HomeMy WebLinkAboutRFP 9055 Scope of Work FINALRFP 9055
City of Denton-Radio System Assessment and Support Services
1
CITY OF DENTON, TEXAS
REQUEST FOR PROPOSALS
RADIO SYSTEM ASSESSMENT AND SUPPORT SERVICES
RADIO SYSTEM ASSESSMENT TO SUPPORT THE CURRENT STATUS, GOALS,
AND OUTCOMES OF THE DENTON LAND MOBILE RADIO SYSTEM
Table of Contents
Section I: Introduction ……….……………………………………….………….….…….…....1
Section II: Submission Information ..……………………….………………….….…..………3
Section III: Evaluation Procedure ………………………….………….…………..….…….…4
APPENDIX A: Tasks …………………………………………….…………………..……….…5
SECTION I – INTRODUCTION
1.1 Purpose
Through this Request for Proposal (RFP), the City of Denton is seeking qualified firms
with substantial experience in providing various aspects of Land Mobile Radio (LMR)
systems for Public Safety departments and other City departments. The work to be
supported will evaluate existing operational equipment performance, antenna
performance, RF propagation, operational procedures, documentation availability,
Federal Communications Commission (FCC) licensing and corresponding programming
software. The scope of work for this RFP includes ten initial “projects” that have been
separated into individual Tasks of Work (Tasks #1 through #10), as outlined in Appendix
A. In addition, radio system support services over the next three (3) years will be
included in the scope.
The awarded firm must present proof of qualifications and ability to accomplish all
aspects of the requested services. A list of Vendor Qualifications is listed below in
Section 1.4.
The awarded firm shall possess a proven track record of providing goods and services
that represent the best value to their clients. The selected proposal should be able to
provide innovative methods to handle municipal challenges and cost-effective solutions.
RFP 9055
City of Denton-Radio System Assessment and Support Services
2
The City of Denton uses a 2-site Motorola simulcast, Phase II, trunked radio system
with 22 radio console units in two different dispatch centers that rely on a core
connection with a neighboring Public Safety partner. This system also supports 1400
subscriber units used by three different agencies. The City of Denton also uses a 3rd
radio tower site to house State interoperability frequencies and equipment.
1.2 Services/Tasks of Work
A list of the individual Tasks of Work is provided below with details for each Task
outlined in Appendix A. Any disruptions of service must be approved by the IT
Communications Manager with as much advance notice as possible.
List of Tasks of Work
Task Task Title
TASK 1: Evaluation of all radio systems including FCC Authorizations.
TASK 2: Infrastructure performance verification of radio sites.
TASK 3: System console performance verification.
TASK 4: Sampling of mobile and portable radio review.
TASK 5: Evaluation of operational procedures.
TASK 6: Propagation study of existing and proposed radio coverages.
TASK 7: Identification of any antenna pattern distortions.
TASK 8: Evaluation of the City of Denton radio system documentation and
confirm the programing software matches the radios.
TASK 9: Verify that the radio system infrastructure equipment is properly
grounded.
TASK 10: Measure the ground resistance at the tower sites.
Additional Services
The City may request for ancillary or additional services within the capacity of the
Vendor as may be useful or necessary in the interests of the City of Denton for the
above Tasks. These additional services may include, but not be limited to, preventative
radio system support services and training for City staff.
1.3 Deliverables
In addition to the services outlined in the scope, the awarded firm shall deliver each of
the deliverables listed below. See Appendix A for the deliverable details for each Task.
• Parameters of infrastructure and documentation
• Parameters of hardware and documentation
RFP 9055
City of Denton-Radio System Assessment and Support Services
3
• Comparison of FCC Authorizations and documentation
• Maps with supporting documentation
• Executive Report
1.4 Vendor Qualifications
All work should be conducted by a firm who has previous substantial experience
working Public Safety and other municipal departments and meet the following criteria:
Licenses/Certifications
• FCC General Radiotelephone Operator License (GROL)
• Public Safety Distributed Antenna System (DAS) Certification
• Radio Frequency Interference Mitigation (RFIM) Industry Certification
• Line Antenna Sweep (LAS) Industry Certification
• Passive Intermodulation (PIM) Industry Certification
• In-Building Public Safety Communications (IB-PSC)
Professional Experience
• Minimum of five (5) years of LMR system experience (two-way radio and
specifically Public Safety P25 systems):
o LMR simulcast radio system experience
o Standard LMR antenna configurations
o RF propagation and RF coverage prediction
• Proven expertise in system design, licensing, FCC and FAA application filings,
and operating Rules and Regulations, with the following FAA and FCC Rules and
Regulations: Part 1, Part 17, Part 90, and Part 101
• Experience and knowledge on testing tower top amplifiers
• Inventory management experience
SECTION II – SUBMISSION INFORMATION
Interested firms must submit sealed cost proposal and qualification submissions that
include, at minimum, the following information:
Summary of Qualifications submittal:
• Company Overview – Provide an overview of the company, including years in
business, size, areas of specialization, particular abilities, and qualifications
related to these services. Include the location of your office where the majority of
the work will be performed and approximate number of employees in that office.
