6416 - Construction of Hickory Sub Underground Transmission Line Duct Bank, Addendum 1 REVISED PRICING SHEET (6)Exhibit 1 - REVISED
RFP 6416 Pricing Sheet for CONSTRUCTION OF HICKORY SUB UNDERGROUND
TRANSMISSION LINE DUCT BANK
The respondent shall complete the following section, which directly corresponds to the Scope of Services, Payment and Performance Requirements. The contractor shall not make changes
to this format.
SECTION I - Project: Furnish all supervision, labor, material, supplies, tools, equipment and transportation to complete:
Item
1
2
3
4
5
BASE GENERAL SUBTOTAL
6
7
8
9
10
11
12
13
BASE TRANSMISSION DUCT BANK SUBTOTAL
14
15
16
17
18
19
BASE DISTRIBUTION DUCT BANK SUBTOTAL
SECTION II - Hourly Rates for Additional Services
Item
20
21
22
23
24
25
SECTION III - Delivery (SUBSTANTIAL COMPLETION SHALL BE PRIOR TO OCTOBER 16, 2017)
26
27
Type of Service Requested
BASE PROPOSAL
GENERAL
Mobilization/ Demobilization
Payment and Performance Bonds
General Site Preparation
Traffic Control, Barricades,Barriers, and Warning Signs
Temporary Erosion Control
TRANSMISSION DUCT BANK
Duct Bank Conduit
Duct Bank Thermal Concrete
Temporary Construction Facilities
Dewatering
Concrete Parking Lot and Driveway Restoration
Sod Restoration
Hydro-seed Restoration
Trench Safety
DISTRIBUTION DUCT BANK
Duct Bank Conduit (Distribution)
Duct Bank Concrete (Distribution)
Dewatering
8' Wide Concrete Sidewalk, Accessibitility Ramps, and Driveways
Sod Restoration
Trench Safety
PRICES SHALL INCLUDE DELIVERY, FOB DESTINATION
Type of Service or Equipment
Track Excavator
Rubber Tire Front End Loader
Rubber Tire Backhoe
Compactor
Bobcat Skid Steer
12 YD Tandem Dump
Total calendar days after Notice to Proceed is issued by City for project start:
Total calendar after Notice to Proceed is issued by City for substantial completion:
Proposer's Name
Principal Place of Business
Quantity
1
1
1
1
1
496
496
1
1
400
110
6000
496
640
640
1
410
200
640
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Unit
LS
LS
LS
LS
LS
LF
LF
LS
LS
SY
SY
SY
LF
LF
LF
LS
SY
SY
LF
Quantity
1
1
1
1
1
1
Unit Price
BASE TOTAL (FOR EVALUATION)
Unit Price
Extended Price
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Extended Price
0
0
0
0
0
0