GIS Engineering Technology Services for DME-6122-Award/Ordinance/Pricing
Docusign City Council Transmittal Coversheet
File Name
Purchasing Contact
City Council Target Date
Granicus #
Ordinance #
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Rebecca Hunter
6/7/2016
FILE
GIS ENGINEERING TECHNOLOGY SERVICES FOR DME
6122
PROFESSIONAL SERVICES AGREEMENT
FOR GIS ENGINEERING TECHNOLOGY SERVICES FOR DME
(FILE 6122)
STATE OF TEXAS §
COUNTY OF DENTON §
THIS AGREEMENT is made and entered into on ________________________, by and
between the City of Denton, Texas, a Texas municipal corporation, with its principal office at
215 East McKinney Street, Denton, Denton County, Texas 76201, hereinafter called “OWNER”
and SSP INNOVATIONS, LLC, with its corporate office at 7399 S. TUCSON WAY, SUITE
B4, CENTENNIAL, CO 80112, hereinafter called “CONSULTANT,” acting herein, by and
through their duly authorized representatives.
WITNESSETH, that in consideration of the covenants and agreements herein contained,
the parties hereto do mutually agree as follows:
ARTICLE I
EMPLOYMENT OF CONSULTANT
The OWNER hereby contracts with the CONSULTANT, as an independent contractor,
and the CONSULTANT hereby agrees to perform the services herein in connection with the
Project as stated in the sections to follow, with diligence and in accordance with the highest
professional standards customarily obtained for such services in the State of Texas. The
professional services set out herein are in connection with the following described project:
The Project shall include, without limitation, Engineering Technology Services for
Denton Municipal Electric, as described in Exhibit B.
ARTICLE II
SCOPE OF SERVICES
The CONSULTANT shall perform the following services in a professional manner:
A. The CONSULTANT shall perform all those services as necessary and as described in the
OWNER’s Scope of Work, which is attached hereto and made a part hereof as Exhibit
“A” as if written word for word herein.
B. To perform all those services set forth in CONSULTANT’s proposals, attached hereto
and made a part hereof as Exhibit “B” as if written word for word herein.
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
August 16, 2016
Page 2
C. CONSULTANT shall perform all those services set forth in individual task orders which
shall be attached to this Agreement and made a part hereof for all purposes as separate
agreements.
D. If there is any conflict between the terms of this Agreement and the exhibits attached to
this Agreement, the terms and conditions of this Agreement will control over the terms
and conditions of the attached exhibits or task orders.
ARTICLE III
Not Applicable
ARTICLE IV
PERIOD OF SERVICE
This Agreement shall become effective upon execution of this Agreement by the
OWNER and the CONSULTANT and upon issue of a notice to proceed by the OWNER, and
shall remain in force for the period which may reasonably be required for th e completion of the
Project, including Additional Services, if any, and any required extensions approved by the
OWNER. This Agreement may be sooner terminated in accordance with the provisions hereof.
Time is of the essence in this Agreement. The CONSULTANT shall make all reasonable efforts
to complete the services set forth herein as expeditiously as possible and to meet the schedule
established by the OWNER, acting through its City Manager or his designee.
ARTICLE V
COMPENSATION
A. COMPENSATION TERMS:
1. “Subcontract Expense” is defined as expenses incurred by the CONSULTANT in
employment of others in outside firms for services in the nature of GIS
ENGINEERING TECHNOLOGY SERVICES FOR DME.
2. “Direct Non-Labor Expense” is defined as that expense for any assignment
incurred by the CONSULTANT for supplies, transportation and equipment,
travel, communications, subsistence, and lodging away from home, and similar
incidental expenses in connection with that assignment.
B. BILLING AND PAYMENT: For and in consideration of the professional services to be
performed by the CONSULTANT herein, the OWNER agrees to pay, based on the cost
estimate detail at an hourly rate shown in Exhibit “C” which is attached hereto and made
a part of this Agreement as if written word for word herein, a total fee, including
reimbursement for direct non-labor expenses not to exceed 2,000,000.
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Page 3
Partial payments to the CONSULTANT will be made on the basis of detailed monthly
statements rendered to and approved by the OWNER through its City Manager or his
designee; however, under no circumstances shall any monthly statement for services
exceed the value of the work performed at the time a statement is rendered. The
OWNER may withhold the final five percent (5%) of the contract amount until
completion of the Project.
Nothing contained in this Article shall require the OWNER to pay for any work which is
unsatisfactory, as reasonably determined by the City Manager or his designee, or which is
not submitted in compliance with the terms of this Agreement. The OWNER shall not be
required to make any payments to the CONSULTANT when the CONSULTANT is in
default under this Agreement.
It is specifically understood and agreed that the CONSULTANT shall not be authorized
to undertake any work pursuant to this Agreement which would require additional
payments by the OWNER for any charge, expense, or reimbursement above the
maximum not to exceed fee as stated, without first having obtained written authorization
from the OWNER. The CONSULTANT shall not proceed to perform the services listed
in Article III “Additional Services,” without obtaining prior written authorization from
the OWNER.
C. ADDITIONAL SERVICES: In the event that additional services are requested, the
CONSULTANT shall be required to submit a project estimate before services may be
authorized by the City. A separate Purchase Order will follow once the services are
approved. Payments for additional services shall be due and payable upon submission
by the CONSULTANT, and shall be in accordance with subsection B hereof. Statements
shall not be submitted more frequently than monthly.
D. PAYMENT: If the OWNER fails to make payments due the CONSULTANT for
services and expenses within thirty (30) days after receipt of the CONSULTANT’s
undisputed statement thereof, the amounts due the CONSULTANT will be increased by
the rate of one percent (1%) per month from the said thirtieth (30th) day, and, in addition,
the CONSULTANT may, after giving seven (7) days’ written notice to the OWNER,
suspend services under this Agreement until the CONSULTANT has been paid in full all
amounts due for services, expenses, and charges, provided, however, nothing herein shall
require the OWNER to pay the late charge of one percent (1%) set forth herein if the
OWNER reasonably determines that the work is unsatisfactory, in accordance with this
Article V, “Compensation.”
ARTICLE VI
OBSERVATION AND REVIEW OF THE WORK
The CONSULTANT will exercise reasonable care and due diligence in discovering and
promptly reporting to the OWNER any defects or deficiencies in the work of the
CONSULTANT or any subcontractors or subconsultants.
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Page 4
ARTICLE VII
OWNERSHIP OF DOCUMENTS
All documents prepared or furnished by the CONSULTANT (and CONSULTANT’s
subcontractors or subconsultants) pursuant to this Agreement are instruments of service, and
shall become the property of the OWNER upon the termination of this Agreement. The
CONSULTANT is entitled to retain copies of all such documents. The documents prepared and
furnished by the CONSULTANT are intended only to be applicable to this Project, and
OWNER’s use of these documents in other projects shall be at OWNER’s sole risk and expense.
In the event the OWNER uses any of the information or materials developed pursuant to this
Agreement in another project or for other purposes than specified herein, CONSULTANT is
released from any and all liability relating to their use in that project.
ARTICLE VIII
INDEPENDENT CONTRACTOR
CONSULTANT shall provide services to OWNER as an independent contractor, not a s
an employee of the OWNER. CONSULTANT shall not have or claim any right arising from
employee status.
ARTICLE IX
INDEMNITY AGREEMENT
The CONSULTANT shall indemnify and save and hold harmless the OWNER and its
officers, agents, and employees from and against any and all liability, claims, demands, damages,
losses, and expenses, including, but not limited to court costs and reasonable attorney fees
incurred by the OWNER, and including, without limitation, damages for bodily and personal
injury, death and property damage, resulting from the negligent acts or omissions of the
CONSULTANT or its officers, shareholders, agents, or employees in the execution, operation, or
performance of this Agreement.
Nothing in this Agreement shall be construed to create a liability to any person who is not
a party to this Agreement, and nothing herein shall waive any of the parties’ defenses, both at
law or equity, to any claim, cause of action, or litigation filed by anyone not a party to this
Agreement, including the defense of governmental immunity, which defenses are hereby
expressly reserved.
ARTICLE X
INSURANCE
During the performance of the services under this Agreement, CONSULTANT shall
maintain the following insurance with an insurance company licensed to do business in the State
of Texas by the State Insurance Commission or any successor agency that has a rating with Best
Rate Carriers of at least an A- or above:
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Page 5
A. Comprehensive General Liability Insurance with bodily injury limits of not less than
$1,000,000 for each occurrence and not less than $1,000,000 in the aggregate, and with
property damage limits of not less than $100,000 for each occurrence and not less than
$100,000 in the aggregate.
B. Automobile Liability Insurance with bodily injury limits of not less than $500,000 for
each person and not less than $500,000 for each accident, and with property damage
limits of not less than $100,000 for each accident.
C. Worker’s Compensation Insurance in accordance with statutory requirements, and
Employers’ Liability Insurance with limits of not less than $100,000 for each accident.
D. Professional Liability Insurance with limits of not less than $1,000,000 annual aggregate.
E. The CONSULTANT shall furnish insurance certificates or insurance policies at the
OWNER’s request to evidence such coverages. The General Liability and Auto Liability
insurance policies shall name the OWNER as an additional insured. CONSULTANT
shall endeavor to provide OWNER with any cancellation or modification to its insurance
policies.
ARTICLE XI
ARBITRATION AND ALTERNATE DISPUTE RESOLUTION
The parties may agree to settle any disputes under this Agreement by submitting the
dispute to arbitration or other means of alternate dispute resolution, such as mediation. No
arbitration or alternate dispute resolution arising out of or relating to this Agreement, involving
one party’s disagreement, may include the other party to the disagreement without the other’s
approval.
ARTICLE XII
TERMINATION OF AGREEMENT
A. Notwithstanding any other provision of this Agreement, either party may terminate by
giving thirty (30) days’ advance written notice to the other party.
B. This Agreement may be terminated in whole or in part in the event of either party
substantially failing to fulfill its obligations under this Agreement. No such termination
will be affected unless the other party is given (1) written notice (delivered by certified
mail, return receipt requested) of intent to terminate and setting forth the reasons
specifying the non-performance, and not less than thirty (30) calendar days to cure the
failure; and (2) an opportunity for consultation with the terminating party prior to
termination.
C. If the Agreement is terminated prior to completion of the services to be provided
hereunder, CONSULTANT shall immediately cease all services and shall render a final
bill for services to the OWNER within thirty (30) days after the date of termination. The
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Page 6
OWNER shall pay CONSULTANT for all services properly rendered and satisfactorily
performed and for reimbursable expenses to termination incurred prior to the date of
termination, in accordance with Article V “Compensation.” Should the OWNER
subsequently contract with a new consultant for the continuation of services on the
Project, CONSULTANT shall cooperate in providing information. The CONSULTANT
shall turn over all documents prepared or furnished by CONSULTANT pursuant to this
Agreement to the OWNER on or before the date of termination, but may maintain copies
of such documents for its use.
ARTICLE XIII
RESPONSIBILITY FOR CLAIMS AND LIABILITIES
Approval by the OWNER shall not constitute, nor be deemed a release of the
responsibility and liability of the CONSULTANT, its employees, associates, agents,
subcontractors, and subconsultants for the accuracy and competency of their designs or other
work; nor shall such approval be deemed to be an assumption of such responsibility by the
OWNER for any defect in the design or other work prepared by the CONSULTANT, its
employees, subcontractors, agents, and consultants.
