6395 - Landfill Cell 3 Liner Construction and Site Improvements, Addendum 4 REVISED PRICING SHEET (2)REVISED - Exhibit 1
*Addendum #4
RFP 6395 - Pricing Sheet for Landfill Cell 3 Liner Construction And Site Improvements
The respondent shall complete the following sections IN YELLOW, which directly correspond to the specifications. The contractor shall not make changes to this format.
Respondent's Name:
Principal Place of Business (City and State)
Respondent is a Corporation, Partnership, sole Proprietorship, Indvidual?
Total calendar days after Notice to Proceed is issued by City for project start:
Total calendar days after project start to substatial completion:
Project timeframe grand total:
Item No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
ADDITIVE ALTERNATE ITEMS
Item No.
A1
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13
A14
A15
A16
Description
Mobilization, Demobilization, Bonds, Insurance and General Conditions
Development and maintenance of Stormwater Pollution Prevention Plan.
Furnish and install temporary sediment and erosion control devices and all related items, complete and in place as required.
Landfill Cell 3 Excavation to subgrade elevations, as shown on the Drawings
Landfill Cell 3 subgrade fill
Recompacted Clay Liner, prepared for geomembrane, inclusive of hauling from on-site stockpiles, complete and in place
HDPE Geomembrane complete and in place
Geocomposite drainage layer, complete in place
Leachate collection system, inclusive of geotextile, drainage media and 12-in diameter HDPE pipe
Landfill Cell 3 protective cover, in place, inclusive of hauling from on-site stockpiles
Precast screening wall and mow strip, complete in place
Scale pit area pavement demolition
Truck Scale, complete in place
Scale pit and approach pads, reinforced concrete, complete in place
Install 10" reinforced concrete pavement bypass lane, complete in place.
8" modified subgrade with 27 pounds/SY of 6% by weight of hydrated lime.
Commercial Gate Operator and arm, Liftmaster MATDCBB3 and CPS-UN4, complete in place
Steel tube guardrail, complete in place
ELR Pump and controls, complete in place
ELR Tank, 250,000 gallon including appurtenances and foundation, complete in place
ELR system piping connections, complete in place
ELR Pump electrical service, complete in place
Precast pump house structure, 10'-0" x 12'-0" x 7'-6" gabled concrete building with granular subbase, complete in place. Design basis: Easi-Set.
Total pricing typed in words, below:
Description
Groundwater Underdrain System, in place in accordance with the Drawings.
Scarify and recompact roadbase (Old Edwards Road)
Excavate/de-silt south stormwater pond
Install 12" flex base, complete in place (Station 14+00 to 19+25)
Install curb and gutter, complete in place
Install 4" HMAC Type 'A' and 2" HMAC Type 'D', complete in place
Earth fill, below road bed
Litter control fence
Scale area hip shade structure, complete in place
Precast rest area building, complete in place. Design basis: Easi-Set.
Restroom water and wastewater connections to existing meter and manhole, complete in place
Restroom electrical service, complete in place
Restroom area shade structure, complete in place
Rest area bypass paving, 8" reinforced concrete pavement, complete in place
8" modified subgrade with 27 pounds/SY of 6% by weight of hydrated lime.
Rest area site work and sidewalk
Total pricing including additive alternate items typed in words, below:
Estimated
Quantity
1
1
1
605000
5000
65500
840000
840000
1
65500
1600
1
1
1
375
375
1
400
1
1
1
1
1
Estimated
Quantity
1
3900
500
1635
3000
5200
1200
15000
2
1
1
1
1
650
650
1
Unit
LS
LS
LS
CY
CY
CY
SF
SF
LS
CY
LF
LS
LS
LS
SY
SY
EA
LF
LS
LS
LS
LS
LS
Unit
LS
SY
CY
SY
LF
SY
CY
SF
EA
LS
LS
LS
EA
SY
SY
LS
0
Unit Cost
Grand Total:
Unit Cost
Grand Total:
Amount
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Amount
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0