40 40.20 0.00 8.40 -12.56 -3.49 -3.41 0.00 0.00 95.40 95.50 0.00 0.00 No Change CDNLFG27 5/16/2022 9:54 41.30 37.80 0.00 20.90 -12.32 -9.13 -9.13 0.21 0.29 75.60 75.80 0.93 1.09 No Change CDNLFG28 5/16/2022 8:44 55.80 40.10 0.00 4.10 -12.80 -1.39 -1.48 0.19 0.05 72.40 72.10 30.40 15.48 Opened Valve 1/2 turn or less CDNLFG29 5/16/2022 8:41 55.40 39.40 0.00 5.20 -12.74 -4.10 -4.23 0.31 0.31 81.50 81.50 38.30 38.33 Opened Valve 1/2 turn or less CDNLFG30 5/16/2022 8:50 56.90 42.00 0.00 1.10 -12.45 -1.42 -1.52 0.06 0.00 82.80 79.10 16.60 0.00 Opened Valve 1/2 turn or less CDNLFG31 5/16/2022 15:24 46.90 37.60 0.00 15.50 -11.24 -5.37 -5.29 2.07 1.54 94.40 94.40 10.28 8.88 Closed Valve 1/2 turn or less CDNLFG32 5/16/2022 15:21 55.50 38.00 0.00 6.50 -10.46 0.04 0.06 0.02 0.01 96.80 97.00 10.05 5.97 No Change,Valve completely closed CDNLFG33 5/16/2022 15:27 50.60 38.30 0.00 11.10 -11.13 -0.43 -0.43 0.18 0.18 91.60 91.60 3.10 3.10 No Change CDNLFG34 5/16/2022 15:30 34.60 33.90 0.00 31.50 -5.03 -0.10 -0.10 0.06 0.09 91.60 91.90 1.76 2.15 No Change CDNLFG35 5/16/2022 15:18 34.90 31.90 0.00 33.20 -9.45 -7.69 -7.69 0.00 0.00 91.00 91.30 0.00 0.00 No Change CDNLFG36 5/16/2022 15:32 58.50 40.00 0.00 1.50 -0.09 0.06 0.07 0.02 0.01 106.50 106.50 9.42 7.48 No Change CDNLFG37 5/16/2022 15:38 49.70 37.70 0.00 12.60 -8.76 -1.21 -1.20 1.79 1.78 85.40 85.40 17.71 17.67 No Change CDNLFG38 5/16/2022 15:16 15.60 16.70 9.70 58.00 -8.85 -0.03 -0.04 0.03 0.03 96.50 97.00 0.33 0.33 No Change,Valve completely closed CDNLFG39 5/16/2022 15:35 58.30 40.00 0.00 1.70 -8.63 -2.43 -2.66 0.42 0.43 86.00 85.80 44.50 44.91 Opened Valve 1/2 turn or less CDNLFG41 5/17/2022 10:03 45.20 35.30 0.00 19.50 -10.93 -0.98 -0.98 0.03 0.03 86.00 85.80 5.27 4.84 No Change CDNLFG42 5/17/2022 10:06 44.30 34.10 0.00 21.60 -10.81 -2.31 -2.30 2.54 2.62 85.80 85.50 5.07 5.15 No Change CDNLFG43 5/17/2022 10:10 49.30 33.70 0.00 17.00 -8.18 -6.89 -6.93 0.06 0.08 89.30 89.20 6.93 8.14 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill Extraction Well Data P:\O&M\City of Denton\2022\(5) May\City of Denton O&M Report May 2022.xlsx Weaver Consultants Group, LLC 6/10/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ001 5/16/2022 13:10 51.00 36.70 0.00 12.30 -11.08 -10.40 -10.40 0.06 0.04 94.20 94.20 15.78 13.64 No Change CDNHZ002 5/16/2022 13:14 50.90 35.70 0.00 13.40 -11.15 -9.38 -9.35 0.05 0.02 84.90 85.20 15.70 9.41 No Change CDNHZ003 5/16/2022 13:17 52.80 36.00 0.00 11.20 -11.12 -6.00 -6.04 0.02 0.00 82.00 81.10 9.09 2.92 No Change CDNHZ005 5/16/2022 13:26 40.70 32.40 0.00 26.90 -11.32 -8.90 -8.96 0.02 0.01 89.70 89.70 8.91 5.87 No Change CDNHZ006 5/16/2022 13:22 24.60 27.60 0.00 47.80 -11.09 0.39 -6.06 0.01 0.00 97.20 91.30 8.23 4.15 Opened Valve 1/2 turn or less CDNHZ007 5/16/2022 13:29 57.10 36.50 1.90 4.50 -11.07 -10.74 -10.74 0.05 0.04 88.30 88.30 15.49 14.10 No Change CDNHZ008 5/16/2022 13:31 17.90 21.70 2.10 58.30 -11.07 -2.86 -2.85 0.02 0.00 95.60 96.10 8.39 0.00 No Change CDNHZ010 5/16/2022 13:36 56.70 38.40 0.00 4.90 -11.34 -11.25 -11.07 0.02 0.02 80.40 80.10 10.37 9.86 No Change CDNHZ011 5/16/2022 13:39 13.70 8.00 17.40 60.90 -11.07 -10.74 -10.74 0.05 0.04 97.00 97.30 15.00 12.72 No Change CDNHZ012 5/16/2022 13:41 23.50 17.40 10.50 48.60 -11.07 -11.07 -11.07 0.09 0.09 97.00 97.30 19.60 20.43 No Change CDNHZ014 5/16/2022 13:44 61.90 36.90 0.00 1.20 -11.28 -0.03 -0.32 0.02 0.01 99.10 98.90 10.48 6.97 Opened Valve 1/2 turn or less CDNHZ015 5/16/2022 13:46 60.70 37.90 0.00 1.40 -11.32 -8.37 -8.24 0.05 0.04 96.80 97.20 15.13 14.15 No Change CDNHZ017 5/16/2022 13:51 59.20 39.70 0.00 1.10 -11.07 -10.26 -10.34 0.00 0.01 101.20 101.20 0.00 6.17 No Change CDNHZ018 5/16/2022 13:56 0.30 1.10 21.10 77.50 -11.13 -1.55 -1.53 0.01 0.00 99.10 99.30 6.50 1.88 No Change CDNHZ019 5/16/2022 13:53 59.10 38.70 0.00 2.20 -11.05 -10.74 -10.74 0.01 0.00 93.80 94.10 5.82 1.84 No Change CDNHZ020 5/16/2022 13:58 58.80 37.90 0.00 3.30 -11.07 -11.12 -11.07 0.07 0.04 93.00 93.20 17.18 13.53 No Change CDNHZ021 5/16/2022 14:01 40.70 22.10 2.40 34.80 -11.07 -0.06 -0.12 0.01 0.00 102.40 102.70 5.55 0.00 Opened Valve 1/2 turn or less CDNHZ022 5/16/2022 14:02 59.30 36.70 0.00 4.00 -11.07 -10.96 -10.99 0.06 0.07 91.60 91.80 16.50 17.59 No Change CDNHZ023 5/16/2022 14:05 59.10 39.00 0.00 1.90 -11.17 -11.23 -11.22 0.01 0.01 98.80 99.30 6.27 6.34 No Change CDNHZ025 5/16/2022 14:07 58.40 39.60 0.00 2.00 -11.41 -11.41 -11.28 0.01 0.00 93.70 93.70 6.88 0.00 No Change CDNHZ026 5/16/2022 14:10 19.80 24.40 0.00 55.80 -11.17 -10.57 -10.40 0.05 0.04 94.90 94.90 14.14 13.02 No Change CDNHZ029 5/16/2022 14:15 48.70 25.40 4.60 21.30 -11.41 -11.07 -10.74 0.03 0.03 99.80 100.10 10.83 11.87 No Change CDNHZ030 5/16/2022 14:18 59.40 38.70 0.00 1.90 -11.34 -0.20 -0.51 0.02 0.00 97.50 97.90 8.70 3.26 Opened Valve 1/2 turn or less CDNHZ031 5/16/2022 14:20 7.60 5.90 20.50 66.00 -11.07 -7.69 -7.69 0.01 0.00 98.10 98.70 6.67 3.70 No Change CDNHZ032 5/16/2022 15:03 56.80 36.50 1.00 5.70 -11.24 -11.09 -11.07 0.02 0.02 105.50 105.70 10.14 8.14 No Change CDNHZ033 5/16/2022 15:05 8.30 6.40 20.40 64.90 -11.17 -8.18 -8.19 0.01 0.01 97.70 99.00 6.13 6.21 No Change CDNHZ034 5/16/2022 15:08 59.70 39.60 0.00 0.70 -11.07 -11.17 -11.07 0.01 0.03 82.20 82.00 7.54 10.85 No Change CDNHZ035 5/16/2022 15:11 58.30 38.20 0.10 3.40 -11.09 -10.18 -10.23 0.14 0.14 83.40 83.10 25.15 25.54 No Change CDNHZ036 5/16/2022 15:13 57.10 39.00 0.30 3.60 -11.10 -11.17 -11.12 0.07 0.06 96.10 96.50 17.50 16.01 No Change Horizontal Well Data P:\O&M\City of Denton\2022\(5) May\City of Denton O&M Report May 2022.xlsx Weaver Consultants Group, LLC 6/10/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill Notes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =63 Number of Wells with Methane > 58%=18 Total Number of Well Readings =63 Number of Wells with Oxygen ≥ 2%=14 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =10 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =5 Number of Wells with No Room to Run (NRTR)=34 P:\O&M\City of Denton\2022\(5) May\City of Denton O&M Report May 2022.xlsx Weaver Consultants Group, LLC 6/10/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCGCH4 6/13/2022 9:19 50.00 34.70 0.00 15.30 -0.04 -0.03 -0.03 0.03 0.03 81.30 81.40 NR NR Calibration Gas CDNCG002 6/13/2022 9:22 0.00 0.00 10.90 89.10 0.18 0.02 0.02 0.00 0.00 82.00 81.40 NR NR Calibration Gas CDNINLT1 6/13/2022 9:32 39.20 30.50 3.90 26.40 -0.07 -19.46 -19.57 19.21 19.21 84.00 84.00 905.00 905.00 Flare Inlet CDNBLWR1 6/13/2022 9:40 38.50 30.30 3.80 27.40 -0.04 3.16 3.26 0.00 0.00 92.00 92.00 905.00 905.00 Flare Blower CDN00GHG 6/13/2022 9:40 38.70 30.00 3.90 27.40 -0.18 3.17 3.27 0.00 0.00 92.00 92.00 NR NR Flare GHG CDNCGCH4 6/15/2022 9:25 50.00 34.90 0.00 15.10 -0.07 -0.02 -0.01 0.02 0.02 87.90 88.20 NR NR Calibration Gas CDNCG002 6/15/2022 9:34 0.00 0.00 11.10 88.90 -0.04 -0.04 0.01 0.02 0.00 88.20 84.00 NR NR Calibration Gas CDNCGCH4 6/16/2022 17:34 49.90 34.90 0.00 15.20 0.00 0.00 -0.01 0.01 0.01 80.40 80.20 NR NR Calibration Gas CDNCG002 6/16/2022 17:38 0.00 0.00 11.10 88.90 0.30 0.00 0.00 0.00 0.00 82.20 81.10 NR NR Calibration Gas CDNINLT2 6/16/2022 17:43 38.00 27.90 5.10 29.00 0.33 -18.66 -18.79 19.40 19.39 89.00 89.00 950.00 950.00 Flare Inlet CDNBLWR2 6/16/2022 17:45 37.40 27.30 5.10 30.20 0.33 3.64 3.70 0.00 0.00 106.00 106.00 950.00 950.00 Flare Blower CDNGW040 6/13/2022 13:35 40.80 30.00 6.50 22.70 -7.07 -5.36 -6.47 0.00 0.06 108.70 110.00 0.00 16.82 No Change CDNGW044 6/15/2022 13:04 47.80 37.00 0.10 15.10 -6.77 -2.67 -2.66 2.67 2.67 102.80 102.80 5.12 5.12 No Change CDNGW045 6/15/2022 13:00 42.30 36.00 0.00 21.70 -9.78 -1.34 -1.34 0.13 0.07 93.60 93.60 4.73 3.58 Closed Valve 1/2 turn or less CDNGW046 6/15/2022 13:07 45.90 36.40 0.00 17.70 -5.19 -4.61 -4.63 0.00 0.00 100.10 100.10 0.00 0.00 No Change CDNGW047 6/15/2022 13:42 1.60 0.80 21.70 75.90 -11.22 -2.47 -2.47 0.01 0.01 93.00 92.90 0.81 0.81 No Change,Valve completely closed CDNGW048 6/15/2022 13:40 45.50 35.90 0.10 18.50 -11.29 -9.39 -9.42 1.65 1.58 96.20 96.30 9.13 8.92 No Change CDNGW049 6/15/2022 15:01 0.00 0.00 22.20 77.80 -0.15 -0.01 -0.01 0.01 0.01 69.30 69.40 6.69 6.40 CDNGW050 6/15/2022 14:48 50.00 37.90 0.00 12.10 -10.08 -8.94 -8.94 9.38 9.38 98.70 98.70 39.40 39.40 No Change CDNGW051 6/15/2022 14:51 55.40 39.20 0.00 5.40 -6.48 -4.06 -4.17 3.57 4.59 97.50 97.50 13.47 15.25 No Change CDNGW052 6/15/2022 14:55 48.00 34.20 2.90 14.90 -8.40 -4.97 -4.56 5.13 4.55 100.50 101.20 29.35 27.64 Closed Valve 1/2 to 1 turn CDNGW054 6/15/2022 15:01 0.00 0.00 21.90 78.10 -0.15 0.00 0.00 0.01 0.01 69.80 69.80 5.79 5.68 CDNGW055 6/15/2022 15:26 57.40 36.80 0.00 5.80 4.21 3.94 3.95 0.04 0.03 100.10 100.50 0.63 0.58 No Change CDNGW057 6/15/2022 15:29 58.40 36.50 0.00 5.10 3.19 3.39 3.40 0.19 0.15 91.20 91.30 3.12 2.79 No Change CDNGW058 6/15/2022 15:31 55.60 38.90 0.00 5.50 5.43 5.38 5.40 0.06 0.04 89.90 89.80 7.11 5.99 No Change CDNGW059 6/15/2022 15:35 56.50 39.40 0.00 4.10 0.07 2.45 2.48 2.47 2.49 95.80 95.20 11.33 11.37 No Change,Valve completely closed CDNGW060 6/15/2022 15:33 56.20 39.50 0.00 4.30 0.27 0.12 0.12 0.05 0.05 96.30 96.60 1.54 1.60 No Change CDNGW061 6/15/2022 15:40 0.00 0.00 22.10 77.90 -0.15 -0.01 0.00 0.01 0.00 73.90 73.50 2.01 1.16 CDNGW062 6/15/2022 15:37 56.30 39.40 0.00 4.30 -1.37 -0.23 -0.32 0.88 2.31 96.70 97.40 12.27 19.91 Opened Valve 1/2 turn or less CDNGW063 6/15/2022 15:24 56.10 39.20 0.00 4.70 1.32 4.67 4.69 0.01 0.00 95.70 96.30 4.78 0.00 No Change CDNGW064 6/15/2022 15:22 55.80 39.80 0.10 4.30 3.38 3.48 3.46 0.15 0.16 94.30 94.30 5.04 5.33 No Change CDNGW065 6/15/2022 14:59 0.00 0.00 21.90 78.10 -0.15 0.00 0.00 0.00 0.00 68.30 68.60 3.53 3.53 CDNGW066 6/15/2022 14:46 55.50 40.30 0.00 4.20 -3.57 -3.58 -3.62 0.04 0.03 100.10 100.40 6.09 5.05 No Change CDNGW067 6/15/2022 13:44 41.80 34.80 0.20 23.20 -9.23 -8.82 -8.81 0.17 0.19 90.30 90.00 12.07 12.59 No Change CDNGW068 6/15/2022 13:37 48.10 36.90 0.00 15.00 -10.46 -6.88 -6.88 0.60 0.60 99.70 99.70 16.66 16.66 No Change CDNGW074 6/15/2022 12:29 0.30 0.30 21.50 77.90 -9.58 -0.28 -0.26 0.01 0.01 89.20 89.20 0.19 0.16 No Change,Valve completely closed CDNGW075 6/15/2022 12:22 35.50 31.70 0.10 32.70 -10.86 -0.94 -0.91 0.36 0.47 97.30 97.30 4.27 4.93 No Change CDNGW076 6/15/2022 12:15 34.80 29.80 0.10 35.30 -8.72 -4.89 -4.58 1.09 1.05 107.70 107.80 70.23 68.80 Closed Valve 1/2 turn or less Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data C:\Users\bmiller\Documents\(1) 2022\denton\6\City of Denton O&M Report June 2022.xlsx Weaver Consultants Group, LLC 7/5/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW077 6/15/2022 12:03 44.10 28.10 4.30 23.50 1.28 -0.09 -0.10 0.01 0.01 92.60 92.70 3.37 3.23 No Change CDNGW078 6/15/2022 13:25 21.30 12.70 14.60 51.40 -0.90 -0.28 -0.28 0.02 0.02 90.80 91.00 0.43 0.39 No Change,Valve completely closed CDNGW079 6/15/2022 12:27 37.00 32.10 0.10 30.80 -10.33 -3.30 -3.29 0.56 0.56 103.40 103.40 5.33 5.32 No Change CDNGW080 6/15/2022 13:21 39.90 32.60 0.00 27.50 -10.69 -1.92 -1.92 1.97 1.97 102.60 102.60 40.85 40.82 No Change CDNGW081 6/15/2022 12:34 0.00 0.00 21.70 78.30 -10.64 -0.85 -0.82 0.01 0.01 91.30 91.30 0.23 0.18 No Change,Valve completely closed CDNGW082 6/15/2022 13:18 45.20 34.90 0.00 19.90 -10.09 -5.01 -5.23 0.52 0.19 106.30 106.30 20.82 12.49 No Change CDNGW083 6/15/2022 12:40 27.30 29.10 0.00 43.60 -10.77 -2.04 -2.05 0.03 0.01 97.40 97.40 3.58 1.69 No Change CDNGW084 6/15/2022 13:14 48.70 36.30 0.00 15.00 -10.57 -5.79 -5.78 1.05 1.08 103.10 103.20 7.25 7.38 No Change CDNGW085 6/15/2022 12:42 33.00 31.40 0.00 35.60 -10.69 -2.87 -2.25 2.87 2.23 99.00 99.00 49.32 43.49 No Change CDNGW086 6/15/2022 12:32 0.10 0.10 21.70 78.10 -10.00 -0.30 -0.30 0.00 0.01 91.00 91.10 1.89 2.56 No Change,Valve completely closed CDNGW087 6/15/2022 13:11 39.50 25.10 5.60 29.80 -11.00 -1.09 -1.09 0.03 0.02 95.30 95.40 1.21 1.11 Closed Valve 1/2 turn or less,Valve CDNGW088 6/15/2022 13:33 35.40 33.00 0.10 31.50 -8.40 -1.82 -1.83 1.83 1.80 97.10 97.10 29.41 29.15 No Change CDNGW089 6/15/2022 13:30 0.40 0.50 20.80 78.30 -1.17 -1.26 -1.25 1.25 1.22 93.30 93.40 24.43 24.11 No Change,Valve completely closed CDNGW090 6/15/2022 13:27 0.10 0.10 21.80 78.00 -0.56 -0.50 -0.72 0.48 0.72 92.60 92.90 20.43 24.87 No Change,Valve completely closed CDNGW091 6/15/2022 12:07 42.30 34.80 0.00 22.90 -8.98 -2.18 -2.09 0.11 0.04 105.70 105.70 7.11 4.42 Closed Valve 1/2 turn or less CDNGW092 6/15/2022 13:47 44.10 35.50 0.00 20.40 -7.67 -6.37 -6.29 6.66 6.56 105.50 105.50 179.31 178.13 No Change CDNGW093 6/15/2022 13:49 41.90 35.70 0.00 22.40 -7.82 -1.28 -1.31 1.22 1.21 100.80 100.80 23.92 23.85 No Change CDNGW094 6/15/2022 13:52 36.70 33.90 0.00 29.40 -3.41 -1.07 -1.06 0.01 0.00 99.50 99.50 2.07 1.13 No Change CDNGW095 6/15/2022 14:43 14.90 10.90 14.80 59.40 -0.53 -0.28 -0.04 0.41 0.64 96.40 97.60 45.32 56.72 Closed Valve 1/2 turn or less CDNGW096 6/15/2022 14:39 52.10 38.70 0.00 9.20 -5.91 -4.72 -4.73 1.01 1.05 95.20 95.20 29.26 29.91 No Change CDNGW097 6/15/2022 14:31 51.80 38.80 0.00 9.40 -5.92 -5.54 -5.51 0.03 0.02 113.70 113.70 10.92 10.20 No Change CDNGW098 6/15/2022 12:09 53.00 40.50 0.00 6.50 -6.75 -4.72 -4.77 1.08 0.72 112.00 112.10 29.94 24.43 No Change CDNGW099 6/15/2022 14:37 52.80 38.20 1.50 7.50 0.51 0.40 0.39 0.32 0.30 96.60 96.60 12.37 11.90 No Change CDNGW100 6/15/2022 14:35 55.70 40.10 0.10 4.10 0.88 0.90 0.90 0.03 0.02 97.10 97.10 3.82 3.39 No Change CDNGW101 6/15/2022 14:33 55.60 39.50 0.00 4.90 1.03 0.88 0.88 0.03 0.03 94.50 94.50 4.91 4.66 No Change CDNGW102 6/15/2022 14:57 54.80 38.90 0.00 6.30 2.67 2.58 2.59 0.63 0.63 100.60 100.70 1.60 1.60 No Change CDNGW106 6/15/2022 12:19 0.20 2.70 20.50 76.60 -0.15 -0.04 -0.03 0.04 0.04 94.40 94.40 4.57 4.22 No Change,Valve completely closed CDNGW107 6/15/2022 12:01 50.40 38.30 0.00 11.30 -10.71 -0.49 -0.50 0.02 0.01 108.80 108.70 4.14 3.38 No Change CDNGW108 6/15/2022 11:59 48.90 38.30 0.00 12.80 -10.94 -0.79 -0.88 0.51 0.40 114.80 114.80 9.23 8.14 No Change CDNGW109 6/15/2022 11:57 48.80 37.90 0.00 13.30 -11.71 -4.80 -5.06 1.48 1.46 118.10 118.20 25.90 25.69 No Change CDNGW110 6/15/2022 11:52 47.00 38.00 0.00 15.00 -12.60 -4.58 -4.45 1.29 0.96 116.90 116.90 32.56 28.09 Closed Valve 1/2 turn or less CDNGW111 6/15/2022 11:49 37.40 34.60 0.00 28.00 -11.18 -2.18 -2.02 0.76 0.68 113.00 113.00 25.06 23.84 Closed Valve 1/2 turn or less CDNGW112 6/15/2022 11:47 25.70 28.80 0.00 45.50 -11.09 -0.29 -0.30 0.08 0.08 111.00 110.90 3.56 3.58 No Change CDNGW113 6/15/2022 11:45 28.10 28.80 0.00 43.10 -11.18 -0.54 -0.56 0.25 0.41 111.10 111.10 6.46 8.31 No Change CDNGW114 6/15/2022 11:38 44.50 35.80 0.00 19.70 -11.33 -1.76 -1.64 1.85 1.33 116.70 116.70 17.48 14.84 Closed Valve 1/2 turn or less CDNGW115 6/15/2022 15:45 45.00 37.50 0.10 17.40 -11.93 -1.87 -1.78 1.39 1.23 112.40 112.40 25.34 23.84 Closed Valve 1/2 turn or less CDNGW116 6/15/2022 11:25 42.20 36.80 0.00 21.00 -11.63 -0.73 -0.71 0.65 0.65 110.70 110.70 17.33 17.29 Closed Valve 1/2 turn or less CDNGW117 6/15/2022 11:20 43.20 36.60 0.10 20.10 -11.51 -0.87 -0.85 1.08 0.84 113.60 113.70 13.41 11.87 Closed Valve 1/2 turn or less CDNGW118 6/15/2022 11:23 44.90 37.60 0.00 17.50 -11.65 -1.10 -1.04 1.60 1.52 109.00 109.00 16.38 15.99 Closed Valve 1/2 turn or less CDNGW119R 6/15/2022 11:18 3.60 2.30 20.60 73.50 -11.14 -0.08 -0.08 0.00 0.00 90.70 90.70 0.12 0.12 No Change,Valve completely closed C:\Users\bmiller\Documents\(1) 2022\denton\6\City of Denton O&M Report June 2022.xlsx Weaver Consultants Group, LLC 7/5/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW120R 6/15/2022 11:16 56.10 40.70 0.00 3.20 -11.12 -10.68 -10.74 0.50 0.47 94.40 94.50 2.20 2.14 Opened Valve 1/2 turn or less CDNGW121R 6/15/2022 11:12 8.40 12.30 13.50 65.80 -11.11 1.13 1.13 0.03 0.03 95.60 95.70 11.69 11.69 No Change,Valve completely closed CDNGW122R 6/15/2022 11:10 2.90 4.70 19.40 73.00 -11.39 4.49 4.50 0.05 0.02 95.90 96.20 15.47 8.90 No Change,Valve completely closed CDNGW123R 6/15/2022 11:07 4.30 9.00 16.20 70.50 -11.69 -0.08 -0.04 0.04 0.01 96.80 96.90 13.53 7.31 No Change,Valve completely closed CDNGW124R 6/15/2022 11:03 54.20 39.90 0.00 5.90 -11.41 3.11 -3.64 0.06 0.01 91.60 93.80 16.94 8.54 Opened Valve 1/2 turn or less CDNGW125R 6/15/2022 11:01 0.30 14.60 6.80 78.30 -11.70 0.00 0.00 0.01 0.01 90.90 91.10 7.60 6.21 No Change,Valve completely closed CDNGW126R 6/15/2022 10:58 12.30 8.70 17.10 61.90 -11.68 0.21 0.23 1.01 0.99 92.00 92.10 71.61 70.98 No Change,Valve completely closed DEWLCR3 6/15/2022 12:18 0.50 0.70 21.20 77.60 -0.15 0.00 0.01 0.01 0.00 93.50 93.60 2.75 0.00 No Change,Valve completely closed DEWLCR4 6/15/2022 15:56 52.00 38.60 0.00 9.40 -10.99 0.34 0.31 11.12 10.49 101.60 103.10 233.32 226.43 Opened Valve 1/2 turn or less DEWLCR5 6/15/2022 15:51 44.10 33.40 2.20 20.30 -14.47 -0.83 -0.66 10.36 4.86 89.50 89.40 23.08 15.89 Closed Valve 1/2 to 1 turn Notes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =77 Number of Wells with Methane > 58%=1 Total Number of Well Readings =77 Number of Wells with Oxygen ≥ 2%=25 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =17 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =20 Number of Wells with No Room to Run (NRTR)=42 CDNSV001 6/15/2022 16:24 9.50 13.80 8.50 68.20 -9.72 -8.84 -8.80 0.08 0.08 96.90 97.30 18.60 18.96 No Change CDNSV002 6/15/2022 16:22 20.60 18.30 7.30 53.80 -9.72 -9.48 -9.48 0.12 0.12 95.50 95.70 23.22 23.29 No Change CDNSV003 6/15/2022 16:20 25.70 23.10 3.20 48.00 -9.49 -9.48 -9.48 0.13 0.13 100.40 100.90 24.18 24.45 No Change CDNSV004 6/15/2022 16:18 18.80 17.30 5.30 58.60 -9.69 -9.74 -9.56 0.12 0.11 106.20 107.00 22.62 21.87 No Change CDNSV005 6/15/2022 16:14 29.30 20.10 6.50 44.10 -9.64 -9.49 -9.47 0.02 0.01 99.90 100.80 8.20 7.86 No Change CDNSV006 6/15/2022 16:26 1.60 2.70 18.90 76.80 -9.85 -7.59 -7.73 0.14 0.13 84.40 84.50 25.07 24.64 No Change CDNSV007 6/15/2022 16:28 0.50 2.50 18.60 78.40 -9.72 -9.56 -9.48 0.13 0.12 90.00 89.70 23.84 23.41 No Change CDNSV008 6/15/2022 16:41 0.60 2.90 18.30 78.20 -10.05 -9.46 -9.43 0.08 0.09 91.90 92.00 19.55 19.67 No Change CDNSV009 6/15/2022 16:43 0.00 0.70 21.00 78.30 -9.72 -9.67 -9.48 0.14 0.12 90.60 90.60 24.73 23.68 No Change CDNSV010 6/15/2022 16:45 0.10 14.10 7.30 78.50 -9.66 -9.60 -9.69 0.15 0.14 98.20 98.50 25.44 24.90 No Change CDNSV011 6/15/2022 16:47 9.00 17.40 4.10 69.50 -9.68 -9.73 -9.65 0.10 0.10 97.10 97.90 20.95 21.42 No Change CDNSV012 6/15/2022 16:50 16.30 16.20 7.30 60.20 -9.72 -9.50 -9.48 0.10 0.11 99.30 101.00 21.56 22.44 No Change CDNSV013 6/15/2022 16:52 2.50 1.50 20.70 75.30 -9.70 -9.48 -9.48 0.10 0.11 93.00 93.00 21.60 22.45 No Change CDNSV014 6/15/2022 16:54 36.80 29.70 2.50 31.00 -9.87 -9.77 -9.48 0.13 0.13 96.80 97.10 24.10 23.97 No Change Soil Vapor Extraction Well Data C:\Users\bmiller\Documents\(1) 2022\denton\6\City of Denton O&M Report June 2022.xlsx Weaver Consultants Group, LLC 7/5/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNLFG02 6/15/2022 10:34 56.00 39.70 0.40 3.90 -12.59 -11.67 -11.72 0.35 0.35 86.70 86.60 39.51 39.85 No Change CDNLFG03 6/15/2022 10:31 53.60 40.10 0.00 6.30 -13.08 -1.59 -1.69 2.72 3.83 87.20 87.10 5.24 6.22 Opened Valve 1/2 turn or less CDNLFG05 6/15/2022 10:36 48.00 38.90 0.00 13.10 -13.12 -3.75 -3.73 0.13 0.12 89.70 89.60 24.77 24.05 No Change CDNLFG06 6/15/2022 10:25 0.40 0.40 21.50 77.70 -12.89 -0.61 -0.60 0.03 0.03 84.70 84.80 0.35 0.33 No Change CDNLFG07 6/15/2022 10:17 0.00 0.00 21.50 78.50 -0.15 -0.34 -0.33 0.02 0.01 87.00 87.10 10.04 4.65 No Change,Valve completely closed CDNLFG08 6/15/2022 10:14 56.10 40.30 0.30 3.30 -0.05 0.06 0.10 0.04 0.04 86.80 86.90 0.42 0.41 No Change CDNLFG16 6/15/2022 10:12 57.20 40.70 0.00 2.10 0.19 0.48 0.46 0.06 0.05 88.70 88.60 0.50 0.45 No Change CDNLFG17 6/15/2022 10:08 0.00 0.00 21.10 78.90 -0.13 0.00 0.00 0.00 0.00 84.40 84.30 3.81 0.00 No Change,Valve completely closed CDNLFG18 6/15/2022 10:08 0.00 0.00 21.60 78.40 0.02 -0.02 0.01 0.02 0.00 84.10 84.20 9.71 2.69 No Change,Valve completely closed CDNLFG19 6/15/2022 10:22 54.60 39.80 0.00 5.60 -13.15 -1.10 -1.10 2.80 4.45 83.00 83.00 3.42 4.30 Opened Valve 1/2 turn or less CDNLFG20 6/15/2022 10:05 48.50 37.50 0.00 14.00 -12.95 -9.09 -9.11 0.15 0.15 85.20 85.30 26.24 26.48 No Change CDNLFG21 6/15/2022 10:02 45.00 36.50 0.00 18.50 -12.79 -7.09 -7.10 0.17 0.16 86.90 86.90 28.31 27.31 No Change CDNLFG22 6/15/2022 9:59 45.20 34.00 0.30 20.50 -13.11 -3.89 -3.91 0.00 0.00 89.80 90.00 0.00 0.00 No Change CDNLFG23 6/15/2022 10:28 35.60 31.70 2.30 30.40 -12.89 -0.76 -0.76 0.04 0.04 89.20 89.30 0.43 0.38 No Change CDNLFG24 6/15/2022 9:53 33.90 32.60 0.00 33.50 -13.12 -0.74 -0.74 0.40 0.41 83.30 83.40 2.03 2.05 No Change CDNLFG25 6/15/2022 9:56 53.30 31.60 2.90 12.20 -12.85 -12.88 -12.87 0.11 0.08 89.20 89.70 22.59 18.63 No Change CDNLFG26 6/15/2022 9:48 43.50 38.80 0.00 17.70 -12.95 -3.84 -3.62 0.00 0.16 96.20 96.20 0.00 27.25 Closed Valve 1/2 turn or less CDNLFG27 6/15/2022 9:51 32.50 33.40 0.00 34.10 -13.32 -9.82 -9.77 0.56 0.50 81.20 81.50 1.51 1.43 Closed Valve 1/2 turn or less CDNLFG28 6/15/2022 9:40 33.00 35.40 0.90 30.70 -13.27 -2.30 -2.18 0.13 0.05 79.30 79.10 25.17 16.06 Closed Valve 1/2 turn or less CDNLFG29 6/15/2022 9:37 46.40 40.40 0.00 13.20 -13.27 -4.95 -4.94 0.36 0.34 83.80 83.80 40.93 40.25 No Change CDNLFG30 6/15/2022 9:46 48.60 40.70 0.00 10.70 -12.93 -2.49 -2.54 0.11 0.08 84.60 84.60 22.31 20.02 No Change CDNLFG31 6/13/2022 13:23 54.30 38.10 0.00 7.60 -10.83 -4.81 -4.94 1.23 2.27 92.40 92.50 7.94 10.78 Opened Valve 1/2 turn or less CDNLFG32 6/13/2022 13:45 57.70 36.90 0.10 5.30 -10.15 -0.25 -0.11 0.28 0.14 104.80 104.80 36.30 25.26 No Change CDNLFG33 6/13/2022 13:29 57.50 39.30 0.00 3.20 -11.10 -0.23 -0.19 0.05 0.01 96.50 96.70 1.65 0.54 No Change CDNLFG34 6/13/2022 13:27 57.30 38.60 0.00 4.10 -5.54 0.52 0.49 0.07 0.08 100.70 100.80 1.87 1.97 No Change CDNLFG35 6/13/2022 13:42 58.10 38.10 0.00 3.80 -8.97 -7.69 -7.69 0.02 0.12 103.10 103.20 9.91 23.14 No Change CDNLFG36 6/13/2022 13:31 57.30 39.80 0.10 2.80 -5.08 0.44 0.48 0.29 0.24 107.80 108.20 36.46 33.27 No Change CDNLFG37 6/13/2022 13:37 55.70 38.60 0.00 5.70 -6.99 -0.35 -0.23 1.42 1.55 88.90 88.80 15.75 16.43 No Change CDNLFG38 6/13/2022 13:40 56.90 39.10 0.00 4.00 -7.33 -0.23 -0.10 0.20 0.10 101.00 101.20 0.90 0.62 No Change CDNLFG39 6/13/2022 13:33 56.60 39.70 0.00 3.70 -6.17 -1.77 -1.52 0.69 0.59 88.80 88.50 57.30 52.75 No Change CDNLFG41 6/15/2022 12:55 35.70 33.30 0.00 31.00 -11.41 -0.97 -0.97 0.02 0.02 90.60 90.50 4.28 4.12 No Change CDNLFG42 6/15/2022 12:52 41.90 34.30 0.00 23.80 -10.96 -1.97 -1.99 1.33 1.43 83.20 83.10 3.68 3.82 No Change CDNLFG43 6/15/2022 12:48 46.80 36.10 0.00 17.10 -10.73 -6.78 -6.71 0.16 0.04 90.40 90.40 11.53 6.01 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill Extraction Well Data C:\Users\bmiller\Documents\(1) 2022\denton\6\City of Denton O&M Report June 2022.xlsx Weaver Consultants Group, LLC 7/5/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ001 6/13/2022 10:25 47.50 35.20 0.10 17.20 -12.52 -12.43 -12.34 0.26 0.19 85.50 85.70 34.20 29.34 No Change CDNHZ002 6/13/2022 10:29 46.20 33.20 0.00 20.60 -12.99 -11.58 -11.07 0.21 0.15 83.00 82.90 31.26 26.16 No Change CDNHZ003 6/13/2022 10:33 50.90 35.70 0.00 13.40 -12.91 -9.07 -9.09 0.21 0.14 81.70 81.80 31.13 25.37 No Change CDNHZ005 6/13/2022 10:39 39.00 30.90 0.00 30.10 -12.81 -11.20 -11.14 0.29 0.24 80.10 80.20 36.22 33.36 No Change CDNHZ006 6/13/2022 10:51 3.30 2.20 19.50 75.00 -12.61 -12.35 -12.37 0.26 0.23 90.70 91.00 33.80 31.79 No Change CDNHZ007 6/13/2022 10:43 52.70 33.50 2.00 11.80 -12.95 -10.86 -9.81 0.05 0.15 92.60 92.90 14.30 26.00 No Change CDNHZ008 6/13/2022 10:54 14.30 23.80 1.00 60.90 -12.45 -4.02 -3.94 0.19 0.09 99.30 99.60 29.17 20.42 No Change CDNHZ010 6/13/2022 10:59 56.70 38.30 0.00 5.00 -12.52 -12.48 -12.68 0.00 0.01 82.50 88.70 0.00 6.89 No Change CDNHZ011 6/13/2022 11:04 14.70 7.60 16.30 61.40 -12.39 -12.39 -12.30 0.00 0.00 100.50 100.30 0.00 0.00 No Change CDNHZ012 6/13/2022 11:07 24.30 18.30 10.10 47.30 -12.31 -12.20 -12.14 0.00 0.00 99.80 101.20 0.00 0.00 No Change CDNHZ014 6/13/2022 11:10 1.90 9.50 12.60 76.00 -12.55 -12.12 -12.09 0.19 0.10 98.30 98.60 28.71 20.52 No Change CDNHZ015 6/13/2022 11:13 58.10 37.50 0.10 4.30 -12.35 -10.05 -9.93 0.26 0.15 99.10 99.60 33.98 25.94 No Change CDNHZ017 6/13/2022 11:19 57.30 36.80 0.00 5.90 -12.41 -12.02 -12.49 0.18 0.00 105.30 101.70 28.19 0.00 Opened Valve 1/2 turn or less CDNHZ018 6/13/2022 11:25 0.60 0.90 20.60 77.90 -12.39 -0.87 -0.77 0.19 0.05 101.20 101.50 30.06 15.69 No Change CDNHZ019 6/13/2022 11:22 59.00 37.10 0.00 3.90 -12.85 -11.94 -12.63 0.02 0.02 96.50 96.80 10.36 8.52 Opened Valve 1/2 turn or less CDNHZ020 6/13/2022 11:33 59.60 38.20 0.20 2.00 -12.35 -11.27 -11.23 0.00 0.00 99.30 98.60 0.00 0.00 No Change CDNHZ021 6/13/2022 11:36 1.10 0.40 21.10 77.40 -12.35 -12.30 -12.30 0.08 0.08 101.00 101.20 18.53 18.23 No Change CDNHZ022 6/13/2022 11:39 60.00 37.80 0.20 2.00 -12.68 -12.72 -12.68 0.15 0.13 96.80 96.80 25.35 23.84 No Change CDNHZ023 6/13/2022 11:47 58.40 37.40 0.00 4.20 -12.69 -12.72 -12.72 0.04 0.00 98.90 99.80 12.37 2.58 No Change CDNHZ025 6/13/2022 11:51 58.90 38.60 0.00 2.50 -12.35 -12.32 -12.38 0.00 0.00 101.60 102.00 0.00 0.00 No Change CDNHZ026 6/13/2022 11:53 25.90 26.60 0.00 47.50 -12.35 -10.83 -12.30 0.00 0.03 96.10 96.10 0.00 11.21 No Change CDNHZ029 6/13/2022 12:41 58.70 29.80 1.30 10.20 -12.31 -12.30 -12.30 0.08 0.07 104.80 105.50 18.58 17.79 No Change CDNHZ030 6/13/2022 12:38 37.80 24.40 9.60 28.20 -12.35 -12.16 -12.17 0.38 0.40 103.10 103.60 41.03 41.96 No Change CDNHZ031 6/13/2022 12:43 0.90 3.80 18.10 77.20 -12.01 -7.57 -7.44 0.33 0.14 100.80 101.00 38.31 24.62 No Change CDNHZ032 6/13/2022 12:46 51.30 32.80 1.90 14.00 -12.22 -11.03 -11.01 0.00 0.00 102.90 103.10 0.00 0.00 No Change CDNHZ033 6/13/2022 12:49 17.50 22.70 8.30 51.50 -12.35 -9.72 -9.57 0.42 0.35 102.50 102.70 43.13 39.43 No Change CDNHZ034 6/13/2022 12:52 59.20 37.10 0.00 3.70 -12.39 -11.85 -11.78 0.00 0.00 80.20 80.60 0.00 0.00 No Change CDNHZ035 6/13/2022 12:55 58.20 36.50 0.30 5.00 -12.35 -12.12 -11.96 0.38 0.28 88.80 88.30 41.40 35.69 No Change CDNHZ036 6/13/2022 12:57 57.50 37.90 0.40 4.20 -12.34 -12.24 -12.06 0.00 0.00 99.80 100.00 0.00 0.00 No Change Horizontal Well Data C:\Users\bmiller\Documents\(1) 2022\denton\6\City of Denton O&M Report June 2022.xlsx Weaver Consultants Group, LLC 7/5/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill Notes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =63 Number of Wells with Methane > 58%=10 Total Number of Well Readings =63 Number of Wells with Oxygen ≥ 2%=16 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =9 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =5 Number of Wells with No Room to Run (NRTR)=39 C:\Users\bmiller\Documents\(1) 2022\denton\6\City of Denton O&M Report June 2022.xlsx Weaver Consultants Group, LLC 7/5/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCGCH4 7/14/2022 9:01 50.00 35.20 0.00 14.80 0.13 0.00 0.00 0.01 0.01 79.10 79.40 NR NR Calibration Gas CDNCG002 7/14/2022 9:06 0.00 0.00 11.10 88.90 0.17 0.00 0.00 0.00 0.00 79.50 79.70 NR NR Calibration Gas CDNINLT1 7/14/2022 9:23 30.80 22.30 8.80 38.10 0.08 -19.60 -19.50 19.88 19.88 90.00 90.00 1060.00 1060.00 Flare Inlet CDNBLWR1 7/14/2022 9:25 30.40 21.70 8.80 39.10 0.10 4.28 4.33 0.00 0.00 104.00 104.00 1060.00 1060.00 Flare Blower CDN00GHG 7/14/2022 9:26 30.80 22.00 8.80 38.40 0.10 4.22 4.23 0.00 0.00 104.00 104.00 NR NR Flare GHG CDNCGCH4 7/18/2022 8:00 50.00 35.00 0.00 15.00 0.26 0.00 0.00 0.01 0.01 77.10 77.10 NR NR Calibration Gas CDNCG002 7/18/2022 8:03 0.00 0.00 11.10 88.90 0.15 0.01 0.01 0.00 0.00 76.90 77.20 NR NR Calibration Gas CDNCGCH4 7/18/2022 15:06 50.00 34.90 0.00 15.10 0.07 -0.01 -0.01 0.01 0.01 75.50 79.20 NR NR Calibration Gas CDNCG002 7/18/2022 15:09 0.00 0.00 11.00 89.00 0.00 0.00 0.00 0.00 0.00 76.70 76.40 NR NR Calibration Gas CDNINLT2 7/18/2022 15:11 32.70 23.30 7.70 36.30 0.06 -18.18 -18.22 18.51 18.49 96.00 96.00 1050.00 1050.00 Flare Inlet CDNBLWR2 7/18/2022 15:12 32.50 22.80 7.80 36.90 0.08 4.06 4.27 0.00 0.00 120.00 120.00 1050.00 1050.00 Flare Blower CDNGW040 7/18/2022 11:05 12.60 8.70 16.80 61.90 -3.50 -3.52 -3.44 0.03 0.03 111.90 112.70 11.65 11.84 No Change CDNGW044 7/14/2022 13:26 49.90 35.80 0.60 13.70 -6.28 -2.59 -2.59 2.61 2.61 106.10 106.10 5.05 5.04 No Change CDNGW045 7/14/2022 13:09 43.10 35.10 0.00 21.80 -10.26 -1.14 -1.12 0.06 0.06 99.20 99.20 3.17 3.13 No Change CDNGW046 7/14/2022 12:11 49.30 35.00 0.00 15.70 -5.06 -4.75 -4.74 0.00 0.00 104.20 104.40 0.00 0.00 No Change CDNGW047 7/14/2022 11:29 2.30 0.90 20.80 76.00 -10.24 -2.44 -2.42 0.00 0.00 90.70 91.20 0.40 0.00 No Change,Valve completely closed CDNGW048 7/14/2022 11:27 50.20 36.20 0.20 13.40 -10.10 -8.75 -8.75 1.60 1.53 98.40 98.40 8.97 8.76 No Change CDNGW049 7/14/2022 10:12 0.00 0.00 20.90 79.10 0.34 0.01 0.01 0.00 0.00 68.90 68.70 0.00 0.00 CDNGW050 7/14/2022 11:17 56.80 38.50 0.00 4.70 -9.26 -8.46 -8.71 8.92 8.90 100.10 100.20 38.42 38.35 No Change CDNGW051 7/14/2022 10:24 59.10 38.30 0.00 2.60 0.72 0.57 0.55 0.02 0.12 97.90 98.00 0.93 2.50 No Change CDNGW052 7/14/2022 10:22 54.20 37.00 0.90 7.90 0.32 -0.05 -0.05 0.02 0.02 97.80 97.90 1.78 1.78 No Change CDNGW054 7/14/2022 10:03 0.00 0.00 20.70 79.30 0.32 0.00 0.01 0.00 0.00 75.20 77.50 0.00 0.00 CDNGW055 7/14/2022 10:01 63.00 35.10 0.00 1.90 3.39 3.04 3.04 0.01 0.01 98.40 98.40 0.36 0.34 No Change CDNGW057 7/14/2022 9:54 59.00 38.20 0.00 2.80 2.51 2.31 2.31 0.14 0.12 92.50 92.70 2.69 2.51 No Change CDNGW058 7/14/2022 9:52 58.70 38.90 0.00 2.40 4.49 4.23 4.23 0.03 0.03 94.10 94.40 5.44 5.00 No Change CDNGW059 7/14/2022 9:45 0.00 0.00 20.90 79.10 0.00 0.01 0.00 0.00 0.00 74.90 74.50 0.28 0.00 CDNGW060 7/14/2022 9:42 60.60 37.70 0.00 1.70 1.31 0.85 0.85 0.00 0.00 99.90 100.10 0.28 0.28 No Change CDNGW061 7/14/2022 9:44 0.00 0.00 20.80 79.20 0.28 0.01 0.01 0.01 0.01 74.00 74.30 2.97 3.08 CDNGW062 7/14/2022 9:48 57.90 40.10 0.10 1.90 -1.07 -0.39 -0.40 1.28 0.92 91.80 91.90 14.87 12.66 No Change CDNGW063 7/14/2022 9:57 59.40 39.10 0.00 1.50 0.98 3.65 3.65 0.00 0.00 92.30 92.40 0.00 0.00 No Change CDNGW064 7/14/2022 10:06 58.90 39.20 0.00 1.90 2.59 2.68 2.67 0.17 0.18 94.90 94.90 5.36 5.54 No Change CDNGW065 7/14/2022 10:11 0.00 0.00 20.50 79.50 0.13 0.00 0.01 0.00 0.00 70.20 70.10 0.00 0.00 CDNGW066 7/14/2022 11:15 57.20 38.00 0.10 4.70 -3.16 -3.02 -2.99 0.52 0.34 99.20 101.10 20.92 16.95 No Change CDNGW067 7/14/2022 11:31 53.00 35.60 0.60 10.80 -8.22 -7.72 -8.16 0.25 0.58 104.50 104.50 14.48 21.93 No Change CDNGW068 7/14/2022 12:14 54.10 37.30 0.00 8.60 -7.99 -5.86 -5.91 0.22 0.19 103.90 104.20 10.17 9.36 Opened Valve 1/2 turn or less CDNGW074 7/14/2022 13:33 35.40 23.40 7.50 33.70 -9.13 -0.10 -0.10 0.02 0.02 96.10 96.20 0.29 0.29 No Change CDNGW075 7/14/2022 13:36 53.40 34.90 0.00 11.70 -9.50 -0.41 -0.43 0.21 0.21 101.10 101.20 3.29 3.27 No Change CDNGW076 7/14/2022 13:39 59.10 37.20 0.00 3.70 -9.16 0.41 0.33 0.02 0.01 100.70 101.10 9.30 5.86 Opened Valve 1/2 turn or less Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data C:\Users\bmiller\Documents\(1) 2022\denton\7\City of Denton O&M Report July 2022.xlsx Weaver Consultants Group, LLC 8/9/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW077 7/14/2022 14:21 55.10 34.10 1.60 9.20 1.60 0.27 0.27 0.02 0.02 100.60 100.60 3.68 3.65 No Change CDNGW078 7/14/2022 12:45 59.90 34.40 0.20 5.50 0.66 0.06 0.07 0.04 0.05 99.70 99.70 0.63 0.69 No Change CDNGW079 7/14/2022 12:48 52.10 34.40 1.70 11.80 -8.83 -1.50 -1.51 0.43 0.43 103.50 103.40 4.66 4.70 No Change CDNGW080 7/14/2022 12:50 52.60 36.30 0.00 11.10 -8.21 -1.17 -1.17 0.01 0.03 105.80 105.70 2.98 5.29 No Change CDNGW081 7/14/2022 12:52 27.70 16.90 12.10 43.30 -8.68 -0.56 -0.55 0.01 0.01 98.20 98.20 0.19 0.19 No Change,Valve completely closed CDNGW082 7/14/2022 12:55 55.20 36.80 0.00 8.00 -6.76 -4.31 -4.40 4.33 4.39 106.90 106.90 59.98 60.37 No Change CDNGW083 7/14/2022 12:59 38.90 32.50 0.00 28.60 -8.29 -1.71 -1.74 0.02 0.02 102.20 102.30 3.26 3.15 No Change CDNGW084 7/14/2022 13:01 53.10 36.20 0.00 10.70 -8.55 -4.96 -4.95 0.87 0.98 104.80 104.70 6.62 7.03 No Change CDNGW085 7/14/2022 13:28 40.20 33.40 0.10 26.30 -8.61 -1.47 -1.48 1.40 1.41 101.70 101.70 34.43 34.58 No Change CDNGW086 7/14/2022 13:31 33.70 21.90 9.20 35.20 -8.76 -0.24 -0.25 0.01 0.01 93.50 93.70 2.72 3.23 No Change,Valve completely closed CDNGW087 7/14/2022 13:04 13.40 6.90 17.60 62.10 -8.49 -1.10 -1.11 0.01 0.01 96.20 96.10 0.71 0.68 No Change,Valve completely closed CDNGW088 7/14/2022 12:17 44.50 36.80 0.00 18.70 -8.06 -1.29 -1.29 0.06 0.03 99.50 99.50 5.34 3.96 No Change CDNGW089 7/14/2022 12:19 1.60 0.80 20.60 77.00 -0.92 -1.06 -1.08 0.00 0.01 95.30 95.30 0.60 1.89 No Change,Valve completely closed CDNGW090 7/14/2022 12:21 9.80 6.10 16.10 68.00 0.62 -0.69 -0.69 0.01 0.01 96.10 96.10 3.22 2.94 No Change,Valve completely closed CDNGW091 7/14/2022 12:24 50.60 37.20 0.00 12.20 -8.94 -1.43 -1.42 0.55 0.55 107.30 107.20 16.03 15.96 No Change CDNGW092 7/14/2022 12:06 49.60 37.70 0.00 12.70 -7.72 -6.33 -6.29 0.06 0.01 106.80 106.80 17.71 7.68 No Change CDNGW093 7/14/2022 12:03 44.60 36.10 0.10 19.20 -7.82 -1.20 -1.27 1.06 1.04 104.70 104.70 22.30 22.08 No Change CDNGW094 7/14/2022 11:51 44.70 34.90 0.00 20.40 -7.63 -1.00 -1.04 0.01 0.00 104.80 104.80 1.96 1.60 No Change CDNGW095 7/14/2022 11:40 12.00 6.60 17.70 63.70 -0.43 -0.84 -0.82 0.00 0.01 93.10 93.70 3.39 6.99 No Change,Valve completely closed CDNGW096 7/14/2022 11:43 55.50 38.90 0.10 5.50 -5.81 -4.67 -4.57 0.96 0.71 106.60 106.50 28.25 24.43 No Change CDNGW097 7/14/2022 11:46 55.90 38.20 0.00 5.90 -5.63 -5.13 -5.35 0.01 0.05 115.10 115.10 5.36 15.27 No Change CDNGW098 7/14/2022 11:49 55.80 38.90 0.00 5.30 -6.03 -4.63 -4.69 0.71 0.74 112.60 112.60 24.14 24.73 No Change CDNGW099 7/14/2022 11:03 57.90 39.80 0.00 2.30 0.56 0.17 0.17 0.18 0.18 99.70 99.70 9.16 9.29 No Change CDNGW100 7/14/2022 11:00 57.50 39.80 0.00 2.70 0.71 0.49 0.50 0.01 0.01 100.40 100.40 2.24 2.29 No Change CDNGW101 7/14/2022 10:56 58.00 39.90 0.00 2.10 0.90 0.39 0.41 0.00 0.01 97.60 97.90 1.39 1.97 No Change CDNGW102 7/14/2022 10:52 58.40 38.30 0.10 3.20 2.69 2.40 2.39 0.97 0.96 102.40 102.50 1.99 1.98 No Change CDNGW106 7/14/2022 13:42 0.00 0.00 20.50 79.50 0.11 0.01 0.01 0.00 0.00 93.20 93.90 1.34 1.20 No Change,Valve completely closed CDNGW107 7/14/2022 14:23 57.20 37.70 0.00 5.10 -9.58 -0.51 -0.56 0.27 0.29 110.70 110.70 14.91 15.45 Opened Valve 1/2 turn or less CDNGW108 7/14/2022 14:25 55.80 38.00 0.00 6.20 -9.73 -0.23 -0.20 0.05 0.10 116.00 116.10 2.86 4.11 Opened Valve 1/2 turn or less CDNGW109 7/14/2022 14:27 55.40 39.20 0.00 5.40 -10.32 -4.43 -4.45 1.33 1.44 118.10 118.20 24.59 25.51 Opened Valve 1/2 turn or less CDNGW110 7/14/2022 14:29 53.10 39.20 0.00 7.70 -10.11 -2.98 -2.99 0.73 0.68 117.10 117.10 24.58 23.68 Opened Valve 1/2 turn or less CDNGW111 7/14/2022 14:31 50.10 38.90 0.00 11.00 -9.58 -1.02 -1.02 0.34 0.34 113.50 113.50 16.81 16.83 No Change CDNGW112 7/14/2022 14:34 40.30 36.20 0.00 23.50 -10.65 -0.17 -0.19 0.09 0.09 113.30 113.30 3.79 3.95 No Change CDNGW113 7/14/2022 14:36 38.40 35.10 0.00 26.50 -10.35 -0.40 -0.42 1.03 1.24 114.10 114.10 13.11 14.36 No Change CDNGW114 7/14/2022 14:38 48.20 37.20 0.00 14.60 -10.24 -1.24 -1.24 1.26 1.18 117.30 117.40 14.43 14.00 No Change CDNGW115 7/14/2022 14:39 47.40 37.50 0.00 15.10 -11.07 -1.33 -1.36 1.02 0.91 112.50 112.60 21.64 20.45 Closed Valve 1/2 turn or less CDNGW116 7/14/2022 14:41 43.00 36.20 0.00 20.80 -10.65 -0.44 -0.42 0.45 0.32 111.60 111.70 14.42 12.18 Closed Valve 1/2 turn or less CDNGW117 7/14/2022 14:48 41.90 35.80 0.00 22.30 -10.94 -0.58 -0.53 0.65 0.70 113.70 113.60 10.43 10.82 Closed Valve 1/2 turn or less CDNGW118 7/14/2022 14:45 41.60 36.00 0.00 22.40 -10.52 -0.92 -0.93 1.27 1.24 109.50 109.60 14.59 14.45 No Change CDNGW119R 7/14/2022 14:49 2.60 1.50 20.70 75.20 -10.60 -0.21 -0.20 0.00 0.00 92.30 92.50 0.17 0.14 No Change,Valve completely closed C:\Users\bmiller\Documents\(1) 2022\denton\7\City of Denton O&M Report July 2022.xlsx Weaver Consultants Group, LLC 8/9/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW120R 7/14/2022 14:51 50.90 39.90 0.00 9.20 -10.73 -10.45 -10.41 0.52 0.41 101.30 101.50 2.24 1.98 No Change CDNGW121R 7/14/2022 14:53 18.70 17.00 8.80 55.50 -10.94 1.97 1.98 0.01 0.00 99.20 99.20 4.98 2.76 No Change,Valve completely closed CDNGW122R 7/14/2022 14:55 3.40 6.10 18.30 72.20 -10.83 4.46 4.46 0.01 0.01 96.00 96.10 6.42 6.42 No Change,Valve completely closed CDNGW123R 7/14/2022 14:58 12.40 13.10 9.90 64.60 -10.82 1.64 1.68 0.01 0.01 99.00 98.90 7.56 7.31 No Change,Valve completely closed CDNGW124R 7/14/2022 15:01 22.80 15.90 8.20 53.10 -11.29 -9.41 -9.43 0.02 0.02 96.80 96.90 10.40 9.84 No Change,Valve completely closed CDNGW125R 7/14/2022 15:03 1.40 16.00 5.80 76.80 -11.01 0.49 0.50 0.01 0.01 96.60 96.70 5.53 5.53 No Change,Valve completely closed CDNGW126R 7/14/2022 15:04 10.30 8.90 16.50 64.30 -10.97 3.51 3.51 1.36 1.35 97.80 97.90 82.99 82.68 No Change,Valve completely closed DEWLCR3 7/14/2022 13:41 0.00 0.00 20.80 79.20 0.45 0.01 0.02 0.00 0.01 93.40 93.50 1.62 2.28 No Change,Valve completely closed DEWLCR4 7/14/2022 15:38 54.60 40.20 0.00 5.20 -9.41 0.17 0.15 9.60 9.41 103.20 104.20 216.78 214.53 Opened Valve 1/2 turn or less DEWLCR5 7/14/2022 15:33 44.50 33.50 2.60 19.40 -13.68 -0.31 -0.29 4.83 4.03 91.60 91.60 15.80 14.45 Closed Valve 1/2 turn or less Notes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =77 Number of Wells with Methane > 58%=10 Total Number of Well Readings =77 Number of Wells with Oxygen ≥ 2%=24 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =17 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =27 Number of Wells with No Room to Run (NRTR)=41 CDNSV001 7/18/2022 14:16 3.00 10.70 11.00 75.30 -7.86 -1.93 -1.92 0.03 0.02 103.50 103.90 10.86 10.53 No Change CDNSV002 7/18/2022 14:18 11.40 15.00 9.40 64.20 -7.86 -7.73 -7.73 0.15 0.15 104.60 104.60 25.68 25.60 No Change CDNSV003 7/18/2022 14:48 14.40 15.50 8.90 61.20 -7.87 -7.52 -7.52 0.10 0.11 111.80 112.20 21.37 21.57 No Change CDNSV004 7/18/2022 14:50 7.50 10.50 11.90 70.10 -7.86 -7.54 -7.39 0.10 0.10 116.60 116.90 21.02 21.02 No Change CDNSV005 7/18/2022 14:54 1.50 1.10 21.20 76.20 -7.59 -5.55 -5.78 0.09 0.08 106.70 107.40 20.22 19.11 No Change CDNSV006 7/18/2022 13:57 0.00 0.40 21.60 78.00 -7.89 -3.15 -3.15 0.14 0.13 91.40 91.20 25.14 24.45 No Change CDNSV007 7/18/2022 13:55 0.00 0.80 21.00 78.20 -7.86 -7.73 -7.69 0.12 0.13 96.50 96.20 23.52 24.10 No Change CDNSV008 7/18/2022 13:53 0.00 1.20 20.50 78.30 -7.56 -6.88 -6.80 0.10 0.10 97.70 97.50 20.76 20.77 No Change CDNSV009 7/18/2022 13:51 0.00 0.30 22.10 77.60 -7.54 -1.92 -2.12 0.02 0.04 95.70 95.40 9.86 12.99 No Change CDNSV010 7/18/2022 13:49 0.00 6.40 15.50 78.10 -7.55 -7.28 -7.27 0.08 0.08 105.60 105.90 19.01 19.15 No Change CDNSV011 7/18/2022 13:47 9.90 14.20 7.30 68.60 -7.56 -7.30 -7.25 0.09 0.09 104.70 105.30 19.83 20.11 No Change CDNSV012 7/18/2022 13:45 14.00 13.20 9.80 63.00 -7.52 -5.81 -5.74 0.07 0.07 108.50 109.00 17.93 17.90 No Change CDNSV013 7/18/2022 13:43 0.30 0.20 22.30 77.20 -7.48 -7.39 -7.39 0.13 0.13 93.40 93.00 24.32 24.33 No Change CDNSV014 7/18/2022 13:42 13.40 9.80 15.50 61.30 -7.73 -7.65 -7.48 0.09 0.08 107.20 107.30 19.55 18.85 No Change Soil Vapor Extraction Well Data C:\Users\bmiller\Documents\(1) 2022\denton\7\City of Denton O&M Report July 2022.xlsx Weaver Consultants Group, LLC 8/9/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNLFG02 7/18/2022 12:43 54.90 38.10 0.20 6.80 -11.07 -10.43 -10.71 0.50 0.56 101.30 101.10 46.91 49.62 No Change CDNLFG03 7/18/2022 12:37 55.50 40.70 0.00 3.80 -11.51 -1.21 -1.17 3.64 3.61 100.30 100.10 5.99 5.97 No Change CDNLFG05 7/18/2022 12:45 46.00 36.30 0.00 17.70 -11.58 -3.08 -3.11 0.11 0.12 95.50 95.10 22.45 23.37 No Change CDNLFG06 7/18/2022 12:39 2.10 0.70 22.00 75.20 -11.67 -0.19 -0.19 0.00 0.01 111.30 111.50 0.09 0.17 No Change,Valve completely closed CDNLFG07 7/18/2022 12:30 56.00 40.00 0.00 4.00 0.05 0.02 0.02 0.02 0.02 111.50 111.70 9.66 9.47 No Change CDNLFG08 7/18/2022 12:36 55.90 40.20 0.00 3.90 0.02 0.46 0.46 0.01 0.01 107.80 108.00 0.22 0.22 No Change CDNLFG16 7/18/2022 12:34 56.50 40.60 0.00 2.90 0.01 0.92 0.92 0.01 0.01 115.10 115.00 0.23 0.23 No Change CDNLFG17 7/18/2022 12:32 0.00 0.00 21.30 78.70 0.09 0.00 0.00 0.00 0.00 107.20 107.30 0.00 0.00 CDNLFG18 7/18/2022 12:31 0.00 0.00 21.70 78.30 0.09 0.00 0.00 0.00 0.00 106.90 106.80 0.00 0.00 CDNLFG19 7/18/2022 12:28 52.30 38.60 0.00 9.10 -11.73 -0.76 -0.76 3.79 3.78 96.40 96.30 3.92 3.92 No Change CDNLFG20 7/18/2022 12:27 48.30 37.00 0.00 14.70 -11.69 -8.12 -7.99 0.11 0.11 94.50 94.50 22.72 22.66 No Change CDNLFG21 7/18/2022 12:24 45.30 36.00 0.00 18.70 -11.24 -6.03 -6.03 0.14 0.13 97.90 97.70 25.28 24.73 No Change CDNLFG22 7/18/2022 12:23 44.20 33.30 0.20 22.30 -11.52 -3.23 -3.23 0.03 0.03 115.70 116.00 12.37 12.25 No Change CDNLFG23 7/18/2022 12:41 39.60 31.60 1.60 27.20 -11.47 -0.34 -0.34 0.02 0.00 113.40 113.40 0.28 0.00 No Change,Valve completely closed CDNLFG24 7/18/2022 12:20 34.60 32.90 0.00 32.50 -11.55 -0.49 -0.48 0.37 0.36 109.70 109.90 1.91 1.88 No Change CDNLFG25 7/18/2022 12:21 50.70 30.30 