ARTICLE XIV
NOTICES
All notices, communications, and reports required or permitted under this Agreement
shall be personally delivered or mailed to the respective parties by depositing same in the United
States mail to the address shown below, certified mail, return receipt requested, unless otherwise
specified herein. Mailed notices shall be deemed communicated as of three (3) days’ mailing:
To CONSULTANT: To OWNER:
SSP Innovations, LLC City of Denton
Dean Perry Purchasing Manager
7399 S. Tucson Way, Suite B4 215 East Mckinney
Centennial, CO 80112 Denton, Texas 76201
All notices shall be deemed effective upon receipt by the party to whom such notice is
given, or within three (3) days’ mailing.
ARTICLE XV
ENTIRE AGREEMENT
This Agreement, consisting of 17 pages and 4 exhibits, constitutes the complete and final
expression of the agreement of the parties, and is intended as a complete and exclusive statement
of the terms of their agreements, and supersedes all prior contemporaneous offers, promises,
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Page 7
representations, negotiations, discussions, communications, and agreements which may have
been made in connection with the subject matter hereof.
ARTICLE XVI
SEVERABILITY
If any provision of this Agreement is found or deemed by a court of competent
jurisdiction to be invalid or unenforceable, it shall be considered severable from the remainder of
this Agreement and shall not cause the remainder to be invalid or unenforceable. In such event,
the parties shall reform this Agreement to replace such stricken provision with a valid and
enforceable provision which comes as close as possible to expressing the intention of the stricken
provision.
ARTICLE XVII
COMPLIANCE WITH LAWS
The CONSULTANT shall comply with all federal, state, and local laws, rules,
regulations, and ordinances applicable to the work covered hereunder as they may now read or
hereinafter be amended.
ARTICLE XVIII
DISCRIMINATION PROHIBITED
In performing the services required hereunder, the CONSULTANT shall not discriminate
against any person on the basis of race, color, religion, sex, national origin or ancestry, age, or
physical handicap.
ARTICLE XIX
PERSONNEL
A. The CONSULTANT represents that it has or will secure, at its own expense, all
personnel required to perform all the services required under this Agreement. Such
personnel shall not be employees or officers of, or have any contractual relations with the
OWNER. CONSULTANT shall inform the OWNER of any conflict of interest or
potential conflict of interest that may arise during the term of this Agreement.
B. All services required hereunder will be performed by the CONSULTANT or under its
supervision. All personnel engaged in work shall be qualified, and shall be authorized
and permitted under state and local laws to perform such services.
ARTICLE XX
ASSIGNABILITY
The CONSULTANT shall not assign any interest in this Agreement, and shall not
transfer any interest in this Agreement (whether by assignment, novation, or otherwise) without
the prior written consent of the OWNER.
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Page 8
ARTICLE XXI
MODIFICATION
No waiver or modification of this Agreement or of any covenant, condition, or limitation
herein contained shall be valid unless in writing and duly executed by the party to be charged
therewith, and no evidence of any waiver or modification shall be offered or received in evidence
in any proceeding arising between the parties hereto out of or affecting this Agreement, or the
rights or obligations of the parties hereunder, and unless such waiver or modification is in
writing and duly executed; and the parties further agree that the provisions of this section will not
be waived unless as set forth herein.
ARTICLE XXII
MISCELLANEOUS
A. The following exhibits are attached to and made a part of this Agreement:
Exhibit A – Owner’s Scope of Work Requirements
Exhibit B – Contractor’s Proposal
Exhibit C – Individual Project Initiation Process
Exhibit D – Conflict of Interest Questionnaire
B. The OWNER shall have the right to audit and make copies of the books, records and
computations pertaining to this agreement. The CONTRACTOR shall retain such books,
records, documents and other evidence pertaining to this agreement during the contract
period and five years thereafter, except if an audit is in progress or audit findings are yet
unresolved, in which case records shall be kept until all audit tasks are completed and
resolved. These books, records, documents and other evidence shall be available, within
10 business days of written request. Further, the CONTRACTOR shall also require all
Subcontractors, material suppliers, and other payees to retain all books, records,
documents and other evidence pertaining to this agreement, and to allow the OWNER
similar access to those documents. All books and records will be made available within a
50 mile radius of the City of Denton. The cost of the audit will be borne by the OWNER
unless the audit reveals an overpayment of 1% or greater. If an overpayment of 1% or
greater occurs, the reasonable cost of the audit, including any travel costs, must be borne
by the CONTRACTOR which must be payable within five business days of receipt of an
invoice. Failure to comply with the provisions of this section shall be a material breach of
this contract and shall constitute, in the OWNER’S sole discretion, grounds for
termination thereof. Each of the terms "books", "records", "documents" and "other
evidence", as used above, shall be construed to include drafts and electronic files, even if
such drafts or electronic files are subsequently used to generate or prepare a final printed
document.
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Page 9
C. Venue of any suit or cause of action under this Agreement shall lie exclusively in Denton
County, Texas. This Agreement shall be construed in accordance with the laws of the
State of Texas.
D. For the purpose of this Agreement, the key persons who will perform most of the work
hereunder shall be authorized by the CONSULTANT. However, nothing herein shall
limit CONSULTANT from using other qualified and competent members of its firm to
perform the services required herein.
E. CONSULTANT shall commence, carry on, and complete any and all projects with all
applicable dispatch, in a sound, economical, and efficient manner and in accordance with
the provisions hereof. In accomplishing the projects, CONSULTANT shall take such
steps as are appropriate to ensure that the work involved is properly coordinated with
related work being carried on by the OWNER.
F. The OWNER shall assist the CONSULTANT by placing at the CONSULTANT’s
disposal all available information pertinent to the Project, including previous reports, any
other data relative to the Project, and arranging for the access thereto, and make all
provisions for the CONSULTANT to enter in or upon public and private property as
required for the CONSULTANT to perform services under this Agreement.
G. The captions of this Agreement are for informational purposes only, and shall not in any
way affect the substantive terms or conditions of this Agreement.
IN WITNESS HEREOF, the City of Denton, Texas has caused this Agreement to be
executed by its duly authorized City Manager, and CONSULTANT has executed this Agreement
through its duly authorized undersigned officer on this date:
_______________________.
CITY OF DENTON, TEXAS
__________________________________
GEORGE C. CAMPBELL, CITY MANAGER
ATTEST:
JENNIFER WALTERS, CITY SECRETARY
BY: __________________________________
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
8/24/2016
Page 10
APPROVED AS TO LEGAL FORM:
ANITA BURGESS, CITY ATTORNEY
BY: __________________________________
CONSULTANT
__________________________________
AUTHORIZED SIGNATURE, TITLE
__________________________________
TEXAS ETHICS COMMISSION
CERTIFICATE NUMBER
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2016-50866
Page 11
CITY OF DENTON
INSURANCE REQUIREMENTS FOR CONTRACTORS
Bidder's attention is directed to the insurance requirements below. It is highly recommended
that bidders confer with their respective insurance carriers or brokers to determine in advance
of Bid submission the availability of insurance certificates and endorsements as prescrib ed
and provided herein. If an apparent low bidder fails to comply strictly with the insurance
requirements, that bidder may be disqualified from award of the contract. Upon bid award, all
insurance requirements shall become contractual obligations, which the successful bidder
shall have a duty to maintain throughout the course of this contract.
STANDARD PROVISIONS:
Without limiting any of the other obligations or liabilities of the Contractor, the Contractor shall
provide and maintain until the contracted work has been completed and accepted by the City of
Denton, Owner, the minimum insurance coverage as indicated hereinafter.
As soon as practicable after notification of bid award, Contractor shall file with the Purchasing
Department satisfactory certificates of insurance, containing the bid number and title of the
project. Contractor may, upon written request to the Purchasing Department, ask for
clarification of any insurance requirements at any time; however, Contractors are strongly
advised to make such requests prior to bid opening, since the insurance requirements may not be
modified or waived after bid opening unless a written exception has been submitted with the bid.
Contractor shall not commence any work or deliver any material until he or she receives
notification that the contract has been accepted, approved, and signed by the City of Denton.
All insurance policies proposed or obtained in satisfaction of these requirements shall comply
with the following general specifications, and shall be maintained in compliance with these
general specifications throughout the duration of the Contract, or longer, if so noted:
Each policy shall be issued by a company authorized to do business in the State of
Texas with an A.M. Best Company rating of at least A- VII or better.
Any deductibles or self-insured retentions shall be declared in the bid proposal. If
requested by the City, the insurer shall reduce or eliminate such deductibles or
self-insured retentions with respect to the City, its officials, agents, employees and
volunteers; or, the contractor shall procure a bond guaranteeing payment of losses and
related investigations, claim administration and defense expenses.
Liability policies shall be endorsed to provide the following:
Name as additional insured the City of Denton, its Officials, Agents,
Employees and volunteers.
That such insurance is primary to any other insurance available to the
additional insured with respect to claims covered under the policy and that this
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Page 12
insurance applies separately to each insured against whom claim is made or
suit is brought. The inclusion of more than one insured shall not operate to
increase the insurer's limit of liability.
Cancellation: City requires 30 day written notice should any of the policies
described on the certificate be cancelled before the expiration date.
Should any of the required insurance be provided under a claims-made form,
Contractor shall maintain such coverage continuously throughout the term of
this contract and, without lapse, for a period of three years beyond the contract
expiration, such that occurrences arising during the contract term which give
rise to claims made after expiration of the contract shall be covered.
Should any of the required insurance be provided under a form of coverage that
includes a general annual aggregate limit providing for claims investigation or
legal defense costs to be included in the general annual aggregate limit, the
Contractor shall either double the occurrence limits or obtain Owners and
Contractors Protective Liability Insurance.
Should any required insurance lapse during the contract term, requests for
payments originating after such lapse shall not be processed until the City
receives satisfactory evidence of reinstated coverage as required b y this
contract, effective as of the lapse date. If insurance is not reinstated, City may,
at its sole option, terminate this agreement effective on the date of the lapse.
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
SPECIFIC ADDITIONAL INSURANCE REQUIREMENTS:
All insurance policies proposed or obtained in satisfaction of this Contract shall additionally
comply with the following marked specifications, and shall be maintained in compliance with
these additional specifications throughout the duration of the Contract, or longer, if so noted:
[X ] A. General Liability Insurance:
General Liability insurance with combined single limits of not less than
$1,000,000.00 shall be provided and maintained by the Contractor. The policy shall
be written on an occurrence basis either in a single policy or in a combination of
underlying and umbrella or excess policies.
If the Commercial General Liability form (ISO Form CG 0001 current edition) is
used:
Coverage A shall include premises, operations, products, and completed
operations, independent contractors, contractual liability covering this
contract and broad form property damage coverage.
Coverage B shall include personal injury.
Coverage C, medical payments, is not required.
If the Comprehensive General Liability form (ISO Form GL 0002 Current Edition
and ISO Form GL 0404) is used, it shall include at least:
Bodily injury and Property Damage Liability for premises, operations,
products and completed operations, independent contractors and property
damage resulting from explosion, collapse or underground (XCU)
exposures.