• Method and Workplan Approach – Describe your team’s overall method and
approach to accomplish the goals and services outlined in Appendix A and
additional services. Explain how you plan to meet specific needs and adapt to
RFP 9055
City of Denton-Radio System Assessment and Support Services
4
changing requirements. Include approximate timeframe for completion of Task of
Works 1 through 10.
• Past Experience and Examples of Comparable Services – Summary of details on
three (3) completed past projects over the past five (5) years, particularly those
comparable in scope and size. Include name of client project manager with
phone number and email address.
• Proposed Team and Qualifications – Provide resumes/bios of all individual(s) that
would be directly responsible for completing these services for the City of
Denton. Include the availability and manpower estimates for each proposed team
member. Provide list of all relevant licenses, certifications, and industry
accreditations.
Cost Proposal submittal:
• Provide a proposal breakdown of the total cost to accomplish the goals, services,
and deliverables for each Task outlined within the scope and Appendix A.
• Provide and explain the pricing structure for any potential additional services.
SECTION III – EVALUATION PROCEDURE
The City of Denton will evaluate the submissions, meeting the Vendor Qualifications
outlined in Section 1.4, in accordance with the selection criteria and will rank the Firm(s)
on the basis of the submittals. The City of Denton reserves the right to consider
information obtained in addition to the data submitted in the response. The selection
criterion is listed below:
Proposed Method and Workplan Approach – 30%
Evaluation of the method and approach to accomplish the goals and services
outlined in Appendix A and additional services. Ability to meet specific needs,
adapt to changing requirements and complete tasks in a timely manner.
Proposed Team – 15%
Evaluation of the qualifications, reputation, and compatibility with needs of the
City of Denton and the Project of the individual or individuals who will perform the
Contract.
Past Experience of Firm – 25%
Evaluation of the quality of the firm’s experience and expertise in the areas
proposed.
Total Cost of Services/Price – 30%
RFP 9055
City of Denton-Radio System Assessment and Support Services
5
APPENDIX A: Tasks of Work
Table of Contents
Overview of Tasks………...…………………………………………………………….…….9
Task 1: Evaluation of all radio systems including FCC Authorizations…………………10
Task 2: Infrastructure performance verification of radio sites……………………………11
Task 3: System console performance verification………………………………..……….12
Task 4: Sampling of rolling stock review….……………………………………………..…13
Task 5: Evaluation of operational procedures……………………………………….…….14
Task 6: Propagation study of existing and proposed radio coverages…………….……15
Task 7: Identification of any antenna pattern distortions…………………………….……16
Task 8: Evaluation of the City of Denton radio system documentation and confirm
programming software matches the radios……………..……………………….17
Task 9: Verify that the radio system equipment is properly grounded………..………….18
Task 10: Measure the ground resistance at the tower sites…………………..…….….…19
RFP 9055
City of Denton-Radio System Assessment and Support Services
6
Overview of Tasks
The tables below present the descriptions and goals of ten Tasks, including but not
limited to, expected deliverables. Each Task is presented in the format below:
Goal
Implementation
Team (GIT)
This section indicates the Goal Implementation Team (GIT) that is
presenting the Task.
Purpose and
Outcomes
This section provides the purpose of the work and the expected
outcomes of the work. This section provides background information
and context for potential firms.
Project Steps
and Timeline
This section outlines the specific steps and purpose timeline of work
that should be accounted for by the responding firm. The firms
should also account for and provide detail regarding any additional
steps or work that may be undertaken to deliver the final products as
listed in the “Deliverables” section of the table for that Task.
Stakeholder /
Participants
This section lists the project stakeholders and/or participants that
the selected firm will use throughout the services to meet the
deliverables of that Task.
Deliverables This section provides documentation for an overview of the major
deliverables that will need to be submitted and approved by the City
of Denton in order to successfully meet the terms of the Contract.
