6481 - Construction of Cedar Street Parking Lot, 1.Pricing SheetExhibit 1
RFP 6481 - Pricing Sheet for Construction of Cedar Street Parking Lot
The respondent shall complete the following sections highlighted in YELLOW, which directly correspond to the specifications. The contractor shall not make changes to this format.
1
2
3
4
5
Total days from Notice to Proceed to Substatial Completion
Proposal Pricing:
6
7
8
Pricing:
Item #
Section 1: Utilities and Site Prep
1
2
3
4
5
6
7
8
9
10
11
12
Section 2: Hardscape
13
14
15
16
17
18
19
20
16
21
22
23
24
Section 2: Hardscape Continued
25
26
27
28
29
30
31
32
33
34
35
36
Section 3: Softscape
37
38
39
40
41
42
43
44
45
46
47
48
Section 4: Stormwater Mitigation
49
50
51
52
53
54
55
56
Section 5: GreenBlue 'RootSpace' (street tree root protection system)
57
*NOTE: PLEASE EMAIL THIS EXHIBIT 1 AS AN EXCEL FILE TO EBIDS@CITYOFDENTON.COM
Respondent's Name:
Principal Place of Business (City and State)
Respondent is a Corporation, Partnership, sole Proprietorship, Indvidual?
Total calendar days to mobilize after Notice to Proceed is issued by City (maximum 14 days):
Total calendar days after Mobilization on site for substatial completion:
Base Bid amount to construct project per specifications:
Payment and Performance Bonds (enter total cost)
Total Bid amount to construct with bonds (evaluated cost)
Total Pricing in typed words below:
Quantity
1
1
3
600
1.2
2032
2180
670
2
1
5
300
367
92
2980
680
3
1687
450
5
48
608
5354
3
114
4
1
3
2
190
10
2
1
315
6
1
2
79
280
317
9
6
7.2
54
8905
1
1
5090
14
21
9
3
950
63
32
200
1700
5620
UOM
LS
EA
EA
LF
AC
SY
SY
LF
EA
LS
EA
CY
SY
SY
SY
LF
EA
LF
SF
EA
EA
SF
SF
EA
LF
LF
EA
EA
EA
LF
EA
EA
EA
SFF
EA
EA
EA
EA
EA
EA
EA
EA
TONS
CY
SF
EA
LS
SF
EA
CY
CY
EA
SF
CY
CY
LF
SF
CF
Product Description
Traffic Control
Construction Entry
Inlet Protection
Silt Fence
Clearing and Grubbing, Including Tree Removal
Concrete Pvmt/Flatwork/Curb Removal
Asphalt Pvmt/Flatwork/Curb Removal
Demolish Existing Stone Retaining Wall
Remove Grate Inlets
Remove Grease Trap
Catch Basin, Drain Pipe, Detention, Complete in Place
Earthwork, Import
7" Reinforced Concrete Paving - Dumpster Area
8" Reinforced Concrete Paving - Drive Approach
5" Reinforced Concrete Paving - Parking
6" Integral Curb (Including Drainage Flume)
Accessible Ramps
Parking Lot Striping
Accessible Striping and Pedestrian Crosswalk
Accessible Parking Signs
Wheel Stops
Enhanced Paving
4" Reinforced Concrete Paving, Broom Finish (Base Bid Quantity)
Tree wells and Tree Grates
6" Concrete Street Tree Planter Edge
12" Concrete Mow Curb
Bicyle Rack (4 bikes)
Benches
Trash Cans
Ornamental Fence
Ornamental Fence Column
6' Dumpster Enclosure Gate Screen
6' Dumpster Enclosure Side Gate
6' Dumpster Enclosure Wall
6' Dumpster Enclosure Wall Column
Custom Kiosk, Complete in Place
Parking Lot Monument
3 Gal Shrub
1 Gal Shrub
4" Pot - Groundcover
3" Cal. Shade Tree
30 Gal. Ornamental Tree
Limestone Boulder
Rio Grande Cobble - small
Planting Soil
Irrigation Controller, Flow Control
Meter Backflow
Drip Irrigation
Bubblers
Large Gravel, 14" Thick (Infiltration Trench)
Washed Sand, 6" Thick (Infiltration Trench)
Observation Well (Infiltration Trench)
Filter Fabric (Infiltration Trench)
Planting/Infiltration Media, 24" Thick (Bioretention Cell/Planter Box)
Gravel Drainage Layer, 12" Thick (Bioretention Cell/Planter Box)
6" Perferated PVC Pipe(Bioretention Cell/Planter Box)
Geotextile Fabric (Bioretention/Planter Box)
Excavation/Installation/Soil
0
0
0
Unit Price
Subtotal
Subtotal
Subtotal
Subtotal
Total Base Bid:
Extended Price
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0