Broad form contractual liability (preferably by endorsement) covering this
contract, personal injury liability and broad form property damage liability.
[X] Automobile Liability Insurance:
Contractor shall provide Commercial Automobile Liability insurance with Combined
Single Limits (CSL) of not less than $500,000.00 either in a single policy or in a
combination of basic and umbrella or excess policies. The policy will include bodily
injury and property damage liability arising out of the operation, maintenance and use of
all automobiles and mobile equipment used in conjunction with this contract.
Satisfaction of the above requirement shall be in the form of a policy endorsement for:
any auto, or
all owned, hired and non-owned autos.
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Page 14
[X] Workers’ Compensation Insurance
Contractor shall purchase and maintain Worker's Compensation insurance which, in
addition to meeting the minimum statutory requirements for issuance of such insurance,
has Employer's Liability limits of at least $100,000 for each accident, $100,000 per each
employee, and a $500,000 policy limit for occupational disease. The City need not be
named as an "Additional Insured" but the insurer shall agree to waive all rights of
subrogation against the City, its officials, agents, employees and volunteers for any work
performed for the City by the Named Insured. For building or construction projects, the
Contractor shall comply with the provisions of Attachment 1 in accordance with
§406.096 of the Texas Labor Code and rule 28TAC 110.110 of the Texas Worker's
Compensation Commission (TWCC).
[ ] Owner's and Contractor's Protective Liability Insurance
The Contractor shall obtain, pay for and maintain at all times during the prosecution of
the work under this contract, an Owner's and Contractor's Protective Liability insurance
policy naming the City as insured for property damage and bodily injury which may arise
in the prosecution of the work or Contractor's operations under this contract. Coverage
shall be on an "occurrence" basis, and the policy shall be issued by the same insurance
company that carries the Contractor's liability insurance. Policy limits will be at least
combined bodily injury and property damage per occurrence with a aggregate.
[X] Professional Liability Insurance
Professional liability insurance with limits not less than $1,000,000 per claim with
respect to negligent acts, errors or omissions in connection with professional services is
required under this Agreement.
[ ] Builders' Risk Insurance
Builders' Risk Insurance, on an All-Risk form for 100% of the completed value shall be
provided. Such policy shall include as "Named Insured" the City of Denton and all
subcontractors as their interests may appear.
[ ] Commercial Crime
Provides coverage for the theft or disappearance of cash or checks, robbery inside/outside
the premises, burglary of the premises, and employee fidelity. The employee fidelity
portion of this coverage should be written on a “blanket” basis to cover all employees,
including new hires. This type insurance should be required if the contractor has access
to City funds. Limits of not less than each occurrence are required.
[ ] Additional Insurance
Other insurance may be required on an individual basis for extra hazardous contracts and
specific service agreements. If such additional insurance is required for a specific
contract, that requirement will be described in the "Specific Conditions" of the contract
specifications.
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Page 15
ATTACHMENT 1
[X] Workers’ Compensation Coverage for Building or Construction Projects for
Governmental Entities
A. Definitions:
Certificate of coverage ("certificate")-A copy of a certificate of insurance, a
certificate of authority to self-insure issued by the commission, or a coverage
agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory
workers' compensation insurance coverage for the person's or entity's employees
providing services on a project, for the duration of the project.
Duration of the project - includes the time from the beginning of the work on the
project until the contractor's/person's work on the project has been completed and
accepted by the governmental entity.
Persons providing services on the project ("subcontractor" in §406.096) - includes all
persons or entities performing all or part of the services the contractor has
undertaken to perform on the project, regardless of whether that person contracted
directly with the contractor and regardless of whether that person has employees.
This includes, without limitation, independent contractors, subcontractors, leasing
companies, motor carriers, owner-operators, employees of any such entity, or
employees of any entity which furnishes persons to provide services on the project.
"Services" include, without limitation, providing, hauling, or delivering equipment or
materials, or providing labor, transportation, or other service related to a project.
"Services" does not include activities unrelated to the project, such as food/beverage
vendors, office supply deliveries, and delivery of portable toilets.
B. The contractor shall provide coverage, based on proper reporting of classification
codes and payroll amounts and filing of any overage agreements, which meets the
statutory requirements of Texas Labor Code, Section 401.011(44) for all employees
of the Contractor providing services on the project, for the duration of the project.
C. The Contractor must provide a certificate of coverage to the governmental entity prior
to being awarded the contract.
D. If the coverage period shown on the contractor's current certificate of coverage ends
during the duration of the project, the contractor must, prior to the end of the
coverage period, file a new certificate of coverage with the governmental entity
showing that coverage has been extended.
E. The contractor shall obtain from each person providing services on a project, and
provide to the governmental entity:
1) a certificate of coverage, prior to that person beginning work on the project, so the
governmental entity will have on file certificates of coverage showing coverage
for all persons providing services on the project; and
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Page 16
2) no later than seven days after receipt by the contractor, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project.
F. The contractor shall retain all required certificates of coverage for the duration of the
project and for one year thereafter.
G. The contractor shall notify the governmental entity in writing by certified mail or
personal delivery, within 10 days after the contractor knew or should have known, of
any change that materially affects the provision of coverage of any person providing
services on the project.
H. The contractor shall post on each project site a notice, in the text, form and manner
prescribed by the Texas Workers' Compensation Commission, informing all persons
providing services on the project that they are required to be covered, and stating how
a person may verify coverage and report lack of coverage.
I. The contractor shall contractually require each person with whom it contracts to
provide services on a project, to:
1) provide coverage, based on proper reporting of classification codes and payroll
amounts and filing of any coverage agreements, which meets the statutory
requirements of Texas Labor Code, Section 401.011(44) for all of its employees
providing services on the project, for the duration of the project;
2) provide to the contractor, prior to that person beginning work on the project, a
certificate of coverage showing that coverage is being provided for all employees
of the person providing services on the project, for the duration of the project;
3) provide the contractor, prior to the end of the coverage period, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
4) obtain from each other person with whom it contracts, and provide to the
contractor:
a) certificate of coverage, prior to the other person beginning work on the
project; and
b) a new certificate of coverage showing extension of coverage, prior to the
end of the coverage period, if the coverage period shown on the current
certificate of coverage ends during the duration of the project;
5) retain all required certificates of coverage on file for the duration of the project
and for one year thereafter;
6) notify the governmental entity in writing by certified mail or personal delivery,
within 10 days after the person knew or should have known, of any change that
materially affects the provision of coverage of any person providing services on
the project; and
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Page 17
7) contractually require each person with whom it contracts, to perform as required
by paragraphs (1) - (7), with the certificates of coverage to be provided to the
person for whom they are providing services.
J. By signing this contract or providing or causing to be provided a certificate of
coverage, the contractor is representing to the governmental entity that all employees
of the contractor who will provide services on the project will be covered by workers'
compensation coverage for the duration of the project, that the coverage will be based
on proper reporting of classification codes and payroll amounts, and that all coverage
agreements will be filed with the appropriate insurance carrier or, in the case of a self-
insured, with the commission's Division of Self-Insurance Regulation. Providing
false or misleading information may subject the contractor to administrative penalties,
criminal penalties, civil penalties, or other civil actions.
K. The contractor’s failure to comply with any of these provisions is a breach of contract
by the contractor which entitles the governmental entity to declare the contract void if
the contractor does not remedy the breach within ten days after receipt of notice of
breach from the governmental entity.
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Certificate of Interested Parties Electronic Filing
In 2015, the Texas Legislature adopted House Bill 1295, which added section 2252.908 of the
Government Code. The law states that the City may not enter into this contract unless the
Contractor submits a disclosure of interested parties (Form 1295) to the City at the time the
Contractor submits the signed contract. The Texas Ethics Commission has adopted rules
requiring the business entity to file Form 1295 electronically with the Commission.
Contractor will be required to furnish an original notarized Certificate of Interest Parties
before the contract is awarded, in accordance with Government Code 2252.908.
The contractor shall:
1. Log onto the State Ethics Commission Website at :
https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm
2. Register utilizing the tutorial provided by the State
3. Print a copy of the completed Form 1295
4. Enter the Certificate Number on signature page.
5. Sign and notarize the Form 1295
6. Email the notarized form to purchasing@cityofdenton.com with the contract number in the
subject line. (EX: Contract 1234 – Form 1295)
The City must acknowledge the receipt of the filed Form 1295 not later than the 30th day after
Council award. Once a Form 1295 is acknowledged, it will be posted to the Texas Ethics
Commission’s website within seven business days.
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
EXHIBIT A
Denton Municipal Electric
GIS Professional Services Agreement Proposal
Denton Municipal Electric (DME) requests the following items be included in a three-year professional
services agreement with SSP Innovations in a not to exceed amount for GIS and GIS-related services to
assist the GIS department in maintenance, deployment and training of GIS technology at DME.
1) Agreement will be a one-year agreement to assist the GIS department at DME. The contract will
automatically renew up to two (2), twelve (12) month periods.
2) Agreement will include all work necessary to build an AMI to OMS integration, fully built to
specifications designed by Schneider Electric in 2014, but not using the Responder Integration
Framework. See AMI to Responder project scope document.
3) Agreement will include the work necessary to review and improve the Disaster Recovery and
Backup solutions at DME for the GIS, OMS and related systems. These requirements would be
set out in a workshop that will include a review of any regulatory rules for the GIS, OMS and
related systems.
4) Agreement will include all work necessary to assist the DME GIS department with GIS upgrades
(Every other year, next one tentatively planned in 2017) as determined by the DME GIS
department five-year work plan. This will include work to assist DME in eventually migrating to
the new ESRI Geometric Network model in the future.
5) Agreement will include all the necessary work to implement an enterprise (GIS-based) design
solution for DME. The work to identify this product will come from the DME/SSP Innovations
project currently underway to identify the Design Workflow Processes at DME.
6) Agreement will include all work necessary to assist the DME GIS department with custom
integrations related to a GIS based asset management software. This agreement shall also
include the deployment of a GIS-based asset management software.
7) Agreement will include any work needed to integrate or customize any pieces of the Clevest
Work Force Management software.
8) Agreement will include the assistance of a DBA to import archive data from an older OMS and
Work Force Management systems. This assistance should also include help to design reports or
queries on the older archive data.
9) Agreement will include an integration of OMS to a mobile application being developed by DME
Community Relations Staff. This will be a polling application that will review a customer’s
current outage status from Responder.
10) Agreement will include a specific time and materials rate for custom support on all GIS, OMS
and related custom components owned by DME. This includes all existing asset management
auto-updaters, inspector auto-updaters and Responder custom pieces & integrations.
(Responder Integration Framework (IVR & SCADA) is currently being supported under a standard
SUELA from Schneider, and will probably continue to be so in the future).
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
EXHIBIT A
11) Agreement will include development of a DME GIS training guide that includes training for DME
GIS end users on ArcFM, Responder, Designer and related software. This could also be a training
portal for DME staff to come to for training resources.
12) Agreement will include rebuilding the ArcFM Silverlight application to adapt for newer web-
based mapping applications including HTML5 or Javascript. This solution could also be
superseded by the use of ArcGIS Online at DME, depending on the path forward for DME with
AGOL. These solutions will move DME to almost all paper-free work in the field.