3.10 15.90 -11.64 -11.25 -11.22 0.09 0.09 116.80 117.30 20.03 19.78 No Change CDNLFG26 7/18/2022 12:16 50.90 40.70 0.00 8.40 -11.71 -0.64 -0.65 0.08 0.08 102.20 102.50 18.90 19.16 No Change CDNLFG27 7/18/2022 12:18 34.90 34.00 0.00 31.10 -11.52 -7.20 -7.22 0.61 0.60 111.10 111.30 1.54 1.54 No Change CDNLFG28 7/18/2022 12:12 40.10 36.60 0.10 23.20 -11.73 -0.70 -0.70 0.02 0.02 101.00 101.00 8.37 8.92 No Change CDNLFG29 7/18/2022 12:10 46.30 39.20 0.00 14.50 -11.73 -3.85 -3.83 0.21 0.20 91.30 91.20 31.42 30.80 No Change CDNLFG30 7/18/2022 12:14 51.80 41.00 0.00 7.20 -11.60 -0.54 -0.54 0.03 0.03 110.60 110.60 11.45 11.45 No Change CDNLFG31 7/18/2022 10:55 42.00 34.80 0.70 22.50 -9.47 -5.43 -5.52 1.84 1.87 104.80 104.90 9.59 9.68 No Change CDNLFG32 7/18/2022 13:37 56.60 38.60 0.00 4.80 -3.95 0.04 0.04 0.02 0.02 114.80 114.90 8.89 8.69 No Change CDNLFG33 7/18/2022 11:00 48.20 38.60 0.00 13.20 -7.43 -0.43 -0.45 0.14 0.12 105.90 106.00 2.61 2.49 No Change CDNLFG34 7/18/2022 10:58 34.90 34.70 0.00 30.40 -2.39 -0.15 -0.15 0.02 0.03 107.90 108.10 0.96 1.15 No Change CDNLFG35 7/18/2022 10:52 42.70 34.60 0.00 22.70 -2.86 -2.63 -2.62 0.00 0.00 110.70 111.00 0.00 0.00 No Change CDNLFG36 7/18/2022 11:02 51.40 38.00 1.20 9.40 -6.21 -0.09 -0.09 0.01 0.01 108.60 108.70 8.05 7.90 No Change CDNLFG37 7/18/2022 11:07 47.00 38.00 0.00 15.00 -3.80 -0.90 -0.88 0.74 0.77 91.70 91.60 11.31 11.56 No Change CDNLFG38 7/18/2022 10:50 55.70 39.10 0.00 5.20 -2.76 -0.01 -0.01 0.02 0.04 106.40 105.80 0.26 0.39 No Change CDNLFG39 7/18/2022 11:04 56.00 39.80 0.00 4.20 -4.85 -2.39 -2.36 0.33 0.31 99.50 100.00 39.26 37.89 No Change CDNLFG41 7/14/2022 13:12 37.90 33.00 0.00 29.10 -10.24 -0.83 -0.83 0.01 0.01 97.00 96.90 2.54 2.54 No Change,Valve completely closed CDNLFG42 7/14/2022 13:16 41.90 34.00 0.00 24.10 -9.80 -1.73 -1.74 1.40 1.47 93.60 93.60 3.74 3.83 No Change CDNLFG43 7/14/2022 13:22 48.40 34.90 0.00 16.70 -9.96 -6.65 -6.54 0.25 0.03 95.40 95.30 14.64 5.31 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill Extraction Well Data C:\Users\bmiller\Documents\(1) 2022\denton\7\City of Denton O&M Report July 2022.xlsx Weaver Consultants Group, LLC 8/9/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ001 7/18/2022 8:18 51.70 35.60 0.30 12.40 -9.76 -9.28 -9.32 0.05 0.05 89.10 89.10 15.28 15.34 No Change CDNHZ002 7/18/2022 8:20 50.30 33.80 0.20 15.70 -9.83 -8.30 -8.07 0.07 0.10 88.90 88.90 18.27 21.84 No Change CDNHZ003 7/18/2022 8:23 54.40 35.70 0.00 9.90 -9.91 -6.94 -6.93 0.04 0.04 88.60 88.20 13.27 12.80 No Change CDNHZ005 7/18/2022 8:25 40.20 31.00 0.00 28.80 -10.17 -7.78 -7.78 0.03 0.03 89.00 89.00 11.86 11.86 No Change CDNHZ006 7/18/2022 8:29 3.30 2.40 19.10 75.20 -10.07 -8.88 -8.92 0.08 0.08 96.50 97.10 19.15 18.83 No Change CDNHZ007 7/18/2022 8:31 43.00 29.20 2.90 24.90 -10.17 -9.68 -9.68 0.07 0.07 92.00 91.90 17.32 17.32 No Change CDNHZ008 7/18/2022 8:33 22.80 27.70 0.10 49.40 -9.91 -2.03 -2.02 0.02 0.02 97.80 97.90 8.58 8.37 No Change CDNHZ010 7/18/2022 8:35 56.30 37.40 0.00 6.30 -10.28 -10.11 -10.07 0.06 0.05 95.60 95.70 16.58 14.24 No Change CDNHZ011 7/18/2022 9:28 16.80 8.70 15.60 58.90 -10.17 -10.08 -9.99 0.07 0.04 101.80 102.10 17.00 13.68 No Change CDNHZ012 7/18/2022 9:30 16.70 13.00 11.20 59.10 -10.17 -10.20 -10.16 0.08 0.08 97.00 97.90 18.90 18.71 Closed Valve 1/2 turn or less,Valve CDNHZ014 7/18/2022 9:32 0.50 1.30 19.50 78.70 -10.06 -7.76 -7.59 0.04 0.05 98.10 99.10 14.05 15.18 No Change CDNHZ015 7/18/2022 9:35 59.10 37.90 0.20 2.80 -10.10 -7.61 -7.59 0.07 0.06 99.20 99.30 17.16 16.05 No Change CDNHZ017 7/18/2022 9:38 58.00 37.40 0.50 4.10 -10.01 -9.88 -9.77 0.04 0.06 95.70 94.50 14.10 15.84 No Change CDNHZ018 7/18/2022 9:47 1.20 2.60 16.50 79.70 -9.88 -0.13 -0.14 0.00 0.00 101.70 101.80 2.65 0.00 Closed Valve 1/2 turn or less,Valve CDNHZ019 7/18/2022 9:41 58.70 38.10 0.20 3.00 -9.86 -9.37 -8.94 0.00 0.00 100.60 100.90 0.00 0.00 No Change CDNHZ020 7/18/2022 9:50 58.60 37.90 0.00 3.50 -10.21 -10.00 -10.11 0.06 0.06 104.50 104.50 15.69 16.71 No Change CDNHZ021 7/18/2022 9:53 3.30 2.00 18.10 76.60 -10.20 -10.00 -10.11 0.06 0.07 101.30 101.30 16.83 17.35 Closed Valve 1/2 turn or less,Valve CDNHZ022 7/18/2022 9:56 58.40 37.10 0.30 4.20 -9.99 -10.00 -9.92 0.11 0.10 103.50 103.70 22.21 20.55 No Change CDNHZ023 7/18/2022 10:00 57.80 39.60 0.00 2.60 -10.08 -10.11 -10.11 0.04 0.05 104.90 104.90 12.36 14.81 No Change CDNHZ025 7/18/2022 10:03 57.30 39.20 0.00 3.50 -10.07 -10.06 -10.09 0.00 0.00 108.30 100.00 3.87 3.66 No Change CDNHZ026 7/18/2022 10:06 17.90 23.20 0.00 58.90 -9.83 -9.42 -9.39 0.05 0.04 104.30 104.40 15.14 12.66 No Change CDNHZ029 7/18/2022 10:09 51.60 26.00 4.80 17.60 -10.17 -9.87 -9.82 0.01 0.01 108.90 109.00 7.92 7.27 No Change CDNHZ030 7/18/2022 10:11 23.20 14.00 14.70 48.10 -10.15 -8.95 -8.84 0.49 0.48 106.60 106.90 46.62 46.26 Closed Valve 1/2 turn or less,Valve CDNHZ031 7/18/2022 10:13 1.60 7.40 14.70 76.30 -10.23 -4.78 -4.80 0.03 0.04 104.00 104.90 11.50 12.53 Closed Valve 1/2 turn or less,Valve CDNHZ032 7/18/2022 10:17 34.20 18.90 10.90 36.00 -10.20 -9.77 -9.68 0.03 0.03 107.00 107.10 11.13 11.37 No Change CDNHZ033 7/18/2022 10:20 11.60 12.90 11.30 64.20 -10.04 -4.18 -4.23 0.04 0.04 108.00 108.10 13.05 12.60 No Change CDNHZ034 7/18/2022 10:21 56.20 38.00 0.00 5.80 -10.15 -9.83 -9.87 0.06 0.08 91.00 90.60 15.75 18.77 No Change CDNHZ035 7/18/2022 10:24 52.60 34.80 2.00 10.60 -10.25 -9.82 -10.09 0.28 0.27 99.80 99.80 35.11 34.90 No Change CDNHZ036 7/18/2022 10:47 53.40 38.40 0.50 7.70 -10.15 -10.09 -10.11 0.08 0.13 104.20 104.40 19.31 23.50 No Change Horizontal Well Data C:\Users\bmiller\Documents\(1) 2022\denton\7\City of Denton O&M Report July 2022.xlsx Weaver Consultants Group, LLC 8/9/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill Notes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =63 Number of Wells with Methane > 58%=4 Total Number of Well Readings =63 Number of Wells with Oxygen ≥ 2%=17 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =8 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =6 Number of Wells with No Room to Run (NRTR)=42 C:\Users\bmiller\Documents\(1) 2022\denton\7\City of Denton O&M Report July 2022.xlsx Weaver Consultants Group, LLC 8/9/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCGCH4 8/14/2022 6:28 49.90 35.20 0.00 14.90 -0.10 0.00 0.00 0.01 0.00 78.90 89.40 NR NR Calibration Gas CDNCG002 8/14/2022 6:30 0.00 0.00 11.10 88.90 0.06 0.01 0.00 0.00 0.00 90.30 90.40 NR NR Calibration Gas CDNINLT1 8/16/2022 11:35 32.10 23.90 8.20 35.80 0.14 -19.00 -18.82 19.30 19.29 92.00 92.00 1030.00 1030.00 Flare Inlet CDNBLWR1 8/16/2022 11:37 31.90 23.50 8.10 36.50 0.26 4.25 4.32 0.00 0.00 104.00 104.20 1030.00 1030.00 Flare Blower CDN00GHG 8/16/2022 11:37 31.80 23.60 8.10 36.50 0.20 4.26 4.29 0.00 0.00 104.30 104.30 NR NR Flare GHG CDNCGCH4 8/17/2022 9:50 50.00 34.80 0.00 15.20 -0.01 0.00 0.00 0.00 0.01 96.10 96.60 NR NR Calibration Gas CDNCG002 8/17/2022 9:51 0.00 0.00 10.90 89.10 0.05 0.00 0.00 0.00 0.00 96.80 96.50 NR NR Calibration Gas CDNCGCH4 8/19/2022 11:05 50.00 35.00 0.00 15.00 0.07 -0.04 0.00 0.05 0.01 89.10 89.20 NR NR Calibration Gas CDNCG002 8/19/2022 11:08 0.00 0.00 11.00 89.00 0.00 0.01 0.01 0.00 0.00 89.80 89.90 NR NR Calibration Gas CDNCGCH4 8/19/2022 13:41 50.20 35.00 0.00 14.80 -0.07 -0.01 -0.01 0.01 0.01 76.60 76.20 NR NR Calibration Gas CDNCG002 8/19/2022 13:42 0.00 0.00 11.00 89.00 0.14 0.01 0.01 0.00 0.00 76.10 76.20 NR NR Calibration Gas CDNINLT2 8/19/2022 13:45 35.20 24.50 6.50 33.80 0.06 -19.14 -19.08 19.23 19.23 94.00 94.00 1000.00 1000.00 Flare Inlet CDNBLWR2 8/19/2022 13:46 35.60 24.90 6.30 33.20 0.11 4.06 4.09 0.00 0.00 102.00 102.00 1000.00 1000.00 Flare Blower CDNGW040 8/16/2022 13:35 1.00 0.50 21.50 77.00 -10.44 -2.69 -2.72 0.01 0.02 109.80 110.10 7.99 9.05 No Change,Valve completely closed CDNGW044 8/17/2022 16:16 52.70 36.70 0.10 10.50 -7.41 -2.44 -2.44 2.44 2.44 107.40 107.30 4.87 4.87 No Change CDNGW045 8/17/2022 16:15 46.70 35.00 0.00 18.30 -11.15 -0.75 -0.76 0.77 0.77 102.40 102.40 11.42 11.45 No Change CDNGW046 8/17/2022 15:03 47.20 34.40 0.00 18.40 -6.12 -4.89 -4.97 0.02 0.00 105.80 105.80 8.11 0.00 No Change CDNGW047 8/17/2022 15:00 0.20 0.20 20.30 79.30 -8.11 -1.58 -1.56 0.01 0.01 104.00 104.20 0.70 0.73 No Change,Valve completely closed CDNGW048 8/17/2022 15:01 48.40 35.70 0.20 15.70 -8.37 -5.54 -6.67 3.00 5.96 101.40 100.90 12.28 17.26 No Change CDNGW049 8/17/2022 13:44 0.00 0.00 20.70 79.30 -0.08 0.00 0.00 0.00 0.00 78.30 78.40 0.00 0.00 CDNGW050 8/17/2022 13:56 57.40 37.90 0.00 4.70 -8.26 -7.65 -7.69 0.49 0.52 102.20 101.80 9.04 9.33 No Change CDNGW051 8/17/2022 13:52 58.50 38.00 0.00 3.50 0.71 0.79 0.70 0.01 0.43 97.50 97.70 0.68 4.68 No Change CDNGW052 8/17/2022 13:54 59.00 37.90 0.00 3.10 0.04 0.42 0.42 0.02 0.01 105.20 105.80 1.60 1.52 No Change CDNGW054 8/17/2022 13:43 0.00 0.00 21.10 78.90 0.00 0.00 0.00 0.00 0.00 79.30 79.30 0.00 0.00 CDNGW055 8/17/2022 13:09 62.10 35.90 0.00 2.00 3.29 3.18 3.19 0.01 0.01 107.60 107.80 0.36 0.27 No Change CDNGW057 8/17/2022 13:07 59.00 37.40 0.00 3.60 1.93 1.93 1.95 0.14 0.19 97.90 98.10 2.66 3.12 No Change CDNGW058 8/17/2022 13:03 58.20 38.80 0.00 3.00 4.28 4.04 4.02 0.02 0.02 105.10 105.80 3.59 3.77 No Change CDNGW059 8/17/2022 12:57 0.00 0.00 21.70 78.30 0.14 0.00 0.00 0.00 0.00 97.50 97.50 0.28 0.39 CDNGW060 8/17/2022 12:59 59.20 38.80 0.10 1.90 0.79 0.63 0.64 0.01 0.01 112.50 112.70 0.73 0.67 No Change CDNGW061 8/17/2022 12:56 0.00 0.00 21.70 78.30 0.18 0.00 0.00 0.00 0.00 96.40 96.20 1.14 1.14 CDNGW062 8/17/2022 13:01 59.20 39.10 0.00 1.70 -7.37 -3.45 -3.44 4.93 5.01 92.90 92.90 29.02 29.25 No Change CDNGW063 8/17/2022 13:39 57.80 37.40 0.00 4.80 2.17 3.56 3.56 0.01 0.01 89.80 90.90 6.62 6.52 No Change CDNGW064 8/17/2022 13:41 58.60 39.00 0.00 2.40 2.92 2.88 2.87 0.24 0.22 99.90 100.00 6.37 6.10 No Change CDNGW065 8/17/2022 13:46 0.00 0.00 21.50 78.50 -0.03 0.00 0.00 0.00 0.01 75.50 75.20 3.08 5.43 CDNGW066 8/17/2022 13:58 58.40 38.40 0.00 3.20 -3.50 -3.35 -3.27 0.01 0.01 108.80 109.20 3.37 3.12 No Change CDNGW067 8/17/2022 14:58 50.20 35.80 0.20 13.80 -8.50 -7.88 -7.73 0.15 0.17 107.40 107.70 10.96 11.87 No Change CDNGW068 8/17/2022 15:05 49.70 35.20 0.00 15.10 -8.36 -7.05 -7.05 0.31 0.31 108.20 108.20 11.92 12.01 No Change CDNGW074 8/17/2022 15:40 53.80 37.00 0.00 9.20 -8.71 0.05 0.04 0.05 0.05 108.20 109.00 0.43 0.45 No Change,Valve completely closed CDNGW075 8/17/2022 15:38 52.10 35.10 0.00 12.80 -9.56 -0.30 -0.30 0.07 0.06 103.90 104.00 1.81 1.80 No Change CDNGW076 8/17/2022 15:36 59.20 37.10 0.00 3.70 -9.40 0.19 -0.06 0.00 0.06 106.70 107.60 0.00 16.08 Opened Valve 1/2 turn or less Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data P:\O&M\City of Denton\2022\(8) August\City of Denton O&M Report August 2022.xlsx Weaver Consultants Group, LLC 9/9/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW077 8/17/2022 15:34 55.80 35.10 1.70 7.40 -0.55 0.36 0.37 0.02 0.01 111.10 111.00 3.62 3.38 No Change CDNGW078 8/19/2022 11:38 63.20 35.90 0.00 0.90 0.38 -0.02 -0.02 0.03 0.03 90.20 90.10 0.58 0.55 No Change CDNGW079 8/19/2022 11:13 53.20 36.40 0.50 9.90 -10.43 -1.71 -1.71 0.49 0.50 104.20 104.20 5.01 5.04 No Change CDNGW080 8/17/2022 16:27 50.50 36.00 0.00 13.50 -10.17 -1.03 -1.02 0.02 0.01 108.30 108.50 3.56 3.18 No Change CDNGW081 8/17/2022 16:25 27.60 19.10 8.20 45.10 -9.77 -0.31 -0.31 0.01 0.01 104.60 104.50 0.22 0.21 No Change,Valve completely closed CDNGW082 8/17/2022 16:23 52.40 36.80 0.00 10.80 -9.34 -4.59 -4.63 4.57 4.61 109.50 109.50 61.43 61.68 No Change CDNGW083 8/17/2022 16:21 37.50 32.10 0.10 30.30 -3.16 -0.82 -0.81 0.01 0.00 108.70 108.90 1.45 0.97 No Change CDNGW084 8/17/2022 16:20 53.00 37.10 0.00 9.90 -9.70 -4.92 -4.80 1.20 1.25 108.40 108.50 7.74 7.90 No Change CDNGW085 8/17/2022 15:45 42.60 33.50 0.00 23.90 -9.97 -1.17 -1.16 1.16 1.15 113.00 113.10 31.02 30.95 No Change CDNGW086 8/17/2022 15:42 54.80 36.10 1.10 8.00 -9.24 -0.01 -0.01 0.02 0.02 108.20 108.30 3.96 3.70 No Change,Valve completely closed CDNGW087 8/17/2022 16:18 21.40 11.80 12.20 54.60 -9.57 -0.87 -0.87 0.01 0.01 107.60 108.00 0.81 0.78 No Change CDNGW088 8/17/2022 14:54 39.30 33.20 0.00 27.50 -9.32 -1.10 -1.10 0.06 0.07 103.90 104.00 5.37 5.53 No Change CDNGW089 8/17/2022 14:52 9.40 5.70 16.30 68.60 -1.15 -0.69 -0.68 0.01 0.01 101.30 101.40 2.07 1.89 No Change,Valve completely closed CDNGW090 8/17/2022 14:29 20.10 12.10 13.50 54.30 -1.02 -0.30 -0.30 0.01 0.01 100.50 100.60 3.00 2.78 No Change,Valve completely closed CDNGW091 8/17/2022 15:32 49.60 36.40 0.00 14.00 -8.96 -1.12 -1.09 0.37 0.46 108.10 108.10 13.06 14.67 No Change CDNGW092 8/17/2022 14:55 48.20 35.60 0.00 16.20 -7.79 -5.69 -5.95 0.06 0.05 107.00 107.00 17.40 14.88 No Change CDNGW093 8/17/2022 14:27 37.50 33.20 0.00 29.30 -8.21 -0.97 -0.97 0.76 0.77 108.60 108.80 18.84 18.88 No Change CDNGW094 8/17/2022 14:26 41.50 33.40 0.00 25.10 -7.40 -0.76 -0.76 0.01 0.01 106.00 106.00 2.44 2.26 No Change CDNGW095 8/17/2022 14:09 27.60 17.40 12.10 42.90 1.33 -0.45 -0.45 0.01 0.01 102.70 102.90 5.49 5.14 No Change,Valve completely closed CDNGW096 8/17/2022 14:11 53.60 37.60 0.00 8.80 -5.59 -4.51 -4.51 0.90 0.97 107.00 107.00 27.41 28.48 No Change CDNGW097 8/17/2022 14:18 55.10 38.20 0.00 6.70 -5.68 -5.20 -5.27 0.03 0.03 115.30 115.30 12.07 12.07 No Change CDNGW098 8/17/2022 14:16 53.50 38.50 0.00 8.00 -6.48 -4.74 -4.93 1.13 1.09 112.70 112.70 30.52 29.94 No Change CDNGW099 8/17/2022 14:08 57.80 38.10 0.00 4.10 1.21 0.53 0.53 0.52 0.52 99.30 99.70 15.64 15.66 No Change CDNGW100 8/17/2022 14:13 57.70 39.30 0.00 3.00 1.14 1.02 1.02 0.02 0.02 109.20 109.20 2.74 2.73 No Change CDNGW101 8/17/2022 14:14 57.80 39.00 0.00 3.20 1.11 0.94 0.95 0.95 0.93 104.80 104.70 28.36 28.17 No Change CDNGW102 8/17/2022 13:51 58.10 39.80 0.10 2.00 3.26 3.00 3.01 0.92 0.80 109.90 109.90 1.92 1.79 No Change CDNGW106 8/16/2022 14:23 1.20 23.50 1.40 73.90 9.69 -0.01 -0.01 0.28 0.17 102.60 101.60 11.52 8.99 No Change,Valve completely closed CDNGW107 8/19/2022 11:40 58.40 37.80 0.00 3.80 -10.93 -0.39 -0.40 0.13 0.14 110.10 110.20 10.53 10.65 Opened Valve 1/2 turn or less CDNGW108 8/19/2022 11:42 56.80 38.50 0.00 4.70 -10.77 -0.42 -0.49 0.16 0.08 115.40 115.40 5.10 3.64 Opened Valve 1/2 turn or less CDNGW109 8/19/2022 11:44 55.20 38.40 0.00 6.40 -12.24 -4.92 -5.05 1.86 2.09 118.20 118.20 29.01 30.73 Opened Valve 1/2 turn or less CDNGW110 8/19/2022 11:45 53.00 37.80 0.00 9.20 -11.42 -3.40 -3.45 0.64 0.86 117.20 117.20 23.01 26.63 Opened Valve 1/2 turn or less CDNGW111 8/19/2022 11:47 48.80 37.20 0.00 14.00 -11.03 -1.19 -1.16 0.51 0.62 113.00 113.10 20.69 22.69 No Change CDNGW112 8/19/2022 11:49 37.90 33.50 0.00 28.60 -11.64 -0.24 -0.23 0.09 0.09 112.80 112.80 3.87 3.83 No Change CDNGW113 8/19/2022 11:50 37.00 32.80 0.00 30.20 -11.73 -0.42 -0.45 0.34 0.52 114.20 114.20 7.58 9.27 No Change CDNGW114 8/19/2022 11:51 49.50 36.50 0.00 14.00 -11.36 -1.32 -1.32 1.39 1.53 117.60 117.70 15.17 15.90 No Change CDNGW115 8/19/2022 11:53 43.60 35.40 0.00 21.00 -11.93 -1.30 -1.30 0.94 0.93 112.50 112.50 20.78 20.68 No Change CDNGW116 8/19/2022 11:55 42.90 34.90 0.00 22.20 -11.84 -0.43 -0.43 0.39 0.36 111.90 111.90 13.38 12.94 No Change CDNGW117 8/19/2022 11:58 40.80 34.30 0.00 24.90 -11.54 -0.61 -0.61 0.61 0.55 113.70 113.60 10.05 9.58 No Change CDNGW118 8/19/2022 11:56 41.40 34.80 0.00 23.80 -11.63 -1.08 -1.08 1.35 1.31 109.10 109.10 15.05 14.84 No Change CDNGW119R 8/19/2022 11:59 0.70 1.00 19.80 78.50 -11.53 -0.05 -0.04 0.00 0.01 89.20 89.30 0.14 0.21 No Change,Valve completely closed P:\O&M\City of Denton\2022\(8) August\City of Denton O&M Report August 2022.xlsx Weaver Consultants Group, LLC 9/9/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW120R 8/19/2022 12:02 55.60 38.00 0.00 6.40 -11.80 -11.35 -11.39 0.29 0.21 98.40 98.50 1.69 1.43 No Change CDNGW121R 8/19/2022 12:04 27.60 21.90 3.50 47.00 -11.56 1.24 1.24 0.02 0.02 99.20 99.30 9.02 8.94 No Change,Valve completely closed CDNGW122R 8/19/2022 12:05 5.70 9.30 16.20 68.80 -11.63 3.17 3.17 0.02 0.01 95.30 95.50 8.78 8.09 No Change,Valve completely closed CDNGW123R 8/19/2022 12:07 17.80 17.60 5.30 59.30 -11.63 1.62 1.62 0.03 0.03 101.10 101.30 11.37 11.14 No Change,Valve completely closed CDNGW124R 8/19/2022 12:09 58.30 39.40 0.00 2.30 -11.93 1.06 1.06 0.04 0.03 92.70 92.80 13.60 13.12 No Change,Valve completely closed CDNGW125R 8/19/2022 12:11 2.50 20.00 3.80 73.70 -11.63 0.97 0.97 0.01 0.01 95.40 95.40 7.83 6.97 No Change,Valve completely closed CDNGW126R 8/19/2022 12:12 10.80 10.30 15.30 63.60 -11.70 3.85 3.85 4.04 4.08 98.10 98.20 142.88 143.48 No Change,Valve completely closed DEWLCR3 8/16/2022 14:21 1.00 4.20 17.90 76.90 10.08 6.74 6.76 0.00 0.00 101.00 101.10 0.00 1.14 No Change,Valve completely closed DEWLCR4 8/16/2022 13:21 57.50 40.70 0.00 1.80 -9.32 0.42 0.37 9.70 8.66 109.20 109.70 216.79 205.04 Opened Valve 1/2 to 1 turn DEWLCR5 8/16/2022 13:17 51.90 37.80 0.70 9.60 -13.81 -0.12 -0.13 3.18 3.27 96.90 96.80 12.79 12.96 No Change Notes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =77 Number of Wells with Methane > 58%=14 Total Number of Well Readings =77 Number of Wells with Oxygen ≥ 2%=19 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =9 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =28 Number of Wells with No Room to Run (NRTR)=39 CDNSV001 8/16/2022 12:06 1.40 9.20 11.60 77.80 -7.97 -1.07 -1.07 0.02 0.02 106.80 107.40 8.23 8.32 No Change CDNSV002 8/16/2022 12:04 2.10 4.10 17.10 76.70 -8.25 -6.03 -6.16 0.09 0.08 91.70 91.80 20.04 18.63 No Change CDNSV003 8/16/2022 11:51 11.20 13.00 10.60 65.20 -8.10 -2.73 -2.71 0.03 0.03 101.10 101.40 12.22 12.36 No Change CDNSV004 8/16/2022 11:49 1.60 3.30 17.90 77.20 -8.06 -4.80 -4.80 0.06 0.06 96.10 96.30 17.17 16.86 No Change CDNSV005 8/16/2022 11:47 1.60 0.90 20.50 77.00 -8.04 -4.13 -4.13 0.06 0.07 97.30 98.30 16.97 17.26 No Change CDNSV006 8/16/2022 12:08 0.00 0.30 20.90 78.80 -8.06 -1.48 -1.46 0.18 0.15 89.90 89.80 29.12 26.16 No Change CDNSV007 8/16/2022 12:09 0.00 0.50 20.40 79.10 -7.80 -4.69 -4.69 0.13 0.13 90.60 90.80 24.16 24.26 No Change CDNSV008 8/16/2022 12:11 0.00 0.60 20.20 79.20 -7.91 -5.72 -5.65 0.13 0.14 91.70 91.60 24.53 25.26 No Change CDNSV009 8/16/2022 12:12 0.00 0.40 20.70 78.90 -7.76 -0.98 -0.98 0.03 0.03 94.70 94.80 10.97 10.86 No Change CDNSV010 8/16/2022 12:14 0.00 2.80 18.00 79.20 -7.91 -7.35 -7.27 0.11 0.11 95.60 95.70 22.52 22.82 No Change CDNSV011 8/16/2022 12:16 3.20 6.00 14.80 76.00 -7.77 -7.11 -7.11 0.07 0.08 94.50 94.50 18.29 18.45 No Change CDNSV012 8/16/2022 12:21 9.30 8.80 13.00 68.90 -7.69 -4.77 -4.76 0.06 0.06 102.20 102.50 16.77 16.97 No Change CDNSV013 8/16/2022 12:23 0.10 0.10 21.00 78.80 -7.37 -6.80 -6.84 0.86 0.96 85.70 85.70 63.29 66.75 No Change CDNSV014 8/16/2022 12:45 10.90 8.20 15.50 65.40 -7.66 -7.07 -7.18 0.08 0.09 99.30 99.60 18.46 19.70 No Change Soil Vapor Extraction Well Data P:\O&M\City of Denton\2022\(8) August\City of Denton O&M Report August 2022.xlsx Weaver Consultants Group, LLC 9/9/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNLFG02 8/19/2022 13:34 56.90 39.40 0.50 3.20 -11.78 -11.43 -11.56 0.46 0.37 90.30 90.20 45.69 40.91 No Change CDNLFG03 8/19/2022 13:32 57.10 40.00 0.00 2.90 -12.27 -0.91 -0.99 3.59 4.47 93.50 93.50 5.99 6.68 Opened Valve 1/2 turn or less CDNLFG05 8/19/2022 13:35 46.70 36.20 0.00 17.10 -12.60 -2.93 -2.92 0.12 0.13 90.80 90.80 23.48 24.94 No Change CDNLFG06 8/19/2022 13:23 19.40 12.10 13.60 54.90 -12.53 0.00 0.01 0.02 0.01 97.50 97.50 0.27 0.24 No Change,Valve completely closed CDNLFG07 8/19/2022 13:25 57.40 39.90 0.00 2.70 0.43 0.42 0.43 0.03 0.03 99.00 99.00 11.90 11.29 No Change,Valve completely closed CDNLFG08 8/19/2022 13:30 57.20 39.90 0.00 2.90 0.21 0.79 0.79 0.03 0.03 98.40 98.60 0.36 0.35 No Change CDNLFG16 8/19/2022 13:29 57.30 40.20 0.00 2.50 0.21 1.24 1.24 0.04 0.04 98.70 98.80 0.40 0.39 No Change CDNLFG17 8/19/2022 13:27 0.00 0.00 20.50 79.50 0.09 0.00 0.00 0.01 0.01 91.10 92.30 5.98 4.63 No Change CDNLFG18 8/19/2022 13:26 0.00 0.00 20.60 79.40 0.34 0.02 0.04 0.00 0.00 91.10 91.20 0.00 0.00 No Change CDNLFG19 8/19/2022 13:19 55.70 38.70 0.00 5.60 -13.21 -0.50 -0.49 4.18 5.52 91.70 91.70 4.14 4.75 Opened Valve 1/2 turn or less CDNLFG20 8/19/2022 13:17 50.40 37.20 0.00 12.40 -12.63 -8.41 -8.37 0.12 0.12 90.00 90.00 23.86 23.32 No Change CDNLFG21 8/19/2022 13:15 48.90 36.40 0.00 14.70 -12.51 -5.37 -5.37 0.12 0.12 91.10 91.20 23.65 23.37 No Change CDNLFG22 8/19/2022 13:13 48.40 34.50 0.20 16.90 -12.57 -2.73 -2.73 0.04 0.04 95.80 95.90 13.58 13.24 No Change CDNLFG23 8/19/2022 13:21 43.30 33.00 1.90 21.80 -12.51 -0.16 -0.15 0.02 0.02 95.10 95.20 0.30 0.27 No Change,Valve completely closed CDNLFG24 8/19/2022 13:09 37.00 33.40 0.00 29.60 -12.88 -0.47 -0.47 0.30 0.31 91.00 91.30 1.74 1.78 No Change CDNLFG25 8/19/2022 13:11 54.80 32.00 2.70 10.50 -12.71 -12.48 -12.42 0.08 0.08 98.10 98.50 18.95 19.29 No Change CDNLFG26 8/19/2022 13:05 52.50 40.80 0.00 6.70 -12.75 -0.51 -0.52 0.00 0.00 96.30 96.50 0.00 0.00 No Change CDNLFG27 8/19/2022 13:07 37.40 34.10 0.00 28.50 -12.74 -7.92 -7.89 0.73 0.71 94.20 94.60 1.72 1.69 No Change CDNLFG28 8/19/2022 13:01 45.90 36.60 0.10 17.40 -13.07 -0.48 -0.48 0.03 0.03 93.40 93.70 11.73 11.00 No Change CDNLFG29 8/19/2022 12:59 49.50 40.10 0.00 10.40 -12.74 -3.89 -3.87 0.21 0.19 88.40 88.40 31.61 29.53 No Change CDNLFG30 8/19/2022 13:03 55.20 42.20 0.00 2.60 -12.82 -0.36 -0.37 0.05 0.05 89.30 89.00 14.72 15.45 Opened Valve 1/2 turn or less CDNLFG31 8/16/2022 14:05 38.00 33.20 1.80 27.00 -11.51 -6.22 -5.92 2.30 1.67 107.70 108.20 10.71 9.12 Closed Valve 1/2 turn or less CDNLFG32 8/16/2022 13:42 57.50 39.80 0.00 2.70 -11.43 0.02 -0.17 0.02 0.00 110.10 110.60 9.59 0.00 Opened Valve 1/2 turn or less CDNLFG33 8/16/2022 14:08 37.10 33.10 0.00 29.80 -11.82 -0.87 -0.87 0.18 0.18 102.60 102.90 3.01 3.02 No Change CDNLFG34 8/16/2022 14:10 21.70 28.80 0.00 49.50 -12.56 -0.53 -0.55 0.22 0.19 105.20 105.30 3.31 3.09 No Change CDNLFG35 8/16/2022 13:40 15.30 23.50 0.80 60.40 -11.89 -8.78 -8.58 0.00 0.00 112.30 112.60 0.00 0.00 Closed Valve 1/2 turn or less CDNLFG36 8/16/2022 14:11 51.20 38.20 1.00 9.60 -11.34 -0.40 -0.40 0.01 0.01 112.80 113.00 7.87 7.65 No Change CDNLFG37 8/16/2022 13:37 39.10 36.50 0.00 24.40 -11.05 -2.15 -2.12 2.14 1.79 88.70 88.70 19.25 17.64 Closed Valve 1/2 turn or less CDNLFG38 8/19/2022 12:23 1.00 4.40 15.50 79.10 -12.42 -0.10 -0.07 0.08 0.07 96.40 96.40 0.57 0.54 No Change,Valve completely closed CDNLFG39 8/16/2022 14:14 55.40 39.70 0.00 4.90 -9.47 -4.63 -4.68 0.56 0.58 99.60 99.50 50.62 51.46 No Change CDNLFG41 8/17/2022 16:12 35.50 32.00 0.00 32.50 -10.48 -0.43 -0.43 0.01 0.01 104.70 104.60 3.20 2.99 No Change CDNLFG42 8/17/2022 15:50 40.60 33.40 0.00 26.00 -10.53 -1.53 -1.53 1.89 1.89 96.40 96.30 4.34 4.34 No Change CDNLFG43 8/17/2022 15:47 47.30 35.00 0.00 17.70 -10.72 -8.07 -7.82 0.15 0.20 97.40 97.40 11.21 12.95 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill Extraction Well Data P:\O&M\City of Denton\2022\(8) August\City of Denton O&M Report August 2022.xlsx Weaver Consultants Group, LLC 9/9/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ001 8/17/2022 10:08 50.80 36.00 0.10 13.10 -11.10 -10.23 -10.23 0.02 0.02 93.50 93.20 10.02 10.48 No Change CDNHZ002 8/17/2022 10:11 51.40 34.00 0.20 14.40 -11.22 -9.24 -9.22 0.05 0.06 93.50 93.50 14.22 17.02 No Change CDNHZ003 8/17/2022 10:13 52.50 34.10 0.00 13.40 -11.11 -7.76 -7.90 0.01 0.01 91.00 90.90 7.43 6.43 No Change CDNHZ005 8/17/2022 10:16 41.50 30.00 0.00 28.50 -10.91 -7.75 -7.82 0.01 0.01 95.90 95.80 6.58 6.40 No Change CDNHZ006 8/17/2022 10:19 10.50 11.10 10.70 67.70 -11.09 -2.57 -2.57 0.02 0.02 109.60 110.50 10.24 9.78 No Change CDNHZ007 8/17/2022 10:21 49.00 32.30 1.80 16.90 -11.11 -7.03 -7.05 0.03 0.04 98.30 98.30 12.40 12.80 No Change CDNHZ008 8/17/2022 10:23 25.20 27.90 0.00 46.90 -11.11 -2.14 -2.14 0.01 0.01 100.90 101.30 6.81 6.60 No Change CDNHZ010 8/17/2022 10:25 58.30 37.80 0.00 3.90 -11.18 -11.05 -11.01 0.03 0.04 90.50 90.40 11.16 13.71 No Change CDNHZ011 8/17/2022 10:27 12.00 5.60 17.00 65.40 -11.17 -11.16 -10.92 0.05 0.07 105.40 105.90 14.43 17.44 No Change CDNHZ012 8/17/2022 10:30 11.60 8.20 14.90 65.30 -11.21 -8.38 -8.50 0.07 0.07 105.10 105.20 17.29 17.36 No Change CDNHZ014 8/17/2022 10:52 58.70 37.30 0.10 3.90 -11.02 -0.02 -0.30 0.02 0.01 106.80 107.80 8.95 7.99 Opened Valve 1/2 turn or less CDNHZ015 8/17/2022 10:54 60.40 37.30 0.10 2.20 -11.47 -8.10 -8.07 0.05 0.06 102.80 103.20 15.47 16.42 No Change CDNHZ017 8/17/2022 10:58 60.10 39.00 0.00 0.90 -11.15 -10.86 -11.13 0.01 0.02 107.10 107.20 7.92 9.94 No Change CDNHZ018 8/17/2022 11:00 2.80 2.90 16.00 78.30 -11.03 0.16 0.13 0.00 0.00 104.10 105.30 0.00 0.00 No Change,Valve completely closed CDNHZ019 8/17/2022 11:02 60.10 37.50 0.10 2.30 -11.32 -11.18 -11.17 0.03 0.03 103.90 104.00 11.41 11.29 No Change CDNHZ020 8/17/2022 11:03 60.40 37.00 0.20 2.40 -11.09 -10.96 -10.96 0.06 0.06 105.40 105.60 16.47 16.66 No Change CDNHZ021 8/17/2022 11:05 13.30 11.00 4.50 71.20 -11.22 0.21 0.21 0.00 0.00 106.60 107.40 3.41 0.96 No Change,Valve completely closed CDNHZ022 8/17/2022 11:07 60.00 36.40 0.30 3.30 -11.15 -11.09 -11.22 0.07 0.07 105.20 105.50 17.88 17.99 No Change CDNHZ023 8/17/2022 11:09 58.60 38.30 0.50 2.60 -11.11 -11.01 -11.01 0.04 0.03 108.60 109.00 12.61 11.17 No Change CDNHZ025 8/17/2022 11:11 58.80 38.90 0.00 2.30 -11.15 -10.92 -10.96 0.00 0.02 105.70 105.90 0.00 9.96 No Change CDNHZ026 8/17/2022 11:12 26.00 27.10 0.20 46.70 -11.28 -5.69 -5.69 0.05 0.05 105.20 105.60 14.74 14.81 No Change CDNHZ029 8/17/2022 11:15 48.60 23.80 4.60 23.00 -11.03 -10.96 -10.96 0.06 0.06 110.30 110.30 15.80 15.80 Closed Valve 1/2 turn or less,Valve CDNHZ030 8/17/2022 11:16 44.80 28.80 4.30 22.10 -11.15 -1.06 -1.05 0.05 0.05 107.10 107.20 15.49 15.79 No Change,Valve completely closed CDNHZ031 8/17/2022 11:18 10.60 11.90 12.00 65.50 -11.13 -3.73 -3.68 0.02 0.02 105.70 106.50 9.25 9.43 No Change,Valve completely closed CDNHZ032 8/17/2022 11:19 46.60 26.70 4.60 22.10 -11.22 -11.05 -11.01 0.03 0.03 108.00 108.20 11.38 11.18 No Change CDNHZ033 8/17/2022 11:21 10.20 8.80 14.70 66.30 -11.28 -11.13 -11.13 0.06 0.06 109.60 109.90 15.99 15.78 No Change CDNHZ034 8/17/2022 11:23 60.30 37.50 0.10 2.10 -11.11 -10.96 -10.94 0.03 0.03 93.20 93.20 11.77 11.91 No Change CDNHZ035 8/17/2022 11:25 51.90 33.30 2.20 12.60 -11.13 -11.09 -11.16 0.20 0.22 98.80 98.90 30.05 31.12 Closed Valve 1/2 turn or less CDNHZ036 8/17/2022 11:27 38.20 32.60 1.00 28.20 -11.21 -10.98 -10.97 0.10 0.09 105.80 106.70 20.99 20.01 Closed Valve 1/2 turn or less Horizontal Well Data P:\O&M\City of Denton\2022\(8) August\City of Denton O&M Report August 2022.xlsx Weaver Consultants Group, LLC 9/9/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill Notes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =63 Number of Wells with Methane > 58%=10 Total Number of Well Readings =63 Number of Wells with Oxygen ≥ 2%=16 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =4 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =9 Number of Wells with No Room to Run (NRTR)=33 P:\O&M\City of Denton\2022\(8) August\City of Denton O&M Report August 2022.xlsx Weaver Consultants Group, LLC 9/9/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCGCH4 9/26/2022 7:35 50.00 35.30 0.00 14.70 -0.03 0.00 0.00 0.00 0.00 90.70 92.10 NR NR Calibration Gas CDNCG002 9/26/2022 7:37 0.00 0.00 11.00 89.00 0.06 0.00 0.00 0.01 0.00 92.50 92.20 NR NR Calibration GasCDNINLT19/26/2022 7:54 28.80 21.30 9.30 40.60 -0.04 -19.07 -19.06 19.40 19.43 85.00 85.00 1285.00 1285.00 Flare Inlet CDNBLWR1 9/26/2022 7:57 28.80 21.30 9.30 40.60 0.18 4.42 4.43 0.00 0.00 91.00 91.00 1285.00 1285.00 Flare Blower CDN00GHG 9/26/2022 7:58 28.90 21.10 9.30 40.70 0.24 4.39 4.37 0.00 0.00 91.00 91.00 NR NR Flare GHGCDNCGCH49/27/2022 11:22 50.00 35.20 0.00 14.80 0.22 -0.01 -0.01 0.01 0.00 77.20 77.80 NR NR Calibration Gas CDNCG002 9/27/2022 11:24 0.00 0.00 10.90 89.10 0.56 0.05 -0.06 0.00 0.10 78.00 78.00 NR NR Calibration Gas CDNCGCH4 9/27/2022 15:58 50.00 35.20 0.00 14.80 NR NR NR NR NR 106.70 NR NR NR Calibration Gas CDNCG002 9/27/2022 15:59 0.00 0.00 10.80 89.20 0.11 -0.01 NR 0.02 NR 106.40 NR NR NR Calibration Gas CDNINLT2 9/27/2022 16:02 31.50 21.90 8.60 38.00 -0.17 -19.04 -19.03 18.91 18.92 92.00 92.00 1300.00 1300.00 Flare InletCDNBLWR29/27/2022 16:04 31.30 21.60 8.60 38.50 -0.11 4.40 4.43 0.00 0.00 108.00 108.00 1300.00 1300.00 Flare Blower CDNGW040 9/26/2022 15:05 2.50 3.60 19.90 74.00 -9.96 -0.91 -0.90 0.00 0.01 94.70 96.10 4.56 4.60 No ChangeCDNGW0449/27/2022 13:39 46.60 34.20 2.30 16.90 -6.36 -2.14 -2.15 2.14 2.14 103.00 104.00 4.58 4.58 No ChangeCDNGW0459/27/2022 15:38 1.60 1.40 5.40 91.60 -22.22 -3.61 -0.58 4.19 0.59 100.10 100.50 26.58 10.03 No ChangeCDNGW0469/27/2022 13:24 47.20 35.50 0.00 17.30 -4.89 -4.10 -4.17 0.04 0.03 95.50 99.40 13.52 12.33 No ChangeCDNGW0479/27/2022 11:56 1.70 0.60 20.30 77.40 -11.36 -1.20 -1.21 0.00 0.00 89.80 89.60 0.31 0.16 No Change,Valve completely closedCDNGW0489/27/2022 11:54 48.70 35.60 0.20 15.50 -10.70 -9.14 -9.11 2.14 1.56 97.90 97.90 10.36 8.86 No ChangeCDNGW0499/27/2022 11:44 2.50 0.80 20.30 76.40 0.05 0.00 -0.01 0.00 0.00 86.10 86.50 0.00 0.00 No Change,Valve completely closedCDNGW0509/27/2022 11:51 57.80 39.10 0.00 3.10 -9.54 -8.65 -8.78 9.13 9.15 95.40 95.50 39.02 39.04 No ChangeCDNGW0519/27/2022 11:47 56.00 38.30 0.00 5.70 0.25 0.24 0.22 0.16 0.16 96.10 96.40 2.84 2.87 No Change,Valve completely closedCDNGW0529/27/2022 11:49 55.80 36.60 3.20 4.40 -0.12 -0.05 -0.04 0.04 0.05 93.40 94.30 2.70 2.80 No Change,Valve completely closedCDNGW0549/27/2022 11:41 1.10 0.50 20.40 78.00 0.07 0.00 0.00 0.00 0.00 86.20 86.00 0.00 0.00 No Change,Valve completely closedCDNGW0559/27/2022 11:40 59.80 34.30 0.00 5.90 2.91 2.63 2.63 0.01 0.01 92.90 93.90 0.29 0.28 No Change,Valve completely closedCDNGW0579/27/2022 11:35 59.70 38.30 0.00 2.00 1.83 1.63 1.61 0.20 0.33 90.50 90.90 3.20 4.16 No Change,Valve completely closedCDNGW0589/27/2022 11:33 56.20 39.40 0.00 4.40 3.89 3.50 3.46 0.57 0.01 88.20 98.20 22.33 3.22 No Change,Valve completely closedCDNGW0599/27/2022 11:28 0.10 0.20 20.90 78.80 0.03 -0.01 0.00 0.00 0.01 86.20 85.80 0.45 0.86 No Change,Valve completely closedCDNGW0609/27/2022 11:31 59.90 38.30 0.00 1.80 0.64 0.41 0.42 0.01 0.01 93.20 95.90 0.72 0.65 No ChangeCDNGW0619/27/2022 11:27 0.20 0.30 20.90 78.60 NR NR NR NR NR 86.80 NR NR NR No Change,Valve completely closedCDNGW0629/27/2022 11:29 57.30 41.70 0.10 0.90 -7.43 -3.88 -3.73 4.61 2.27 90.60 90.60 28.12 19.79 No ChangeCDNGW0639/27/2022 11:38 60.10 38.00 0.00 1.90 -0.54 3.00 2.99 0.01 0.00 89.60 89.40 6.43 1.91 No ChangeCDNGW0649/27/2022 11:42 56.40 38.80 0.00 4.80 2.96 2.60 2.59 0.11 0.15 90.60 91.80 4.29 5.04 No Change,Valve completely closedCDNGW0659/27/2022 11:44 0.40 0.30 20.50 78.80 -0.06 -0.01 0.01 0.02 0.00 88.70 88.60 9.48 0.00 No Change,Valve completely closedCDNGW0669/27/2022 11:58 40.30 30.60 0.20 28.90 -2.76 -2.77 -2.60 0.02 0.06 91.50 94.30 3.78 7.29 No Change,Valve completely closedCDNGW0679/27/2022 12:11 50.30 35.90 0.30 13.50 -7.90 -7.64 -8.07 0.22 0.52 104.00 104.30 13.51 20.86 No ChangeCDNGW0689/27/2022 12:45 48.40 36.70 0.00 14.90 -7.28 -6.71 -6.71 0.88 0.78 100.80 100.20 20.17 19.08 No ChangeCDNGW0749/27/2022 14:06 54.10 37.50 0.00 8.40 -8.50 0.05 0.07 0.05 0.04 98.60 98.80 0.47 0.38 No ChangeCDNGW0759/27/2022 14:08 46.10 35.70 0.00 18.20 -9.00 -0.30 -0.27 0.25 0.31 101.60 101.90 3.55 3.96 No Change CDNGW076 9/27/2022 14:10 48.50 35.40 0.00 16.10 -0.72 -1.76 -1.65 0.84 0.73 87.70 87.50 63.25 58.81 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data P:\O&M\City of Denton\2022\(9) September\City of Denton O&M Report September 2022 Weaver Consultants Group, LLC GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW077 9/27/2022 14:38 56.60 36.80 0.00 6.60 0.43 0.53 0.53 0.01 0.01 96.10 96.30 3.18 3.23 No Change CDNGW078 9/27/2022 13:33 58.40 35.30 0.00 6.30 0.19 0.35 0.35 0.35 0.35 95.10 95.20 1.88 1.87 No Change,Valve completely closed CDNGW079 9/27/2022 13:34 50.50 36.00 0.00 13.50 -8.43 -1.14 -1.14 0.46 0.34 102.70 103.50 4.82 4.13 No ChangeCDNGW0809/27/2022 13:31 52.00 37.40 0.00 10.60 -8.83 -0.91 -0.90 0.01 0.00 96.10 101.90 2.18 1.13 No Change CDNGW081 9/27/2022 13:36 21.40 13.10 12.10 53.40 -8.20 -0.27 -0.27 0.01 0.01 89.70 89.90 0.19 0.18 No Change,Valve completely closed CDNGW082 9/27/2022 13:29 52.20 37.30 0.00 10.50 0.28 -4.43 -4.56 4.43 4.56 89.70 89.30 61.55 62.46 No ChangeCDNGW0839/27/2022 13:37 10.30 5.70 18.50 65.50 -0.13 -0.25 -0.24 0.00 0.00 92.90 93.40 1.12 0.69 No Change CDNGW084 9/27/2022 13:28 51.20 36.70 0.00 12.10 -8.76 -4.38 -4.37 0.60 0.81 89.70 89.90 5.58 6.47 No ChangeCDNGW0859/27/2022 14:02 42.50 33.80 0.00 23.70 -8.74 -1.72 -1.69 1.72 1.67 99.90 102.40 38.29 37.64 No Change CDNGW086 9/27/2022 14:04 56.10 37.60 0.20 6.10 -8.42 0.09 0.09 0.02 0.02 96.00 96.10 3.72 3.60 No Change CDNGW087 9/27/2022 13:26 20.50 12.20 11.90 55.40 -39.98 -2.86 -0.69 4.03 0.02 94.30 95.10 14.37 0.90 No ChangeCDNGW0889/27/2022 12:43 40.20 34.80 0.00 25.00 -8.22 -1.04 -1.05 1.04 1.02 98.10 98.10 22.22 21.96 No Change CDNGW089 9/27/2022 12:41 1.00 0.50 20.30 78.20 0.90 -0.71 -0.71 0.00 0.00 93.10 93.10 0.85 0.30 No Change,Valve completely closedCDNGW0909/27/2022 12:19 12.00 7.00 16.80 64.20 1.12 -0.27 -0.27 0.00 0.00 91.00 90.80 1.62 1.81 No Change,Valve completely closedCDNGW0919/27/2022 14:36 48.80 36.00 0.00 15.20 -8.40 -0.84 -0.82 0.18 0.21 103.40 107.50 9.28 9.95 No Change CDNGW092 9/27/2022 12:13 46.40 35.20 0.00 18.40 -6.34 -5.12 -5.06 0.10 0.05 105.30 NR 21.87 14.91 No ChangeCDNGW0939/27/2022 12:15 41.80 35.90 0.00 22.30 -7.18 -0.83 -0.83 0.77 0.77 93.80 103.30 19.14 19.02 No Change CDNGW094 9/27/2022 12:17 43.70 34.70 0.00 21.60 -6.39 -0.58 -0.57 0.09 0.10 100.50 100.50 8.79 9.42 No Change CDNGW095 9/27/2022 12:09 36.00 23.90 9.60 30.50 0.74 -0.46 -0.45 0.00 0.01 92.70 92.90 4.16 4.80 No Change,Valve completely closedCDNGW0969/27/2022 12:07 57.40 39.50 0.00 3.10 -3.56 -3.13 -2.97 3.11 3.03 106.10 106.20 50.96 50.30 No ChangeCDNGW0979/27/2022 12:04 54.80 38.40 0.00 6.80 -3.60 -3.44 -3.61 0.05 0.02 112.80 113.60 14.77 9.77 No Change CDNGW098 9/27/2022 14:34 54.70 39.90 0.00 5.40 -4.21 -3.02 -3.09 0.48 0.56 112.70 112.70 20.04 21.48 No ChangeCDNGW0999/27/2022 12:00 52.60 37.60 0.00 9.80 0.29 0.42 0.42 0.41 0.42 95.20 99.00 14.06 14.18 No Change CDNGW100 9/27/2022 12:01 58.90 40.50 0.00 0.60 1.25 0.95 0.94 0.01 0.01 97.60 97.80 2.08 1.99 No Change CDNGW101 9/27/2022 12:03 58.40 40.20 0.00 1.40 0.29 0.93 0.93 0.92 0.91 87.10 87.40 28.37 28.29 No Change,Valve completely closedCDNGW1029/27/2022 11:45 56.70 39.50 0.00 3.80 -30.65 -1.88 2.44 4.34 0.49 97.00 97.50 4.19 1.42 No Change,Valve completely closed CDNGW106 9/27/2022 14:16 1.20 23.10 0.40 75.30 10.20 -0.07 -0.07 0.02 0.02 100.20 100.90 2.80 2.84 No Change CDNGW107 9/27/2022 14:41 55.10 39.60 0.00 5.30 -9.70 -0.85 -0.48 0.09 0.18 110.20 110.20 8.63 12.27 No ChangeCDNGW1089/27/2022 14:42 46.80 36.60 0.00 16.60 -20.41 -4.32 -0.22 4.18 0.63 114.30 NR 26.21 10.24 No ChangeCDNGW1099/27/2022 14:43 44.50 34.60 0.00 20.90 -10.92 -4.90 -5.06 1.90 1.87 114.80 116.70 29.42 29.08 No Change CDNGW110 9/27/2022 14:44 45.50 36.20 0.00 18.30 -10.93 -3.31 -3.31 0.88 0.87 116.80 117.20 26.89 26.69 No ChangeCDNGW1119/27/2022 14:46 46.00 36.80 0.00 17.20 -9.74 -0.98 -0.96 0.31 0.36 112.30 112.60 16.13 17.41 No Change CDNGW112 9/27/2022 14:48 33.90 32.30 0.00 33.80 -10.48 -0.15 -0.15 0.14 0.15 111.20 111.50 4.90 5.00 No Change CDNGW113 9/27/2022 14:49 37.80 34.70 0.00 27.50 -10.23 -0.34 -0.35 0.37 0.04 113.20 113.30 7.89 2.68 No ChangeCDNGW1149/27/2022 14:50 46.10 36.30 0.00 17.60 -9.79 -1.13 -1.13 1.26 1.25 116.10 117.00 14.45 14.36 No Change CDNGW115 9/27/2022 14:51 44.00 36.30 0.00 19.70 -10.58 -1.08 -1.08 0.78 0.81 112.80 112.90 18.94 19.31 No ChangeCDNGW1169/27/2022 14:53 45.10 37.00 0.00 17.90 -10.55 -0.26 -0.27 0.37 0.40 111.60 111.70 13.17 13.69 No Change CDNGW117 9/27/2022 14:56 46.90 37.00 0.00 16.10 -10.62 -0.40 -0.40 0.52 0.54 112.40 112.60 9.32 9.47 No Change CDNGW118 9/27/2022 14:57 51.20 38.70 0.00 10.10 -31.83 -3.35 0.39 4.04 0.03 94.40 94.90 26.25 2.07 No ChangeCDNGW119R9/27/2022 15:21 0.90 0.70 20.60 77.80 -10.64 -0.17 -0.16 0.00 0.00 95.00 95.70 0.17 0.17 No Change,Valve completely closed P:\O&M\City of Denton\2022\(9) September\City of Denton O&M Report September 2022 Weaver Consultants Group, LLC GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW120R 9/27/2022 15:22 55.30 39.70 0.00 5.00 -10.40 -10.54 -10.50 0.21 0.19 98.30 98.70 1.42 1.36 No Change CDNGW121R 9/27/2022 15:24 22.00 18.10 2.70 57.20 -10.66 -10.50 -10.48 10.50 10.60 92.50 91.90 225.55 226.71 No Change CDNGW122R 9/27/2022 15:26 3.50 9.30 16.30 70.90 -10.63 -8.91 -8.33 3.30 0.01 102.90 101.10 126.76 8.17 No Change,Valve completely closedCDNGW123R9/27/2022 15:28 18.90 20.20 2.60 58.30 -10.58 3.72 3.73 0.02 0.02 96.30 96.60 9.81 9.20 No Change,Valve completely closed CDNGW124R 9/27/2022 15:29 53.80 39.90 0.20 6.10 -10.42 3.41 3.45 0.03 0.03 94.20 94.30 12.43 12.43 No Change CDNGW125R 9/27/2022 15:31 2.30 20.30 3.80 73.60 -10.03 5.40 5.38 0.01 0.01 95.60 95.70 8.35 7.62 No Change,Valve completely closedCDNGW126R9/27/2022 15:32 9.60 9.70 15.70 65.00 -10.59 4.98 4.98 0.01 0.01 97.70 98.00 6.05 7.85 No Change DEWLCR3 9/27/2022 14:12 0.20 2.40 18.90 78.50 11.51 5.82 5.82 0.01 0.01 97.50 97.50 2.56 2.56 No ChangeDEWLCR49/26/2022 10:36 56.60 39.80 0.00 3.60 -7.16 0.28 0.28 7.56 7.49 87.70 87.70 195.58 194.72 No Change DEWLCR5 9/26/2022 10:30 53.40 37.40 0.90 8.30 -13.79 -0.18 -0.18 3.19 3.14 90.70 90.60 12.87 12.77 No Change Notes:1)Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5)Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6)Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =77 Number of Wells with Methane > 58%=7 Total Number of Well Readings =77 Number of Wells with Oxygen ≥ 2%=23 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =13 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =22 Number of Wells with No Room to Run (NRTR)=39 CDNSV001 9/26/2022 10:53 1.60 8.70 12.20 77.50 -7.92 -1.02 -1.01 0.01 0.01 88.60 88.70 8.03 6.82 No Change CDNSV002 9/26/2022 10:50 0.10 0.40 21.00 78.50 -7.90 -0.71 -0.71 0.09 0.10 82.60 82.60 21.10 22.29 No Change CDNSV003 9/26/2022 10:47 4.10 4.10 18.20 73.60 -7.93 -0.19 -0.19 0.00 0.00 88.40 88.90 3.63 3.46 No Change CDNSV004 9/26/2022 10:45 7.50 11.10 10.80 70.60 -7.92 -7.46 -7.44 0.07 0.07 85.30 85.30 17.72 17.52 No Change CDNSV005 9/26/2022 10:41 3.20 1.60 19.90 75.30 -8.03 -5.12 -5.38 0.02 0.02 85.00 85.10 10.09 9.58 No ChangeCDNSV0069/26/2022 10:57 0.10 0.30 21.20 78.40 -7.66 -1.32 -1.33 0.14 0.14 80.20 80.20 25.88 26.22 No Change CDNSV007 9/26/2022 11:00 0.00 0.50 20.80 78.70 -7.61 -4.34 -4.36 0.11 0.10 83.70 83.40 22.73 21.83 No Change CDNSV008 9/26/2022 11:03 0.00 0.50 20.70 78.80 -7.56 -5.41 -5.42 0.17 0.15 85.40 85.10 27.85 26.08 No ChangeCDNSV0099/26/2022 11:06 0.00 0.30 21.10 78.60 -7.35 -0.82 -0.81 0.02 0.02 84.00 84.00 10.00 10.06 No Change CDNSV010 9/26/2022 11:09 0.00 1.20 19.60 79.20 -7.53 -7.12 -7.10 0.08 0.08 83.60 83.60 19.73 19.46 No Change CDNSV011 9/26/2022 11:12 0.40 0.90 20.00 78.70 -7.42 -5.10 -5.06 0.12 0.11 79.80 79.60 23.32 22.43 No Change CDNSV012 9/26/2022 11:14 6.50 6.10 15.70 71.70 -7.37 -4.76 -4.72 0.05 0.04 85.70 85.90 14.56 14.44 No Change CDNSV013 9/26/2022 11:16 0.20 0.10 21.40 78.30 -7.27 -6.98 -6.88 0.50 0.50 78.80 78.10 48.62 48.30 No ChangeCDNSV0149/26/2022 11:39 6.70 5.40 17.10 70.80 -7.27 -7.10 -7.42 0.12 0.11 87.60 87.70 23.89 21.97 No Change Soil Vapor Extraction Well Data P:\O&M\City of Denton\2022\(9) September\City of Denton O&M Report September 2022 Weaver Consultants Group, LLC GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNLFG02 9/26/2022 10:22 56.00 40.30 0.30 3.40 -11.23 -10.83 -10.77 0.39 0.30 87.20 87.90 41.96 36.87 No ChangeCDNLFG039/26/2022 9:54 57.90 41.30 0.00 0.80 -11.84 -2.14 -2.14 3.07 3.06 89.00 89.00 5.56 5.55 No ChangeCDNLFG059/26/2022 10:20 46.90 37.40 0.00 15.70 -11.75 -3.89 -3.91 0.08 0.11 89.50 89.50 19.33 22.68 No ChangeCDNLFG069/26/2022 9:43 0.40 0.40 21.50 77.70 -11.45 -1.12 -1.11 0.02 0.02 81.60 82.30 0.28 0.28 No Change,Valve completely closedCDNLFG079/26/2022 9:45 42.10 28.50 8.00 21.40 0.23 -0.98 -0.98 0.01 0.01 81.20 82.10 5.74 6.59 No Change,Valve completely closedCDNLFG089/26/2022 9:51 0.10 0.10 21.50 78.30 -0.09 -0.57 -0.58 0.00 0.00 81.20 82.50 0.11 0.08 No Change,Valve completely closedCDNLFG169/26/2022 9:50 1.20 0.80 20.50 77.50 -0.09 -0.14 -0.14 0.01 0.01 82.60 82.90 0.16 0.15 No Change,Valve completely closed CDNLFG17 9/26/2022 9:48 0.10 0.10 21.60 78.20 -0.09 -0.01 0.00 0.00 0.00 78.90 79.10 3.63 0.00 No Change,Valve completely closed CDNLFG18 9/26/2022 9:47 0.90 0.40 21.50 77.20 0.22 -0.01 0.00 0.00 0.00 82.10 82.70 0.00 0.00 No Change,Valve completely closed CDNLFG19 9/26/2022 9:40 54.50 39.10 0.00 6.40 -11.42 -1.58 -1.58 3.86 3.88 86.90 87.40 3.99 4.00 No Change CDNLFG20 9/26/2022 9:38 50.40 38.90 0.00 10.70 -11.24 -8.14 -8.15 0.10 0.10 86.20 86.30 21.04 21.35 No Change CDNLFG21 9/26/2022 9:35 50.00 37.60 0.00 12.40 -11.26 -5.92 -5.90 0.09 0.08 86.20 86.30 19.92 18.98 No Change CDNLFG22 9/26/2022 9:33 43.20 34.50 0.30 22.00 -11.37 -3.67 -3.66 0.03 0.02 