Loading...
6592 - Services for the JD Edwards 9.2 Upgrade, Addendum 1 Materials Management Department 901-B Texas Street Denton, Texas 76209 ADDENDUM #1 REQUEST FOR PROPOSALS RFP 6592 The City of Denton is seeking the best value solution for the: Supply of Services for the “JD Edwards 9.2 Upgrade” NIGP CLASS and ITEM 209 11 209 37 920 00 Issue Date: October 26, 2017 Response due Date and Time (Central Time): Thursday, November 16, 2017, 11:00 A.M. C.S.T The City highly recommends that respondents do not wait until minutes before the due date and time to email a submission. It can take significant time for the submissions to reach the City. ADDENDUM #1 RFP# 6592 SUPPLY OF SERVICES FOR THE “JD EDWARDS 9.2 UPGRADE “ 1 RFP#6592- ADDENDUM #1 1. Can I get a list of Attendees for the Prebid Conference? Yes, please see attached. 2a) We would like to understand the integrations with any upstream or downstream systems. Are those 3rd party integrations taken care by COD IT or part of this technical upgrade? Most of our integrations are pushing and pulling of Flat files. Internally we have database connections into third party software. Integrations or interfaces will be handled by COD 2b) Can you please share as-is architectural diagram showing all these integration points. Current integration are via windows 2012 R2 server. Most are launched windows Scheduled tasks, and the scripts are a mixture of PL/SQL, bat files and power shell 3a) Please provide details of existing customizations / standard JDE object customization? Sales order P564210 - copy and modify of "P4210" where we have added the account number. 3b) Are there any pain areas/limitations in existing objects, which need to be resolved by new JDE E1 9.2 System? We are not addressing any changes at this time outside of those specified in the SOW (Mobility Gateway, Up to 5 Role based UXONE instances. 4. Can you please provide the number of RICE (reports, interfaces, conversions, and enhancements) components for our effort estimate? Answer not available at time of publishing. 5a). Is security redesign a part of the upgrade project? No 5b). What is the current access protocol? On site, unsure of this question. ADDENDUM #1 RFP# 6592 SUPPLY OF SERVICES FOR THE “JD EDWARDS 9.2 UPGRADE “ 2 RFP#6592- ADDENDUM #1 6. Is migrating entire data of 9.1 is in scope or is there any cutoff to number of years of data migrated? We are planning to do data clean up and archive prior to migration. 7. Is BI Publisher being currently used? If not, is there an interest to review it for your needs in future? a) No. b) Not planned at this time. 8. Is the City of Denton concerned about offshoring (we do not do that) but more importantly maybe having data leave the US and go offshore? We will not be offshoring data, prefer resources on site. 9. Having trouble finding section 2 - of RFP #6592 Exhibit 1 A, "The contractor may also list additional services in Section 2 that may be beneficial to the requested services". I believe this is talking about the Specifications listed on Tab B, “Additional Required Info B” of Exhibit 1 workbook. If not, under “Respondent A”, of Exhibit 1Workbook, there is a section labeled Alternative Fixed Costs Proposal. 10. How many modified objects in JDE which need to be retrofit from 9.1 to 9.2? One. 11. Do you want a price quote on development retrofits? Retrofits would be priced separately. 12a). How many interfaces are connected to JDE? See question #10 12b) What types of interfaces? ODBC, Flat File ADDENDUM #1 RFP# 6592 SUPPLY OF SERVICES FOR THE “JD EDWARDS 9.2 UPGRADE “ 3 RFP#6592- ADDENDUM #1 13. We have reviewed the document and the only question I have is that one of the “project assumptions” is that the partner must be a minimum Platinum Oracle Partner. We are a Gold Oracle Partner. Will we still be allowed to participate? We are removing the Platinum Level Partner requirement – Silver Level is the new requirement based on the services we are looking for. 14. 15. Is this RFP for time and materials or just Services? Both. 16. Per Notes, it says Sheree is removing Oracle partner? Making it a silver partner? We are removing the Platinum Level Partner requirement – Silver Level is the new requirement based on the services we are looking for. 17. What are we looking for in Services? Someone to partner with expertise to work alongside our engineer? Yes – we are looking for experienced JDE talent to work hands on with our team. The SME would be the technical expert, guiding the team on the activities and working alongside them. 18. How many licenses are you planning? Do not understand the relevancy. NO OTHER CHANGES AT THIS TIME All Documents can be obtained by accessing the City of Denton’s Materials Management website at: ADDENDUM #1 RFP# 6592 SUPPLY OF SERVICES FOR THE “JD EDWARDS 9.2 UPGRADE “ 4 RFP#6592- ADDENDUM #1 https:// www.cityofdenton.com/business/soliciations-contracting This form must be signed and returned with your proposal. Name: ____________________________________ Signature: _________________________________ Company: __________________________________ Title: _____________________ Date: ____________ Addendum #1 to be returned with Proposal