6509 - Mockingbird Lane Reconstruction, Tabulation SheetIFB 6509 - Tabulation for Mockingbird Lane Reconstruction
i
ii
iii
iv
v
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Item
28
29
30
31
32
Item
33
34
35
36
Respondent's Name:
Principal Place of Business (City and State):
Respondent is a Corporation, Partnership, Sole Proprietorship, Individual?
Total calendar days after Notice to Proceed is issued by City for substantial completion of Base Bid (Maximum of 105):
Total calendar days after Notice to Proceed is issued by City for project start:
BASE BID
Description
General
Surety Bonds
Mobilization/Demobilization
Temporary Erosion Control
General Site Preparation
Barricades, Signs and Traffic Control
Project Signs
Demolition
Remove Concrete Curb and Gutter
Remove Concrete Sidewalks and Ramps
Remove and Replace Sidewalk Expansion Joints
Remove Concrete Drive Approach
Remove Small Signs and Replace
Remove Concrete Valley Gutter and Aprons
Remove Drop Inlet Structure
Remove Asphalt Pavement
Reconstruction
8" Lime Subgrade Treatment
Lime at 7% (46 lbs/SY)
3" Type C Surface (PG 64-22)
6" Type B Base (PG 64-22)
6" Curb and 18" Gutter
4" Concrete Sidewalk
5' Wide Type 1 Ramp (5' Long)
5' Wide Type 1 Ramp (6' Long)
5' Wide Type 1 Ramp (7' Long)
5' Wide Type 1 Ramp (8' Long)
5' Wide Type 1 Ramp (9' Long)
5' Wide Type 1 Ramp (10' Long)
9" Concrete Pavement (6-Sack, High Early Strength)
Description
8" Concrete Pvmt (Intersection Radius and Valley Gutter)
6" Concrete Drive Approach
Concrete Solid Tapered Nose
Bermuda Solid Sod
Concrete Flume
Drainage
10' Standard Inlet
10' Curb Inlet w/Back Opening
18" Storm RCP
24" Storm RCP
Quantity
1
1
1
1
1
2
1825
5165
100
3883
4
1660
2
14000
Quantity
14200
330
13614
13614
2840
3844
3
1
2
1
1
2
130
Quantity
250
450
12
600
33
Quantity
1
2
33
39
Unit
LS
LS
LS
LS
LS
EA
LF
SF
SF
SF
EA
SF
EA
SY
Unit
SY
TONS
SY
SY
LF
SF
EA
EA
EA
EA
EA
EA
SY
Unit
SY
SY
EA
SY
LF
Unit
EA
EA
LF
LF
The LANE Construction Corporation
Justin, TX
Corporation
105
20
Unit Price
4900
20000
11500
32500
63000
650
21.5
1.75
10
1.5
100
1.5
1500
7
Unit Price
7.25
160
11.5
23
20
6
1450
1500
1525
1550
1600
1800
77.5
Unit Price
65
62
1000
7.5
41
Unit Price
4000
3900
85
100
Total Base Bid
Total
4900
20000
11500
32500
63000
1300
39237.5
9038.75
1000
5824.5
400
2490
3000
98000
Total
102950
52800
156561
313122
56800
23064
4350
1500
3050
1550
1600
3600
10075
Total
16250
27900
12000
4500
1353
Total
4000
7800
2805
3900
1103720.75
JAGOE-PUBLIC COMPANY
DENTON, TEXAS
CORPORATION
105
14
Unit Price
16500
110000
45000
40000
60000
360
10
4
50
5
675
4.75
1850
5.75
Unit Price
3.65
155
10.25
19.25
23
7.5
1900
1900
1920
1920
1930
2100
89
Unit Price
88
62
610
8.6
90
Unit Price
6500
6400
260
330
Total Base Bid
Total
16500
110000
45000
40000
60000
720
18250
20660
5000
19415
2700
7885
3700
80500
51830
51150
139543.5
262069.5
65320
28830
5700
1900
3840
1920
1930
4200
11570
22000
27900
7320
5160
2970
6500
12800
8580
12870
1166233
Quality Excavation, LTD
Aubrey, Texas
Partnership
105
Will start on day of Notice to Proceed
Unit Price
29340
65620
9860
16975
13820
700
3.6
1.4
11
1.4
875
2.25
870
7.4
Unit Price
8.95
168
12.9
25.6
50.25
6.3
1175
1275
1375
1375
1625
1775
84
Unit Price
72.3
72.3
914
8.1
58
Unit Price
11000
11000
238
227
Total Base Bid
Total
29340
65620
9860
16975
13820
1400
6570
7231
1100
5436.2
3500
3735
1740
103600
127090
55440
175620.6
348518.4