83.20 83.70 11.12 10.68 No Change CDNLFG23 9/26/2022 9:57 14.10 11.40 13.30 61.20 -11.64 -1.09 -1.09 0.00 0.00 85.00 85.20 0.06 0.00 No Change,Valve completely closed CDNLFG24 9/27/2022 15:49 32.40 33.20 0.00 34.40 -11.54 -0.55 -0.55 0.45 0.45 96.60 96.70 2.12 2.12 No Change,Valve completely closed CDNLFG25 9/26/2022 9:26 34.90 33.60 0.00 31.50 -11.64 -0.66 -0.66 0.00 0.00 83.00 82.90 0.00 0.00 No Change CDNLFG26 9/26/2022 9:17 48.10 40.20 0.00 11.70 -11.81 -1.42 -1.42 0.00 0.00 95.00 95.00 0.00 0.00 No Change CDNLFG27 9/26/2022 9:21 8.80 6.90 17.10 67.20 -11.66 -7.26 -6.69 0.57 0.00 79.20 78.50 1.53 0.07 Closed Valve 1/2 turn or less,Valve CDNLFG28 9/26/2022 9:05 41.60 37.50 0.30 20.60 -12.17 -1.28 -1.28 0.01 0.01 78.10 78.20 5.40 5.26 No Change CDNLFG29 9/26/2022 9:02 50.30 41.40 0.00 8.30 -12.05 -4.42 -4.40 0.21 0.22 81.90 82.00 31.77 31.90 No Change CDNLFG30 9/26/2022 9:11 55.10 43.40 0.00 1.50 -11.83 -1.37 -1.44 0.03 0.06 79.60 82.20 11.96 16.52 Opened Valve 1/2 turn or less CDNLFG31 9/26/2022 15:19 37.70 33.70 1.60 27.00 -11.18 -3.75 -3.76 0.69 0.84 109.00 109.00 5.89 6.48 No Change CDNLFG32 9/26/2022 15:16 18.10 23.80 3.80 54.30 -10.91 -0.31 -0.33 0.00 0.00 90.10 91.00 0.00 0.00 No Change CDNLFG33 9/26/2022 15:22 38.70 35.20 0.00 26.10 -11.13 -0.44 -0.46 0.20 0.20 94.60 94.60 3.21 3.18 No Change CDNLFG34 9/26/2022 15:25 24.70 30.30 0.00 45.00 -0.11 -0.10 -0.08 0.18 0.17 91.10 91.00 3.04 2.96 No Change CDNLFG35 9/26/2022 15:12 14.80 23.80 0.60 60.80 -10.67 -7.91 -7.92 0.00 0.00 87.80 89.70 0.00 0.00 No Change CDNLFG36 9/26/2022 15:41 54.60 39.30 0.20 5.90 -2.81 -0.08 -0.07 0.01 0.01 98.20 99.60 5.26 4.97 No ChangeCDNLFG379/26/2022 15:07 39.20 36.20 0.00 24.60 -10.04 -1.49 -1.50 1.37 1.40 88.10 87.90 15.43 15.63 No ChangeCDNLFG389/26/2022 15:10 6.30 8.00 14.40 71.30 -10.54 -0.09 -0.09 0.07 0.06 93.60 94.40 0.55 0.49 No ChangeCDNLFG399/26/2022 15:43 51.70 38.10 1.70 8.50 -9.47 -4.33 -4.19 0.59 0.58 88.60 86.90 52.48 51.93 No Change CDNLFG41 9/27/2022 14:23 31.70 31.20 0.00 37.10 -10.43 -0.36 -0.36 0.02 0.02 92.20 91.80 3.62 3.88 No Change CDNLFG42 9/27/2022 14:21 39.40 33.70 0.00 26.90 -10.06 -1.52 -1.52 2.14 2.23 91.30 90.80 4.63 4.74 No ChangeCDNLFG439/27/2022 14:20 46.10 36.10 0.00 17.80 0.01 -7.17 -7.14 0.10 0.11 93.30 92.10 9.11 9.85 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill Extraction Well Data P:\O&M\City of Denton\2022\(9) September\City of Denton O&M Report September 2022 Weaver Consultants Group GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ001 9/26/2022 13:02 46.70 35.20 0.20 17.90 -10.84 -10.19 -10.16 0.07 0.07 98.20 98.30 17.12 17.96 No Change CDNHZ002 9/26/2022 13:05 49.20 34.40 0.10 16.30 -10.82 -8.84 -8.46 0.05 0.05 94.10 94.00 15.00 15.24 No ChangeCDNHZ0039/26/2022 13:09 49.40 34.90 0.00 15.70 -10.69 -6.74 -6.76 0.03 0.03 93.10 93.20 12.51 11.45 No Change CDNHZ005 9/26/2022 13:13 35.00 30.00 0.00 35.00 -10.56 -7.68 -7.63 0.03 0.03 97.20 98.10 12.25 12.06 No Change CDNHZ006 9/26/2022 13:16 15.50 17.40 5.20 61.90 -10.90 -4.62 -4.59 0.08 0.08 103.30 104.50 18.43 18.67 No ChangeCDNHZ0079/26/2022 13:18 49.00 33.20 1.60 16.20 -10.54 -0.72 -0.71 0.01 0.01 102.00 102.30 6.87 7.32 No Change CDNHZ008 9/26/2022 13:20 15.70 21.50 2.60 60.20 -10.91 -10.75 -10.84 0.06 0.06 94.00 94.00 16.27 16.43 No ChangeCDNHZ0109/26/2022 13:22 55.90 38.70 0.00 5.40 -10.79 -10.59 -10.58 0.06 0.06 89.10 88.40 16.49 16.43 No Change CDNHZ011 9/26/2022 13:25 3.90 1.90 20.00 74.20 -10.61 -10.84 -10.94 0.07 0.06 98.40 99.00 17.12 15.95 No Change CDNHZ012 9/26/2022 13:29 28.00 23.60 4.60 43.80 -11.04 -4.94 -4.99 0.04 0.04 101.40 101.80 13.80 13.35 No ChangeCDNHZ0149/26/2022 13:31 0.50 1.30 19.70 78.50 -10.79 -8.80 -8.73 0.05 0.05 93.90 93.90 15.67 15.60 No Change CDNHZ015 9/26/2022 13:34 58.30 38.10 0.20 3.40 -10.87 -8.05 -8.15 0.07 0.08 99.40 99.60 18.10 19.01 No ChangeCDNHZ0179/26/2022 13:36 48.10 33.70 0.50 17.70 -10.75 -10.53 -10.69 0.05 0.04 93.70 95.40 14.66 13.37 No ChangeCDNHZ0189/26/2022 13:40 12.40 15.30 4.60 67.70 -10.92 0.92 1.00 0.00 0.00 98.20 99.50 0.00 0.00 No Change,Valve completely closed CDNHZ019 9/26/2022 13:38 53.80 35.60 0.20 10.40 -10.92 -10.67 -10.77 0.05 0.06 96.30 96.80 15.48 16.90 No Change CDNHZ020 9/26/2022 13:43 55.40 38.00 0.20 6.40 -10.82 -10.89 -10.88 0.08 0.09 98.00 98.60 18.42 19.71 No ChangeCDNHZ0219/26/2022 13:42 20.50 12.50 1.60 65.40 -10.75 1.07 1.08 0.00 0.00 101.30 101.90 0.00 0.00 No Change,Valve completely closed CDNHZ022 9/26/2022 13:45 58.00 38.00 0.30 3.70 -10.67 -10.82 -11.20 0.08 0.07 98.60 99.10 18.56 17.14 No Change CDNHZ023 9/26/2022 13:47 55.90 37.70 1.00 5.40 -10.85 -10.58 -10.72 0.07 0.06 102.20 103.20 17.67 16.51 No ChangeCDNHZ0259/26/2022 13:49 54.40 38.50 0.60 6.50 -10.75 -10.86 -10.74 0.05 0.04 97.30 98.20 14.70 13.46 No Change CDNHZ026 9/26/2022 13:51 18.60 20.80 1.30 59.30 0.24 -5.60 -5.61 0.13 0.13 97.20 98.20 24.73 24.50 No ChangeCDNHZ0299/26/2022 13:54 69.30 28.00 0.00 2.70 -10.68 9.39 9.37 0.00 0.00 103.60 105.70 0.00 0.00 No ChangeCDNHZ0309/26/2022 13:56 54.00 38.30 0.00 7.70 -10.79 0.36 0.34 0.00 0.00 101.10 101.30 0.00 0.00 No Change CDNHZ031 9/26/2022 13:58 4.00 10.60 12.40 73.00 -10.74 -2.92 -2.90 0.01 0.01 101.40 102.30 7.84 6.96 No Change,Valve completely closed CDNHZ032 9/26/2022 14:20 46.50 26.10 7.00 20.40 -10.83 -0.70 -0.72 0.01 0.01 96.50 97.40 5.50 5.94 No ChangeCDNHZ0339/26/2022 14:22 5.60 4.10 17.80 72.50 -10.84 -7.66 -7.78 0.05 0.05 98.60 99.50 15.27 15.19 No Change CDNHZ034 9/26/2022 14:24 38.00 28.00 0.10 33.90 -10.87 -10.82 -10.92 0.06 0.06 90.10 90.20 16.82 16.90 No Change CDNHZ035 9/26/2022 14:27 48.10 33.30 1.90 16.70 -10.77 -10.74 -10.57 0.31 0.30 89.50 89.60 37.12 36.65 No ChangeCDNHZ0369/26/2022 14:29 33.20 30.90 1.40 34.50 -10.81 -5.82 -5.68 0.06 0.06 95.50 96.10 17.03 17.10 No Change Horizontal Well Data P:\O&M\City of Denton\2022\(9) September\City of Denton O&M Report September 2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill Notes:1)Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5)Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6)Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =63 Number of Wells with Methane > 58%=2 Total Number of Well Readings =63 Number of Wells with Oxygen ≥ 2%=19 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =10 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =4 Number of Wells with No Room to Run (NRTR)=29 P:\O&M\City of Denton\2022\(9) September\City of Denton O&M Report September 2022 Weaver Consultants Group, LLC GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDN00GHG 10/31/2022 18:09 31.90 21.30 9.30 37.50 -0.29 3.69 3.74 0.00 0.00 90.00 90.00 1130.00 1130.00 GHG CDNBLWR1 10/27/2022 12:55 31.00 23.20 7.90 37.90 0.27 3.64 NR 0.00 NR 88.50 NR 1103.00 NR Blower CDNBLWR2 10/31/2022 17:16 33.40 22.40 8.60 35.60 -0.27 3.69 3.70 0.00 0.00 90.00 90.00 1130.00 1130.00 Blower CDNCG002 10/27/2022 12:18 0.30 0.40 10.90 88.40 0.26 0.00 0.00 0.00 0.01 84.30 85.10 NR NR Calibration CDNCG002 10/27/2022 17:35 0.10 0.00 11.00 88.90 -0.27 0.00 0.00 0.00 0.00 75.60 NR NR NR Calibration CDNCG002 10/31/2022 11:23 0.00 0.00 10.90 89.10 0.02 0.00 NR 0.00 NR 72.40 NR NR NR Calibration CDNCGCH4 10/27/2022 12:16 50.00 36.00 0.00 14.00 NR NR NR NR NR 84.10 NR NR NR Calibration CDNCGCH4 10/27/2022 17:31 50.50 34.50 0.50 14.50 -0.27 -0.01 0.00 0.01 0.01 76.80 76.30 NR NR Calibration CDNCGCH4 10/31/2022 11:21 50.10 35.20 0.10 14.60 NR NR NR NR NR 68.40 NR NR NR Calibration CDNCGCH4 10/31/2022 16:57 50.10 35.20 0.20 14.50 -0.13 -0.02 -0.02 0.02 0.02 67.80 67.80 NR NR Calibration CDNINLT1 10/27/2022 12:29 27.80 20.90 8.90 42.40 -0.02 -18.66 -18.75 18.88 18.87 88.50 88.50 1103.00 1103.00 Flare Inlet CDNINLT2 10/31/2022 17:10 24.70 16.00 11.80 47.50 -0.01 -16.60 -16.57 16.55 16.54 90.00 90.00 1130.00 1130.00 Flare Inlet CDNGW040 10/31/2022 16:40 1.50 1.70 17.90 78.90 0.13 -0.08 -0.07 0.07 0.07 77.10 76.90 18.58 18.98 No Change CDNGW044 10/31/2022 14:14 0.10 0.10 20.10 79.70 -8.78 0.03 0.04 0.01 0.04 96.30 95.90 0.33 0.59 Valve completely closed CDNGW045 10/31/2022 14:12 35.50 26.10 4.70 33.70 -11.62 -0.60 -0.61 0.60 0.60 91.10 91.10 10.19 10.25 No Change CDNGW046 10/31/2022 13:53 49.70 37.60 0.60 12.10 -9.21 -6.08 -6.08 6.35 6.12 99.70 99.80 169.85 166.79 No Change CDNGW047 10/31/2022 13:13 10.50 7.10 16.40 66.00 -11.50 -0.11 -0.11 0.00 0.00 79.90 80.10 0.14 0.28 No Change CDNGW048 10/31/2022 13:11 49.70 36.60 1.30 12.40 -11.63 -9.38 -9.38 2.41 2.37 96.30 96.30 11.01 10.92 No Change CDNGW049 10/31/2022 16:34 0.70 0.40 20.20 78.70 -0.06 0.01 0.01 0.00 0.00 73.10 73.20 0.00 0.00 No Change CDNGW050 10/31/2022 13:09 53.90 38.80 0.00 7.30 -11.37 -10.19 -10.11 10.36 10.38 95.10 95.00 41.45 41.48 No Change CDNGW051 10/31/2022 12:59 55.40 40.10 0.00 4.50 0.03 1.38 1.28 1.14 0.94 90.50 90.40 7.74 7.01 No Change CDNGW052 10/31/2022 12:58 56.20 40.10 0.00 3.70 1.31 0.86 1.22 0.86 1.22 86.60 NR 12.26 14.62 No Change CDNGW054 10/31/2022 12:54 0.30 0.30 20.20 79.20 -0.06 0.01 0.01 0.00 0.00 76.60 82.90 0.00 0.00 No Change CDNGW055 10/31/2022 12:53 57.20 35.90 0.00 6.90 4.04 3.78 3.78 0.03 0.02 86.10 86.50 0.51 0.48 No Change CDNGW057 10/31/2022 12:49 57.10 38.80 0.00 4.10 2.68 3.42 3.41 0.06 0.06 81.50 82.20 1.72 1.83 No Change CDNGW058 10/31/2022 12:47 58.30 40.80 0.00 0.90 5.35 5.26 5.26 0.01 0.03 94.40 96.20 2.86 5.27 No Change CDNGW059 10/31/2022 12:44 0.60 0.30 20.10 79.00 -0.06 0.00 0.00 0.00 0.00 77.80 78.60 0.35 0.28 No Change CDNGW060 10/31/2022 12:43 57.20 40.10 0.00 2.70 0.82 1.06 1.06 0.01 0.01 85.50 88.90 0.65 0.63 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data P:\O&M\City of Denton\2022\(10) October\Forms\City of Denton O&M Report October 2022 Weaver Consultants Group, LLC 11/15/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW061 10/31/2022 12:41 0.40 0.20 20.10 79.30 0.24 0.00 0.01 0.00 0.00 78.20 78.40 0.00 1.16 No Change CDNGW062 10/31/2022 12:45 53.80 40.40 0.10 5.70 -11.25 -4.03 -3.56 8.99 2.76 89.80 89.80 39.15 21.81 No Change CDNGW063 10/31/2022 12:51 57.40 40.10 0.00 2.50 -0.06 4.28 4.28 0.00 0.00 84.50 77.50 0.00 0.00 No Change CDNGW064 10/31/2022 12:55 55.70 42.10 0.00 2.20 -0.12 3.08 3.09 0.24 0.26 85.50 85.50 6.57 6.76 No Change CDNGW065 10/31/2022 12:57 0.50 0.30 20.20 79.00 -0.06 0.00 0.00 0.00 0.00 66.90 NR 0.00 0.00 No Change CDNGW066 10/31/2022 13:08 42.00 30.70 0.60 26.70 -1.26 -1.33 -1.27 0.02 0.02 82.70 NR 3.82 4.19 No Change CDNGW067 10/31/2022 13:14 47.20 34.90 1.70 16.20 -7.88 -7.45 -7.10 0.34 0.18 101.80 101.60 16.85 12.26 No Change CDNGW068 10/31/2022 13:57 0.10 0.10 20.20 79.60 -8.11 -6.72 -6.10 0.09 0.04 97.80 93.60 6.53 4.17 Closed Valve > 1 turn CDNGW074 10/31/2022 14:25 58.60 39.00 0.00 2.40 -9.57 0.14 0.12 0.02 0.71 88.80 92.60 0.27 1.71 Opened Valve 1/2 turn or less CDNGW075 10/31/2022 14:23 55.80 38.50 0.00 5.70 -10.17 -0.27 -0.26 0.37 0.36 96.20 96.80 4.38 4.28 No Change CDNGW076 10/31/2022 14:21 58.50 39.00 0.00 2.50 -9.73 -0.86 -0.84 0.03 0.02 102.50 102.50 11.67 9.16 No Change CDNGW077 10/31/2022 15:31 58.20 38.20 0.10 3.50 3.66 0.57 0.57 0.02 0.02 87.60 88.10 4.45 4.30 No Change CDNGW078 10/31/2022 16:10 56.70 38.00 0.10 5.20 0.21 0.39 0.39 0.38 0.38 81.80 82.10 1.97 1.98 No Change CDNGW079 10/31/2022 14:19 57.70 38.40 0.00 3.90 -9.72 -0.81 -0.81 0.06 0.04 96.70 96.80 1.75 1.43 No Change CDNGW080 10/31/2022 14:05 57.30 39.30 0.00 3.40 -9.22 -0.58 -0.60 0.05 0.04 101.70 101.80 6.18 5.94 Opened Valve 1/2 to 1 turn CDNGW081 10/31/2022 14:18 55.20 38.20 0.10 6.50 -9.86 -0.01 -0.01 0.03 0.02 85.40 85.90 0.32 0.32 No Change CDNGW082 10/31/2022 14:07 50.90 38.20 0.60 10.30 0.25 -4.00 -4.06 0.39 0.37 105.20 105.20 18.11 17.53 No Change CDNGW083 10/31/2022 14:16 3.30 1.70 19.20 75.80 -0.06 -0.03 -0.03 0.01 0.01 75.40 78.00 1.77 1.76 No Change CDNGW084 10/31/2022 14:08 54.60 38.10 0.20 7.10 -9.40 -3.38 -3.36 0.23 0.03 80.70 81.80 3.49 1.16 No Change CDNGW085 10/31/2022 14:28 50.70 37.80 0.90 10.60 -10.29 -1.89 -1.51 1.91 1.51 99.20 99.30 40.35 35.85 No Change CDNGW086 10/31/2022 14:26 54.70 39.10 0.00 6.20 -9.44 0.18 0.18 0.01 0.01 85.60 86.60 3.37 3.45 No Change CDNGW087 10/31/2022 14:10 16.90 11.30 13.80 58.00 -8.62 -0.75 -0.75 0.01 0.01 85.40 85.50 0.75 0.75 No Change CDNGW088 10/31/2022 13:58 54.00 38.70 0.00 7.30 -8.35 -0.62 -0.62 0.08 0.08 95.80 96.30 6.23 6.04 No Change CDNGW089 10/31/2022 14:00 54.70 39.00 0.00 6.30 -0.99 0.01 0.01 0.02 0.02 85.90 86.20 3.11 2.96 No Change CDNGW090 10/31/2022 14:01 57.80 39.00 0.00 3.20 -0.06 0.36 0.36 0.02 0.02 81.60 82.10 3.90 3.65 No Change CDNGW091 10/31/2022 14:03 51.10 37.20 1.20 10.50 -8.87 -0.64 -0.65 1.96 1.92 109.70 109.80 30.12 29.86 No Change CDNGW092 10/31/2022 13:51 54.90 40.00 0.00 5.10 -0.09 -5.43 -5.35 0.04 0.03 104.50 104.60 14.25 12.78 No Change CDNGW093 10/31/2022 13:28 53.10 38.20 0.50 8.20 -7.04 -0.22 -0.22 0.13 0.12 104.70 104.90 7.94 7.57 No Change CDNGW094 10/31/2022 13:26 57.00 39.10 0.00 3.90 -6.69 -0.04 -0.04 0.03 0.04 93.50 94.00 5.07 5.59 No Change CDNGW095 10/31/2022 13:16 54.20 41.00 0.00 4.80 -1.14 0.84 0.84 0.02 0.02 81.80 82.00 9.71 9.01 No Change CDNGW096 10/31/2022 13:17 54.20 39.20 0.00 6.60 -1.81 -2.05 -2.08 0.22 0.50 104.50 104.90 13.72 20.60 No Change CDNGW097 10/31/2022 13:21 53.50 42.00 0.00 4.50 -2.80 -2.62 -2.20 2.59 2.27 112.40 112.40 112.31 105.29 No Change CDNGW098 10/31/2022 13:24 56.90 41.30 0.00 1.80 -2.94 -2.84 -2.63 1.08 1.16 113.40 113.70 29.95 30.95 No Change CDNGW099 10/31/2022 13:06 55.20 40.90 0.00 3.90 1.27 1.08 1.08 1.06 1.06 83.80 84.10 22.77 22.76 No Change CDNGW100 10/31/2022 13:05 53.90 41.00 0.00 5.10 1.95 1.78 1.79 0.02 0.02 87.50 87.40 2.71 2.71 No Change CDNGW101 10/31/2022 13:03 56.20 41.40 0.00 2.40 2.02 1.76 1.76 1.72 1.72 82.90 83.00 39.03 39.02 No Change CDNGW102 10/31/2022 13:01 55.90 40.30 0.00 3.80 3.99 3.75 3.75 1.60 1.58 83.40 83.90 2.60 2.58 No Change CDNGW106 10/31/2022 14:38 6.60 19.20 1.80 72.40 8.15 -0.19 -0.16 0.01 0.01 89.10 89.30 2.26 2.13 No Change CDNGW107 10/31/2022 15:33 54.40 39.70 0.00 5.90 -10.77 -0.32 -0.32 0.07 0.07 106.70 106.80 7.72 7.40 No Change CDNGW108 10/31/2022 15:34 52.10 39.90 0.00 8.00 -11.20 -0.42 -0.36 0.05 0.04 112.30 112.30 2.99 2.61 No Change CDNGW109 10/31/2022 15:36 53.10 39.70 0.00 7.20 -12.09 -5.54 -5.54 2.22 2.22 117.30 118.00 31.65 31.65 No Change P:\O&M\City of Denton\2022\(10) October\Forms\City of Denton O&M Report October 2022 Weaver Consultants Group, LLC 11/15/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW110 10/31/2022 15:37 53.80 39.90 0.00 6.30 -12.69 -3.62 -3.62 0.90 0.93 117.90 118.10 27.21 27.57 No Change CDNGW111 10/31/2022 15:38 50.10 38.00 0.00 11.90 -11.51 -1.01 -1.02 0.34 0.35 111.10 111.80 16.93 17.00 No Change CDNGW112 10/31/2022 15:39 54.80 40.10 0.00 5.10 -11.49 -0.17 -0.17 0.09 0.09 107.80 107.90 3.96 3.97 No Change CDNGW113 10/31/2022 15:40 51.70 39.40 0.00 8.90 -11.60 -0.36 -0.32 0.98 0.09 104.20 105.80 12.88 3.82 No Change CDNGW114 10/31/2022 15:41 52.90 39.50 0.00 7.60 -11.62 -1.23 -1.23 1.53 1.49 112.90 113.20 15.98 15.74 No Change CDNGW115 10/31/2022 15:43 53.30 39.60 0.00 7.10 -12.20 -1.21 -1.20 0.88 0.94 108.30 108.50 20.27 20.87 No Change CDNGW116 10/31/2022 15:44 53.50 40.00 0.00 6.50 -11.93 -0.26 -0.27 0.43 0.46 109.00 109.20 14.20 14.58 No Change CDNGW117 10/31/2022 15:45 51.40 38.30 0.00 10.30 -11.82 -0.28 -0.29 0.58 0.64 105.60 106.50 9.95 10.39 No Change CDNGW118 10/31/2022 15:47 54.70 41.00 0.00 4.30 -11.69 0.75 0.71 0.02 0.00 83.70 86.90 1.84 0.84 Opened Valve 1/2 turn or less CDNGW119R 10/31/2022 15:49 0.20 0.40 20.10 79.30 -11.65 -0.13 -0.12 0.00 0.01 84.30 85.50 0.12 0.25 No Change,Valve completely closed CDNGW120R 10/31/2022 15:51 55.10 41.20 0.00 3.70 -11.79 -11.52 -11.52 0.20 0.21 87.40 88.00 1.41 1.45 No Change CDNGW121R 10/31/2022 15:53 7.30 4.90 17.50 70.30 -11.73 -11.86 -11.86 12.49 12.47 83.50 85.30 246.93 246.38 Closed Valve 1/2 turn or less CDNGW122R 10/31/2022 15:55 2.10 6.30 16.90 74.70 -11.77 -1.80 -1.53 0.01 0.01 88.80 81.20 7.55 5.59 No Change,Valve completely closed CDNGW123R 10/31/2022 15:57 19.40 21.10 2.00 57.50 -11.63 5.85 5.85 0.01 0.02 83.50 84.00 8.68 8.77 No Change CDNGW124R 10/31/2022 15:58 43.00 30.90 4.50 21.60 -11.69 1.44 1.39 0.02 0.02 80.40 80.50 9.84 9.31 No Change CDNGW125R 10/31/2022 16:00 1.70 20.10 4.80 73.40 -11.65 4.18 4.12 0.01 0.00 81.10 81.50 6.11 4.45 No Change CDNGW126R 10/31/2022 16:01 8.30 10.30 15.10 66.30 -11.71 2.47 2.46 0.01 0.01 82.70 82.90 7.15 7.42 No Change CDNHZ001 10/27/2022 16:09 46.80 35.60 0.40 17.20 -11.80 -10.96 -10.90 0.02 0.03 85.60 85.90 8.28 11.10 No Change CDNHZ002 10/27/2022 16:12 45.80 35.20 0.80 18.20 -11.73 -9.83 -9.52 0.02 0.01 86.30 86.60 10.24 5.87 No Change CDNHZ003 10/27/2022 16:14 47.00 35.00 0.70 17.30 -11.75 -7.42 -7.43 0.02 0.02 85.70 86.10 8.76 8.76 No Change CDNHZ005 10/27/2022 16:16 34.70 30.80 0.30 34.20 -11.83 -8.71 -8.80 0.01 0.02 89.20 89.60 7.93 9.46 No Change CDNHZ006 10/27/2022 16:19 2.20 2.20 16.40 79.20 -12.18 -6.88 -6.81 0.00 0.00 87.80 88.30 0.00 0.00 No Change CDNHZ007 10/27/2022 16:21 49.50 35.70 1.10 13.70 -12.19 -0.93 -0.92 0.02 0.02 95.50 96.20 9.40 9.21 No Change CDNHZ008 10/27/2022 16:22 14.70 14.80 6.00 64.50 -12.30 -11.92 -11.90 0.00 0.00 84.40 84.60 3.28 0.00 No Change CDNHZ010 10/27/2022 16:24 53.60 37.10 1.20 8.10 -11.78 -11.95 -11.95 0.03 0.03 81.10 81.50 12.05 12.09 No Change CDNHZ011 10/27/2022 16:25 2.50 1.30 17.00 79.20 -12.00 -12.06 -12.20 0.01 0.01 82.50 84.40 5.03 5.23 No Change CDNHZ012 10/27/2022 16:27 16.90 13.20 9.60 60.30 -12.07 -1.96 -1.95 0.01 0.01 84.60 85.10 8.19 8.15 No Change CDNHZ014 10/27/2022 16:29 13.40 14.50 7.90 64.20 -12.07 -8.75 -8.50 0.01 0.04 81.20 81.70 4.76 12.95 No Change CDNHZ015 10/27/2022 16:30 55.90 39.90 0.40 3.80 -12.01 -8.55 -8.57 0.02 0.02 82.50 NR 10.14 10.30 No Change CDNHZ017 10/27/2022 16:32 52.90 37.70 1.50 7.90 0.00 -12.24 -12.11 0.04 0.02 83.60 84.00 13.33 9.78 No Change CDNHZ018 10/31/2022 16:49 6.10 8.00 0.50 85.40 0.28 1.46 1.59 0.03 0.02 83.50 87.40 11.79 10.79 No Change CDNHZ019 10/27/2022 16:34 54.80 37.60 1.50 6.10 -12.21 -12.24 -12.11 0.02 0.01 83.00 83.40 9.70 8.06 No Change CDNHZ020 10/27/2022 16:35 54.90 39.80 0.40 4.90 -12.07 -12.32 -12.15 0.03 0.02 80.10 80.40 11.43 9.08 No Change CDNHZ021 10/27/2022 16:56 25.80 13.70 0.10 60.40 -12.00 1.05 1.01 0.00 0.00 82.70 83.50 3.82 3.31 No Change CDNHZ022 10/27/2022 16:58 57.60 38.20 0.20 4.00 -12.10 -12.24 -12.33 0.03 0.02 79.90 80.70 10.84 9.23 No Change P:\O&M\City of Denton\2022\(10) October\Forms\City of Denton O&M Report October 2022 Weaver Consultants Group, LLC 11/15/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ023 10/27/2022 17:00 37.20 27.40 6.10 29.30 -12.45 -12.20 -11.81 0.01 0.02 82.40 82.90 7.85 10.48 No Change CDNHZ025 10/27/2022 17:01 55.80 40.10 0.70 3.40 -12.30 -11.98 -11.96 0.01 0.01 81.50 81.60 7.69 7.79 No Change CDNHZ026 10/27/2022 17:03 21.00 23.60 2.40 53.00 -12.18 -7.13 -7.05 0.01 0.01 81.20 81.60 6.77 6.50 No Change CDNHZ029 10/27/2022 17:05 66.60 27.50 0.00 5.90 -12.20 10.84 -6.99 0.02 0.01 79.90 81.10 9.61 6.54 Opened Valve 1/2 turn or less CDNHZ030 10/27/2022 17:06 50.50 36.40 0.40 12.70 -12.34 2.85 2.78 0.02 0.02 84.30 84.60 9.52 8.78 No Change CDNHZ031 10/27/2022 17:08 9.80 26.20 0.70 63.30 -12.40 0.13 0.13 0.01 0.01 80.00 80.10 7.32 6.05 No Change CDNHZ032 10/27/2022 17:09 55.20 36.90 0.00 7.90 -12.37 2.67 2.28 0.02 0.02 79.40 80.10 10.55 8.54 Opened Valve 1/2 turn or less CDNHZ033 10/27/2022 17:11 19.70 22.00 3.00 55.30 -12.32 -1.18 -1.22 0.01 0.01 79.70 79.90 6.42 4.67 No Change CDNHZ034 10/31/2022 11:43 7.30 4.00 17.90 70.80 -13.41 -12.08 -12.18 0.02 0.00 81.10 81.20 9.30 0.00 No Change CDNHZ035 10/31/2022 11:48 0.30 0.10 20.60 79.00 -13.42 -13.33 -1.01 0.00 0.01 76.80 74.50 0.00 5.33 Closed Valve > 1 turn CDNHZ036 10/31/2022 11:51 20.20 13.90 12.20 53.70 -13.39 -6.56 -0.33 0.01 0.00 85.40 75.60 6.64 4.08 Closed Valve > 1 turn CDNLFG02 10/27/2022 14:51 0.10 0.20 19.00 80.70 -5.34 -4.52 -0.32 0.08 0.02 82.90 85.10 19.52 9.42 Closed Valve > 1 turn CDNLFG03 10/27/2022 14:49 54.40 40.80 0.00 4.80 -5.90 0.28 0.28 2.83 2.78 83.70 83.70 5.38 5.33 No Change CDNLFG05 10/27/2022 14:53 50.60 39.90 1.00 8.50 -6.75 -0.74 -0.67 0.07 0.11 87.60 87.70 17.68 22.90 No Change CDNLFG06 10/27/2022 14:41 57.00 40.70 0.00 2.30 -5.73 1.20 1.20 0.29 0.29 78.30 78.70 1.12 1.12 No Change CDNLFG07 10/27/2022 14:48 0.10 0.10 18.90 80.90 -0.04 0.03 0.03 0.00 0.00 74.00 NR 0.00 0.00 No Change,Valve completely closed CDNLFG08 10/27/2022 14:48 0.10 0.20 18.80 80.90 0.26 -0.05 0.02 0.10 0.15 75.70 75.10 0.65 0.81 No Change,Valve completely closed CDNLFG16 10/27/2022 14:47 0.10 0.10 18.80 81.00 -0.08 -0.03 -0.03 0.02 0.02 77.40 NR 0.30 0.30 No Change,Valve completely closed CDNLFG17 10/27/2022 14:47 0.20 0.20 18.70 80.90 -0.08 0.00 0.00 0.00 0.00 75.40 76.00 0.00 0.00 No Change,Valve completely closed CDNLFG18 10/27/2022 14:46 1.60 0.70 18.50 79.20 -0.08 0.01 -0.01 0.00 0.01 76.00 75.80 0.00 5.76 No Change,Valve completely closed CDNLFG19 10/27/2022 14:43 56.90 40.80 0.00 2.30 -5.73 1.14 1.15 3.05 2.86 81.60 81.90 3.58 3.47 No Change CDNLFG20 10/27/2022 14:44 50.10 35.60 2.40 11.90 -5.72 -3.72 -3.69 0.04 0.03 83.40 83.50 13.68 12.09 No Change CDNLFG21 10/27/2022 14:36 54.30 38.70 1.20 5.80 -5.79 -0.55 -0.55 0.08 0.06 86.90 86.90 19.35 16.54 No Change CDNLFG22 10/27/2022 14:38 57.00 38.70 0.00 4.30 -5.78 1.16 1.17 0.02 0.02 80.20 80.90 10.64 9.39 No Change CDNLFG23 10/27/2022 14:40 56.80 39.40 0.00 3.80 -5.87 0.90 0.90 0.02 0.02 75.50 75.40 0.28 0.27 No Change CDNLFG24 10/27/2022 14:31 57.90 39.20 0.40 2.50 -5.82 -0.25 -0.24 0.28 0.29 83.40 83.60 1.70 1.72 No Change CDNLFG25 10/27/2022 14:34 0.20 0.20 18.90 80.70 -5.58 -5.54 -1.49 0.00 0.00 82.00 77.20 0.00 0.00 Closed Valve 1/2 to 1 turn CDNLFG26 10/27/2022 14:27 55.70 44.30 0.00 0.00 -5.84 1.52 1.52 0.00 0.00 92.00 92.30 0.00 0.00 No Change,Valve completely closed CDNLFG27 10/27/2022 14:29 39.50 27.30 6.10 27.10 -5.88 -3.14 -3.14 0.49 0.49 76.90 77.10 1.43 1.43 No Change CDNLFG28 10/27/2022 13:18 56.00 44.00 0.00 0.00 1.09 1.51 1.52 0.02 0.02 80.50 80.90 9.40 9.20 No Change CDNLFG28 10/27/2022 14:23 56.10 42.60 0.00 1.30 -6.14 1.26 1.28 0.02 0.02 80.80 81.10 10.61 8.99 No Change CDNLFG29 10/27/2022 13:16 55.70 44.30 0.00 0.00 1.02 1.11 1.13 0.03 0.03 84.10 84.30 11.14 11.35 No Change CDNLFG29 10/27/2022 14:21 52.60 43.70 0.00 3.70 -5.95 -1.06 -1.04 0.13 0.13 83.20 83.60 24.69 24.98 No Change CDNLFG30 10/27/2022 14:25 54.70 45.30 0.00 0.00 -5.99 1.36 1.36 0.04 0.07 82.80 82.80 13.26 17.95 No Change CDNLFG31 10/31/2022 12:00 33.60 25.00 8.30 33.10 -14.20 -4.08 -4.07 1.49 1.40 105.10 105.10 8.67 8.40 No Change CDNLFG32 10/31/2022 11:57 49.80 36.40 2.00 11.80 -13.26 -0.35 -0.36 0.00 0.00 88.00 88.30 0.00 0.00 No Change CDNLFG33 10/31/2022 12:04 53.10 38.60 0.90 7.40 0.18 -0.42 -0.42 0.27 0.27 68.60 69.50 3.84 3.80 No Change CDNLFG34 10/31/2022 12:03 50.80 38.20 0.10 10.90 -11.86 -0.05 -0.05 0.22 0.24 88.70 88.80 3.36 3.51 No Change CDNLFG35 10/31/2022 11:55 44.90 35.10 0.00 20.00 -13.10 -9.03 -9.05 0.00 0.00 85.10 85.30 0.00 0.00 No Change CDNLFG36 10/31/2022 12:06 56.30 42.10 0.00 1.60 -5.96 0.11 -0.12 0.01 0.03 94.50 90.20 6.46 10.84 Opened Valve 1/2 turn or less P:\O&M\City of Denton\2022\(10) October\Forms\City of Denton O&M Report October 2022 Weaver Consultants Group, LLC 11/15/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNLFG37 10/31/2022 12:30 38.00 30.40 5.20 26.40 -13.91 -0.75 -0.74 0.85 0.72 84.80 84.80 12.21 11.22 No Change CDNLFG38 10/31/2022 11:53 38.60 30.40 1.70 29.30 -11.95 -0.10 -0.10 0.10 0.10 81.50 81.60 0.64 0.63 No Change CDNLFG39 10/31/2022 12:08 30.50 21.60 9.70 38.20 -13.06 -3.76 -3.10 0.53 0.28 74.40 75.20 50.45 37.02 Closed Valve 1/2 to 1 turn CDNLFG41 10/31/2022 14:30 43.70 36.20 0.00 20.10 -11.71 -0.19 -0.18 0.01 0.01 82.60 82.70 3.26 3.26 No Change CDNLFG42 10/31/2022 14:32 51.40 37.20 0.60 10.80 -11.47 -1.43 -1.42 2.58 2.59 82.10 NR 5.13 5.15 No Change CDNLFG43 10/31/2022 14:34 51.70 37.60 0.00 10.70 -11.62 -8.20 -8.20 0.09 0.06 91.30 91.30 8.82 7.25 No Change DEWLCR3 10/31/2022 14:40 0.10 2.40 18.20 79.30 7.64 3.72 3.73 0.01 0.01 87.50 87.40 2.45 2.00 No Change DEWLCR4 10/27/2022 15:13 0.00 0.00 1.10 98.90 0.91 -7.66 -7.56 0.01 0.00 83.20 83.90 5.36 2.77 No Change DEWLCR5 10/27/2022 15:09 57.70 42.30 0.00 0.00 -14.78 -0.04 -0.04 3.31 3.33 80.90 81.60 13.23 13.26 No Change Notes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =139 Number of Wells with Methane > 58%=5 Total Number of Well Readings =139 Number of Wells with Oxygen ≥ 2%=42 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =13 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =49 Number of Wells with No Room to Run (NRTR)=65 P:\O&M\City of Denton\2022\(10) October\Forms\City of Denton O&M Report October 2022 Weaver Consultants Group, LLC 11/15/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNSV001 10/27/2022 15:41 2.00 11.60 8.20 78.20 -8.05 -0.92 -0.92 0.01 0.01 79.00 79.30 7.83 7.79 No Change CDNSV002 10/27/2022 15:39 0.20 0.50 18.20 81.10 -8.19 -0.74 -0.73 0.09 0.05 77.20 77.30 21.42 15.31 No Change CDNSV003 10/27/2022 15:37 17.00 15.20 9.40 58.40 -8.18 -0.25 -0.24 0.03 0.02 82.50 82.90 10.98 10.08 No Change CDNSV004 10/31/2022 16:46 5.50 5.00 15.40 74.10 0.20 -8.63 -8.46 8.79 8.80 81.70 82.20 201.91 202.00 No Change CDNSV005 10/27/2022 15:15 2.00 1.00 17.90 79.10 -8.27 -3.06 -3.06 0.02 0.02 74.60 75.00 8.72 8.69 No Change CDNSV006 10/27/2022 15:48 0.00 0.20 18.30 81.50 -7.56 -1.30 -1.28 0.08 0.15 75.60 75.60 20.13 27.02 No Change CDNSV007 10/27/2022 15:53 0.00 0.20 18.10 81.70 -7.87 -3.87 -3.87 0.06 0.02 76.70 76.70 17.56 10.23 No Change CDNSV008 10/27/2022 15:56 0.00 0.20 18.10 81.70 -7.51 -4.83 -4.84 0.08 0.12 77.60 77.60 19.00 23.80 No Change CDNSV009 10/27/2022 15:57 0.00 0.20 18.10 81.70 -7.29 -1.54 -1.54 0.02 0.02 77.60 77.60 9.81 9.42 No Change CDNSV010 10/27/2022 15:59 0.00 0.10 18.20 81.70 -7.33 -3.09 -3.10 0.13 0.12 74.60 74.60 25.18 23.67 No Change CDNSV011 10/27/2022 16:00 0.20 0.40 17.80 81.60 -7.27 -2.21 -2.20 0.13 0.10 72.10 71.90 25.53 22.01 No Change CDNSV012 10/27/2022 16:02 7.60 7.80 12.20 72.40 -7.26 -4.55 -4.53 0.01 0.01 81.10 81.60 7.86 7.23 No Change CDNSV013 10/27/2022 16:03 0.10 0.10 18.50 81.30 -6.91 -6.11 -6.42 1.13 1.40 65.10 64.80 74.09 82.37 No Change CDNSV014 10/27/2022 16:05 22.80 19.00 7.00 51.20 -7.18 -7.44 -7.39 0.01 0.00 81.20 81.60 7.50 2.65 No Change Soil Vapor Extraction Well Data P:\O&M\City of Denton\2022\(10) October\Forms\City of Denton O&M Report October 2022 Weaver Consultants Group, LLC 11/15/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCGCH4 11/18/2022 9:43 50.10 34.80 0.00 15.10 -0.01 0.01 -0.01 0.18 0.01 93.30 93.90 NR NR Calibration CDNCG002 11/18/2022 9:46 0.00 0.00 10.90 89.10 3.57 3.88 0.01 -115.79 0.00 95.50 96.30 NR NR Calibration CDNINLT1 11/18/2022 10:29 44.50 34.60 2.10 18.80 -16.57 16.82 NR 0.13 NR 80.00 NR 850.00 NR Flare Inlet CDNBLWR1 11/18/2022 10:31 43.70 34.80 2.10 19.40 2.08 0.00 2.14 -0.04 0.00 60.90 61.10 850.00 850.00 Blower CDNCG002 11/21/2022 10:45 0.10 0.00 11.00 88.90 0.00 0.00 0.00 -0.01 0.00 93.80 93.50 NR NR Calibration CDNCG002 11/21/2022 14:01 0.00 0.00 10.80 89.20 -0.03 0.00 -0.01 0.19 0.00 79.80 80.30 NR NR Calibration CDNCGCH4 11/21/2022 10:41 49.90 34.90 0.00 15.20 0.00 0.01 -0.01 0.23 0.01 94.00 94.10 NR NR Calibration CDNCGCH4 11/21/2022 13:59 50.00 35.00 0.00 15.00 -0.04 0.01 -0.03 0.19 0.00 78.00 78.80 NR NR Calibration CDNCGCH4 11/22/2022 9:15 50.10 35.00 0.00 14.90 -0.01 0.01 -0.01 0.15 0.01 72.40 72.10 NR NR Calibration CDNCG002 11/22/2022 9:19 0.00 0.00 10.90 89.10 0.00 0.00 0.00 -0.04 0.00 71.20 73.40 NR NR Calibration CDNINLT2 11/22/2022 10:58 45.20 34.90 2.10 17.80 -16.80 16.97 NR 0.13 NR 70.00 NR 850.00 NR Flare Inlet CDN00GHG 11/22/2022 11:02 45.60 35.20 2.00 17.20 1.67 0.00 1.83 0.13 0.00 82.00 82.00 850.00 850.00 GHG CDNBLWR2 11/22/2022 11:00 45.60 34.60 2.00 17.80 1.70 0.00 1.61 0.11 0.00 82.00 82.00 850.00 850.00 Blower CDNGW040 11/22/2022 10:18 2.60 4.80 18.80 73.80 -0.14 0.14 -0.08 0.13 0.07 61.10 61.70 26.53 18.60 No Change CDNGW044 11/21/2022 16:12 41.20 32.80 0.20 25.80 -2.26 2.17 -2.27 -10.43 2.09 76.70 76.70 4.72 4.64 No Change CDNGW045 11/21/2022 16:10 39.40 35.50 0.10 25.00 -1.17 1.11 -1.16 -14.88 1.11 63.00 62.90 14.24 14.22 No Change CDNGW046 11/21/2022 15:25 44.10 36.10 0.00 19.80 -7.28 7.97 -7.28 -10.90 7.94 97.00 97.20 190.19 189.86 No Change CDNGW047 11/21/2022 15:02 0.00 0.00 20.30 79.70 -1.41 0.05 -1.40 -13.44 0.04 59.90 60.00 1.69 1.51 No Change,Valve completely closed CDNGW048 11/21/2022 15:00 46.90 36.90 0.00 16.20 -11.87 2.43 -11.96 -13.98 2.13 93.30 93.20 11.05 10.36 No Change CDNGW049 11/21/2022 14:46 0.00 0.00 20.20 79.80 -0.06 0.00 -0.03 0.21 0.00 47.90 48.30 0.00 0.00 No Change CDNGW050 11/21/2022 14:58 56.40 39.20 0.00 4.40 -12.04 12.34 -12.04 -13.05 12.34 91.80 NR 45.19 45.19 No Change CDNGW051 11/21/2022 14:48 53.20 36.40 0.10 10.30 0.66 0.47 1.04 0.29 0.85 69.50 70.60 5.08 6.79 No Change CDNGW052 11/21/2022 14:47 54.10 37.30 0.10 8.50 0.10 0.05 0.10 0.39 0.05 58.80 NR 3.02 3.02 No Change CDNGW054 11/21/2022 14:43 0.00 0.00 20.20 79.80 -0.11 0.07 -0.09 0.21 0.05 53.60 53.60 18.80 15.43 No Change CDNGW055 11/21/2022 13:35 59.90 35.20 0.00 4.90 3.59 0.12 3.62 4.12 0.10 58.60 59.00 1.15 1.04 No Change CDNGW057 11/21/2022 13:31 58.90 39.30 0.00 1.80 3.42 0.01 3.43 3.66 0.01 66.10 66.30 0.86 0.89 No Change CDNGW058 11/21/2022 13:30 57.80 40.10 0.00 2.10 4.02 3.94 4.03 4.31 3.93 72.20 72.80 59.68 59.53 No Change CDNGW059 11/21/2022 13:27 1.10 0.50 21.10 77.30 -0.09 0.10 0.00 0.23 0.00 50.50 51.00 2.36 0.41 No Change CDNGW060 11/21/2022 13:26 53.30 38.80 0.00 7.90 0.76 0.03 0.76 1.21 0.03 60.80 61.70 1.33 1.29 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data C:\Users\rvazquez\Desktop\City of Denton O&M Report Nov 2022.xlsx Weaver Consultants Group, LLC 12/21/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW061 11/21/2022 13:25 1.20 0.60 21.10 77.10 -0.30 0.38 -0.10 0.23 0.14 51.60 51.70 18.96 11.27 No Change CDNGW062 11/21/2022 13:28 51.30 38.10 0.00 10.60 -5.08 5.17 -5.27 -12.93 5.29 88.90 88.80 29.76 30.09 No Change CDNGW063 11/21/2022 13:34 54.50 39.30 0.00 6.20 3.91 0.07 3.96 0.23 0.01 49.30 48.70 18.70 8.44 No Change CDNGW064 11/21/2022 14:44 59.80 40.00 0.00 0.20 2.80 0.28 2.67 -0.15 0.45 78.60 78.60 7.11 8.97 No Change CDNGW065 11/21/2022 14:46 3.70 1.00 20.00 75.30 -4.32 4.07 -0.13 -9.95 0.10 46.90 46.80 143.56 22.67 No Change CDNGW066 11/21/2022 14:56 51.70 35.80 0.10 12.40 -8.99 0.02 -8.16 -9.03 0.02 58.00 59.80 4.71 4.67 No Change CDNGW067 11/21/2022 15:04 50.20 36.50 0.10 13.20 -11.86 0.40 -11.87 -12.42 0.45 99.50 99.70 18.30 19.30 No Change CDNGW068 11/21/2022 15:26 51.80 37.20 0.30 10.70 -6.15 0.05 -6.13 -14.89 0.04 64.20 64.20 4.93 4.55 No Change CDNGW074 11/21/2022 16:27 21.30 25.80 0.00 52.90 -0.78 0.98 -0.77 -13.86 0.98 74.30 74.30 2.04 2.04 No Change CDNGW075 11/21/2022 16:25 36.90 32.50 0.00 30.60 -1.12 0.38 -1.12 -14.31 0.37 86.40 86.40 4.44 4.41 No Change CDNGW076 11/21/2022 16:20 46.20 35.60 0.20 18.00 -2.03 0.41 -2.03 -14.37 0.41 98.30 NR 43.39 43.39 No Change CDNGW077 11/21/2022 15:59 61.70 38.30 0.00 0.00 -0.03 0.00 -0.03 -1.22 0.01 60.90 60.80 1.79 2.04 No Change CDNGW078 11/21/2022 16:01 0.00 0.00 20.40 79.60 -0.42 0.02 -0.42 0.53 0.01 53.20 53.30 0.41 0.39 No Change CDNGW079 11/21/2022 16:18 43.70 35.60 0.50 20.20 -2.19 0.14 -2.19 -14.28 0.15 83.10 83.30 2.75 2.80 No Change CDNGW080 11/21/2022 16:03 41.10 34.70 0.10 24.10 -2.59 0.12 -2.59 -13.97 0.12 99.10 NR 9.94 9.94 No Change CDNGW081 11/21/2022 16:16 8.90 5.40 17.50 68.20 -1.20 0.03 -1.18 -14.15 0.00 52.30 52.30 0.35 0.06 No Change,Valve completely closed CDNGW082 11/21/2022 16:05 46.40 37.40 0.00 16.20 -6.78 7.18 -6.46 0.19 7.01 53.80 53.40 80.61 79.71 No Change CDNGW083 11/21/2022 16:14 0.00 0.00 20.30 79.70 -0.77 0.01 -0.77 -0.50 0.01 48.20 48.30 2.51 2.34 No Change CDNGW084 11/21/2022 16:06 52.10 37.20 0.00 10.70 -4.78 0.23 -4.79 -14.08 0.20 91.70 91.80 3.46 3.24 No Change CDNGW085 11/21/2022 16:30 25.30 22.70 6.70 45.30 -0.95 0.88 -0.38 -14.37 0.29 87.90 86.50 27.63 15.94 Closed Valve 1/2 to 1 turn CDNGW086 11/21/2022 16:29 32.40 22.30 8.90 36.40 -0.38 0.02 -0.38 -14.02 0.02 50.40 50.50 4.20 3.94 No Change,Valve completely closed CDNGW087 11/21/2022 16:08 12.70 7.50 16.30 63.50 -1.74 0.02 -1.73 -15.01 0.01 52.70 52.70 1.13 0.68 No Change CDNGW088 11/21/2022 15:29 33.50 32.00 0.00 34.50 -2.11 0.12 -2.10 -14.56 0.12 86.90 87.00 7.64 7.72 No Change CDNGW089 11/21/2022 15:31 0.50 0.60 19.80 79.10 -1.73 0.02 -1.71 -5.24 0.01 55.10 55.20 3.13 1.58 No Change CDNGW090 11/21/2022 15:33 5.30 3.80 18.20 72.70 -0.93 0.00 -0.93 -1.19 0.00 54.70 54.80 0.92 1.09 No Change CDNGW091 11/21/2022 15:56 46.70 36.80 0.10 16.40 -1.65 0.57 -1.61 -14.48 0.56 103.40 103.00 16.33 16.15 No Change CDNGW092 11/21/2022 15:22 44.10 36.20 0.00 19.70 -9.75 0.11 -9.73 -13.46 0.04 103.50 103.50 22.85 13.01 No Change CDNGW093 11/21/2022 15:19 43.20 34.00 1.10 21.70 -1.96 2.22 -1.83 -12.86 2.11 98.90 98.70 32.35 31.50 Closed Valve 1/2 turn or less CDNGW094 11/21/2022 15:17 52.60 38.00 0.00 9.40 -1.06 1.02 -1.05 -13.22 0.98 90.20 90.30 29.77 29.14 No Change CDNGW095 11/21/2022 15:08 5.50 3.40 18.50 72.60 -1.56 0.00 -1.56 1.01 0.00 57.20 57.00 4.61 4.74 No Change CDNGW096 11/21/2022 15:11 47.80 37.50 0.10 14.60 -7.61 2.02 -4.95 -10.10 0.02 103.90 101.70 40.95 4.34 Closed Valve 1/2 to 1 turn CDNGW097 11/21/2022 15:13 56.30 39.30 0.00 4.40 -10.91 0.01 -10.58 -13.69 0.06 112.60 112.70 7.91 16.79 No Change CDNGW098 11/21/2022 15:15 58.40 38.90 0.00 2.70 0.10 0.39 -0.11 -11.70 0.37 57.60 66.40 18.93 18.26 Opened Valve 1/2 to 1 turn CDNGW099 11/21/2022 14:54 49.50 34.30 4.70 11.50 -0.01 0.06 0.02 0.55 0.09 56.70 57.30 5.30 6.70 No Change CDNGW100 11/21/2022 14:53 56.20 40.00 0.00 3.80 0.51 0.06 0.60 1.21 0.04 57.70 57.90 5.73 4.44 No Change CDNGW101 11/21/2022 14:52 54.00 39.70 0.00 6.30 1.11 1.14 1.12 1.56 1.15 57.00 57.90 32.51 32.62 No Change CDNGW102 11/21/2022 14:50 56.60 39.80 0.00 3.60 2.81 1.40 2.81 0.19 1.40 55.20 55.80 2.49 2.49 No Change CDNGW106 11/21/2022 16:23 0.10 7.10 15.30 77.50 0.85 0.03 0.86 0.07 0.02 51.00 51.50 4.15 3.54 No Change CDNGW107 11/22/2022 9:32 44.50 37.70 0.00 17.80 -0.83 0.05 -0.83 -14.87 0.05 103.40 103.20 6.50 6.38 No Change CDNGW108 11/22/2022 9:34 44.10 35.80 0.00 20.10 -0.96 0.25 -0.92 -15.11 0.26 109.70 110.00 6.53 6.60 No Change CDNGW109 11/22/2022 9:36 48.00 39.00 0.00 13.00 -7.63 2.36 -7.61 -16.12 2.33 116.50 116.40 32.61 32.37 No Change C:\Users\rvazquez\Desktop\City of Denton O&M Report Nov 2022.xlsx Weaver Consultants Group, LLC 12/21/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW110 11/22/2022 9:38 49.60 37.90 0.00 12.50 -5.16 1.15 -5.27 -16.10 1.22 116.00 116.10 30.65 31.59 No Change CDNGW111 11/22/2022 9:39 41.30 35.70 0.00 23.00 -1.81 0.49 -1.81 -14.96 0.49 109.30 NR 20.31 20.31 No Change CDNGW112 11/22/2022 9:41 25.90 28.90 0.00 45.20 -0.36 0.11 -0.35 -14.75 0.13 104.10 103.90 4.35 4.68 No Change CDNGW113 11/22/2022 9:42 30.60 31.10 0.00 38.30 -0.66 0.76 -0.56 -14.88 0.57 103.60 103.20 11.32 9.84 No Change CDNGW114 11/22/2022 9:44 46.30 37.60 0.00 16.10 -1.82 1.81 -1.79 -15.15 1.77 112.90 113.10 17.37 17.16 No Change CDNGW115 11/22/2022 9:47 49.20 39.20 0.00 11.60 -1.72 1.05 -1.69 -15.43 1.08 109.20 109.40 22.08 22.40 No Change CDNGW116 11/22/2022 9:48 49.30 38.10 0.00 12.60 -0.58 0.57 -0.56 -15.11 0.61 107.40 107.50 16.29 16.93 No Change CDNGW117 11/22/2022 9:50 54.60 39.10 0.00 6.30 -0.61 0.60 -0.58 -15.15 0.75 107.10 107.10 10.02 11.28 No Change CDNGW118 11/22/2022 9:52 55.00 41.40 0.00 3.60 0.25 0.04 0.12 -15.43 0.04 64.60 77.90 2.54 2.64 Opened Valve 1/2 to 1 turn CDNGW119R 11/22/2022 9:54 0.40 0.80 20.80 78.00 -0.12 0.07 -0.06 -14.98 0.01 53.80 54.00 0.85 0.31 No Change CDNGW120R 11/22/2022 9:56 57.00 40.20 0.30 2.50 -15.14 0.15 -15.13 -15.07 0.28 56.10 56.10 1.25 1.70 No Change CDNGW121R 11/22/2022 9:58 2.10 1.30 20.10 76.50 -1.19 0.01 -1.19 -14.73 0.01 54.80 54.80 6.88 6.79 No Change,Valve completely closed CDNGW122R 11/22/2022 10:00 1.60 6.20 18.30 73.90 -1.08 0.00 -0.80 -14.84 0.01 55.90 53.10 3.84 4.98 No Change CDNGW123R 11/22/2022 10:02 20.10 19.80 4.00 56.10 0.56 0.12 0.67 -15.19 0.01 57.60 57.90 25.92 5.73 No Change CDNGW124R 11/22/2022 10:04 39.30 27.20 7.00 26.50 -0.10 0.12 -0.08 -14.76 0.10 56.00 56.30 25.55 22.76 No Change CDNGW125R 11/22/2022 10:05 0.50 21.30 4.40 73.80 0.70 0.05 0.69 -14.86 0.05 57.80 57.90 16.71 16.47 No Change CDNGW126R 11/22/2022 10:07 6.40 10.40 15.90 67.30 -0.13 0.09 -0.11 -14.71 0.08 55.70 56.30 22.71 20.18 No Change CDNHZ001 11/21/2022 11:30 46.10 35.50 0.00 18.40 -13.49 0.02 -13.51 -14.29 0.04 60.90 61.30 9.55 12.76 No Change CDNHZ002 11/21/2022 11:53 43.50 33.90 0.00 22.60 -12.36 0.01 -12.51 -14.42 0.01 63.40 64.70 7.37 7.83 No Change CDNHZ003 11/21/2022 11:55 46.10 35.60 0.00 18.30 -7.01 0.14 -7.01 -14.56 0.14 61.50 62.00 26.44 26.35 No Change CDNHZ005 11/21/2022 11:57 29.90 28.60 0.00 41.50 -10.62 0.06 -10.62 -14.26 0.06 62.90 NR 16.33 16.33 No Change CDNHZ006 11/21/2022 12:00 3.80 4.20 17.50 74.50 -9.79 0.00 -9.82 -14.20 0.01 57.60 58.60 2.09 5.01 No Change CDNHZ007 11/21/2022 12:04 1.40 0.90 20.40 77.30 -9.64 0.04 -0.71 -14.28 0.01 59.00 57.00 13.61 6.09 Closed Valve 1/2 to 1 turn CDNHZ008 11/21/2022 12:08 9.40 19.30 2.00 69.30 -14.49 0.07 -1.47 -14.49 0.36 64.10 55.80 18.19 42.46 Closed Valve 1/2 to 1 turn CDNHZ010 11/21/2022 12:10 59.00 39.10 0.00 1.90 -14.53 0.36 -14.73 -14.32 0.38 73.50 73.60 40.26 41.79 No Change CDNHZ011 11/21/2022 12:12 16.70 9.80 15.40 58.10 -14.82 0.03 -14.79 -14.53 0.00 58.20 58.50 12.36 0.00 No Change CDNHZ012 11/21/2022 12:13 10.30 8.20 15.00 66.50 -6.08 0.09 -6.08 -14.40 0.09 58.30 NR 20.62 20.62 No Change CDNHZ014 11/21/2022 12:15 48.10 34.50 1.80 15.60 -14.47 0.06 -14.48 -14.54 0.05 59.20 59.60 17.03 14.73 No Change CDNHZ015 11/21/2022 12:17 59.30 38.70 0.00 2.00 -12.01 0.40 -12.00 -14.49 0.38 61.30 61.30 43.35 42.21 No Change CDNHZ017 11/21/2022 12:18 55.90 39.70 0.00 4.40 -14.56 0.07 -14.60 -14.35 0.06 59.70 60.10 17.83 16.00 No Change CDNHZ018 11/21/2022 12:22 15.80 19.80 0.00 64.40 0.68 0.05 0.71 -14.52 0.00 59.30 59.50 15.38 4.37 No Change CDNHZ019 11/21/2022 12:20 56.20 38.00 0.00 5.80 -14.85 0.06 -14.81 -14.53 0.06 61.50 61.60 17.12 17.18 No Change CDNHZ020 11/21/2022 12:23 56.70 39.40 0.00 3.90 -14.60 0.06 -14.56 -14.47 0.07 64.20 64.30 17.05 17.35 No Change CDNHZ021 11/21/2022 12:25 36.80 15.10 0.00 48.10 1.99 0.09 1.93 -14.50 0.21 59.80 59.80 21.15 32.29 No Change CDNHZ022 11/21/2022 12:26 39.70 24.90 0.00 35.40 -14.79 0.00 -14.68 -14.52 0.00 60.90 61.60 0.00 3.75 No Change C:\Users\rvazquez\Desktop\City of Denton O&M Report Nov 2022.xlsx Weaver Consultants Group, LLC 12/21/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ023 11/21/2022 12:27 51.10 36.10 0.00 12.80 -14.41 0.10 -14.62 -14.28 0.04 60.50 61.00 21.83 14.42 No Change CDNHZ023 11/21/2022 12:28 49.40 36.70 0.00 13.90 -14.33 0.04 -14.19 -14.21 0.04 57.80 58.50 14.29 13.84 No Change CDNHZ025 11/22/2022 10:25 56.50 41.00 0.10 2.40 -15.09 0.02 -15.09 -15.17 0.00 61.80 61.90 8.74 0.00 No Change CDNHZ026 11/21/2022 12:30 44.80 35.00 0.00 20.20 -11.73 0.04 -11.72 -14.17 0.04 60.40 60.80 14.32 13.67 No Change CDNHZ029 11/21/2022 12:34 68.40 27.60 0.00 4.00 11.62 0.08 0.43 -14.44 0.01 63.70 62.40 20.23 5.32 Opened Valve > 1 turn CDNHZ030 11/21/2022 12:36 47.70 36.20 0.00 16.10 1.76 0.01 1.62 -14.33 0.01 63.40 65.20 7.83 5.22 Opened Valve 1/2 turn or less CDNHZ031 11/21/2022 12:37 9.20 23.90 1.90 65.00 0.57 0.13 0.62 -14.47 0.07 66.00 66.30 25.29 18.60 No Change CDNHZ032 11/21/2022 12:40 60.90 34.80 0.00 4.30 2.94 0.04 2.71 -14.46 0.01 64.60 66.10 14.62 6.94 Opened Valve 1/2 turn or less CDNHZ033 11/21/2022 12:41 11.50 12.00 10.10 66.40 -2.07 0.08 -2.07 -14.22 0.00 66.80 67.50 19.95 4.66 Valve completely closed CDNHZ034 11/21/2022 12:43 57.90 38.30 0.00 3.80 -12.82 0.48 -12.80 -14.26 0.47 74.40 74.60 46.83 46.43 No Change CDNHZ035 11/21/2022 12:44 56.50 38.20 0.00 5.30 -3.03 0.36 -3.01 -14.13 0.33 65.70 66.20 42.20 40.44 No Change CDNHZ036 11/21/2022 12:46 54.80 38.40 0.00 6.80 -6.28 0.05 -6.26 -14.51 0.05 66.70 67.60 15.72 14.70 No Change CDNLFG02 11/18/2022 11:43 55.30 40.80 0.00 3.90 1.06 0.06 1.15 0.93 0.03 49.30 49.60 16.83 13.09 No Change CDNLFG03 11/18/2022 11:41 53.40 43.10 0.10 3.40 0.81 0.03 0.84 -0.08 0.00 53.60 54.10 0.55 0.18 No Change CDNLFG05 11/18/2022 11:44 56.50 39.80 0.00 3.70 0.71 0.00 0.73 0.82 0.00 62.00 62.60 0.00 0.00 No Change CDNLFG06 11/18/2022 11:34 52.80 38.40 0.00 8.80 0.79 0.05 0.79 0.82 0.05 48.50 48.70 0.45 0.49 No Change CDNLFG07 11/18/2022 11:40 0.10 0.20 21.20 78.50 -0.03 0.00 0.04 -0.04 0.00 44.80 44.90 1.98 0.00 No Change CDNLFG08 11/18/2022 11:40 0.30 0.70 20.70 78.30 -0.05 0.04 -0.03 0.24 0.01 42.10 42.60 0.44 0.22 No Change CDNLFG16 11/18/2022 11:39 0.10 0.30 20.90 78.70 0.03 0.01 0.00 -0.07 0.02 41.80 41.40 0.16 0.30 No Change CDNLFG17 11/18/2022 11:39 0.30 0.40 21.20 78.10 -0.07 0.02 -0.01 -0.08 0.01 43.00 43.20 9.90 7.41 No Change CDNLFG18 11/18/2022 11:38 2.40 1.00 21.00 75.60 -0.07 0.00 -0.08 -0.17 0.00 41.90 42.00 0.00 0.00 No Change CDNLFG19 11/18/2022 11:36 52.60 38.60 0.00 8.80 0.80 0.22 0.87 0.95 0.15 52.60 53.00 1.00 0.83 No Change CDNLFG20 