6304 - Denton Energy Center Waterline Phase 1, Addendum 2Exhibit 1 - Revised(2)
RFP 6304 Pricing Sheet for Water Line Improvements - Phase 1 DME Denton Energy Center
The respondent shall complete the following section, which directly corresponds to the Scope of Services, Payment and Performance Requirements. The contractor shall not make changes
to this format.
SECTION I - Project: Furnish all supervision, labor, material, supplies, tools, equipment and transportation to complete:
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
A1
A2
SECTION II - Hourly Rates for Additional Services
Item
15
16
17
18
19
20
SECTION III - Delivery
20
21
Type of Service Requested
BASE PROPOSAL
GENERAL
Mobilization/ Demobilization
Payment and Performance Bonds
General Site Preparation
Traffic Control, Barricades,Barriers, and Warning Signs
Temporary Erosion Control
WATER
12" C900 DR 14 PVC Water
12" R.J.D.I. Water Carrier Pipe
16" C151 DIP CL 52
24" Steel Casing By Open Trench
12" Gate Valve
Fire Hydrant Assembly
Connection to Existing Water Line
Trench Safety
Rock Excavation
ALTERNATE
WATER
16" C151 DIP CL 52
16" Gate Valve
PRICES SHALL INCLUDE DELIVERY, FOB DESTINATION
Type of Service or Equipment
Track Excavator
Rubber Tire Front End Loader
Rubber Tire Backhoe
Compactor
Bobcat Skid Steer
12 YD Tandem Dump
Total working days (Monday - Friday/Saturday) after Notice to Proceed is issued by City for project start:
Total working days (Monday - Friday/Saturday) after Notice to Proceed is issued by City for substantial completion:
Proposer's Name
Principal Place of Business
Quantity
1
1
1
1
1
4786
424
9
420
9
8
1
5219
700
Quantity
1505
2
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Unit
LS
LS
LS
LS
LS
LF
LF
LF
LF
EA
EA
EA
LF
CY
Unit
LF
EA
Quantity
1
1
1
1
1
1
Unit Price
BASE TOTAL (FOR EVALUATION)
Unit Price
ALT TOTAL
Unit Price
Extended Price
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Extended Price
0
0
0
Extended Price
0
0
0
0
0
0