142710
24217.2
3525
1275
2750
1375
1625
3550
10920
18075
32535
10968
4860
1914
11000
22000
7854
8853
1286602.4
Oldcastle Materials Texas, Inc. dba TexasBit
Irving, Texas
Corporation
100
14
Unit Price
2736.84
107503.01
4000
44658.3
12105.2
1578.95
8.95
2.1
27.11
4.95
631.58
4.47
1263.16
8.79
Unit Price
9.11
159.09
14.3
26.56
30
8.94
1315.78
1736.8
1947.36
2289.47
2421.05
3947.36
197.36
Unit Price
160.78
116.05
1000
5.42
54.47
Unit Price
5789.47
6315.79
204.56
249.5
Total Base Bid
Total
2736.84
107503.01
4000
44658.3
12105.2
3157.9
16333.75
10846.5
2711
19220.85
2526.32
7420.2
2526.32
123060
129362
52499.7
194680.2
361587.84
85200
34365.36
3947.34
1736.8
3894.72
2289.47
2421.05
7894.72
25656.8
40195
52222.5
12000
3252
1797.51
5789.47
12631.58
6750.48
9730.5
1408711.23
IFB 6509 - Pricing Sheet for Mockingbird Lane Reconstruction
The respondent shall complete the following section, which directly corresponds to the specifications. The contractor shall not make changes to this format.
i
ii
iii
iv
v
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Item
28
29
30
31
32
Item
33
34
35
36
Respondent's Name:
Principal Place of Business (City and State):
Respondent is a Corporation, Partnership, Sole Proprietorship, Individual?
Total calendar days after Notice to Proceed is issued by City for substantial completion of Base Bid (Maximum of 105):
Total calendar days after Notice to Proceed is issued by City for project start:
BASE BID
Description
General
Surety Bonds
Mobilization/Demobilization
Temporary Erosion Control
General Site Preparation
Barricades, Signs and Traffic Control
Project Signs
Demolition
Remove Concrete Curb and Gutter
Remove Concrete Sidewalks and Ramps
Remove and Replace Sidewalk Expansion Joints
Remove Concrete Drive Approach
Remove Small Signs and Replace
Remove Concrete Valley Gutter and Aprons
Remove Drop Inlet Structure
Remove Asphalt Pavement
Reconstruction
8" Lime Subgrade Treatment
Lime at 7% (46 lbs/SY)
3" Type C Surface (PG 64-22)
6" Type B Base (PG 64-22)
6" Curb and 18" Gutter
4" Concrete Sidewalk
5' Wide Type 1 Ramp (5' Long)
5' Wide Type 1 Ramp (6' Long)
5' Wide Type 1 Ramp (7' Long)
5' Wide Type 1 Ramp (8' Long)
5' Wide Type 1 Ramp (9' Long)
5' Wide Type 1 Ramp (10' Long)
9" Concrete Pavement (6-Sack, High Early Strength)
Description
8" Concrete Pvmt (Intersection Radius and Valley Gutter)
6" Concrete Drive Approach
Concrete Solid Tapered Nose
Bermuda Solid Sod
Concrete Flume
Drainage
10' Standard Inlet
10' Curb Inlet w/Back Opening
18" Storm RCP
24" Storm RCP
Note: Please email this Exhibit 1 as an Excel file to ebids@cityofdenton.com
Quantity
1
1
1
1
1
2
1825
5165
100
3883
4
1660
2
14000
Quantity
14200
330
13614
13614
2840
3844
3
1
2
1
1
2
130
Quantity
250
450
12
600
33
Quantity
1
2
33
39
Unit
LS
LS
LS
LS
LS
EA
LF
SF
SF
SF
EA
SF
EA
SY
Unit
SY
TONS
SY
SY
LF
SF
EA
EA
EA
EA
EA
EA
SY
Unit
SY
SY
EA
SY
LF
Unit
EA
EA
LF
LF
Unit Price
Unit Price
Unit Price
Unit Price
Bid Bond / Cashiers Check
Total Base Bid
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
0
0
0
0
0
Total
0
0
0
0
0
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
0
0
0
0
0
Total
0
0
0
0
0
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
0
0
0
0
0
Total
0
0
0
0
0
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
0
0
0
0
0
Total
0
0
0
0
0
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
0
0
0
0
0
Total
0
0
0
0
0