11/18/2022 11:37 48.90 37.30 0.00 13.80 0.58 0.00 0.58 0.53 0.00 57.80 NR 0.00 0.00 No Change CDNLFG21 11/18/2022 11:29 51.20 37.50 0.00 11.30 0.86 0.00 0.90 0.80 0.00 72.00 72.10 0.00 0.00 No Change CDNLFG22 11/18/2022 11:30 53.00 36.90 0.00 10.10 1.06 0.08 1.06 0.60 0.08 50.60 NR 20.36 20.36 No Change CDNLFG23 11/18/2022 11:33 55.70 38.30 0.00 6.00 0.56 0.55 0.64 0.67 0.66 48.50 48.30 1.57 1.73 No Change CDNLFG24 11/18/2022 11:31 54.40 39.70 0.00 5.90 0.22 0.08 0.22 0.78 0.08 49.10 NR 0.95 0.95 No Change CDNLFG25 11/18/2022 11:27 57.50 36.30 0.00 6.20 28.38 0.14 28.40 0.40 0.12 51.50 52.00 28.60 26.52 No Change CDNLFG26 11/18/2022 11:24 53.70 44.00 0.00 2.30 1.41 0.00 1.40 0.66 0.00 73.10 73.10 0.00 0.00 No Change CDNLFG27 11/18/2022 11:25 55.20 41.90 0.00 2.90 0.93 0.04 0.94 0.73 0.00 52.40 52.80 0.44 0.08 No Change CDNLFG28 11/18/2022 11:21 52.40 42.00 0.00 5.60 0.92 0.04 0.93 0.21 0.04 50.00 50.80 14.93 13.58 No Change CDNLFG29 11/18/2022 10:41 54.30 43.40 0.00 2.30 0.58 0.03 0.61 0.59 0.02 65.20 65.50 12.12 8.68 No Change CDNLFG30 11/18/2022 11:22 52.20 44.30 0.00 3.50 1.17 0.00 1.18 0.08 0.00 69.90 69.90 0.00 0.00 No Change CDNLFG31 11/21/2022 12:53 48.30 39.70 0.00 12.00 -4.70 0.57 -4.63 -14.33 0.61 99.80 99.70 5.37 5.59 No Change CDNLFG32 11/21/2022 12:51 34.10 31.40 0.00 34.50 -0.20 0.00 -0.24 0.23 0.00 70.90 71.00 0.00 0.00 No Change CDNLFG33 11/21/2022 13:16 53.50 40.80 0.00 5.70 -0.37 0.44 -0.35 0.20 0.41 73.40 73.70 4.88 4.70 No Change CDNLFG34 11/21/2022 13:18 51.40 40.60 0.00 8.00 0.17 0.11 0.14 -9.17 0.18 72.70 74.50 2.39 3.12 Opened Valve 1/2 to 1 turn CDNLFG35 11/21/2022 12:49 49.30 37.10 0.00 13.60 -12.12 0.00 -12.22 -14.12 0.00 64.00 64.90 0.00 0.00 No Change CDNLFG36 11/21/2022 13:21 53.10 40.20 0.00 6.70 0.30 0.37 0.36 -6.29 0.29 61.20 61.70 42.99 38.22 No Change CDNLFG37 11/21/2022 13:20 52.60 39.10 0.00 8.30 -0.37 0.98 -0.33 -14.74 0.95 82.20 82.70 13.13 12.96 No Change CDNLFG38 11/21/2022 12:47 39.50 32.30 0.00 28.20 -0.10 0.12 -0.10 -14.89 0.12 66.20 NR 0.72 0.72 No Change C:\Users\rvazquez\Desktop\City of Denton O&M Report Nov 2022.xlsx Weaver Consultants Group, LLC 12/21/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNLFG39 11/21/2022 13:23 54.00 40.30 0.00 5.70 -0.27 0.29 -0.25 -13.73 0.08 81.00 81.50 37.58 20.01 No Change CDNLFG41 11/21/2022 16:36 34.10 32.10 0.00 33.80 -0.73 0.03 -0.73 -14.99 0.02 58.90 59.40 5.47 4.56 No Change CDNLFG42 11/21/2022 16:35 38.30 34.10 0.00 27.60 -2.27 2.89 -2.23 -14.16 2.53 74.10 74.20 5.46 5.12 No Change CDNLFG43 11/21/2022 16:33 45.40 36.00 0.00 18.60 -8.95 0.24 -8.74 -13.41 0.08 87.80 87.80 14.18 8.04 Closed Valve 1/2 turn or less DEWLCR3 11/21/2022 16:22 4.50 15.70 5.00 74.80 -0.21 0.02 -0.21 0.07 0.02 51.70 NR 4.60 4.60 No Change DEWLCR4 11/21/2022 10:56 57.50 39.90 0.10 2.50 -8.00 0.92 -10.03 1.02 0.46 73.60 73.70 68.95 48.71 No Change DEWLCR5 11/21/2022 10:53 57.30 39.60 0.40 2.70 -0.15 3.60 -0.15 -15.80 3.59 75.40 NR 13.87 13.85 No Change Notes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =139 Number of Wells with Methane > 58%=9 Total Number of Well Readings =138 Number of Wells with Oxygen ≥ 2%=35 Total Number of Readings NOT Collected =1 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =25 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =138 Number of Wells with No Room to Run (NRTR)=136 C:\Users\rvazquez\Desktop\City of Denton O&M Report Nov 2022.xlsx Weaver Consultants Group, LLC 12/21/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNSV001 11/21/2022 11:07 2.60 12.10 8.70 76.60 -2.20 0.05 -2.16 -13.45 0.01 56.50 56.70 15.70 7.27 No Change CDNSV002 11/21/2022 11:05 9.40 15.30 6.90 68.40 -13.02 0.16 -13.34 -12.56 0.00 55.40 55.50 27.64 0.00 No Change CDNSV003 11/21/2022 11:03 26.70 27.20 0.70 45.40 -2.16 0.02 -2.14 -12.97 0.02 54.60 55.10 9.68 9.34 No Change CDNSV004 11/21/2022 11:02 13.50 13.80 9.00 63.70 -11.76 0.02 -11.76 -12.84 0.01 56.30 56.80 10.83 4.65 No Change CDNSV005 11/21/2022 10:59 3.90 1.80 19.10 75.20 -1.04 0.00 -1.19 -13.03 0.00 61.00 60.10 0.00 0.00 No Change CDNSV006 11/21/2022 11:09 0.10 0.60 20.10 79.20 -3.04 0.15 -3.04 -13.01 0.17 59.20 59.30 27.38 29.09 No Change CDNSV007 11/21/2022 11:11 0.10 0.90 19.60 79.40 -7.39 0.18 -6.61 -12.53 0.08 63.90 64.10 29.59 20.20 Closed Valve 1/2 to 1 turn CDNSV008 11/21/2022 11:12 0.60 1.50 19.10 78.80 -7.56 0.05 -7.56 -12.67 0.05 67.50 NR 15.82 15.82 No Change CDNSV009 11/21/2022 11:14 0.00 0.40 20.30 79.30 -3.06 0.40 -3.03 -13.25 0.36 62.20 62.30 44.48 42.12 No Change CDNSV010 11/21/2022 11:15 0.00 7.80 12.50 79.70 -12.58 0.00 -12.63 -12.09 0.00 58.00 58.20 0.00 0.00 No Change CDNSV011 11/21/2022 11:17 0.70 1.70 19.00 78.60 -9.46 0.19 -9.48 -12.96 0.15 57.80 57.90 30.40 26.80 No Change CDNSV012 11/21/2022 11:18 13.50 15.00 8.40 63.10 -10.75 0.09 -10.75 -13.33 0.07 52.50 52.60 20.93 18.91 No Change CDNSV013 11/21/2022 11:20 38.70 27.20 4.70 29.40 -13.74 0.00 -13.81 -13.53 0.00 53.00 53.00 0.00 0.00 No Change CDNSV014 11/21/2022 11:21 42.20 33.20 0.50 24.10 -13.07 0.00 -12.95 -13.20 0.00 54.40 54.40 0.00 0.00 No Change Soil Vapor Extraction Well Data C:\Users\rvazquez\Desktop\City of Denton O&M Report Nov 2022.xlsx Weaver Consultants Group, LLC 12/21/2022 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCGCH4 12/15/2022 11:00 50.00 35.20 0.00 14.80 0.00 0.01 0.00 -0.02 0.01 78.20 76.80 NR NR Calibration CDNCG002 12/15/2022 11:03 0.00 0.00 10.80 89.20 0.00 0.00 0.00 -0.03 0.00 75.30 74.80 NR NR CalibrationCDNINLT112/15/2022 11:08 38.80 28.50 5.50 27.20 -16.32 16.80 -16.33 -0.04 16.78 67.00 67.00 920.00 920.00 Flare Inlet CDNBLWR1 12/15/2022 11:13 37.40 28.80 5.50 28.30 2.52 0.00 2.54 -0.02 0.00 96.00 96.00 920.00 920.00 Blower CDNCGCH4 12/16/2022 9:23 50.10 35.00 0.00 14.90 -0.01 0.01 -0.01 0.06 0.01 75.30 76.40 NR NR CalibrationCDNCG00212/16/2022 9:25 0.00 0.00 10.80 89.20 0.00 0.00 0.00 0.01 0.00 77.10 NR NR NR Calibration CDNCGCH4 12/16/2022 14:54 50.20 35.00 0.00 14.80 0.00 0.00 0.00 -0.06 0.00 84.50 85.30 NR NR Calibration CDNCG002 12/16/2022 14:56 0.00 0.00 10.80 89.20 0.01 0.00 0.01 -0.02 0.00 86.50 85.80 NR NR Calibration CDNINLT2 12/16/2022 15:21 49.80 39.40 0.80 10.00 -17.41 17.45 -17.47 -0.21 17.51 67.00 67.00 820.00 820.00 Flare Inlet CDNBLWR2 12/16/2022 15:23 50.50 38.40 0.70 10.40 1.90 0.00 1.93 0.01 0.00 86.00 86.00 820.00 820.00 BlowerCDN00GHG12/16/2022 15:23 51.70 38.80 0.90 8.60 1.88 0.00 1.94 0.02 0.00 86.00 86.00 820.00 820.00 GHG CDNGW040 12/16/2022 11:44 1.60 4.00 20.70 73.70 -0.21 0.19 -0.15 -0.12 0.14 51.00 51.20 31.06 26.79 No ChangeCDNGW04412/16/2022 10:15 0.50 0.70 22.30 76.50 -0.34 10.80 -0.32 0.11 10.86 70.10 71.10 10.57 10.58 No ChangeCDNGW04512/16/2022 10:10 43.20 36.50 0.00 20.30 -2.74 0.67 -2.66 -15.36 0.61 75.20 75.30 10.94 10.40 Closed Valve 1/2 turn or lessCDNGW04612/15/2022 16:47 35.50 29.80 3.60 31.10 -8.16 8.04 -8.18 -9.43 8.05 96.50 96.50 190.73 190.82 No ChangeCDNGW04712/15/2022 16:04 0.00 0.10 21.20 78.70 -1.19 0.02 -1.14 -15.01 0.02 60.00 60.00 1.06 1.12 No ChangeCDNGW04812/15/2022 16:02 21.50 16.80 11.50 50.20 -12.58 2.26 -12.42 -14.79 1.87 92.50 92.30 10.66 9.70 Closed Valve 1/2 turn or lessCDNGW04912/15/2022 15:48 0.10 0.10 21.00 78.80 -0.09 0.00 -0.09 -0.21 0.00 55.70 NR 0.00 0.00 No ChangeCDNGW05012/15/2022 16:00 31.80 23.00 9.50 35.70 -12.75 12.92 -12.68 -13.96 12.90 91.90 92.00 46.17 46.14 No ChangeCDNGW05112/15/2022 15:50 55.60 39.60 0.00 4.80 0.52 0.44 0.51 -0.07 0.43 59.50 65.90 4.96 4.85 No ChangeCDNGW05212/15/2022 15:49 55.00 41.10 0.00 3.90 -0.25 0.04 -0.20 0.25 0.04 55.70 55.70 2.63 2.66 No ChangeCDNGW05412/15/2022 14:54 0.00 0.10 21.40 78.50 -0.10 0.00 -0.10 -0.24 0.00 61.30 61.70 0.00 0.00 No ChangeCDNGW05512/15/2022 14:50 57.60 37.30 0.00 5.10 3.53 3.62 3.53 3.74 3.62 60.70 NR 6.23 6.23 No ChangeCDNGW05712/15/2022 14:47 54.90 40.00 0.00 5.10 3.50 0.03 3.54 3.70 0.01 64.80 65.50 1.32 0.76 No ChangeCDNGW05812/15/2022 14:45 53.40 41.40 0.00 5.20 3.83 0.06 3.87 4.08 0.01 75.90 75.90 7.38 2.86 No ChangeCDNGW05912/15/2022 14:43 0.60 0.40 21.20 77.80 -0.12 0.02 -0.12 -0.24 0.02 53.10 53.30 1.09 1.02 No ChangeCDNGW06012/15/2022 14:41 46.70 35.90 0.00 17.40 0.81 0.04 0.84 0.99 0.02 63.30 63.90 1.54 0.93 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data P:\O&M\City of Denton\2022\(12) December\Forms\City of Denton O&M Report Dec 2022 Weaver Consultants Group, LLC GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW061 12/15/2022 14:41 3.10 1.30 21.00 74.60 -0.11 0.01 -0.11 -0.19 0.01 53.40 NR 3.49 3.49 No ChangeCDNGW06212/15/2022 14:44 55.70 41.80 0.00 2.50 -5.10 8.12 -5.11 -11.95 8.22 88.20 88.50 37.23 37.45 No ChangeCDNGW06312/15/2022 14:48 56.20 39.60 4.20 0.00 -0.06 0.00 -0.06 -0.21 0.00 56.20 NR 0.00 0.00 No ChangeCDNGW06412/15/2022 14:51 50.20 38.70 0.00 11.10 2.72 0.27 2.72 0.78 0.27 78.40 NR 6.94 6.94 No ChangeCDNGW06512/15/2022 15:48 0.00 0.00 21.00 79.00 -0.10 0.02 -0.07 -0.24 0.00 55.10 55.00 9.98 0.00 No ChangeCDNGW06612/15/2022 15:58 45.50 34.00 0.00 20.50 -10.41 0.21 -9.22 -10.56 0.03 59.80 60.40 13.79 5.34 No ChangeCDNGW06712/15/2022 16:05 40.00 31.50 3.60 24.90 -11.73 0.23 -11.81 -12.06 0.18 99.60 99.20 13.87 12.16 No ChangeCDNGW06812/15/2022 16:49 0.20 0.30 21.10 78.40 -7.14 0.14 -6.74 -14.60 0.17 63.80 63.90 8.44 9.11 No ChangeCDNGW07412/16/2022 10:26 13.40 21.70 0.00 64.90 -1.22 0.94 -1.20 -13.63 0.97 64.20 64.60 2.01 2.04 No ChangeCDNGW07512/16/2022 10:25 33.10 31.80 0.00 35.10 -1.78 0.09 -1.85 -15.29 0.21 81.00 81.20 2.22 3.32 No ChangeCDNGW07612/16/2022 10:23 42.90 33.00 0.00 24.10 -3.05 0.88 -3.13 -13.67 0.97 95.00 95.00 63.95 67.27 No ChangeCDNGW07712/16/2022 10:42 50.00 40.30 0.00 9.70 -0.90 0.91 -0.92 -6.64 0.94 61.80 63.10 28.87 29.29 No ChangeCDNGW07812/16/2022 9:46 0.00 0.00 22.40 77.60 -1.08 1.10 -1.08 0.11 1.11 43.70 44.00 3.48 3.49 No ChangeCDNGW07912/16/2022 10:20 43.10 35.60 0.10 21.20 -2.91 0.04 -2.89 -14.74 0.05 70.40 70.40 1.45 1.69 No ChangeCDNGW08012/16/2022 9:47 40.90 35.30 0.00 23.80 -3.31 0.12 -3.31 -14.70 0.11 96.20 96.50 10.21 9.76 No ChangeCDNGW08112/16/2022 10:19 1.80 0.90 21.70 75.60 -1.96 0.07 -1.96 -15.69 0.07 42.10 NR 0.56 0.56 No ChangeCDNGW08212/16/2022 10:00 37.30 29.50 5.10 28.10 -7.90 0.64 -7.88 0.05 0.58 88.10 88.20 23.49 22.27 No ChangeCDNGW08312/16/2022 10:18 0.30 0.80 22.50 76.40 -0.08 0.09 -0.07 -0.10 0.07 41.50 41.60 6.89 6.12 No ChangeCDNGW08412/16/2022 10:04 11.70 7.00 18.80 62.50 -5.44 0.01 -4.86 -10.93 0.91 83.60 78.00 0.49 6.93 Closed Valve 1/2 turn or lessCDNGW08512/16/2022 10:29 0.40 0.20 22.50 76.90 -0.14 0.11 -0.12 -15.53 0.10 58.80 58.30 10.25 9.54 No ChangeCDNGW08612/16/2022 10:28 5.30 3.70 20.00 71.00 -0.84 0.08 -0.84 -13.11 0.07 42.60 42.70 8.64 8.12 No ChangeCDNGW08712/16/2022 10:06 6.30 3.40 20.50 69.80 -2.89 0.19 -2.89 -14.65 0.19 43.30 43.30 3.30 3.24 No ChangeCDNGW08812/15/2022 16:50 44.70 36.80 0.00 18.50 -2.06 0.12 -2.06 -13.10 0.12 88.30 NR 7.68 7.68 No ChangeCDNGW08912/15/2022 16:52 3.50 3.20 18.80 74.50 -1.60 0.01 -1.60 -5.26 0.01 54.80 NR 1.97 1.97 No ChangeCDNGW09012/15/2022 16:54 9.20 6.70 17.30 66.80 -0.87 0.01 -0.86 -1.25 0.02 52.80 52.80 2.47 3.93 No ChangeCDNGW09112/15/2022 16:55 45.30 36.70 0.00 18.00 -1.34 0.67 -1.33 -14.39 0.65 101.70 101.90 17.74 17.54 No Change CDNGW092 12/15/2022 16:45 50.10 39.60 0.00 10.30 -7.90 0.03 -7.61 -14.30 0.11 103.20 103.30 11.54 23.24 No Change CDNGW093 12/15/2022 16:23 47.00 39.20 0.00 13.80 -1.57 1.42 -1.56 -14.50 1.42 98.00 98.00 25.93 25.88 No Change CDNGW094 12/15/2022 16:20 47.80 38.10 0.40 13.70 -1.14 1.02 -1.12 -12.89 1.00 90.10 90.30 29.77 29.50 No Change CDNGW095 12/15/2022 16:07 28.20 22.00 10.10 39.70 -0.87 0.02 -1.01 -0.58 0.22 58.80 58.80 9.69 34.41 No Change CDNGW096 12/15/2022 16:08 51.50 38.30 1.30 8.90 -1.68 0.02 -1.73 -10.92 0.03 91.00 91.00 3.73 5.11 No Change CDNGW097 12/15/2022 16:11 27.60 20.70 11.00 40.70 -10.37 0.05 -10.40 -13.57 0.06 112.50 112.30 16.02 16.29 No Change CDNGW098 12/15/2022 16:14 57.50 42.20 0.00 0.30 -0.45 0.50 -0.45 -13.72 0.50 98.40 NR 20.73 20.73 No Change CDNGW099 12/15/2022 15:56 39.60 31.70 0.00 28.70 0.40 0.51 0.42 0.79 0.53 58.80 59.40 16.12 16.45 No Change CDNGW100 12/15/2022 15:55 53.20 41.90 0.00 4.90 0.93 0.04 0.98 1.13 0.02 59.50 59.60 4.61 2.91 No Change CDNGW101 12/15/2022 15:54 53.10 41.20 0.00 5.70 1.12 1.21 1.13 1.13 1.22 55.90 56.80 33.54 33.67 No Change CDNGW102 12/15/2022 15:52 54.10 39.40 0.00 6.50 2.81 2.94 2.92 -0.21 3.01 53.00 54.00 3.62 3.65 No ChangeCDNGW10612/16/2022 10:39 2.00 18.80 2.80 76.40 -0.22 0.08 -0.09 0.52 0.01 46.70 46.90 6.55 2.51 No ChangeCDNGW10712/16/2022 10:50 47.30 38.10 0.00 14.60 -1.10 0.07 -0.98 -15.51 0.00 96.70 96.80 7.80 1.61 No ChangeCDNGW10812/16/2022 10:51 46.70 37.30 0.00 16.00 -1.28 0.10 -1.20 -15.08 0.11 106.10 106.10 4.07 4.36 No ChangeCDNGW10912/16/2022 10:53 50.90 38.50 0.00 10.60 -6.80 1.79 -6.90 -15.70 1.79 114.60 114.80 28.47 28.44 No Change P:\O&M\City of Denton\2022\(12) December\Forms\City of Denton O&M Report Dec 2022 Weaver Consultants Group, LLC GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW110 12/16/2022 10:54 49.40 39.70 0.00 10.90 -5.06 1.27 -5.11 -16.98 1.17 115.10 115.30 32.25 31.02 No ChangeCDNGW11112/16/2022 10:55 43.60 36.20 0.00 20.20 -1.82 0.33 -1.83 -15.00 0.33 107.30 107.40 16.58 16.65 No ChangeCDNGW11212/16/2022 10:57 24.80 29.00 0.00 46.20 -0.35 0.08 -0.34 -15.14 0.08 98.70 97.20 3.64 3.79 No ChangeCDNGW11312/16/2022 10:58 30.10 32.00 0.00 37.90 -0.59 0.08 -0.59 -15.72 0.34 98.10 97.90 3.81 7.64 No ChangeCDNGW11412/16/2022 10:59 46.90 39.20 0.00 13.90 -1.94 1.66 -1.93 -15.00 1.77 110.80 111.30 16.62 17.17 No ChangeCDNGW11512/16/2022 11:00 51.70 38.70 0.00 9.60 -1.77 13.66 -1.77 -2.81 13.71 107.70 107.90 78.82 78.94 No ChangeCDNGW11612/16/2022 11:02 50.30 37.80 0.00 11.90 -0.66 0.80 -0.62 -15.17 0.78 104.00 104.10 19.41 19.16 No ChangeCDNGW11712/16/2022 11:03 55.50 39.70 0.00 4.80 -0.61 0.73 -0.61 -15.11 0.73 103.70 NR 11.12 11.12 No ChangeCDNGW11812/16/2022 11:05 58.20 41.80 0.00 0.00 0.08 0.03 0.08 -15.34 0.03 92.30 NR 2.34 2.34 No ChangeCDNGW119R12/16/2022 11:08 0.30 0.90 22.30 76.50 -0.10 0.07 -0.10 -15.28 0.07 46.90 NR 0.86 0.86 No ChangeCDNGW120R12/16/2022 11:09 54.40 35.50 0.20 9.90 -14.80 0.14 -14.87 -15.35 0.18 48.60 48.90 1.21 1.37 No ChangeCDNGW121R12/16/2022 11:10 12.10 8.50 16.80 62.60 -0.24 0.09 -0.23 -15.24 0.08 48.80 49.30 21.92 20.78 No ChangeCDNGW122R12/16/2022 11:12 1.60 5.80 19.90 72.70 4.66 0.25 4.66 -14.71 0.25 48.00 48.30 37.68 37.27 No ChangeCDNGW123R12/16/2022 11:13 17.00 17.30 6.70 59.00 0.59 0.18 0.60 -15.12 0.18 51.30 51.50 31.37 31.12 No ChangeCDNGW124R12/16/2022 11:36 35.40 25.00 8.90 30.70 -0.18 0.12 -0.16 -14.95 0.11 48.80 48.90 26.08 24.45 No ChangeCDNGW125R12/16/2022 11:37 0.30 19.80 5.50 74.40 -0.09 0.12 -0.09 -14.92 0.12 48.30 NR 25.58 25.58 No ChangeCDNGW126R12/16/2022 11:38 5.30 12.80 15.50 66.40 0.64 0.14 0.68 -14.91 0.10 48.00 48.30 27.45 23.14 No ChangeCDNHZ00112/15/2022 13:19 44.60 32.60 2.30 20.50 -13.43 0.13 -13.33 -13.76 0.07 67.50 67.60 24.32 18.24 No ChangeCDNHZ00212/15/2022 13:21 45.90 35.20 0.00 18.90 -11.28 0.00 -11.28 -13.46 0.00 66.80 NR 0.00 0.00 No ChangeCDNHZ00312/15/2022 13:23 50.70 37.00 0.00 12.30 -6.69 0.32 -6.71 -13.88 0.30 64.40 65.10 39.45 37.91 No ChangeCDNHZ00512/15/2022 13:24 37.60 31.20 0.00 31.20 -10.72 0.66 -10.72 -13.61 0.66 66.50 NR 55.68 55.68 No ChangeCDNHZ00612/15/2022 13:26 22.40 27.60 0.00 50.00 6.73 0.19 6.80 -0.02 0.03 65.10 65.70 31.37 11.82 No ChangeCDNHZ00712/15/2022 13:27 5.80 3.20 18.80 72.20 -13.64 0.07 -13.60 -13.63 0.07 70.50 NR 17.29 18.52 No ChangeCDNHZ00812/15/2022 13:29 19.90 21.50 2.80 55.80 -4.78 0.06 -4.83 -13.71 0.14 63.80 64.20 17.37 26.29 No ChangeCDNHZ01012/15/2022 13:30 48.70 35.10 2.30 13.90 -13.40 0.09 -13.40 -13.64 0.09 73.50 NR 20.27 20.27 No ChangeCDNHZ01112/15/2022 13:32 9.00 5.00 17.60 68.40 -13.49 0.03 -13.46 -13.77 0.00 64.00 65.40 12.59 0.00 Closed Valve > 1 turn CDNHZ012 12/15/2022 13:33 21.20 18.80 7.30 52.70 -1.93 0.13 -1.87 -13.88 0.02 64.60 65.10 25.47 9.45 No Change CDNHZ014 12/15/2022 13:34 22.80 16.20 11.50 49.50 -13.02 0.08 -12.96 -13.71 0.03 64.90 65.80 19.57 11.68 Closed Valve 1/2 turn or less CDNHZ015 12/15/2022 13:35 48.00 33.60 3.30 15.10 -11.69 0.07 -11.74 -13.71 0.08 63.40 63.70 18.58 18.98 No Change CDNHZ017 12/15/2022 13:37 39.30 28.40 6.30 26.00 -13.45 0.01 -13.47 -13.74 0.02 64.50 65.00 8.00 8.49 No Change CDNHZ018 12/15/2022 13:39 17.70 19.80 0.00 62.50 1.47 0.00 1.48 -13.75 0.00 66.30 67.50 0.00 0.00 Opened Valve 1/2 turn or less CDNHZ019 12/15/2022 13:41 38.20 28.10 6.40 27.30 -13.57 1.80 -13.75 -14.01 0.00 64.40 66.30 91.80 0.00 No Change CDNHZ020 12/15/2022 13:42 49.40 37.70 2.10 10.80 -13.78 0.05 -13.75 -14.09 0.05 64.50 64.70 14.92 15.46 No ChangeCDNHZ02112/15/2022 14:04 61.00 25.50 0.00 13.50 1.20 0.01 -1.99 -13.97 0.00 66.50 66.70 6.61 0.00 Opened Valve 1/2 turn or lessCDNHZ02212/15/2022 14:05 53.40 34.60 1.20 10.80 -13.87 0.07 -13.60 -14.00 0.00 64.70 65.10 17.51 0.00 No Change P:\O&M\City of Denton\2022\(12) December\Forms\City of Denton O&M Report Dec 2022 Weaver Consultants Group, LLC GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ023 12/15/2022 14:07 44.20 32.10 4.50 19.20 -13.54 0.02 -13.81 -13.72 0.09 68.00 68.10 9.89 20.80 No ChangeCDNHZ02512/15/2022 14:08 26.80 19.80 10.10 43.30 -13.76 0.04 -13.68 -13.93 0.00 65.50 66.00 13.29 0.00 Closed Valve 1/2 turn or lessCDNHZ02612/15/2022 14:09 31.20 21.80 9.40 37.60 -12.58 0.04 -12.66 -13.92 0.02 63.60 64.20 12.76 10.16 Closed Valve 1/2 turn or lessCDNHZ02912/15/2022 14:11 64.70 28.00 0.00 7.30 12.23 0.00 4.82 -14.03 0.00 65.70 67.60 0.00 0.00 Opened Valve 1/2 turn or lessCDNHZ03012/15/2022 14:13 6.20 3.90 18.80 71.10 -3.69 0.11 -3.73 -13.84 0.10 69.20 69.60 22.59 21.81 No ChangeCDNHZ03112/15/2022 14:14 6.10 24.00 2.00 67.90 0.73 0.06 0.87 -14.07 0.00 68.60 69.20 17.18 0.00 No ChangeCDNHZ03212/15/2022 14:16 9.60 6.60 16.90 66.90 -7.20 0.03 -6.85 -14.01 0.00 64.70 67.00 11.22 0.00 Closed Valve 1/2 turn or lessCDNHZ03312/15/2022 14:18 25.00 25.60 0.00 49.40 2.76 0.03 2.76 -13.98 0.02 66.50 66.80 11.37 10.24 No ChangeCDNHZ03412/15/2022 14:19 46.40 33.80 2.10 17.70 -12.71 0.03 -12.69 -14.09 0.03 71.00 71.20 11.46 10.66 No ChangeCDNHZ03512/15/2022 14:21 38.10 27.80 6.80 27.30 -3.05 0.06 -3.05 -13.96 0.06 62.70 62.90 16.81 16.70 No Change CDNHZ036 12/15/2022 14:23 50.50 37.30 1.80 10.40 -6.46 0.06 -6.46 -16.03 0.06 70.20 NR 16.77 16.77 No ChangeCDNLFG0212/15/2022 11:58 53.40 41.50 0.00 5.10 1.06 0.03 1.06 0.59 0.03 61.90 NR 11.70 11.70 No ChangeCDNLFG0312/15/2022 11:56 55.00 41.20 0.00 3.80 0.87 0.00 0.88 0.07 0.02 64.30 64.50 0.00 0.42 No Change CDNLFG05 12/15/2022 11:59 50.80 38.50 0.00 10.70 0.71 0.00 0.71 0.62 0.00 67.80 NR 0.00 0.00 No ChangeCDNLFG0612/15/2022 11:48 58.50 40.20 0.00 1.30 0.70 0.64 0.91 0.42 0.70 58.60 58.70 1.67 1.75 No Change CDNLFG07 12/15/2022 11:56 0.00 0.10 21.40 78.50 -0.18 0.06 0.07 0.18 0.00 55.00 55.30 17.50 3.92 No Change CDNLFG08 12/16/2022 11:48 0.00 0.10 24.70 75.20 -0.11 0.10 -0.11 -0.12 0.09 69.20 69.60 0.64 0.61 No ChangeCDNLFG1612/15/2022 11:55 0.00 0.10 21.30 78.60 -0.04 0.02 0.00 -0.04 0.01 53.70 53.10 0.30 0.20 No Change CDNLFG17 12/15/2022 11:54 0.20 0.30 21.30 78.20 -0.11 0.07 -0.09 0.05 0.05 54.40 54.40 18.85 15.73 No ChangeCDNLFG1812/15/2022 11:53 0.10 0.10 21.30 78.50 -0.03 0.03 -0.02 -0.03 0.02 54.90 54.60 12.38 10.73 No Change CDNLFG19 12/15/2022 11:49 56.50 39.90 0.00 3.60 1.22 0.14 1.23 1.44 0.14 55.10 55.00 0.80 0.79 No Change CDNLFG20 12/15/2022 11:51 56.30 40.60 0.00 3.10 1.51 0.05 1.49 1.64 0.09 63.00 63.20 15.84 21.12 No ChangeCDNLFG2112/15/2022 11:42 57.00 39.60 0.00 3.40 1.58 0.00 1.58 1.36 0.00 68.30 68.70 0.00 0.00 No Change CDNLFG22 12/15/2022 11:43 56.00 40.30 0.00 3.70 1.60 0.06 1.59 1.36 0.08 48.50 48.80 17.24 20.42 No Change CDNLFG23 12/15/2022 11:46 58.40 39.30 0.00 2.30 0.69 0.16 0.80 0.46 0.01 51.90 51.90 0.85 0.22 No ChangeCDNLFG2412/15/2022 11:44 54.20 38.90 0.00 6.90 0.29 0.16 0.39 0.57 0.01 57.90 58.50 1.32 0.28 No Change CDNLFG25 12/15/2022 11:40 60.80 37.30 0.00 1.90 26.92 0.08 26.92 1.36 0.07 62.10 62.40 21.00 19.49 No ChangeCDNLFG2612/15/2022 11:37 55.60 44.40 0.00 0.00 1.70 0.06 1.70 0.48 0.05 75.30 NR 16.48 15.02 No Change CDNLFG27 12/15/2022 11:39 55.50 40.00 0.00 4.50 1.09 0.04 1.14 0.65 0.00 61.70 61.90 0.43 0.11 No Change CDNLFG28 12/15/2022 11:32 56.10 43.70 0.00 0.20 1.13 0.18 1.15 0.30 0.14 63.40 NR 29.66 26.24 No ChangeCDNLFG2912/15/2022 11:30 53.90 42.90 0.00 3.20 0.57 0.00 0.57 0.52 0.00 72.90 NR 0.00 0.00 No ChangeCDNLFG3012/15/2022 11:35 52.80 44.10 0.00 3.10 1.42 0.00 1.43 -0.02 0.00 72.10 72.00 0.00 0.00 No Change CDNLFG31 12/15/2022 14:29 47.40 37.90 1.90 12.80 -5.43 1.60 -5.43 -15.17 1.56 95.70 95.70 9.03 8.93 No ChangeCDNLFG3212/15/2022 14:28 23.40 28.60 1.50 46.50 -1.04 0.00 -1.03 -0.24 0.00 67.40 67.60 0.00 0.00 No ChangeCDNLFG3312/15/2022 14:32 53.00 41.90 0.00 5.10 -0.23 0.08 -0.23 -15.84 0.08 67.70 68.20 2.13 2.13 No Change CDNLFG34 12/15/2022 14:37 55.10 40.60 0.00 4.30 0.11 0.06 0.03 -12.28 0.67 76.40 77.80 1.80 5.98 Opened Valve 1/2 to 1 turnCDNLFG3512/15/2022 14:26 51.00 40.40 0.00 8.60 -13.57 0.00 -13.65 -14.90 0.00 61.40 61.80 0.00 0.00 No Change CDNLFG36 12/15/2022 14:33 55.00 43.90 0.00 1.10 0.34 0.00 0.29 -7.85 0.01 63.70 64.50 0.00 4.76 No Change CDNLFG37 12/15/2022 14:39 53.30 42.60 0.10 4.00 -0.27 1.05 -0.27 -14.62 1.05 83.30 NR 13.61 13.61 No ChangeCDNLFG3812/15/2022 14:24 39.70 37.40 0.00 22.90 -0.22 0.13 -0.22 -14.83 0.13 66.20 NR 0.76 0.76 No ChangeCDNLFG3912/15/2022 14:35 48.80 40.20 0.00 11.00 -0.13 0.12 -0.25 -13.36 0.18 81.80 81.90 24.29 29.47 No Change P:\O&M\City of Denton\2022\(12) December\Forms\City of Denton O&M Report Dec 2022 Weaver Consultants Group, LLC GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNLFG41 12/16/2022 10:32 34.30 31.00 0.20 34.50 -1.70 0.10 -1.73 -15.29 0.15 55.80 56.20 9.70 11.64 No Change CDNLFG42 12/16/2022 10:33 39.50 32.20 2.00 26.30 -2.87 1.40 -2.92 -15.29 1.32 71.20 71.30 3.81 3.70 No Change CDNLFG43 12/16/2022 10:35 47.60 35.80 0.00 16.60 -6.94 0.04 -6.80 0.09 0.04 85.50 85.70 5.79 6.04 No ChangeDEWLCR312/16/2022 10:38 0.20 5.90 18.50 75.40 -0.12 0.11 -0.01 1.02 0.00 45.80 45.80 10.25 1.19 No Change DEWLCR4 12/15/2022 12:17 28.40 20.40 10.90 40.30 -21.23 20.20 -20.48 0.99 18.90 76.40 76.40 309.11 299.75 No Change DEWLCR5 12/15/2022 12:14 52.00 40.10 0.00 7.90 0.04 3.61 0.04 -15.91 3.51 77.40 77.50 13.87 13.68 No ChangeNotes: 1)Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5)Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6)Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =139 Number of Wells with Methane > 58%=6 Total Number of Well Readings =138 Number of Wells with Oxygen ≥ 2%=59 Total Number of Readings NOT Collected =1 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =37 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =138 Number of Wells with No Room to Run (NRTR)=138 P:\O&M\City of Denton\2022\(12) December\Forms\City of Denton O&M Report Dec 2022 Weaver Consultants Group, LLC GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNSV001 12/15/2022 12:46 2.10 8.70 11.80 77.40 -2.76 0.12 -2.73 -12.63 0.09 63.40 63.60 24.04 20.95 No Change CDNSV002 12/15/2022 12:44 6.10 8.60 13.30 72.00 -12.54 0.00 -12.58 -12.76 0.01 63.10 63.30 1.68 6.52 No ChangeCDNSV00312/15/2022 12:43 21.50 24.30 2.90 51.30 -2.67 0.08 -2.67 -12.71 0.08 63.60 NR 20.14 20.14 No Change CDNSV004 12/15/2022 12:21 14.90 12.90 10.00 62.20 -11.71 0.04 -11.58 -12.58 0.02 54.90 55.00 14.23 9.89 No Change CDNSV005 12/15/2022 12:19 42.20 22.70 5.00 30.10 -5.85 0.10 -5.69 -12.73 0.00 62.90 63.20 22.28 3.83 No ChangeCDNSV00612/15/2022 12:47 1.60 3.10 18.30 77.00 -8.71 0.08 -8.48 -12.57 0.03 68.80 68.80 19.61 12.26 No Change CDNSV007 12/15/2022 12:49 0.00 0.10 21.20 78.70 -11.20 0.09 -11.21 -12.49 0.05 67.70 67.70 20.09 15.85 No Change CDNSV008 12/15/2022 12:51 0.00 0.00 21.20 78.80 -11.83 0.05 -11.84 -12.56 0.04 66.40 66.70 15.04 13.69 No Change CDNSV009 12/15/2022 12:52 0.00 0.10 21.20 78.70 -10.00 0.11 -10.00 -12.35 0.11 62.60 NR 23.22 23.22 No Change CDNSV010 12/15/2022 12:54 0.40 1.20 18.80 79.60 -12.22 0.07 -12.23 -12.35 0.05 61.20 61.30 18.59 15.79 No ChangeCDNSV01112/15/2022 12:55 0.00 0.00 21.20 78.80 -12.29 0.01 -12.29 -12.45 0.01 62.00 NR 7.36 7.36 No Change CDNSV012 12/15/2022 12:56 0.80 0.70 20.70 77.80 -11.22 0.06 -11.22 -12.69 0.04 63.00 NR 16.79 13.88 No Change CDNSV013 12/15/2022 12:58 25.90 16.90 11.30 45.90 -12.41 0.07 -12.41 -12.39 0.03 66.80 66.90 18.00 12.16 No ChangeCDNSV01412/15/2022 12:59 17.90 15.70 9.90 56.50 -12.34 0.06 -12.24 -12.36 0.00 65.90 66.30 17.08 0.00 No Change Soil Vapor Extraction Well Data P:\O&M\City of Denton\2022\(12) December\Forms\City of Denton O&M Report Dec 2022 Weaver Consultants Group, LLC GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCGCH4 1/8/2023 4:06 50.10 35.20 0.00 14.70 -0.01 -0.02 -0.02 0.02 0.02 76.00 75.80 NR NR CalibrationCDNCG0021/8/2023 4:09 0.00 0.00 11.10 88.90 0.01 0.00 0.00 0.00 0.00 73.80 73.60 NR NR Calibration CDNINLT1 1/8/2023 4:26 42.40 31.10 4.90 21.60 0.00 -16.38 -16.39 16.55 16.54 67.70 67.80 1057.00 1057.00 Flare Inlet CDNBLWR1 1/8/2023 4:28 41.70 30.70 5.00 22.60 0.01 3.10 3.07 0.00 0.00 94.00 94.00 1057.00 1057.00 Blower CDNCGCH4 1/8/2023 11:53 50.50 35.00 0.00 14.50 -0.14 -0.03 -0.03 0.03 0.04 71.30 71.60 NR NR Calibration CDNCG002 1/8/2023 12:00 0.00 0.20 11.10 88.70 -139.14 0.00 4.11 4.21 0.00 71.70 70.70 NR NR CalibrationCDNINLT21/8/2023 12:03 51.00 34.70 2.30 12.00 0.06 -16.93 -16.98 16.95 16.89 71.90 72.00 1058.00 1058.00 Flare Inlet CDNBLWR2 1/8/2023 12:06 50.70 34.80 2.20 12.30 -0.14 2.88 2.83 0.00 0.00 92.00 92.00 1058.00 1058.00 BlowerCDN00GHG1/8/2023 12:07 51.10 35.30 2.20 11.40 -0.16 2.88 2.86 0.00 0.00 92.00 92.00 1058.00 1058.00 GHG CDNGW040 1/8/2023 11:40 2.20 1.90 20.10 75.80 -0.10 -0.17 -0.19 0.20 0.17 74.50 74.30 31.03 29.14 No ChangeCDNGW0441/8/2023 10:14 42.10 34.00 0.10 23.80 -10.03 -0.11 -0.05 0.05 0.02 82.60 82.60 0.68 0.47 No ChangeCDNGW0451/8/2023 10:10 48.20 40.50 0.00 11.30 -13.57 -0.14 -0.15 0.16 0.16 84.10 84.20 5.23 5.26 No ChangeCDNGW0461/8/2023 10:08 49.60 37.80 0.00 12.60 -9.58 -7.14 -7.35 7.17 7.11 98.40 98.40 180.14 179.47 No ChangeCDNGW0471/8/2023 9:48 0.30 0.30 21.00 78.40 -13.84 -1.35 -1.35 0.01 0.01 82.40 82.40 0.63 0.52 No ChangeCDNGW0481/8/2023 9:46 49.90 39.70 0.10 10.30 -13.37 -10.45 -10.45 10.76 10.77 94.20 94.10 23.13 23.15 No ChangeCDNGW0491/8/2023 9:21 1.70 0.90 21.20 76.20 0.01 -0.06 -0.05 0.01 0.01 82.40 82.40 7.86 7.30 No ChangeCDNGW0501/8/2023 9:29 49.60 39.00 0.00 11.40 -12.62 -11.32 -11.32 11.50 11.50 94.00 94.00 43.61 43.61 No Change CDNGW051 1/8/2023 9:25 51.60 39.10 0.00 9.30 -0.08 1.48 1.53 1.46 1.46 80.60 80.90 8.81 8.83 No Change CDNGW052 1/8/2023 9:27 50.80 38.30 0.00 10.90 0.33 1.12 1.12 1.10 1.10 86.80 NR 13.87 13.87 No Change CDNGW054 1/8/2023 8:35 0.10 0.10 21.40 78.40 -43.52 -0.02 -2.36 4.39 0.01 71.20 69.70 146.33 6.10 No Change CDNGW055 1/8/2023 8:29 57.30 36.30 0.00 6.40 5.19 5.18 5.00 0.04 0.02 87.50 87.60 0.60 0.47 No Change CDNGW057 1/8/2023 8:25 56.50 40.40 0.00 3.10 4.80 4.55 4.55 0.06 0.07 80.80 80.80 1.81 1.93 No ChangeCDNGW0581/8/2023 8:23 53.40 40.70 0.00 5.90 5.57 5.86 5.84 0.03 0.01 88.20 88.30 4.70 3.47 No ChangeCDNGW0591/8/2023 8:19 5.60 1.80 21.00 71.60 0.12 -0.06 -0.05 0.01 0.01 84.00 83.70 0.66 0.69 No ChangeCDNGW0601/8/2023 8:17 56.70 41.90 0.00 1.40 2.06 1.61 1.61 0.02 0.01 87.90 88.10 0.96 0.85 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data P:\O&M\City of Denton\2023\(1) January\Forms\City of Denton O&M Report Jan 2023.xlsx Weaver Consultants Group, LLC 2/2/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW061 1/8/2023 8:16 1.50 0.70 20.90 76.90 0.03 -0.03 -0.03 0.03 0.02 83.70 83.80 5.15 3.82 No ChangeCDNGW0621/8/2023 8:21 51.90 41.30 0.20 6.60 -10.04 -2.46 -1.35 1.30 2.52 89.60 89.60 15.00 20.88 No ChangeCDNGW0631/8/2023 8:27 54.10 41.00 0.00 4.90 0.01 5.74 5.61 0.05 0.02 83.00 82.90 15.16 9.86 No ChangeCDNGW0641/8/2023 8:32 49.90 39.40 0.00 10.70 2.23 3.71 3.70 0.21 0.20 86.40 86.40 6.14 5.97 No ChangeCDNGW0651/8/2023 9:22 0.00 0.00 21.20 78.80 0.01 0.04 0.06 0.01 0.01 82.90 82.90 5.39 5.39 No ChangeCDNGW0661/8/2023 9:30 47.80 38.20 0.00 14.00 -11.93 -12.24 -11.62 11.99 12.79 84.90 85.10 100.07 103.19 No ChangeCDNGW0671/8/2023 9:49 49.00 41.50 0.30 9.20 -11.77 -11.22 -11.37 11.40 11.48 101.20 101.20 96.27 96.61 No ChangeCDNGW0681/8/2023 10:06 46.70 34.80 3.20 15.30 -12.93 -5.82 -5.95 0.01 0.01 82.50 82.60 2.60 2.41 No ChangeCDNGW0741/8/2023 10:43 46.60 37.60 0.00 15.80 -13.84 -0.49 -0.49 0.94 0.94 84.80 NR 1.98 1.98 No ChangeCDNGW0751/8/2023 10:45 49.70 37.30 0.00 13.00 -13.80 -0.72 -0.72 0.13 0.14 92.70 92.70 2.62 2.66 No ChangeCDNGW0761/8/2023 10:48 52.50 38.10 0.00 9.40 -12.37 -1.33 -1.32 0.13 0.14 101.00 101.00 24.52 25.50 No ChangeCDNGW0771/8/2023 10:56 52.20 38.90 0.00 8.90 -1.03 0.33 0.33 0.02 0.02 80.30 80.40 4.28 3.91 Opened Valve 1/2 to 1 turn CDNGW078 1/8/2023 10:22 53.00 36.30 0.00 10.70 -2.56 0.39 0.39 0.38 0.38 81.70 81.70 1.98 1.98 No Change CDNGW079 1/8/2023 10:24 51.70 38.50 0.00 9.80 -13.35 -1.40 -1.42 0.12 0.11 88.60 88.50 2.46 2.41 No Change CDNGW080 1/8/2023 10:20 51.90 38.70 0.00 9.40 -13.46 -1.78 -1.78 0.11 0.12 102.50 102.60 9.73 9.92 No Change CDNGW081 1/8/2023 10:26 9.70 6.80 16.10 67.40 -13.08 -0.45 -0.46 0.01 0.01 76.30 76.50 0.24 0.23 No Change CDNGW082 1/8/2023 10:19 49.90 37.50 0.00 12.60 -0.12 -6.33 -6.27 5.96 5.98 60.40 60.90 73.10 73.16 No ChangeCDNGW0831/8/2023 10:28 46.00 34.40 0.10 19.50 -0.08 0.10 0.10 0.02 0.02 80.00 80.10 2.81 2.78 No ChangeCDNGW0841/8/2023 10:17 49.90 37.90 0.20 12.00 -0.16 -0.41 -0.40 0.01 0.01 76.60 76.50 0.83 0.79 No ChangeCDNGW0851/8/2023 10:39 50.40 39.30 0.90 9.40 0.11 -8.69 -8.69 8.23 8.23 80.00 80.00 83.93 83.93 No ChangeCDNGW0861/8/2023 10:41 53.60 41.20 0.00 5.20 -13.50 0.19 0.19 0.02 0.01 82.30 83.00 3.85 3.26 No ChangeCDNGW0871/8/2023 10:15 9.50 5.90 17.50 67.10 -13.12 -0.96 -0.95 0.01 0.01 72.30 72.60 0.83 0.81 No ChangeCDNGW0881/8/2023 10:04 49.40 39.00 0.00 11.60 -14.49 -1.20 -1.20 0.11 0.11 94.60 94.70 7.39 7.24 No ChangeCDNGW0891/8/2023 10:02 5.70 3.30 18.90 72.10 -3.49 -0.45 -0.46 0.00 0.00 77.50 77.90 0.27 0.77 No ChangeCDNGW0901/8/2023 10:00 56.80 39.10 0.00 4.10 -0.55 0.03 0.02 0.06 0.06 78.80 79.20 7.18 7.53 No ChangeCDNGW0911/8/2023 9:58 53.90 40.30 0.00 5.80 -13.33 -0.58 -0.60 0.72 0.70 105.80 105.90 18.39 18.11 No ChangeCDNGW0921/8/2023 9:52 52.90 40.80 0.00 6.30 -10.90 -7.35 -7.30 7.16 7.29 104.30 104.30 185.85 187.47 No ChangeCDNGW0931/8/2023 9:54 53.40 40.70 0.00 5.90 -12.33 -0.68 -0.68 1.31 1.30 103.70 103.60 24.80 24.72 No ChangeCDNGW0941/8/2023 9:56 52.70 40.10 0.00 7.20 -12.92 -0.36 -0.34 0.35 0.36 95.30 95.20 17.26 17.51 No ChangeCDNGW0951/8/2023 9:44 51.70 41.00 0.00 7.30 -0.82 0.44 0.44 0.02 0.02 81.80 NR 11.21 11.21 No ChangeCDNGW0961/8/2023 9:42 54.00 40.70 0.00 5.30 -12.01 -0.60 -0.60 0.01 0.01 96.80 96.80 2.79 2.37 No ChangeCDNGW0971/8/2023 9:40 52.70 41.30 0.00 6.00 -12.30 -8.78 -8.80 9.41 9.26 113.10 113.10 210.47 208.81 No ChangeCDNGW0981/8/2023 9:38 54.30 42.30 0.00 3.40 -10.26 0.38 0.38 0.45 0.43 101.00 100.80 19.63 19.23 No ChangeCDNGW0991/8/2023 9:32 41.80 36.80 0.00 21.40 1.38 1.16 1.16 1.22 1.22 84.00 84.10 24.45 24.42 No ChangeCDNGW1001/8/2023 9:34 51.90 41.80 0.00 6.30 2.06 1.74 1.73 0.02 0.02 86.20 86.10 3.32 3.36 No ChangeCDNGW1011/8/2023 9:36 52.50 41.00 0.00 6.50 2.06 1.98 1.97 1.92 1.94 82.30 82.30 41.22 41.46 No ChangeCDNGW1021/8/2023 9:24 53.90 41.70 0.00 4.40 4.80 4.49 4.49 1.29 1.29 85.40 NR 2.33 2.33 No Change CDNGW106 1/8/2023 10:53 0.20 20.20 1.10 78.50 2.79 -0.35 -0.37 0.02 0.02 81.80 81.70 3.04 2.89 No Change CDNGW107 1/8/2023 10:58 50.70 39.80 0.00 9.50 -13.70 -0.42 -0.42 0.04 0.02 104.50 104.50 5.76 4.23 No Change CDNGW108 1/8/2023 10:59 51.00 40.40 0.00 8.60 -14.44 -0.54 -0.54 0.24 0.24 112.80 112.90 6.35 6.35 No Change CDNGW109 1/8/2023 11:01 52.00 41.90 0.00 6.10 -15.51 -5.99 -6.18 1.91 1.96 117.00 116.90 29.40 29.72 No Change P:\O&M\City of Denton\2023\(1) January\Forms\City of Denton O&M Report Jan 2023.xlsx Weaver Consultants Group, LLC 2/2/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW110 1/8/2023 11:03 50.70 41.20 0.00 8.10 -15.90 -4.40 -4.41 1.26 1.22 115.80 116.10 32.16 31.61 No ChangeCDNGW1111/8/2023 11:05 50.00 41.10 0.00 8.90 -14.27 -1.36 -1.36 0.14 0.14 111.90 NR 10.67 10.67 No ChangeCDNGW1121/8/2023 11:06 45.30 37.80 0.00 16.90 -14.36 -0.28 -0.28 0.09 0.13 106.20 106.50 3.95 4.66 No ChangeCDNGW1131/8/2023 11:08 48.40 40.70 0.00 10.90 -14.21 -0.47 -0.48 0.41 0.41 106.00 106.10 8.31 8.33 No ChangeCDNGW1141/8/2023 11:09 48.70 39.50 0.00 11.80 -14.02 -1.49 -1.48 1.71 1.75 114.80 114.90 16.84 17.03 No ChangeCDNGW1151/8/2023 11:11 46.20 38.20 0.00 15.60 -14.66 -1.47 -1.47 0.96 1.00 110.80 110.80 21.04 21.47 No ChangeCDNGW1161/8/2023 11:13 51.90 40.80 0.00 7.30 -14.76 -0.44 -0.46 0.37 0.43 109.80 109.90 13.03 14.15 No ChangeCDNGW1171/8/2023 11:14 48.60 39.40 0.00 12.00 -14.70 -0.58 -0.59 0.89 0.84 109.10 109.00 12.24 11.86 No ChangeCDNGW1181/8/2023 11:31 49.20 40.70 0.00 10.10 -14.61 -0.72 -0.71 0.79 0.84 105.90 106.00 11.58 11.92 No ChangeCDNGW119R1/8/2023 11:16 5.20 2.00 20.90 71.90 -14.68 -0.10 -0.14 0.05 0.01 70.70 70.80 0.69 0.25 No ChangeCDNGW120R1/8/2023 11:18 54.80 42.80 0.00 2.40 -14.64 -14.15 -14.15 0.49 0.36 74.30 74.30 2.22 1.91 No ChangeCDNGW121R1/8/2023 11:19 1.10 0.60 21.10 77.20 -14.64 -0.19 -0.24 0.07 0.02 72.20 72.10 19.77 10.94 No Change CDNGW122R 1/8/2023 11:21 1.00 4.90 18.80 75.30 -14.59 12.79 12.64 0.16 0.06 73.90 74.20 29.85 17.65 No Change CDNGW123R 1/8/2023 11:23 13.00 13.40 8.30 65.30 -14.36 0.74 0.70 0.09 0.05 75.20 75.20 21.66 16.92 No Change CDNGW124R 1/8/2023 11:24 27.10 21.30 10.40 41.20 -14.36 1.88 1.86 0.21 0.18 75.20 75.20 33.22 30.45 No Change CDNGW125R 1/8/2023 11:26 2.30 17.90 7.40 72.40 -14.26 4.04 4.01 0.22 0.19 75.00 75.00 34.17 31.40 No Change CDNGW126R 1/8/2023 11:26 2.50 13.40 14.80 69.30 -14.51 4.36 4.23 0.22 0.08 75.40 75.50 34.16 20.81 No ChangeCDNHZ0011/8/2023 6:53 53.60 37.80 0.00 8.60 -13.86 -11.81 -11.93 0.02 0.01 77.80 77.70 9.36 7.44 No ChangeCDNHZ0021/8/2023 6:55 46.70 34.80 0.00 18.50 -13.76 -11.98 -12.15 0.06 0.00 75.10 75.20 16.87 0.00 No ChangeCDNHZ0031/8/2023 6:57 50.20 36.70 0.00 13.10 -13.72 -6.03 -6.03 0.01 0.01 78.60 78.50 7.06 7.66 No ChangeCDNHZ0051/8/2023 7:00 48.90 33.10 0.00 18.00 -13.84 -10.45 -10.45 0.29 0.28 81.10 81.20 36.35 35.99 No ChangeCDNHZ0061/8/2023 7:02 32.60 29.90 0.00 37.50 -13.83 4.50 4.45 0.02 0.01 88.80 89.00 9.39 6.64 No ChangeCDNHZ0071/8/2023 7:04 14.30 10.00 12.80 62.90 -13.80 -3.72 -3.72 0.01 0.01 86.90 87.40 7.99 7.68 No ChangeCDNHZ0081/8/2023 7:07 39.90 30.20 0.00 29.90 -13.95 -4.12 -4.12 0.02 0.02 83.20 83.50 8.85 8.44 No ChangeCDNHZ0101/8/2023 7:09 56.10 38.70 0.00 5.20 -13.86 -13.68 -13.64 0.32 0.31 76.60 76.60 38.13 37.81 No ChangeCDNHZ0111/8/2023 7:11 17.40 10.30 14.40 57.90 -14.14 -13.94 -13.92 0.00 0.00 84.00 84.40 0.00 2.12 No ChangeCDNHZ0121/8/2023 7:13 14.20 16.10 10.70 59.00 -13.70 -0.21 -0.21 0.01 0.01 86.40 86.60 7.91 7.60 No ChangeCDNHZ0141/8/2023 7:15 40.70 33.30 0.10 25.90 -13.78 -4.58 -4.59 0.05 0.06 77.70 77.50 15.74 16.52 No ChangeCDNHZ0151/8/2023 7:17 53.30 39.30 0.00 7.40 -14.12 -9.39 -9.35 0.01 0.01 77.10 76.90 7.77 5.92 No ChangeCDNHZ0171/8/2023 7:19 53.20 40.10 0.00 6.70 -14.06 -13.94 -13.85 0.00 0.00 84.40 85.10 0.00 0.00 No ChangeCDNHZ0181/8/2023 7:21 9.50 16.50 2.00 72.00 -14.36 -0.24 -0.23 0.02 0.01 87.00 87.20 8.90 5.37 No ChangeCDNHZ0191/8/2023 7:24 55.30 40.30 0.10 4.30 -13.65 -13.51 -13.56 0.01 0.02 82.80 82.70 6.39 9.76 No ChangeCDNHZ0201/8/2023 7:26 54.50 39.30 0.00 6.20 -13.74 -13.56 -13.59 0.03 0.00 77.70 77.60 12.29 0.00 No ChangeCDNHZ0211/8/2023 7:29 60.80 21.40 0.00 17.80 -14.06 2.70 2.70 0.02 0.01 89.50 89.70 9.11 7.86 No Change CDNHZ022 1/8/2023 7:31 50.20 35.00 0.00 14.80 -13.91 -13.85 -13.85 0.00 0.00 81.30 81.20 0.00 0.00 No Change P:\O&M\City of Denton\2023\(1) January\Forms\City of Denton O&M Report Jan 2023.xlsx Weaver Consultants Group, LLC 2/2/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ023 1/8/2023 7:33 51.80 39.40 0.10 8.70 -13.82 -13.83 -13.91 0.03 0.00 85.10 85.50 11.77 4.11 No ChangeCDNHZ0251/8/2023 7:34 52.00 40.60 0.00 7.40 -13.76 -13.85 -13.75 0.00 0.02 81.20 80.90 2.61 9.41 No ChangeCDNHZ0261/8/2023 7:37 54.80 36.50 3.70 5.00 -13.73 -0.67 2.02 0.00 0.00 87.40 87.50 3.34 0.00 No ChangeCDNHZ0291/8/2023 7:39 42.30 21.60 4.10 32.00 -13.70 -13.30 -13.41 0.01 0.01 88.20 88.50 6.36 5.19 No ChangeCDNHZ0301/8/2023 7:41 42.80 34.40 3.80 19.00 -13.78 0.16 0.16 0.02 0.02 90.00 90.20 10.21 9.47 No ChangeCDNHZ0311/8/2023 7:43 5.10 23.40 4.40 67.10 -14.01 0.05 0.04 0.02 0.01 90.60 90.70 8.88 7.57 No ChangeCDNHZ0321/8/2023 7:45 42.30 29.10 4.10 24.50 -13.73 2.23 2.23 0.02 0.02 87.60 87.80 10.69 9.73 No ChangeCDNHZ0331/8/2023 7:47 27.20 25.50 0.00 47.30 -13.64 5.61 5.55 0.05 0.04 88.80 89.00 14.89 13.86 No ChangeCDNHZ0341/8/2023 7:49 50.60 38.40 0.00 11.00 -14.14 -12.24 -12.15 0.07 0.06 77.80 77.50 17.44 16.21 No ChangeCDNHZ0351/8/2023 7:51 51.90 38.50 0.00 9.60 -14.03 -2.59 -2.58 0.02 0.01 81.20 81.20 8.90 7.59 No ChangeCDNHZ0361/8/2023 7:52 52.60 40.80 0.10 6.50 -13.99 -5.99 -5.97 0.01 0.01 86.80 87.00 7.72 7.49 No Change CDNLFG02 1/8/2023 5:15 52.40 40.70 0.00 6.90 -8.93 0.90 1.12 0.01 0.01 75.90 77.80 8.16 8.15 Opened Valve 1/2 turn or lessCDNLFG031/8/2023 5:12 52.30 42.90 0.10 4.70 -8.73 -0.79 -0.70 3.93 4.07 82.00 82.10 6.34 6.44 No Change CDNLFG05 1/8/2023 5:17 57.00 41.00 0.00 2.00 -9.58 -1.66 -1.75 0.38 0.41 85.80 85.90 42.59 44.17 No ChangeCDNLFG061/8/2023 5:00 56.30 40.30 0.00 3.40 -8.00 0.45 0.49 0.07 0.12 74.50 76.00 0.54 0.72 Opened Valve 1/2 turn or less CDNLFG07 1/8/2023 5:11 0.10 0.10 21.10 78.70 0.00 0.01 -0.04 0.00 0.00 72.00 72.10 3.40 0.00 No Change CDNLFG08 1/8/2023 5:10 0.30 0.40 20.70 78.60 0.01 -0.04 -0.03 0.02 0.01 72.50 72.70 0.25 0.21 No Change CDNLFG16 1/8/2023 5:09 0.30 0.50 21.00 78.20 0.02 0.01 0.01 0.00 0.02 73.40 73.00 0.05 0.29 No Change CDNLFG17 1/8/2023 5:09 0.40 0.40 21.00 78.20 0.01 0.00 0.00 0.01 0.01 71.60 71.80 6.29 6.29 No ChangeCDNLFG181/8/2023 5:08 1.50 0.70 20.90 76.90 0.07 -0.01 -0.01 0.04 0.03 71.70 71.10 14.55 12.39 No Change CDNLFG19 1/8/2023 5:02 52.10 38.50 0.00 9.40 -7.02 0.23 0.23 3.79 4.47 76.20 76.30 4.00 4.34 No ChangeCDNLFG201/8/2023 5:04 56.00 40.70 0.00 3.30 -6.99 -4.98 -4.98 0.35 0.35 80.10 80.10 40.94 40.94 No Change CDNLFG21 1/8/2023 4:52 56.60 41.40 0.00 2.00 -7.05 -3.03 -3.03 0.00 0.00 83.70 83.70 0.00 0.00 No Change CDNLFG22 1/8/2023 4:54 55.20 37.80 0.00 7.00 -7.15 -1.09 -1.08 0.03 0.03 69.70 70.00 11.06 11.00 No Change CDNLFG23 1/8/2023 4:58 56.80 39.20 0.00 4.00 -8.88 0.33 0.33 0.02 0.02 72.80 NR 0.25 0.25 No Change CDNLFG24 1/8/2023 4:44 55.30 41.20 0.00 3.50 -8.21 -0.63 -0.63 0.48 0.49 74.30 74.30 2.24 2.26 No Change CDNLFG24 1/8/2023 4:56 56.40 41.10 0.00 2.50 -8.13 -0.57 -0.57 0.51 0.51 74.10 74.10 2.31 2.31 No Change CDNLFG25 1/8/2023 4:49 1.70 0.90 20.30 77.10 0.01 0.04 0.04 0.01 0.01 82.40 82.40 7.51 6.03 No ChangeCDNLFG261/8/2023 4:40 54.80 44.70 0.00 0.50 -10.02 -0.21 -0.19 0.24 0.25 87.80 87.70 33.73 34.40 No Change CDNLFG27 1/8/2023 4:42 55.60 40.90 0.00 3.50 -9.40 -6.03 -5.98 0.85 0.65 70.90 71.00 1.90 1.66 No ChangeCDNLFG281/8/2023 4:35 54.90 44.80 0.00 0.30 -12.92 -0.09 -0.13 0.01 0.02 72.00 72.10 8.39 10.89 No ChangeCDNLFG291/8/2023 4:33 55.10 43.50 0.00 1.40 -12.99 -3.66 -3.67 0.36 0.38 81.00 81.10 41.17 42.24 No Change CDNLFG30 1/8/2023 4:37 54.70 44.70 0.00 0.60 -10.10 -0.35 -0.36 0.03 0.02 79.30 79.30 12.87 9.84 No Change CDNLFG31 1/8/2023 8:01 50.90 42.50 0.00 6.60 -13.63 -5.09 -5.11 1.10 1.07 95.40 95.50 7.48 7.41 No Change CDNLFG32 1/8/2023 7:59 35.30 28.50 2.30 33.90 0.15 -1.36 -1.38 0.00 0.00 88.60 88.80 0.00 0.00 No Change CDNLFG33 1/8/2023 8:04 52.30 42.50 0.00 5.20 -13.39 -0.06 -0.06 0.05 0.06 82.00 82.10 1.70 1.81 No ChangeCDNLFG341/8/2023 8:11 51.00 41.40 0.00 7.60 -11.12 0.06 0.18 0.40 1.72 85.60 85.70 4.58 9.51 Opened Valve 1/2 to 1 turn CDNLFG35 1/8/2023 7:56 52.00 40.40 0.00 7.60 -12.58 -11.90 -12.08 0.00 0.00 82.10 82.30 0.00 0.00 No ChangeCDNLFG361/8/2023 8:06 52.20 42.90 0.00 4.90 -5.49 0.55 0.54 0.00 0.00 84.10 84.80 0.00 0.00 No Change CDNLFG37 1/8/2023 8:13 52.20 41.90 0.00 5.90 -12.50 0.09 0.22 0.95 1.95 84.10 84.30 12.96 18.51 Opened Valve 1/2 to 1 turn CDNLFG38 1/8/2023 7:54 50.50 42.10 0.00 7.40 -13.49 -0.05 -0.04 0.04 0.07 83.60 83.60 0.43 0.53 No Change P:\O&M\City of Denton\2023\(1) January\Forms\City of Denton O&M Report Jan 2023.xlsx Weaver Consultants Group, LLC 2/2/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNLFG39 1/8/2023 8:08 50.50 40.40 0.00 9.10 -12.42 0.11 0.67 0.18 0.32 83.40 83.50 29.58 39.31 Opened Valve 1/2 turn or less CDNLFG41 1/8/2023 10:31 49.80 39.00 0.00 11.20 -14.10 -0.02 0.01 0.01 0.01 74.40 74.30 3.08 3.36 Opened Valve 1/2 turn or lessCDNLFG421/8/2023 10:33 49.00 39.00 0.00 12.00 -14.54 -1.02 -1.03 2.54 2.53 75.80 75.80 5.13 5.11 No Change CDNLFG43 1/8/2023 10:36 37.90 22.40 4.80 34.90 -0.06 -5.65 -5.67 0.03 0.11 87.80 87.90 5.41 9.54 No Change DEWLCR3 1/8/2023 10:51 0.20 6.40 17.00 76.40 3.81 3.97 3.97 0.02 0.01 84.90 84.90 3.84 3.53 No Change DEWLCR4 1/8/2023 5:45 54.10 41.80 0.30 3.80 0.99 -3.00 -11.04 11.28 3.11 79.00 79.10 236.28 