Loading...
6400 - Computer Aided Dispatch Sys, Mobile Data Sys, Law Records Mgmt Sys & Fire Records Mgmt Sys, 3.Statement of Work/ Specifications (16) RFP# 6400 PD FIRE CAD MDS RMS FRMS CITY OF DENTON EXHIBIT 3-1 City of Denton RFP #6400 Exhibit 3-1: Respondent Compliance Matrix SectionSection HeaderBidder Response The response Comply indicates the Bidder has read and understands the referenced section of the RFP Select from Drop Down 3.1 Purpose Select from Drop Down 3.2 Background Select from Drop Down 3.3 PSAP Environment Select from Drop Down Table 3-2 Required interfaces Section 3.4 - Project Expectations Select from Drop Down 3.4 (A) Tested and operational systems Select from Drop Down 3.4 (B) Virtual environment Select from Drop Down 3.4 (C) Software license termination Select from Drop Down 3.4 (D) Software escrow account Select from Drop Down 3.4 (E) Licensing options Select from Drop Down 3.4 (F) Data dictionary Select from Drop Down 3.4 (G) APCO ANS 1.110.102015 standard Select from Drop Down 3.4 (H) LEITSC Record Management System V.2 Section 3.5 - System Configuration 3.5Select from Drop Down Figure 3-1 Public Safety network diagram Section 3.6 - Respondent Characteristics 3.6Respondent minimum qualificationsSelect from Drop Down 3.6.1Respondent required experienceSelect from Drop Down Section 3.7 - Commitment to Use Case Demonstrations 3.7Use Case explanations and demonstrationsSelect from Drop Down Section 3.8 - Mandatory Technical Requirements 3.8.1RFP Exhibit 3 Attachments 1 through 7Select from Drop Down 3.9.2Explanation of Clarifications and ExceptionsSelect from Drop Down Section 3.9- Project Management Methodology 3.90Project management methodologySelect from Drop Down Section 3.10 - Project Communications 3.1Communications managementSelect from Drop Down Section 3.11 - Implementation Staff 3.11Proposed implementation staffSelect from Drop Down Section 3.12 - Training 3.12.1Training GuidelinesSelect from Drop Down 3.12.2Test and Training EnvironmentsSelect from Drop Down Section 3.13 - System Documentation 3.13System documentationSelect from Drop Down RFP# 6400 PD FIRE CAD MDS RMS FRMS CITY OF DENTON EXHIBIT 3-1 Section 3.14 - Data Migration Select from Drop Down 3.14Data migration and conversion Section 3.15 - General Maintenance Provisions 3.15Maintenance and support provisions Select from Drop Down Section 3.16 - System Maintenance and Support 3.16Warranty, maintenance, and support Select from Drop Down Section 3.17 - Failover Solution and File Back-up/File Recovery 3.17Redundancy and resiliency solutionSelect from Drop Down Section 3.18 - Hardware Requirements 3.18Provision of hardware and specificationsSelect from Drop Down Section 3.19 - General System Requirements 3.19.1System designSelect from Drop Down 3.19.2Virtualized Server EnvironmentSelect from Drop Down 3.19.3Service related to software installationSelect from Drop Down 3.19.4Standard operating systems and other softwareSelect from Drop Down 3.19.5NetworkingSelect from Drop Down Section 3.20 - Host Server Requirements 3.20.1Hardware requirementsSelect from Drop Down 3.20.2Concurrent system operationsSelect from Drop Down Section 3.21 - Application Virtual Server Definition and Requirements Virtual machine configuration 3.21Select from Drop Down Section 3.22 - End-User Workstation Requirements Desktop hardware and software 3.22.1Select from Drop Down Mobile computer hardware and software 3.22.2Select from Drop Down Tablet and smartphone devices 3.22.3Select from Drop Down Section 3.23 - Performance Requirements Performance related requirements 3.23Select from Drop Down Section 3.24 - Testing Performance criteria and test plans 3.24Select from Drop Down Section 3.25 - Functional Acceptance Testing Functional acceptance testing (FAT) procedures 3.25Select from Drop Down Section 3.26 - Integration Testing 3.26Select from Drop Down Vendor shall demonstrate that interfaces are functional Section 3.27 - Initial System Acceptance 3.27Select from Drop Down Agreement of initial system acceptance (ISA) Section 3.28 - Go-Live and 45 Day Reliability Test 3.28Select from Drop Down 45 day performance test period Section 3.29- Final Acceptance Testing 3.29Select from Drop Down Final system acceptance Section 3.30 - Ongoing System Performance RFP# 6400 PD FIRE CAD MDS RMS FRMS CITY OF DENTON EXHIBIT 3-1 3.30Select from Drop Down Ongoing system performance Section 3.31 - System Performance Profile 3.31Select from Drop Down Performance criteria A through F 3.31.1Select from Drop Down System response times 3.31.1.1Select from Drop Down Transaction maximum response times 3.31.1.2Select from Drop Down Transaction times for CAD and MDS 3.31.2Select from Drop Down Transaction maximum response times for LERMS and FRMS 3.31.3Select from Drop Down Computer system availability Section 3.32 - Support and Maintenance Requirements 3.32Select from Drop Down Basic support for covered applications Section 3.33- Software Errors 3.33Select from Drop Down Correction of software malfunctions Section 3.34 - Error Reporting Error reporting and classification 3.34Select from Drop Down Section 3.35 - Technical Support Center 24x7x 365 telephone support and assistance 3.35Select from Drop Down Section 3.36 - Software Malfunction Severity Level Definitions Severity level 1 definition 3.36.1Select from Drop Down Severity level 2 definition 3.36.2Select from Drop Down Severity level 3 definition 3.36.3Select from Drop Down Severity level 4 definition 3.36.4Select from Drop Down Workaround definition 3.36.5Select from Drop Down Section 3.37 - Escalation 3.37Select from Drop Down Escalation policies and procedures Section 3.38 - Response Time Credits 3.38Select from Drop Down Maintenance and response credits Section 3.39 - Confidentiality and Security CJIS Security Policy requirements 3.39Select from Drop Down Section 3.40 - Delays 3.40 Implementation status reporting and alternative procurementSelect from Drop Down Section 3.41- Delivery Failures Remedies for delivery failure 3.41Select from Drop Down