13) Agreement will include development of DME focused, web-based portals using ArcGIS Online.
One item will include a streetlight outage reporting application for the public to report
streetlights out to the office. Another will include improvement of the current Public Facing
Outage Map.
14) Agreement will include development of a GIS Dashboard for all management (ArcGIS Online).
This will include items such as a miles of line calculation for all distribution primary overhead &
underground, transmission and fiber underground and overhead.
15) Agreement will include help to scope new GIS related projects at DME including the integration
and development needed for implementation of Distribution Automation systems and an
Unmanned Aerial Vehicle system.
16) Agreement will include a health check of all GIS systems that DME uses. This will include an
entire review of all of the GIS, GIS customizations and integrations. This should also include a
review of the hardware systems that the GIS environment is running on.
17) Agreement will include any other GIS related projects or integrations that are identified
including further customizations for any GIS products or integrations to other systems at DME.
This could also include development of any applications needed for the DME GIS group. This will
probably be a time and materials, in a not-to-exceed amount.
18) The City of Denton and Denton Municipal Electric will retain ALL ownership of customizations
developed for COD and DME systems. Any products deployed and requiring licensure will need
to be negotiated at that time. The vendor will also maintain a repository of all DME custom
code worked on during the length of this agreement.
19) All travel & allowable expenses are to be included in the vendor provided rates or a not-to-
exceed amount will be provided.
20) Upon request of a new task, there will need to be a written proposal prepared by the vendor.
This proposal will identify all work to be completed for the task requested. This should be in
some similar form as a Scope of Work with Milestones in each project identified.
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Scope of Work #16-2-3
Integration of Schneider Electric’s Responder OMS with Clevest MWM
Version 1.2
Prepared For:
April 21, 2016
Work to be performed by
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Table of Contents
1 Overview ............................................................................................................................................... 3
1.1 Design Phase ................................................................................................................................. 4
1.1.1 Kickoff and Workshop ........................................................................................................... 4
1.1.2 Documentation ..................................................................................................................... 5
1.2 Development Phase ...................................................................................................................... 6
1.3 Deployment Phase ........................................................................................................................ 7
2 Assumptions .......................................................................................................................................... 8
3 Project Plan ........................................................................................................................................... 9
4 Quote .................................................................................................................................................. 10
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
1 Overview
To satisfy Denton Municipal Electric’s (“DME”) stated requirements of seamlessly utilizing the Schneider
Electric (“SE”) Responder Outage Management System information in the field on a real-time basis, SSP
Innovations (“SSP”) is proposing a comprehensive integration project between Responder and Clevest
mobile work management (MWM) tools.
Specifically, SSP proposes the design, development and deployment of integration code to provide the
Responder side of a two-way interface to Clevest software for four independent functions:
- GetOutageReasonCodes
- GetAllActiveOutageEvents
- UpdateOutageStatus
- RestoreOutage
At times this project may require several different SSP, Clevest and DME resources. However,
throughout the entirety of the project, the selected SSP Project Manager (TBD dependent on start date)
will be the sole person responsible for executive project communication, issue resolution, resource
management & scheduling, and ultimately, an on-time delivery of the stated solution. Additionally, the
SSP Account Manager (Dean Perry) will be available to DME throughout the project duration to discuss
any non-technical or personnel-specific concerns or questions.
DME is already utilizing and is familiar with Esri ArcGIS and the Schneider Electric ArcFM software. This
project will interface DME’s Responder OMS with the Clevest MWM software to provide a more
streamlined, efficient, and ultimately valuable usage of time during an outage event.
The following section describes the tasks required to perform this implementation in detail.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
1.1 Design Phase
1.1.1 Kickoff and Workshop
Prior to kicking off the project, SSP will internally meet to review the goals, roles, risk items and plans for
the project. This shall ensure all SSP project personnel have a clear understanding of the plan ahead of
work beginning.
Next, the SSP Senior Consultant and PM will remotely host a project kickoff meeting with DME. This
meeting will consist of a review of the project goals, roles, personnel and schedule. Time will be allowed
for questions and answers. IT team members from DME and technical representatives from Clevest are
required to attend and participate.
Upon the Kickoff Meeting’s conclusion, SSP will lead a review of the touch points between the two
products, where in the workflow they will be used, and what they will do.
The four integration touch points are described below, as understood at the creation of this SOW:
- GetOutageReasonCodes is called in an on-demand fashion by an administrator as needed. The
goal of this is to pull all of the legal outage cause codes from the OMS so that Clevest can
present those codes to field workers for selection and then ultimately the code(s) selected by
the field worker for an individual outage are sent back to the OMS when restoration occurs.
This method is generally called once during the initial setup and then again if the list of valid
cause codes is ever updated in the OMS. DME has requested that the outage reason codes will
not be the full set that is available in the Responder system, and will be configured for this
integration touch point on the Responder side of the interface.
- GetAllActiveOutageEvents is called on a configurable polling interval. This is generally set
somewhere around every 1 to 15 minutes with the utility being able to balance system
performance against how quickly new information moves from the OMS to Clevest. This call will
effectively create new outages in Clevest and update existing outages in Clevest with the latest
information from the OMS.
- UpdateOutageStatus is called multiple times per outage as the assigned crew(s) work the
outage. Most of these updates are related to crew status (Acknowledged, Onsite, etc). At this
time, DME has requested to Clevest that the ETOR will not be passed in from the field for the
outage, though this data may be passed in the future.
- RestoreOutage is called once per outage at the time the field worker concludes their work and
believes the faulting device has been repaired or replaced. Additionally, comments will be
entered by the field worker that will need to passed into the Responder system.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
1.1.2 Documentation
Upon completion of the workshops, SSP will create a document detailing the design approach of the
integration from the Responder perspective. The design will explicitly cover the web method signatures
from the Multispeak specification as well as the expected implementation of functionality within the
Responder API. SSP will then review the document with Clevest remotely to ensure the design
specifications match the expectations from Clevest.
Upon completion of the joint review meeting, SSP will update the document as required and submit it to
Clevest and DME for each recipient’s future usage.
Provided all issues raised in the review meeting were addressed sufficiently, the Design Document will
be considered approved for development at this time.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
1.2 Development Phase
To begin the development phase, SSP will meet with Clevest and DME to establish a test environment at
DME. Responder sample data will be loaded into the environment for testing purposes. Clevest should
be prepared to provide an installation of their MWM software in the SSP-accessible test environment. If
this is not possible they should be prepared to fully validate the approach SSP uses to create test
harnesses as noted below.
*Per updated SSP internal technology policy, in order for SSP to utilize DME’s Schneider Electric licensing
for development and/or testing purposes, SSP will require DME to accommodate one of two activities
for SSP’s proper access:
1. If permitted within its software license agreements and preferable to DME, DME will provide
SSP the required Schneider Electric software installers via FTP or Sharefile for SSP’s use on
development machines. DME provides access to its network via VPN along with the IP address
and machine name of its license server. SSP will reference the license server for the term of
testing any code / processes only. The network access will support allowing SSP machines onto
the DME network to reference the server.
2. Alternatively, DME will provide a desktop or server that SSP is provided login rights to, on DME’s
network. SSP will deploy our software development tools to this machine and use it to develop
and test all new functionality. SSP will remote desktop to this environment to perform this work.
This machine can be either physical or virtual. If virtual is preferred, SSP can provide the
machine to DME. SSP’s TFS source control can and will still be used for code control.
Next, SSP will develop the programming code which will successfully enable the four interfaces that will
be exposed to Clevest per the Multispeak specification. Only the web methods required for these
operations will be implemented within the web service (i.e. the entire Multispeak interface will not be
exposed). SSP will create messages to be used through SoapUI that will allow the integration points to
be unit-tested.
Each piece of functionality will be unit-tested to ensure it is working as designed. Clevest may be
consulted during this unit testing to ensure the interface is operating as required for their software
requirements. Clevest’s involvement during unit testing will be handled via GoToMeeting sessions.
Finally, SSP will document the integration for future interrogation by DME. This document will include an
installation guide and a description on how to configure, test, and validate each web method.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
1.3 Deployment Phase
To deploy the solution, SSP will travel onsite to DME offices for ~three days. It is expected that Clevest
would also be present onsite for this implementation, testing, and validation exercise.
SSP will install the integration code into the client production environment. For the balance of the visit,
SSP will provide onsite production support as DME users test and validate the new functionality utilizing
the Clevest software against their Responder environment. Any issues will be addressed by either SSP or
Clevest as needed to ensure that the integration is working as designed. DME will be expected to
validate that the functionality meets the design documentation and operates correctly.
Finally, upon completion of the onsite trip, SSP will provide remote support for the solution, up to 40
hours, over the following 10 business days. If support is required beyond the 10 business days or the 40
hours (whichever is achieved first) a change order may be required.
At the completion of the offsite support period, the integration project will be considered complete.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2 Assumptions
The following assumptions have been made regarding the description of this work:
DME will provide their GIS and Responder data to SSP for testing purposes in an SSP test
environment.
DME IT will provide all servers and will install all core Operating Systems.
DME IT will be available to support any environmental, system access, or operating systems issues
throughout the project.
DME IT will provide all required environmental access in a timely manner (response time within 24
hours of request).
DME must provide the targeted Oracle database version to SSP in writing at the project kickoff.
DME will provide appropriate staff commitment levels to ensure the success of the integration
project.
Clevest will provide appropriate staff commitment levels to ensure the success of the integration
project.
Alterations to the design documentation after acceptance may require a change order depending on
the significance of the change.
Only the four web service end points noted in Section 1 will be implemented as part of this project.
SSP has not included any time to train Schneider Electric on the support of the code, the usage of
the code, the test harness, or the integration. If training time is needed, a change order will be
required.
DME will be responsible for ensuring that any required Responder data is in place to support the
integration.
DME and/or Clevest will be responsible for developing any formal test cases of the integrations
points based on their usage within the Clevest software. SSP will not create or deliver any formal
test cases.
Post deployment support will be provided for up to 10 business days following the onsite go live
week or 40 hours of work, whichever expires first. Once this support phase expires, the project will
be deemed complete. If additional support time is required a change order will be required.
The integration will be developed against Responder version 10.2.1.
No formal training has been included in this statement of work. It is expected that the DME staff will
be trained on Responder and Clevest usage independent of this project.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
3 Project Plan
The detailed project plan that was used to scope and budget this project has been included below. It can
be reviewed for additional information on tasks and duration.
Dates depicted in the project plan are tentative and subject to change dependent on actual project start
date and other factors; they're included here to communicate duration of tasks.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
4 Quote
This quote is tied directly to the scope of work detailed within this document. Any changes to the scope
of work before or during the project would result in a change order.
This quote is provided as a fixed priced number inclusive of all expenses and is good for 90 days from the
date listed on this SOW.
Upon completion of this project, a single invoice will be provided to DME for its entirety.
