Loading...
6646 - Fiber Optic Cable Installation Services, 1.Pricing SheetExhibit 1 -RFP 6646 - Pricing Sheet for Fiber Optic Installation Services The respondent shall complete the following section, which directly corresponds to the specifications. The contractor shall not make changes to this format. Services Proposal Pricing to include all costs including but not limited to labor, supervision and equipment: ITEM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 ESTIMATED TOTAL ANNUAL COST Traffic Operations ITS Fiber Project Phase 1 39 40 Estimated Annual Quantity 5000 50000 1 1 1 1 1 1 1 1 1 1 1 1 1 1 50000 5000 50000 600 20 50 10 25 10 10 300 10000 10000 10000 10000 1 1 1 1 10 5 1 1 1 UOM FT FT Per Splice 12 Fibers Per Splice 72 Fibers Per Splice 144 Fibers EA EA Reel Reel Per Splice 12 Fibers Per Splice 72 Fibers Per Splice 144 Fibers EA EA Reel Reel ft ft ft hr hr hr hr hr hr hr ft ft ft ft ft ft ft ft ft hr hr hr Type of Service Requested Installation of fiber optic cable on utility poles per DME guidelines. All manufactures requirements for installation of fiber optic cable shall be met. Installation of fiber optic cable in existing conduit. All manufactures requirements for installation of fiber optic cable shall be met. ADSS Fiber Splicing (Traffic supplying Enclosure and all supplies, not equipment) per manufacturers recommendations ADSS Fiber Splicing (Traffic supplying Enclosure and all supplies, not equipment) per manufacturers recommendations ADSS Fiber Splicing (Traffic supplying Enclosure and all supplies, not equipment) per manufacturers recommendations ADSS Fiber Cable Prep ADSS Enclosure Prep ADSS 72 Fiber Reel Test and Verification . Documentation of every fiber ADSS 144 Fiber Reel Test and Verification . Documentation of every fiber Altos Fiber Splicing (Traffic supplying Enclosure and all supplies, not equipment) per manufacturers recommendations Altos Fiber Splicing (Traffic supplying Enclosure and all supplies, not equipment) per manufacturers recommendations Altos Fiber Splicing (Traffic supplying Enclosure and all supplies, not equipment) per manufacturers recommendations Altos Fiber Cable Prep Altos Enclosure Prep Altos 72 Fiber Reel Test and Verification . Documentation of every fiber Altos 144 Fiber Reel Test and Verification . Documentation of every fiber Installation of Pull Tape in existing conduit Rodding existing conduit Installation of Trace wire in existing conduit per Traffic's requirements. 1 man crew to perform small maintinance jobs 1 man crew with Bucket to perform small maintinance jobs 2 man crew to perform small maintinance jobs 2 man crew with bucket to perform small maintinance jobs 3 man crew to perform small maintinance jobs 3 man crew with bucket to perform small maintinance jobs 3 man crew with backhoe to perform small maintinance jobs Trenching 2 inch typical 48" depth Installation of 2" PVC conduit in open trench Boring 2" typical 48" depth Boring (2) 2" typical 48" depth in same bore Installation of 2" PVC conduit in bore Trenching 4 inch typical 48" depth Installation of 4" PVC conduit in open trench Boring 4" typical 48" depth Installation of 4" PVC conduit in bore Emergency Services (minimum 4 hours) 1 man crew Emergency Services (minimum 4 hours) 2 man crew Emergency Services (minimum 4 hours) 3 man crew Complete build out of Denton ITS Fiber Network Project Phase 1 per plans. Traffic supplying Enclosure and all supplies, not equipment Complete build out of Denton ITS Fiber Network Project Phase 1 per plans. Contractor supplies all material per approved City Standards. Respondent Company Name: Principal Place of Business (City,ST) City of Denton requested completion schedule 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 1 week notification of work 1 week notification of work 1 week notification of work 1 week notification of work 1 week notification of work 1 week notification of work 1 week notification of work 1 week notification of work 1 week notification of work 1 week notification of work 1 week notification of work 1 week notification of work 1 week notification of work 1 week notification of work 1 week notification of work 1 week notification of work 1 week notification of work 1 week notification of work 2HR Response 3HR Response 4HR Response 120 days 120 days City of Denton Recommended installation time 2000 ft per day/ straight pull 2000 ft per day/ straight pull 24 per day 72 per day 72 per day 1hr 2hr 1 day 1 day 24 per day 72 per day 72 per day 1hr 2hr 1 day 1 day Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion 200 ft per day / straight run 200 ft per day / straight run 200 ft per day / straight run 200 ft per day / straight run 200 ft per day / straight run 200 ft per day / straight run 200 ft per day / straight run 200 ft per day / straight run Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Cost of Service 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Estimated Annual Total Cost 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0