RFP 9055
City of Denton-Radio System Assessment and Support Services
7
TASK 1: Evaluation of all radio systems including FCC Authorizations
Goal
Implementation
Team (GIT)
City of Denton Technology Services Department
Purpose and
Outcomes
Radio system evaluation to include all three radio sites. Provide
exact latitude / longitude, tower information, operating frequencies,
authorized radio emissions, FCC licensed Effective Radiated Power
(ERP) per channel, radio equipment, transmission line type and
length, antenna(s) type, model number and gain, mounted location
on tower, antenna orientation, antenna system configuration (include
RF passive equipment), receiver equipment (multi-coupler, RF
filters, tower-top amplifiers), link type, link frequency (licensed or
unlicensed?), link radio equipment (include emission, FCC ERP,
path information). Review FCC database for all City of Denton
issued FCC licenses.
Project Steps
and Timeline
Meet with the City of Denton IT Communications Manager for a kick-
off meeting to review the TASK, timeline, the roles and
responsibilities, milestones, and desired outcomes. The Vendor will
submit an Implementation Plan to the IT Communications Manager.
Stakeholder /
Participants
Employees and/or approved contractors of Vendor.
Deliverables Provide documentation and an Executive Summary Report of items
listed in the above Purpose and Outcomes. Provide
recommendations.
RFP 9055
City of Denton-Radio System Assessment and Support Services
8
TASK 2: Infrastructure performance verification of radio sites.
Goal
Implementation
Team (GIT)
City of Denton Technology Services Department
Purpose and
Outcomes
Infrastructure performance verification to include all radio sites.
Provide RF transmitter output power, transmitter modulation level,
RF power losses between the transmitter and antenna, RF reflected
power, Return Loss, RF noise floor level (include measurement
method), effective receiver sensitivity of each receiver, interference
and intermodulation information.
Project Steps
and Timeline
Meet with the City of Denton IT Communications Manager for a kick-
off meeting to review the TASK, timeline, the roles and
responsibilities, milestones, and desired outcomes. The Vendor will
submit an Implementation Plan to the IT Communications Manager.
Stakeholder /
Participants
Employees and/or approved contractors of Vendor.
Deliverables Provide Documentation and an Executive Summary Report of items
listed in the above Purpose and Outcomes.
RFP 9055
City of Denton-Radio System Assessment and Support Services
9
TASK 3: System console performance verification.
Goal
Implementation
Team (GIT)
City of Denton Technology Services Department
Purpose and
Outcomes
Provide all console locations, the quantity of dispatch locations,
listing of console equipment, the dispatch performance, and the
reliability evaluation.
Project Steps
and Timeline
Meet with the City of Denton IT Communications Manager for a kick-
off meeting to review the TASK, timeline, the roles and
responsibilities, milestones, and desired outcomes. The Vendor will
submit an Implementation Plan to the IT Communications Manager.
Stakeholder /
Participants
Employees and/or approved contractors of Vendor.
Deliverables Provide documentation and an Executive Summary Report of items
listed in the above Purpose and Outcomes.
RFP 9055
City of Denton-Radio System Assessment and Support Services
10
TASK 4: Sampling of mobile and portable radio review.
Goal
Implementation
Team (GIT)
City of Denton Technology Services Department
Purpose and
Outcomes
Provide information on mobile and portable equipment in use by the
City of Denton. The GIT above will determine the percentage of
each type of equipment to sample and the specific information to be
measured for this task.
Project Steps
and Timeline
Meet with the City of Denton IT Communications Manager for a kick-
off meeting to review the TASK, timeline, the roles and
responsibilities, milestones, and desired outcomes. The Vendor will
submit an Implementation Plan to the IT Communications Manager.
Stakeholder /
Participants
Employees and/or approved contractors of Vendor.
Deliverables Provide documentation on the sampling and maintenance and an
Executive Summary Report of items listed in the above Purpose and
Outcomes. Provide recommendations.
RFP 9055
City of Denton-Radio System Assessment and Support Services
11
TASK 5: Documenting operational procedures to increase the reliability of
communications for in-building communications for first responders.
Goal
Implementation
Team (GIT)
City of Denton Technology Services Department
Purpose and
Outcomes
Provide operational procedure details of the radio system, the list of
all Distributed Antenna System(s) (DAS), a list of all in-building
coverages with Received Signal Strength Indication of each DAS
system, the Fire Marshall training information, design engineering
license information / liability insurance.