Project Task Est. Duration* Subtotal
DME Responder-Clevest Integration
Design Phase 3 bus. days $4,800.00
Project Management
Kickoffs & Workshops
Documentation
Development Phase 12 bus. days $23,500.00
Project Management
Work w/ Clevest to Establish Dev/Test Environment
Develop Integration Code
Unit Testing
Interface Documentation
Deployment Phase 13 bus. days $18,135.00
Project Management
Onsite Client Testing
Offsite Support
Grand Total 28 bus. days $46,435.00
*Duration estimates are subject to many project factors, some of which are outside of SSP’s control.
Therefore, all durations depicted are non-binding estimates only.
Note: All travel costs are included in the above quote.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Scope of Work #16-2-9
Integration of Schneider Electric’s Responder OMS with Trilliant AMI
Version 1.2
Prepared For:
April 21, 2016
Work to be performed by
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Table of Contents
1 Overview ............................................................................................................................................... 3
1.1 Design Phase ................................................................................................................................. 4
1.1.1 Kickoff and Workshop ........................................................................................................... 4
1.1.2 Documentation ..................................................................................................................... 4
1.2 Development Phase ...................................................................................................................... 5
1.3 Deployment Phase ........................................................................................................................ 6
2 Assumptions .......................................................................................................................................... 7
3 Project Plan ........................................................................................................................................... 8
4 Quote .................................................................................................................................................... 9
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
1 Overview
To satisfy Denton Municipal Electric’s (“DME”) stated requirements of seamlessly utilizing the Trilliant
Advanced Metering Infrastructure (“AMI”) System information within the Schneider Electric (“SE”)
Responder Outage Management System in the back office, SSP Innovations (“SSP”) is proposing a
comprehensive integration project between the two systems.
SSP will work with DME and Trilliant to implement an integration between the Trilliant AMI system and
the Responder OMS based on the information provided by DME based on past workshops. These
integration points will include Responder accepting power-down and power-up messages from the AMI
system via a new custom web service that will be implemented by SSP. This web service will not use the
Responder Integration services.
SSP will also implement a meter ping utility that will allow users to ping one or more meters from
Responder/ArcMap to determine if the meters are up. The status for the meters will be displayed on the
map.
Finally, SSP will implement a new CIS integration to track non-pay customers with coloration changes on
the map for non-paying customers. More detail is available for all of these integration points in the
provided DME documentation.
At times this project may require several different SSP, Trilliant and DME resources. However,
throughout the entirety of the project, the selected SSP Project Manager (TBD dependent on start date)
will be the sole person responsible for executive project communication, issue resolution, resource
management & scheduling, and ultimately, an on-time delivery of the stated solution. Additionally, the
SSP Account Manager (Dean Perry) will be available to DME throughout the project duration to discuss
any non-technical or personnel-specific concerns or questions.
DME is already utilizing and is familiar with Esri ArcGIS and the Schneider Electric ArcFM software. This
project will interface DME’s Responder OMS with the Trilliant AMI system to provide a more
streamlined, efficient, and ultimately valuable usage of the OMS.
The following section describes the tasks required to perform this implementation in detail.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
1.1 Design Phase
1.1.1 Kickoff and Workshop
Prior to kicking off the project, SSP will internally meet to review the goals, roles, risk items and plans for
the project. This shall ensure all SSP project personnel have a clear understanding of the plan ahead of
work beginning.
Next, the SSP Senior Consultant and PM will remotely host a project kickoff meeting with DME. This
meeting will consist of a review of the project goals, roles, personnel and schedule. Time will be allowed
for questions and answers. IT team members from DME and technical representatives from Trilliant are
required to attend and participate.
Upon the Kickoff Meeting’s conclusion, SSP will conduct remote workshops with DME Rx administrators,
Trilliant, and the CIS department to determine the exact approach for integrating the systems. The
integrations will all be based on a services oriented architecture (SOA) approach utilizing web services.
Trilliant will be responsible for designing the AMI side of the integration and the CIS department will be
responsible for designing the CIS side of the integration.
1.1.2 Documentation
Upon completion of the workshops, SSP will create a document detailing the design approach of the
integration from the Responder perspective. SSP will then review the document with Trilliant and DME
remotely to ensure the design specifications match the expectations from both parties.
Upon completion of the joint review meeting, SSP will update the document as required and submit it to
Trilliant and DME for each recipient’s future usage.
Provided all issues raised in the review meeting were addressed sufficiently, the Design Document will
be considered approved for development at this time.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
1.2 Development Phase
*Per updated SSP internal technology policy, in order for SSP to utilize DME’s Schneider Electric licensing
for development and/or testing purposes, SSP will require DME to accommodate one of two activities
for SSP’s proper access:
1. If permitted within its software license agreements and preferable to DME, DME will provide
SSP the required Schneider Electric software installers via FTP or Sharefile for SSP’s use on
development machines. DME provides access to its network via VPN along with the IP address
and machine name of its license server. SSP will reference the license server for the term of
testing any code / processes only. The network access will support allowing SSP machines onto
the DME network to reference the server.
2. Alternatively, DME will provide a desktop or server that SSP is provided login rights to, on DME’s
network. SSP will deploy our software development tools to this machine and use it to develop
and test all new functionality. SSP will remote desktop to this environment to perform this work.
This machine can be either physical or virtual. If virtual is preferred, SSP can provide the
machine to DME. SSP’s TFS source control can and will still be used for code control.
It has been assumed that the DME environment inclusive of the Responder application will have been
previously replicated at the SSP or DME offices per the prior Clevest integration work.
SSP will first create the web method signatures that will be required for development by Trilliant and/or
the CIS department. Once created, SSP will provide the WSDL for these web methods for reference by
the respective development groups.
Next, SSP will create the required integration code for the four interface points. The code will be unit
tested at SSP and interface installation and configuration documentation will be created.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
1.3 Deployment Phase
To deploy the solution, SSP will travel onsite to DME offices for ~four days. It is expected that Trilliant
and the CIS department would also be present onsite for this implementation, testing, and validation
exercise.
SSP will install the integration code into the client production environment. SSP will test and validate the
functionality within each system as well. For the balance of the visit, SSP will provide onsite production
support as DME users test and validate the new functionality. Any issues will be addressed by either SSP
or Trilliant as needed to ensure that the integration is working as designed. DME will be expected to
validate that the functionality meets the design documentation and operates correctly.
Finally, upon completion of the onsite trip, SSP will provide remote support for the solution, up to 40
hours, over the following 10 business days. If support is required beyond the 10 business days or the 40
hours (whichever is achieved first) a change order may be required.
Additional time has not been included for a second environment installation, however if this becomes a
requirement, the DME SSP retainer may be utilized for the work. At the completion of the offsite
support period, the integration project will be considered complete.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2 Assumptions
The following assumptions have been made regarding the description of this work:
SSP will already have a functioning DME test Rx environment up and running at our offices per
previous projects.
DME IT will provide all servers and will install all core Operating Systems.
DME IT will be available to support any environmental, system access, or operating systems issues
throughout the project.
DME IT will provide all required environmental access in a timely manner (response time within 24
hours of request).
DME must provide the targeted Oracle database version to SSP in writing at the project kickoff.
DME will provide appropriate staff commitment levels to ensure the success of the integration
project.
Trilliant will provide appropriate staff commitment levels to ensure the success of the integration
project.
Alterations to the design documentation after acceptance may require a change order depending on
the significance of the change.
Only the functionality described in Section 1 will be implemented as part of this project.
SSP has not included any time to train Schneider Electric on the support of the code, the usage of
the code, the test harness, or the integration. If training time is needed, a change order will be
required.
DME will be responsible for ensuring that any required Responder data is in place to support the
integration.
DME and/or Trilliant will be responsible for developing any formal test cases of the integration
points based on their usage within the Trilliant software. SSP will not create or deliver any formal
test cases.
Post deployment support will be provided for up to 10 business days following the onsite go live visit
or 40 hours of work, whichever expires first. Once this support phase expires, the project will be
deemed complete. If additional support time is required a change order will be required.
The integration will be developed against Responder version 10.2.1.
No formal training has been included in this statement of work. It is expected that the DME staff will
be trained on Responder and Trilliant usage independent of this project.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
3 Project Plan
The detailed project plan that was used to scope and budget this project has been included below. It can
be reviewed for additional information on tasks and duration.
Dates depicted in the project plan are tentative and subject to change dependent on actual project start
date and other factors; they're included here to communicate duration of tasks.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
4 Quote
This quote is tied directly to the scope of work detailed within this document. Any changes to the scope
of work before or during the project would result in a change order.
This quote is provided as a fixed priced number inclusive of all expenses and is good for 90 days from the
date listed on this SOW.
Upon completion of this project, a single invoice will be provided to DME for its entirety.
Project Task Est. Duration* Subtotal
DME Responder-Trilliant Integration
Design Phase 4 Bus. Days $6,800.00
Project Management
Kickoffs & Workshops
Documentation
Development Phase 12 Bus. Days $24,000.00
Project Management
Develop Integration Code
Unit Testing
Interface Documentation
Deployment Phase 14 Bus. Days $20,370.00
Project Management
Onsite Installation, Testing, Validation
Offsite Support
Grand Total 30 Bus. Days $51,170.00
*Duration estimates are subject to many project factors, some of which are outside of SSP’s control.
Therefore, all durations depicted are non-binding estimates only.
Note: All travel costs are included in the above quote.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Scope of Work #16-2-11
Implementation of
ArcGIS Online Public Streetlight Reporting Application
Version 1.1
Prepared For:
March 7, 2016
Work to be performed by
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Table of Contents
1 Overview ............................................................................................................................................... 3
1.1 Design Phase ................................................................................................................................. 4
1.2 Development Phase ...................................................................................................................... 4
1.3 Deployment Phase ........................................................................................................................ 4
2 Assumptions .......................................................................................................................................... 5
3 Project Plan ........................................................................................................................................... 6
4 Quote .................................................................................................................................................... 7
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
1 Overview
Denton Municipal Electric (“DME”) has experimented with ArcGIS Online and has communicated its wish
to configure an enterprise level solution that will allow them to expose and collect data from the public.
In order to resolve this requirement, SSP Innovations (“SSP”) will work with DME to install all required
components to securely expose data from the back office to the internet via our standard recommended
architecture. This will provide the foundation for this specific streetlight reporting effort as well as all
future ArcGIS Online projects including customer engagement, field inspections, public outage maps,
and many other implementation use cases.
Specifically within this project, SSP will work with DME to install and configure a template to collect
streetlight outages from the public. The outages will be used to drive automatic notifications of other
systems and/or individuals within DME (TBD). Additionally, a public facing streetlight outage map will be
created to inform customers as to current outages and potentially restored outage locations.
At times this project may require several different SSP and DME resources. However, throughout the
entirety of the project, the selected SSP Project Manager (TBD dependent on start date) will be the sole
person responsible for executive project communication, issue resolution, resource management &
scheduling, and ultimately, an on-time delivery of the stated solution. Additionally, the SSP Account
Manager (Dean Perry) will be available to DME throughout the project duration to discuss any
nontechnical or personnel-specific concerns or questions.
The following section describes the tasks required to perform this implementation in detail.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
1.1 Design Phase
To begin the project, SSP will host a remote web session, up to four hours, to kick off the project and
understand any work DME has done to date related to the streetlight outage reporting effort. This will
also provide DME IT an opportunity to review the recommended architecture and to ask questions
relating to the proposed solution. Additionally, DME should be prepared to represent what types of
notifications are required for a streetlight outage, within this meeting. SSP will support email
notifications and/or a call into a 3rd party system via a web service, if this functionality already exists.