126.58 Opened Valve > 1 turn DEWLCR5 1/8/2023 5:39 57.20 42.20 0.00 0.60 -15.98 -0.04 0.15 3.75 6.77 79.30 79.40 14.11 18.90 Opened Valve 1/2 to 1 turnNotes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =139 Number of Wells with Methane > 58%=1 Total Number of Well Readings =139 Number of Wells with Oxygen ≥ 2%=34 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =19 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =43Number of Wells with No Room to Run (NRTR)=58 P:\O&M\City of Denton\2023\(1) January\Forms\City of Denton O&M Report Jan 2023.xlsx Weaver Consultants Group, LLC 2/2/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNSV001 1/8/2023 6:01 6.00 12.80 7.50 73.70 -12.60 -1.89 -1.89 0.02 0.02 77.90 78.10 9.53 9.47 No ChangeCDNSV0021/8/2023 5:59 17.40 18.80 5.50 58.30 -12.65 -12.15 -12.15 0.02 0.02 75.80 75.70 8.93 8.74 No Change CDNSV003 1/8/2023 5:57 30.90 29.50 0.30 39.30 -12.41 -2.54 -2.55 0.03 0.02 77.90 78.10 10.94 10.65 No Change CDNSV004 1/8/2023 5:50 19.70 17.30 5.80 57.20 -12.58 -11.51 -11.51 0.01 0.01 71.20 70.80 7.27 6.77 No Change CDNSV005 1/8/2023 5:48 24.80 13.10 10.90 51.20 -12.56 -6.01 -5.99 0.00 0.00 77.40 78.70 3.65 3.77 No Change CDNSV006 1/8/2023 6:03 2.20 3.70 17.40 76.70 -12.39 -7.31 -7.31 0.12 0.10 70.40 70.30 23.82 21.85 No ChangeCDNSV0071/8/2023 6:04 2.50 5.10 15.00 77.40 -12.45 -11.05 -10.92 0.03 0.05 70.80 70.70 12.45 15.24 No Change CDNSV008 1/8/2023 6:06 8.00 8.00 13.70 70.30 -12.45 -11.69 -11.77 0.03 0.03 71.50 71.30 11.99 12.13 No ChangeCDNSV0091/8/2023 6:09 1.30 1.70 16.30 80.70 -12.63 -8.07 -8.07 0.02 0.02 68.20 68.20 10.29 9.66 No Change CDNSV010 1/8/2023 6:11 9.70 17.10 1.20 72.00 -12.60 -12.24 -12.20 0.02 0.01 71.90 71.80 10.57 5.91 No ChangeCDNSV0111/8/2023 6:12 4.50 16.50 4.20 74.80 -12.45 -12.15 -12.15 0.02 0.02 72.30 72.50 9.34 9.02 No Change CDNSV012 1/8/2023 6:14 19.00 23.30 0.60 57.10 -12.82 -10.96 -10.96 0.02 0.02 78.00 78.40 9.50 8.74 No Change CDNSV013 1/8/2023 6:16 28.50 20.90 6.40 44.20 -12.41 -12.47 -12.45 0.01 0.01 79.20 79.60 7.87 7.72 No Change CDNSV014 1/8/2023 6:18 34.60 31.60 1.20 32.60 -12.30 -12.52 -12.54 0.02 0.02 79.20 79.60 9.09 9.45 No Change Soil Vapor Extraction Well Data P:\O&M\City of Denton\2023\(1) January\Forms\City of Denton O&M Report Jan 2023.xlsx Weaver Consultants Group, LLC 2/2/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCGCH4 2/13/2023 6:15 49.90 34.80 0.00 15.30 0.07 0.01 0.01 0.00 0.00 60.80 60.90 NR NR Calibration CDNCG002 2/13/2023 6:23 0.00 0.00 11.00 89.00 0.00 0.25 0.26 0.00 0.00 61.70 61.80 NR NR CalibrationCDNINLT22/13/2023 6:28 52.80 37.90 1.30 8.00 0.01 -17.37 -17.44 17.49 17.47 65.60 66.10 816.00 816.00 Flare Inlet CDNBLWR2 2/13/2023 6:31 51.90 36.90 1.30 9.90 0.01 1.94 1.94 0.00 0.00 79.00 79.00 816.00 816.00 Blower CDN00GHG 2/13/2023 6:32 52.80 37.40 1.30 8.50 0.01 1.91 1.94 0.00 0.00 79.00 79.00 816.00 816.00 Calibration CDNGW040 2/13/2023 3:04 1.30 5.60 18.60 74.50 -7.17 -0.08 -0.08 0.00 0.00 64.20 64.70 0.00 0.00 No Change CDNGW044 2/13/2023 4:36 1.70 1.90 19.60 76.80 -2.29 -3.67 0.05 3.00 0.01 68.40 68.50 5.59 0.30 No Change CDNGW045 2/13/2023 4:37 33.80 28.10 0.10 38.00 -7.90 0.77 0.77 0.76 0.76 74.10 74.30 11.71 11.66 No Change CDNGW046 2/13/2023 4:18 49.20 38.30 0.00 12.50 -3.00 -1.64 -1.50 1.66 1.58 90.90 90.80 88.61 86.39 No Change CDNGW047 2/13/2023 3:58 1.80 0.90 20.30 77.00 -9.24 -0.32 -0.32 0.02 0.02 66.00 66.00 1.11 1.12 No ChangeCDNGW0482/13/2023 3:57 49.30 40.10 0.00 10.60 -8.62 -6.60 -6.63 1.53 2.21 89.60 89.60 8.86 10.65 No ChangeCDNGW0492/13/2023 3:23 0.20 0.30 20.30 79.20 0.01 0.00 0.02 0.00 0.00 64.00 64.00 0.00 0.00 No ChangeCDNGW0502/13/2023 3:33 50.80 39.00 0.00 10.20 -7.21 -6.71 -6.69 6.75 6.75 89.70 89.80 33.86 33.85 No ChangeCDNGW0512/13/2023 3:27 51.40 41.10 0.00 7.50 0.01 1.65 1.72 1.15 0.21 82.60 82.70 7.81 3.33 No ChangeCDNGW0522/13/2023 3:28 52.70 39.40 0.00 7.90 0.80 2.30 2.30 0.00 0.01 71.80 73.30 0.58 1.38 No ChangeCDNGW0542/13/2023 3:22 2.30 1.10 20.20 76.40 0.01 0.04 0.04 0.00 0.00 58.40 59.60 0.00 0.00 No ChangeCDNGW0552/13/2023 3:19 54.90 36.90 0.00 8.20 5.80 5.57 5.57 0.00 0.01 63.70 64.00 0.19 0.31 No ChangeCDNGW0572/13/2023 5:50 51.10 38.60 0.00 10.30 4.10 4.17 3.86 4.16 3.86 71.50 71.50 15.03 14.48 No ChangeCDNGW0582/13/2023 3:14 53.10 40.10 0.00 6.80 6.28 6.32 6.29 0.00 0.01 77.40 77.40 1.91 3.30 No ChangeCDNGW0592/13/2023 3:09 2.00 0.80 20.30 76.90 0.03 0.03 0.03 0.03 0.03 64.40 64.60 1.27 1.32 No ChangeCDNGW0602/13/2023 3:08 47.00 35.90 0.00 17.10 2.75 2.56 2.56 0.00 0.00 65.40 65.50 0.46 0.29 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data P:\O&M\City of Denton\2023\(2) February\Forms\City of Denton O&M Report Feb 2023 Weaver Consultants Group, LLC10/2/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW061 2/13/2023 3:07 0.10 0.20 20.10 79.60 0.03 -0.14 -0.05 0.13 0.08 64.60 64.60 10.92 8.62 No ChangeCDNGW0622/13/2023 3:12 55.70 42.70 0.00 1.60 -6.09 -1.14 -1.26 6.30 7.18 88.50 88.50 32.98 35.19 No ChangeCDNGW0632/13/2023 3:17 55.10 40.90 0.00 4.00 1.12 6.02 5.95 0.00 0.00 55.40 NR 3.24 0.00 No ChangeCDNGW0642/13/2023 3:21 52.90 41.70 0.00 5.40 1.91 4.41 4.42 0.44 0.44 80.40 80.50 8.91 8.85 No ChangeCDNGW0652/13/2023 3:26 1.70 0.80 20.20 77.30 0.01 0.04 0.04 0.00 0.00 61.40 61.60 0.00 0.00 No ChangeCDNGW0662/13/2023 3:35 52.30 41.30 0.00 6.40 -5.70 -5.95 -6.13 0.01 0.02 64.70 64.80 3.19 4.25 No ChangeCDNGW0672/13/2023 3:59 48.90 40.40 0.00 10.70 -6.76 -6.37 -5.95 0.27 0.10 96.00 96.40 15.00 9.26 No ChangeCDNGW0682/13/2023 4:16 49.50 37.80 0.00 12.70 -6.05 -2.91 -3.09 0.72 0.90 65.50 65.60 19.03 21.21 No ChangeCDNGW0742/13/2023 4:51 53.50 40.60 0.00 5.90 -7.72 0.36 0.37 0.47 0.49 66.60 66.60 1.43 1.46 No ChangeCDNGW0752/13/2023 4:53 43.50 34.80 0.00 21.70 -8.78 0.18 0.16 0.34 0.29 82.10 82.40 4.27 3.90 No ChangeCDNGW0762/13/2023 4:55 51.60 38.20 0.00 10.20 -8.50 -1.96 -1.96 1.99 1.99 91.40 92.40 96.82 96.76 No ChangeCDNGW0772/13/2023 5:01 51.10 40.10 0.00 8.80 0.95 1.21 1.22 0.00 0.00 63.30 63.30 1.52 0.00 No ChangeCDNGW0782/13/2023 4:28 49.40 33.90 0.00 16.70 1.06 1.49 1.49 1.44 1.44 60.30 60.80 3.93 3.93 No ChangeCDNGW0792/13/2023 4:29 48.80 39.00 0.00 12.20 -7.17 -0.11 -0.11 0.08 0.09 75.90 75.90 2.11 2.17 No ChangeCDNGW0802/13/2023 4:26 50.20 38.20 0.00 11.60 -7.60 -0.23 -0.23 0.07 0.10 95.10 95.20 7.51 9.40 No ChangeCDNGW0812/13/2023 4:31 52.70 38.70 0.00 8.60 -7.70 0.59 0.59 0.00 0.00 61.20 61.60 0.12 0.08 No ChangeCDNGW0822/13/2023 4:24 45.90 35.80 0.00 18.30 0.01 -2.84 -2.92 2.15 2.16 65.80 65.70 44.03 44.12 No ChangeCDNGW0832/13/2023 4:33 47.10 37.70 0.00 15.20 0.05 0.95 0.96 0.92 0.93 61.80 62.10 21.69 21.78 No ChangeCDNGW0842/13/2023 4:22 51.80 37.80 0.00 10.40 -7.97 1.22 1.16 0.01 0.13 65.40 65.60 0.58 2.69 Opened Valve 1/2 to 1 turnCDNGW0852/13/2023 4:45 48.80 38.20 1.50 11.50 -8.77 -1.46 0.64 1.25 0.97 63.60 63.70 33.76 29.84 No ChangeCDNGW0862/13/2023 4:48 54.60 41.20 0.00 4.20 -7.57 1.01 0.99 0.00 0.00 61.20 61.50 1.34 1.18 No ChangeCDNGW0872/13/2023 4:20 57.10 38.10 0.00 4.80 -8.86 1.01 0.94 0.00 0.07 63.70 64.40 0.29 1.95 Opened Valve 1/2 to 1 turnCDNGW0882/13/2023 4:14 46.20 37.60 0.00 16.20 -3.58 -0.28 -0.31 0.47 0.51 92.90 92.80 15.02 15.56 No ChangeCDNGW0892/13/2023 4:12 41.70 35.50 0.00 22.80 1.40 0.78 0.78 0.00 0.00 64.40 64.40 1.07 1.34 No ChangeCDNGW0902/13/2023 4:10 49.80 37.40 0.00 12.80 -0.18 1.08 1.08 0.00 0.00 63.10 63.30 1.18 1.18 No ChangeCDNGW0912/13/2023 4:08 53.60 40.50 0.00 5.90 -8.57 0.33 0.34 0.80 0.82 102.50 102.60 19.47 19.64 No Change CDNGW092 2/13/2023 4:02 48.10 38.60 0.00 13.30 -7.17 -4.13 -4.36 0.00 0.20 102.90 102.90 3.87 31.15 No Change CDNGW093 2/13/2023 4:05 49.20 38.50 0.00 12.30 -7.93 -2.93 -3.16 2.86 3.18 103.40 103.40 36.50 38.45 No Change CDNGW094 2/13/2023 4:06 51.80 40.30 0.00 7.90 -7.42 0.63 0.63 0.59 0.58 84.00 85.20 22.81 22.68 No Change CDNGW095 2/13/2023 3:55 27.90 11.80 19.80 40.50 0.01 0.03 0.00 0.04 0.02 52.60 52.90 15.50 10.96 No Change CDNGW096 2/13/2023 3:53 50.30 42.30 0.00 7.40 -6.35 0.67 0.69 0.01 0.04 89.10 89.10 3.04 5.56 No Change CDNGW097 2/13/2023 3:52 31.00 13.20 19.40 36.40 -6.06 0.71 0.72 0.03 0.03 59.20 88.80 13.47 11.81 No Change CDNGW098 2/13/2023 3:49 50.50 40.00 0.00 9.50 -6.57 1.36 1.19 0.68 0.72 95.10 98.80 24.32 24.84 Opened Valve 1/2 to 1 turn CDNGW099 2/13/2023 3:42 53.70 41.80 0.00 4.50 2.32 2.15 2.16 2.13 2.15 63.30 63.70 32.91 33.03 No Change CDNGW100 2/13/2023 3:44 52.50 40.70 0.00 6.80 2.75 2.61 2.61 0.00 0.00 71.30 72.20 1.23 1.00 No Change CDNGW101 2/13/2023 3:47 50.70 42.10 0.00 7.20 3.10 2.90 2.90 0.01 0.01 64.80 64.90 2.35 2.35 No Change CDNGW102 2/13/2023 3:24 49.20 39.20 0.00 11.60 5.48 4.31 4.45 0.86 0.72 66.10 66.10 1.93 1.77 No Change CDNGW106 2/13/2023 4:59 3.20 26.50 1.30 69.00 1.04 -0.22 -0.17 0.00 0.01 61.70 61.80 1.07 1.75 No ChangeCDNGW1072/13/2023 5:03 51.00 39.30 0.00 9.70 -8.62 -0.71 -0.80 0.17 0.13 103.40 103.40 12.08 10.43 No ChangeCDNGW1082/13/2023 5:05 48.60 39.20 0.00 12.20 -8.52 -0.25 -0.25 0.27 0.27 108.70 109.10 6.76 6.76 No ChangeCDNGW1092/13/2023 5:06 49.60 39.90 0.00 10.50 -10.40 -4.15 -4.11 1.26 1.17 114.80 114.80 24.02 23.11 No Change P:\O&M\City of Denton\2023\(2) February\Forms\City of Denton O&M Report Feb 2023 Weaver Consultants Group, LLC10/2/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW110 2/13/2023 5:08 48.70 41.00 0.00 10.30 -11.08 -2.94 -2.95 0.83 0.89 114.90 115.00 26.27 27.15 No ChangeCDNGW1112/13/2023 5:10 50.40 39.80 0.00 9.80 -9.41 -0.69 -0.67 0.28 0.29 108.10 108.50 15.24 15.60 No ChangeCDNGW1122/13/2023 5:12 30.70 30.00 0.00 39.30 -10.32 -0.19 -0.18 0.08 0.09 99.00 99.40 3.61 3.87 No ChangeCDNGW1132/13/2023 5:13 32.40 31.90 0.00 35.70 -10.10 -0.27 -0.29 0.14 0.12 98.50 98.80 4.95 4.60 No ChangeCDNGW1142/13/2023 5:15 43.60 37.70 0.00 18.70 -9.88 -1.04 -1.05 1.26 1.25 111.50 111.70 14.53 14.47 No ChangeCDNGW1152/13/2023 5:16 45.70 39.60 0.00 14.70 -10.36 -0.96 -0.96 0.77 0.82 108.40 108.30 18.89 19.55 No ChangeCDNGW1162/13/2023 5:18 43.30 36.10 0.00 20.60 -10.67 -0.67 -0.88 0.02 0.24 105.90 106.00 2.85 10.55 No ChangeCDNGW1172/13/2023 5:19 51.90 39.80 1.10 7.20 -10.37 -0.83 -0.76 0.07 0.30 103.60 104.10 3.51 7.08 No ChangeCDNGW1182/13/2023 5:34 52.80 42.00 0.00 5.20 -10.11 -0.84 -1.03 0.29 0.05 104.00 104.00 7.02 2.95 No ChangeCDNGW119R2/13/2023 5:21 1.60 0.90 20.40 77.10 -10.73 -0.63 -0.36 0.55 0.28 60.90 60.90 2.42 1.72 No ChangeCDNGW120R2/13/2023 5:22 50.60 40.10 0.10 9.20 -10.47 -11.02 -10.90 0.55 0.55 60.80 60.90 2.39 2.40 No ChangeCDNGW121R2/13/2023 5:24 0.90 0.70 20.40 78.00 -10.39 -1.56 -1.42 0.42 0.27 61.60 61.60 47.38 37.89 No ChangeCDNGW122R2/13/2023 5:25 0.20 0.30 20.60 78.90 -21.52 -4.71 -0.04 4.42 0.01 57.10 57.20 153.51 7.85 No ChangeCDNGW123R2/13/2023 5:27 8.90 9.40 11.50 70.20 -10.50 1.01 0.90 0.84 0.94 60.50 60.60 67.27 71.35 No ChangeCDNGW124R2/13/2023 5:28 21.90 18.70 11.70 47.70 -10.42 0.34 0.37 0.01 0.00 59.60 59.80 5.95 4.04 No ChangeCDNGW125R2/13/2023 5:29 1.90 14.60 9.50 74.00 -10.30 2.45 2.43 0.30 0.30 60.10 60.30 40.30 40.11 No ChangeCDNGW126R2/13/2023 5:30 2.30 10.40 15.20 72.10 -10.54 -0.56 -0.57 0.94 0.95 59.90 60.00 71.42 71.53 No ChangeCDNHZ0012/13/2023 2:01 48.20 35.10 0.40 16.30 -8.61 -8.57 -8.58 0.01 0.00 68.10 68.30 5.13 0.00 No ChangeCDNHZ0022/13/2023 2:02 46.60 34.20 1.30 17.90 -8.81 -8.56 -8.63 0.00 0.01 70.10 70.30 0.00 7.55 No ChangeCDNHZ0032/13/2023 2:04 51.70 37.60 0.00 10.70 -8.42 -2.79 -2.79 0.01 0.01 65.00 65.10 5.45 5.45 No ChangeCDNHZ0052/13/2023 2:06 43.80 33.40 0.00 22.80 -8.71 -6.86 -6.93 0.00 0.00 66.70 67.00 0.00 0.00 No ChangeCDNHZ0062/13/2023 2:08 29.50 29.40 0.00 41.10 -8.67 5.69 5.78 0.00 0.00 69.30 69.60 0.00 0.00 No ChangeCDNHZ0072/13/2023 2:10 13.50 10.60 11.30 64.60 -8.58 -5.33 -5.31 0.00 0.00 71.10 71.20 0.00 0.00 No ChangeCDNHZ0082/13/2023 2:11 41.00 28.30 0.00 30.70 -8.77 -2.37 -2.37 0.00 0.00 70.30 70.50 1.57 0.00 No ChangeCDNHZ0102/13/2023 2:13 50.20 37.70 0.00 12.10 -8.61 -8.90 -8.97 0.43 0.49 69.10 69.10 45.32 48.31 No ChangeCDNHZ0112/13/2023 2:15 17.30 10.40 13.20 59.10 -8.45 -8.54 -8.33 0.03 0.02 68.50 68.70 12.12 8.88 No Change CDNHZ012 2/13/2023 2:16 13.80 23.40 6.70 56.10 -8.42 1.50 1.55 0.00 0.00 70.90 71.00 0.00 0.00 No Change CDNHZ014 2/13/2023 2:18 52.40 39.80 0.00 7.80 -8.39 -5.06 -5.01 0.00 0.00 68.40 68.50 0.00 0.00 No Change CDNHZ015 2/13/2023 2:20 51.90 38.50 0.10 9.50 -8.41 -6.63 -6.63 0.01 0.00 67.80 67.70 6.02 3.81 No Change CDNHZ017 2/13/2023 2:21 51.20 39.80 0.10 8.90 -8.43 -8.33 -8.32 0.01 0.00 67.80 67.90 6.28 0.00 No Change CDNHZ018 2/13/2023 2:24 7.10 16.70 0.00 76.20 -8.62 1.86 1.84 0.00 0.00 70.00 70.20 0.00 0.00 No Change CDNHZ019 2/13/2023 2:26 52.40 39.70 0.00 7.90 -8.45 -8.67 -8.97 0.29 0.25 62.60 62.60 37.45 34.84 No Change CDNHZ020 2/13/2023 2:27 52.30 38.00 0.00 9.70 -8.58 -8.46 -8.36 0.01 0.01 63.30 63.60 7.37 5.15 No ChangeCDNHZ0212/13/2023 2:29 38.60 17.20 0.00 44.20 -8.76 1.53 1.50 0.00 0.00 69.30 69.60 0.00 0.00 No ChangeCDNHZ0222/13/2023 2:30 51.70 37.40 0.00 10.90 -8.82 -8.97 -8.33 0.86 0.03 66.40 66.50 63.98 12.29 No Change P:\O&M\City of Denton\2023\(2) February\Forms\City of Denton O&M Report Feb 2023 Weaver Consultants Group, LLC10/2/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ023 2/13/2023 2:31 46.90 36.70 0.40 16.00 -8.43 -8.44 -8.33 0.01 0.02 67.00 67.10 7.34 9.29 No ChangeCDNHZ0252/13/2023 2:33 54.40 40.20 0.60 4.80 -8.32 -8.33 -8.22 0.04 0.02 67.20 67.30 12.86 8.48 No ChangeCDNHZ0262/13/2023 2:34 49.00 35.80 0.00 15.20 -8.41 -8.05 -8.03 0.00 0.00 69.40 69.60 0.00 0.00 No ChangeCDNHZ0292/13/2023 2:35 36.90 18.60 6.50 38.00 -8.82 -8.33 -8.33 0.00 0.00 69.00 69.10 0.00 0.00 No ChangeCDNHZ0302/13/2023 2:37 21.00 19.00 0.90 59.10 -8.78 -0.04 -0.01 0.01 0.01 68.00 68.20 5.69 4.73 No ChangeCDNHZ0312/13/2023 2:38 6.30 23.10 3.10 67.50 -8.62 2.28 2.27 0.00 0.00 69.70 69.90 0.00 0.00 No ChangeCDNHZ0322/13/2023 2:40 38.90 27.90 3.50 29.70 -9.01 2.84 2.84 0.00 0.00 68.30 68.50 0.00 0.00 No ChangeCDNHZ0332/13/2023 2:41 26.80 24.10 0.00 49.10 -8.73 3.59 3.69 0.01 0.00 69.40 69.60 5.23 0.00 No ChangeCDNHZ0342/13/2023 2:42 44.50 33.20 0.00 22.30 -8.94 -7.73 -7.73 0.00 0.03 66.30 66.30 0.00 12.60 No ChangeCDNHZ0352/13/2023 2:44 51.70 39.00 0.00 9.30 -8.25 -0.95 -0.96 0.00 0.00 65.10 65.10 0.00 0.00 No Change CDNHZ036 2/13/2023 2:45 50.10 38.90 0.10 10.90 -8.54 -4.50 -4.50 0.00 0.00 67.80 68.10 0.00 0.00 No ChangeCDNLFG022/13/2023 0:44 50.20 39.90 0.00 9.90 -3.99 1.06 0.78 0.00 0.00 67.30 69.80 0.00 0.00 Opened Valve 1/2 turn or lessCDNLFG032/13/2023 0:42 46.20 37.60 0.00 16.20 -4.90 -0.07 -0.07 2.46 2.43 78.70 78.70 5.04 5.00 No Change CDNLFG05 2/13/2023 0:46 50.40 40.10 0.00 9.50 -4.07 -0.58 -0.59 0.23 0.22 82.00 82.20 33.12 32.67 No ChangeCDNLFG062/13/2023 0:32 51.50 38.20 0.00 10.30 -4.65 0.48 0.48 0.02 0.02 69.20 69.80 0.29 0.28 No Change CDNLFG07 2/13/2023 0:41 0.10 0.10 20.30 79.50 0.01 0.03 0.00 0.00 0.00 63.20 63.40 0.00 0.00 No Change CDNLFG08 2/13/2023 5:56 1.10 0.60 20.30 78.00 0.00 -0.56 -0.50 0.59 0.52 61.50 61.40 1.60 1.50 No ChangeCDNLFG162/13/2023 0:39 0.10 0.10 20.30 79.50 0.01 0.03 0.03 0.03 0.02 65.50 65.30 0.33 0.32 No Change CDNLFG17 2/13/2023 0:38 0.20 0.20 20.30 79.30 0.03 0.04 0.03 0.00 0.00 64.40 64.40 0.00 0.00 No ChangeCDNLFG182/13/2023 0:38 0.40 0.30 20.20 79.10 0.01 0.03 0.03 0.00 0.00 64.10 64.50 0.00 0.00 No Change CDNLFG19 2/13/2023 0:33 51.60 40.80 0.00 7.60 -3.87 0.26 0.26 2.22 2.19 73.20 73.30 3.08 3.06 No Change CDNLFG20 2/13/2023 0:35 47.70 40.00 0.00 12.30 -5.44 -3.45 -3.45 0.04 0.04 77.80 77.90 13.83 12.98 No ChangeCDNLFG212/13/2023 0:27 50.00 41.60 0.00 8.40 -4.82 -1.90 -1.86 0.30 0.29 81.70 81.80 37.91 37.23 No Change CDNLFG22 2/13/2023 0:25 14.70 10.40 13.70 61.20 -4.18 -0.49 -0.49 0.00 0.00 65.90 65.60 0.00 0.00 No Change CDNLFG23 2/13/2023 0:30 44.50 40.10 0.00 15.40 -4.96 0.43 0.43 0.00 0.00 66.10 66.10 0.09 0.10 No ChangeCDNLFG242/13/2023 0:21 38.60 34.00 0.00 27.40 -5.02 -0.26 -0.26 0.29 0.28 69.40 69.80 1.74 1.72 No Change CDNLFG25 2/13/2023 0:23 18.00 12.20 13.70 56.10 0.01 0.33 0.33 0.00 0.00 71.60 72.10 0.00 0.00 No ChangeCDNLFG262/13/2023 0:17 51.80 43.60 0.00 4.60 -5.08 0.83 0.83 0.00 0.01 83.90 84.40 2.70 4.93 No Change CDNLFG27 2/13/2023 0:19 42.30 37.70 0.00 20.00 -4.11 -2.71 -2.70 0.10 0.23 66.40 66.50 0.64 0.99 No Change CDNLFG28 2/13/2023 0:13 44.10 40.70 0.00 15.20 -5.89 0.61 0.62 0.01 0.00 70.80 71.00 6.11 0.00 No ChangeCDNLFG292/13/2023 0:11 47.80 42.70 0.00 9.50 -6.64 -1.74 -1.69 0.00 0.00 79.60 79.70 0.00 0.00 No ChangeCDNLFG302/13/2023 0:15 51.50 43.50 0.00 5.00 -4.18 0.60 0.61 0.00 0.00 76.90 76.90 0.00 0.00 No Change CDNLFG31 2/13/2023 2:53 43.80 39.20 0.00 17.00 -8.42 -2.90 -2.87 0.27 0.29 87.80 88.00 3.74 3.86 No ChangeCDNLFG322/13/2023 2:51 28.90 26.10 0.60 44.40 -8.00 -1.33 -1.33 0.00 0.00 69.50 69.60 0.00 0.00 No ChangeCDNLFG332/13/2023 2:55 50.00 42.20 0.00 7.80 -8.25 0.50 0.48 0.49 0.47 73.30 73.60 5.12 5.04 Opened Valve 1/2 turn or less CDNLFG34 2/13/2023 3:01 51.00 40.60 0.00 8.40 -5.48 0.54 0.54 0.35 0.31 78.70 78.70 4.30 4.04 No ChangeCDNLFG352/13/2023 2:48 36.20 30.10 0.00 33.70 -7.38 -7.48 -7.52 0.05 0.00 68.00 68.10 15.34 0.00 No Change CDNLFG36 2/13/2023 2:57 47.00 40.40 0.00 12.60 0.29 0.92 0.92 0.00 0.00 66.80 66.90 0.00 0.00 No Change CDNLFG37 2/13/2023 3:02 50.60 41.60 0.00 7.80 -7.48 0.49 0.53 1.24 1.06 82.30 82.70 14.79 13.68 No ChangeCDNLFG382/13/2023 2:46 46.90 36.20 0.00 16.90 -8.03 0.02 0.01 0.00 0.00 66.80 67.10 0.13 0.06 No ChangeCDNLFG392/13/2023 2:59 51.00 41.60 0.00 7.40 -7.23 0.72 0.72 0.16 0.16 82.10 82.20 27.93 27.93 No Change P:\O&M\City of Denton\2023\(2) February\Forms\City of Denton O&M Report Feb 2023 Weaver Consultants Group, LLC10/2/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNLFG41 2/13/2023 4:39 35.90 30.10 0.00 34.00 -8.14 0.30 0.29 0.01 0.02 76.30 77.10 3.30 4.18 No Change CDNLFG42 2/13/2023 4:41 50.80 39.20 0.00 10.00 -7.93 0.24 0.23 0.89 0.89 66.90 67.40 3.06 3.07 No Change CDNLFG43 2/13/2023 4:43 49.90 38.20 0.00 11.90 0.07 -0.10 -0.11 0.40 0.40 77.50 77.70 18.82 18.96 No ChangeDEWLCR32/13/2023 4:57 0.40 10.30 14.50 74.80 1.38 0.89 0.88 0.02 0.02 61.90 62.00 4.08 4.41 No Change DEWLCR4 2/13/2023 1:21 54.20 41.80 0.40 3.60 1.42 -3.11 -3.34 0.01 0.05 82.80 82.70 5.57 16.00 No Change DEWLCR5 2/13/2023 1:11 51.40 39.90 0.20 8.50 -14.69 -0.09 -0.11 5.84 6.45 76.10 76.10 17.62 18.51 No ChangeNotes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =139 Number of Wells with Methane > 58%=0 Total Number of Well Readings =139 Number of Wells with Oxygen ≥ 2%=29 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =17 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =63 Number of Wells with No Room to Run (NRTR)=74 P:\O&M\City of Denton\2023\(2) February\Forms\City of Denton O&M Report Feb 2023 Weaver Consultants Group, LLC10/2/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNSV001 2/13/2023 1:34 6.70 12.50 7.80 73.00 -7.85 -1.86 -1.84 0.00 0.00 68.20 68.40 0.00 0.00 No Change CDNSV002 2/13/2023 1:32 16.70 17.10 6.90 59.30 -8.37 -8.01 -8.01 0.00 0.00 67.90 68.00 0.00 0.00 No ChangeCDNSV0032/13/2023 1:29 31.50 29.20 0.80 38.50 -8.37 -4.69 -4.67 0.00 0.00 68.90 69.10 0.00 0.00 No Change CDNSV004 2/13/2023 1:27 22.10 16.60 6.60 54.70 -8.20 -7.69 -7.95 0.00 0.00 69.60 69.70 0.00 0.00 No Change CDNSV005 2/13/2023 1:25 29.20 14.70 9.30 46.80 -8.43 -5.42 -5.31 0.00 0.00 70.40 70.60 0.00 0.00 No ChangeCDNSV0062/13/2023 1:36 3.80 6.10 14.70 75.40 -8.01 -6.59 -6.57 0.01 0.03 64.90 64.80 7.31 12.07 No Change CDNSV007 2/13/2023 1:38 4.30 7.40 12.40 75.90 -8.03 -7.88 -7.90 0.00 0.00 63.30 63.60 0.00 0.00 No Change CDNSV008 2/13/2023 1:40 9.40 9.70 10.50 70.40 -8.03 -8.05 -7.99 0.00 0.00 63.30 63.60 0.00 0.00 No Change CDNSV009 2/13/2023 1:41 7.90 5.00 12.30 74.80 -7.73 -6.59 -6.59 0.00 0.00 62.10 61.90 0.00 0.00 No Change CDNSV010 2/13/2023 1:44 20.10 20.50 1.80 57.60 -7.73 -7.97 -8.03 0.00 0.00 66.00 66.10 0.00 0.00 No ChangeCDNSV0112/13/2023 1:45 2.40 1.70 19.10 76.80 -7.80 -7.75 -7.99 0.00 0.00 66.20 66.60 0.00 0.00 No Change CDNSV012 2/13/2023 1:47 15.90 20.40 1.80 61.90 -7.81 -7.52 -7.52 0.00 0.00 67.10 67.40 1.55 1.55 No Change CDNSV013 2/13/2023 1:48 23.50 18.50 4.90 53.10 -7.73 -7.59 -7.52 0.01 0.00 66.90 67.20 7.36 0.00 No ChangeCDNSV0142/13/2023 1:50 34.60 31.80 0.60 33.00 -7.71 -7.60 -7.61 0.00 0.01 66.80 67.20 4.33 4.78 No Change Soil Vapor Extraction Well Data P:\O&M\City of Denton\2023\(2) February\Forms\City of Denton O&M Report Feb 2023 Weaver Consultants Group, LLC10/2/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCGCH4 3/22/2023 22:12 49.90 34.70 0.00 15.40 0.01 -0.01 -0.01 0.01 0.01 63.60 63.60 NR NR CalibrationCDNCG0023/22/2023 22:15 0.00 0.00 11.00 89.00 0.00 0.00 0.00 0.00 0.00 63.70 63.80 NR NR Calibration CDNINLT1 3/22/2023 22:24 51.10 36.50 2.00 10.40 0.00 -16.93 -16.95 17.45 17.50 80.20 80.20 790.00 790.00 Flare Inlet CDNBLWR1 3/22/2023 22:31 49.90 35.70 1.90 12.50 0.00 1.82 1.80 0.00 0.00 91.50 91.50 790.00 790.00 Blower CDNCGCH4 3/23/2023 6:52 50.00 35.10 0.00 14.90 -0.06 0.01 0.01 0.01 0.01 74.70 74.60 NR NR Calibration CDNCG002 3/23/2023 6:57 0.00 0.00 10.70 89.30 -0.27 0.01 0.02 0.00 0.01 74.60 74.70 NR NR CalibrationCDNINLT23/23/2023 7:03 49.50 36.90 1.50 12.10 -0.11 -16.87 -16.87 17.07 17.09 80.60 82.00 825.00 825.00 Flare Inlet CDNBLWR2 3/23/2023 7:05 50.50 36.20 1.50 11.80 -0.05 1.89 1.89 0.00 0.00 90.50 90.50 825.00 825.00 Blower CDN00GHG 3/23/2023 7:05 52.20 37.10 1.70 9.00 -0.03 1.91 1.91 0.00 0.00 81.20 81.10 825.00 825.00 GHG CDNGW040 3/23/2023 6:17 0.50 0.20 20.90 78.40 -0.27 -0.02 0.02 0.04 0.00 79.50 79.40 13.46 0.00 No ChangeCDNGW0443/23/2023 5:03 4.10 3.90 20.10 71.90 -0.12 -0.62 -0.08 0.64 0.10 76.60 76.40 2.57 1.04 No ChangeCDNGW0453/23/2023 5:05 45.10 34.50 0.00 20.40 -5.88 0.89 0.89 0.87 0.87 82.60 82.70 12.41 12.42 No ChangeCDNGW0463/23/2023 4:39 53.60 37.60 0.00 8.80 2.24 1.93 1.90 0.00 0.00 85.70 86.00 0.00 0.00 No ChangeCDNGW0473/23/2023 4:24 2.10 0.80 20.60 76.50 -8.27 0.00 0.00 0.00 0.00 84.70 85.20 0.28 0.28 No ChangeCDNGW0483/23/2023 4:22 43.60 31.70 0.00 24.70 -7.80 -5.59 -5.78 1.41 0.96 93.10 93.10 8.51 7.03 No ChangeCDNGW0493/23/2023 4:06 0.10 0.00 21.20 78.70 0.17 0.01 0.03 0.04 0.00 84.00 84.10 14.51 0.00 No ChangeCDNGW0503/23/2023 4:21 40.80 30.00 0.00 29.20 -6.88 -5.76 -5.40 5.90 5.70 93.00 93.10 31.62 31.11 No ChangeCDNGW0513/23/2023 4:10 57.60 40.00 0.00 2.40 0.09 2.37 2.37 2.33 2.33 87.70 87.80 11.09 11.08 No ChangeCDNGW0523/23/2023 4:08 39.00 26.90 0.00 34.10 0.86 2.21 2.24 2.15 2.20 88.90 89.00 19.42 19.62 No ChangeCDNGW0543/23/2023 2:50 0.10 0.10 20.80 79.00 0.13 -0.01 -0.02 0.00 0.02 83.00 83.30 3.11 8.52 No ChangeCDNGW0553/23/2023 2:44 56.40 35.20 0.00 8.40 4.79 4.70 4.75 0.09 0.02 87.70 87.90 0.95 0.48 No ChangeCDNGW0573/23/2023 2:42 56.50 38.40 0.00 5.10 4.39 4.19 4.25 4.09 4.15 82.70 82.40 14.75 14.87 No ChangeCDNGW0583/23/2023 2:38 53.10 38.40 0.00 8.50 0.00 5.60 5.64 5.46 5.48 85.00 85.20 69.43 69.58 No ChangeCDNGW0593/23/2023 2:35 2.20 0.80 20.60 76.40 0.00 0.04 0.06 0.01 0.04 83.80 84.20 0.85 1.49 No Change CDNGW060 3/23/2023 2:34 53.70 38.50 0.00 7.80 0.21 2.40 2.42 0.03 0.02 85.40 85.60 1.19 1.02 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data P:\O&M\City of Denton\2023\(3) March\Forms\City of Denton O&M Report March 2023.xlsx Weaver Consultants Group, LLC 3/27/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW061 3/23/2023 2:33 1.70 0.70 20.60 77.00 0.00 0.00 0.01 0.14 0.05 82.30 82.30 10.95 6.43 No ChangeCDNGW0623/23/2023 2:36 32.30 25.40 0.00 42.30 0.28 -0.66 -0.74 0.70 0.76 89.60 89.70 11.02 11.53 No ChangeCDNGW0633/23/2023 2:41 54.30 39.70 0.00 6.00 0.00 5.38 5.44 0.14 0.03 84.00 83.60 26.67 11.26 No ChangeCDNGW0643/23/2023 2:46 53.10 38.60 0.00 8.30 0.00 3.69 3.71 3.58 3.61 86.50 86.40 25.13 25.22 No ChangeCDNGW0653/23/2023 4:07 0.00 0.00 21.20 78.80 0.00 -0.02 0.04 0.01 0.04 83.50 83.60 7.86 14.26 No ChangeCDNGW0663/23/2023 4:19 42.50 31.60 0.00 25.90 -6.50 -6.40 -4.67 0.06 0.05 87.00 87.20 7.25 6.85 No ChangeCDNGW0673/23/2023 4:25 51.00 36.70 0.00 12.30 -5.77 -4.63 -4.76 5.18 4.96 99.20 99.10 65.94 64.53 No ChangeCDNGW0683/23/2023 4:41 29.60 19.70 9.00 41.70 -5.37 -1.39 -1.36 0.03 0.02 86.50 86.60 3.47 2.83 No ChangeCDNGW0743/23/2023 5:17 42.40 28.60 0.00 29.00 -7.66 -0.17 -0.18 0.41 0.42 82.30 82.40 1.31 1.33 No ChangeCDNGW0753/23/2023 5:19 47.90 35.00 0.00 17.10 -8.45 -0.30 -0.51 0.83 1.00 90.80 90.90 6.57 7.21 No ChangeCDNGW0763/23/2023 5:21 56.80 37.40 0.00 5.80 -7.34 -0.93 -0.93 0.88 0.88 98.50 98.60 64.08 64.08 No ChangeCDNGW0773/23/2023 5:28 40.10 29.30 0.00 30.60 0.22 0.93 0.96 0.90 0.93 84.00 83.90 28.15 28.63 No Change CDNGW078 3/23/2023 4:50 55.70 34.80 0.00 9.50 1.13 1.25 1.29 1.21 1.26 82.90 83.10 3.53 3.60 No Change CDNGW079 3/23/2023 4:52 54.70 38.20 0.00 7.10 -7.84 -0.21 -0.21 0.21 0.21 88.00 NR 3.32 3.32 No Change CDNGW080 3/23/2023 4:54 48.70 36.00 0.00 15.30 -2.37 -0.24 -0.20 0.26 0.32 99.00 99.10 14.90 16.58 No Change CDNGW081 3/23/2023 4:55 53.80 36.90 0.30 9.00 -7.99 0.52 0.52 0.50 0.50 83.80 84.20 1.45 1.45 No Change CDNGW082 3/23/2023 4:57 40.80 28.40 0.00 30.80 0.24 -2.86 -2.95 2.86 2.89 86.20 86.00 49.78 50.10 No ChangeCDNGW0833/23/2023 4:58 43.80 33.50 0.00 22.70 1.31 0.84 0.88 0.88 0.92 82.60 83.00 20.77 21.23 No ChangeCDNGW0843/23/2023 5:00 52.40 36.60 0.10 10.90 -7.80 -1.46 -1.49 1.48 1.49 93.80 93.90 8.73 8.76 No ChangeCDNGW0853/23/2023 5:13 31.50 26.70 3.00 38.80 -8.15 0.46 0.32 1.13 1.27 83.30 83.50 31.61 33.45 No ChangeCDNGW0863/23/2023 5:15 53.70 38.10 0.00 8.20 -7.92 0.67 0.60 0.41 0.48 85.20 85.30 19.01 20.54 No ChangeCDNGW0873/23/2023 5:02 53.00 36.20 0.00 10.80 -7.27 0.65 0.70 0.64 0.68 87.40 87.70 5.81 5.99 No ChangeCDNGW0883/23/2023 4:43 42.40 34.20 0.00 23.40 -6.73 -1.66 -1.66 1.60 1.60 98.40 98.30 27.48 27.48 No ChangeCDNGW0893/23/2023 4:45 53.30 38.00 0.00 8.70 0.64 0.28 0.29 0.26 0.26 85.50 85.50 11.15 11.21 No ChangeCDNGW0903/23/2023 4:47 46.40 31.10 0.00 22.50 0.73 0.64 0.64 0.84 0.83 84.50 84.60 27.18 26.95 No ChangeCDNGW0913/23/2023 4:49 41.90 30.10 0.00 28.00 -7.93 0.15 0.16 1.11 1.10 104.90 105.00 22.85 22.72 No ChangeCDNGW0923/23/2023 4:36 49.80 38.20 0.00 12.00 -5.99 -4.34 -4.19 4.36 4.27 104.40 104.50 146.13 144.49 No ChangeCDNGW0933/23/2023 4:34 31.10 23.30 3.30 42.30 -7.18 -5.96 -4.17 6.21 4.11 106.30 106.30 53.26 43.51 No ChangeCDNGW0943/23/2023 4:32 42.60 30.10 0.00 27.30 0.00 0.38 0.37 0.01 0.01 93.70 93.80 3.43 3.36 No ChangeCDNGW0953/23/2023 4:26 57.80 39.30 0.10 2.80 0.00 -0.12 -0.11 0.03 0.01 83.00 82.90 12.35 4.84 No ChangeCDNGW0963/23/2023 4:28 53.70 38.80 0.00 7.50 -5.96 0.23 0.20 0.01 0.07 95.20 95.50 3.02 7.74 No ChangeCDNGW0973/23/2023 4:29 54.00 37.60 8.40 0.00 0.00 0.02 -0.04 0.05 0.03 80.20 81.10 16.35 11.72 No ChangeCDNGW0983/23/2023 4:30 52.10 39.50 0.00 8.40 -6.18 0.40 0.40 1.01 1.01 108.20 108.40 29.18 29.20 No ChangeCDNGW0993/23/2023 4:17 45.70 31.20 0.00 23.10 2.02 1.60 1.64 1.60 1.60 83.70 83.80 27.98 27.95 No ChangeCDNGW1003/23/2023 4:15 41.30 30.00 0.00 28.70 2.48 2.22 2.20 2.17 2.17 86.70 86.60 32.48 32.49 No ChangeCDNGW1013/23/2023 4:14 49.00 37.40 0.00 13.60 2.71 2.33 2.33 2.28 2.29 81.50 81.70 45.01 45.08 No ChangeCDNGW1023/23/2023 4:11 36.00 23.40 0.00 40.60 0.04 4.57 4.68 4.52 4.57 86.10 86.50 4.35 4.38 No Change CDNGW106 3/23/2023 5:25 3.30 16.40 0.70 79.60 3.50 -0.22 -0.18 0.04 0.03 82.60 82.70 4.42 3.93 No Change CDNGW107 3/23/2023 5:30 48.90 36.40 0.00 14.70 -8.49 -1.17 -1.18 0.04 0.22 107.00 107.00 5.63 13.57 No Change CDNGW108 3/23/2023 5:32 49.80 37.60 0.00 12.60 -8.80 -0.77 -1.07 0.46 0.50 110.50 111.10 8.74 9.14 No Change CDNGW109 3/23/2023 5:33 51.10 39.10 0.00 9.80 -9.52 -4.57 -4.57 0.53 0.53 115.80 116.00 15.56 15.56 No Change P:\O&M\City of Denton\2023\(3) March\Forms\City of Denton O&M Report March 2023.xlsx Weaver Consultants Group, LLC 3/27/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW110 3/23/2023 5:35 46.10 36.50 0.00 17.40 -9.82 -3.54 -3.76 0.08 0.20 115.30 115.30 8.01 12.91 No ChangeCDNGW1113/23/2023 5:37 50.70 39.80 0.00 9.50 -9.63 -0.90 -1.16 0.00 0.26 108.40 108.50 1.13 14.84 No ChangeCDNGW1123/23/2023 5:39 42.00 37.50 0.00 20.50 -9.46 -0.85 -0.91 0.70 0.75 105.20 105.20 10.92 11.30 No ChangeCDNGW1133/23/2023 5:40 42.80 37.50 0.00 19.70 -9.72 -0.94 -0.55 0.52 0.14 104.00 104.20 9.41 4.93 No ChangeCDNGW1143/23/2023 5:42 41.70 34.60 0.00 23.70 -9.76 -1.48 -1.53 0.93 0.88 113.20 113.40 12.48 12.08 No ChangeCDNGW1153/23/2023 5:43 46.50 37.20 0.00 16.30 -10.78 -1.74 -1.79 0.05 0.09 109.50 109.60 4.77 6.49 No ChangeCDNGW1163/23/2023 5:45 49.00 38.60 0.00 12.40 -10.46 -0.97 -0.44 0.38 0.15 108.00 108.10 13.35 8.47 No ChangeCDNGW1173/23/2023 5:47 49.30 37.60 0.00 13.10 -10.23 -0.88 -0.70 0.91 0.68 108.30 108.30 12.35 10.73 No ChangeCDNGW1183/23/2023 6:02 53.70 41.00 0.00 5.30 -10.20 -0.85 -0.99 0.30 0.23 105.50 105.50 7.13 6.29 No ChangeCDNGW119R3/23/2023 5:49 1.40 0.70 20.70 77.20 -10.63 -0.39 -0.24 0.30 0.17 79.30 79.30 1.77 1.31 No ChangeCDNGW120R3/23/2023 5:50 41.80 32.10 0.00 26.10 -10.72 -9.90 -9.89 0.56 0.40 79.60 79.60 2.37 2.01 No ChangeCDNGW121R3/23/2023 5:51 7.20 7.20 16.90 68.70 -10.56 4.40 4.41 0.07 0.01 81.50 81.60 19.30 7.45 No Change CDNGW122R 3/23/2023 5:53 0.60 2.10 20.00 77.30 -10.75 16.63 16.66 0.18 0.01 81.00 81.00 31.18 7.56 No Change CDNGW123R 3/23/2023 5:55 0.20 0.30 20.70 78.80 -10.93 -0.52 -0.49 0.38 0.39 81.50 81.50 44.37 45.20 No Change CDNGW124R 3/23/2023 5:57 21.50 16.90 10.80 50.80 -10.40 0.58 0.40 0.61 0.43 80.60 80.80 56.38 47.32 No Change CDNGW125R 3/23/2023 5:58 4.40 11.20 11.90 72.50 -10.47 3.38 3.60 3.30 3.51 81.40 81.40 131.09 135.25 No Change CDNGW126R 3/23/2023 5:58 0.40 10.80 18.80 70.00 -10.76 2.07 2.08 2.02 2.15 81.70 81.70 102.62 105.67 No ChangeCDNHZ0013/23/2023 1:26 55.90 37.20 0.00 6.90 -7.80 -7.04 -6.97 0.00 0.01 81.60 81.60 0.00 6.22 No ChangeCDNHZ0023/23/2023 1:28 49.00 31.80 0.00 19.20 -8.04 -7.39 -7.31 0.02 0.02 85.20 85.10 8.76 9.41 No ChangeCDNHZ0033/23/2023 1:30 48.90 34.80 0.00 16.30 -8.04 -2.43 -2.43 0.02 0.02 83.10 82.90 9.66 9.41 No ChangeCDNHZ0053/23/2023 1:32 49.00 32.70 0.30 18.00 -7.70 -6.30 -6.29 0.01 0.01 84.60 84.60 7.88 7.89 No ChangeCDNHZ0063/23/2023 1:34 42.40 31.70 0.00 25.90 -7.95 7.48 7.97 0.28 0.03 87.50 87.60 37.19 11.45 No ChangeCDNHZ0073/23/2023 1:35 48.20 29.20 0.00 22.60 -8.03 0.60 0.61 0.02 0.02 89.80 90.00 9.58 8.49 No ChangeCDNHZ0083/23/2023 1:37 45.50 34.00 0.00 20.50 -8.04 -2.44 -2.42 0.02 0.01 86.30 86.40 8.45 8.02 No ChangeCDNHZ0103/23/2023 1:38 50.60 36.30 0.00 13.10 -7.99 -7.90 -7.95 0.04 0.00 80.60 79.90 12.98 0.00 No ChangeCDNHZ0113/23/2023 1:40 17.10 8.90 14.60 59.40 -7.72 -7.48 -7.44 0.02 0.01 87.30 87.50 9.13 4.57 No ChangeCDNHZ0123/23/2023 1:42 12.90 28.10 0.70 58.30 -8.37 2.24 2.25 0.03 0.03 90.30 90.40 12.63 11.66 No ChangeCDNHZ0143/23/2023 1:44 46.00 34.80 0.00 19.20 -8.21 -5.14 -5.10 0.03 0.03 87.40 87.50 12.15 11.25 No ChangeCDNHZ0153/23/2023 1:45 53.30 36.90 0.00 9.80 -7.76 -5.75 -5.69 0.02 0.02 86.30 86.40 9.83 9.33 No ChangeCDNHZ0173/23/2023 1:47 41.40 27.40 4.70 26.50 -7.87 -7.54 -7.82 0.03 0.02 89.10 89.20 11.01 10.19 No ChangeCDNHZ0183/23/2023 1:48 9.90 18.70 0.00 71.40 -8.08 1.51 1.61 0.05 0.01 89.90 90.00 15.91 7.61 No ChangeCDNHZ0193/23/2023 1:50 55.10 38.20 0.40 6.30 -7.55 -7.37 -7.44 0.02 0.01 87.60 87.60 9.69 7.91 No ChangeCDNHZ0203/23/2023 1:52 50.60 35.10 0.00 14.30 -7.57 -7.46 -7.48 0.03 0.03 85.10 85.20 12.39 11.21 No ChangeCDNHZ0213/23/2023 1:53 47.30 21.70 0.00 31.00 -8.00 2.59 0.67 0.01 0.00 89.00 87.00 8.00 0.00 Opened Valve 1/2 to 1 turn CDNHZ022 3/23/2023 1:55 62.90 25.40 0.20 11.50 -7.85 -7.82 -7.48 0.00 0.02 86.60 87.00 0.00 10.22 No Change P:\O&M\City of Denton\2023\(3) March\Forms\City of Denton O&M Report March 2023.xlsx Weaver Consultants Group, LLC 3/27/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ023 3/23/2023 1:56 48.30 35.40 0.90 15.40 -8.06 -7.88 -7.86 0.02 0.02 87.00 87.10 9.13 9.86 No ChangeCDNHZ0253/23/2023 1:57 49.90 36.40 0.20 13.50 -7.89 -7.71 -7.99 0.00 0.00 86.00 86.20 0.00 0.00 No ChangeCDNHZ0263/23/2023 1:59 46.20 32.70 0.70 20.40 -7.46 -7.39 -7.28 0.02 0.02 87.10 87.40 10.38 9.63 No ChangeCDNHZ0293/23/2023 2:00 35.90 16.60 6.40 41.10 -7.82 -7.71 -7.82 0.00 0.05 86.10 86.30 0.00 15.60 No ChangeCDNHZ0303/23/2023 2:02 53.10 35.50 0.90 10.50 0.05 4.58 4.52 0.05 0.02 88.50 88.90 16.18 9.39 No ChangeCDNHZ0313/23/2023 2:03 5.10 23.50 2.20 69.20 -7.71 3.63 3.69 0.04 0.01 89.30 89.50 13.43 7.16 No ChangeCDNHZ0323/23/2023 2:05 31.30 22.40 7.40 38.90 -7.85 2.73 2.73 0.05 0.04 88.40 88.50 15.28 14.10 No ChangeCDNHZ0333/23/2023 2:07 30.00 25.70 0.00 44.30 -7.91 7.46 7.44 0.05 0.01 89.20 89.40 16.15 7.72 No ChangeCDNHZ0343/23/2023 2:09 52.20 37.30 0.00 10.50 -7.91 -6.80 -6.80 0.02 0.01 76.90 76.70 9.24 5.96 No ChangeCDNHZ0353/23/2023 2:10 40.40 27.70 0.30 31.60 0.20 -1.47 -1.47 0.02 0.02 83.90 NR 9.55 9.55 No ChangeCDNHZ0363/23/2023 2:12 53.30 38.20 0.20 8.30 -7.60 -4.13 -4.16 0.02 0.02 87.90 88.00 9.33 8.40 No Change CDNLFG02 3/22/2023 23:34 52.30 38.60 0.00 9.10 -2.54 0.23 0.22 0.01 0.01 76.10 76.10 7.92 8.24 No ChangeCDNLFG033/22/2023 23:32 47.20 36.40 0.00 16.40 -2.48 -0.18 -0.18 0.96 0.95 77.50 77.50 3.15 3.14 No Change CDNLFG05 3/22/2023 23:35 53.50 38.40 0.00 8.10 -2.07 -1.16 -1.04 0.79 0.68 81.70 81.80 61.68 56.99 No ChangeCDNLFG063/22/2023 23:18 57.40 37.20 0.00 5.40 -2.42 0.13 0.09 0.63 1.32 77.70 77.90 1.63 2.36 Opened Valve 1/2 turn or less CDNLFG07 3/22/2023 23:29 0.10 0.10 20.90 78.90 0.00 -0.11 -0.09 0.00 0.00 77.30 77.10 2.71 3.32 No Change CDNLFG08 3/22/2023 23:28 0.20 0.10 20.90 78.80 0.00 -0.07 -0.05 0.01 0.02 77.10 77.10 0.18 0.28 No Change CDNLFG16 3/23/2023 6:17 0.20 0.20 20.50 79.10 -0.10 0.02 0.02 0.00 0.01 79.20 79.10 0.11 0.14 No Change CDNLFG17 3/22/2023 23:27 0.20 0.20 20.90 78.70 0.02 -0.01 -0.03 0.00 0.00 76.20 76.20 0.00 0.00 No ChangeCDNLFG183/22/2023 23:26 0.50 0.30 20.80 78.40 0.00 0.00 -0.01 0.00 0.00 76.40 76.50 0.00 0.00 No Change CDNLFG19 3/22/2023 23:20 49.40 37.30 0.00 13.30 -2.68 0.09 0.09 1.41 1.13 74.60 74.40 2.45 2.19 No ChangeCDNLFG203/22/2023 23:23 53.80 39.00 0.00 7.20 -2.05 -1.84 -1.82 0.02 0.02 76.40 76.50 10.28 9.36 No Change CDNLFG21 3/22/2023 23:08 56.20 39.60 0.00 4.20 -3.90 -1.47 -1.50 0.04 0.07 81.30 81.30 13.09 18.05 No Change CDNLFG22 3/22/2023 23:10 51.00 35.30 0.40 13.30 -2.07 -0.51 -0.51 0.02 0.02 73.90 74.40 8.80 8.80 No Change CDNLFG23 3/22/2023 23:16 55.30 38.10 0.00 6.60 -2.75 0.12 0.13 0.67 1.25 80.40 80.40 1.68 2.29 Opened Valve 1/2 turn or less CDNLFG24 3/22/2023 23:13 50.90 36.10 0.00 13.00 -1.99 -0.23 -0.23 0.07 0.07 76.70 76.80 0.83 0.84 No Change CDNLFG25 3/22/2023 23:06 0.30 0.30 21.00 78.40 0.00 0.01 0.01 0.00 0.00 74.70 75.00 1.11 0.00 No Change CDNLFG26 3/22/2023 23:01 52.30 43.10 0.00 4.60 -2.35 0.21 0.05 0.00 0.00 86.50 88.30 0.00 0.00 Opened Valve > 1 turnCDNLFG273/22/2023 23:04 55.80 39.20 0.00 5.00 -2.24 -1.95 -1.95 0.03 0.03 69.10 69.10 0.37 0.36 No Change CDNLFG28 3/22/2023 22:54 52.80 42.70 0.00 4.50 -3.92 0.43 -0.05 0.01 0.03 74.80 72.40 7.85 12.66 No ChangeCDNLFG293/22/2023 22:51 56.20 42.40 0.00 1.40 -3.75 -1.34 -1.19 0.08 0.01 79.50 79.60 19.99 6.03 No ChangeCDNLFG303/22/2023 22:57 54.10 43.60 0.00 2.30 -3.59 0.47 -0.19 0.03 0.27 78.30 79.30 12.02 36.27 Opened Valve 1/2 to 1 turn CDNLFG31 3/23/2023 2:19 49.20 40.00 0.00 10.80 -7.98 -3.90 -3.90 0.13 0.14 89.40 89.40 2.63 2.67 No Change CDNLFG32 3/23/2023 2:17 26.10 25.50 3.50 44.90 0.00 -1.43 -1.44 0.00 0.00 87.50 87.80 0.00 0.00 No Change CDNLFG33 3/23/2023 2:22 53.00 40.70 0.00 6.30 -7.65 -0.18 -0.18 0.13 0.13 83.50 NR 2.59 2.59 No Change CDNLFG34 3/23/2023 2:28 50.70 37.70 0.00 11.60 -5.71 0.22 0.21 0.03 0.04 85.20 85.20 1.19 1.38 No ChangeCDNLFG353/23/2023 2:15 10.00 3.50 17.10 69.40 -7.08 -6.57 -6.84 6.87 7.25 87.30 87.50 178.50 183.22 No Change CDNLFG36 3/23/2023 2:24 54.50 41.60 0.20 3.70 0.11 0.60 0.63 0.00 0.00 89.20 89.40 0.00 0.00 No ChangeCDNLFG373/23/2023 2:30 54.60 41.30 0.00 4.10 -6.60 0.00 -0.05 0.00 0.05 84.30 84.20 0.79 3.05 Opened Valve 1/2 turn or less CDNLFG38 3/23/2023 2:13 35.60 28.50 0.40 35.50 -6.40 -0.07 -0.04 0.03 0.01 84.70 84.70 0.35 0.21 No Change CDNLFG39 3/23/2023 2:26 48.20 36.60 0.00 15.20 -6.69 -0.12 -0.09 0.15 0.21 81.90 82.00 26.85 31.70 No Change P:\O&M\City of Denton\2023\(3) March\Forms\City of Denton O&M Report March 2023.xlsx Weaver Consultants Group, LLC 3/27/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNLFG41 3/23/2023 5:07 47.20 34.10 0.00 18.70 -7.27 -0.47 0.01 1.24 1.46 82.40 82.50 33.07 35.81 No Change CDNLFG42 3/23/2023 5:09 53.40 39.00 0.00 7.60 -7.71 -0.16 -0.51 0.88 0.49 73.60 73.60 3.03 2.26 No ChangeCDNLFG433/23/2023 5:11 57.90 40.00 0.10 2.00 1.43 0.70 0.74 0.67 0.72 76.40 76.30 24.44 25.30 No Change DEWLCR3 3/23/2023 5:24 0.40 5.40 17.40 76.80 4.52 3.43 3.47 0.50 0.47 83.00 83.00 21.06 20.39 No Change DEWLCR4 3/23/2023 0:28 49.00 36.90 1.00 13.10 0.88 -4.46 -4.64 0.05 0.04 84.50 84.50 15.34 13.32 No Change DEWLCR5 3/23/2023 0:24 50.30 37.10 2.80 9.80 -15.05 -0.36 -0.36 6.13 6.29 78.40 78.30 18.01 18.24 No Change Notes:1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =139 Number of Wells with Methane > 58%=1 Total Number of Well Readings =139 Number of Wells with Oxygen ≥ 2%=32 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =20 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =59 Number of Wells with No Room to Run (NRTR)=82 P:\O&M\City of Denton\2023\(3) March\Forms\City of Denton O&M Report March 2023.xlsx Weaver Consultants Group, LLC 3/27/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNSV001 3/23/2023 0:39 12.10 13.80 7.10 67.00 -7.61 -2.45 -2.45 0.01 0.01 83.70 83.90 6.28 5.99 No ChangeCDNSV0023/23/2023 0:37 19.10 17.90 6.10 56.90 -7.63 -7.31 -7.31 0.01 0.01 80.70 80.80 7.74 7.19 No Change CDNSV003 3/23/2023 0:33 29.60 25.50 1.90 43.00 -7.50 -5.12 -5.10 0.02 0.01 83.60 83.60 8.83 7.53 No Change CDNSV004 3/23/2023 0:32 19.80 15.00 4.90 60.30 -7.55 -6.80 -6.80 0.01 0.01 83.50 83.50 7.73 7.50 No Change CDNSV005 3/23/2023 0:30 30.90 15.80 8.00 45.30 -7.50 -5.14 -5.13 0.01 0.01 82.50 82.50 7.30 6.53 No Change CDNSV006 3/23/2023 0:40 5.40 4.50 16.40 73.70 -7.33 -5.14 -5.13 0.04 0.03 81.10 79.80 12.79 12.14 No ChangeCDNSV0073/23/2023 0:43 5.70 7.70 13.50 73.10 -7.59 -6.80 -6.81 0.00 0.01 77.30 77.20 4.44 4.69 No Change CDNSV008 3/23/2023 0:44 5.10 4.80 11.80 78.30 -7.71 -7.11 -7.11 0.01 0.01 78.20 78.20 7.62 7.62 No ChangeCDNSV0093/23/2023 0:46 6.50 4.70 15.80 73.00 -7.33 -6.06 -6.08 0.01 0.01 78.90 78.80 5.33 4.87 No Change CDNSV010 3/23/2023 0:52 13.90 11.30 2.10 72.70 -7.18 -6.80 -6.80 0.04 0.03 81.50 81.50 12.73 11.27 No ChangeCDNSV0113/23/2023 0:54 3.90 8.10 8.70 79.30 -7.72 -7.31 -7.48 0.01 0.00 82.80 83.00 7.25 0.00 No Change CDNSV012 3/23/2023 0:56 10.20 10.10 11.80 67.90 -7.50 -6.80 -6.80 0.01 0.01 83.20 83.30 6.49 5.30 No Change CDNSV013 3/23/2023 0:58 22.80 18.20 7.90 51.10 -7.56 -7.37 -7.39 0.01 0.01 83.30 83.50 7.58 7.49 No Change CDNSV014 3/23/2023 1:00 36.90 30.20 1.60 31.30 -7.35 -7.12 -7.22 0.01 0.02 82.90 83.10 8.17 10.59 No Change Soil Vapor Extraction Well Data P:\O&M\City of Denton\2023\(3) March\Forms\City of Denton O&M Report March 2023.xlsx Weaver Consultants Group, LLC 3/27/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCG002 4/5/2023 9:04 0.00 0.00 11.20 88.80 0.02 0.00 0.00 0.00 0.00 79.10 79.40 NR NR CalibrationCDNCGCH44/5/2023 9:07 50.40 35.20 0.00 14.40 -0.01 0.00 0.00 0.00 0.00 79.90 80.90 NR NR Calibration CDNINLT1 4/5/2023 9:37 46.10 33.80 2.90 17.20 0.27 -18.97 -19.00 18.76 18.77 58.90 59.20 710.00 710.00 Flare Inlet CDNBLWR1 4/5/2023 9:39 46.00 33.90 2.80 17.30 0.26 1.57 1.60 0.00 0.00 56.00 56.10 710.00 710.00 Blower CDNCG002 4/5/2023 21:17 0.00 0.00 11.70 88.30 0.33 0.02 0.00 0.00 0.00 69.10 72.40 NR NR Calibration CDNCGCH4 4/5/2023 21:19 50.20 35.10 0.00 14.70 0.00 0.00 0.00 0.00 0.00 77.20 78.80 NR NR CalibrationCDNINLT24/5/2023 21:22 47.90 33.70 2.40 16.00 0.25 -18.48 -18.43 18.48 18.48 62.90 62.50 750.00 750.00 Flare Inlet CDNBLWR2 4/5/2023 21:25 47.90 33.80 2.40 15.90 0.27 1.66 1.67 0.00 0.00 61.30 61.60 750.00 750.00 Blower CDN00GHG 4/5/2023 21:26 48.00 34.40 2.40 15.20 0.27 1.68 1.66 0.00 0.00 61.70 61.10 750.00 750.00 GHG CDNGW040 4/5/2023 21:09 0.00 0.00 22.40 77.60 0.00 0.00 0.00 0.00 0.00 64.40 64.80 0.00 0.00CDNGW0444/5/2023 15:06 59.60 40.40 0.00 0.00 -1.75 -0.22 -0.21 0.96 0.95 73.90 73.90 3.16 3.15 No Change,Valve completely closedCDNGW0454/5/2023 15:11 59.40 39.30 0.00 1.30 -7.43 -0.18 -0.16 0.21 0.21 79.20 79.20 6.18 6.05 No ChangeCDNGW0464/5/2023 15:18 29.70 19.70 10.90 39.70 0.02 -0.41 -0.42 0.00 0.01 68.10 68.10 1.74 2.24 No ChangeCDNGW0474/5/2023 15:22 0.30 0.20 22.20 77.30 -8.64 -0.94 -0.93 0.02 0.02 63.70 64.20 0.95 1.00 No Change,Valve completely closedCDNGW0484/5/2023 15:25 59.50 40.30 0.00 0.20 -8.33 -7.30 -7.36 0.81 0.85 89.70 89.80 6.46 6.60 No ChangeCDNGW0494/5/2023 15:41 NR NR NR NR 0.56 0.06 NR 0.00 NR 73.60 NR 0.00 NRCDNGW0504/5/2023 15:29 59.40 40.60 0.00 0.00 -7.06 -7.07 -6.96 7.23 7.16 88.80 88.80 35.05 34.89 No ChangeCDNGW0514/5/2023 17:05 45.60 32.00 5.10 17.30 0.79 0.47 0.48 0.01 0.00 72.10 72.10 0.63 0.40 No ChangeCDNGW0524/5/2023 15:38 54.90 38.20 1.00 5.90 0.71 -0.37 -0.36 0.40 0.40 72.20 72.20 8.46 8.43 No ChangeCDNGW0544/5/2023 15:41 NR NR NR NR 0.26 0.03 NR 0.03 NR 68.80 NR 11.93 NRCDNGW0554/5/2023 15:47 63.20 36.80 0.00 0.00 2.52 2.01 2.01 0.00 0.00 