Project Steps
and Timeline
Meet with the City of Denton IT Communications Manager for a kick-
off meeting to review the TASK, timeline, the roles and
responsibilities, milestones, and desired outcomes. The Vendor will
submit an Implementation Plan to the IT Communications Manager.
Stakeholder /
Participants
Employees and/or approved contractors of Vendor.
Deliverables Provide documentation and an Executive Summary Report of items
listed in the above Purpose and Outcomes. Provide
recommendations.
RFP 9055
City of Denton-Radio System Assessment and Support Services
12
TASK 6: Propagation study of existing and proposed radio coverages.
Goal
Implementation
Team (GIT)
City of Denton Technology Services Department
Purpose and
Outcomes
Provide RF propagation studies of existing and proposed radio
systems.
Project Steps
and Timeline
Meet with the City of Denton IT Communications Manager for a kick-
off meeting to review the TASK, timeline, the roles and
responsibilities, milestones, and desired outcomes. The Vendor will
submit an Implementation Plan to the IT Communications Manager.
Stakeholder /
Participants
Employees and/or approved contractors of Vendor.
Deliverables Provide documentation to include area maps and an Executive
Summary Report of items listed in the above Purpose and
Outcomes. Provide recommendations.
RFP 9055
City of Denton-Radio System Assessment and Support Services
13
TASK 7: Identification of any antenna pattern distortions.
Goal
Implementation
Team (GIT)
City of Denton Technology Services Department
Purpose and
Outcomes
Identify all antenna pattern distortions along with the reason for the
distortion.
Project Steps
and Timeline
Meet with the City of Denton IT Communications Manager for a kick-
off meeting to review the TASK, timeline, the roles and
responsibilities, milestones, and desired outcomes. The Vendor will
submit an Implementation Plan to the IT Communications Manager.
Stakeholder /
Participants
Employees and/or approved contractors of Vendor.
Deliverables Provide documentation to include system diagrams and an
Executive Summary Report of items listed in the above Purpose and
Outcomes. Provide recommendations.
RFP 9055
City of Denton-Radio System Assessment and Support Services
14
TASK 8: Evaluation of the City of Denton radio system documentation and
confirm the programming software matches the radios.
Goal
Implementation
Team (GIT)
City of Denton Technology Services Department
Purpose and
Outcomes
Evaluate all existing system documentation. Provide a system block
diagram of systems as directed by the GIT. Verify the radio
programming software matches the radios.
Project Steps
and Timeline
Meet with the City of Denton IT Communications Manager for a kick-
off meeting to review the TASK, timeline, the city roles and
responsibilities, milestones, and desired outcomes. The Vendor will
submit an Implementation Plan to the IT Communications Manager.
Stakeholder /
Participants
Employees and/or approved contractors of Vendor.
Deliverables Provide documentation and an Executive Summary Report of items
listed in the above Purpose and Outcomes. Provide
recommendations.
RFP 9055
City of Denton-Radio System Assessment and Support Services
15
TASK 9: Verify that the radio system infrastructure equipment is properly
grounded.
Goal
Implementation
Team (GIT)
City of Denton Technology Services Department
Purpose and
Outcomes
Verify all system radio equipment is correctly grounded.
Project Steps
and Timeline
Meet with the City of Denton IT Communications Manager for a kick-
off meeting to review the TASK, timeline, the roles and
responsibilities, milestones, and desired outcomes. The Vendor will
submit an Implementation Plan to the IT Communications Manager.
Stakeholder /
Participants
Employees and/or approved contractors of Vendor.
Deliverables Provide documentation and an Executive Summary Report of items
listed in the above Purpose and Outcomes. Provide
recommendations.
RFP 9055
City of Denton-Radio System Assessment and Support Services
16
TASK 10: Measure the ground resistance at the tower sites.
Goal
Implementation
Team (GIT)
City of Denton Technology Services Department
Purpose and
Outcomes
Measure the ground resistance at all tower sites.
Project Steps
and Timeline
Meet with the City of Denton IT Communications Manager for a kick-
off meeting to review the TASK, timeline, the roles and
responsibilities, milestones, and desired outcomes. The Vendor will
submit an Implementation Plan to the IT Communications Manager.
Stakeholder /
Participants
Employees and/or approved contractors of Vendor.
Deliverables Provide documentation and an Executive Summary Report of items
listed in the above Purpose and Outcomes. Provide
recommendations.