Next, SSP will draft a high-level document showing the approach to the required ArcGIS Online
informational map products, as well as the notifications. This document will be reviewed with DME,
updated per any client feedback, and finally submitted & accepted as the design for the project.
1.2 Development Phase
To begin the development phase, SSP will develop the code for the notification functionality using a
standard SSP Nightly Batch Suite (NBS) application. An NBS application decreases the time required to
develop custom applications by providing standardized approaches for application scheduling
notifications, logging, and geodatabase access.
An application will be developed matching the requirements from the design document.
1.3 Deployment Phase
To deploy the solution, SSP will travel onsite to DME for a full week. The week will include installation
and configuration of an enterprise-ready ArcGIS Online configuration including secure access of mapping
services via the internet.
SSP will then install and validate the NBS automation application for consuming streetlight outages
entered via ArcGIS Online. SSP will also create the various web maps to be used in collecting the outages
and for displaying the outage map to the public via the DME website.
SSP will conclude the week by fully training DME administrative personnel on the solution, to allow
them to deploy similar solutions on their own in the future. The goal is to enable DME to be as self-
sufficient with the technology as possible.
Finally, immediately upon conclusion of the onsite week, SSP will provide a remote support period for
DME’s production usage of the application, up to five business days or 10 hours of labor, whichever
occurs first. Should additional support be required, a change order may be necessary, or the DME-SSP
retainer may be used.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2 Assumptions
The following assumptions have been made regarding the description of this work:
DME IT will provide all servers and will install all core Operating Systems.
DME IT will be available to support any environmental, system access, or operating systems
issues throughout the project.
DME IT will provide all required environmental access in a timely manner (response time within
24 hours of request).
DME will provide appropriate staff commitment levels to ensure the success of the project.
DME owns or will purchase all of the necessary Esri licensing for the software used for this
project, including the required ArcGIS Server and ArcGIS Online subscription licensing (named
users).
DME will provide a dedicated server (either physical or VM Ware) to host the Esri ArcGIS Server
application.
DME will OPTIONALLY provide a dedicated server (either physical or VM Ware) to host Microsoft
IIS and ArcGIS Web Adaptor within their DMZ.
DME will be responsible for purchasing an SSL certificate and installing it within Microsoft IIS on
the DMZ server if https is used (recommended).
DME will allow the ArcGIS Server rest services to be made accessible to the internet via a DMZ
web server and will open the required ports as shown in the diagram in this SOW.
The post-deployment remote support included in this project is for up to 10 hours of work or 5
days of duration, whichever comes first. If further support is deemed necessary, a change order
or follow-on support contract may be required.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
3 Project Plan
The detailed project plan that was used to scope and budget this project has been included below. It can
be reviewed for additional information on tasks and duration.
Dates depicted in the project plan are tentative and subject to change dependent on actual project start
date and other factors; they're included here to communicate duration of tasks.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
4 Quote
This quote is tied directly to the scope of work detailed within this document. Any changes to the scope
of work before or during the project would result in a change order.
This quote is provided as a fixed priced number inclusive of all expenses and is good for 90 days from the
date listed on this SOW.
Upon completion of this project, a single invoice will be provided to DME for its entirety.
Project Task Est. Duration* Subtotal
DME ArcGIS Online Public Streetlight Reporting Application Implementation
Design Phase 2 bus days $4,000.00
Project Management
Kickoffs & Workshops
Documentation
Development Phase 2 bus days $4,000.00
Project Management
SSP NBS App Code Development
Deployment Phase 10 bus days $20,005.00
Project Management
Onsite Install/Configure Solution
SSP Nightly Batch Suite Framework Product Purchase
Offsite Support
Grand Total 14 bus days $28,005.00
*Duration estimates are subject to many project factors, some of which are outside of SSP’s control.
Therefore, all durations depicted are non-binding estimates only.
Note: All travel costs are included in the above quote.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Ballpark Estimate
Miscellaneous Requirements
Version 1.3
Prepared For:
April 21, 2016
Work to be performed by
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Table of Contents
1 Overview ............................................................................................................................................... 3
2 Ballpark Estimates by Requirement ...................................................................................................... 4
2.1 Implementation of Graphic Work Design & Work Order Management System Integration ....... 4
2.1.1 Anticipated Task List ............................................................................................................. 4
2.2 Integration of Responder OMS to DME Community Relations Outage Application .................... 5
2.2.1 Anticipated Task List ............................................................................................................. 5
2.3 Improvement of Public Facing Outage Map ................................................................................. 6
2.3.1 Anticipated Task List ............................................................................................................. 6
2.4 Implementation of GIS Management Dashboard ......................................................................... 7
2.4.1 Anticipated Task List ............................................................................................................. 8
2.5 Review of Disaster Recovery & Backup Solutions for GIS, OMS and Related Systems ................. 9
2.5.1 Anticipated Task List ............................................................................................................. 9
2.6 Assistance with GIS Upgrade ...................................................................................................... 10
2.6.1 Anticipated Task List ........................................................................................................... 11
2.7 Implementation of GIS-Based Asset Management Software ..................................................... 13
2.7.1 Anticipated Task List ........................................................................................................... 14
2.8 Implementation of Reporting Solution for Legacy OMS Data .................................................... 15
2.8.1 Anticipated Task List ........................................................................................................... 15
2.9 Implementation of New DME Web-Based GIS Solution ............................................................. 16
2.9.1 Anticipated Task List ........................................................................................................... 16
2.10 GIS Health Check-up ................................................................................................................... 17
2.10.1 Anticipated Task List ........................................................................................................... 17
2.11 Development of Custom DME GIS Training Materials ................................................................ 18
2.11.1 Anticipated Task List ........................................................................................................... 18
2.12 GIS-Related Projects for Distribution Automation and Unmanned Aerial Vehicle Systems ...... 19
2.12.1 Anticipated Task List ........................................................................................................... 19
2.13 GIS Support Retainer ................................................................................................................... 20
2.13.1 Anticipated Task List ........................................................................................................... 20
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
1 Overview
Denton Municipal Electric (“DME”) has provided an extensive list of various requirements to SSP
Innovations (“SSP”) around enhancing and/or improving the functionality of and around its GIS. In
response to the list, this document provides rough order of magnitude cost estimates, and line-item task
detail where possible, as to the work likely required to resolve each requirement.
All depictions of levels of effort, durations and/or costs within this document shall be considered non-
binding ballpark estimates for rough budgeting purposes only. SSP does not guarantee the success of
any of the below solutions at the stated price.
In order to obtain a committed SOW with subtask-level detail, schedule and fixed costs, a scoping
conversation would be required between the two entities for the corresponding requirement.
Prices included are using SSP rates and projected costs for projects signed in calendar year 2016. These
rates are subject to change.
*A portion of the services described herein requires SSP’s access to DME’s Schneider Electric ArcFM
Suite licensing. Per updated SSP internal technology policy, in order for SSP to utilize DME’s Schneider
Electric licensing for development and/or testing purposes, SSP will require DME to accommodate one
of two activities for SSP’s proper access:
1. If permitted within its software license agreements and preferable to DME, DME will provide
SSP the required Schneider Electric software installers via FTP or Sharefile for SSP’s use on
development machines. DME provides access to its network via VPN along with the IP address
and machine name of its license server. SSP will reference the license server for the term of
testing any code / processes only. The network access will support allowing SSP machines onto
the DME network to reference the server.
2. Alternatively, DME will provide a desktop or server that SSP is provided login rights to, on DME’s
network. SSP will deploy our software development tools to this machine and use it to develop
and test all new functionality. SSP will remote desktop to this environment to perform this work.
This machine can be either physical or virtual. If virtual is preferred, SSP can provide the
machine to DME. SSP’s TFS source control can and will still be used for code control.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2 Ballpark Estimates by Requirement
2.1 Implementation of Graphic Work Design & Work Order Management
System Integration
SSP is currently working with DME to document DME’s workflow processes and potential system
interfaces surrounding work order management and design. DME will utilize this project as an input into
the decision-making process around a future purchase and installation of both a capital work order
management system as well as a graphic work design tool.
Depending on the systems DME chooses for installation, SSP will handle the installation, configuration,
and any customization of the applications to meet DME’s requirements. A financial ballpark previously
provided to DME has been included in this document as a placeholder for this work. A revised and
detailed task order and project plan will be created and agreed upon with DME before any work
commences.
Cost Estimate: $600,000.00
2.1.1 Anticipated Task List
Not available at this time – scoping calls required.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2.2 Integration of Responder OMS to DME Community Relations Outage
Application
DME is currently evaluating customer-facing applications that will allow customers to check their status
within an outage event. This will work by allowing the third-party application to check for a customer’s
participation in a confirmed incident within Responder. Another option would be to allow customers to
report an outage via the third-party application.
While DME has not selected a vendor or application for this functionality as of yet, SSP has previously
implemented similar Responder-based functionality at other utilities and has used those projects to
provide a ballpark for this project.
Cost Estimate: $55,000.00
2.2.1 Anticipated Task List
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2.3 Improvement of Public Facing Outage Map
This implementation will utilize the ArcGIS Online components that were installed via the previously
scoped project Installation of ArcGIS Online Public Streetlight Reporting Application (SSP SOW #16-2-11)
to provide secure access to GIS data via the internet. This will allow for the Responder data to be viewed
via the public facing DME website.
DME has already experimented with creating an outage map, but the current map shows the individual
responder incident locations (exact location of outage), which is not a recommended pattern.
SSP recommends usage of our standard approach for public facing responder outage maps. This
approach utilizes an aggregation of the Responder incident data to various polygons covering the service
territory. This data is then made available to a web map template provided by Esri specifically for public
facing outages. This template will be installed and configured alongside the SSP NBS application for
Responder aggregation.
Cost Estimate: $16,000.00
2.3.1 Anticipated Task List
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2.4 Implementation of GIS Management Dashboard
DME would like to build a GIS dashboard that includes both statistical information extracted from GIS
(e.g., miles of line for distribution primary overhead and underground, etc.), as well as general mapping
tools for managing day-to-day operations. SSP is currently working on a similar project at another utility
and has used this project to ballpark this effort at DME.
SSP would propose to create a standard ASP.Net website that is driven by two major functional tabs.
The first (default) tab will contain the statistical key performance indicators (KPIs) that are extracted
from the underlying data. Presentation of this data may include charts and graphs as needed. The
second major tab will include an embedded web view of a configured Esri Operations Dashboard which
will provide a mapping-based approach to locating specific assets, events, or work. Operations
dashboard provides additional functionality for adding graphs and charts tied directly to the data on the
map.
The combination of the statistical and map-based dashboard will provide DME with maximum flexibility
for providing information to managers throughout the utility.
Cost Estimate: $98,405.00
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2.4.1 Anticipated Task List
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2.5 Review of Disaster Recovery & Backup Solutions for GIS, OMS and
Related Systems
DME would like to have their current DR and backup solutions reviewed by an expert in the field.