77.10 76.70 0.19 0.09 No ChangeCDNGW0574/5/2023 15:50 60.60 39.40 0.00 0.00 2.51 1.94 1.96 0.02 0.02 77.20 77.30 1.00 0.97 No ChangeCDNGW0584/5/2023 15:53 60.30 39.10 0.00 0.60 3.08 2.32 2.35 0.01 0.01 79.80 80.00 3.13 2.85CDNGW0594/5/2023 20:12 NR NR NR NR -0.04 0.02 0.02 0.02 0.02 72.60 72.40 1.14 1.11 CDNGW060 4/5/2023 15:57 59.40 39.40 0.00 1.20 1.32 0.65 0.66 0.01 0.01 73.30 73.40 0.87 0.69 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data P:\O&M\City of Denton\2023\(4) April\Forms\City of Denton O&M Report April 2023.xlsx Weaver Consultants Group, LLC 4/9/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW061 4/5/2023 15:58 NR NR NR NR 0.68 0.13 NR 0.00 NR 70.00 NR 0.35 NRCDNGW0624/5/2023 20:15 55.90 39.30 0.00 4.80 -0.04 -3.35 -3.15 2.01 3.01 71.60 71.40 18.96 23.18 No ChangeCDNGW0634/5/2023 16:45 NR NR NR NR 0.37 0.04 0.04 0.00 0.00 78.30 78.50 0.00 0.00CDNGW0644/5/2023 16:49 59.00 41.00 0.00 0.00 2.21 1.96 1.94 0.14 0.14 81.70 81.60 4.90 5.06 No ChangeCDNGW0654/5/2023 16:52 NR NR NR NR -0.04 0.00 0.00 0.00 0.00 75.00 75.90 0.00 0.00CDNGW0664/5/2023 17:10 59.30 40.10 0.00 0.60 -6.32 -6.54 -6.79 0.01 0.03 72.70 73.00 3.16 4.95 No ChangeCDNGW0674/5/2023 20:03 54.60 34.20 0.00 11.20 -7.12 -7.00 -6.36 6.87 6.27 90.80 92.60 76.16 72.77 No ChangeCDNGW0684/5/2023 18:02 51.90 36.00 0.00 12.10 -8.04 -3.41 -3.42 0.03 0.02 76.30 76.60 3.88 3.31 No ChangeCDNGW0744/5/2023 14:54 49.00 35.60 0.00 15.40 -8.54 -0.37 -0.35 0.48 0.54 75.50 75.50 1.43 1.51 Opened Valve 1/2 turn or lessCDNGW0754/5/2023 14:51 51.20 35.90 0.00 12.90 -8.72 -0.81 -0.81 0.23 0.17 86.70 86.70 3.46 2.95 No ChangeCDNGW0764/5/2023 14:49 52.40 38.50 0.00 9.10 -8.16 -1.46 -1.50 0.85 0.85 97.90 98.10 62.94 62.88 No ChangeCDNGW0774/5/2023 18:31 48.60 32.10 4.10 15.20 -0.34 -0.31 -0.32 0.00 0.00 72.80 72.40 1.17 1.17 No Change CDNGW078 4/5/2023 18:24 61.60 37.90 0.00 0.50 0.77 -0.39 -0.39 0.33 0.33 66.90 66.60 1.86 1.88 No Change,Valve completely closed CDNGW079 4/5/2023 18:20 56.80 38.20 0.00 5.00 -8.90 -1.56 -1.55 0.07 0.08 83.00 83.40 1.98 2.03 No Change CDNGW080 4/5/2023 18:18 54.50 38.20 0.00 7.30 -5.94 -1.70 -1.70 0.02 0.01 95.90 96.10 3.64 2.06 No Change CDNGW081 4/5/2023 18:15 19.10 12.40 15.40 53.10 -8.65 -0.73 -0.73 0.01 0.01 72.40 72.40 0.17 0.17 No Change,Valve completely closed CDNGW082 4/5/2023 18:15 18.10 12.00 15.00 54.90 -8.19 -0.75 -0.76 0.01 0.01 72.60 72.50 2.69 2.33 No ChangeCDNGW0834/5/2023 18:11 0.00 0.00 21.90 78.10 -0.19 -0.07 -0.08 0.03 0.03 68.30 68.50 3.95 3.59 No ChangeCDNGW0844/5/2023 18:08 59.90 39.40 0.00 0.70 -8.90 -3.01 -3.07 3.02 3.06 90.40 90.50 12.49 12.56 No ChangeCDNGW0854/5/2023 15:02 52.30 37.10 0.00 10.60 -8.35 -0.02 -0.05 0.02 0.02 73.70 77.90 4.01 3.94 Opened Valve 1/2 turn or lessCDNGW0864/5/2023 14:57 58.50 38.80 0.30 2.40 -8.44 -0.01 -0.01 0.02 0.01 69.60 69.80 3.82 3.18 No Change,Valve completely closedCDNGW0874/5/2023 18:05 59.70 38.90 0.00 1.40 -8.29 -0.89 -0.89 0.04 0.05 83.70 83.70 1.40 1.55 No ChangeCDNGW0884/5/2023 17:59 50.10 37.10 0.00 12.80 -7.58 -3.11 -3.12 0.46 0.41 96.70 96.70 14.79 13.84 No ChangeCDNGW0894/5/2023 17:56 0.00 0.00 20.80 79.20 -2.22 -1.53 -1.53 0.01 0.01 71.40 71.40 2.34 2.60 No Change,Valve completely closedCDNGW0904/5/2023 17:53 8.50 5.80 18.90 66.80 1.02 -0.83 -0.82 0.01 0.01 69.00 69.10 2.61 3.38 No Change,Valve completely closedCDNGW0914/5/2023 18:27 57.80 39.40 0.00 2.80 -9.03 -1.16 -1.16 0.76 0.76 102.10 102.10 18.95 18.90 No ChangeCDNGW0924/5/2023 19:54 54.60 39.10 0.00 6.30 -9.80 -6.49 -6.60 0.17 0.28 102.40 102.30 28.60 37.43 No ChangeCDNGW0934/5/2023 17:41 54.80 39.60 0.00 5.60 -8.62 -2.98 -3.74 0.81 1.48 103.80 104.00 19.49 26.21 No ChangeCDNGW0944/5/2023 17:45 54.90 37.40 0.00 7.70 -8.25 -0.98 -0.98 0.94 0.95 90.20 90.40 28.53 28.69 No ChangeCDNGW0954/5/2023 17:36 19.10 13.30 16.00 51.60 -0.06 -1.02 -1.02 0.01 0.02 71.20 71.20 0.09 0.12 No ChangeCDNGW0964/5/2023 17:33 58.10 39.40 0.00 2.50 -6.31 -1.75 -1.73 0.02 0.04 90.20 90.10 4.41 5.73 No ChangeCDNGW0974/5/2023 17:29 57.50 39.80 0.00 2.70 -6.31 -6.21 -6.09 0.02 0.02 111.00 110.30 9.63 10.03 No ChangeCDNGW0984/5/2023 19:43 57.30 40.50 0.00 2.20 -6.95 -1.08 -1.05 0.48 0.48 105.90 106.10 20.20 20.19 No ChangeCDNGW0994/5/2023 17:18 7.80 4.30 20.60 67.30 0.11 -0.06 -0.06 0.06 0.06 72.60 72.70 5.49 5.39 Closed Valve 1/2 turn or lessCDNGW1004/5/2023 17:22 57.60 40.20 0.00 2.20 0.46 0.25 0.26 0.04 0.03 74.70 74.80 4.30 3.68 No ChangeCDNGW1014/5/2023 17:25 56.40 38.70 0.00 4.90 0.78 0.49 0.51 0.02 0.01 73.90 74.20 3.71 3.23 No ChangeCDNGW1024/5/2023 16:58 58.10 39.10 0.00 2.80 2.04 1.73 1.73 0.32 0.29 74.20 74.30 1.16 1.11 No Change CDNGW106 4/5/2023 14:43 6.90 32.30 0.50 60.30 2.77 0.04 0.03 0.01 0.00 82.20 84.20 2.07 0.86 No Change,Valve completely closed CDNGW107 4/5/2023 18:34 49.80 37.10 0.00 13.10 -9.59 -1.93 -1.92 0.22 0.35 105.70 105.70 13.64 17.05 No Change CDNGW108 4/5/2023 18:37 49.40 37.50 0.00 13.10 -9.29 -0.89 -0.90 0.08 0.09 110.50 110.80 3.55 3.89 No Change CDNGW109 4/5/2023 18:41 20.10 13.90 13.90 52.10 -10.11 -4.93 -4.83 1.05 0.89 115.30 115.10 21.82 20.13 Closed Valve 1/2 turn or less P:\O&M\City of Denton\2023\(4) April\Forms\City of Denton O&M Report April 2023.xlsx Weaver Consultants Group, LLC 4/9/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW110 4/5/2023 18:45 54.40 40.10 0.00 5.50 -11.03 -3.70 -3.68 0.79 0.81 115.00 115.00 25.58 25.85 No ChangeCDNGW1114/5/2023 18:48 43.50 37.90 0.00 18.60 -10.20 -0.93 -0.89 0.34 0.33 105.60 105.60 16.87 16.58 No ChangeCDNGW1124/5/2023 18:51 32.90 34.30 0.00 32.80 -10.53 -0.23 -0.23 0.07 0.07 102.80 102.60 3.35 3.53 No ChangeCDNGW1134/5/2023 18:55 33.90 33.80 0.00 32.30 -10.67 -0.42 -0.44 0.14 0.22 102.20 102.80 4.88 6.05 Opened Valve 1/2 turn or lessCDNGW1144/5/2023 18:57 47.30 37.70 0.00 15.00 -10.58 -1.41 -1.40 1.29 1.28 113.30 113.20 14.64 14.60 No ChangeCDNGW1154/5/2023 18:59 45.50 37.60 0.00 16.90 -11.31 -1.30 -1.31 0.79 0.79 109.40 109.40 19.16 19.20 Opened Valve 1/2 turn or lessCDNGW1164/5/2023 19:02 42.50 36.20 0.00 21.30 -11.16 -0.44 -0.44 0.45 0.42 106.10 106.20 14.48 14.09 Opened Valve 1/2 turn or lessCDNGW1174/5/2023 19:05 46.40 36.70 0.00 16.90 -10.99 -0.56 -0.59 0.63 0.69 107.30 107.60 10.30 10.79 Opened Valve 1/2 turn or lessCDNGW1184/5/2023 19:08 46.90 36.90 0.00 16.20 -10.91 -0.72 -0.74 0.76 0.82 103.60 103.80 11.35 11.81 Opened Valve 1/2 turn or lessCDNGW119R4/5/2023 19:13 0.00 0.00 22.30 77.70 -10.81 -0.01 -0.01 0.03 0.03 64.20 64.30 0.53 0.57 No Change,Valve completely closedCDNGW120R4/5/2023 19:15 55.50 39.60 0.00 4.90 -10.95 -10.87 -10.86 0.20 0.36 67.70 67.70 1.44 1.92 No ChangeCDNGW121R4/5/2023 19:18 0.00 0.00 22.20 77.80 -10.91 -5.44 -5.44 0.02 0.02 61.40 61.30 11.24 11.36 No Change,Valve completely closed CDNGW122R 4/5/2023 19:20 0.80 0.90 22.60 75.70 -10.90 -0.08 -0.08 0.01 0.02 61.10 61.00 8.30 9.49 No Change,Valve completely closed CDNGW123R 4/5/2023 19:23 0.10 0.30 22.60 77.00 -10.88 -0.55 -0.54 0.22 0.21 60.60 60.60 34.16 33.53 No Change,Valve completely closed CDNGW124R 4/5/2023 19:27 28.40 19.00 11.20 41.40 -10.97 -0.25 -0.22 0.03 0.02 60.80 60.80 13.11 9.63 No Change,Valve completely closed CDNGW125R 4/5/2023 19:30 0.10 0.80 21.80 77.30 -10.95 -0.23 -0.21 0.01 0.01 59.70 59.70 6.22 7.39 No Change,Valve completely closed CDNGW126R 4/5/2023 19:32 0.40 1.30 21.70 76.60 -11.00 -0.08 -0.07 0.00 0.00 59.70 59.80 0.00 4.05 No Change,Valve completely closedCDNHZ0014/5/2023 14:04 61.50 38.50 0.00 0.00 -8.76 -8.41 -8.42 0.01 0.02 68.20 68.40 7.35 9.42 No ChangeCDNHZ0024/5/2023 14:01 37.40 26.20 8.80 27.60 -8.61 -8.35 -8.45 0.00 0.00 69.50 70.00 0.00 0.00 No ChangeCDNHZ0034/5/2023 13:57 57.90 36.20 0.00 5.90 -8.91 -4.42 -4.42 0.02 0.02 66.50 66.50 8.94 8.44 No Change,Valve completely closedCDNHZ0054/5/2023 13:53 59.60 36.90 0.10 3.40 -8.89 -7.55 -7.61 0.02 0.02 68.20 68.40 8.50 9.05 No ChangeCDNHZ0064/5/2023 13:50 32.10 22.20 6.00 39.70 -8.86 -0.97 -0.97 0.01 0.01 73.60 73.90 7.49 7.19 No Change,Valve completely closedCDNHZ0074/5/2023 13:46 36.70 19.80 8.30 35.20 -8.85 -7.94 -7.99 0.01 0.01 71.60 71.70 4.64 4.93 Closed Valve 1/2 turn or lessCDNHZ0084/5/2023 13:42 38.00 35.40 0.00 26.60 -8.94 -5.22 -5.18 0.01 0.00 71.80 72.10 5.16 1.97 No ChangeCDNHZ0104/5/2023 13:39 60.90 38.90 0.00 0.20 -9.08 -8.69 -8.99 0.00 0.05 71.60 71.50 0.00 16.02 No ChangeCDNHZ0114/5/2023 13:36 34.50 18.10 11.30 36.10 -8.84 -8.73 -8.79 0.02 0.02 70.20 70.30 8.87 8.37 No ChangeCDNHZ0124/5/2023 13:33 14.50 30.80 0.00 54.70 -8.79 -0.61 -0.63 0.00 0.00 71.10 71.20 0.00 0.00 No Change,Valve completely closedCDNHZ0144/5/2023 13:30 59.40 38.10 0.00 2.50 -8.95 -5.92 -5.92 0.00 0.00 67.20 67.60 3.66 3.95 No ChangeCDNHZ0154/5/2023 13:27 60.90 39.00 0.00 0.10 -8.95 -7.77 -7.50 0.02 0.03 72.00 72.20 9.65 11.04 No ChangeCDNHZ0174/5/2023 13:25 61.10 37.40 0.00 1.50 -8.89 -8.82 -8.90 0.02 0.00 71.50 71.90 10.35 0.00 No ChangeCDNHZ0184/5/2023 13:18 10.10 19.50 0.80 69.60 -9.08 -0.70 -0.71 0.00 0.00 69.80 69.90 0.00 0.00 No ChangeCDNHZ0194/5/2023 13:10 60.40 38.30 0.00 1.30 -8.85 -8.84 -8.93 0.01 0.00 69.80 70.10 6.33 0.00 No ChangeCDNHZ0204/5/2023 13:07 60.50 39.50 0.00 0.00 -8.85 -8.87 -8.88 0.01 0.00 70.40 70.90 7.69 0.00 No ChangeCDNHZ0214/5/2023 13:02 29.40 15.00 6.80 48.80 -8.71 -8.92 -9.00 0.00 0.00 68.20 68.40 0.00 0.00 No Change CDNHZ022 4/5/2023 12:58 52.20 31.60 3.80 12.40 -8.69 -8.94 -8.92 0.01 0.00 69.30 70.30 7.20 0.00 Closed Valve 1/2 turn or less P:\O&M\City of Denton\2023\(4) April\Forms\City of Denton O&M Report April 2023.xlsx Weaver Consultants Group, LLC 4/9/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ023 4/5/2023 12:53 59.90 39.50 0.00 0.60 -8.65 -8.51 -8.78 0.00 0.02 69.30 69.60 0.00 8.46 No ChangeCDNHZ0254/5/2023 12:50 60.20 39.80 0.00 0.00 -8.80 -8.79 -8.35 0.01 0.00 67.40 67.60 7.71 0.00 No ChangeCDNHZ0264/5/2023 12:47 61.30 38.30 0.00 0.40 -8.72 -8.61 -8.51 0.02 0.01 67.10 67.40 10.09 7.83 No ChangeCDNHZ0294/5/2023 12:44 60.90 26.80 3.50 8.80 -8.93 -8.74 -8.71 0.01 0.00 68.60 69.00 5.43 4.21 Closed Valve 1/2 turn or lessCDNHZ0304/5/2023 12:40 58.00 37.00 0.60 4.40 -8.69 -0.31 -0.29 0.02 0.02 67.50 67.70 10.06 9.43 Closed Valve 1/2 turn or lessCDNHZ0314/5/2023 12:36 3.60 25.50 1.40 69.50 -8.92 -0.80 -0.79 0.00 0.00 68.60 68.80 4.21 1.93 No Change,Valve completely closedCDNHZ0324/5/2023 12:33 29.20 23.30 8.90 38.60 -9.00 -0.12 -0.12 0.00 0.00 68.10 68.20 0.00 0.00 No Change,Valve completely closedCDNHZ0334/5/2023 12:29 34.30 29.90 0.00 35.80 -9.09 3.79 3.77 0.00 0.00 69.30 70.20 4.68 0.00 No Change,Valve completely closedCDNHZ0344/5/2023 12:24 61.00 39.00 0.00 0.00 -9.09 -8.69 -8.68 0.02 0.00 68.50 68.40 8.89 4.09 No ChangeCDNHZ0354/5/2023 12:21 60.50 39.50 0.00 0.00 -8.95 -4.79 -4.77 0.02 0.02 65.90 66.00 9.24 8.58 No ChangeCDNHZ0364/5/2023 12:18 59.90 40.10 0.00 0.00 -9.10 -6.77 -6.77 0.03 0.02 65.00 65.20 11.34 10.57 No Change CDNLFG02 4/5/2023 10:57 58.70 39.80 0.00 1.50 -4.05 -2.80 -2.79 0.03 0.01 58.60 58.70 12.02 8.46 No ChangeCDNLFG034/5/2023 10:47 51.70 37.40 0.00 10.90 -4.17 -1.80 -1.82 0.89 0.96 70.00 70.00 3.06 3.16 Opened Valve 1/2 turn or less CDNLFG05 4/5/2023 10:54 58.90 40.90 0.00 0.20 -4.23 -3.14 -3.13 0.00 0.00 76.90 76.70 4.23 0.00 No ChangeCDNLFG064/5/2023 10:35 59.40 39.40 0.00 1.20 -4.20 -1.79 -1.79 0.50 0.49 58.80 59.00 1.47 1.47 No Change CDNLFG07 4/5/2023 11:06 0.00 0.00 23.00 77.00 -0.37 -0.11 -0.11 0.00 0.00 54.20 53.50 0.00 0.00 CDNLFG08 4/5/2023 11:05 0.00 0.00 23.30 76.70 -0.37 0.00 -0.06 0.04 0.08 56.60 55.80 0.43 0.58 CDNLFG16 4/5/2023 11:10 0.00 0.00 23.60 76.40 0.00 0.04 0.04 0.00 0.00 56.30 56.80 0.04 0.06 CDNLFG17 4/5/2023 21:11 NR NR NR NR NR NR NR NR NR 65.90 NR NR NRCDNLFG184/5/2023 11:08 0.00 0.00 23.50 76.50 -0.37 0.03 0.03 0.00 0.00 54.20 54.60 0.00 0.00 CDNLFG19 4/5/2023 10:31 58.60 39.50 0.00 1.90 -4.17 -1.61 -1.58 0.99 1.42 63.30 63.30 2.07 2.48 No ChangeCDNLFG204/5/2023 10:27 58.10 39.60 0.00 2.30 -3.93 -3.71 -3.79 0.00 0.00 67.20 67.30 3.54 0.00 No Change CDNLFG21 4/5/2023 10:19 59.90 40.10 0.00 0.00 -4.16 -3.79 -3.79 0.01 0.03 70.30 70.30 6.41 12.05 No Change CDNLFG22 4/5/2023 10:16 57.00 36.50 0.90 5.60 -4.29 -3.18 -3.19 0.01 0.00 51.30 51.30 6.48 3.91 Closed Valve 1/2 turn or less CDNLFG23 4/5/2023 10:39 48.20 39.00 0.00 12.80 -4.43 -1.87 -1.84 0.95 0.94 61.80 62.00 2.03 2.02 Opened Valve 1/2 turn or less CDNLFG24 4/5/2023 10:12 52.10 36.10 0.00 11.80 -4.27 -0.54 -0.54 0.12 0.13 57.60 57.70 1.14 1.18 No Change CDNLFG25 4/5/2023 10:09 0.00 0.00 0.00 100.00 -0.02 -0.04 NR 0.00 NR 50.50 NR 2.27 NR CDNLFG26 4/5/2023 10:02 46.80 40.20 0.00 13.00 -4.34 -4.24 -4.26 0.09 0.09 79.80 80.10 6.57 6.50 No ChangeCDNLFG274/5/2023 10:06 58.00 39.70 0.00 2.30 -4.41 -4.31 -4.34 0.00 0.03 51.90 51.90 0.04 0.38 No Change,Valve completely closed CDNLFG28 4/5/2023 9:55 54.40 40.50 0.00 5.10 -4.29 -4.03 -4.07 0.02 0.00 63.50 63.50 10.46 0.00CDNLFG294/5/2023 9:50 57.10 42.30 0.00 0.60 -4.17 -3.95 -3.94 0.00 0.00 72.50 72.30 0.00 0.00 No ChangeCDNLFG304/5/2023 9:58 52.00 40.80 0.00 7.20 -4.35 -4.35 -4.32 0.00 0.00 72.70 72.40 3.55 0.00 No Change CDNLFG31 4/5/2023 12:01 58.20 41.20 0.00 0.60 -9.21 -5.51 -5.50 0.44 0.43 84.50 84.30 4.78 4.73 No Change CDNLFG32 4/5/2023 12:06 11.70 23.20 6.00 59.10 -8.65 -1.10 -0.53 0.15 0.03 69.50 69.50 0.80 0.38 No Change CDNLFG33 4/5/2023 16:09 58.10 40.60 0.00 1.30 -8.60 -0.92 -0.92 0.96 0.96 77.60 77.60 7.16 7.14 No Change CDNLFG34 4/5/2023 16:05 58.70 40.70 0.00 0.60 -5.30 -0.67 -0.66 0.17 0.15 79.80 80.20 3.02 2.83 No ChangeCDNLFG354/5/2023 12:11 57.10 36.40 0.90 5.60 -8.74 -8.66 -8.47 0.01 0.01 65.80 66.00 0.18 0.18 No Change CDNLFG36 4/5/2023 16:21 40.80 30.50 5.50 23.20 -0.08 -0.40 -0.39 0.00 0.00 80.60 80.60 0.00 0.00 No Change,Valve completely closedCDNLFG374/5/2023 16:02 59.20 39.90 0.00 0.90 -8.12 -1.57 -1.55 1.09 1.01 83.80 83.80 13.85 13.34 No Change CDNLFG38 4/5/2023 12:15 0.40 13.60 14.40 71.60 -8.21 -0.13 -0.11 0.16 0.15 65.20 65.20 0.84 0.80 No Change,Valve completely closed CDNLFG39 4/5/2023 16:40 58.80 41.20 0.00 0.00 -6.96 -1.63 -1.65 0.00 0.00 83.10 83.10 0.00 0.00 No Change P:\O&M\City of Denton\2023\(4) April\Forms\City of Denton O&M Report April 2023.xlsx Weaver Consultants Group, LLC 4/9/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNLFG41 4/5/2023 14:10 0.30 0.20 22.50 77.00 -8.92 -0.01 -0.02 0.56 0.58 63.50 64.70 22.64 23.04 Opened Valve 1/2 turn or less CDNLFG42 4/5/2023 14:33 60.00 36.60 0.00 3.40 -8.80 -0.50 -0.49 0.54 0.53 68.50 68.50 2.38 2.37 No ChangeCDNLFG434/5/2023 14:29 59.30 38.60 0.00 2.10 0.79 0.29 0.30 0.01 0.01 75.90 76.60 3.41 2.82 Closed Valve 1/2 turn or less DEWLCR3 4/5/2023 14:38 0.30 2.10 20.80 76.80 3.81 2.88 2.88 0.01 0.02 77.70 77.70 2.15 4.20 DEWLCR4 4/5/2023 20:30 57.60 40.40 0.00 2.00 -0.34 -5.43 -5.43 5.33 5.33 83.30 83.30 164.17 164.20 DEWLCR5 4/5/2023 20:53 2.40 3.80 21.50 72.30 -9.08 -9.16 -9.16 0.03 0.02 61.30 61.00 1.34 0.90 Notes:1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =139 Number of Wells with Methane > 58%=44 Total Number of Well Readings =139 Number of Wells with Oxygen ≥ 2%=36 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =30 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =21 Number of Wells with No Room to Run (NRTR)=82 P:\O&M\City of Denton\2023\(4) April\Forms\City of Denton O&M Report April 2023.xlsx Weaver Consultants Group, LLC 4/9/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNSV001 4/5/2023 20:47 11.20 13.10 9.60 66.10 -8.46 -3.08 -3.08 0.00 0.00 61.80 61.70 4.18 4.32 No ChangeCDNSV0024/5/2023 20:43 19.50 19.40 8.00 53.10 -8.59 -8.48 -8.52 0.01 0.00 59.10 59.20 6.63 0.00 No Change CDNSV003 4/5/2023 20:41 30.70 28.60 0.00 40.70 -8.62 -6.89 -6.75 0.02 0.02 59.70 59.50 10.75 9.79 CDNSV004 4/5/2023 20:38 16.10 14.70 6.80 62.40 -8.65 -8.52 -8.52 0.01 0.00 59.90 59.80 5.41 0.00 CDNSV005 4/5/2023 20:34 21.00 12.60 12.20 54.20 -8.59 -6.09 -5.87 0.00 0.00 60.30 60.20 0.00 0.00 No Change CDNSV006 4/5/2023 20:49 2.50 3.60 19.50 74.40 -8.47 -6.32 -6.26 0.00 0.00 64.60 64.60 0.00 0.00CDNSV0074/5/2023 20:51 2.50 3.90 19.20 74.40 -8.52 -8.10 -8.03 0.01 0.00 64.60 64.30 4.67 0.00 CDNSV008 4/5/2023 20:56 9.10 8.80 14.00 68.10 -8.56 -8.37 -8.41 0.01 0.00 62.00 61.90 6.18 3.82CDNSV0094/5/2023 20:58 0.00 0.00 18.30 81.70 -8.50 -7.12 -7.16 0.00 0.00 58.50 58.40 0.00 0.00 CDNSV010 4/5/2023 21:00 41.10 33.80 0.00 25.10 -8.46 -8.22 -8.14 0.03 0.04 60.00 60.00 12.76 13.25CDNSV0114/5/2023 21:02 12.90 24.60 1.50 61.00 -8.49 -8.32 -8.27 0.00 0.00 58.80 58.70 0.00 0.00 CDNSV012 4/5/2023 21:04 20.00 24.50 0.40 55.10 -8.47 -8.08 -8.11 0.02 0.02 59.70 59.50 10.25 10.60 CDNSV013 4/5/2023 21:06 17.70 13.90 14.10 54.30 -8.27 -8.08 -8.15 0.00 0.00 59.80 59.60 0.00 0.00 CDNSV014 4/5/2023 20:24 44.30 33.00 0.60 22.10 -8.46 -8.34 -8.48 0.01 0.02 60.70 60.50 7.25 8.54 No Change Soil Vapor Extraction Well Data P:\O&M\City of Denton\2023\(4) April\Forms\City of Denton O&M Report April 2023.xlsx Weaver Consultants Group, LLC 4/9/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCG002 5/8/2023 9:23 0.00 0.00 11.30 88.70 -0.02 0.00 0.00 0.00 0.00 75.80 75.60 NR NR CalibrationCDNCGCH45/8/2023 9:27 50.20 35.00 0.00 14.80 -0.03 0.00 0.00 0.00 0.00 75.50 75.00 NR NR Calibration CDNINLT1 5/8/2023 10:00 40.10 29.30 5.80 24.80 0.26 -18.63 -17.24 18.87 17.42 75.60 76.00 550.00 550.00 Flare Inlet CDNBLWR1 5/8/2023 10:02 40.00 29.30 5.70 25.00 0.26 0.91 0.92 0.00 0.00 73.70 73.50 550.00 550.00 Blower CDNCG002 5/9/2023 8:15 0.00 0.00 11.60 88.40 0.02 0.00 0.00 0.00 0.00 78.10 77.80 NR NR Calibration CDNCGCH4 5/9/2023 8:18 48.60 36.00 0.00 15.40 0.00 0.00 0.00 0.00 0.00 77.50 76.00 NR NR CalibrationCDNCG0025/9/2023 10:15 0.00 0.00 11.30 88.70 0.00 0.00 0.00 0.00 0.00 89.40 89.30 NR NR Flare Inlet CDNCGCH4 5/9/2023 10:17 50.10 35.80 0.00 14.10 -0.01 0.00 0.00 0.00 0.00 89.50 89.70 NR NR Blower CDNINLT2 5/9/2023 10:20 47.50 33.80 2.70 16.00 -0.01 -18.85 -18.83 18.92 19.10 90.50 88.90 1085.00 1085.00 GHG CDNBLWR2 5/9/2023 10:26 47.60 34.20 2.80 15.40 0.00 2.97 3.00 0.00 0.00 92.70 93.40 1085.00 1085.00 Calibration CDN00GHG 5/9/2023 10:27 47.90 34.10 2.80 15.20 -0.01 2.97 2.99 0.00 0.00 93.60 93.20 1085.00 1085.00 Flare Inlet CDNGW040 5/9/2023 10:06 0.00 0.00 21.60 78.40 0.33 0.03 0.01 0.00 0.00 88.30 88.40 0.00 0.00CDNGW0445/8/2023 16:12 58.10 38.30 0.00 3.60 -6.61 -1.08 -1.08 1.05 1.05 91.50 91.50 3.25 3.25 No Change,Valve completely closedCDNGW0455/8/2023 16:14 57.50 39.30 0.00 3.20 -11.74 0.08 0.08 0.11 0.12 89.90 90.00 4.44 4.61 No ChangeCDNGW0465/8/2023 16:20 56.50 36.80 0.00 6.70 -8.21 -5.82 -5.87 5.85 5.86 99.10 99.00 69.91 70.01 No ChangeCDNGW0475/8/2023 16:26 0.40 0.40 21.00 78.20 -11.96 -0.37 -0.38 0.06 0.05 97.80 97.70 1.73 1.60 No Change,Valve completely closedCDNGW0485/8/2023 16:30 57.30 39.40 0.00 3.30 -11.75 -11.64 -11.72 11.72 11.83 96.20 96.10 24.05 24.16 No ChangeCDNGW0495/8/2023 16:40 NR NR NR NR -141.34 4.83 NR 4.73 NR 94.50 NR 151.22 NRCDNGW0505/8/2023 16:35 57.20 39.40 0.00 3.40 -10.99 -10.34 -10.36 10.54 10.51 96.40 96.50 41.73 41.67 No ChangeCDNGW0515/8/2023 17:47 57.90 38.40 0.00 3.70 2.69 1.25 1.37 1.26 1.42 99.50 99.50 8.07 8.54 No Change CDNGW052 5/8/2023 16:38 57.80 38.50 0.00 3.70 0.88 1.39 1.39 1.42 1.42 94.90 95.10 15.68 15.67 No Change CDNGW054 5/8/2023 16:41 NR NR NR NR NR NR NR NR NR 94.70 NR NR NR CDNGW055 5/8/2023 16:45 60.60 35.90 0.00 3.50 5.32 4.39 4.39 0.25 0.26 102.50 102.60 1.59 1.60 No Change CDNGW057 5/8/2023 16:48 58.40 37.90 0.00 3.70 4.76 3.84 3.84 0.07 0.07 88.40 88.50 1.93 1.95 No Change CDNGW058 5/8/2023 16:50 57.70 38.00 0.00 4.30 6.13 5.43 5.44 5.37 5.38 91.10 91.10 68.47 68.53 No ChangeCDNGW0595/8/2023 16:52 NR NR NR NR NR NR NR NR NR 83.70 NR NR NRCDNGW0605/8/2023 16:54 56.90 38.90 0.00 4.20 2.54 1.75 1.75 0.01 0.01 88.10 88.60 0.75 0.85 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data P:\O&M\City of Denton\2023\(5) May\Forms\City of Denton O&M Report May 2023.xlsx Weaver Consultants Group, LLC 6/12/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW061 5/8/2023 16:55 NR NR NR NR NR NR NR NR NR 88.10 NR NR NRCDNGW0625/8/2023 17:19 56.50 39.70 0.00 3.80 -8.32 -9.93 -9.38 9.32 8.68 90.70 90.80 39.51 38.18 No ChangeCDNGW0635/8/2023 17:26 57.10 40.20 0.00 2.70 -4.67 4.82 4.82 0.00 0.00 69.70 70.90 0.00 0.00 No ChangeCDNGW0645/8/2023 17:30 57.10 38.90 0.00 4.00 3.94 3.04 3.05 0.31 0.30 89.70 89.70 7.37 7.28 No ChangeCDNGW0655/8/2023 17:31 NR NR NR NR NR NR NR NR NR 71.10 NR NR NRCDNGW0665/8/2023 19:05 56.00 38.40 0.00 5.60 -10.07 -10.60 -10.58 0.13 0.12 94.00 94.40 10.50 9.92 No ChangeCDNGW0675/8/2023 19:25 58.10 40.20 0.00 1.70 -9.93 -10.27 -9.88 10.47 10.21 101.50 101.40 92.44 91.37 No ChangeCDNGW0685/8/2023 19:28 56.60 37.10 0.00 6.30 -11.24 -5.11 -5.30 5.46 5.46 92.00 92.10 50.68 50.67 No ChangeCDNGW0745/8/2023 16:00 57.80 39.00 0.00 3.20 -10.89 -0.69 -0.69 0.62 0.62 93.00 93.10 1.59 1.59 No ChangeCDNGW0755/8/2023 15:57 58.60 38.90 0.00 2.50 -10.84 -0.87 -0.84 0.51 0.47 97.80 97.80 5.12 4.90 No ChangeCDNGW0765/8/2023 15:53 59.20 38.80 0.00 2.00 -11.22 -1.17 -1.17 0.00 0.00 103.00 103.00 0.00 0.00 No ChangeCDNGW0775/8/2023 18:08 58.30 39.30 0.00 2.40 -1.69 -0.01 -0.01 0.02 0.02 101.30 101.50 3.90 3.77 No Change CDNGW078 5/8/2023 19:43 41.70 25.20 6.40 26.70 0.44 -0.07 -0.07 0.03 0.03 87.60 87.60 0.57 0.57 No Change,Valve completely closed CDNGW079 5/8/2023 19:46 57.90 39.20 0.00 2.90 -10.34 -1.80 -1.81 0.13 0.14 92.70 92.80 2.58 2.66 No Change CDNGW080 5/8/2023 19:49 58.10 39.40 0.00 2.50 -10.81 -2.11 -2.10 0.10 0.08 102.30 102.40 9.06 8.39 No Change CDNGW081 5/8/2023 19:51 2.80 1.70 20.70 74.80 -11.60 -0.69 -0.69 0.07 0.07 86.10 86.10 1.86 1.85 No Change,Valve completely closed CDNGW082 5/8/2023 19:54 53.70 37.10 0.00 9.20 -5.15 -5.45 -5.50 5.62 5.63 83.80 83.80 69.56 69.63 No ChangeCDNGW0835/8/2023 19:58 49.10 32.90 4.00 14.00 0.60 -0.19 -0.19 0.17 0.17 86.40 86.40 8.99 8.99 No ChangeCDNGW0845/8/2023 20:01 58.80 38.80 0.00 2.40 -11.07 -3.99 -3.99 3.96 3.95 95.70 95.70 14.21 14.19 No ChangeCDNGW0855/8/2023 16:07 54.90 38.70 0.50 5.90 -10.57 0.73 0.73 0.11 0.11 95.50 95.60 9.77 9.63 No Change,Valve completely closedCDNGW0865/8/2023 16:03 57.60 38.50 0.00 3.90 -10.42 0.44 0.44 0.02 0.02 97.20 97.90 4.19 4.16 No Change,Valve completely closedCDNGW0875/8/2023 20:03 58.60 37.50 0.00 3.90 -11.16 -2.32 -2.32 2.29 2.28 89.70 89.80 10.90 10.87 No ChangeCDNGW0885/8/2023 19:31 57.00 39.80 0.00 3.20 -11.17 -4.56 -4.50 4.55 4.48 101.00 101.00 45.95 45.63 No ChangeCDNGW0895/8/2023 19:35 6.20 3.40 19.50 70.90 -4.99 -1.19 -1.19 1.16 1.16 85.90 86.00 23.73 23.66 No Change,Valve completely closedCDNGW0905/8/2023 19:38 10.70 6.50 17.00 65.80 -0.04 -0.56 -0.56 0.03 0.03 85.80 85.80 4.79 5.34 No Change,Valve completely closedCDNGW0915/8/2023 18:05 57.20 39.50 0.00 3.30 -10.96 -1.23 -1.23 0.48 0.50 108.20 108.20 14.92 15.24 No ChangeCDNGW0925/8/2023 19:21 55.80 39.80 0.00 4.40 -9.60 -6.21 -6.14 0.22 0.22 104.90 104.80 33.16 32.71 No ChangeCDNGW0935/8/2023 19:19 56.30 39.10 0.00 4.60 -9.80 -2.73 -2.72 2.70 2.68 106.60 106.60 35.36 35.22 No ChangeCDNGW0945/8/2023 19:16 56.10 39.20 0.00 4.70 -9.44 -0.70 -0.70 0.67 0.66 100.20 100.20 23.84 23.78 No ChangeCDNGW0955/8/2023 19:08 56.20 40.10 0.00 3.70 1.14 0.05 0.05 0.01 0.01 89.70 89.70 0.09 0.09 No ChangeCDNGW0965/8/2023 19:11 56.70 39.50 0.00 3.80 -8.96 -1.07 -1.06 0.01 0.01 100.40 100.40 2.13 2.27 No ChangeCDNGW0975/8/2023 19:13 56.10 39.10 0.00 4.80 -8.50 -7.57 -7.67 7.82 8.00 113.40 113.40 192.45 194.60 No ChangeCDNGW0985/8/2023 18:49 56.40 40.10 0.00 3.50 -9.53 -2.24 -2.14 1.94 1.85 112.30 112.40 40.16 39.19 No ChangeCDNGW0995/8/2023 19:01 56.30 39.10 0.00 4.60 1.66 0.78 0.79 0.81 0.82 87.40 87.60 19.82 19.88 No ChangeCDNGW1005/8/2023 18:57 56.40 40.40 0.00 3.20 1.99 1.24 1.25 1.29 1.30 94.30 93.70 24.84 24.99 No ChangeCDNGW1015/8/2023 18:54 56.50 40.50 0.00 3.00 2.00 1.34 1.35 0.00 0.01 96.70 97.20 0.57 3.44 No ChangeCDNGW1025/8/2023 17:34 56.90 38.70 0.00 4.40 4.99 4.01 4.01 0.00 0.01 96.00 96.20 0.00 0.19 No Change CDNGW106 5/8/2023 15:49 3.70 9.30 15.80 71.20 4.75 -0.16 -0.08 0.03 0.03 97.80 97.80 3.76 3.50 No Change,Valve completely closed CDNGW107 5/8/2023 18:12 56.20 38.80 0.00 5.00 -11.19 -2.31 -2.29 0.48 0.47 110.00 110.10 20.07 19.89 No Change CDNGW108 5/8/2023 18:15 56.50 39.60 0.00 3.90 -11.61 -1.22 -1.17 0.26 0.22 114.90 114.90 6.53 6.08 No Change CDNGW109 5/8/2023 18:18 55.30 39.80 0.00 4.90 -12.05 -5.88 -5.99 1.44 1.50 117.60 117.50 25.54 26.05 No Change P:\O&M\City of Denton\2023\(5) May\Forms\City of Denton O&M Report May 2023.xlsx Weaver Consultants Group, LLC 6/12/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW110 5/8/2023 18:21 54.40 39.40 0.00 6.20 -13.02 -4.93 -4.90 1.05 1.03 116.00 116.00 29.36 29.09 No ChangeCDNGW1115/8/2023 18:24 51.80 38.50 0.00 9.70 -11.57 -1.35 -1.36 0.46 0.37 109.10 109.20 19.64 17.61 No ChangeCDNGW1125/8/2023 18:26 42.30 36.90 0.00 20.80 -10.48 -0.30 -0.30 0.07 0.06 110.40 110.40 3.38 3.21 No Change,Valve completely closedCDNGW1135/8/2023 18:29 42.70 36.20 0.00 21.10 -11.59 -0.91 -0.94 0.47 0.41 111.00 111.10 8.84 8.32 No ChangeCDNGW1145/8/2023 18:32 48.50 38.00 0.00 13.50 -10.67 -2.87 -2.96 1.37 1.46 116.20 116.20 15.01 15.53 No ChangeCDNGW1155/8/2023 18:35 42.10 36.70 0.00 21.20 -12.08 -2.37 -2.38 1.00 0.99 111.60 111.60 21.48 21.33 No ChangeCDNGW1165/8/2023 18:37 43.30 36.20 0.00 20.50 -12.03 -1.20 -1.27 0.64 0.75 110.20 110.20 17.25 18.67 No ChangeCDNGW1175/8/2023 18:40 40.50 35.30 0.00 24.20 -11.20 -1.41 -1.39 0.72 0.72 111.70 111.70 10.94 10.93 No ChangeCDNGW1185/8/2023 18:44 45.30 37.00 0.00 17.70 -11.68 -2.15 -2.14 1.18 1.17 108.40 108.40 14.05 13.98 No ChangeCDNGW119R5/9/2023 9:52 0.10 0.50 21.20 78.20 -11.21 -0.05 -0.04 0.04 0.04 79.70 79.70 0.67 0.67 No Change,Valve completely closedCDNGW120R5/9/2023 9:50 54.00 40.00 0.00 6.00 -11.79 -12.32 -11.90 0.48 0.09 79.70 79.70 2.18 0.93 No ChangeCDNGW121R5/9/2023 9:47 0.20 0.50 20.90 78.40 -11.05 -0.67 -0.68 0.03 0.03 79.20 79.30 11.81 12.25 No Change,Valve completely closed CDNGW122R 5/9/2023 9:45 0.50 1.60 20.80 77.10 -12.45 0.40 0.40 0.03 0.04 80.80 80.70 12.72 13.47 No Change,Valve completely closed CDNGW123R 5/9/2023 9:41 7.80 7.80 15.60 68.80 -12.48 0.20 0.23 0.04 0.04 81.80 81.70 13.46 13.75 No Change,Valve completely closed CDNGW124R 5/9/2023 9:38 22.10 15.50 13.10 49.30 -12.00 -0.09 -0.09 0.02 0.02 78.60 78.60 10.14 10.14 No Change,Valve completely closed CDNGW125R 5/9/2023 9:36 0.30 8.10 15.60 76.00 -12.87 -0.07 -0.06 0.03 0.03 80.40 80.40 12.14 12.87 No Change,Valve completely closed CDNGW126R 5/9/2023 9:34 1.90 8.40 17.10 72.60 -12.42 -0.07 -0.06 0.04 0.04 81.30 81.10 15.14 14.85 No Change,Valve completely closedCDNHZ0015/8/2023 15:23 59.90 37.70 0.00 2.40 -11.58 -9.56 -9.69 0.00 0.00 87.30 87.30 0.00 0.00 No ChangeCDNHZ0025/8/2023 15:19 59.90 37.00 0.00 3.10 -11.89 -11.01 -10.91 0.00 0.00 94.70 94.80 0.00 0.00 No ChangeCDNHZ0035/8/2023 15:15 59.20 38.00 0.00 2.80 -11.57 -4.87 -4.86 0.00 0.00 92.90 92.90 0.00 0.00 No ChangeCDNHZ0055/8/2023 15:11 60.20 37.60 0.00 2.20 -11.90 -9.88 -9.84 0.00 0.00 95.30 95.20 0.00 0.00 No ChangeCDNHZ0065/8/2023 15:07 44.30 31.20 0.00 24.50 -11.70 0.48 0.47 0.00 0.00 100.70 100.90 0.00 0.00 No ChangeCDNHZ0075/8/2023 15:04 60.60 29.80 0.00 9.60 -11.64 2.17 2.17 0.00 0.00 98.10 98.60 0.00 0.00 No ChangeCDNHZ0085/8/2023 15:01 50.10 38.50 0.00 11.40 -11.65 -8.18 -8.18 0.00 0.00 83.00 83.30 0.00 0.00 No ChangeCDNHZ0105/8/2023 14:57 59.40 38.50 0.00 2.10 -11.64 -12.35 -12.31 0.00 0.00 83.80 83.70 0.00 0.00 No ChangeCDNHZ0115/8/2023 14:54 33.40 16.70 11.30 38.60 -11.96 -11.80 -11.65 0.00 0.00 98.60 98.80 0.00 0.00 No ChangeCDNHZ0125/8/2023 14:49 16.20 30.40 0.00 53.40 -11.79 3.24 3.25 0.00 0.00 99.50 99.60 0.00 0.00 No Change,Valve completely closedCDNHZ0145/8/2023 14:46 58.40 39.20 0.00 2.40 -12.05 -0.53 -0.06 0.00 0.19 89.10 86.10 0.00 30.07 No ChangeCDNHZ0155/8/2023 14:42 58.00 38.20 0.20 3.60 -12.05 -8.18 -8.19 0.00 0.00 90.20 90.10 0.00 0.00 No Change,Valve completely closedCDNHZ0175/8/2023 14:38 58.50 38.20 0.20 3.10 -11.65 -12.35 -12.63 0.00 0.00 96.40 96.50 0.00 0.00 No ChangeCDNHZ0185/8/2023 14:33 12.80 20.80 0.00 66.40 -11.71 1.14 1.13 0.00 0.00 97.60 97.70 0.00 0.00 No ChangeCDNHZ0195/8/2023 14:30 57.90 38.50 0.10 3.50 -11.90 -12.41 -12.46 0.00 0.00 92.80 92.80 0.00 0.00 No ChangeCDNHZ0205/8/2023 14:28 56.00 35.80 1.40 6.80 -11.81 -12.31 -12.53 0.00 0.00 89.90 89.80 0.00 0.00 No ChangeCDNHZ0215/8/2023 14:25 13.90 9.40 12.30 64.40 -11.69 -12.42 -12.61 0.00 0.00 95.80 95.80 0.00 0.00 No Change CDNHZ022 5/8/2023 13:42 54.90 34.20 1.90 9.00 -11.85 -12.40 -12.38 0.00 0.00 93.50 93.70 0.00 0.00 No Change P:\O&M\City of Denton\2023\(5) May\Forms\City of Denton O&M Report May 2023.xlsx Weaver Consultants Group, LLC 6/12/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ023 5/8/2023 13:30 57.20 39.40 0.10 3.30 -11.86 -11.73 -11.70 0.00 0.00 93.70 95.00 0.00 0.00 Closed Valve 1/2 turn or lessCDNHZ0255/8/2023 13:25 57.50 40.50 0.00 2.00 -11.92 -12.59 -11.29 0.00 0.00 90.30 90.30 0.00 0.00 Closed Valve 1/2 turn or lessCDNHZ0265/8/2023 13:19 58.30 38.70 0.10 2.90 -11.92 -11.77 -11.79 0.00 0.00 93.80 93.90 0.00 0.00 Closed Valve 1/2 turn or lessCDNHZ0295/8/2023 13:16 54.10 22.80 3.80 19.30 -11.83 -11.75 -11.75 0.00 0.00 93.30 93.50 0.00 0.00 Closed Valve 1/2 turn or lessCDNHZ0305/8/2023 13:12 60.70 37.80 0.00 1.50 -11.93 2.03 2.02 0.00 0.00 90.40 90.60 0.00 0.00 No Change,Valve completely closedCDNHZ0315/8/2023 13:06 5.50 27.40 0.00 67.10 -11.54 1.94 1.95 0.00 0.00 94.20 94.20 0.00 0.00 No Change,Valve completely closedCDNHZ0325/8/2023 13:03 18.90 18.80 10.70 51.60 -11.84 -0.29 -0.29 0.00 0.00 93.00 93.10 0.00 0.00 No Change,Valve completely closedCDNHZ0335/8/2023 12:58 34.70 29.90 0.00 35.40 -11.86 9.15 9.12 0.00 0.00 92.80 93.50 0.00 0.00 No Change,Valve completely closedCDNHZ0345/8/2023 12:54 59.00 39.30 0.00 1.70 -11.81 -11.24 -11.21 0.00 0.00 79.50 79.60 0.00 0.00 No ChangeCDNHZ0355/8/2023 12:50 58.50 38.70 0.00 2.80 -11.98 -3.03 -2.99 0.00 0.00 93.20 93.50 0.00 0.00 No ChangeCDNHZ0365/8/2023 12:43 59.10 39.30 0.00 1.60 -10.51 -3.54 -3.45 0.00 0.00 82.80 82.90 0.00 0.00 No Change CDNLFG02 5/8/2023 11:20 57.80 40.90 0.00 1.30 -10.62 -1.69 -1.71 0.00 0.00 75.70 75.70 0.00 0.00 No ChangeCDNLFG035/8/2023 11:07 58.00 39.30 0.00 2.70 -10.50 -6.54 -6.56 4.56 4.38 80.90 80.90 6.78 6.65 No Change CDNLFG05 5/8/2023 11:17 58.50 39.80 0.00 1.70 -11.00 -3.19 -3.26 0.34 0.43 86.70 86.60 40.07 44.97 No ChangeCDNLFG065/8/2023 10:59 58.50 39.20 0.00 2.30 -10.60 -3.42 -3.42 2.43 2.43 75.40 75.40 3.19 3.19 No Change CDNLFG07 5/8/2023 11:09 NR NR NR NR NR NR NR NR NR 80.30 NR NR NR CDNLFG08 5/8/2023 11:13 NR NR NR NR -128.33 4.46 NR 4.36 NR 83.00 NR 4.29 NR CDNLFG16 5/8/2023 11:13 NR NR NR NR 0.42 -0.02 NR 0.03 NR 81.00 NR 0.36 NR CDNLFG17 5/8/2023 11:11 NR NR NR NR 0.34 0.01 NR 0.00 NR 80.20 NR 0.00 NRCDNLFG185/8/2023 11:10 NR NR NR NR NR NR NR NR NR 80.20 NR NR NR CDNLFG19 5/8/2023 10:55 58.40 39.30 0.00 2.30 -10.60 -6.98 -6.80 6.10 5.92 78.20 78.30 5.01 4.94 No ChangeCDNLFG205/8/2023 10:52 58.60 39.90 0.00 1.50 -10.07 -7.53 -7.44 0.00 0.00 80.00 80.10 0.00 0.00 No Change CDNLFG21 5/8/2023 10:47 59.30 40.70 0.00 0.00 -10.11 -3.57 -3.57 0.00 0.00 83.90 83.80 0.00 0.00 No Change CDNLFG22 5/8/2023 10:39 61.20 38.80 0.00 0.00 -10.43 -1.42 -1.42 0.00 0.00 76.20 76.20 0.00 0.00 No Change,Valve completely closed CDNLFG23 5/8/2023 11:03 55.90 40.20 0.00 3.90 -10.81 -5.08 -5.11 4.31 4.27 81.80 81.80 4.22 4.20 No Change CDNLFG24 5/8/2023 10:32 59.30 38.80 0.00 1.90 -10.39 -1.31 -1.31 0.48 0.48 74.40 74.40 2.23 2.24 No Change CDNLFG25 5/8/2023 10:36 NR NR NR NR 0.25 0.01 NR 0.00 NR 75.40 NR 0.00 NR No Change,Valve completely closed CDNLFG26 5/8/2023 10:24 50.30 41.00 0.00 8.70 -10.90 -6.19 -6.20 1.76 1.76 90.70 90.80 28.85 28.83 No ChangeCDNLFG275/8/2023 10:28 58.30 40.00 0.00 1.70 -10.46 -7.73 -7.61 0.69 0.70 71.50 71.50 1.70 1.71 No Change CDNLFG28 5/8/2023 10:16 55.10 42.20 0.00 2.70 -10.68 -2.32 -2.32 0.00 0.00 73.30 73.30 0.00 0.00CDNLFG295/8/2023 10:11 57.00 42.20 0.00 0.80 -8.79 -2.61 -2.62 0.00 0.00 80.00 80.00 0.00 0.00 No ChangeCDNLFG305/8/2023 10:20 54.60 41.80 0.00 3.60 -10.52 -4.00 -3.98 0.00 0.00 81.30 81.40 0.00 0.00 No Change CDNLFG31 5/8/2023 12:26 53.90 40.70 0.00 5.40 -11.22 -6.70 -6.72 1.09 1.11 90.40 90.40 7.50 7.55 No Change CDNLFG32 5/8/2023 12:31 39.40 29.70 5.50 25.40 -10.73 -0.17 -0.12 0.03 0.03 92.30 91.80 0.35 0.34 No Change CDNLFG33 5/8/2023 17:09 56.00 41.10 0.00 2.90 -12.22 -0.62 -0.62 0.57 0.57 93.60 93.80 5.42 5.42 No Change CDNLFG34 5/8/2023 12:21 57.20 41.60 0.00 1.20 -8.72 -1.99 -1.99 1.42 1.35 87.50 87.50 8.62 8.40 No ChangeCDNLFG355/8/2023 12:36 58.10 39.10 0.00 2.80 -10.53 -10.48 -10.45 0.04 0.05 95.30 95.70 0.40 0.46 No Change CDNLFG36 5/8/2023 17:05 44.50 34.90 1.80 18.80 -3.05 0.00 0.02 0.00 0.00 94.80 96.10 0.00 0.00 No Change,Valve completely closedCDNLFG375/8/2023 17:02 55.50 40.20 0.00 4.30 -10.62 -2.61 -2.95 1.68 2.00 86.00 86.00 17.12 18.67 No Change CDNLFG38 5/8/2023 12:40 46.80 37.10 1.70 14.40 -10.40 -0.09 -0.10 0.07 0.07 86.30 86.20 0.53 0.55 No Change CDNLFG39 5/8/2023 16:59 56.20 41.20 0.00 2.60 -10.40 -0.94 -0.95 0.00 0.00 85.70 85.70 0.00 0.00 No Change P:\O&M\City of Denton\2023\(5) May\Forms\City of Denton O&M Report May 2023.xlsx Weaver Consultants Group, LLC 6/12/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNLFG41 5/8/2023 15:27 57.70 39.20 0.00 3.10 -11.41 -0.02 -0.02 0.00 0.00 82.20 82.20 1.06 0.82 No Change CDNLFG42 5/8/2023 15:30 57.70 40.20 0.00 2.10 -11.58 -0.18 -0.18 0.16 0.16 82.40 82.50 1.29 1.28 No ChangeCDNLFG435/8/2023 15:34 58.00 39.20 0.00 2.80 -1.48 -0.65 -0.64 0.11 0.10 85.80 85.90 9.92 9.46 No Change DEWLCR3 5/8/2023 15:42 0.20 4.10 18.40 77.30 6.73 5.52 5.58 0.04 0.05 98.50 98.50 6.18 6.28 No Change,Valve completely closed DEWLCR4 5/9/2023 9:23 51.00 38.80 0.00 10.20 0.43 -3.67 -3.70 3.66 3.69 84.90 84.90 136.47 136.89 No Change DEWLCR5 5/9/2023 9:28 47.90 36.70 1.60 13.80 -15.18 -7.08 -6.77 6.25 5.95 80.60 80.60 18.00 17.57 Closed Valve 1/2 turn or less Notes:1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =139 Number of Wells with Methane > 58%=32 Total Number of Well Readings =139 Number of Wells with Oxygen ≥ 2%=19 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =0 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =30 Number of Wells with No Room to Run (NRTR)=-2 P:\O&M\City of Denton\2023\(5) May\Forms\City of Denton O&M Report May 2023.xlsx Weaver Consultants Group, LLC 6/12/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNSV001 5/9/2023 9:07 11.50 14.50 6.10 67.90 -11.00 -2.79 -2.80 0.00 0.00 78.40 78.20 0.00 0.00 No ChangeCDNSV0025/9/2023 9:10 23.60 21.60 4.60 50.20 -11.00 -11.08 -11.04 0.00 0.00 75.40 75.00 0.00 0.00 CDNSV003 5/9/2023 9:13 33.60 30.70 0.00 35.70 -10.90 -3.91 -3.89 0.00 0.00 80.60 80.40 0.00 0.00 No Change CDNSV004 5/9/2023 9:15 20.40 20.80 1.90 56.90 -10.97 -10.91 -10.91 0.00 0.00 80.40 80.00 0.00 0.00 No Change CDNSV005 5/9/2023 9:18 5.90 3.10 18.90 72.10 -10.73 -1.77 -1.77 0.00 0.00 76.50 76.40 0.00 0.00 No Change CDNSV006 5/9/2023 9:02 1.90 2.10 19.30 76.70 -11.01 -5.70 -5.79 0.00 0.00 71.10 71.10 0.00 0.00 No ChangeCDNSV0075/9/2023 8:54 2.10 3.20 18.20 76.50 -11.30 -9.54 -9.54 0.00 0.00 72.80 72.60 0.00 0.00 No Change CDNSV008 5/9/2023 8:57 9.80 10.80 13.40 66.00 -10.83 -10.65 -10.60 0.00 0.00 74.90 74.80 0.00 0.00 No ChangeCDNSV0095/9/2023 8:49 4.40 5.00 17.60 73.00 -11.05 -8.56 -8.52 0.00 0.00 71.10 71.00 0.00 0.00 No Change CDNSV010 5/9/2023 8:46 44.80 37.00 0.00 18.20 -10.86 -10.62 -10.67 0.00 0.00 73.70 73.20 3.69 0.00 No ChangeCDNSV0115/9/2023 8:42 9.00 22.20 1.50 67.30 -10.97 -10.08 -10.00 0.00 0.00 77.20 75.70 0.00 0.00 No Change CDNSV012 5/9/2023 8:38 19.80 19.60 5.50 55.10 -10.69 -10.02 -10.23 0.00 0.00 78.40 78.20 0.00 0.00 No Change CDNSV013 5/9/2023 8:31 7.50 6.00 17.80 68.70 -11.10 -11.03 -10.50 0.00 0.00 77.40 76.50 0.00 0.00 No Change CDNSV014 5/9/2023 8:26 40.50 31.60 1.80 26.10 -11.08 -10.61 -10.23 0.00 0.00 78.10 77.20 0.00 0.00 No Change Soil Vapor Extraction Well Data P:\O&M\City of Denton\2023\(5) May\Forms\City of Denton O&M Report May 2023.xlsx Weaver Consultants Group, LLC 6/12/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCGCH4 6/20/2023 11:19 49.80 35.00 0.00 15.20 -0.01 0.00 0.00 0.00 0.00 75.80 75.80 NR NR CalibrationCDNCG0026/20/2023 11:21 0.00 0.00 11.40 88.60 0.00 0.00 0.00 0.00 0.00 75.30 75.40 NR NR Calibration CDNINLT1 6/20/2023 11:30 44.80 32.10 3.00 20.10 0.14 -11.54 -11.55 11.73 11.76 93.80 95.30 785.00 785.00 Flare Inlet CDNBLWR1 6/20/2023 11:32 44.50 32.30 2.90 20.30 0.20 1.83 1.81 0.00 0.00 96.20 95.90 785.00 785.00 Blower CDNCGCH4 6/21/2023 8:17 49.70 35.50 0.00 14.80 -0.01 0.00 0.00 0.00 0.00 73.30 73.60 NR NR Calibration CDNCG002 6/21/2023 8:22 0.00 0.00 11.40 88.60 0.02 0.00 0.00 0.00 0.00 73.30 73.70 NR NR CalibrationCDNCG0026/21/2023 19:17 0.00 0.00 11.20 88.80 0.02 0.00 0.00 0.00 0.00 86.40 88.30 NR NR Flare Inlet CDNCGCH4 6/21/2023 19:19 50.00 35.30 0.00 14.70 -0.05 0.00 0.00 0.00 0.00 90.60 91.00 NR NR Blower CDNINLT2 6/21/2023 19:22 46.60 33.10 2.10 18.20 -0.01 -11.88 -11.86 12.10 12.08 85.90 85.80 800.00 800.00 GHG CDNBLWR2 6/21/2023 19:23 46.10 33.80 2.20 17.90 -0.01 1.84 1.88 0.00 0.00 85.80 85.70 800.00 800.00 Calibration CDN00GHG 6/21/2023 19:24 47.20 35.10 2.10 15.60 0.01 1.80 1.89 0.00 0.00 85.60 85.60 800.00 800.00 Flare Inlet CDNGW040 6/21/2023 19:12 0.00 0.00 21.00 79.00 0.03 0.00 0.00 0.00 0.00 92.80 92.30 0.00 0.00CDNGW0446/21/2023 12:28 57.90 39.20 0.00 2.90 -2.55 0.15 0.15 0.18 0.18 95.20 95.20 1.36 1.35 No Change,Valve completely closedCDNGW0456/21/2023 12:26 57.90 38.20 0.00 3.90 -6.68 0.06 0.07 0.02 0.02 98.00 98.60 1.86 1.61 No ChangeCDNGW0466/21/2023 14:52 58.60 37.40 0.00 4.00 1.20 0.61 0.61 0.01 0.00 92.40 92.80 1.99 1.90 No ChangeCDNGW0476/21/2023 14:57 0.60 0.60 20.90 77.90 -6.61 -0.47 -0.46 0.02 0.03 89.10 89.00 1.05 1.29 No Change,Valve completely closedCDNGW0486/21/2023 14:55 58.60 37.10 0.00 4.30 -7.03 -6.97 -6.95 0.95 0.98 95.20 95.30 6.94 7.07 No ChangeCDNGW0496/21/2023 17:11 NR NR NR NR NR NR NR NR NR 87.00 NR NR NRCDNGW0506/21/2023 17:17 59.80 38.50 0.00 1.70 -6.57 -6.37 -6.33 6.27 6.24 95.80 95.70 32.48 32.41 No ChangeCDNGW0516/21/2023 17:15 60.00 37.90 0.00 2.10 2.07 1.81 1.81 0.22 0.22 89.50 89.70 3.38 3.43 No Change CDNGW052 6/21/2023 17:13 60.90 36.10 0.00 3.00 0.19 0.94 0.95 0.94 0.93 93.90 94.00 12.74 12.73 No Change CDNGW054 6/21/2023 17:11 NR NR NR NR NR NR NR NR NR 85.20 NR NR NR CDNGW055 6/21/2023 17:10 60.10 37.00 0.00 2.90 3.31 3.32 3.33 0.04 0.05 90.60 90.70 0.64 0.69 No Change CDNGW057 6/21/2023 17:07 58.40 39.50 0.00 2.10 2.43 3.16 3.16 0.45 0.48 89.10 89.10 4.86 5.01 No Change CDNGW058 6/21/2023 17:05 59.60 38.80 0.00 1.60 4.67 4.43 4.44 0.02 0.01 91.80 91.90 3.70 3.41 No ChangeCDNGW0596/21/2023 16:34 NR NR NR NR 0.03 0.01 0.01 0.00 0.00 85.90 85.90 0.36 0.28CDNGW0606/21/2023 17:03 54.40 35.50 0.00 10.10 1.57 1.46 1.46 0.02 0.02 89.90 89.90 0.89 0.91 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data P:\O&M\City of Denton\2023\(6) June\Forms\City of Denton O&M Report May 2023.xlsx Weaver Consultants Group, LLC 7/11/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW061 6/21/2023 16:35 NR NR NR NR -0.03 0.02 0.02 0.01 0.01 85.80 85.80 2.21 2.82CDNGW0626/21/2023 16:33 NR NR NR NR -0.03 0.00 0.00 0.00 0.00 85.00 85.20 0.55 0.55CDNGW0636/21/2023 16:31 57.60 39.60 0.00 2.80 0.78 4.52 4.53 0.00 0.00 80.50 80.50 0.00 0.00 No ChangeCDNGW0646/21/2023 16:27 59.30 37.60 0.00 3.10 3.01 3.12 3.13 0.22 0.21 89.00 89.10 6.15 6.04 No ChangeCDNGW0656/21/2023 16:25 NR NR NR NR 0.41 -0.51 -0.64 0.49 0.63 79.80 79.60 48.56 55.25CDNGW0666/21/2023 16:21 57.70 39.70 0.00 2.60 -4.64 -5.02 -4.63 0.03 0.00 81.40 81.10 4.90 1.63 No ChangeCDNGW0676/21/2023 15:01 58.30 38.70 0.00 3.00 -5.17 -5.50 -5.58 0.26 0.24 100.30 100.30 14.92 14.15 No ChangeCDNGW0686/21/2023 14:49 57.50 38.00 0.00 4.50 -6.81 -2.28 -2.27 0.04 0.04 92.90 92.90 4.58 4.33 No ChangeCDNGW0746/21/2023 12:40 57.20 38.40 0.00 4.40 -5.18 -0.22 -0.21 0.37 0.37 96.60 96.60 1.23 1.22 No ChangeCDNGW0756/21/2023 12:43 56.40 37.50 0.00 6.10 -5.23 -0.11 -0.11 0.12 0.12 100.20 100.40 2.47 2.50 No ChangeCDNGW0766/21/2023 12:46 56.10 37.40 0.00 6.50 -5.90 -0.53 -0.52 1.31 1.38 104.10 104.10 77.94 79.89 No ChangeCDNGW0776/21/2023 17:39 57.90 36.50 0.00 5.60 1.13 0.21 0.21 0.00 0.00 93.20 93.20 1.62 1.62 No Change CDNGW078 6/21/2023 13:18 60.40 37.00 0.00 2.60 0.71 0.69 0.68 0.00 0.00 93.40 93.60 0.20 0.17 No Change,Valve completely closed CDNGW079 6/21/2023 12:50 56.20 37.50 0.00 6.30 -4.99 -0.56 -0.56 0.10 0.10 99.40 99.40 2.24 2.24 No Change CDNGW080 6/21/2023 13:13 57.00 38.80 0.00 4.20 -2.51 -0.50 -0.56 0.03 0.00 103.60 103.50 4.81 1.13 No Change CDNGW081 6/21/2023 12:53 54.20 35.50 1.60 8.70 -4.94 0.12 0.12 0.00 0.01 96.90 96.90 0.20 0.68 No Change,Valve completely closed CDNGW082 6/21/2023 13:12 56.30 38.80 0.00 4.90 -2.28 -0.51 -0.53 0.00 0.01 103.60 103.60 0.00 2.17 No ChangeCDNGW0836/21/2023 12:55 56.50 38.00 0.00 5.50 1.31 0.40 0.39 0.43 0.42 98.60 98.50 14.25 14.14 Closed Valve 1/2 turn or lessCDNGW0846/21/2023 13:06 57.70 38.20 0.00 4.10 -5.61 -2.11 -2.11 0.32 0.31 100.20 100.20 4.04 4.01 No ChangeCDNGW0856/21/2023 12:33 56.00 37.90 0.00 6.10 -6.04 -4.77 -3.54 4.81 4.24 99.10 99.30 63.59 59.82 No ChangeCDNGW0866/21/2023 12:37 56.50 38.20 0.00 5.30 -5.00 