6481-1 Construction of Cedar Street Parking Lot - Addendum 4 (Replacing Addendum 2) - Pricing Sheet (REVISED4)Exhibit 1 REV-2
RFP 6481 - Pricing Sheet for Construction of Cedar Street Parking Lot
The respondent shall complete the following sections highlighted in YELLOW, which directly correspond to the specifications. The contractor shall not make changes to this format.
1
2
3
4
5
Total days from Notice to Proceed to Substatial Completion
Proposal Pricing:
6
7
8
Pricing:
Item #
Section 1: Utilities and Site Prep
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Section 2: Hardscape
19
20
21
22
23
24
25
26
27
28
29
30
31
32
Section 2: Hardscape, continued
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Section 3: Softscape
49
50
51
52
53
54
55
56
57
58
59
60
Section 4: Stormwater Mitigation
61
62
63
64
65
66
67
68
Section 5: GreenBlue 'RootSpace' (street tree root protection system)
69
*THIS EXHIBIT 1 MUST BE EMAILED AS AN EXCEL FILE TO EBIDS@CITYOFDENTON.COM*
PLEASE NOTE: The quantities indicated on the drawings and in the Technical Specification are believed to be accurate but shall be considered only as estimates. The project requires
complete and functional construction in accordance with the Technical Specifications and Technical Drawings. Differences between the quantities of material required and the estimated
quantities will not be considered as basis for a change in the unit price for the project. In submitting a proposal, the proposer is stating that he has reviewed the project drawings
and specifications and understands their intent and has checked the quantities and dimension and is asserting that the proposal is intended to account for all conditions and quantities
to complete the project as described in the plans and specification.
Respondent's Name:
Principal Place of Business (City and State)
Respondent is a Corporation, Partnership, sole Proprietorship, Indvidual?
Total calendar days to mobilize after Notice to Proceed is issued by City (maximum 14 days):
Total calendar days after Mobilization on site for substatial completion:
Base Bid amount to construct project per specifications:
Payment and Performance Bonds (enter total cost)
Total Bid amount to construct with bonds (evaluated cost)
Total Pricing in typed words below:
Quantity
1
1
8
600
1.2
2032
1752
294
2
1
5
138
224
293
56
1
5
4
367
92
2980
680
3
126
1687
450
5
48
608
5354
3
114
4
1
3
2
190
10
2
1
315
6
1
2
1
315
6
2
79
280
317
9
6
6
54
8905
1
1
5090
14
21
9
3
950
63
32
158
1700
5620
UOM
LS
EA
EA
LF
AC
SY
SY
LF
EA
LS
EA
CY
LF
LF
LF
EA
EA
EA
SY
SY
SY
LF
EA
SF
LF
SF
EA
EA
SF
SF
EA
LF
LF
EA
EA
EA
LF
EA
EA
EA
SFF
EA
EA
EA
EA
SFF
EA
EA
EA
EA
EA
EA
EA
TONS
CY
SF
EA
LS
SF
EA
CY
CY
EA
SF
CY
CY
LF
SF
CF
Product Description
Traffic Control
Construction Entry
Inlet Protection
Silt Fence
Clearing and Grubbing, Including Tree Removal
Concrete Pvmt/Flatwork/Curb Removal
Asphalt Pvmt/Flatwork/Curb Removal
Demolish Existing Stone Retaining Wall
Remove Grate Inlets
Remove Grease Trap
Catch Basin, Drain Pipe, Detention, Complete in Place
Earthwork, Export
6" Storm Drain Pipe
12" Storm Drain Pipe
18" Strom Drain Pipe
Electrical Meter/Connection
Pedestrian Light Pole Fixtures, Footings, Conduit, Wiring
Parking Lot Light Pole Fixtures, Footings, Conduit, Wiring
7" Reinforced Concrete Paving - Dumpster Area
8" Reinforced Concrete Paving - Drive Approach
5" Reinforced Concrete Paving - Parking
6" Integral Curb (Including Drainage Flume)
Accessible Ramps
Truncated Dome Concrete Pavers
Parking Lot Striping
Accessible Striping and Pedestrian Crosswalk
Accessible Parking Signs
Wheel Stops
Enhanced Paving
4" Reinforced Concrete Paving, Broom Finish (Base Bid Quantity)
Tree wells and Tree Grates
6" Concrete Street Tree Planter Edge
12" Concrete Mow Curb
Bicyle Rack (4 bikes)
Benches
Trash Cans
Ornamental Fence
Ornamental Fence Column
6' Dumpster Enclosure Gate Screen
6' Dumpster Enclosure Side Gate
6' Dumpster Enclosure Wall
6' Dumpster Enclosure Wall Column
Custom Kiosk, Complete in Place
6' Dumpster Enclosure Gate Screen
6' Dumpster Enclosure Side Gate
6' Dumpster Enclosure Wall
6' Dumpster Enclosure Wall Column
Parking Lot Monument
3 Gal Shrub
1 Gal Shrub
4" Pot - Groundcover
3" Cal. Shade Tree
30 Gal. Ornamental Tree
Limestone Boulder
Rio Grande Cobble - small
Planting Soil
Irrigation Controller, Flow Control
Meter Backflow
Drip Irrigation
Bubblers
Large Gravel, 14" Thick (Infiltration Trench)
Washed Sand, 6" Thick (Infiltration Trench)
Observation Well (Infiltration Trench)
Filter Fabric (Infiltration Trench)
Planting/Infiltration Media, 24" Thick (Bioretention Cell/Planter Box)
Gravel Drainage Layer, 12" Thick (Bioretention Cell/Planter Box)
6" Perferated PVC Pipe(Bioretention Cell/Planter Box)
Geotextile Fabric (Bioretention/Planter Box)
Excavation/Installation/Soil
0
0
0
Unit Price
Subtotal
Subtotal
Subtotal
Subtotal
Total Base Bid:
Extended Price
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0