An SSP enterprise architect will travel to DME to work with them to review all current procedures for
disaster recovery, optionally high availability, and backups. The architect will then draft a
recommendations document covering all recommended changes including potential usage of additional
database and/or other software applications to increase the redundancy of the system.
SSP will then lead the implementation of the changes and provide support surrounding the new
software/procedures. SSP has provided a ballpark for this effort based on experience at other utilities.
Cost Estimate: $33,235.00
2.5.1 Anticipated Task List
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2.6 Assistance with GIS Upgrade
Every other year, DME performs upgrades for the GIS and the related application extensions (ArcFM,
OMS, etc.). DME is already underway with an upgrade to Esri 10.2.1, which will be the standardized
version for usage within ArcGIS Desktop until the newer Esri Utility Network (UN) is ready for usage by
the industry.
This may or may not be within the three-year suggested timeframe of this proposed agreement.
Therefore, SSP has included a ballpark for supporting various upgrade activities during this time. This
may be related to implementation of the new UN and/or may be used to update/upgrade other
supporting application components within the context of DME GIS.
A key suggestion for this work would be an Oracle upgrade to version 12c, which is heavily tied to
several DME custom Responder integrations for SCADA and IVR. Per DME recommendations, these
Responder integrations should be upgraded and/or replaced for better Oracle compliance prior to
upgrading Oracle. The time and budget allotted to this task will be evaluated closer to the time when an
upgrade is requested/required by DME.
Cost Estimate: $156,620.00
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2.6.1 Anticipated Task List
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2.7 Implementation of GIS-Based Asset Management Software
DME uses a Microsoft Access Database application to manage their assets today. The asset data is
stored directly in their GIS database and there is custom functionality in place to allow the asset data to
be linked to GIS asset records. The current solution is not a centrally managed application, utilizes VBA -
which has been scheduled by Microsoft for deprecation - and lacks enterprise level security.
SSP is proposing to work with DME to develop a custom implementation of SSP’s asset management
project-ware which will move the asset management functionality into an enterprise-level intranet
website using the latest recommended development platforms. This new implementation will give DME
thorough confidence in the enterprise security by integrating it with Microsoft Active Directory for
authentication along with a flexible role-based authorization model.
SSP’s project-ware also includes best practices for integrating this data into the GIS within an ArcFM
data model. SSP will review and make use of the asset management and GIS integration developed at
DME today where possible to ensure the new solution meets the business needs of the organization. A
ballpark for this work has been included based on a prior asset management statement of work
provided to DME.
Cost Estimate: $263,490.00
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2.7.1 Anticipated Task List
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2.8 Implementation of Reporting Solution for Legacy OMS Data
DME relies on legacy OMS data from a previous installation of Milsoft (prior to Responder). Currently
the only method of viewing the data is via usage of Milsoft’s reporting tool. DME no longer wants to rely
on the Milsoft reporting tool for access to this data and has requested that new independent reports be
created to replicate the data that they need for ongoing operational management.
SSP’s DBA will work with DME to review the Oracle storage for the underlying data. This data will then
be replicated at SSP’s offices where the DBA will work to design and build reports conveying the
information that DME requires. These reports may utilize an out-of-the-box software package like SQL
Server Reporting or Microsoft Access (TBD) to render the report format.
The resulting reports will be reviewed with DME and subsequently updated as needed. The final solution
will then be deployed to DME, at which time the Milsoft application can be retired. SSP has included a
ballpark for this work based on the requirements available at this time.
Cost Estimate: $18,900.00
2.8.1 Anticipated Task List
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2.9 Implementation of New DME Web-Based GIS Solution
This implementation will utilize the ArcGIS Online components that were installed via the previously
scoped project Installation of ArcGIS Online Public Streetlight Reporting Application (SSP SOW #16-2-11).
DME desires to move off of the legacy ArcFM Silverlight Viewer that is in use today to a newer HTML5 /
JavaScript API viewer. Based on conversations with DME, SSP is recommending moving to an ArcGIS
Online-based map viewer. This will provide DME with an industry-standard viewer without any
customization required. The one key item that is not readily available in ArcGIS Online is ArcFM tracing,
however DME has indicated that this functionality is not heavily used, and is therefore not imperative.
As part of this effort, SSP will also work with DME to replace their current ArcGIS Engine Inspector usage
with an ArcGIS Online Collector installation. This will include configuring collection templates for field
users to capture inspections including attribute data, GPS location, and optionally pictures. This data will
then be available in the back office.
SSP has also included some (TBD) NBS automation to utilize the inspection data to drive notifications or
other related reporting. SSP has included a ballpark for this work.
Cost Estimate: $24,900.00
2.9.1 Anticipated Task List
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2.10 GIS Health Check-up
DME has requested a health check-up for all GIS systems that DME uses. This will cover an entire review
of all core GIS, GIS customizations, and integrations in place.
SSP will send both an enterprise architect and a senior consultant onsite to work with DME to review
usage of the various systems. The architect will focus on usage of the database and hardware sizing,
while the senior consultant will review the software, customization, and integration usage. The senior
consultant will include a review all custom code to ensure it is operating correctly and efficiently.
The senior consultant and the architect will work together to create a recommendations guide covering
all aspects of the GIS implementation. This document will be presented to DME, updated and finalized. It
should be noted that this effort does not include the implementation of any recommendations. SSP has
included a ballpark for this effort which may be revised closer to the project.
Cost Estimate: $30,870.00
2.10.1 Anticipated Task List
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2.11 Development of Custom DME GIS Training Materials
DME desires customized training materials for onboarding new GIS personnel and/or regression training
of existing personnel.
SSP will work with DME to create custom course presentation content and exercises for ArcFM,
Responder, whatever graphic work design tool is chosen, and any related applications. SSP will deliver
the custom materials and then travel onsite to teach the course(s) during two separate visits.
The training materials will be owned by DME and can be used for subsequent internal training sessions
as needed. Either DME staff or SSP staff can be used for future training as desired (not included in this
estimate).
SSP has included a ballpark for this effort which may be revised based on changes in the systems at the
time the training materials are developed. DME will be responsible for providing access to the DME
environment for development of the materials.
Cost Estimate: $75,610.00
2.11.1 Anticipated Task List
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2.12 GIS-Related Projects for Distribution Automation and Unmanned
Aerial Vehicle Systems
DME has requested assistance with future GIS-related projects including the integration and
development needed for implementation of Distribution Automation systems and an Unmanned Aerial
Vehicle system.
The requirements for these systems are unknown at this time so a simple placeholder for 130 days of
work has been included in this document, to provide a general ballpark.
This item will need to be estimated once requirements are known.
Cost Estimate: $260,000.00
2.12.1 Anticipated Task List
Not available at this time – scoping calls required.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
2.13 GIS Support and Additional Projects
DME desires a contractual mechanism to request ad hoc services for small jobs and/or issue/bug
resolution from a qualified GIS consultant over the course of this PSA.
This will be a time & materials (T&M) rate for custom support on all GIS, OMS, and related custom
components owned by DME. This includes all existing asset management auto-updaters, inspector auto-
updaters and Responder custom pieces & integrations. This also includes any other GIS related projects
or integrations that are identified including further customizations for any GIS products or integrations
to other systems at DME. This could also include development of any applications needed for the DME
GIS group.
In order to project a not-to-exceed cost for this task order, SSP has provided an estimate of 12% of a full
time consultant to help with these miscellaneous activities over the course of a three-year time period.
This work will be invoiced every thirty days ONLY for the work completed in the previous thirty days. SSP
tracks T&M work down to the quarter-hour and provides timesheet log-level detail for all time worked
under a T&M agreement. Any approved expenses would be reimbursed by DME.
The not-to-exceed cost and level of effort for this estimate can be increased or decreased by DME prior
contracting for the work, based on DME’s needs. SSP will work at the direction of DME until the allotted
funds are exhausted, at which time a change order will be required to allocate additional funds.
Cost Estimate: Not-to-Exceed $241,360.00
Hourly Rate: $200.00
*In the event SSP must travel to DME to provide support services, all pre-approved travel expenses will
be reimbursed by DME at cost.
2.13.1 Anticipated Task List
As-needed support and services for duration of PSA.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
SSP Proposal Summary
Integration/Clevest 46,435.00$
Integration/Trilliant 51,170.00$
Streetlight Reporting 28,005.00$
Miscellaneous
Includes: Graphic Work Design & Work Order Mgmt System Integration 600,000.00$
Integration/Responder OMS 55,000.00$
Improvement of Public Facing Outage Map 16,000.00$
Implement/GIS Mgmt Dashboard 98,405.00$
Review of Disaster Recovery & Backup Solutions 33,235.00$
GIS upgrade Assistance 156,620.00$
Implement/GIS Asset Mgmt Software 263,490.00$
Implement/Reporting Solution for Legacy OMS Data 18,900.00$
Implement New DME Web Based GIS 24,900.00$
GIS Health Checkup 30,870.00$
Development of Custom DME GIS Training Materials 75,610.00$
GIS Related Projects for Distribution Automation 260,000.00$
GIS Support Retainer 241,360.00$
Hourly Rate for incidental services ‐ $200 per hour
Travel expenses are to be pre‐approved by DME and reimbursed at cost.
EXHIBIT B
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
EXHIBIT C
1
INDIVIDUAL PROJECT INITIATION PROCESS
This section establishes the process whereby individual projects will be initiated. It is a general outline of the steps
to be taken in setting project schedules and establishing project prices. The steps are generally in order of
occurrence; however, nothing herein precludes the parties from agreeing to an amended approach for any given
project.
1. The starting point for the process shall be when the project request is delivered to the contractor by DME with
indication of a preferred start date. The preferred start date shall not be less than 30 calendar days from the date the
plans are delivered to the contractor. Longer planning periods are permissible. DME and the contractor will
coordinate, to the extent feasible, in the development phases of pr ojects to better facilitate planning for both parties.
Benefits could be realized in long range budget forecasting, better project timing, planning, and in coordinating and
optimizing contractor resources and availability.
2. The contractor shall acknowledge receipt of the project request, indicate acceptance of the planned start date or
propose an alternate start date, and shall propose a time to discuss the project. This project meeting shall be
scheduled not less than 14 calendar days before the preferred start date.
3. At the project meeting, the following actions are expected:
1. The contractor shall provide:
A formal estimate of the cost based on the contract unit rates in force at the time of the notice based on
the units shown on the project plans
A proposed time-frame to be allowed for project completion
A list of classification and quantity of expected personnel that will be assigned to the project
A list of the type and quantity of expected equipment that will be assigned to the project
Raise any issues of concern
2. DME shall provide:
Revised project plans, if any
A description of the project and constraints and answer questions
Raise any issues of concern
3. Jointly, both parties shall (some items may require additional time after the project meeting for resolution.
Resolution must be achieved before the purchase order can be issued):
Review the project plan and scope
Attempt to arrive at a final cost estimate
Establish a formal project start date
Attempt to resolve concerns on all issues or agree on a process and time for resolving issues
4. After a formal start date and pricing are established, DME will enter the requisition for the purchase order based
on the agreed contracted pricing and a separate PO will be issued by Purchasing.
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
Exhibit
CONFLICT OF INTEREST QUESTIONNAIRE - FORM CIQ
For vendor or other person doing business with local governmental entity
This questionnaire reflects changes made to the law by H.B. 23, 84th Leg., Regular Session.