0.42 0.42 0.01 0.00 99.20 99.20 1.97 1.94 No Change,Valve completely closedCDNGW0876/21/2023 12:59 56.90 38.60 0.00 4.50 -6.01 -0.01 -0.03 0.05 0.06 98.60 98.60 1.64 1.72 Opened Valve 1/2 turn or lessCDNGW0886/21/2023 13:54 50.10 38.30 0.00 11.60 -5.51 -2.13 -1.87 0.40 0.23 99.80 99.80 13.65 10.36 No ChangeCDNGW0896/21/2023 13:48 49.50 34.20 2.10 14.20 -0.25 0.01 0.01 0.01 0.01 92.70 92.70 2.04 1.86 No Change,Valve completely closedCDNGW0906/21/2023 13:45 58.90 37.90 0.00 3.20 -0.43 0.35 0.36 0.01 0.01 92.70 92.70 3.19 3.03 No Change,Valve completely closedCDNGW0916/21/2023 17:34 56.30 39.00 0.00 4.70 -6.24 -0.65 -0.73 0.23 0.40 107.00 107.10 10.37 13.70 No ChangeCDNGW0926/21/2023 15:03 56.80 37.10 0.00 6.10 -5.20 -4.10 -4.09 0.02 0.09 104.80 104.80 10.04 21.52 No ChangeCDNGW0936/21/2023 15:11 55.30 38.50 0.00 6.20 -5.17 -1.83 -1.86 1.79 1.81 105.40 105.40 28.85 29.04 No ChangeCDNGW0946/21/2023 15:09 56.60 37.20 0.00 6.20 -4.99 -0.69 -0.69 0.67 0.70 96.40 96.70 23.91 24.52 No ChangeCDNGW0956/21/2023 15:21 58.40 40.00 0.00 1.60 0.39 -0.03 -0.03 0.02 0.01 82.60 82.50 0.10 0.09 No ChangeCDNGW0966/21/2023 16:03 55.30 38.20 0.00 6.50 -2.08 0.24 0.25 0.06 0.05 87.20 87.20 7.49 6.91 No ChangeCDNGW0976/21/2023 16:05 57.30 39.00 0.00 3.70 -1.97 -2.26 -2.26 0.03 0.03 109.50 109.20 12.10 11.85 No ChangeCDNGW0986/21/2023 17:26 57.50 37.90 0.00 4.60 -3.96 -1.58 -1.51 2.00 1.94 109.80 109.70 40.88 40.27 No ChangeCDNGW0996/21/2023 16:17 58.20 39.00 0.00 2.80 2.10 1.35 1.35 1.37 1.38 81.00 81.00 25.89 25.99 No ChangeCDNGW1006/21/2023 16:14 57.20 39.20 0.00 3.60 1.47 1.80 1.81 1.82 1.83 80.00 79.80 29.96 29.98 No ChangeCDNGW1016/21/2023 16:12 56.20 41.10 0.00 2.70 2.34 1.77 1.80 1.75 1.81 79.40 79.40 39.48 40.18 No ChangeCDNGW1026/21/2023 16:24 58.50 39.20 0.00 2.30 4.04 3.43 3.31 0.50 0.63 82.10 81.90 1.45 1.63 No Change CDNGW106 6/21/2023 12:07 10.50 22.40 5.10 62.00 3.36 -0.25 -0.18 0.01 0.00 101.90 102.20 1.69 0.60 No Change,Valve completely closed CDNGW107 6/21/2023 17:42 53.00 38.50 0.00 8.50 -6.15 -1.46 -1.51 0.31 0.31 108.90 108.90 16.01 16.19 CDNGW108 6/21/2023 17:46 56.10 39.30 0.00 4.60 -6.23 -4.31 -1.86 4.48 1.91 113.80 113.80 27.15 17.82 No Change CDNGW109 6/21/2023 17:50 56.80 39.00 0.00 4.20 -6.40 -4.80 -4.74 2.08 1.99 116.90 116.90 30.73 30.06 No Change P:\O&M\City of Denton\2023\(6) June\Forms\City of Denton O&M Report May 2023.xlsx Weaver Consultants Group, LLC 7/11/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW110 6/21/2023 17:52 54.90 39.40 0.00 5.70 -6.50 -3.04 -3.03 0.67 0.67 115.50 115.50 23.58 23.60 No ChangeCDNGW1116/21/2023 17:54 54.20 38.20 0.00 7.60 -6.03 -0.62 -0.62 0.26 0.27 109.10 109.10 14.82 15.00 No ChangeCDNGW1126/21/2023 17:57 44.50 37.70 0.00 17.80 -6.11 -0.06 -0.09 0.01 0.03 108.20 108.10 1.36 2.35 Opened Valve 1/2 turn or lessCDNGW1136/21/2023 17:59 43.90 36.50 0.00 19.60 -6.01 -0.29 -0.31 0.14 0.13 110.50 110.70 4.82 4.75 Opened Valve 1/2 turn or lessCDNGW1146/21/2023 18:01 49.90 37.60 0.00 12.50 -5.96 -1.50 -1.52 0.83 0.87 115.90 115.90 11.73 12.04 Opened Valve 1/2 turn or lessCDNGW1156/21/2023 18:03 44.50 37.10 0.00 18.40 -6.10 -1.10 -1.16 0.55 0.56 111.60 111.60 15.99 16.06 Opened Valve 1/2 turn or lessCDNGW1166/21/2023 18:06 49.10 38.00 0.00 12.90 -5.75 -0.71 -0.70 0.68 0.64 110.60 110.70 17.80 17.16 Opened Valve 1/2 turn or lessCDNGW1176/21/2023 18:13 42.80 36.10 0.00 21.10 -5.28 -0.59 -0.68 0.38 0.44 110.40 110.50 7.98 8.63 Opened Valve 1/2 turn or lessCDNGW1186/21/2023 18:10 45.20 36.80 0.00 18.00 -5.84 -0.95 -1.02 0.65 0.69 108.50 108.50 10.47 10.76 Opened Valve 1/2 turn or lessCDNGW119R6/21/2023 18:16 0.50 0.90 20.80 77.80 -5.70 -0.06 -0.06 0.04 0.05 90.80 90.90 0.64 0.68 No Change,Valve completely closedCDNGW120R6/21/2023 18:18 56.20 39.10 0.00 4.70 -5.62 -5.97 -6.01 0.17 0.18 92.20 92.40 1.29 1.35 No ChangeCDNGW121R6/21/2023 18:21 3.10 2.00 20.00 74.90 -5.58 -0.80 -0.79 0.13 0.14 88.90 88.90 26.22 26.63 No Change,Valve completely closed CDNGW122R 6/21/2023 18:22 1.40 2.90 19.90 75.80 -5.72 -0.08 -0.08 0.02 0.02 88.60 88.60 9.52 9.95 No Change,Valve completely closed CDNGW123R 6/21/2023 18:26 11.90 13.80 6.90 67.40 -5.60 -0.17 -2.11 0.05 0.07 89.00 89.20 15.14 19.45 Opened Valve 1/2 turn or less CDNGW124R 6/21/2023 18:28 17.20 12.80 13.60 56.40 -5.70 -0.11 -0.11 0.01 0.01 88.60 88.70 7.01 7.01 No Change,Valve completely closed CDNGW125R 6/21/2023 18:29 20.30 12.80 13.70 53.20 -5.69 -0.13 -0.13 0.00 0.00 89.10 89.20 3.69 4.32 No Change,Valve completely closed CDNGW126R 6/21/2023 18:31 1.20 8.00 16.70 74.10 -5.73 -0.07 -0.07 0.02 0.02 90.90 90.90 10.41 10.53 No Change,Valve completely closedCDNHZ0016/21/2023 11:25 58.50 36.70 0.00 4.80 -6.56 -6.81 -6.80 0.01 0.01 104.80 105.10 4.76 5.21CDNHZ0026/21/2023 11:21 27.30 17.30 11.40 44.00 -6.70 -7.35 -7.35 0.00 0.00 108.70 109.30 0.00 0.00 Closed Valve 1/2 turn or lessCDNHZ0026/21/2023 11:22 25.80 15.70 11.20 47.30 -6.52 -7.29 -7.29 0.00 0.00 110.20 110.30 0.00 0.00 No ChangeCDNHZ0036/21/2023 11:18 57.30 38.10 0.00 4.60 -6.61 -2.39 -2.39 0.02 0.02 99.10 99.20 9.04 9.54 No ChangeCDNHZ0056/21/2023 10:08 57.00 37.10 0.00 5.90 -6.93 -6.28 -6.26 0.00 0.01 101.80 101.90 0.00 6.40 No ChangeCDNHZ0066/21/2023 10:03 46.20 29.10 0.00 24.70 -6.93 -0.16 -0.16 0.00 0.00 102.70 102.90 0.00 0.00 No ChangeCDNHZ0076/21/2023 10:00 59.70 27.10 0.00 13.20 -6.96 -0.12 -0.12 0.00 0.00 100.90 100.90 0.00 0.00 No ChangeCDNHZ0086/21/2023 9:55 38.20 33.80 0.00 28.00 -7.04 -5.61 -5.67 0.00 0.00 102.60 102.30 0.00 0.00 No ChangeCDNHZ0106/21/2023 9:50 59.60 38.10 0.00 2.30 -6.93 -7.51 -7.63 0.00 0.00 89.00 88.60 0.00 0.00 No ChangeCDNHZ0116/21/2023 9:46 62.90 34.70 0.00 2.40 -6.99 0.96 0.95 0.00 0.00 101.70 101.30 0.00 0.00 Valve completely closedCDNHZ0126/21/2023 9:43 20.00 31.00 0.00 49.00 -6.97 3.05 3.09 0.01 0.00 102.80 102.90 6.60 0.00 No ChangeCDNHZ0146/21/2023 9:39 58.70 38.20 0.00 3.10 -7.01 -0.06 -1.23 0.00 0.00 92.80 90.60 0.00 0.00 Opened Valve 1/2 to 1 turnCDNHZ0156/21/2023 9:33 58.90 38.00 0.00 3.10 -7.07 -5.69 -5.70 0.00 0.00 94.50 94.40 0.00 0.00 No ChangeCDNHZ0176/21/2023 9:30 58.30 38.80 0.00 2.90 -7.13 -7.60 -7.67 0.00 0.00 100.50 100.50 0.00 0.00 No ChangeCDNHZ0186/21/2023 9:27 2.30 11.80 8.40 77.50 -7.21 -0.11 -0.08 0.00 0.00 97.30 97.50 0.00 0.00 Closed Valve 1/2 turn or lessCDNHZ0196/21/2023 9:23 58.80 36.50 0.00 4.70 -7.11 -7.63 -7.64 0.00 0.00 97.60 97.70 0.00 4.27 No ChangeCDNHZ0206/21/2023 9:20 57.90 37.20 0.00 4.90 -7.22 -7.70 -7.69 0.01 0.01 96.50 96.60 8.07 7.40 No Change CDNHZ021 6/21/2023 9:16 30.70 17.10 4.50 47.70 -7.21 -7.65 -7.58 0.00 0.00 94.30 94.50 0.00 0.00 No Change P:\O&M\City of Denton\2023\(6) June\Forms\City of Denton O&M Report May 2023.xlsx Weaver Consultants Group, LLC 7/11/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ021 6/21/2023 9:17 27.00 14.50 6.90 51.60 -7.23 -7.67 -7.71 0.00 0.00 94.80 94.80 0.00 0.00 No ChangeCDNHZ0226/21/2023 9:12 58.70 37.00 0.00 4.30 -7.25 -7.17 -6.82 0.00 0.00 94.30 94.20 0.00 0.00 Closed Valve 1/2 turn or lessCDNHZ0236/21/2023 9:07 58.80 36.50 0.00 4.70 -7.31 -7.29 -7.29 0.00 0.00 93.50 91.30 0.00 0.00 Closed Valve 1/2 turn or lessCDNHZ0256/21/2023 9:02 58.10 39.00 0.00 2.90 -7.48 -7.48 -7.29 0.01 0.01 96.40 95.80 5.20 4.91 Closed Valve 1/2 turn or lessCDNHZ0266/21/2023 8:58 36.90 30.30 0.00 32.80 -7.47 -6.26 -6.17 0.00 0.00 90.70 90.50 1.87 0.00 Closed Valve 1/2 turn or lessCDNHZ0296/21/2023 8:54 58.70 25.40 2.70 13.20 -7.50 -7.45 -7.29 0.00 0.00 90.10 89.60 0.00 0.00 Closed Valve 1/2 turn or lessCDNHZ0306/21/2023 8:50 53.00 33.00 2.40 11.60 -7.53 -5.35 -5.27 0.01 0.01 90.20 90.20 6.49 6.31 Closed Valve 1/2 turn or lessCDNHZ0316/21/2023 8:43 8.30 27.60 0.00 64.10 -7.58 -1.37 -6.43 0.00 0.00 88.40 87.60 0.00 0.00 Opened Valve 1/2 turn or lessCDNHZ0316/21/2023 8:44 8.10 28.10 0.00 63.80 -7.54 -7.33 -7.03 0.00 0.01 87.00 86.70 3.86 5.92 No ChangeCDNHZ0326/21/2023 8:39 20.80 24.50 5.10 49.60 -7.64 -0.31 -0.31 0.03 0.03 88.00 87.90 12.31 11.71 No Change,Valve completely closedCDNHZ0326/21/2023 8:39 20.90 24.70 5.20 49.20 -7.64 -0.33 -0.32 0.03 0.02 87.50 87.50 11.19 10.58 No Change,Valve completely closed CDNHZ033 6/20/2023 14:54 37.10 29.20 0.00 33.70 -7.06 -5.11 -5.11 0.00 0.00 113.70 111.00 0.00 0.00 No Change,Valve completely closedCDNHZ0346/20/2023 14:50 56.00 35.40 0.00 8.60 -7.15 -6.30 -6.18 0.01 0.00 94.20 93.10 4.81 0.00 Closed Valve 1/2 turn or less CDNHZ035 6/20/2023 14:47 56.00 36.60 0.60 6.80 -7.18 -1.62 -1.51 0.00 0.01 109.80 109.90 0.00 6.10 Closed Valve 1/2 turn or lessCDNHZ0366/20/2023 14:44 59.30 37.70 0.00 3.00 -7.22 -0.09 -0.68 0.00 0.00 110.60 111.90 0.00 0.00 Opened Valve 1/2 turn or less CDNLFG02 6/20/2023 13:08 57.50 41.70 0.00 0.80 -7.13 -0.81 -0.81 0.01 0.01 98.30 98.40 5.74 5.32 No Change CDNLFG03 6/20/2023 13:05 48.20 35.70 0.00 16.10 -7.26 -4.15 -4.14 3.05 2.99 90.80 90.80 5.51 5.46 No Change CDNLFG05 6/20/2023 12:40 53.20 37.70 0.00 9.10 -7.40 -2.06 -2.05 0.00 0.00 90.80 90.80 0.00 0.00 No Change CDNLFG06 6/20/2023 13:01 49.10 35.30 0.00 15.60 -7.22 -1.03 -1.03 0.54 0.54 97.10 97.40 1.49 1.48 No ChangeCDNLFG076/20/2023 13:10 NR NR NR NR 0.01 0.00 0.00 0.01 0.01 97.30 96.40 5.66 5.66 CDNLFG08 6/20/2023 13:13 NR NR NR NR -0.04 -0.02 -0.02 0.01 0.01 97.20 97.30 0.22 0.18CDNLFG166/20/2023 13:13 NR NR NR NR -0.02 0.00 0.01 0.01 0.00 98.70 97.10 0.17 0.11 CDNLFG17 6/21/2023 17:22 NR NR NR NR NR NR NR NR NR 88.80 NR NR NRCDNLFG186/20/2023 13:11 NR NR NR NR 0.00 0.00 0.00 0.00 0.00 96.10 96.10 0.00 0.00 CDNLFG19 6/20/2023 12:55 52.40 37.90 0.00 9.70 -7.26 -4.69 -4.64 4.09 3.99 92.30 92.30 4.07 4.02 No Change CDNLFG20 6/20/2023 12:51 50.40 37.80 0.00 11.80 -7.01 -5.62 -5.54 0.00 0.00 90.40 90.30 0.00 0.00 No Change CDNLFG21 6/20/2023 12:33 55.50 38.20 0.00 6.30 -7.10 -3.86 -3.84 0.00 0.00 93.80 93.80 0.00 2.47 No Change CDNLFG22 6/20/2023 12:30 46.20 31.40 2.70 19.70 -7.23 -2.14 -2.14 0.02 0.01 102.80 103.00 8.89 7.92 No Change,Valve completely closedCDNLFG236/20/2023 12:48 30.00 31.30 0.00 38.70 -7.40 -3.61 -3.54 2.99 2.92 97.50 97.50 3.47 3.43 Closed Valve 1/2 turn or less CDNLFG24 6/20/2023 12:26 32.10 31.20 0.00 36.70 -7.41 -0.82 -0.82 0.28 0.28 89.30 89.40 1.69 1.67 No Change,Valve completely closedCDNLFG256/20/2023 12:24 NR NR NR NR NR NR -0.01 NR 0.00 98.10 97.90 NR 0.00 No ChangeCDNLFG266/20/2023 12:10 31.00 29.90 0.40 38.70 -7.50 -6.14 -6.14 0.60 0.60 97.50 97.50 16.78 16.70 Closed Valve 1/2 turn or less CDNLFG27 6/20/2023 12:14 33.80 31.80 0.00 34.40 -7.50 -6.72 -6.66 0.14 0.14 98.50 98.90 0.74 0.74 No Change CDNLFG28 6/20/2023 12:01 30.40 33.40 0.00 36.20 -7.99 -3.74 -4.05 0.00 0.00 82.90 82.30 0.00 0.00 Opened Valve 1/2 turn or less CDNLFG29 6/20/2023 11:58 49.30 40.00 0.00 10.70 -7.96 -3.76 -3.76 0.00 0.00 89.20 89.10 0.00 0.00 No Change CDNLFG30 6/20/2023 12:04 33.90 32.80 0.00 33.30 -7.29 -5.20 -5.25 0.00 0.00 84.80 84.70 0.00 0.00 No ChangeCDNLFG316/20/2023 14:29 47.50 37.00 0.30 15.20 -7.83 -4.02 -3.82 0.55 0.45 97.10 97.40 5.29 4.78 Closed Valve 1/2 turn or less CDNLFG32 6/20/2023 14:33 46.40 34.90 1.00 17.70 -7.31 -0.07 -0.06 0.00 0.01 97.30 98.20 0.06 0.14 No ChangeCDNLFG336/21/2023 16:44 52.10 39.70 0.00 8.20 -7.74 -0.03 -0.17 0.17 0.43 89.80 89.80 3.00 4.71 No Change CDNLFG34 6/20/2023 14:25 48.50 37.60 0.00 13.90 -6.03 -1.15 -1.00 0.80 0.79 96.40 96.50 6.43 6.38 No Change CDNLFG35 6/20/2023 14:37 44.10 35.20 0.00 20.70 -7.39 -6.31 -6.14 0.09 0.07 109.20 109.40 0.60 0.53 No Change P:\O&M\City of Denton\2023\(6) June\Forms\City of Denton O&M Report May 2023.xlsx Weaver Consultants Group, LLC 7/11/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNLFG36 6/21/2023 16:41 43.60 33.90 3.10 19.40 0.04 -0.36 -0.49 0.28 0.42 88.00 88.00 36.49 44.74 No Change,Valve completely closed CDNLFG37 6/21/2023 16:55 55.00 39.60 0.00 5.40 -7.39 -1.92 -1.80 1.15 1.00 85.80 85.80 14.19 13.22 No ChangeCDNLFG386/20/2023 14:41 26.00 27.30 2.50 44.20 -7.43 -0.06 -0.02 0.05 0.00 108.00 108.20 0.44 0.13 Closed Valve 1/2 turn or less,Valve completely CDNLFG39 6/21/2023 16:37 54.40 37.20 0.00 8.40 -7.01 -0.71 -0.67 0.00 0.00 85.50 85.40 0.00 0.00 No Change CDNLFG41 6/21/2023 12:22 57.40 38.80 0.00 3.80 -6.67 -0.01 -0.01 0.01 0.01 90.40 89.70 3.26 2.81 Opened Valve 1/2 turn or less CDNLFG42 6/21/2023 12:17 57.60 39.00 0.00 3.40 -6.69 -0.07 -0.06 0.03 0.03 94.10 94.10 0.54 0.50 No Change CDNLFG43 6/21/2023 12:12 58.90 38.60 0.00 2.50 1.50 0.74 0.74 0.80 0.80 103.80 103.90 26.01 26.05 No ChangeDEWLCR36/21/2023 12:05 0.30 5.30 17.60 76.80 4.26 2.61 2.60 0.01 0.01 101.00 101.10 2.94 3.47 DEWLCR4 6/21/2023 18:40 54.70 39.30 0.00 6.00 1.23 -3.00 -2.99 2.99 2.99 88.50 88.50 123.00 123.05 No ChangeDEWLCR56/21/2023 18:55 3.20 3.30 18.40 75.10 -0.32 -7.42 -7.31 0.02 0.04 91.70 92.10 1.11 1.47 No Change Notes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =139 Number of Wells with Methane > 58%=29 Total Number of Well Readings =143 Number of Wells with Oxygen ≥ 2%=23 Total Number of Readings NOT Collected =-4 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =0 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =32 Number of Wells with No Room to Run (NRTR)=-2 P:\O&M\City of Denton\2023\(6) June\Forms\City of Denton O&M Report May 2023.xlsx Weaver Consultants Group, LLC 7/11/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNSV001 6/21/2023 18:50 11.40 14.50 6.40 67.70 -5.62 -1.22 -1.22 0.00 0.00 91.00 91.30 0.00 0.00 No ChangeCDNSV0026/21/2023 18:48 14.40 15.90 8.50 61.20 -5.67 -5.67 -5.68 0.00 0.00 90.60 90.30 0.00 0.00 No Change CDNSV003 6/21/2023 18:46 19.80 18.90 6.00 55.30 -6.50 -14.66 -11.89 13.28 12.95 92.40 92.90 242.09 240.62 No Change CDNSV004 6/21/2023 19:09 34.00 25.10 5.00 35.90 -5.64 -5.98 -6.01 0.01 0.01 94.60 94.60 7.13 5.27 No Change CDNSV005 6/21/2023 18:42 6.40 4.00 17.60 72.00 -5.64 -0.50 -0.49 0.00 0.00 93.40 93.40 0.00 0.00 No Change CDNSV006 6/21/2023 18:52 1.70 1.90 19.40 77.00 -5.62 -3.35 -3.35 0.00 0.00 84.50 84.40 0.00 0.00 No ChangeCDNSV0076/21/2023 18:56 2.40 2.80 18.50 76.30 -5.62 -5.37 -5.37 0.00 0.00 87.80 87.50 0.00 0.00 No Change CDNSV008 6/21/2023 18:58 3.90 3.70 17.70 74.70 -5.64 -5.39 -5.37 0.00 0.00 86.40 86.30 0.00 0.00 No ChangeCDNSV0096/21/2023 18:59 1.00 1.50 19.40 78.10 -5.67 -4.47 -4.45 0.00 0.00 85.00 85.00 0.00 0.00 No Change CDNSV010 6/21/2023 19:01 18.60 14.60 11.30 55.50 -5.62 -6.01 -6.01 0.01 0.01 88.90 88.90 8.09 6.88 No ChangeCDNSV0116/21/2023 19:03 4.30 6.20 15.80 73.70 -5.62 -5.92 -5.71 0.00 0.00 93.40 93.80 0.00 0.00 No Change CDNSV012 6/21/2023 19:05 14.60 13.50 7.40 64.50 -5.64 -5.37 -5.37 0.01 0.00 95.40 95.70 5.27 0.00 No Change CDNSV013 6/21/2023 19:07 35.90 27.90 1.10 35.10 -5.62 -6.01 -6.01 0.00 0.00 94.50 94.60 3.40 3.23 No Change CDNSV014 6/21/2023 19:08 34.50 25.50 4.90 35.10 -5.62 -5.98 -6.01 0.00 0.00 94.20 94.30 0.00 0.00 No Change Soil Vapor Extraction Well Data P:\O&M\City of Denton\2023\(6) June\Forms\City of Denton O&M Report May 2023.xlsx Weaver Consultants Group, LLC 7/11/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCG002 7/25/2023 11:00 0.00 0.00 11.40 88.60 0.00 0.00 0.00 0.00 0.00 76.60 76.50 NR NR Calibration CDNCGCH4 7/25/2023 11:03 50.00 35.70 0.00 14.30 -0.01 0.00 0.00 0.00 0.00 77.80 77.60 NR NR CalibrationCDNINLT17/25/2023 11:14 44.70 33.40 2.70 19.20 0.01 -12.22 -12.14 12.16 12.13 100.80 100.30 809.00 809.00 Flare Inlet CDNBLWR1 7/25/2023 11:15 44.60 33.90 2.70 18.80 0.05 1.92 1.93 0.00 0.00 100.50 100.60 809.00 809.00 Blower CDNCG002 7/28/2023 9:25 0.00 0.00 11.20 88.80 0.02 0.00 0.00 0.00 0.00 88.80 89.90 NR NR CalibrationCDNCGCH47/28/2023 9:27 49.90 35.00 0.00 15.10 0.02 0.00 0.00 0.00 0.00 90.00 89.60 NR NR Calibration CDNCG002 7/28/2023 12:11 0.00 0.00 11.50 88.50 0.01 0.00 0.00 0.00 0.00 81.20 78.60 NR NR Calibration CDNCGCH4 7/28/2023 12:15 50.40 35.60 0.00 14.00 -0.01 0.00 0.00 0.00 0.00 78.30 78.20 NR NR Calibration CDNINLT2 7/28/2023 12:19 45.10 33.40 2.80 18.70 0.00 -10.27 -10.18 10.34 10.28 98.50 98.60 817.00 817.00 Flare Inlet CDNBLWR2 7/28/2023 12:21 44.70 33.20 2.80 19.30 0.00 1.95 1.99 0.00 0.00 100.30 100.50 817.00 817.00 Calibration CDN00GHG 7/28/2023 12:21 45.10 33.70 2.80 18.40 -0.02 1.96 2.01 0.00 0.00 100.70 101.10 817.00 817.00 GHG CDNGW040 7/28/2023 10:46 0.00 0.00 20.20 79.80 0.54 0.05 0.04 0.00 0.00 96.30 97.10 0.00 0.00 CDNGW044 7/25/2023 19:26 57.10 39.70 0.00 3.20 -1.72 0.70 0.70 0.73 0.74 103.10 103.10 2.70 2.70 No Change,Valve completely closedCDNGW0457/25/2023 19:28 56.60 39.30 0.00 4.10 -6.84 0.58 0.59 0.01 0.01 101.60 101.70 1.02 1.44 No ChangeCDNGW0467/25/2023 19:37 55.70 36.70 0.00 7.60 1.94 1.28 1.29 0.08 0.05 103.90 104.00 8.34 6.72 No ChangeCDNGW0477/25/2023 20:14 0.80 0.60 21.40 77.20 -6.60 -0.24 -0.23 0.21 0.21 99.60 99.50 3.32 3.27 No Change,Valve completely closedCDNGW0487/25/2023 20:16 56.80 40.00 0.00 3.20 -6.43 -6.82 -7.12 0.87 1.29 98.10 98.10 6.64 8.09 No ChangeCDNGW0497/28/2023 9:59 NR NR NR NR -129.35 4.46 NR 4.37 NR 92.20 NR 145.55 NR CDNGW050 7/25/2023 20:19 56.50 38.10 0.00 5.40 -5.47 -5.41 -5.41 5.48 5.48 99.50 99.50 30.33 30.32 No ChangeCDNGW0517/25/2023 20:35 58.40 38.90 0.00 2.70 2.93 2.35 2.36 0.03 0.01 96.50 96.60 1.17 0.83 No ChangeCDNGW0527/25/2023 20:33 57.10 38.90 0.00 4.00 0.56 1.31 1.32 1.35 1.36 98.80 98.80 15.25 15.30 No ChangeCDNGW0547/28/2023 9:58 NR NR NR NR 0.38 0.01 NR 0.00 NR 93.50 NR 0.00 NRCDNGW0557/28/2023 9:56 61.90 37.50 0.00 0.60 3.16 2.90 2.91 0.66 0.66 97.70 97.70 2.57 2.57CDNGW0557/28/2023 9:57 62.80 37.20 0.00 0.00 3.22 2.92 2.92 0.58 0.56 97.70 97.70 2.41 2.38 No ChangeCDNGW0577/28/2023 9:53 59.40 39.40 0.00 1.20 3.12 2.75 2.75 0.02 0.02 95.40 95.80 0.92 0.95 No ChangeCDNGW0577/28/2023 9:54 60.00 39.10 0.00 0.90 3.12 2.75 2.75 0.02 0.02 96.00 96.10 0.96 0.97 No ChangeCDNGW0587/28/2023 9:50 59.10 39.40 0.00 1.50 4.09 3.84 3.84 0.02 0.04 99.20 99.70 4.26 5.64 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data P:\O&M\City of Denton\2023\(7) July\Forms\City of Denton O&M Report July 2023 Weaver Consultants Group, LLC8/8/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW058 7/28/2023 9:51 59.30 39.90 0.00 0.80 3.90 3.83 3.85 0.00 0.01 100.10 100.20 0.66 2.62 No ChangeCDNGW0597/25/2023 20:54 NR NR NR NR NR NR NR NR NR 94.50 NR NR NRCDNGW0607/25/2023 21:00 57.80 37.20 0.00 5.00 2.09 1.50 1.55 0.05 0.02 96.90 96.80 1.61 0.89 No ChangeCDNGW0617/25/2023 21:01 NR NR NR NR NR NR NR NR NR 96.20 NR NR NRCDNGW0627/25/2023 20:56 57.50 39.70 0.00 2.80 -2.92 -3.78 -4.02 3.01 3.24 97.20 97.20 22.60 23.43 No ChangeCDNGW0637/25/2023 20:53 57.60 39.10 0.00 3.30 -0.14 4.18 4.20 0.00 0.00 93.80 94.10 0.00 0.00 No ChangeCDNGW0647/25/2023 20:50 57.50 38.90 0.00 3.60 3.14 2.51 2.55 0.39 0.34 93.50 93.50 8.23 7.68 No ChangeCDNGW0657/25/2023 20:48 NR NR NR NR NR NR NR NR NR 89.80 NR NR NRCDNGW0667/25/2023 20:37 58.20 38.40 0.00 3.40 -5.24 -5.87 -5.94 0.03 0.04 97.80 97.90 5.01 5.77 No ChangeCDNGW0677/25/2023 20:11 56.10 39.40 0.00 4.50 -5.17 -5.56 -5.56 0.18 0.18 103.50 103.50 12.36 12.36 No ChangeCDNGW0687/25/2023 19:58 57.40 38.40 0.00 4.20 -6.00 -1.71 -1.70 0.01 0.02 103.80 103.80 2.48 2.79 No ChangeCDNGW0747/25/2023 19:13 56.50 37.70 0.00 5.80 -6.05 -0.55 -0.36 0.62 0.46 107.70 108.00 1.57 1.35 No Change,Valve completely closedCDNGW0757/25/2023 19:11 57.50 38.30 0.00 4.20 -5.97 -0.49 -0.46 0.49 0.46 106.40 106.40 4.96 4.80 No Change,Valve completely closedCDNGW0767/25/2023 19:05 57.00 38.80 0.00 4.20 -6.11 -0.61 -0.61 0.70 0.71 106.80 106.80 56.62 57.18 No ChangeCDNGW0777/28/2023 10:10 53.40 34.90 0.00 11.70 1.08 0.15 0.16 0.01 0.01 99.30 99.70 2.79 3.41 No ChangeCDNGW0787/25/2023 19:46 57.60 38.70 0.00 3.70 -0.47 0.73 0.72 0.72 0.72 102.50 102.60 2.67 2.68 No Change,Valve completely closedCDNGW0797/25/2023 19:44 56.80 39.20 0.00 4.00 -5.71 -0.93 -0.92 0.16 0.16 104.50 104.50 2.84 2.82 No ChangeCDNGW0807/25/2023 19:47 57.70 36.20 0.00 6.10 -6.28 -0.78 -0.77 0.11 0.09 106.00 106.00 9.68 8.88 No Change,Valve completely closedCDNGW0817/25/2023 19:42 56.50 37.90 0.70 4.90 -5.96 -0.08 -0.16 0.13 0.20 102.60 102.90 2.55 3.20 No Change,Valve completely closedCDNGW0827/25/2023 19:50 57.00 39.00 0.00 4.00 -2.77 -2.47 -2.40 2.46 2.48 105.60 105.50 45.43 45.64 No ChangeCDNGW0837/25/2023 19:40 57.80 38.60 0.00 3.60 1.06 0.41 0.43 0.44 0.46 103.50 103.60 14.31 14.79 No Change,Opened Valve 1/2 turn or lessCDNGW0847/25/2023 19:52 56.80 39.00 0.00 4.20 -5.94 -2.22 -2.19 0.34 0.30 102.70 102.80 4.14 3.87 No ChangeCDNGW0857/25/2023 19:20 55.50 38.60 0.00 5.90 -5.90 -0.11 -0.12 0.18 0.18 106.60 104.90 12.44 12.42 No Change,Valve completely closedCDNGW0867/25/2023 19:16 57.30 39.50 0.00 3.20 -4.88 -0.14 -0.14 0.04 0.04 108.10 107.20 5.67 5.68 No ChangeCDNGW0877/25/2023 19:55 56.40 38.10 0.00 5.50 -6.43 -0.05 -0.01 0.08 0.04 104.10 104.10 2.01 1.33 No ChangeCDNGW0887/25/2023 20:00 50.00 38.50 0.00 11.50 -5.50 -2.21 -2.41 0.52 0.74 101.50 101.50 15.69 18.67 No Change CDNGW089 7/25/2023 20:02 42.20 31.10 4.80 21.90 -3.43 -0.09 -0.04 0.04 0.02 101.70 101.80 4.58 3.38 No Change,Valve completely closed CDNGW090 7/25/2023 20:06 58.60 37.90 0.00 3.50 0.79 0.29 0.29 0.03 0.03 101.00 101.20 4.81 4.69 No Change,Valve completely closed CDNGW091 7/28/2023 10:05 58.30 40.10 0.00 1.60 -6.81 -0.75 -0.76 0.22 0.21 107.80 107.80 10.17 9.90 No Change CDNGW092 7/25/2023 20:08 56.10 37.20 0.00 6.70 -4.55 -3.44 -3.61 0.08 0.00 105.80 105.80 20.33 2.73 No Change CDNGW093 7/25/2023 20:22 53.80 37.70 0.00 8.50 -5.40 -4.34 -2.63 3.04 1.22 107.00 107.00 37.42 23.75 No Change CDNGW094 7/25/2023 20:24 54.30 38.50 0.00 7.20 -5.38 -0.13 -0.11 0.11 0.09 102.50 102.50 9.56 8.64 No Change,Valve completely closed CDNGW095 7/25/2023 20:31 57.00 39.60 0.00 3.40 -0.31 0.79 0.79 0.02 0.02 97.50 97.40 0.11 0.12 No Change,Valve completely closed CDNGW096 7/25/2023 20:29 56.20 39.90 0.00 3.90 -4.97 -0.14 -0.10 0.03 0.00 102.60 102.60 4.72 1.79 No Change CDNGW097 7/25/2023 20:26 56.90 39.70 0.00 3.40 -3.55 -3.34 -3.33 0.02 0.03 112.70 112.70 9.26 11.53 No Change CDNGW098 7/28/2023 10:02 59.50 39.10 0.00 1.40 -4.29 -0.61 -0.74 0.91 1.02 113.00 113.00 27.54 29.17 No Change CDNGW099 7/25/2023 20:39 57.10 39.60 0.00 3.30 1.57 0.88 0.95 0.89 0.97 98.60 98.20 20.53 21.48 No Change CDNGW100 7/25/2023 20:41 56.70 39.60 0.00 3.70 2.09 1.41 1.42 1.40 1.42 96.80 96.90 25.88 26.01 No Change,Valve completely closedCDNGW1017/25/2023 20:44 57.10 38.90 0.00 4.00 2.07 1.45 1.46 1.43 1.48 97.20 97.00 35.12 35.71 No ChangeCDNGW1027/25/2023 20:47 57.80 39.90 0.00 2.30 4.15 3.53 3.55 0.03 0.02 95.30 95.20 0.35 0.29 No ChangeCDNGW1067/25/2023 18:56 0.60 22.60 9.90 66.90 4.83 4.17 4.13 0.04 0.03 101.80 103.00 4.13 3.84 No Change P:\O&M\City of Denton\2023\(7) July\Forms\City of Denton O&M Report July 2023 Weaver Consultants Group, LLC8/8/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW107 7/28/2023 10:14 52.40 38.40 0.00 9.20 -7.52 -2.14 -2.09 0.82 0.78 109.20 109.20 26.26 25.48 No ChangeCDNGW1087/28/2023 10:17 56.80 40.40 0.00 2.80 -7.15 -2.38 -2.56 1.81 1.95 114.10 114.10 17.31 17.96 No ChangeCDNGW1097/28/2023 10:20 56.50 39.70 0.00 3.80 -7.53 -4.33 -4.33 1.10 1.16 117.00 116.90 22.36 22.91 No ChangeCDNGW1107/28/2023 10:24 55.60 39.50 0.00 4.90 -8.16 -3.36 -3.36 0.60 0.58 115.60 115.60 22.24 21.96 No ChangeCDNGW1117/28/2023 10:27 50.20 38.70 0.00 11.10 -7.00 -1.23 -1.16 0.62 0.52 109.70 109.70 22.76 20.85 No ChangeCDNGW1127/28/2023 10:30 33.30 31.70 2.70 32.30 -7.26 -0.21 -0.18 0.05 0.04 112.60 112.60 2.98 2.51 Closed Valve 1/2 turn or lessCDNGW1137/28/2023 10:33 41.80 37.20 0.00 21.00 -7.12 -0.88 -0.87 0.48 0.46 113.40 113.50 8.91 8.73 No ChangeCDNGW1147/28/2023 10:37 50.00 38.20 0.00 11.80 -6.94 -2.10 -2.11 0.99 1.03 117.60 117.60 12.78 13.03 No ChangeCDNGW1157/28/2023 10:40 43.50 36.90 0.00 19.60 -7.29 -1.98 -2.01 0.91 0.93 112.20 112.30 20.47 20.69 No ChangeCDNGW1167/28/2023 10:43 45.60 37.40 0.00 17.00 -7.18 -0.98 -0.98 0.64 0.65 112.30 112.30 17.26 17.39 No ChangeCDNGW1177/28/2023 10:52 41.50 35.50 0.00 23.00 -7.28 -1.08 -1.09 0.56 0.53 113.10 113.10 9.62 9.44 No ChangeCDNGW1187/28/2023 10:49 15.60 11.30 14.80 58.30 -7.05 -1.46 -1.14 0.80 0.57 109.10 109.10 11.57 9.81 Closed Valve 1/2 turn or lessCDNGW119R7/28/2023 10:57 0.50 0.80 20.00 78.70 -6.95 -0.03 -0.01 0.04 0.05 98.60 98.70 0.59 0.67 No Change,Valve completely closedCDNGW120R7/28/2023 10:59 57.20 39.70 0.00 3.10 -7.20 -7.73 -7.58 0.26 0.04 104.50 104.80 1.59 0.61 No ChangeCDNGW121R7/28/2023 11:02 56.60 35.10 0.10 8.20 -7.04 3.94 3.91 0.00 0.02 105.90 106.00 3.90 8.72 No Change,Valve completely closedCDNGW121R7/28/2023 11:02 56.60 34.80 0.10 8.50 -7.04 -2.72 -5.26 0.09 0.06 106.00 107.80 21.55 16.67 No ChangeCDNGW122R7/28/2023 11:05 2.00 5.80 18.20 74.00 -7.11 -0.12 -0.44 0.06 0.07 107.30 107.60 16.63 17.96 No Change,Valve completely closedCDNGW123R7/28/2023 11:09 13.20 17.80 0.70 68.30 -7.12 -1.10 -6.48 0.18 0.11 105.40 105.80 29.97 22.94 No Change,Valve completely closedCDNGW124R7/28/2023 11:11 15.00 15.20 13.20 56.60 -7.10 0.18 0.21 0.03 0.03 100.70 100.80 11.12 12.33 No Change,Valve completely closedCDNGW125R7/28/2023 11:13 5.30 11.70 12.90 70.10 -7.18 0.65 0.65 0.03 0.03 100.80 100.80 12.34 12.34 No Change,Valve completely closedCDNGW126R7/28/2023 11:14 1.10 10.10 15.40 73.40 -7.19 0.64 0.66 0.03 0.03 101.00 101.00 11.26 12.94 No Change,Valve completely closedCDNHZ0017/25/2023 18:31 59.00 37.80 0.00 3.20 -6.45 -6.45 -6.43 0.00 0.00 108.00 108.00 0.00 0.00CDNHZ0027/25/2023 18:27 60.00 37.20 0.00 2.80 -6.49 -6.43 -6.43 0.00 0.00 114.70 115.70 0.00 0.00CDNHZ0037/25/2023 18:23 58.60 38.10 0.00 3.30 -6.37 -1.86 -1.82 0.01 0.00 104.40 104.50 5.49 0.00 No ChangeCDNHZ0057/25/2023 18:20 54.60 37.30 0.00 8.10 -6.41 -5.82 -5.75 0.00 0.00 109.60 109.60 0.00 0.00 No ChangeCDNHZ0067/25/2023 18:16 49.90 26.00 0.00 24.10 -6.51 -0.09 -0.09 0.00 0.00 110.00 111.40 0.00 0.00 No Change CDNHZ007 7/25/2023 18:13 62.00 25.50 0.00 12.50 -6.61 -0.04 -0.04 0.00 0.00 113.00 113.60 0.00 0.00 No Change CDNHZ008 7/25/2023 18:09 35.20 33.60 0.10 31.10 -6.37 -5.33 -5.16 0.03 0.00 111.40 111.50 10.61 0.00 No Change CDNHZ010 7/25/2023 18:06 57.90 32.80 0.00 9.30 -6.53 -4.89 -4.86 0.00 0.00 97.20 96.50 0.00 0.00 No Change CDNHZ011 7/25/2023 18:04 62.20 34.80 0.00 3.00 -6.67 4.81 4.83 0.00 0.00 112.80 113.00 0.00 0.00 No Change,Valve completely closed CDNHZ012 7/25/2023 18:01 20.80 30.40 0.00 48.80 -6.84 3.45 3.45 0.00 0.00 113.00 113.40 0.00 0.00 No Change CDNHZ014 7/25/2023 17:58 57.10 40.00 0.00 2.90 -6.84 -1.07 -1.03 0.00 0.00 116.40 111.00 0.00 0.00 No Change CDNHZ015 7/25/2023 17:54 54.10 34.60 0.00 11.30 -6.61 -4.91 -4.91 0.00 0.00 114.50 114.50 0.00 0.00 No ChangeCDNHZ0177/25/2023 17:52 55.50 38.80 0.00 5.70 -6.62 -6.50 -6.43 0.00 0.00 115.10 116.80 0.00 0.00 No ChangeCDNHZ0187/25/2023 17:47 5.30 18.20 1.30 75.20 -6.63 -6.27 -6.28 0.00 0.00 120.70 121.60 0.00 0.00 No Change P:\O&M\City of Denton\2023\(7) July\Forms\City of Denton O&M Report July 2023 Weaver Consultants Group, LLC8/8/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ019 7/25/2023 17:42 57.10 34.60 0.00 8.30 -6.60 -5.72 -5.68 0.00 0.00 115.50 117.10 0.00 0.00 No ChangeCDNHZ0207/25/2023 17:38 58.40 37.50 0.00 4.10 -6.54 -6.18 -5.07 0.00 0.00 113.60 114.90 0.00 0.00 Closed Valve 1/2 turn or lessCDNHZ0217/25/2023 17:34 9.50 5.90 15.70 68.90 -6.65 -7.14 -7.12 0.00 0.00 115.50 118.00 0.00 0.00 No Change,Closed Valve 1/2 turn or CDNHZ022 7/25/2023 17:30 56.90 35.80 0.00 7.30 -6.53 -6.43 -6.43 0.00 0.00 117.50 118.60 0.00 0.00 No ChangeCDNHZ0237/25/2023 17:25 58.40 39.50 0.00 2.10 -6.53 -6.43 -6.43 0.00 0.00 117.20 118.80 0.00 0.00 No ChangeCDNHZ0257/25/2023 17:16 58.70 39.30 0.00 2.00 -6.50 -4.80 -4.77 0.00 0.00 121.90 118.40 0.00 0.00 No Change,Valve completely closedCDNHZ0267/25/2023 17:13 47.70 34.30 0.00 18.00 -6.59 -2.53 -2.49 0.03 0.00 119.20 119.40 10.97 0.00 No ChangeCDNHZ0297/25/2023 17:09 51.20 22.20 0.00 26.60 -6.59 -6.38 -6.20 0.00 0.00 119.30 122.10 0.00 0.00 No Change,Valve completely closedCDNHZ0307/25/2023 17:02 61.30 37.60 0.00 1.10 -6.74 -2.01 -2.06 0.00 0.00 121.40 120.40 0.00 0.00 No Change,Valve completely closedCDNHZ0317/25/2023 16:59 10.40 28.30 0.00 61.30 -6.77 -6.36 -6.43 0.00 0.00 119.90 118.20 0.00 0.00 No Change,Valve completely closed CDNHZ032 7/25/2023 16:54 21.90 29.00 1.20 47.90 -6.79 -6.43 -6.39 0.00 0.00 117.30 117.40 0.00 0.00 No Change,Valve completely closedCDNHZ0337/25/2023 16:50 40.10 30.80 0.00 29.10 -6.99 -6.44 -6.77 0.00 0.00 119.40 118.50 0.00 0.00 No ChangeCDNHZ0347/25/2023 16:47 59.80 37.40 0.00 2.80 -7.03 -6.04 -6.03 0.00 0.00 102.00 101.30 2.14 0.00 No Change CDNHZ035 7/25/2023 16:43 60.40 37.80 0.00 1.80 -7.00 -5.59 -5.79 0.00 0.00 120.30 118.30 0.00 0.00 No ChangeCDNHZ0367/25/2023 16:39 60.40 39.60 0.00 0.00 -6.94 -5.38 -5.10 0.01 0.00 120.00 120.00 5.83 0.00 No Change CDNLFG02 7/25/2023 12:17 58.40 41.10 0.00 0.50 -7.53 -1.06 -0.93 0.15 0.00 104.00 104.00 26.44 0.00 No Change CDNLFG03 7/25/2023 12:11 48.30 36.50 0.00 15.20 -7.65 -4.62 -4.12 3.43 2.96 96.00 96.00 5.82 5.41 Closed Valve 1/2 turn or lessCDNLFG057/25/2023 12:14 51.30 38.50 0.00 10.20 -7.67 -2.18 -2.16 0.00 0.00 92.00 92.10 0.00 0.00 No Change CDNLFG06 7/25/2023 12:04 51.50 37.10 0.00 11.40 -7.66 -1.24 -1.22 0.73 0.71 104.20 104.20 1.71 1.69 No ChangeCDNLFG077/25/2023 12:19 NR NR NR NR 0.54 -0.01 NR 0.00 NR 103.80 NR 0.00 NR CDNLFG08 7/25/2023 12:22 NR NR NR NR NR NR NR NR NR 104.50 NR NR NR CDNLFG16 7/25/2023 12:21 NR NR NR NR NR NR NR NR NR 103.00 NR NR NRCDNLFG177/28/2023 10:45 NR NR NR NR NR NR NR NR NR 93.10 NR NR NR CDNLFG18 7/25/2023 12:20 NR NR NR NR NR NR NR NR NR 101.80 NR NR NR CDNLFG19 7/25/2023 12:01 53.70 39.00 0.00 7.30 -7.87 -4.02 -4.00 3.46 3.42 96.20 96.10 3.74 3.71 No ChangeCDNLFG207/25/2023 11:58 50.70 38.60 0.00 10.70 -7.80 -6.43 -6.43 0.01 0.00 91.90 91.80 5.11 0.00 No Change CDNLFG21 7/25/2023 11:53 56.10 39.50 0.00 4.40 -7.87 -4.10 -4.07 0.03 0.00 96.30 96.30 11.91 0.00 No ChangeCDNLFG227/25/2023 11:50 42.10 30.30 4.50 23.10 -7.89 -2.26 -2.26 0.00 0.00 109.20 109.40 0.00 0.00 No Change,Valve completely closed CDNLFG23 7/25/2023 12:08 32.70 33.60 0.00 33.70 -7.68 -3.84 -3.44 3.19 2.81 104.10 104.10 3.56 3.35 Closed Valve 1/2 turn or less CDNLFG24 7/25/2023 11:48 33.20 33.60 0.00 33.20 -8.04 -0.92 -0.88 0.31 0.28 103.20 103.80 1.74 1.67 Closed Valve 1/2 turn or lessCDNLFG257/25/2023 11:45 NR NR NR NR 0.37 0.01 0.00 0.00 0.00 104.80 104.70 0.00 0.00CDNLFG267/25/2023 11:40 29.70 31.50 0.20 38.60 -8.36 -6.48 -6.74 0.63 0.58 102.90 102.90 17.02 16.35 Closed Valve 1/2 turn or less CDNLFG27 7/25/2023 11:43 33.40 32.10 0.00 34.50 -8.05 -7.56 -7.55 0.12 0.11 111.60 111.60 0.68 0.66 Closed Valve 1/2 turn or lessCDNLFG287/25/2023 11:33 31.30 34.60 0.00 34.10 -8.23 -4.83 -4.84 0.00 0.00 83.40 83.20 0.00 0.00 Opened Valve 1/2 turn or lessCDNLFG297/25/2023 11:30 49.30 41.20 0.00 9.50 -8.34 -4.09 -4.15 0.00 0.00 91.10 91.00 0.00 0.00 No Change CDNLFG30 7/25/2023 11:37 33.30 34.20 0.00 32.50 -7.99 -6.06 -6.06 0.00 0.00 87.10 87.10 0.00 0.00 No ChangeCDNLFG317/25/2023 16:23 49.70 37.80 0.10 12.40 -7.66 -2.82 -2.80 0.41 0.39 101.40 102.20 4.55 4.47 Closed Valve 1/2 turn or less CDNLFG32 7/25/2023 16:26 57.00 39.30 0.00 3.70 -7.67 -0.02 -0.01 0.00 0.00 114.20 114.40 0.13 0.11 No Change,Valve completely closed CDNLFG33 7/25/2023 21:08 50.30 37.20 0.00 12.50 -7.01 -0.60 -0.56 0.59 0.55 94.20 94.30 5.54 5.35 No ChangeCDNLFG347/28/2023 9:43 47.60 37.50 0.00 14.90 -7.46 -1.47 -1.47 1.00 0.95 94.30 94.40 7.18 7.00 No ChangeCDNLFG357/25/2023 16:30 28.10 31.60 0.00 40.30 -7.38 -6.18 -6.34 0.13 0.09 115.80 116.00 0.72 0.60 Closed Valve 1/2 turn or less P:\O&M\City of Denton\2023\(7) July\Forms\City of Denton O&M Report July 2023 Weaver Consultants Group, LLC8/8/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNLFG36 7/25/2023 21:05 52.00 37.40 2.00 8.60 0.64 -0.16 -0.15 0.03 0.02 95.30 95.30 12.14 10.73 No Change CDNLFG37 7/28/2023 9:46 55.20 39.40 0.00 5.40 -7.07 -2.07 -2.24 0.94 1.12 87.70 87.70 12.81 13.97 No Change CDNLFG38 7/25/2023 16:36 59.30 40.70 0.00 0.00 -6.85 -0.03 -0.03 0.02 0.02 119.10 119.60 0.28 0.30 No Change,Valve completely closedCDNLFG397/25/2023 21:03 54.20 36.60 0.00 9.20 -6.33 -1.12 -1.07 0.00 0.00 87.60 87.50 0.00 0.00 No Change CDNLFG41 7/25/2023 18:39 54.70 37.40 0.00 7.90 -6.74 -1.17 -1.17 0.77 0.77 95.10 91.20 25.71 25.74 No Change CDNLFG42 7/25/2023 18:42 57.50 38.60 0.00 3.90 -6.41 -0.06 -0.08 0.03 0.04 101.50 96.40 0.54 0.64 No ChangeCDNLFG437/25/2023 18:49 57.30 36.50 0.00 6.20 1.73 1.31 1.30 0.02 0.02 108.20 108.40 4.48 4.31 No Change DEWLCR3 7/25/2023 18:53 0.60 6.10 17.30 76.00 5.87 5.13 5.16 0.01 0.05 107.30 107.50 2.46 6.23 No Change,Valve completely closedDEWLCR47/25/2023 12:42 55.60 40.20 0.00 4.20 1.23 -3.64 -3.58 3.62 3.54 96.20 96.20 134.23 132.84 No Change DEWLCR5 7/25/2023 12:36 0.60 0.40 21.10 77.90 -9.87 -4.00 -4.05 3.84 3.80 93.80 93.80 14.01 13.95 No Change Notes:1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =139 Number of Wells with Methane > 58%=25 Total Number of Well Readings =143 Number of Wells with Oxygen ≥ 2%=14 Total Number of Readings NOT Collected =-4 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =0 Number of Wells with Temp. ≥ 120°F =9 Number of Wells with Positive Pressure ≥ 0 =34 Number of Wells with No Room to Run (NRTR)=-2 P:\O&M\City of Denton\2023\(7) July\Forms\City of Denton O&M Report July 2023 Weaver Consultants Group, LLC8/8/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNSV001 7/28/2023 11:32 6.10 10.00 9.40 74.50 -5.46 -0.76 -0.76 0.00 0.00 106.30 109.80 0.00 0.00 No Change CDNSV002 7/28/2023 11:27 2.00 2.50 18.10 77.40 -5.46 -2.59 -2.57 0.00 0.00 90.60 90.50 0.00 0.00 No ChangeCDNSV0037/28/2023 11:25 8.30 7.40 14.40 69.90 -5.46 -0.32 -0.33 0.00 0.00 104.70 105.00 0.00 0.00 No Change CDNSV004 7/28/2023 11:22 4.00 3.60 16.80 75.60 -5.59 -4.03 -4.03 0.00 0.00 101.20 101.20 0.00 0.00 No Change CDNSV005 7/28/2023 11:20 5.50 3.70 16.90 73.90 -5.46 -0.51 -0.51 0.00 0.00 106.90 107.10 0.00 0.00 No ChangeCDNSV0067/28/2023 11:34 1.90 2.60 18.30 77.20 -5.50 -3.70 -3.69 0.00 0.00 92.30 92.10 0.00 0.00 No Change CDNSV007 7/28/2023 11:36 1.20 2.20 18.00 78.60 -5.47 -5.39 -5.35 0.00 0.00 97.10 97.00 0.00 0.00 No Change CDNSV008 7/28/2023 11:39 1.10 2.10 18.50 78.30 -5.46 -4.84 -4.84 0.00 0.00 95.80 95.60 0.00 0.00 No Change CDNSV009 7/28/2023 11:40 1.80 1.80 19.10 77.30 -5.46 -2.78 -2.77 0.00 0.00 99.20 99.20 0.00 0.00 No Change CDNSV010 7/28/2023 11:43 16.60 13.50 12.10 57.80 -5.38 -6.05 -6.09 0.00 0.00 97.20 97.20 0.00 0.00 No ChangeCDNSV0117/28/2023 11:43 16.60 13.80 12.20 57.40 -5.42 -5.99 -6.05 0.00 0.00 97.20 97.20 0.00 0.00 No Change CDNSV012 7/28/2023 11:46 16.90 14.40 8.10 60.60 -5.29 -5.11 -5.11 0.00 0.00 103.20 103.20 0.00 0.00 No Change CDNSV013 7/28/2023 11:49 1.70 1.00 19.70 77.60 -5.28 -6.02 -6.14 0.00 0.00 104.90 104.90 0.00 0.00 No ChangeCDNSV0147/28/2023 11:51 4.60 3.30 17.70 74.40 -5.26 -6.01 -5.92 0.00 0.00 99.10 99.00 0.00 0.00 No Change Soil Vapor Extraction Well Data P:\O&M\City of Denton\2023\(7) July\Forms\City of Denton O&M Report July 2023 Weaver Consultants Group, LLC8/8/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments CDNCGCH4 8/15/2023 14:10 49.90 35.70 0.00 14.40 0.01 0.00 0.00 0.00 0.00 79.40 79.40 NR NR Calibration CDNCG002 8/15/2023 14:14 0.00 0.00 11.50 88.50 0.03 0.00 0.00 0.00 0.00 79.70 79.80 NR NR CalibrationCDNINLT18/15/2023 14:25 44.70 31.40 3.30 20.60 0.28 -19.72 -19.71 19.65 19.63 94.40 93.30 1504.00 1504.00 Flare Inlet CDNBLWR1 8/15/2023 14:26 43.40 31.00 3.20 22.40 0.29 3.77 3.77 0.00 0.00 95.80 97.00 1504.00 1504.00 Blower CDNCGCH4 8/16/2023 9:35 49.90 35.60 0.00 14.50 0.02 0.00 0.00 0.00 0.00 72.10 71.80 NR NR CalibrationCDNCG0028/16/2023 9:40 0.00 0.00 11.70 88.30 0.00 0.00 0.00 0.00 0.00 70.20 70.20 NR NR Calibration CDNCG002 8/16/2023 15:27 0.00 0.00 11.50 88.50 0.01 0.00 0.00 0.00 0.00 NR NR NR NR Calibration CDNCGCH4 8/16/2023 15:30 50.00 35.10 0.00 14.90 0.00 0.00 0.00 0.00 0.00 85.60 84.50 NR NR Calibration CDNINLT2 8/16/2023 15:33 42.90 31.90 3.40 21.80 0.01 -18.74 -18.86 19.05 19.02 97.40 96.70 1409.00 1409.00 Flare Inlet CDNBLWR2 8/16/2023 15:35 42.30 31.60 3.40 22.70 -0.02 3.52 3.52 0.00 0.00 98.10 98.70 1409.00 1409.00 Calibration CDN00GHG 8/16/2023 15:35 42.50 32.10 3.40 22.00 -0.01 3.47 3.51 0.00 0.00 99.30 98.70 1409.00 1409.00 GHG CDNGW040 8/16/2023 15:13 0.00 0.00 22.00 78.00 0.54 -0.04 -0.03 0.00 0.00 94.50 94.20 0.00 0.00 CDNGW044 8/15/2023 20:13 57.30 39.20 0.00 3.50 -7.85 -2.16 -2.15 2.14 2.12 96.90 96.90 4.61 4.59 No Change,Valve completely closedCDNGW0458/15/2023 20:17 57.20 39.10 0.00 3.70 -12.36 -0.68 -0.67 0.06 0.06 86.00 86.00 3.33 3.23 No Change,Valve completely closedCDNGW0468/15/2023 20:19 53.50 38.40 0.00 8.10 -8.81 -7.14 -6.82 0.15 0.31 100.10 100.20 11.39 16.26 No ChangeCDNGW0478/16/2023 10:26 0.20 0.10 21.40 78.30 -12.47 -1.21 -1.20 0.02 0.02 89.40 89.30 0.89 0.96 No Change,Valve completely closedCDNGW0488/16/2023 10:32 55.40 39.70 0.00 4.90 -12.61 -12.19 -12.12 1.55 1.53 99.10 99.10 8.78 8.74 No ChangeCDNGW0498/16/2023 11:25 NR NR NR NR NR NR NR NR NR 90.60 NR NR NR CDNGW050 8/16/2023 10:40 58.20 39.60 0.00 2.20 -11.77 -10.94 -10.95 11.29 11.29 99.90 99.90 43.00 43.01 CDNGW051 8/16/2023 11:23 60.30 37.10 0.00 2.60 1.57 1.01 1.01 0.03 0.01 101.00 101.10 1.19 0.79 No ChangeCDNGW0528/16/2023 11:20 51.10 35.00 3.00 10.90 0.54 0.04 0.04 0.03 0.05 97.00 97.00 2.23 2.84 Closed Valve 1/2 turn or lessCDNGW0548/16/2023 11:25 NR NR NR NR NR NR NR NR NR 89.90 NR NR NRCDNGW0558/16/2023 11:28 61.20 36.10 0.00 2.70 3.46 2.79 2.84 0.99 0.93 99.70 99.70 3.14 3.05 No ChangeCDNGW0578/16/2023 11:31 60.50 37.90 0.00 1.60 3.27 2.63 2.68 0.10 0.03 97.40 97.50 2.25 1.30 No ChangeCDNGW0588/16/2023 11:34 58.40 39.00 0.00 2.60 4.34 3.83 3.83 0.04 0.01 104.00 104.20 6.03 2.13 No ChangeCDNGW0598/16/2023 11:36 NR NR NR NR NR NR NR NR NR 98.00 NR NR NRCDNGW0608/16/2023 11:38 59.00 39.40 0.00 1.60 1.23 0.62 0.62 0.01 0.01 103.60 103.60 0.83 0.77 No Change Gas Extraction Monitoring Wellfield Data City of Denton Landfill GHG / Calibration / Blower / Flare Data P:\O&M\City of Denton\2023\(8) August\Forms\City of Denton O&M Report August 2023 Weaver Consultants Group, LLC10/2/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW061 8/16/2023 11:41 NR NR NR NR NR NR NR NR NR 93.90 NR NR NRCDNGW0628/16/2023 12:05 57.60 39.00 0.00 3.40 -10.99 -12.70 -12.36 13.30 12.98 93.30 93.40 46.77 46.23 No ChangeCDNGW0638/16/2023 12:09 58.20 40.00 0.00 1.80 -2.39 3.35 3.36 0.02 0.00 106.00 105.90 8.71 4.22CDNGW0648/16/2023 12:16 58.00 39.60 0.00 2.40 0.53 -0.01 -0.01 0.02 0.02 100.20 97.80 1.76 1.69 No ChangeCDNGW0658/16/2023 12:16 NR NR NR NR NR NR NR NR NR NR NR NR NRCDNGW0668/16/2023 11:14 59.20 39.10 0.00 1.70 -10.62 -10.90 -11.27 0.03 0.04 101.10 101.50 5.15 5.94 Closed Valve 1/2 turn or lessCDNGW0678/16/2023 10:22 55.30 38.60 0.00 6.10 -11.22 -11.12 -11.50 0.29 0.52 104.80 104.80 15.48 20.65 No ChangeCDNGW0688/16/2023 10:02 59.00 38.90 0.00 2.10 -12.29 -6.19 -6.20 0.04 0.04 99.90 99.90 4.27 4.52 No ChangeCDNGW0748/15/2023 20:02 50.60 36.60 0.00 12.80 -12.02 -1.20 -1.19 0.76 0.74 97.00 97.10 1.76 1.74 No ChangeCDNGW0758/15/2023 19:59 54.20 37.30 0.00 8.50 -12.05 -1.38 -1.44 0.56 0.62 99.70 99.70 5.34 5.63 No ChangeCDNGW0768/15/2023 19:56 54.20 37.40 0.00 8.40 -11.89 -1.48 -1.47 0.00 0.00 105.40 105.30 0.00 0.00 No ChangeCDNGW0778/16/2023 14:09 56.90 37.50 0.60 5.00 0.86 0.19 0.18 0.01 0.01 102.10 102.20 2.47 2.54 No ChangeCDNGW0788/15/2023 20:33 1.90 0.80 22.30 75.00 0.37 -0.36 -0.37 0.03 0.02 80.50 80.40 0.51 0.47 No Change,Valve completely closedCDNGW0798/15/2023 20:30 54.20 38.00 0.00 7.80 -11.82 -3.11 -3.21 0.69 0.77 99.30 99.20 5.93 6.25 No ChangeCDNGW0808/15/2023 20:36 54.30 38.10 0.00 7.60 -11.60 -2.72 -2.70 0.13 0.13 104.30 104.30 10.53 10.56 No Change,Valve completely closedCDNGW0818/15/2023 20:27 1.60 0.70 22.30 75.40 -11.72 -1.10 -1.07 0.01 0.02 85.10 85.00 0.70 1.06 No Change,Valve completely closedCDNGW0828/15/2023 20:39 54.70 37.60 0.00 7.70 -11.75 -6.48 -6.48 6.28 6.23 105.10 105.10 71.99 71.72 No ChangeCDNGW0838/15/2023 20:25 23.40 15.90 14.00 46.70 0.21 -0.42 -0.41 0.41 0.40 84.20 84.20 14.11 13.90 No Change,Valve completely closedCDNGW0848/15/2023 20:42 57.20 36.60 0.00 6.20 -11.96 -5.52 -5.45 0.87 0.91 99.40 99.40 6.65 6.79 No Change,Valve completely closedCDNGW0858/15/2023 20:08 55.30 38.80 0.50 5.40 -11.86 0.15 0.16 0.11 0.11 89.10 89.20 9.83 9.61 No Change,Valve completely closedCDNGW0868/15/2023 20:05 47.60 32.20 3.90 16.30 -11.76 -0.07 -0.04 0.02 0.00 90.80 90.70 4.08 1.07 Closed Valve 1/2 turn or lessCDNGW0878/15/2023 20:22 45.60 36.70 0.00 17.70 -11.68 -2.79 -2.76 0.09 0.07 94.10 93.60 2.20 1.96 No ChangeCDNGW0888/16/2023 10:06 41.20 35.00 0.00 23.80 -12.08 -4.95 -4.91 1.32 1.28 100.10 100.00 24.82 24.45 Closed Valve 1/2 turn or lessCDNGW0898/16/2023 10:10 1.50 1.00 21.00 76.50 -5.25 -1.75 -1.75 0.01 0.01 88.10 88.00 2.54 2.32 No Change,Valve completely closedCDNGW0908/16/2023 10:14 9.10 4.10 19.20 67.60 -0.49 -0.99 -1.00 0.00 0.00 87.20 87.20 1.19 0.66 No Change,Valve completely closedCDNGW0918/16/2023 14:06 56.30 38.90 0.00 4.80 -11.21 -1.26 -1.13 0.55 0.46 108.70 108.70 15.93 14.61 No Change CDNGW092 8/16/2023 10:19 54.10 38.70 0.00 7.20 -10.62 -7.11 -7.12 0.02 0.03 106.40 106.40 10.03 11.46 No Change CDNGW093 8/16/2023 15:04 42.10 36.10 0.00 21.80 -9.76 -2.58 -2.54 2.55 2.51 107.80 107.90 34.36 34.06 No Change CDNGW094 8/16/2023 15:08 