6283C - Construction of Denton Regional Public Safety Training Facility, Addendum 2 (2)
November 18, 2016
Project: Denton Regional Public Safety and Training Facility – Phase 1
PGAL Project No.: 518.07016.00
ADDENDUM NO. 2
This Addendum forms a part of the Contract Documents and modifies them as noted below.
Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do
so may subject Bidder to disqualification.
This Addendum consists of twenty-two (22) pages and the following attachments, revised
November 18, 2016:
· Section 012300 - Alternates
· Civil Drawing Sheets: 1.00, C2.00, C3.00, C3.01, C4.00, C4.01, C5.00, C6.00, C7.00,
C7.01
· Architectural Drawing Sheets: G0.03, BT3.01, OC3.00
· Mechanical, Electrical and Plumbing Drawing Sheets: MEP101, OCMEP201
· Plumbing Drawing Sheets: P301, P401
· Electrical Drawing Sheets: E401
CLARIFICATIONS
REQUEST FOR INFORMATION - QUESTIONS AND ANSWERS
None to Date
APPROVED SUBSTITUTIONS
Subject to compliance with specified requirements, the following manufacturers and/or
products are approved. Submittals indicating compliance shall be submitted in accordance
with Sections 013300 and 016000.
Item 2.1 Section 126723 Benches - CBS Constructors
REFER TO PROJECT MANUAL
Item 2.2 Insert the attached “Section 012300 – Alternates” in the Project Manual.
DPSTF - Phase 1 ADDENDUM NO. 2 Page 2 of 3
REFER TO DRAWINGS
SHEET C1.00 – PAVING PLAN
Item 2.3 Added an accessible route connecting from the drive to the building and along the
west, south and east façades of the building.
Item 2.4. Revised note specifying Contractors responsibilities pertaining to removing,
transporting and assembling the Conex Containers. Reference Keynote 4.
SHEET C2.00 – GRADING PLAN
Item 2.5 Revised Keyed notes No’s 1- 4
Item 2.6 Added accessible route at Outdoor Classroom.
SHEET C3.00 – PRE-DEVELOMENT DRAINAGE MAP
Item 2.7 Insert the new drawing sheet.
SHEET C3.01 – POST DEVELOPMENT DRAINAGE MAP
Item 2.8 Insert the new drawing sheet.
SHEET C4.00 – WATER AND SANITARY SEWER PROFILE
Item 2.9 Revised per the City’s Comments
SHEET C5.00 – EROSION CONTROL
Item 2.10 Insert the new drawing sheet.
SHEET C6.00 – GENERAL NOTES
Item 2.11 Insert the new drawing sheet.
SHEET C7.00 – DETAIL SHEET
Item 2.12 Added concrete sidewalk detail.
SHEET C7.01 – DETAIL SHEET
Item 2.13 Insert the new drawing sheet.
SHEET G0.03 – OUTDOOR CLASSROOM BUILDING CODE ANALYSIS
Item 2.14 Occupant load has been revised.
Item 2.15 Drinking Fountains have been added to the Plumbing Systems Fixture Count.
SHEET BT3.01– BURN TOWER CONCRETE STAIR SECTIONS
Item 2.16 Added Hi / Lo drinking fountains with a bottle filler at the east façade.
SHEET OC3.00– OUTDOOR CLASSROOM
Item 2.17 Added an accessible route connecting from the drive to the building and along the
west, south and east façades of the building.
Item 2.18 Added Hi / Lo drinking fountains with a bottle filler at the east façade.
DPSTF - Phase 1 ADDENDUM NO. 2 Page 3 of 3
SHEET MEP 1.01 – MEP SITE PLAN
Item 2.19 The transformer has been located per the requested location from the Building
Permit review comments.
Item 2.20 The primary connection cabinet at the edge of the right-of-way has been shown
and the primary electric line has been rerouted to this location.
Item 2.21 A four-inch conduit stub out has been provided to the north as requested in the
Building Permit review comments. Reference keynote 17.
Item 2.22 Added a stub out for future electric service to Administration building. Reference
Keynote 18.
Item 2.23 A four-inch conduit stub out has been provided to the south as requested in the
Building Permit review comments. Reference keynote 17.
END OF ADDENDUM NO. 2