This questionnaire is being filed in accordance with Chapter 176, Local Government Code, by a vendor who has a business relat ionship as
defined by Section 176.001(1-a) with a local governmental entity and the vendor meets requirements under Sec tion 176.006(a).
By law this questionnaire must be filed with the records administrator of the local government entity not later than the 7th business day after
the date the vendor becomes aware of facts that require the statement to be filed. See Section 176.006(a-1), Local Government Code.
A vendor commits an offense if the vendor knowingly violates Section 176.006, Local Government Code. An offense under this s ection is a
misdemeanor.
1 Name of vendor who has a business relationship with local governmental entity.
2
Check this box if you are filing an update to a previously filed questionnaire.
(The law requires that you file an updated completed questionnaire with the appropriate filing authority not later than the 7th business
day after the date on which you became aware that the originally filed questionnaire was incomplete or inaccurate.)
3 Name of local government officer about whom the information in this section is being disclosed.
Name of Officer
This section, (item 3 including subparts A, B, C & D), must be completed for each officer with whom the vendor has an employment or other business relationship
as defined by Section 176.001(1-a), Local Government Code. Attach additional pages to this Form CIQ as necessary.
A. Is the local government officer named in this section receiving or likely to receive taxable income, other than investment income, from the vendor?
Yes No
B. Is the vendor receiving or likely to receive taxable income, other than investment income, from or at the direction of the local government officer
named in this section AND the taxable income is not received from the local governmental entity?
Yes No
C. Is the filer of this questionnaire employed by a corporation or other business entity with respect to which the local gov ernment officer serves as an
officer or director, or holds an ownership of one percent or more?
Yes No
D. Describe each employment or business and family relationship with the local government officer named in this section.
4
I have no Conflict of Interest to disclose.
5
Signature of vendor doing business with the governmental entity Date
DocuSign Envelope ID: 8D4A357A-9685-4A1D-B1E7-2EE76C0952E3
D
X
X
5/5/2016
X
X
N/A
N/A
SSP Innovations
Certificate Of Completion
Envelope Id: 8D4A357A96854A1DB1E72EE76C0952E3 Status: Completed
Subject: City Council Docusign Item - 6122 GIS Engineering Technology Services for DME (SSP Innovations)
Source Envelope:
Document Pages: 70 Signatures: 5 Envelope Originator:
Certificate Pages: 6 Initials: 0 Rebecca Hunter
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
rebecca.hunter@cityofdenton.com
IP Address: 129.120.6.150
Record Tracking
Status: Original
5/5/2016 11:40:16 AM
Holder: Rebecca Hunter
rebecca.hunter@cityofdenton.com
Location: DocuSign
Signer Events Signature Timestamp
Rebecca Hunter
rebecca.hunter@cityofdenton.com
Senior Buyer
City of Denton
Security Level: Email, Account Authentication
(Optional)
Completed
Using IP Address: 129.120.6.150
Sent: 5/5/2016 11:44:33 AM
Viewed: 5/5/2016 11:44:45 AM
Signed: 5/5/2016 11:45:58 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
ID:
Dean Perry
Dean.perry@sspinnovations.com
Director of Sales
Security Level: Email, Account Authentication
(Optional)Using IP Address: 108.21.220.11
Sent: 5/5/2016 11:46:01 AM
Viewed: 5/5/2016 1:46:54 PM
Signed: 5/5/2016 1:52:38 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
ID:
John Knight
john.knight@cityofdenton.com
Deputy City Attorney
City of Denton
Security Level: Email, Account Authentication
(Optional)
Using IP Address: 129.120.6.150
Sent: 5/5/2016 1:52:43 PM
Viewed: 5/5/2016 2:43:51 PM
Signed: 5/5/2016 2:44:58 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
ID:
Julia Winkley
julia.winkley@cityofdenton.com
Contracts Administration Supervisor
City of Denton
Security Level: Email, Account Authentication
(Optional)
Completed
Using IP Address: 129.120.6.150
Sent: 5/5/2016 2:45:01 PM
Viewed: 5/6/2016 10:34:12 AM
Signed: 8/16/2016 1:50:16 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
ID:
Signer Events Signature Timestamp
Howard Martin
howard.martin@cityofdenton.com
Interim City Manager
City of Denton
Security Level: Email, Account Authentication
(Optional)
Using IP Address: 129.120.6.150
Sent: 8/16/2016 1:50:21 PM
Resent: 8/23/2016 12:37:56 PM
Viewed: 8/24/2016 11:18:32 AM
Signed: 8/24/2016 11:18:52 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
ID:
Jennifer Walters
jennifer.walters@cityofdenton.com
City Secretary
City of Denton
Security Level: Email, Account Authentication
(Optional)
Using IP Address: 129.120.6.150
Sent: 8/24/2016 11:18:56 AM
Viewed: 8/25/2016 6:55:47 AM
Signed: 8/25/2016 6:57:10 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
ID:
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Julia Winkley
julia.winkley@cityofdenton.com
Contracts Administration Supervisor
City of Denton
Security Level: Email, Account Authentication
(Optional)
Sent: 5/5/2016 1:52:41 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
ID:
Sherri Thurman
sherri.thurman@cityofdenton.com
Security Level: Email, Account Authentication
(Optional)
Sent: 5/5/2016 1:52:42 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
ID:
Robin Fox
Robin.fox@cityofdenton.com
Security Level: Email, Account Authentication
(Optional)
Sent: 8/16/2016 1:50:20 PM
Electronic Record and Signature Disclosure:
Accepted: 10/9/2015 11:39:51 AM
ID: 04463961-03db-4c4d-9228-d660d6146ed6
Jane Richardson
jane.richardson@cityofdenton.com
Security Level: Email, Account Authentication
(Optional)
Sent: 8/16/2016 1:50:22 PM
Viewed: 8/18/2016 11:34:59 AM
Carbon Copy Events Status Timestamp
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
ID:
Jennifer Bridges
jennifer.bridges@cityofdenton.com
Procurement Assistant
City of Denton
Security Level: Email, Account Authentication
(Optional)
Sent: 8/25/2016 6:57:14 AM
Viewed: 8/25/2016 8:42:33 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
ID:
Trey Price
trey.price@cityofdenton.com
Security Level: Email, Account Authentication
(Optional)
Sent: 8/25/2016 6:57:15 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
ID:
Jane Richardson
jane.richardson@cityofdenton.com
Security Level: Email, Account Authentication
(Optional)
Sent: 8/25/2016 6:57:17 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
ID:
Notary Events Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 8/25/2016 6:57:17 AM
Certified Delivered Security Checked 8/25/2016 6:57:17 AM
Signing Complete Security Checked 8/25/2016 6:57:17 AM
Completed Security Checked 8/25/2016 6:57:17 AM
Electronic Record and Signature Disclosure
ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, City of Denton (we, us or Company) may be required by law to provide to
you certain written notices or disclosures. Described below are the terms and conditions for
providing to you such notices and disclosures electronically through your DocuSign, Inc.
(DocuSign) Express user account. Please read the information below carefully and thoroughly,
and if you can access this information electronically to your satisfaction and agree to these terms
and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of
this document.
Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available
electronically to you by us. For such copies, as long as you are an authorized user of the
DocuSign system you will have the ability to download and print any documents we send to you
through your DocuSign user account for a limited period of time (usually 30 days) after such
documents are first sent to you. After such time, if you wish for us to send you paper copies of
any such documents from our office to you, you will be charged a $0.00 per-page fee. You may
request delivery of such paper copies from us by following the procedure described below.
Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time
change your mind and tell us that thereafter you want to receive required notices and disclosures
only in paper format. How you must inform us of your decision to receive future notices and
disclosure in paper format and withdraw your consent to receive notices and disclosures
electronically is described below.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. To indicate to us that you are changing your mind, you must
withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your
DocuSign account. This will indicate to us that you have withdrawn your consent to receive
required notices and disclosures electronically from us and you will no longer be able to use your
DocuSign Express user account to receive required notices and consents electronically from us
or to sign electronically documents from us.
All notices and disclosures will be sent to you electronically
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through your DocuSign user account all required notices, disclosures,
authorizations, acknowledgements, and other documents that are required to be provided or
made available to you during the course of our relationship with you. To reduce the chance of
you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process, please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
electronically from us.
Electronic Record and Signature Disclosure created on: 4/20/2015 2:25:38 PM
Parties agreed to: Robin Fox
How to contact City of Denton:
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to: kevin.gunn@cityofdenton.com
To advise City of Denton of your new e-mail address
To let us know of a change in your e-mail address where we should send notices and disclosures
electronically to you, you must send an email message to us at kevin.gunn@cityofdenton.com
and in the body of such request you must state: your previous e-mail address, your new e-mail
address. We do not require any other information from you to change your email address..
In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected
in your DocuSign account by following the process for changing e-mail in DocuSign.
To request paper copies from City of Denton
To request delivery from us of paper copies of the notices and disclosures previously provided
by us to you electronically, you must send us an e-mail to kevin.gunn@cityofdenton.com and in
the body of such request you must state your e-mail address, full name, US Postal address, and
telephone number. We will bill you for any fees at that time, if any.
To withdraw your consent with City of Denton
To inform us that you no longer want to receive future notices and disclosures in electronic
format you may:
i. decline to sign a document from within your DocuSign account, and on the subsequent
page, select the check-box indicating you wish to withdraw your consent, or you may;
ii. send us an e-mail to kevin.gunn@cityofdenton.com and in the body of such request you
must state your e-mail, full name, IS Postal Address, telephone number, and account
number. We do not need any other information from you to withdraw consent.. The
consequences of your withdrawing consent for online documents will be that transactions
may take a longer time to process..
Required hardware and software
Operating Systems: Windows2000? or WindowsXP?
Browsers (for SENDERS): Internet Explorer 6.0? or above
Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0,
NetScape 7.2 (or above)
Email: Access to a valid email account
Screen Resolution: 800 x 600 minimum
Enabled Security Settings:
•Allow per session cookies
•Users accessing the internet behind a Proxy
Server must enable HTTP 1.1 settings via
proxy connection
** These minimum requirements are subject to change. If these requirements change, we will
provide you with an email message at the email address we have on file for you at that time
providing you with the revised hardware and software requirements, at which time you will
have the right to withdraw your consent.
Acknowledging your access and consent to receive materials electronically
To confirm to us that you can access this information electronically, which will be similar to
other electronic notices and disclosures that we will provide to you, please verify that you
were able to read this electronic disclosure and that you also were able to print on paper or
electronically save this page for your future reference and access or that you were able to
e-mail this disclosure and consent to an address where you will be able to print on paper or
save it for your future reference and access. Further, if you consent to receiving notices and
disclosures exclusively in electronic format on the terms and conditions described above,
please let us know by clicking the 'I agree' button below.
By checking the 'I Agree' box, I confirm that:
• I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF
ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and
• I can print on paper the disclosure or save or send the disclosure to a place where I can
print it, for future reference and access; and
• Until or unless I notify City of Denton as described above, I consent to receive from
exclusively through electronic means all notices, disclosures, authorizations,
acknowledgements, and other documents that are required to be provided or made
available to me by City of Denton during the course of my relationship with you.