54.20 38.50 0.00 7.30 -10.17 -0.53 -0.52 0.50 0.50 97.10 98.30 20.78 20.65 No Change CDNGW095 8/16/2023 10:44 8.70 6.00 18.10 67.20 -0.31 -1.00 -1.00 0.02 0.02 91.40 92.10 0.11 0.11 No Change,Valve completely closed CDNGW096 8/16/2023 10:48 58.90 40.20 0.00 0.90 -9.62 -1.70 -1.67 0.06 0.05 105.20 105.20 7.29 6.55 No Change CDNGW097 8/16/2023 10:54 58.10 40.70 0.00 1.20 -9.65 -8.08 -8.11 0.02 0.01 114.40 114.40 9.70 6.96 No Change CDNGW098 8/16/2023 14:01 57.40 40.30 0.00 2.30 -9.55 -0.80 -0.82 1.18 1.21 103.30 103.80 31.60 32.01 No Change CDNGW099 8/16/2023 11:05 58.40 40.00 0.00 1.60 0.81 0.31 0.31 0.33 0.34 99.70 99.60 12.48 12.68 Closed Valve 1/2 turn or less CDNGW100 8/16/2023 11:03 58.10 38.80 0.00 3.10 1.02 0.61 0.61 0.64 0.65 97.30 97.30 17.44 17.56 No Change CDNGW101 8/16/2023 10:59 58.30 40.50 0.00 1.20 1.04 0.70 0.71 0.72 0.72 95.80 95.80 24.84 24.84 No Change CDNGW102 8/16/2023 12:22 57.80 38.60 0.00 3.60 3.31 2.69 2.72 0.05 0.02 104.90 104.80 0.46 0.27 No Change CDNGW106 8/15/2023 19:50 0.60 4.40 20.00 75.00 0.54 0.00 0.00 0.02 0.02 96.10 91.40 3.30 3.08 No ChangeCDNGW1078/16/2023 14:13 50.60 37.10 0.00 12.30 -12.07 -2.19 -2.20 0.36 0.39 109.90 109.80 17.42 17.96 No ChangeCDNGW1088/16/2023 14:15 50.70 37.00 0.00 12.30 -11.61 -1.18 -1.18 0.51 0.50 115.90 115.90 9.24 9.15 No Change P:\O&M\City of Denton\2023\(8) August\Forms\City of Denton O&M Report August 2023 Weaver Consultants Group, LLC10/2/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNGW109 8/16/2023 14:17 53.10 38.70 0.00 8.20 -12.36 -5.69 -5.65 1.34 1.33 117.70 117.80 24.62 24.51 No ChangeCDNGW1108/16/2023 14:20 53.50 39.30 0.00 7.20 -12.64 -5.00 -4.99 1.13 1.11 116.30 116.30 30.47 30.20 No ChangeCDNGW1118/16/2023 14:22 51.20 38.10 0.00 10.70 -12.34 -1.51 -1.37 0.73 0.54 111.00 111.00 24.68 21.21 No ChangeCDNGW1128/16/2023 14:24 40.30 36.50 0.00 23.20 -12.20 -0.34 -0.32 0.10 0.09 113.40 113.50 4.01 3.81 No ChangeCDNGW1138/16/2023 14:27 41.70 35.50 0.00 22.80 -12.10 -1.04 -1.03 0.46 0.48 113.60 113.60 8.73 8.94 No ChangeCDNGW1148/16/2023 14:30 48.80 37.60 0.00 13.60 -12.23 -3.34 -3.28 1.75 1.74 117.30 117.30 16.94 16.91 No ChangeCDNGW1158/16/2023 14:32 47.20 37.20 0.00 15.60 -13.31 -2.79 -2.78 1.24 1.25 112.60 112.70 23.88 23.93 No ChangeCDNGW1168/16/2023 14:33 41.10 35.60 0.00 23.30 -12.01 -1.23 -1.44 0.72 0.88 112.50 112.60 18.21 20.19 No ChangeCDNGW1178/16/2023 14:41 39.80 34.80 0.00 25.40 -12.49 -1.69 -1.67 0.94 0.92 113.50 113.50 12.50 12.37 No ChangeCDNGW1188/16/2023 14:36 45.60 37.00 0.00 17.40 -12.03 -2.00 -2.08 1.23 1.31 110.10 110.00 14.36 14.81 No ChangeCDNGW119R8/16/2023 14:44 1.60 1.60 21.20 75.60 -12.26 -0.09 -0.09 0.02 0.02 102.70 103.00 0.48 0.49 No ChangeCDNGW120R8/16/2023 14:46 52.40 37.80 0.00 9.80 -12.21 -12.59 -12.51 0.39 0.34 105.50 105.90 1.93 1.81 No ChangeCDNGW121R8/16/2023 14:48 54.30 35.70 0.10 9.90 -12.29 7.10 6.95 0.01 0.00 106.50 106.50 7.32 4.37 No ChangeCDNGW122R8/16/2023 14:50 5.50 8.20 18.70 67.60 -12.30 3.37 3.37 0.00 0.01 100.90 100.80 3.92 6.78 No ChangeCDNGW123R8/16/2023 14:53 12.80 17.90 0.20 69.10 -12.30 0.86 0.90 0.00 0.00 103.00 103.30 2.75 1.95CDNGW124R8/16/2023 14:55 14.90 15.10 14.40 55.60 -12.36 0.10 0.10 0.01 0.01 97.00 97.30 7.74 7.96 No ChangeCDNGW125R8/16/2023 14:56 15.90 12.70 14.80 56.60 -12.37 0.16 0.16 0.02 0.02 98.20 98.30 8.89 9.57 No ChangeCDNGW126R8/16/2023 14:56 16.00 11.90 14.60 57.50 -12.81 0.18 0.19 0.01 0.01 99.00 99.10 4.78 8.51 No ChangeCDNHZ0018/15/2023 19:30 58.40 36.70 0.00 4.90 -12.21 -10.75 -10.18 0.00 0.00 96.60 96.60 0.00 0.00 No ChangeCDNHZ0028/15/2023 19:26 59.70 37.00 0.00 3.30 -12.43 -10.75 -10.74 0.00 0.00 99.30 99.50 0.00 0.00 No ChangeCDNHZ0038/15/2023 19:22 55.60 38.10 0.00 6.30 -12.45 -6.01 -6.04 0.00 0.00 98.10 98.20 0.00 0.00 No ChangeCDNHZ0058/15/2023 19:16 48.40 34.60 0.00 17.00 -12.33 -10.23 -10.23 0.00 0.00 98.70 98.70 0.00 0.00 No ChangeCDNHZ0068/15/2023 19:10 39.10 24.10 2.10 34.70 -12.51 -0.52 -0.53 0.00 0.00 103.90 104.20 0.00 0.00 No ChangeCDNHZ0078/15/2023 19:07 63.40 23.70 0.00 12.90 -12.25 -0.32 -0.32 0.00 0.00 99.50 99.40 0.00 0.00 No ChangeCDNHZ0088/15/2023 19:03 21.80 26.60 3.30 48.30 -12.48 -9.08 -9.03 0.00 0.00 101.80 101.70 0.00 0.00 No ChangeCDNHZ0108/15/2023 18:57 56.90 37.50 0.00 5.60 -12.44 -12.88 -12.88 0.00 0.00 92.20 92.10 0.00 0.00 No Change CDNHZ011 8/15/2023 18:54 61.40 33.70 0.00 4.90 -12.41 2.01 2.00 0.00 0.00 101.90 103.20 0.00 0.00 No Change CDNHZ012 8/15/2023 18:46 21.40 30.20 0.00 48.40 -12.38 2.80 2.81 0.02 0.00 102.80 103.10 8.86 0.00 No Change CDNHZ014 8/15/2023 18:42 56.10 38.50 0.40 5.00 -12.42 -3.96 -3.90 0.00 0.00 99.20 99.20 0.00 0.00 No Change CDNHZ015 8/15/2023 18:36 58.10 38.20 0.00 3.70 -12.40 -8.52 -8.54 0.00 0.00 106.90 106.80 0.00 0.00 No Change CDNHZ017 8/15/2023 18:33 57.20 39.30 0.00 3.50 -12.47 -13.23 -13.29 0.00 0.05 105.60 106.20 0.00 14.02 No Change CDNHZ018 8/15/2023 18:30 6.40 14.80 5.40 73.40 -12.43 -2.78 -2.75 0.00 0.00 110.90 111.30 0.00 0.00 No Change,Valve completely closed CDNHZ019 8/15/2023 18:27 57.80 37.10 0.00 5.10 -12.38 -1.92 -1.92 0.01 0.00 106.60 107.00 5.48 3.72 No ChangeCDNHZ0208/15/2023 18:25 58.10 38.20 0.00 3.70 -12.38 4.71 4.71 0.00 0.00 104.50 104.60 0.00 0.00 No Change,Valve completely closedCDNHZ0218/15/2023 18:21 33.40 18.40 0.00 48.20 -12.48 -0.12 -2.03 0.00 0.00 105.00 105.60 0.00 0.00 No Change,Valve completely closed P:\O&M\City of Denton\2023\(8) August\Forms\City of Denton O&M Report August 2023 Weaver Consultants Group, LLC10/2/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNHZ022 8/15/2023 18:18 60.70 36.70 0.00 2.60 -12.59 5.43 5.37 0.05 0.01 104.10 104.10 15.66 5.37 No Change,Valve completely closedCDNHZ0238/15/2023 18:15 56.10 39.20 0.00 4.70 -12.43 3.77 3.79 0.00 0.00 106.20 106.70 0.00 0.00 No Change,Valve completely closedCDNHZ0258/15/2023 18:12 56.60 40.10 0.00 3.30 -12.46 6.29 6.26 0.00 0.00 106.20 107.90 0.00 0.00 No Change,Valve completely closedCDNHZ0268/15/2023 18:09 58.50 38.80 0.00 2.70 -12.41 -0.90 -0.88 0.00 0.01 107.80 107.90 4.30 5.27 No ChangeCDNHZ0298/15/2023 18:05 65.70 30.50 0.00 3.80 -12.48 -1.28 -1.28 0.00 0.00 104.60 104.70 0.00 0.00 No Change,Valve completely closedCDNHZ0308/15/2023 18:01 57.70 39.90 0.00 2.40 -12.51 -12.20 -12.13 0.01 0.01 107.60 107.50 5.88 5.73 Closed Valve 1/2 turn or lessCDNHZ0318/15/2023 17:57 9.90 13.00 13.50 63.60 -12.51 -12.47 -12.27 0.00 0.00 106.90 109.00 0.00 0.00 Closed Valve 1/2 turn or lessCDNHZ0328/15/2023 17:53 21.80 27.20 0.50 50.50 -12.51 0.53 0.52 0.01 0.01 109.40 109.60 7.54 7.70 No ChangeCDNHZ0338/15/2023 17:00 35.60 29.50 0.00 34.90 -12.37 -0.39 -0.41 0.00 0.00 106.20 108.10 0.00 0.00 No Change,Valve completely closedCDNHZ0348/15/2023 16:55 58.80 38.30 0.00 2.90 -12.33 -8.35 -8.52 0.00 0.00 93.80 93.80 0.00 0.00 No Change CDNHZ035 8/15/2023 16:52 26.60 22.70 6.40 44.30 -12.08 -1.25 -1.25 0.00 0.00 106.80 106.80 0.00 0.00 No Change,Valve completely closedCDNHZ0368/15/2023 16:48 58.30 39.20 0.00 2.50 -12.23 -8.23 -8.27 0.00 0.00 105.60 105.80 4.40 4.23 No ChangeCDNLFG028/15/2023 15:19 57.40 39.80 0.00 2.80 -11.54 -0.51 -0.51 0.01 0.00 97.30 97.30 4.76 4.35 No Change CDNLFG03 8/15/2023 15:22 51.10 37.70 0.00 11.20 -11.85 -5.82 -5.92 4.69 4.75 94.30 94.30 6.80 6.83 No ChangeCDNLFG058/15/2023 15:16 51.40 38.00 0.00 10.60 -11.90 -1.87 -1.87 0.00 0.00 94.20 94.20 0.00 0.00 No Change CDNLFG06 8/15/2023 15:30 49.10 36.90 0.00 14.00 -11.84 -1.63 -1.64 1.49 1.50 92.30 92.40 2.47 2.48 No Change CDNLFG07 8/15/2023 15:39 NR NR NR NR NR NR NR NR NR 101.20 NR NR NRCDNLFG088/15/2023 15:40 NR NR NR NR NR NR NR NR NR 98.20 NR NR NR CDNLFG16 8/15/2023 15:40 NR NR NR NR NR NR NR NR NR 100.70 NR NR NR CDNLFG17 8/16/2023 13:40 NR NR NR NR NR NR NR NR NR 92.50 NR NR NR CDNLFG18 8/15/2023 15:42 NR NR NR NR 0.56 -0.01 NR 0.00 NR 100.50 NR 0.00 NR CDNLFG19 8/15/2023 15:33 55.10 39.10 0.00 5.80 -11.99 -6.22 -6.13 5.87 5.88 98.00 98.00 4.84 4.84 No ChangeCDNLFG208/15/2023 15:36 49.60 37.70 0.00 12.70 -11.88 -8.52 -8.52 0.00 0.00 92.20 92.20 0.00 0.00 No Change CDNLFG21 8/15/2023 15:09 54.00 38.30 0.00 7.70 -11.83 -3.40 -3.39 0.00 0.00 93.10 93.00 0.00 0.00 No Change CDNLFG22 8/15/2023 15:13 28.10 17.90 10.90 43.10 -11.78 -0.98 -0.98 0.00 0.00 103.90 104.70 0.00 0.00 No Change,Valve completely closedCDNLFG238/15/2023 15:26 40.70 35.20 0.00 24.10 -11.95 -4.14 -4.11 3.96 3.95 98.20 98.30 3.99 3.98 No Change CDNLFG24 8/15/2023 15:06 42.30 34.60 0.00 23.10 -11.72 -1.20 -1.25 0.56 0.60 102.80 102.80 2.35 2.43 Opened Valve 1/2 turn or lessCDNLFG258/15/2023 15:06 NR NR NR NR NR NR NR NR NR 105.80 NR NR NR CDNLFG26 8/15/2023 14:58 32.90 32.30 0.00 34.80 -12.15 -7.60 -7.80 1.64 1.71 103.50 103.70 27.50 28.06 Opened Valve 1/2 turn or less CDNLFG27 8/15/2023 15:02 36.60 32.50 0.00 30.90 -11.99 -9.79 -9.88 0.64 0.61 102.00 102.00 1.59 1.56 Opened Valve 1/2 turn or lessCDNLFG288/15/2023 14:53 33.20 33.20 0.00 33.60 -12.40 -4.06 -4.24 0.00 0.00 84.40 84.00 0.00 0.00 Opened Valve 1/2 turn or lessCDNLFG298/15/2023 14:50 47.80 39.50 0.00 12.70 -12.61 -4.53 -4.52 0.00 0.00 89.90 89.90 0.00 0.00 No Change,Valve completely closed CDNLFG30 8/15/2023 14:56 33.30 32.30 0.00 34.40 -11.76 -5.54 -5.61 0.00 0.00 90.60 90.10 0.00 0.00 Opened Valve 1/2 turn or lessCDNLFG318/15/2023 16:30 46.10 38.80 0.00 15.10 -12.84 -4.16 -4.12 0.68 0.64 103.20 103.10 5.85 5.70 No ChangeCDNLFG328/15/2023 16:33 56.80 40.20 0.00 3.00 -11.82 -1.87 -1.94 1.29 1.34 104.60 105.60 2.27 2.31 No Change,Valve completely closed CDNLFG33 8/16/2023 11:53 49.80 38.00 0.00 12.20 -12.86 -0.79 -0.76 0.77 0.73 99.10 99.20 6.28 6.12 No ChangeCDNLFG348/16/2023 11:50 47.50 38.60 0.00 13.90 -12.42 -1.85 -1.83 1.23 1.21 97.50 97.50 7.95 7.89 No Change CDNLFG35 8/15/2023 16:39 28.10 31.50 0.00 40.40 -12.38 -9.89 -9.98 0.35 0.36 106.60 106.90 1.18 1.19 Opened Valve 1/2 turn or less CDNLFG36 8/16/2023 11:57 48.40 35.30 2.80 13.50 -4.47 -0.31 -0.30 0.01 0.00 109.10 109.70 6.46 0.00 No ChangeCDNLFG378/16/2023 11:45 54.50 35.70 0.00 9.80 -11.76 -3.29 -3.47 1.62 1.80 89.40 89.10 16.72 17.62 No ChangeCDNLFG388/15/2023 16:43 46.80 37.60 0.30 15.30 -11.90 -0.01 -0.01 0.01 0.00 106.90 107.00 0.19 0.08 No Change,Valve completely closed P:\O&M\City of Denton\2023\(8) August\Forms\City of Denton O&M Report August 2023 Weaver Consultants Group, LLC10/2/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNLFG39 8/16/2023 12:01 56.20 39.10 0.00 4.70 -11.17 -2.39 -2.38 0.00 0.00 88.80 88.70 0.00 0.00 No Change CDNLFG41 8/15/2023 19:37 55.20 35.00 0.00 9.80 -12.42 -0.25 -0.24 0.03 0.02 90.10 89.90 4.73 4.14 No Change CDNLFG42 8/15/2023 19:42 56.70 37.70 0.00 5.60 -12.56 -0.77 -0.77 0.75 0.75 91.70 91.70 2.75 2.75 No ChangeCDNLFG438/15/2023 19:44 56.90 38.60 0.00 4.50 -2.64 -1.37 -1.38 0.02 0.00 98.00 98.30 3.80 1.14 No Change DEWLCR3 8/15/2023 19:52 0.40 7.30 14.60 77.70 2.26 -0.16 -0.07 0.01 0.01 89.20 89.30 2.42 2.81 No Change,Valve completely closed DEWLCR4 8/15/2023 16:10 56.80 40.90 0.00 2.30 0.93 -6.94 -6.95 0.01 0.02 96.10 96.10 6.39 10.63 No ChangeDEWLCR58/15/2023 15:57 50.40 37.70 0.50 11.40 -14.38 -5.47 -5.10 5.20 4.84 92.90 92.90 16.28 15.71 Closed Valve 1/2 turn or less Notes: 1) Methane readings shaded orange are < 48%, and red are ≥ 58%. 2) Oxygen readings shaded blue are >2%. 3) Header pressure readings shaded yellow indicate low header vacuum (> -5 in. of H2O column) available at the well. 4) Initial/adjusted static pressure readings shaded green have ≥ 0 inches of H2O column at the well. 5) Adjusted static pressure readings shaded purple have "very little room to run." The well vacuum is within 5 inches of H2O column of the available header pressure. 6) Temperature readings ≥ 120 degrees F are shaded dark purple Total Number of Wells =139 Number of Wells with Methane > 58%=25 Total Number of Well Readings =139 Number of Wells with Oxygen ≥ 2%=22 Total Number of Readings NOT Collected =0 Number of Wells with Balance Gas : Oxygen Ratio < 4:1 =0 Number of Wells with Temp. ≥ 120°F =0 Number of Wells with Positive Pressure ≥ 0 =25Number of Wells with No Room to Run (NRTR)=-2 P:\O&M\City of Denton\2023\(8) August\Forms\City of Denton O&M Report August 2023 Weaver Consultants Group, LLC10/2/2023 GEM ID Date and Time CH4%2 CO2 %O2 %3 Bal% Header Pressure4 Initial Static Pressure5 Adjusted Static Pressure5,6 Initial Differential Pressure Adjusted Differential Pressure Initial Temp. (°F) Final Temp. (°F) Initial Flow Adjusted Flow Comments Gas Extraction Monitoring Wellfield Data City of Denton Landfill CDNSV001 8/16/2023 13:46 5.20 11.20 8.50 75.10 -9.77 -0.78 -0.79 0.00 0.00 103.40 103.40 0.00 0.00 No Change CDNSV002 8/16/2023 13:48 0.50 1.00 21.00 77.50 -9.85 -0.24 -0.22 0.00 0.00 90.50 90.30 0.00 0.00 No ChangeCDNSV0038/16/2023 13:51 8.70 8.30 13.60 69.40 -9.97 -0.13 -0.13 0.00 0.00 99.70 99.50 0.00 0.00 No Change CDNSV004 8/16/2023 13:51 12.20 9.60 13.80 64.40 -9.78 -0.12 -0.11 0.00 0.00 99.10 99.10 0.00 0.00 No Change CDNSV005 8/16/2023 13:54 8.20 5.70 17.60 68.50 -9.68 -0.70 -0.69 0.00 0.00 106.50 106.40 0.00 0.00 No ChangeCDNSV0068/16/2023 13:43 0.50 1.20 20.00 78.30 -9.81 -4.95 -4.93 0.00 0.00 89.10 89.10 0.00 0.00 No Change CDNSV007 8/16/2023 13:39 0.50 1.20 19.90 78.40 -9.51 -7.60 -7.61 0.00 0.00 93.30 93.00 0.00 0.00 No Change CDNSV008 8/16/2023 13:37 0.40 1.00 20.70 77.90 -9.43 -6.18 -6.18 0.00 0.00 92.30 92.20 0.00 0.00 No Change CDNSV009 8/16/2023 13:35 0.20 1.20 21.00 77.60 -9.32 -1.62 -1.62 0.00 0.00 94.60 94.50 0.00 0.00 No Change CDNSV010 8/16/2023 13:32 8.90 11.70 12.50 66.90 -9.33 -9.49 -9.27 0.00 0.00 95.10 95.30 0.00 0.00 No ChangeCDNSV0118/16/2023 13:30 0.60 0.80 21.00 77.60 -9.15 -3.95 -3.93 0.00 0.00 86.40 86.30 0.00 0.00 No Change CDNSV012 8/16/2023 13:27 17.10 14.30 8.10 60.50 -9.27 -8.04 -8.04 0.01 0.01 98.80 99.10 5.93 5.93 No Change CDNSV013 8/16/2023 13:26 2.30 1.20 21.80 74.70 -9.28 -8.34 -8.33 0.53 0.52 86.00 86.00 49.60 48.69 No ChangeCDNSV0148/16/2023 13:24 7.70 4.20 19.10 69.00 -9.27 -9.30 -9.43 0.00 0.00 93.30 90.80 0.00 0.00 No Change Soil Vapor Extraction Well Data P:\O&M\City of Denton\2023\(8) August\Forms\City of Denton O&M Report August 2023 Weaver Consultants Group, LLC10/2/2023 TIER 2 NMOC EMISSION RATE REPORT CITY OF DENTON LANDFILL DENTON COUNTY, TEXAS TCEQ PERMIT NO. MSW-1590B Prepared for City of Denton August 2023 Prepared by Weaver Consultants Group, LLC 6420 Southwest Blvd., Suite 206 Fort Worth, Texas 76109 817-735-9770 Project No. 1006-351-50-35 August 2, 2023 Project #: 1006-351-50-35 6420 Southwest Boulevard • Suite 206 • Fort Worth, Texas 76109 • 817-735-9770 • wcgrp.com • Offices Nationwide Cheryl Seager Director, Enforcement and Compliance Assurance Division EPA Region 6 120 Elm Street, Suite 500 Mail Code 6ECD Dallas, Texas 75270 Re: Federal Plan Subpart OOO Tier 2 NMOC Emission Rate Report City of Denton Landfill – Denton County, Texas TCEQ Permit No. MSW-1590B Dear Ms. Seager: Please find enclosed the Tier 2 NMOC Emission Rate Report for the City of Denton Landfill (Landfill) located in Denton County, Texas, which is being submitted on behalf of our client, the City of Denton. The Landfill is subject to 40 Code of Federal Regulations (CFR) §62, Subpart OOO – Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction, Reconstruction, or Modification Before July 17, 2014 and Have Not Been Modified or Reconstructed Since July 17, 2014. These new rules were published in the Federal Register on May 21, 2021 and became effective on June 21, 2021. 40 CFR Part 62 Subpart OOO requires facilities to test and submit a Tier 2 report containing the site-specific nonmethane organic compound (NMOC) concentration every 5 years. Previous Tier 2 testing was completed at the site in 2018 and a report was submitted to the Texas Commission on Environmental Quality (TCEQ). A retest to obtain a current NMOC concentration for the landfill was completed at the site between June 20-23, 2023 and on July 24, 2023. The NMOC emission rate was estimated using the EPA Landfill Gas Emissions Model and the site-specific NMOC concentration. The Tier 2 results indicate that the NMOC emission rate will be below the regulatory threshold of 34 megagrams per year (Mg/yr) for 2023. Per 40 CFR §62.16724(c), an annual NMOC emission rate report will be submitted in 2024. A copy of this report has also been sent to the Texas Commission on Environmental Quality (TCEQ), and all other reports required by Subpart OOO will continue to be sent to EPA until the TCEQ has been issued full delegation for 40 CFR §62, Subpart OOO. Weaver Consultants Group, LLC Q:\CITY OF DENTON\TIER 2\2023\TIER 2 EMISSION RATE REPORT.DOC Tier 2 NMOC Emission Rate Report Rev. 0, 8/2/23 ii CONTENTS 1 INTRODUCTION 1-1 2 SAMPLING PROCEDURES 2-1 3 LABORATORY RESULTS 3-1 4 NMOC EMISSION RATE RESULTS AND PROJECTIONS 4-1 ATTACHMENT 1 Field Data ATTACHMENT 3 Laboratory Results and Information ATTACHMENT 3 Tier 2 NMOC Emission Rate Calculations Weaver Consultants Group, LLC Q:\CITY OF DENTON\TIER 2\2023\TIER 2 EMISSION RATE REPORT.DOC Tier 2 NMOC Emission Rate Report Rev. 0, 8/2/23 1-1 1 INTRODUCTION Pursuant to the Federal Plan for Municipal Solid Waste Landfills 40 Code of Federal Regulations (CFR) Part 62, Subpart OOO (Subpart OOO), a Tier 2 NMOC emission rate report for the City of Denton Landfill was submitted in 2018. The Tier 2 regulations state that the site-specific non-methane organic compound (NMOC) concentration must be retested every five years. As such, Weaver Consultants Group, LLC (WCG) conducted a Tier 2 NMOC test at the landfill between June 20 and June 23, 2023, and on July 24, 2023. This Tier 2 NMOC Emission Rate Report for the City of Denton Landfill was prepared for submittal to the Environmental Protection Agency (EPA), in accordance with the requirements of Subpart OOO regulations. The Tier 2 test was performed to determine the current site-specific concentration of NMOCs for use in calculating the landfill’s NMOC emission rate. The NMOC emission rate was estimated using the U.S. EPA’s Landfill Gas Emissions Model and the site-specific NMOC concentration. The Tier 2 results indicate that the NMOC emission rate will be below the regulatory threshold of 34 megagrams per year (Mg/yr) for 2023. Per 40 CFR §62.16724(c), an annual NMOC emission rate report will be submitted in 2024. Included in this report is a description of the field procedures used to collect the landfill gas (LFG) samples for laboratory analysis, the laboratory results, the completed Tier 2 NMOC emission rate calculations, and a discussion of the Tier 2 test results. Weaver Consultants Group, LLC Q:\CITY OF DENTON\TIER 2\2023\TIER 2 EMISSION RATE REPORT.DOC Tier 2 NMOC Emission Rate Report Rev. 0, 8/2/23 2-1 2 SAMPLING PROCEDURES The Tier 2 test procedures described below are consistent with the requirements and methods outlined in the EPA’s Method 25C for collecting and analyzing LFG samples for Tier 2 analysis. In accordance with the Subpart OOO [40 CFR §62.16718(a)(3)], the Tier 2 sampling protocol requires two samples be collected for every hectare of landfill in which refuse has been in-place for more than two (2) years, to a maximum of 50 samples. The City of Denton Landfill currently consists of approximately 116.23 acres (47 hectare) which has had refuse in place for more than two (2) years. The landfill currently has an active landfill gas collection and control system (GCCS) which influences approximately 70.9 acres (60.9%) of the landfill that has had waste in place for more than 2 years. NMOC samples were collected from the header pipe prior to the condensate knockout pot using the following NSPS method: 1.Prior to sampling, the LFG extraction wells were checked for vacuum. 2.Prior to collecting the LFG samples, a portable LFG monitoring instrument was used to measure the methane, carbon dioxide, oxygen and balanced gas (assumed to be nitrogen) concentrations at the header as a check for any indication of air leaks in the GCCS. The concentrations were observed to be within the limits allowed under EPA Method 25C for NSPS testing. 3.Three (3) passivated canisters were connected to the sampling train and a 3- liter LFG sample was collected at a rate of 500 ml/min or less. One of the canisters appeared to have an air leak and cannot be used in the Tier 2 calculations. As such a fourth sample was collected July 23, 2023, and the lab data for that sample have been included in the emissions report. 4.The canisters were sent via overnight delivery to a laboratory for analysis. The canisters were analyzed using EPA Method 25C for the NMOC analysis, and the nitrogen concentration of each sample was determined by using EPA Method 3C. The data from the gas sampling is included in Attachment 1 and a copy of the chain-of-custody form used during shipment of the canisters is included within Attachment 2. The City of Denton Landfill has approximately 45.33 (39.1%) acres of waste older than 2 years that is not influenced by (GCCS). Weaver Consultants Group, LLC Q:\CITY OF DENTON\TIER 2\2023\TIER 2 EMISSION RATE REPORT.DOC Tier 2 NMOC Emission Rate Report Rev. 0, 8/2/23 2-2 Using EPA Method 25C, Tier 2 sampling in the areas not influenced by the GCCS were collected from the landfill as follows: 1.A Hydropunch was used to drive a sampling probe through the landfill surface to depths of approximately 6 to 9 feet (at least 0.9 meters below the landfill cover). 2.The sampling train was connected to the sample probe and purged at a rate of 500 milliliters per minute (ml/min) or less for a minimum of 3 probe volumes. 3.The LFG present in the probe-hole was analyzed in the field using a portable LFG monitoring unit. Oxygen, carbon dioxide, methane, and nitrogen (balanced gas) concentrations were recorded. A copy of the field data is included in Attachment 1. 4.Upon verification that LFG was present in the probe-hole, sample canisters were used to collect a 1-liter sample from each sampling point at a sampling rate of 500 ml/min or less. 5.One extra canister of LFG was collected from 3 locations. This information has been included in the results. 6.The canisters were sent by overnight delivery to Air Technology Laboratories for analysis. The canisters were analyzed using EPA Method 25C for the NMOC analysis, with the nitrogen concentration of each sample being determined by EPA Method 3C. Weaver Consultants Group, LLC Q:\CITY OF DENTON\TIER 2\2023\TIER 2 EMISSION RATE REPORT.DOC Tier 2 NMOC Emission Rate Report Rev. 0, 8/2/23 3-1 3 LABORATORY RESULTS The certified analytical results for the Tier 2 testing, are presented in Attachment 2 – Laboratory Results and Information. Air Technology Laboratories used the equations in Section 12 of Method 25C to correct for dilution of the samples by water vapor, nitrogen, and pressurization of the canister in the lab. Three samples were drawn from each canister and analyzed by Air Technology Laboratories. The average of the analytical results for each canister are shown in the following tables and are expressed as total NMOC parts per million by volume (ppmv) as carbon. Per 40 CFR §62.16718(a)(3), to convert to total NMOC by volume as hexane, WCG divided the results by six. Table 1 Flare NMOC Concentration Lab Number Sample Location Corrected NMOC as Carbon (ppmv) Corrected NMOC as Hexane (ppmv) 1 PO72503-01 Flare 1a 690 115.0 PO62604-12 Flare 2 760 126.7 PO62604-13 Flare 3 720 120.1 Average 120.6 1 WCG divided the NMOC concentration, as carbon, by six to obtain NMOC as hexane. Weaver Consultants Group, LLC Q:\CITY OF DENTON\TIER 2\2023\TIER 2 EMISSION RATE REPORT.DOC Tier 2 NMOC Emission Rate Report Rev. 0, 8/2/23 3-2 Table 2 Landfill NMOC Concentration Lab Number Sample Location Corrected NMOC as Carbon (ppmv) Corrected NMOC as Hexane (ppmv) 1 Weighting Factor Weighted Contribution to Average NMOC as Hexane (ppmv) PO62604-01 1, 2, 3 840 140 3/24 17.5 PO62604-02 4, 5, 6 980 163.3 3/24 20.4 PO62604-03 7, 8, 9 1300 216.7 3/24 27.1 PO62604-04 10, 11, 12 1700 283.3 3/24 35.4 PO62604-05 13, 14, 15 1700 283.3 3/24 35.4 PO62604-06 16, 17, 18 1700 283.3 3/24 35.4 PO62604-07 19, 20, 21 3300 550 3/24 68.8 PO62604-08 22, 23, 24 1600 266.7 3/24 33.3 Weighted Average 273.3 1 WCG divided the NMOC concentration, as carbon, by six to obtain NMOC as hexane. Table 3 Total Site NMOC Concentration Landfill NMOC as Hexane (ppmv) Landfill Area (acres) Weighting Factor based on % acreage of the landfill Weighted Contribution to Average NMOC as Hexane (ppmv) Flare Samples 120.6 70.9 60.9% 73.4 Landfill Samples 273.3 45.3 39.1% 106.8 Weighted Average 180.2 Weaver Consultants Group, LLC Q:\CITY OF DENTON\TIER 2\2023\TIER 2 EMISSION RATE REPORT.DOC Tier 2 NMOC Emission Rate Report Rev. 0, 8/2/23 4-1 4 NMOC EMISSION RATE RESULTS AND PROJECTIONS 4.1 NMOC Emission Rate Results The Tier 2 NMOC emission rate calculation was completed using the U.S. EPA’s Landfill Gas Emissions Model to provide an estimate of the NMOC emissions using the site-specific NMOC sample concentrations for the City of Denton Landfill. The 2023 Tier 2 NMOC emission rate was calculated using refuse acceptance rates and the site- specific NMOC concentration of 180.2 ppmv as hexane, as determined by the Tier 2 test results. Based on site records, the mass of nondegradable solid waste was subtracted from the total mass of solid waste for the years 2004 – 2022. In accordance with Subpart OOO, a methane generation potential (Lo) of 170 cubic meters per megagram and a methane generation rate constant (k) of 0.05 per year was used in the NMOC calculations. The estimated 2023 NMOC emission rate for the Landfill was calculated to be 32.0 Mg/yr. The annual refuse acceptance rate and Tier 2 NMOC emission rate calculations for the landfill are provided in Attachment 3. The NMOC emission rate was estimated using the U.S. EPA’s Landfill Gas Emissions Model and the site-specific NMOC concentration. The Tier 2 results indicate that the NMOC emission rate will be below the regulatory threshold of 34 megagrams per year (Mg/yr) for 2023. Per 40 CFR §62.16724 (c), another annual NMOC emission rate report will be submitted in 2024. ATTACHMENT 1 FIELD DATA Method 25C/3C Gas Sampling Field Data Form Project Name:Tier 2 Testing Sample Source: Date:6/22/2023 Sampler: Location:City of Denton Landfill Angie Vandergriff Client:City of Denton Sample # Start Time Finish Time Start Pressure ("Hg) Finish Pressure ("Hg) Flare #1 8:00 8:06 -15 -5 Flare #2 8:20 8:26 -22 -5 Flare #3 8:40 8:46 -22 -5 Date:7/24/2023 Sampler: Location:City of Denton Landfill Angie Vandergriff Client:City of Denton Sample # Start Time Finish Time Start Pressure ("Hg) Finish Pressure ("Hg) Flare 1a 1:00 1:10 -22 -5 Flare 2a 1:30 1:36 -22 -5 Q:\City of Denton\Tier 2\2023\Method 25C-3C form-Flare ATTACHMENT 2 LABORATORY RESULTS AND INFORMATION ATTACHMENT 3 TIER 2 NMOC EMISSION RATE CALCULATIONS Attachment 3 LandGEM v. 3.03 - 2023 Tier 2 Reort 8/2/2023 Input Review LANDFILL CHARACTERISTICS Landfill Open Year 1985 Landfill Closure Year (with 80-year limit)2023 Actual Closure Year (without limit)2023 Have Model Calculate Closure Year?No Waste Design Capacity 9,648,056 megagrams MODEL PARAMETERS Methane Generation Rate, k 0.050 year -1 Potential Methane Generation Capacity, L0 170 m 3 /Mg NMOC Concentration 180 ppmv as hexane Methane Content 50 % by volume GASES / POLLUTANTS SELECTED Gas / Pollutant #1:NMOC Gas / Pollutant #2: Gas / Pollutant #3: Gas / Pollutant #4: WASTE ACCEPTANCE RATES (Mg/year)(short tons/year)(Mg)(short tons) 1985 88,177 96,995 0 0 1986 95,584 105,143 88,177 96,995 1987 140,641 154,705 183,761 202,138 1988 105,139 115,652 324,403 356,843 1989 77,999 85,799 429,541 472,495 1990 50,860 55,945 507,540 558,294 1991 58,764 64,640 558,400 614,240 1992 68,717 75,588 617,164 678,880 1993 75,061 82,567 685,880 754,468 1994 103,373 113,710 760,941 837,035 1995 80,767 88,843 864,314 950,745 1996 78,797 86,676 945,080 1,039,588 1997 103,406 113,747 1,023,877 1,126,265 1998 92,019 101,221 1,127,283 1,240,011 1999 101,241 111,365 1,219,302 1,341,232 2000 102,536 112,790 1,320,543 1,452,597 2001 100,080 110,088 1,423,079 1,565,387 2002 97,295 107,024 1,523,159 1,675,475 2003 96,635 106,299 1,620,454 1,782,500 2004 84,707 93,178 1,717,090 1,888,799 2005 87,661 96,427 1,801,796 1,981,976 2006 83,044 91,348 1,889,458 2,078,403 2007 89,073 97,981 1,972,501 2,169,751 2008 99,475 109,422 2,061,574 2,267,732 2009 124,248 136,673 2,161,049 2,377,154 2010 115,861 127,447 2,285,297 2,513,827 2011 117,136 128,849 2,401,158 2,641,274 2012 137,370 151,107 2,518,294 2,770,123 2013 143,730 158,103 2,655,664 2,921,230 2014 154,216 169,637 2,799,394 3,079,333 2015 186,440 205,084 2,953,610 3,248,971 2016 197,092 216,801 3,140,050 3,454,055 2017 204,560 225,016 3,337,142 3,670,856 2018 222,072 244,279 3,541,702 3,895,872 2019 236,884 260,572 3,763,773 4,140,151 2020 337,085 370,794 4,000,657 4,400,723 2021 381,675 419,842 4,337,743 4,771,517 2022 371,768 408,945 4,719,418 5,191,359 Year Waste Accepted Waste-In-Place Q:\City of Denton\Tier 2\2023\ Attachment 3 LandGEM v. 3.03 - 2023 Tier 2 Reort - REPORT Page 1 of 2 Weaver Consultants Group, LLC 8/2/2023 Attachment 3 LandGEM v. 3.03 - 2023 Tier 2 Reort 8/2/2023 Results (Mg/year)(m 3 /year)(av ft^3/min) 1985 0 0 0 1986 9.465E-01 2.641E+02 1.774E-02 1987 1.926E+00 5.374E+02 3.611E-02 1988 3.342E+00 9.324E+02 6.264E-02 1989 4.308E+00 1.202E+03 8.074E-02 1990 4.935E+00 1.377E+03 9.250E-02 1991 5.240E+00 1.462E+03 9.822E-02 1992 5.615E+00 1.567E+03 1.053E-01 1993 6.079E+00 1.696E+03 1.139E-01 1994 6.588E+00 1.838E+03 1.235E-01 1995 7.376E+00 2.058E+03 1.383E-01 1996 7.884E+00 2.199E+03 1.478E-01 1997 8.345E+00 2.328E+03 1.564E-01 1998 9.048E+00 2.524E+03 1.696E-01 1999 9.594E+00 2.677E+03 1.798E-01 2000 1.021E+01 2.849E+03 1.914E-01 2001 1.082E+01 3.017E+03 2.027E-01 2002 1.136E+01 3.170E+03 2.130E-01 2003 1.185E+01 3.307E+03 2.222E-01 2004 1.231E+01 3.435E+03 2.308E-01 2005 1.262E+01 3.521E+03 2.366E-01 2006 1.295E+01 3.612E+03 2.427E-01 2007 1.321E+01 3.684E+03 2.475E-01 2008 1.352E+01 3.771E+03 2.534E-01 2009 1.393E+01 3.885E+03 2.610E-01 2010 1.458E+01 4.068E+03 2.733E-01 2011 1.511E+01 4.216E+03 2.833E-01 2012 1.563E+01 4.362E+03 2.930E-01 2013 1.635E+01 4.560E+03 3.064E-01 2014 1.709E+01 4.768E+03 3.204E-01 2015 1.791E+01 4.997E+03 3.358E-01 2016 1.904E+01 5.312E+03 3.569E-01 2017 2.023E+01 5.643E+03 3.792E-01 2018 2.144E+01 5.980E+03 4.018E-01 2019 2.278E+01 6.354E+03 4.269E-01 2020 2.421E+01 6.753E+03 4.538E-01 2021 2.664E+01 7.433E+03 4.994E-01 2022 2.944E+01 8.214E+03 5.519E-01 2023 3.200E+01 8.926E+03 5.998E-01 Year NMOC Q:\City of Denton\Tier 2\2023\ Attachment 3 LandGEM v. 3.03 - 2023 Tier 2 Reort - REPORT Page 2 of 2 Weaver Consultants Group, LLC 8/2/2023 Recipient:Shipper: DALLAS, TX, US,Fort Worth, TX, US, Reference 1006-351-50-35 sw The following is the proof-of-delivery for tracking number:772929493949 Thank you for choosing FedEx Status: Signed for by: Service type: Special Handling: Delivered To: Delivery Location: Delivery date: Delivery Information: Shipping Information: Tracking number:Ship Date: Weight: Deliver Weekday Proof-of-delivery details appear below; however, no signature is available for this FedEx Express shipment because a signature was not required. FedEx Standard Overnight Signature release on file 772929493949 Aug 3, 2023 09:11 0.5 LB/0.23 KG Delivered August 03, 2023 Dear Customer, Aug 2, 2023 DALLAS, TX, Recipient:Shipper: TCEQ Region 4, TCEQ-Region 4 2309 GRAVEL DR FORT WORTH, TX, US, 76118 Angie Vandergriff, Weaver Consultants Group 6420 Southwest Blvd. Suite 206 Fort Worth, TX, US, 76109 Reference 1006-351-50-35 sw The following is the proof-of-delivery for tracking number:772929509643 Thank you for choosing FedEx Status: Signed for by: Service type: Special Handling: Delivered To: Delivery Location: Delivery date: Delivery Information: Shipping Information: Tracking number:Ship Date: Weight: Deliver Weekday Receptionist/Front Desk FedEx Standard Overnight C.CAROL 772929509643 Aug 3, 2023 13:02 0.5 LB/0.23 KG Delivered August 04, 2023 Dear Customer, 2309 GRAVEL DR Aug 2, 2023 FORT WORTH, TX, 76118 RFP for LFGE Project (#8465) www.scsengineers.com Appendix D3 Landfill Gas Recovery Projections Annual Total Total LFG Waste Waste LFG Recovery System LFG Recovery from Disposal In Place Potential Coverage Existing/Planned System Year (tons/yr) (tons) (scfm) (mmcf/day) (mmBtu/yr) (%) (scfm) (mmcf/day) (mmBtu/yr) 1985 96,995 96,995 0 0.00 0 0% 0 0.00 0 1986 105,143 202,138 64 0.09 16,890 0% 0 0.00 0 1987 154,705 356,843 128 0.18 34,052 0% 0 0.00 0 1988 115,652 472,495 221 0.32 58,682 0% 0 0.00 0 1989 85,799 558,294 281 0.41 74,844 0% 0 0.00 0 1990 55,945 614,239 319 0.46 84,719 0% 0 0.00 0 1991 64,640 678,879 334 0.48 88,733 0% 0 0.00 0 1992 75,588 754,467 353 0.51 93,998 0% 0 0.00 0 1993 82,567 837,034 379 0.55 100,819 0% 0 0.00 0 1994 113,710 950,744 408 0.59 108,399 0% 0 0.00 0 1995 88,843 1,039,587 455 0.65 120,895 0% 0 0.00 0 1996 86,676 1,126,263 482 0.69 128,220 0% 0 0.00 0 1997 113,747 1,240,010 506 0.73 134,678 0% 0 0.00 0 1998 101,221 1,341,231 547 0.79 145,420 0% 0 0.00 0 1999 111,365 1,452,596 576 0.83 153,258 0% 0 0.00 0 2000 112,790 1,565,386 610 0.88 162,339 0% 0 0.00 0 2001 110,342 1,675,728 643 0.93 171,060 0% 0 0.00 0 2002 107,271 1,782,999 671 0.97 178,442 0% 0 0.00 0 2003 106,544 1,889,543 697 1.00 185,498 0% 0 0.00 0 2004 120,657 2,010,200 723 1.04 192,277 0% 0 0.00 0 2005 124,513 2,134,713 751 1.08 199,643 0% 0 0.00 0 2006 113,615 2,248,328 781 1.13 207,798 0% 0 0.00 0 2007 127,820 2,376,148 804 1.16 213,726 0% 0 0.00 0 2008 131,294 2,507,442 834 1.20 221,684 60% 500 0.72 133,011 2009 160,596 2,668,038 870 1.25 231,457 57% 494 0.71 131,366 2010 143,130 2,811,168 994 1.43 264,382 50% 494 0.71 131,251 2011 147,838 2,959,006 1,268 1.83 337,317 45% 568 0.82 151,073 2012 166,022 3,125,028 1,424 2.05 378,840 38% 536 0.77 142,437 2013 176,509 3,301,537 1,571 2.26 417,744 34% 534 0.77 141,914 2014 191,250 3,492,787 1,653 2.38 439,693 32% 528 0.76 140,482 2015 231,990 3,724,777 1,751 2.52 465,629 32% 561 0.81 149,148 2016 249,278 3,974,055 1,763 2.54 468,754 41% 731 1.05 194,345 2017 268,000 4,242,055 1,638 2.36 435,680 44% 713 1.03 189,592 2018 279,298 4,521,353 1,652 2.38 439,412 43% 712 1.03 189,473 2019 292,189 4,813,542 1,672 2.41 444,607 44% 744 1.07 197,781 2020 388,067 5,201,609 1,633 2.35 434,405 52% 844 1.22 224,432 2021 436,674 5,638,283 1,726 2.49 459,041 28% 483 0.70 128,462 2022 458,869 6,097,152 1,889 2.72 502,417 35% 663 0.95 176,332 2023 470,340 6,567,492 2,079 2.99 552,919 41% 850 1.22 226,033 2024 482,100 7,049,592 2,286 3.29 608,095 37% 840 1.21 223,371 2025 494,150 7,543,742 2,489 3.58 661,900 60% 1,482 2.13 394,131 2026 506,500 8,050,242 2,686 3.87 714,481 65% 1,759 2.53 467,863 2027 519,160 8,569,402 2,880 4.15 765,974 69% 1,975 2.84 525,218 2028 532,140 9,101,542 3,070 4.42 816,510 70% 2,164 3.12 575,579 2029 545,440 9,646,982 3,257 4.69 866,215 72% 2,339 3.37 622,139 2030 559,080 10,206,062 3,441 4.96 915,204 72% 2,493 3.59 663,026 2031 567,470 10,773,532 3,623 5.22 963,592 73% 2,650 3.82 704,740 2032 575,980 11,349,512 3,799 5.47 1,010,362 74% 2,807 4.04 746,493 2033 584,620 11,934,132 3,969 5.72 1,055,650 75% 2,964 4.27 788,312 2034 593,390 12,527,522 4,134 5.95 1,099,582 76% 3,122 4.50 830,224 2035 602,290 13,129,812 4,295 6.18 1,142,277 76% 3,260 4.69 867,065 2036 611,320 13,741,132 4,451 6.41 1,183,845 76% 3,397 4.89 903,571 2037 620,490 14,361,622 4,604 6.63 1,224,388 77% 3,534 5.09 939,796 2038 629,800 14,991,422 4,753 6.84 1,264,003 77% 3,669 5.28 975,792 2039 639,250 15,630,672 4,899 7.05 1,302,782 78% 3,804 5.48 1,011,606 2040 648,840 16,279,512 5,042 7.26 1,340,808 78% 3,926 5.65 1,044,115 2041 655,330 16,934,842 5,182 7.46 1,378,160 78% 4,047 5.83 1,076,322 2042 661,880 17,596,722 5,318 7.66 1,414,262 78% 4,165 6.00 1,107,767 EXHIBIT 1. LFG RECOVERY PROJECTION - ALL PHASES CITY OF DENTON LANDFILL (UNIT 1), DENTON, TX City of Denton LFG model EXHBITS 11-10-23 CONFIDENTIAL AND PROPRIETARY © Copyright 1997-2020 SCS Engineers 11/10/2023 Annual Total Total LFG Waste Waste LFG Recovery System LFG Recovery from Disposal In Place Potential Coverage Existing/Planned System Year (tons/yr) (tons) (scfm) (mmcf/day) (mmBtu/yr) (%) (scfm) (mmcf/day) (mmBtu/yr) EXHIBIT 1. LFG RECOVERY PROJECTION - ALL PHASES CITY OF DENTON LANDFILL (UNIT 1), DENTON, TX 2043 668,500 18,265,222 5,449 7.85 1,449,212 79% 4,281 6.16 1,138,517 2044 675,190 18,940,412 5,577 8.03 1,483,103 79% 4,394 6.33 1,168,632 2045 681,940 19,622,352 5,700 8.21 1,516,022 79% 4,505 6.49 1,198,171 2046 688,760 20,311,112 5,821 8.38 1,548,047 79% 4,614 6.64 1,227,187 2047 695,650 21,006,762 5,938 8.55 1,579,254 80% 4,722 6.80 1,255,731 2048 702,610 21,709,372 6,053 8.72 1,609,713 80% 4,827 6.95 1,283,850 2049 709,640 22,419,012 6,165 8.88 1,639,487 80% 4,932 7.10 1,311,590 2050 716,740 23,135,752 6,274 9.03 1,668,639 80% 5,019 7.23 1,334,911 2051 723,910 23,859,662 6,382 9.19 1,697,223 80% 5,105 7.35 1,357,778 2052 731,150 24,590,812 6,487 9.34 1,725,293 80% 5,190 7.47 1,380,234 2053 738,460 25,329,272 6,591 9.49 1,752,896 80% 5,273 7.59 1,402,317 2054 745,840 26,075,112 6,693 9.64 1,780,079 80% 5,355 7.71 1,424,063 2055 753,300 26,828,412 6,794 9.78 1,806,884 80% 5,435 7.83 1,445,507 2056 760,830 27,589,242 6,894 9.93 1,833,352 80% 5,515 7.94 1,466,682 2057 768,440 28,357,682 6,992 10.07 1,859,520 80% 5,594 8.05 1,487,616 2058 776,120 29,133,802 7,089 10.21 1,885,423 80% 5,671 8.17 1,508,338 2059 783,880 29,917,682 7,186 10.35 1,911,093 80% 5,749 8.28 1,528,875 2060 791,720 30,709,402 7,282 10.49 1,936,563 80% 5,825 8.39 1,549,250 2061 799,640 31,509,042 7,377 10.62 1,961,860 80% 5,901 8.50 1,569,488 2062 807,640 32,316,682 7,471 10.76 1,987,013 80% 5,977 8.61 1,589,611 2063 33,318 32,350,000 7,565 10.89 2,012,047 80% 6,052 8.72 1,609,638 2064 0 32,350,000 7,069 10.18 1,880,039 83% 5,868 8.45 1,560,709 2065 0 32,350,000 6,583 9.48 1,750,788 85% 5,596 8.06 1,488,169 2066 0 32,350,000 6,132 8.83 1,630,722 85% 5,212 7.51 1,386,114 2067 0 32,350,000 5,712 8.23 1,519,143 85% 4,855 6.99 1,291,271 2068 0 32,350,000 5,322 7.66 1,415,410 85% 4,524 6.51 1,203,099 2069 0 32,350,000 4,959 7.14 1,318,940 85% 4,215 6.07 1,121,099 2070 0 32,350,000 4,622 6.66 1,229,195 85% 3,929 5.66 1,044,816 City of Denton LFG model EXHBITS 11-10-23 CONFIDENTIAL AND PROPRIETARY © Copyright 1997-2020 SCS Engineers 11/10/2023 City of Denton LFG model EXHBITS 11-10-23CONFIDENTIAL AND PROPRIETARY© Copyright 1997-2018 SCS Engineers 11/10/202301,0002,0003,0004,0005,0006,0007,0001995 2000 2005 2010 2015 2020 2025 2030 2035 2040 2045 2050LFG Flow at 50% Methane (scfm)EXHIBIT 2. LFG RECOVERY PROJECTION: CITY OF DENTON LANDFILL (UNIT 1), DENTON, TXRecovery PotentialRecovery from Existing/Planned SystemActual LFG Recovery RFP for LFGE Project (#8465) www.scsengineers.com Appendix D4 WWTP Flow Data 05010015020025030035040011/13/201811/30/201812/17/20181/3/20191/20/20192/6/20192/23/20193/12/20193/29/20194/15/20195/2/20195/19/20196/5/20196/22/20197/9/20197/26/20198/12/20198/29/20199/15/201910/2/201910/19/201911/5/201911/22/201912/9/201912/26/20191/12/20201/29/20202/15/20203/3/20203/20/20204/6/20204/23/20205/10/20205/27/20206/13/20206/30/20207/17/20208/3/20208/20/20209/6/20209/23/202010/10/202010/27/202011/13/202011/30/202012/17/2020MCFDate"Waste Gas""Heat Exchange""Total Gas Production" RFP for LFGE Project (#8465) www.scsengineers.com Appendix D5 Laboratory Data JET-CARE Cedar Knolls | NJ | USA T +1 973 292 9597 E inquiries@jet-care.com W jet-care.com SPECTRO | JET-CARE Odiham | Hampshire | UK T +44 (0) 1256 704000 E enquiries@spectro-oil.com W spectro-oil.com ‘Spectro’ and ‘Jet-Care’ are registered trademarks and trading names of Palace International Ltd. and are used under license by Jet-Care International Inc. Copyright © Palace International Ltd. 2016. All rights reserved. Page 1 of 1 Q/195A Issue 5, April 25 2016 SILICON TEST SAMPLE REPORT  Attention Michelle Schefsky  Telephone  Company DTE Biomass Energy  Fax  Address 1527 S. Mayhill Rd Suite 107 Denton, TX 76208  Email: MICHELLE.SCHEFSKY@DTEENERGY.COM  Site: Denton Power Report Date 07-02-19  Equipment Registration Analysis Date 07-02-19  Position: Date Received 06-28-19  Hours “” indicates information supplied by customer Summary Issue No: 1  Sample Date 06/24/2019 Sample Ref 4708  *Methane % 53.4% Lab Ref No Lab Result (ppm) M19F607 10.3 Lab Ref No Lab Result (ppm) M19F608 19.1 Lab Ref No Lab Result (ppm) M19F609 23.3 NOTE: As previously agreed, calculations supplied by Bio-Engineering Services are performed using original silicon results and Methane Values* as supplied with submitted samples. µg/BTU conversion and Silicon Test values are provided under the authority of Mark Downing, Bio-Engineering Services. This service is outside the scope of UKAS accreditation. Silicon Test (mg/Nm3CH4) 131.59 Silicon (ppm) 60.05 µg/Btu 3.88 Comments: Approved by: Opinions and interpretations herein are outside the scope of UKAS accreditation The tests are carried out in accordance with ‘in house’ documented methods. Silicon by Inductively Coupled Plasma is carried out using M019. Results are issued under the authority of Pam Kaur, Laboratory Manager. Christopher Polanco Laboratory Technician